A method and device for handling direct current faults in a wind power flexible direct current transmission grid-connected system
By monitoring the fault information of the wind power flexible DC transmission grid-connected system, combined with system safety and multi-index optimization, the problem of rapid and effective DC fault handling in the wind power system is solved, and the reliability of fault isolation and system stability are improved.
Patent Information
- Application Number
- CN202411034837.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-07-31
AI Technical Summary
During operation, wind power flexible DC transmission grid-connected system causes frequent DC failures due to wind power fluctuations and system complexity. Traditional fault removal methods cannot be solved quickly and effectively, affecting the stable operation of the system.
Using monitoring fault information, the scheduling scheme is gradually optimized through system safety optimization and multi-index optimization (including wind power cluster scheduling costs, wind curtailment rates, and energy-consuming resistance scheduling costs), to achieve fault isolation and system recovery.
It improves the reliability and effectiveness of fault isolation, reduces the cost and time of fault recovery, and ensures the safe and stable operation of the system.
Smart Images

Figure CN118572645B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system operation and control, and in particular to a method and device for handling direct current faults in a wind power flexible direct current transmission grid-connected system. Background Art
[0002] With the rapid development of renewable energy technology, wind power, as an important component of it, has become a key force in the transformation of the global energy structure. The wind power-flexible DC transmission grid-connected system refers to a system that connects wind farms to the power grid through flexible DC transmission technology, providing a more efficient and stable solution for the delivery of wind power energy. However, in the actual operation of the wind power-flexible DC transmission grid-connected system, due to the volatility and uncertainty of wind power and the complexity of the flexible DC transmission system itself, the occurrence of system DC faults is difficult to avoid. Rapid and effective clearance of DC faults is of great significance to ensure the safe and stable operation of the system. Traditional DC fault clearing methods mainly rely on manual intervention and simple equipment inspections. For complex fault conditions, it may not be possible to quickly and effectively clear the fault, nor can it ensure the stable operation of the power system in a timely manner. Therefore, there is an urgent need for a DC fault handling method and device for a wind power flexible DC transmission grid-connected system. Summary of the invention
[0003] The present invention provides a method and device for handling DC faults in a wind power flexible DC transmission grid-connected system. The method can quickly and accurately isolate DC faults and restore the normal operation of the system. Compared with traditional fault clearing methods, the method has higher reliability and effectiveness.
[0004] In a first aspect, the present invention provides a method for handling DC faults in a wind power flexible DC transmission grid-connected system, comprising:
[0005] When a DC fault is detected in the target wind power flexible DC transmission grid-connected system, fault information is obtained;
[0006] Determine an initial scheduling plan according to the fault information;
[0007] The initial scheduling plan is optimized for system safety and multiple indicators in turn to obtain a target scheduling plan; wherein the indicators of the multiple indicator optimization include the scheduling cost of the wind power cluster, the wind power cluster wind abandonment rate, and the scheduling cost of the energy-consuming resistor.
[0008] Optionally, the initial scheduling scheme is sequentially optimized for system security and multiple indicators to obtain a target scheduling scheme, including:
[0009] Performing system security optimization on the initial scheduling plan to obtain a first scheduling plan;
[0010] Sorting the indicators in the multi-indicator optimization to determine the optimization order of each indicator;
[0011] The first scheduling scheme is optimized in sequence according to the optimization order to obtain the target scheduling scheme.
[0012] Optionally, the sorting of the indicators in the multi-indicator optimization to determine the optimization order of the indicators includes:
[0013] Use fuzzy evaluation for the indicators and define a comparison scale;
[0014] Determine the comparison results of each pair of indicators for pairwise comparison according to the scale; wherein the comparison results of the same pair of indicators under different fault information are different;
[0015] According to the comparison results, a fuzzy judgment matrix is established;
[0016] According to the fuzzy judgment matrix, the weight value of each indicator is calculated;
[0017] The weight values are sorted from large to small to obtain the optimization order.
[0018] Optionally, optimizing the first scheduling scheme in sequence according to the optimization order to obtain the target scheduling scheme includes:
[0019] Determining an indicator for a first optimization according to the optimization sequence, and performing the first optimization on the first scheduling scheme to obtain a second scheduling scheme;
[0020] Determining an indicator for a second optimization according to the optimization sequence, and performing the second optimization on the second scheduling scheme to obtain a third scheduling scheme;
[0021] The index for the third optimization is determined according to the optimization sequence, and the third scheduling scheme is optimized for the third time to obtain the target scheduling scheme.
[0022] Optionally, the optimization of the wind power cluster dispatching cost includes:
[0023] Get the current scheduling plan during the current optimization;
[0024] Calculating a first dispatching cost of each wind power cluster included in the current dispatching scheme;
[0025] Determine the current scheduling plan corresponding to the minimum first scheduling cost as the optimized scheduling plan;
[0026] The first scheduling cost is determined by the following formula:
[0027]
[0028] in, C Z1 is the first scheduling cost; n is the number of wind power clusters included in the current dispatch plan; K E1,i For the i Capacity cost of a wind farm cluster; E 1,i For the i The total storage capacity of the wind farm cluster; η 1,i For the i The first dispatchable capacity of wind power clusters; K P1,i For the i Unit power cost of a wind power cluster; P dis1,i For the i The dispatching power of a wind power cluster; K aux1,i For the i The unit energy auxiliary facility cost of a wind power cluster.
[0029] Optionally, the optimization of the energy-consuming resistor scheduling cost includes:
[0030] Get the current scheduling plan during the current optimization;
[0031] Calculating a second scheduling cost of each energy-consuming resistor included in the current scheduling scheme;
[0032] Determine the current scheduling plan corresponding to the minimum second scheduling cost as the optimized scheduling plan;
[0033] The second scheduling cost is determined by the following formula:
[0034]
[0035] in, C Z2 is the second scheduling cost; m is the number of energy-consuming resistors included in the current scheduling plan; K E2,j For the j The capacity cost of each energy-consuming resistor; E 2,j For the j The total storage capacity of energy-consuming resistors; η 2,j For the j The second adjustable capacity of the energy-consuming resistor; K P2,j For the jThe unit power cost of an energy-consuming resistor; P dis2,j For the j The dispatching power of energy-consuming resistors; K aux2,j For the j The unit energy auxiliary facility cost of an energy-consuming resistor.
[0036] Optionally, the optimization of the wind power cluster wind abandonment rate includes:
[0037] Get the current scheduling plan during the current optimization;
[0038] Determine the sum of the wind power abandonment rates of each wind power cluster included in the current scheduling scheme according to the historical data of the target wind power flexible direct current transmission grid-connected system;
[0039] The current dispatching plan corresponding to the minimum sum of wind abandonment rates is determined as the optimized dispatching plan.
[0040] In a second aspect, an embodiment of the present invention further provides a DC fault processing device for a wind power flexible DC transmission grid-connected system, which is applied in a wind power flexible DC transmission grid-connected system, and the device includes:
[0041] A monitoring module is used to obtain fault information when a DC fault is detected in the target wind power flexible DC transmission grid-connected system;
[0042] The scheduling module is used to determine an initial scheduling plan according to the fault information; and to optimize the system safety and multi-index of the initial scheduling plan in turn to obtain a target scheduling plan; wherein the multi-index optimization indicators include the scheduling cost of the wind power cluster, the wind power cluster wind abandonment rate, and the scheduling cost of the energy-consuming resistor.
[0043] In a third aspect, an embodiment of the present invention further provides a computing device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the method described in any first aspect of this specification is implemented.
[0044] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed in a computer, enables the computer to execute the method described in any first aspect of this specification.
[0045] In a fifth aspect, a computer program product is provided, comprising a computer program, wherein when the computer program is executed by a processor, the steps of the method described in any first aspect of this specification are implemented.
[0046] The embodiment of the present invention provides a method and device for handling DC faults in a wind power flexible DC transmission grid-connected system. When a DC fault occurs in the wind power flexible DC transmission grid-connected system, the method timely optimizes the system security and multiple indexes including the dispatching cost of the wind power cluster, the wind power cluster wind abandonment rate, and the dispatching cost of the energy-consuming resistor in sequence, thereby obtaining a target dispatching scheme. In this way, the present invention puts the safety of the power system first, and then performs multi-index optimization. On the premise of ensuring the safety of the system, the coordinated control of the energy-consuming resistor and the wind power cluster is realized, and the wind power cluster and the energy-consuming resistor are optimized and dispatched at the same time, so as to realize the DC fault clearance of the wind power flexible DC transmission grid-connected system, improve the reliability and effectiveness of fault isolation, and reduce the cost and time of fault recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0048] Figure 1 It is a flow chart of a method for handling DC faults in a wind power flexible DC transmission grid-connected system provided by an embodiment of the present invention;
[0049] Figure 2 is a hardware architecture diagram of a computing device provided by an embodiment of the present invention;
[0050] Figure 3 It is a structural schematic diagram of a DC fault processing device for a wind power flexible DC transmission grid-connected system provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0052] The specific implementation of the concept of this application is described below.
[0053] Please refer to Figure 1 The embodiment of the present invention provides a method for handling DC faults in a wind power flexible DC transmission grid-connected system, the method comprising:
[0054] Step 100, when a DC fault is detected in the target wind power flexible DC transmission grid-connected system, fault information is obtained;
[0055] Step 102, determining an initial scheduling plan according to the fault information;
[0056] Step 104, performing system safety optimization and multi-index optimization on the initial scheduling plan in sequence to obtain a target scheduling plan; wherein the multi-index optimization indicators include the scheduling cost of the wind power cluster, the wind power cluster wind abandonment rate, and the scheduling cost of the energy-consuming resistor.
[0057] In an embodiment of the present invention, when a DC fault occurs in the wind power flexible DC transmission grid-connected system, the method timely optimizes the system security and multiple indexes including the dispatching cost of the wind power cluster, the wind power cluster wind abandonment rate, and the dispatching cost of the energy-consuming resistor in sequence, thereby obtaining a target dispatching scheme. In this way, the present invention puts the safety of the power system first, and then performs multi-index optimization. On the premise of ensuring the safety of the system, the coordinated control of the energy-consuming resistor and the wind power cluster is realized, and the wind power cluster and the energy-consuming resistor are optimized and dispatched at the same time, so as to realize the DC fault clearance of the wind power flexible DC transmission grid-connected system, improve the stability of the power system, improve the reliability and effectiveness of fault isolation, and reduce the cost and time of fault recovery.
[0058] In the present invention, the wind power flexible DC transmission grid-connected system mainly consists of the following parts:
[0059] Several wind power clusters: Each wind power cluster consists of multiple wind turbines, which are responsible for converting wind energy into electrical energy;
[0060] Flexible DC transmission system: including converter stations, DC transmission lines, etc., responsible for transmitting the electricity generated by the wind farm to the power grid in the form of DC; the wind farm generates electricity through the MMC converter station at the sending end, and the MMC converter station at the receiving end converts the DC power into AC power;
[0061] Several energy-consuming resistors: The receiving-end MMC converter station is connected to energy-consuming resistors to consume surplus power;
[0062] Control system: realizes coordinated control of wind farms and flexible DC transmission systems to ensure stable operation and efficient scheduling of the systems.
[0063] Described below Figure 1 How the various steps are performed.
[0064] First, in step 100, by real-time monitoring the operating status of the target wind power flexible DC transmission grid-connected system, including electrical quantities such as voltage and current, and operating parameters such as power and frequency of the system, the occurrence of DC faults can be discovered and determined in a timely manner. In addition, advanced signal processing technology and wavelet transform can be used to detect fault signals to improve the accuracy and reliability of DC fault detection.
[0065] In step 102, the initial scheduling schemes corresponding to different fault information may be the same or different, but the target scheduling schemes corresponding to different fault information are different. It should be noted that the initial scheduling scheme may be all the dispatchable schemes of the wind power flexible DC transmission grid-connected system during normal operation. Each initial scheduling scheme includes the dispatching power (active power) of each dispatching device, and the dispatching devices are wind power clusters and energy-consuming resistors. It should be noted that the energy-consuming resistor used as a dispatching device in the present invention may be an energy-consuming resistor that is not currently in use. If the dispatching power of a certain energy-consuming resistor in the initial scheduling scheme is 0, the energy-consuming resistor in the scheme is still not in use.
[0066] In step 104, the initial scheduling scheme is optimized in terms of system security and multiple indicators to obtain a target scheduling scheme, including:
[0067] S1: Optimize the system security of the initial scheduling plan to obtain the first scheduling plan;
[0068] S2: Sort the indicators in the multi-indicator optimization and determine the optimization order of each indicator;
[0069] S3: Optimize the first scheduling plan in sequence according to the optimization order to obtain the target scheduling plan.
[0070] In the present invention, the fault information includes the fault current value. Different fault information corresponds to different fault current value ranges. The higher the fault current value, the higher the fault level. Moreover, the target wind power flexible DC transmission grid-connected system prioritizes different indicators at different fault levels. Therefore, after giving priority to system safety and performing the first optimization, the present invention further sorts the three indicators included in the second optimization of the multi-index optimization to determine the indicators that should be prioritized in the current fault information, thereby selecting the safest and most suitable target scheduling scheme for the current fault situation according to the real-time fault situation of the current target wind power flexible DC transmission grid-connected system, so that the fault handling method is more scientific, efficient and accurate.
[0071] In a preferred embodiment, the initial scheduling scheme is optimized for system security with respect to S1 to obtain a first scheduling scheme, including the following two methods:
[0072] The first method is to obtain the expected values of the parameters of the target wind power flexible DC transmission grid-connected system after scheduling based on each initial scheduling scheme;
[0073] For each parameter, determine the system stability value corresponding to the parameter, and calculate the difference between the expected value of the parameter and the system stability value;
[0074] The sum of the squares of the differences of each parameter is used as the deviation system stability score of the initial scheduling plan;
[0075] The initial scheduling plan corresponding to the smallest deviation from the system stability score is used as the first scheduling plan.
[0076] It should be noted that the parameters include voltage, current, active power, reactive power, etc. The system stability value is the rated value of each parameter when the target wind power flexible DC transmission grid-connected system is running stably before a fault occurs.
[0077] Specifically, in this method, the objective function min is set f (), the objective function is used to determine the minimum deviation from the system stability score, which is determined by calculating the minimum deviation of all parameters from the system stability value after scheduling based on the initial scheduling plan. f () can make the power system as safe as possible.
[0078] The second method is to obtain the unit power dispatch safety index and dispatch cost funds of each dispatch equipment included in each initial dispatch plan;
[0079] The sum of the product of the unit power dispatching safety index of each dispatching equipment and the dispatching cost funds in the initial dispatching plan is used as the safety optimization score of the initial dispatching plan;
[0080] The initial scheduling plan corresponding to the maximum safety optimization score is used as the first scheduling plan.
[0081] Specifically, in this method, the objective function max is set R , the objective function is used to determine the maximum security optimization score, so that max R The power system can be made as safe as possible.
[0082] Assume that the total dispatch economic cost is 1 unit, and the dispatch cost of any dispatch equipment is X i is a unit, then
[0083]
[0084] in, R Optimize scores for safety; r i For thei Unit power dispatch safety index of each dispatching device; X i For the i The dispatch cost of each dispatch equipment; Q is the economic cost index; q i For the i The unit power dispatch economic cost index of each dispatching device.
[0085] It should be noted that the unit power dispatching safety index and unit power dispatching economic cost index corresponding to different dispatching equipment are different; the unit power dispatching safety index and unit power dispatching economic cost index of the same dispatching equipment under different dispatching powers (active power) are also different.
[0086] In the second method mentioned above, the economic cost of the current dispatching plan can also be calculated after considering the security of the power system.
[0087] In the present invention, the security of the entire system is first ensured through system security optimization, the first scheduling scheme is selected under the premise of sufficiently high security, and the initial scheduling scheme is optimized for the first time.
[0088] In a preferred embodiment, step S2 sorts the indicators in the multi-indicator optimization to determine the optimization order of the indicators, including:
[0089] Use fuzzy evaluation for indicators and define a scale for comparison;
[0090] Determine the comparison results of each pair of indicators according to the scale; wherein the comparison results of the same pair of indicators under different fault information are different;
[0091] According to the comparison results, a fuzzy judgment matrix is established;
[0092] According to the fuzzy judgment matrix, the weight value of each index is calculated;
[0093] Sort the weight values from large to small to get the optimization order.
[0094] It should be noted that the scale and the comparison results determined according to the scale can be determined by the expert group based on experience. The calculation of the weight value includes but is not limited to the use of methods such as geometric mean, arithmetic mean, eigenvalue, etc. Among them, the comparison results of each pair of indicators under different fault information are different, so the optimization order determined by different fault information is also different, which can also achieve different indicators that are prioritized for the target wind power flexible direct current transmission grid-connected system under different fault information, that is, the optimization order of each indicator is not the same, and then determine the most suitable target scheduling plan according to different fault information.
[0095] More importantly, in the present invention, the fuzzy judgment matrix meets the definition of the consistency matrix, that is, the constructed fuzzy judgment matrix does not have a logical problem. For example, when constructing a fuzzy judgment matrix with A, B, and C indicators, if it is determined that A is equivalent to B as 3 (that is, the comparison result is 3, A is slightly more important than B), and A is equivalent to C as 1 / 3 (C is slightly more important than A), when it is determined that B is equivalent to C, according to the above logic, C should be more important than B; if when constructing the fuzzy judgment matrix, it is wrongly filled in as B is equivalent to C as 3 (B is slightly more important than C), a logical error occurs and the definition of the consistency matrix is not met.
[0096] In the present invention, a simulation evaluation method is used to establish a fuzzy judgment matrix, and based on the fuzzy judgment matrix, the optimization ranking of the three indicators of wind power cluster dispatching cost, wind power cluster wind abandonment rate, and energy-consuming resistor dispatching cost in the second optimization is realized, thereby improving the efficiency and accuracy of determining the target dispatching plan and realizing scientific and accurate DC fault clearing.
[0097] In a preferred embodiment, step S3 optimizes the first scheduling scheme in sequence according to the optimization order to obtain the target scheduling scheme, including:
[0098] Determine the index for the first optimization according to the optimization order, and perform the first optimization on the first scheduling plan to obtain the second scheduling plan;
[0099] Determine the index for the second optimization according to the optimization order, and perform the second optimization on the second scheduling plan to obtain the third scheduling plan;
[0100] The indicators for the third optimization are determined according to the optimization order, and the third scheduling plan is optimized for the third time to obtain the target scheduling plan.
[0101] It should be noted that both the second scheduling scheme and the third scheduling scheme include several scheduling schemes.
[0102] In the present invention, after obtaining the optimization sequence, the first optimization, the second optimization and the third optimization in the second optimization are performed in sequence according to the indicators corresponding to the optimization sequence, and the optimization is performed step by step to finally obtain the target scheduling scheme. For example, if the optimization sequence is 0.6 (wind power cluster scheduling cost), 0.3 (wind power cluster wind abandonment rate), 0.1 (energy consumption resistor scheduling cost), then the wind power cluster scheduling cost optimization, wind power cluster wind abandonment rate optimization and energy consumption resistor scheduling cost optimization are performed in sequence; if the optimization sequence is 0.5 (wind power cluster wind abandonment rate), 0.3 (wind power cluster scheduling cost), 0.2 (energy consumption resistor scheduling cost), then the wind power cluster wind abandonment rate optimization, wind power cluster scheduling cost optimization and energy consumption resistor scheduling cost optimization are performed in sequence.
[0103] In a preferred embodiment, the optimization of the wind power cluster dispatching cost includes:
[0104] Get the current scheduling plan during the current optimization;
[0105] Calculate the first dispatching cost of each wind power cluster included in the current dispatching plan;
[0106] Determine the current scheduling plan corresponding to the minimum first scheduling cost as the optimized scheduling plan;
[0107] The first dispatch cost is determined by the following formula:
[0108]
[0109] in, C Z1 is the first scheduling cost; n is the number of wind power clusters included in the current dispatch plan; K E1,i For the i Capacity cost of a wind farm cluster; E 1,i For the i The total storage capacity of the wind farm cluster; η 1,i For the i The first dispatchable capacity of wind power clusters; K P1,i For the i Unit power cost of a wind power cluster; P dis1,i For the i The dispatching power of a wind power cluster; K aux1,i For the i The unit energy auxiliary facility cost of a wind power cluster.
[0110] In a preferred embodiment, the optimization of the energy-consuming resistor scheduling cost includes:
[0111] Get the current scheduling plan during the current optimization;
[0112] Calculate the second scheduling cost of the energy-consuming resistor included in each current scheduling plan;
[0113] Determine the current scheduling plan corresponding to the minimum second scheduling cost as the optimized scheduling plan;
[0114] The second dispatch cost is determined by the following formula:
[0115]
[0116] in, CZ2 is the second scheduling cost; m is the number of energy-consuming resistors included in the current scheduling plan; K E2,j For the j The capacity cost of each energy-consuming resistor; E 2,j For the j The total storage capacity of energy-consuming resistors; η 2,j For the j The second adjustable capacity of the energy-consuming resistor; K P2,j For the j The unit power cost of an energy-consuming resistor; P dis2,j For the j The dispatching power of energy-consuming resistors; K aux2,j For the j The unit energy auxiliary facility cost of an energy-consuming resistor.
[0117] It should be noted that η 1,i , η 2,j are all constants, and the dispatchable capacity of different dispatching equipment is different. The cost of auxiliary equipment under different dispatching powers is different, that is, the unit energy auxiliary facility cost under different dispatching powers is different. For any dispatching plan, m The number of all energy-consuming resistors equipped for the target wind power flexible DC transmission grid-connected system. In the current scheduling scheme, for any energy-consuming resistor that is not put into use, the corresponding total storage capacity is E 2,j =0, dispatch power P dis2,j =0, that is .
[0118] In a preferred embodiment, the optimization of the wind power cluster wind curtailment rate includes:
[0119] Get the current scheduling plan during the current optimization;
[0120] Determine the sum of the wind power abandonment rates of the wind power clusters included in each current dispatching plan based on historical data of the target wind power flexible DC transmission grid-connected system;
[0121] The current dispatching plan corresponding to the minimum sum of wind abandonment rates is determined as the optimized dispatching plan.
[0122] In the present invention, by optimizing the dispatching cost of wind power clusters, the dispatching cost of energy-consuming resistors, and the wind power cluster wind abandonment rate, it can be determined that the optimization of each indicator is a process of solving the minimum value of the objective function. Therefore, after determining the optimization order, no matter which re-optimization is targeted, it is only necessary to solve the minimum objective function corresponding to the re-optimization, thereby converting the original multi-objective optimization problem into a method for multiple single-objective optimization problems, thereby improving the efficiency of DC fault processing.
[0123] The present invention is based on clearing the DC fault when a fault occurs on the DC side of the flexible DC transmission system, and realizes the coordinated control of the energy-consuming resistor and the wind power cluster by considering the scheduling coordination of the large-scale wind turbine cluster and the energy-consuming resistor at the same time during the upper-level scheduling. Compared with the traditional multi-objective optimization that only optimizes the wind turbine scheduling, the hierarchical multi-objective optimization scheduling of the present invention takes the power system security as the first optimization, and includes triple optimization for three indicators in the second-level optimization system, which optimizes the highest power system security among the minimum scheduling cost of the wind power cluster, the maximum wind power energy utilization rate (i.e., the minimum wind abandonment rate of the wind power cluster), and the minimum scheduling cost of the energy-consuming resistor. According to the real-time information of the wind power cluster and the energy-consuming resistor, based on fuzzy evaluation analysis, the optimal scheduling of the wind turbine cluster and the energy-consuming resistor is optimized, and the stability of the entire power system is improved.
[0124] like Figure 2 , Figure 3 As shown, an embodiment of the present invention provides a DC fault processing device for a wind power flexible DC transmission grid-connected system. The device embodiment can be implemented by software, or by hardware or a combination of software and hardware. From the hardware level, Figure 2 As shown, it is a hardware architecture diagram of a computing device where a DC fault processing device of a wind power flexible DC transmission grid-connected system provided by an embodiment of the present invention is located, except Figure 2 In addition to the processor, memory, network interface, and non-volatile memory shown in the figure, the computing device in which the device is located in the embodiment may also generally include other hardware, such as a forwarding chip responsible for processing messages, etc. Taking software implementation as an example, Figure 3 As shown, as a device in a logical sense, the CPU of the computing device in which it is located reads the corresponding computer program in the non-volatile memory into the memory and runs it. This embodiment provides a DC fault processing device for a wind power flexible DC transmission grid-connected system, the device comprising:
[0125] The monitoring module 300 is used to obtain fault information when a DC fault is detected in the target wind power flexible DC transmission grid-connected system;
[0126] The scheduling module 302 is used to determine the initial scheduling plan according to the fault information; and perform system safety optimization and multi-index optimization on the initial scheduling plan in turn to obtain a target scheduling plan; wherein the multi-index optimization indicators include the wind power cluster scheduling cost, the wind power cluster wind abandonment rate, and the energy consumption resistor scheduling cost.
[0127] In some specific implementations, the monitoring module 300 may be used to execute the above step 100 , and the scheduling module 302 may be used to execute the above steps 102 and 104 .
[0128] It should be noted that the device is the control system in the aforementioned wind power flexible DC transmission grid-connected system, which is used to achieve coordinated control of the wind farm and the flexible DC transmission system to ensure stable operation and efficient scheduling of the entire system.
[0129] In one embodiment of the present invention, the scheduling module 302 is further configured to perform the following operations:
[0130] S1: Optimize the system security of the initial scheduling plan to obtain the first scheduling plan;
[0131] S2: Sort the indicators in the multi-indicator optimization and determine the optimization order of each indicator, including:
[0132] Use fuzzy evaluation for indicators and define a scale for comparison;
[0133] Determine the comparison results of each pair of indicators according to the scale; wherein the comparison results of the same pair of indicators under different fault information are different;
[0134] According to the comparison results, a fuzzy judgment matrix is established;
[0135] According to the fuzzy judgment matrix, the weight value of each index is calculated;
[0136] Sort the weight values from large to small to get the optimization order;
[0137] S3: Optimize the first scheduling scheme in sequence according to the optimization order to obtain a target scheduling scheme, including:
[0138] Determine the index for the first optimization according to the optimization order, and perform the first optimization on the first scheduling plan to obtain the second scheduling plan;
[0139] Determine the index for the second optimization according to the optimization order, and perform the second optimization on the second scheduling plan to obtain the third scheduling plan;
[0140] The indicators for the third optimization are determined according to the optimization order, and the third scheduling plan is optimized for the third time to obtain the target scheduling plan.
[0141] In one embodiment of the present invention, the scheduling module 302 is further configured to perform the following operations:
[0142] Obtain expected values of parameters of the target wind power flexible DC transmission grid-connected system after scheduling based on each initial scheduling scheme;
[0143] For each parameter, determine the system stability value corresponding to the parameter, and calculate the difference between the expected value of the parameter and the system stability value;
[0144] The sum of the squares of the differences of each parameter is used as the deviation system stability score of the initial scheduling plan;
[0145] The initial scheduling plan corresponding to the smallest deviation from the system stability score is used as the first scheduling plan.
[0146] In one embodiment of the present invention, the scheduling module 302 is further configured to perform the following operations:
[0147] Obtain the unit power dispatch safety index and dispatch cost funds of each dispatch equipment included in each initial dispatch plan;
[0148] The sum of the product of the unit power dispatching safety index of each dispatching equipment and the dispatching cost funds in the initial dispatching plan is used as the safety optimization score of the initial dispatching plan;
[0149] The initial scheduling plan corresponding to the maximum safety optimization score is used as the first scheduling plan.
[0150] In one embodiment of the present invention, the scheduling module 302 is further configured to perform the following operations:
[0151] When optimizing the dispatching cost of the wind power cluster, obtaining the current dispatching plan at the time of current optimization;
[0152] Calculate the first dispatching cost of each wind power cluster included in the current dispatching plan;
[0153] Determine the current scheduling plan corresponding to the minimum first scheduling cost as the optimized scheduling plan;
[0154] The first dispatch cost is determined by the following formula:
[0155]
[0156] in, C Z1 is the first scheduling cost; n is the number of wind power clusters included in the current dispatch plan; K E1,i For the i Capacity cost of a wind farm cluster; E 1,i For thei The total storage capacity of the wind farm cluster; η 1,i For the i The first dispatchable capacity of wind power clusters; K P1,i For the i Unit power cost of a wind power cluster; P dis1,i For the i The dispatching power of a wind power cluster; K aux1,i For the i The unit energy auxiliary facility cost of a wind power cluster.
[0157] In one embodiment of the present invention, the scheduling module 302 is further configured to perform the following operations:
[0158] When optimizing the scheduling cost of the energy-consuming resistor, the current scheduling plan at the time of the current optimization is obtained;
[0159] Calculate the second scheduling cost of the energy-consuming resistor included in each current scheduling plan;
[0160] Determine the current scheduling plan corresponding to the minimum second scheduling cost as the optimized scheduling plan;
[0161] The second dispatch cost is determined by the following formula:
[0162]
[0163] in, C Z2 is the second scheduling cost; m is the number of energy-consuming resistors included in the current scheduling plan; K E2,j For the j The capacity cost of each energy-consuming resistor; E 2,j For the j The total storage capacity of energy-consuming resistors; η 2,j For the j The second adjustable capacity of the energy-consuming resistor; K P2,j For the j The unit power cost of an energy-consuming resistor; P dis2,j For the j The dispatching power of energy-consuming resistors; K aux2,j For the j The unit energy auxiliary facility cost of an energy-consuming resistor.
[0164] In one embodiment of the present invention, the scheduling module 302 is further configured to perform the following operations:
[0165] When optimizing the wind power cluster wind abandonment rate, obtain the current dispatching plan at the time of current optimization;
[0166] Determine the sum of the wind power abandonment rates of the wind power clusters included in each current dispatching plan based on historical data of the target wind power flexible DC transmission grid-connected system;
[0167] The current dispatching plan corresponding to the minimum sum of wind abandonment rates is determined as the optimized dispatching plan.
[0168] It is understandable that the structure illustrated in the embodiment of the present invention does not constitute a specific limitation on a DC fault handling device for a wind power flexible DC transmission grid-connected system. In other embodiments of the present invention, a DC fault handling device for a wind power flexible DC transmission grid-connected system may include more or fewer components than shown in the figure, or combine certain components, or split certain components, or arrange the components differently. The components shown in the figure may be implemented in hardware, software, or a combination of software and hardware.
[0169] The information interaction, execution process and other contents between the modules in the above-mentioned device are based on the same concept as the embodiment of the method of the present invention. For the specific contents, please refer to the description in the embodiment of the method of the present invention, and no further description is given here.
[0170] An embodiment of the present invention further provides a computing device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, a method for handling DC faults in a wind power flexible DC transmission grid-connected system in any embodiment of the present invention is implemented.
[0171] An embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the processor executes a method for handling DC faults in a wind power flexible DC transmission grid-connected system in any embodiment of the present invention.
[0172] An embodiment of the present application also provides a computer program product, which includes a computer program. A processor of a computer device reads the computer program from a computer-readable storage medium, and the processor executes the computer program, so that the computer device executes a method for handling DC faults in a wind power flexible DC transmission grid-connected system as described in any of the above embodiments.
[0173] Specifically, a system or device equipped with a storage medium can be provided, on which software program code that implements the functions of any of the above-mentioned embodiments is stored, and a computer (or CPU or MPU) of the system or device can be enabled to read and execute the program code stored in the storage medium.
[0174] In this case, the program code itself read from the storage medium can realize the function of any one of the above-mentioned embodiments, and thus the program code and the storage medium storing the program code constitute a part of the present invention.
[0175] The storage medium embodiments for providing the program code include a floppy disk, a hard disk, a magneto-optical disk, an optical disk (such as CD-ROM, CD-R, CD-RW, DVD-ROM, DVD-RAM, DVD-RW, DVD+RW), a magnetic tape, a non-volatile memory card, and a ROM. Alternatively, the program code can be downloaded from a server computer via a communication network.
[0176] In addition, it should be clear that the functions of any of the above embodiments can be implemented not only by executing the program code read by the computer, but also by enabling the operating system on the computer to complete part or all of the actual operations based on the instructions of the program code.
[0177] In addition, it can be understood that the program code read from the storage medium is written to a memory provided in an expansion board inserted into the computer or to a memory provided in an expansion module connected to the computer, and then based on the instructions of the program code, a CPU installed on the expansion board or expansion module is enabled to perform part or all of the actual operations, thereby realizing the functions of any of the above-mentioned embodiments.
[0178] It should be noted that, in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical factors in the process, method, article or device including the elements.
[0179] A person of ordinary skill in the art can understand that all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiments; and the aforementioned storage medium includes: ROM, RAM, magnetic disk or optical disk, etc., various media that can store program codes.
[0180] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for handling DC faults in a wind power flexible DC transmission grid-connected system, characterized in that: include: When a DC fault is detected in the target wind power flexible DC transmission grid-connected system, fault information is obtained; Determine an initial scheduling plan according to the fault information; The initial scheduling scheme is sequentially optimized for system safety and multiple indexes to obtain a target scheduling scheme; wherein the multiple indexes for optimization include the scheduling cost of the wind power cluster, the wind power cluster wind abandonment rate, and the scheduling cost of the energy-consuming resistor; The initial scheduling scheme is sequentially optimized for system security and multiple indicators to obtain a target scheduling scheme, including: Performing system security optimization on the initial scheduling plan to obtain a first scheduling plan; Sorting the indicators in the multi-indicator optimization to determine the optimization order of each indicator; Optimize the first scheduling scheme in sequence according to the optimization order to obtain the target scheduling scheme; The step of sorting the indicators in the multi-indicator optimization and determining the optimization order of the indicators includes: Use fuzzy evaluation for the indicators and define a comparison scale; Determine the comparison results of each pair of indicators for pairwise comparison according to the scale; wherein the comparison results of the same pair of indicators under different fault information are different; According to the comparison result, a fuzzy judgment matrix is established; According to the fuzzy judgment matrix, the weight value of each indicator is calculated; Sort the weight values from large to small to obtain the optimization order; The step of optimizing the first scheduling scheme in sequence according to the optimization order to obtain the target scheduling scheme includes: Determining an indicator for a first optimization according to the optimization sequence, and performing the first optimization on the first scheduling scheme to obtain a second scheduling scheme; Determining an indicator for a second optimization according to the optimization sequence, and performing the second optimization on the second scheduling scheme to obtain a third scheduling scheme; The index for the third optimization is determined according to the optimization sequence, and the third scheduling scheme is optimized for the third time to obtain the target scheduling scheme.
2. The method according to claim 1, characterized in that The performing system security optimization on the initial scheduling scheme to obtain a first scheduling scheme includes: Obtaining expected values of parameters of the target wind power flexible direct current transmission grid-connected system after scheduling based on each of the initial scheduling schemes; For each of the parameters, determine the system stability value corresponding to the parameter, and calculate the difference between the expected value of the parameter and the system stability value; The sum of the squares of the differences of the parameters is used as the deviation system stability score of the initial scheduling scheme; The initial scheduling plan corresponding to the minimum deviation from the system stability score is used as the first scheduling plan.
3. The method according to claim 1, characterized in that The performing system security optimization on the initial scheduling scheme to obtain a first scheduling scheme includes: Obtaining the unit power dispatching safety index and dispatching cost funds of each dispatching device included in each of the initial dispatching plans; The sum of the product of the unit power dispatching safety index of each dispatching device in the initial dispatching scheme and the dispatching cost funds is used as the safety optimization score of the initial dispatching scheme; The initial scheduling plan corresponding to the maximum safety optimization score is used as the first scheduling plan.
4. The method according to claim 1, characterized in that The optimization of the wind power cluster dispatching cost includes: Get the current scheduling plan during the current optimization; Calculating a first dispatching cost of each wind power cluster included in the current dispatching scheme; Determine the current scheduling plan corresponding to the minimum first scheduling cost as the optimized scheduling plan; The first scheduling cost is determined by the following formula: in, C Z1 is the first scheduling cost; n is the number of wind power clusters included in the current dispatch plan; K E1,i For the i Capacity cost of a wind farm cluster; E 1,i For the i The total storage capacity of the wind farm cluster; η 1,i For the i The first dispatchable capacity of wind power clusters; K P1,i For the i Unit power cost of a wind power cluster; P dis1,i For the i The dispatching power of a wind power cluster; K aux1,i For the i The unit energy auxiliary facility cost of a wind power cluster.
5. The method according to claim 1, characterized in that: The optimization of the energy-consuming resistor scheduling cost includes: Get the current scheduling plan during the current optimization; Calculating a second scheduling cost of each energy-consuming resistor included in the current scheduling scheme; Determine the current scheduling plan corresponding to the minimum second scheduling cost as the optimized scheduling plan; The second scheduling cost is determined by the following formula: in, C Z2 is the second scheduling cost; m is the number of energy-consuming resistors included in the current scheduling plan; K E2,j For the j The capacity cost of each energy-consuming resistor; E 2,j For the j The total storage capacity of energy-consuming resistors; η 2,j For the j The second adjustable capacity of the energy-consuming resistor; K P2,j For the j The unit power cost of an energy-consuming resistor; P dis2,j For the j The dispatching power of energy-consuming resistors; K aux2,j For the j The unit energy auxiliary facility cost of an energy-consuming resistor.
6. The method according to any one of claims 1 to 5, characterized in that: The optimization of the wind power cluster wind curtailment rate includes: Get the current scheduling plan during the current optimization; Determine the sum of the wind power abandonment rates of each wind power cluster included in the current scheduling scheme according to the historical data of the target wind power flexible direct current transmission grid-connected system; The current dispatching plan corresponding to the minimum sum of wind abandonment rates is determined as the optimized dispatching plan.
7. A DC fault handling device for a wind power flexible DC transmission grid-connected system, characterized in that: include: A monitoring module is used to obtain fault information when a DC fault is detected in the target wind power flexible DC transmission grid-connected system; A scheduling module, used to determine an initial scheduling plan according to the fault information; The initial scheduling scheme is optimized in terms of system safety and multiple indexes in turn to obtain a target scheduling scheme; wherein the multiple indexes for optimization include the scheduling cost of the wind power cluster, the wind power cluster wind abandonment rate, and the scheduling cost of the energy-consuming resistor; The scheduling module is also used to perform the following operations: S1: Optimize the system security of the initial scheduling plan to obtain the first scheduling plan; S2: Sort the indicators in the multi-indicator optimization and determine the optimization order of each indicator, including: Use fuzzy evaluation for indicators and define a scale for comparison; Determine the comparison results of each pair of indicators according to the scale; wherein the comparison results of the same pair of indicators under different fault information are different; According to the comparison results, a fuzzy judgment matrix is established; According to the fuzzy judgment matrix, the weight value of each index is calculated; Sort the weight values from large to small to get the optimization order; S3: Optimize the first scheduling scheme in sequence according to the optimization order to obtain a target scheduling scheme, including: Determine the index for the first optimization according to the optimization order, and perform the first optimization on the first scheduling plan to obtain the second scheduling plan; Determine the index for the second optimization according to the optimization order, and perform the second optimization on the second scheduling plan to obtain the third scheduling plan; The indicators for the third optimization are determined according to the optimization order, and the third scheduling plan is optimized for the third time to obtain the target scheduling plan.
8. A computing device, comprising a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the method according to any one of claims 1 to 6 is implemented.
9. A computer-readable storage medium having a computer program stored thereon, which, when executed in a computer, causes the computer to execute the method according to any one of claims 1 to 6.