A method and system for monitoring ship berthing at a dock around the clock and in all weather conditions

By calculating the ship's deflection and ship speed evaluation coefficient, it realizes all-day and all-weather ship berthing monitoring, solves the problem of blind spots in traditional methods of monitoring in bad weather or at night, and improves safety and early warning accuracy.

CN118571071BInactive Publication Date: 2024-10-11YANTAI PORT GRP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411059853.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional ship berthing monitoring is ineffective in bad weather or night conditions, resulting in blind spots in monitoring and the inability to detect abnormal ship conditions in a timely manner, resulting in loss of life and property.

Method used

By collecting the basic information and environmental information of the ship, calculating the offset evaluation coefficient and ship speed evaluation coefficient, obtaining the safety evaluation coefficient, making real-time safety judgments and outputting early warning strategies, ensuring all-day and all-weather monitoring and alarms.

Benefits of technology

It effectively reduces the losses caused by the ship's inability to timely alarm in abnormal conditions, and improves the safety and early warning accuracy of the dock area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118571071B_ABST
    Figure CN118571071B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for monitoring ship berthing at a dock all day and all weather, and relates to the field of monitoring and analysis technology, which includes collecting basic information corresponding to each ship, confirming the target berthing area corresponding to each ship at the target dock; confirming the line information corresponding to each ship, confirming the offset information corresponding to each ship within a preset monitoring time period, and obtaining the offset assessment coefficient corresponding to each ship; collecting environmental information on the line information corresponding to each ship in real time, confirming the ship speed impact index corresponding to the ship, and confirming the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to the ship; obtaining the offset assessment coefficient and the ship speed assessment coefficient corresponding to each ship, calculating and obtaining the safety assessment coefficient corresponding to each ship, making a judgment on the safety of each ship and confirming the judgment result, and performing different safety early warning strategies on each ship based on the judgment result. The present invention has the effect of improving the safety of ships.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of monitoring and analysis, and in particular to a method and system for monitoring ship berthing at a dock around the clock and in all weather conditions. Background Art

[0002] In the related technologies, traditional ship berthing monitoring mainly relies on artificial vision and simple monitoring equipment, but it is not effective in severe weather or night conditions, which can easily cause monitoring blind spots. In addition, the ship's moving status is not analyzed in severe weather or night conditions, and when the ship is in an abnormal state, an alarm cannot be issued in time, resulting in serious loss of life and property. There is room for improvement. Summary of the invention

[0003] In view of the deficiencies of the prior art, the present invention provides a method and system for monitoring ship berthing at a dock around the clock and in all weather conditions.

[0004] In a first aspect, the present invention provides a method for monitoring ship berthing at a dock around the clock and in all weather conditions, comprising the following steps:

[0005] Collecting basic information corresponding to each ship, including the ship type and stay duration corresponding to each ship, and confirming the target berthing area corresponding to each ship at the target terminal based on the basic information corresponding to each ship;

[0006] Confirming the route information corresponding to each ship based on the berthing area corresponding to each ship at the target wharf, and confirming the offset information corresponding to each ship within a preset monitoring time period, and then obtaining the offset assessment coefficient corresponding to each ship based on the offset information corresponding to each ship;

[0007] Collecting environmental information on the route information corresponding to each ship in real time, and confirming the ship speed impact index corresponding to the ship based on the environmental information, and confirming the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to the ship;

[0008] Obtain the offset assessment coefficient and ship speed assessment coefficient corresponding to each ship, calculate the safety assessment coefficient corresponding to each ship, judge the safety of each ship based on the safety assessment coefficient corresponding to each ship and confirm the judgment result, and implement different safety warning strategies for each ship based on the judgment result.

[0009] Preferably, confirming the target berthing area corresponding to each ship at the target wharf based on the basic information corresponding to each ship specifically includes:

[0010] Extract the ship type and stay duration corresponding to each ship from the basic information corresponding to each ship;

[0011] Confirming the first berthing area corresponding to each ship based on the ship type corresponding to each ship, comparing the stay time corresponding to each ship with a preset stay time threshold, and confirming the second berthing area corresponding to each ship;

[0012] The berthing area corresponding to each ship is confirmed based on the first berthing area and the second berthing area corresponding to each ship, and the berthing area is marked as a target berthing area.

[0013] Preferably, confirming the offset information corresponding to each ship within a preset monitoring time period specifically includes:

[0014] Obtain the real-time location information of each ship based on the route information of each ship , and obtain the actual position information of each ship through the positioning device ,in, Indicates the number corresponding to each ship, ;

[0015] By formula , confirm the real-time offset distance corresponding to each ship ,in, Expressed as Correction coefficient of real-time offset distance corresponding to each ship;

[0016] The real-time offset distance corresponding to each ship The deviation from the preset threshold Make a comparison;

[0017] If there is a real-time offset distance corresponding to the ship When the ship reaches the corrected route, a prompt for corrected route is output to the ship, and offset information is marked, wherein the offset information includes the number of offsets and the offset time corresponding to each offset.

[0018] Preferably, obtaining the offset assessment coefficient corresponding to each ship based on the offset information corresponding to each ship specifically includes:

[0019] Obtain the offset times corresponding to each ship based on the offset information corresponding to each ship The offset time corresponding to each offset ,in, ;

[0020] By calculating the formula , and obtain the offset assessment coefficient corresponding to each ship ,in, Indicated as number The preset arrival time interval corresponding to the ships.

[0021] Preferably, confirming the ship speed impact index corresponding to the ship based on the environmental information, and confirming the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to each ship, specifically includes:

[0022] Confirm the environmental information on the route information corresponding to each ship, the environmental information includes water flow speed and wind speed , and then through the formula , calculate the corresponding ship speed impact index ,in, The speed change vectors of the preset unit water velocity and unit wind velocity to the ship velocity are respectively represented;

[0023] Check the real-time speed of each ship through the basic information of each ship ;

[0024] By formula , calculate the speed assessment coefficient corresponding to each ship ,in, Indicates the preset reference speed.

[0025] Preferably, the safety assessment coefficient corresponding to each ship is calculated, specifically including:

[0026] The deviation assessment coefficient corresponding to each ship and ship speed assessment factor Substitute into the formula , and obtain the corresponding safety assessment factor for each ship ,in, They are respectively expressed as the weight coefficients corresponding to the offset assessment coefficient and the ship speed assessment coefficient.

[0027] Preferably, the safety of each ship is judged based on the safety assessment coefficient corresponding to each ship and the judgment result is confirmed, and different safety warning strategies are implemented for each ship based on the judgment result, specifically including:

[0028] Confirm the safety assessment factor corresponding to each ship , and the safety assessment factor corresponding to each ship The preset safety assessment threshold range For comparison, Denotes the first safety assessment threshold, It is represented as the second safety assessment threshold;

[0029] If the safety assessment factor corresponding to the ship Less than , it is determined that the ship is operating normally and no measures need to be taken, and monitoring should continue;

[0030] If the safety assessment factor corresponding to the ship In If the ship is abnormally operating, a first-level warning is output to the ship control terminal;

[0031] If the safety assessment factor corresponding to the ship Beyond , it is determined that the ship is operating abnormally and a level 2 warning is output to the ship control terminal.

[0032] Preferably, after obtaining the safety assessment coefficient corresponding to each ship, the method further includes:

[0033] By formula , calculate the safety risk coefficient corresponding to the target area ;

[0034] The safety risk factor corresponding to the target area Compared with the preset security risk threshold Make a comparison;

[0035] like , it is determined that there is danger in the target area, and a first warning instruction is output to each ship control terminal in the target area; otherwise, a second warning instruction is output to each ship control terminal in the target area.

[0036] In a second aspect, the present invention provides a 24 / 7 all-weather dock ship berthing monitoring system, comprising:

[0037] The target berthing area confirmation module is used to collect basic information corresponding to each ship, including the ship type and stay duration corresponding to each ship, and confirm the target berthing area corresponding to each ship at the target terminal based on the basic information corresponding to each ship;

[0038] The deviation evaluation coefficient analysis module is used to confirm the route information corresponding to each ship based on the berthing area corresponding to each ship at the target terminal, and confirm the deviation information corresponding to each ship within a preset monitoring time period, and then obtain the deviation evaluation coefficient corresponding to each ship based on the deviation information corresponding to each ship;

[0039] The ship speed assessment coefficient analysis module is used to collect the environmental information on the route information corresponding to each ship in real time, and confirm the ship speed impact index corresponding to the ship based on the environmental information, and confirm the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to the ship;

[0040] The early warning module is used to obtain the deviation assessment coefficient and ship speed assessment coefficient corresponding to each ship, calculate the safety assessment coefficient corresponding to each ship, judge the safety of each ship based on the safety assessment coefficient corresponding to each ship and confirm the judgment result, and implement different safety early warning strategies for each ship based on the judgment result.

[0041] In summary, the present invention includes at least one of the following beneficial technical effects:

[0042] (1) The present invention provides a method for monitoring ship berthing at a dock around the clock and in all weather conditions. The method obtains the target berthing area corresponding to each ship at the target dock, confirms the route information corresponding to each ship, and then confirms the offset assessment coefficient and ship speed assessment coefficient corresponding to each ship based on the route information corresponding to each ship, and then confirms the safety assessment coefficient corresponding to each ship. The safety of each ship is judged based on the safety assessment coefficient corresponding to each ship and the judgment result is confirmed. Different safety warning strategies are implemented for each ship based on the judgment result, thereby effectively reducing the situation where the loss of life and property is caused by the failure to timely alarm when the ship is in an abnormal state;

[0043] (2) The safety risk coefficient corresponding to the target area is confirmed through the safety assessment coefficient corresponding to each ship, and the safety risk coefficient corresponding to the target area is compared with the preset safety risk threshold. Based on the comparison result, an early warning instruction is output to remind the target area of ​​danger and remind the ships in the target area to drive carefully, thereby effectively reducing the occurrence of loss of life and property on ships. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a flow chart of a method for monitoring ship berthing at a dock around the clock and in all weather conditions according to an embodiment of the present invention.

[0045] Figure 2 It is a schematic diagram of a system for monitoring ship berthing at a dock around the clock and in all weather conditions according to an embodiment of the present invention. DETAILED DESCRIPTION

[0046] The following is combined with Figure 1-Figure 2 The present invention is described in further detail.

[0047] Example 1

[0048] The embodiment of the invention discloses a method for monitoring ship berthing at a dock at all times and in all weather conditions.

[0049] Reference Figure 1 A method for monitoring ship berthing at a dock around the clock and in all weather conditions, comprising the following steps:

[0050] S1. Collecting basic information corresponding to each ship, including the ship type and stay duration corresponding to each ship, and confirming the target berthing area corresponding to each ship at the target terminal based on the basic information corresponding to each ship;

[0051] S2. Confirming the route information corresponding to each ship based on the berthing area corresponding to each ship at the target terminal, and confirming the offset information corresponding to each ship within a preset monitoring time period, and then obtaining the offset evaluation coefficient corresponding to each ship based on the offset information corresponding to each ship;

[0052] S3. Real-time collection of environmental information on the route information corresponding to each ship, and confirming the speed impact index corresponding to the ship based on the environmental information, and confirming the speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the speed impact index corresponding to the ship;

[0053] S4. Obtain the offset assessment coefficient and ship speed assessment coefficient corresponding to each ship, calculate the safety assessment coefficient corresponding to each ship, make a judgment on the safety of each ship based on the safety assessment coefficient corresponding to each ship and confirm the judgment result, and implement different safety warning strategies for each ship based on the judgment result.

[0054] It should be noted that the target berthing area corresponding to each ship at the target terminal is confirmed based on the basic information corresponding to each ship, including:

[0055] Extract the ship type and stay duration corresponding to each ship from the basic information corresponding to each ship;

[0056] Confirming the first berthing area corresponding to each ship based on the ship type corresponding to each ship, comparing the stay time corresponding to each ship with a preset stay time threshold, and confirming the second berthing area corresponding to each ship;

[0057] The berthing area corresponding to each ship is confirmed based on the first berthing area and the second berthing area corresponding to each ship, and the berthing area is marked as a target berthing area.

[0058] Specifically, in the embodiment of the present invention, the preset stay time threshold is set to 8 hours, and the preset stay time threshold is set by the system according to historical data.

[0059] Specifically, the first berthing area corresponding to each ship is confirmed by the ship type corresponding to each ship. For example, if the ship type is a large ship, the corresponding first berthing area is the large ship berthing area, and if the ship type is a small ship, the corresponding first berthing area is the small ship berthing area; the second berthing area corresponding to each ship is confirmed by the stay time corresponding to each ship. For example, if the stay time corresponding to a ship exceeds the preset stay time threshold, it is determined to be a long stay, and the corresponding second berthing area is a long-term berthing area, otherwise, it is a short-term berthing area.

[0060] It should be noted that the offset information corresponding to each ship is confirmed within the preset monitoring time period, specifically including:

[0061] Obtain the real-time location information of each ship based on the route information of each ship , and obtain the actual position information of each ship through the positioning device ,in, Indicates the number corresponding to each ship, ;

[0062] By formula , confirm the real-time offset distance corresponding to each ship ,in, Expressed as Correction coefficient of real-time offset distance corresponding to each ship;

[0063] Specifically, the correction coefficient of the real-time offset distance corresponding to the ship is used to adjust the real-time offset distance corresponding to each ship, and the correction coefficient of the real-time offset distance corresponding to the ship is obtained by correcting and fitting the historical data;

[0064] The real-time offset distance corresponding to each ship The deviation from the preset threshold Make a comparison;

[0065] If there is a real-time offset distance corresponding to the ship When the ship reaches the corrected route, a prompt for corrected route is output to the ship, and offset information is marked, wherein the offset information includes the number of offsets and the offset time corresponding to each offset.

[0066] Further, based on the offset information corresponding to each ship, the offset assessment coefficient corresponding to each ship is obtained, specifically including:

[0067] Obtain the offset times corresponding to each ship based on the offset information corresponding to each ship The offset time corresponding to each offset ,in, ;

[0068] By calculating the formula , and obtain the offset assessment coefficient corresponding to each ship ,in, Indicated as number The preset arrival time interval corresponding to the ships.

[0069] Specifically, by obtaining the deviation assessment coefficient corresponding to each ship, the route deviation of each ship can be discovered in time in bad weather or at night, reducing the occurrence of safety accidents caused by the deviation of the route of each ship due to bad weather or at night, thereby improving the safety of ship operation.

[0070] Further, based on the environmental information, the ship speed impact index corresponding to the ship is confirmed, and based on the basic information corresponding to each ship and the ship speed impact index corresponding to each ship, the ship speed assessment coefficient corresponding to each ship is confirmed, specifically including:

[0071] Confirm the environmental information on the route information corresponding to each ship, the environmental information includes water flow speed and wind speed , and then through the formula , calculate the corresponding ship speed impact index ,in, The speed change vectors of the preset unit water velocity and unit wind velocity to the ship velocity are respectively represented;

[0072] Check the real-time speed of each ship through the basic information of each ship ;

[0073] By formula , calculate the speed assessment coefficient corresponding to each ship ,in, Indicates the preset reference speed.

[0074] Furthermore, the safety assessment coefficient corresponding to each ship is calculated, including:

[0075] The deviation assessment coefficient corresponding to each ship and ship speed assessment factor Substitute into the formula , and obtain the corresponding safety assessment factor for each ship ,in, They are respectively expressed as the weight coefficients corresponding to the offset assessment coefficient and the ship speed assessment coefficient.

[0076] It should be noted that the safety of each ship is judged and confirmed based on the safety assessment coefficient corresponding to each ship, and different safety warning strategies are implemented for each ship based on the judgment results, including:

[0077] Confirm the safety assessment factor corresponding to each ship , and the safety assessment factor corresponding to each ship The preset safety assessment threshold range For comparison, Denotes the first safety assessment threshold, Expressed as the second safety assessment threshold, and All of them are obtained by fitting and correcting historical data;

[0078] Specifically, in the embodiment of the present invention, the first security assessment threshold is set to 0.6, and the second security assessment threshold is set to 0.8.

[0079] If there is a safety assessment factor corresponding to the ship Less than When the ship is detected, it is determined that the ship is operating normally and no measures need to be taken, and monitoring should continue;

[0080] If there is a safety assessment factor corresponding to the ship In When the ship is in the range of 1 to 20 km / h, it is determined that the ship is operating abnormally, and a first-level warning is output to the ship control terminal;

[0081] If there is a safety assessment factor corresponding to the ship Beyond , it is determined that the ship is operating abnormally and a secondary warning is output to the ship control terminal.

[0082] Specifically, the dock is equipped with a monitoring terminal for outputting warning information to the ship control terminal, wherein the warning level of the second-level warning is greater than that of the first-level warning.

[0083] By obtaining the offset assessment coefficient and ship speed assessment coefficient corresponding to each ship, the corresponding safety assessment coefficient of each ship is calculated, and then a judgment is made on the safety of each ship. By selecting different safety warning processing strategies, potential safety hazards can be discovered in time and corresponding measures can be taken to deal with them, thereby improving the safety of ship operation.

[0084] Furthermore, after obtaining the safety assessment coefficient corresponding to each ship, it also includes:

[0085] By formula , calculate the safety risk coefficient corresponding to the target area ;

[0086] The safety risk factor corresponding to the target area Compared with the preset security risk threshold Compare, where the preset security risk threshold It is obtained by fitting and correcting historical data;

[0087] like , it is determined that there is danger in the target area, and a first warning instruction is output to each ship control terminal in the target area; otherwise, a second warning instruction is output to each ship control terminal in the target area.

[0088] Specifically, by obtaining the safety assessment coefficient corresponding to each ship and calculating the safety risk coefficient corresponding to the target area, the safety of the target area is judged according to the safety risk coefficient corresponding to the target area, and the safety risk coefficient corresponding to the target area is compared with the preset safety risk threshold. When the safety risk coefficient corresponding to the target area is greater than the preset safety risk threshold, it is determined that there is a danger in the target area, and a first early warning instruction is output to each ship control terminal in the target area, wherein the first early warning instruction is set to remind ships to slow down and pay attention to safety in the harsh environment of the target area, otherwise, a second early warning instruction is output to each ship control terminal in the target area, and the second early warning instruction is set to remind ships in the target area to pay attention to safety.

[0089] Example 2

[0090] The embodiment of the present invention also discloses a 24 / 7 all-weather dock ship berthing monitoring system.

[0091] Reference Figure 2 , a 24 / 7 all-weather terminal ship berthing monitoring system, including:

[0092] The target berthing area confirmation module is used to collect basic information corresponding to each ship, including the ship type and stay duration corresponding to each ship, and confirm the target berthing area corresponding to each ship at the target terminal based on the basic information corresponding to each ship;

[0093] The deviation evaluation coefficient analysis module is used to confirm the route information corresponding to each ship based on the berthing area corresponding to each ship at the target terminal, and confirm the deviation information corresponding to each ship within a preset monitoring time period, and then obtain the deviation evaluation coefficient corresponding to each ship based on the deviation information corresponding to each ship;

[0094] The ship speed assessment coefficient analysis module is used to collect the environmental information on the route information corresponding to each ship in real time, and confirm the ship speed impact index corresponding to the ship based on the environmental information, and confirm the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to the ship;

[0095] The early warning module is used to obtain the deviation assessment coefficient and ship speed assessment coefficient corresponding to each ship, calculate the safety assessment coefficient corresponding to each ship, judge the safety of each ship based on the safety assessment coefficient corresponding to each ship and confirm the judgment result, and implement different safety early warning strategies for each ship based on the judgment result.

[0096] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

Claims

1. A method for monitoring ship berthing at a dock around the clock and in all weather conditions. It is characterized in that The following steps are involved: Collecting basic information corresponding to each ship, including the ship type and stay duration corresponding to each ship, and confirming the target berthing area corresponding to each ship at the target wharf based on the basic information corresponding to each ship; Confirming the route information corresponding to each ship based on the berthing area corresponding to each ship at the target wharf, and confirming the offset information corresponding to each ship within a preset monitoring time period, and then obtaining the offset assessment coefficient corresponding to each ship based on the offset information corresponding to each ship; Confirm the offset information corresponding to each ship within the preset monitoring time period, including: Obtain the real-time location information of each ship based on the route information of each ship , and obtain the actual position information of each ship through the positioning device ,in, Indicates the number corresponding to each ship, ; By formula , confirm the real-time offset distance corresponding to each ship ,in, Expressed as Correction coefficient of real-time offset distance corresponding to each ship; The real-time offset distance corresponding to each ship The deviation from the preset threshold Make a comparison; If there is a real-time offset distance corresponding to the ship When the ship reaches the corrected route, a correction prompt is output to the ship, and the deviation information is marked, wherein the deviation information includes the number of deviations and the deviation time corresponding to each deviation; Based on the offset information corresponding to each ship, the offset assessment coefficient corresponding to each ship is obtained, specifically including: Obtain the offset times corresponding to each ship based on the offset information corresponding to each ship The offset time corresponding to each offset ,in, ; By calculating the formula , and obtain the offset assessment coefficient corresponding to each ship ,in, Indicated as number The preset arrival time interval corresponding to the ships; Collecting environmental information on the route information corresponding to each ship in real time, and confirming the ship speed impact index corresponding to the ship based on the environmental information, and confirming the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to the ship; Confirming the ship speed impact index corresponding to the ship based on the environmental information, and confirming the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to each ship, specifically including: Confirm the environmental information on the route information corresponding to each ship, the environmental information includes water flow speed and wind speed , and then through the formula , calculate the corresponding ship speed impact index ,in, The speed change vectors of the preset unit water velocity and unit wind velocity to the ship velocity are respectively represented; Check the real-time speed of each ship through the basic information of each ship ; By formula , calculate the speed assessment coefficient corresponding to each ship ,in, Expressed as a preset reference speed; Obtain the deviation assessment coefficient and ship speed assessment coefficient corresponding to each ship, calculate the safety assessment coefficient corresponding to each ship, make a judgment on the safety of each ship based on the safety assessment coefficient corresponding to each ship and confirm the judgment result, and implement different safety warning strategies for each ship based on the judgment result; Calculate the safety assessment coefficients corresponding to each ship, including: The deviation assessment coefficient corresponding to each ship and ship speed assessment factor Substitute into the formula , and obtain the corresponding safety assessment factor for each ship ,in, They are respectively expressed as the weight coefficients corresponding to the offset assessment coefficient and the ship speed assessment coefficient.

2. According to the all-day and all-weather dock ship berthing monitoring method of claim 1, It is characterized in that Based on the basic information of each ship, the target berthing area corresponding to each ship at the target terminal is confirmed, including: Extract the ship type and stay duration corresponding to each ship from the basic information corresponding to each ship; Confirming the first berthing area corresponding to each ship based on the ship type corresponding to each ship, comparing the stay time corresponding to each ship with a preset stay time threshold, and confirming the second berthing area corresponding to each ship; The berthing area corresponding to each ship is confirmed based on the first berthing area and the second berthing area corresponding to each ship, and the berthing area is marked as a target berthing area.

3. According to the all-day and all-weather dock ship berthing monitoring method of claim 1, It is characterized in that The safety of each ship is judged and confirmed based on the safety assessment coefficient corresponding to each ship. Different safety warning strategies are implemented for each ship based on the judgment results, including: Confirm the safety assessment factor corresponding to each ship , and the safety assessment factor corresponding to each ship The preset safety assessment threshold range For comparison, Denotes the first safety assessment threshold, It is represented as the second safety assessment threshold; If the safety assessment factor corresponding to the ship Less than , it is determined that the ship is operating normally and no measures need to be taken, and monitoring should continue; If the safety assessment factor corresponding to the ship In If the ship is abnormally operating, a first-level warning is output to the ship control terminal; If the safety assessment factor corresponding to the ship Beyond , it is determined that the ship is operating abnormally and a level 2 warning is output to the ship control terminal.

4. A method for monitoring ship berthing at a dock all day and all weather according to claim 3, It is characterized in that After obtaining the safety assessment coefficients corresponding to each ship, it also includes: By formula , calculate the safety risk coefficient corresponding to the target area ,in, Expressed as the total number of ships; The safety risk factor corresponding to the target area Compared with the preset security risk threshold Make a comparison; like , it is determined that there is danger in the target area, and a first warning instruction is output to each ship control terminal in the target area; otherwise, a second warning instruction is output to each ship control terminal in the target area.

5. A 24 / 7 all-weather dock ship berthing monitoring system, It is characterized in that include: The target berthing area confirmation module is used to collect basic information corresponding to each ship, including the ship type and stay duration corresponding to each ship, and confirm the target berthing area corresponding to each ship at the target terminal based on the basic information corresponding to each ship; The deviation evaluation coefficient analysis module is used to confirm the route information corresponding to each ship based on the berthing area corresponding to each ship at the target terminal, and confirm the deviation information corresponding to each ship within a preset monitoring time period, and then obtain the deviation evaluation coefficient corresponding to each ship based on the deviation information corresponding to each ship; Confirm the offset information corresponding to each ship within the preset monitoring time period, including: Obtain the real-time location information of each ship based on the route information of each ship , and obtain the actual position information of each ship through the positioning device ,in, Indicates the number corresponding to each ship, ; By formula , confirm the real-time offset distance corresponding to each ship ,in, Expressed as Correction coefficient of real-time offset distance corresponding to each ship; The real-time offset distance corresponding to each ship The deviation from the preset threshold Make a comparison; If there is a real-time offset distance corresponding to the ship When the ship reaches the corrected route, a correction prompt is output to the ship, and the deviation information is marked, wherein the deviation information includes the number of deviations and the deviation time corresponding to each deviation; Based on the offset information corresponding to each ship, the offset assessment coefficient corresponding to each ship is obtained, specifically including: Obtain the offset times corresponding to each ship based on the offset information corresponding to each ship The offset time corresponding to each offset ,in, ; By calculating the formula , and obtain the offset assessment coefficient corresponding to each ship ,in, Indicated as number The preset arrival time interval corresponding to the ships; The ship speed assessment coefficient analysis module is used to collect the environmental information on the route information corresponding to each ship in real time, and confirm the ship speed impact index corresponding to the ship based on the environmental information, and confirm the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to the ship; Confirming the ship speed impact index corresponding to the ship based on the environmental information, and confirming the ship speed assessment coefficient corresponding to each ship based on the basic information corresponding to each ship and the ship speed impact index corresponding to each ship, specifically including: Confirm the environmental information on the route information corresponding to each ship, the environmental information includes water flow speed and wind speed , and then through the formula , calculate the corresponding ship speed impact index ,in, The speed change vectors of the preset unit water velocity and unit wind velocity to the ship velocity are respectively represented; Check the real-time speed of each ship through the basic information of each ship ; By formula , calculate the speed assessment coefficient corresponding to each ship ,in, Expressed as a preset reference speed; The early warning module is used to obtain the deviation assessment coefficient and the ship speed assessment coefficient corresponding to each ship, calculate the safety assessment coefficient corresponding to each ship, make a judgment on the safety of each ship based on the safety assessment coefficient corresponding to each ship and confirm the judgment result, and implement different safety early warning strategies for each ship based on the judgment result; Calculate the safety assessment coefficients corresponding to each ship, including: The deviation assessment coefficient corresponding to each ship and ship speed assessment factor Substitute into the formula , and obtain the corresponding safety assessment factor for each ship ,in, They are respectively expressed as the weight coefficients corresponding to the offset assessment coefficient and the ship speed assessment coefficient.

Citation Information

Patent Citations

  • Ship waterborne safety system and data acquisition calculation method thereof

    CN106997691A

  • Channel safety early warning method and system, computer equipment and storage medium

    CN111833656A

  • Fishery ship yaw early warning system and method

    CN113409617A

  • All-weather wharf ship berthing detection system based on multi-sensor acquisition and analysis

    CN118260659A

  • Method for seakeeping quality assessment using ship monitoring system and system for seakeeping quality assessment

    KR1020180105921A