A cascade hydropower storage, wind power, solar power and fire power planning and operation method, system, equipment and medium
Through the cascade water storage, wind, solar and thermal planning and operation method, we optimize the coordinated operation of wind power, photovoltaic power generation, thermal power and pumped hydro energy storage, solve the problems of instability of the power system and high power curtailment, and achieve efficient and stable operation of the system and energy efficiency. Take full advantage.
Patent Information
- Application Number
- CN202411061411.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-05
AI Technical Summary
Existing technology is difficult to effectively coordinate the fluctuations of wind power and photovoltaic power generation with the operation of thermal power and pumped hydropower, resulting in instability of the power system and high power abandonment. Moreover, the development potential of pure pumped hydropower tends to be saturated and there is a lack of efficient cascades. Planning and operation methods of hydro-storage, wind, solar and thermal systems.
Using the cascade hydro-storage, wind, solar and thermal planning and operation method, a mixed integer linear programming model is constructed by establishing a multi-energy collaborative multi-objective optimization function and nonlinear partial linearization, and the normal boundary intersection method is used to transform it into a single-objective optimization problem to obtain the system capacity configuration. Run the dispatching strategy to optimize the operating status of cascade hydropower, wind power, and photovoltaic power generation.
Effectively reduce power abandonment, improve system operation efficiency and stability, achieve full utilization and complementation of energy, and support the optimization and sustainable development of energy structure.
Smart Images

Figure CN118572703B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of multi-energy complementary power generation, and in particular to a cascade hydro-storage, wind-solar-solar-firepower planning and operation method, system, equipment and medium. Background Art
[0002] Wind power and photovoltaic energy have temporal and spatial randomness and output volatility, which leads to the instability of their power output. In order to overcome this challenge, clean energy bases usually adopt a multi-energy complementary strategy to integrate multiple energy forms, aiming to effectively smooth out the volatility of wind power and photovoltaic power generation through the coordination and complementation of multiple energy forms, thereby ensuring the continuity and stability of energy supply.
[0003] Both thermal power and pumped storage can be used as regulating energy sources to smooth renewable energy. Thermal power can reduce output when demand is low due to its deep peak regulation capability, but respond quickly during peak hours to provide necessary support for the power grid. Pumped storage can achieve spatiotemporal allocation of energy through the flexible conversion of pumped storage and hydropower generation, further enhancing the regulatory flexibility of the power system. However, many current studies tend to study the two separately, ignoring the synergistic effect that can be brought about by combining the two.
[0004] In addition, in the face of the vigorous development of new energy, the development potential of pure pumped-storage power stations has gradually become saturated, but the country still has abundant hydropower resources, which provides space for the innovative development of pumped-storage technology. By integrating and transforming existing hydropower facilities, especially utilizing the existing infrastructure of cascade hydropower stations, hydropower resources can be converted into efficient pumped-storage power stations without the need to build additional reservoirs, thereby greatly improving the flexibility and reliability of the power system without increasing the environmental burden. Therefore, how to build an efficient, coordinated, and optimally configured cascade water-storage, wind-solar-thermal system planning and operation method between thermal power, integrated and transformed pumped storage, and renewable energy such as wind power and photovoltaics has become a major issue that urgently needs to be solved in the current energy field. Summary of the invention
[0005] The purpose of the present invention is to provide a cascade hydropower, wind power, photovoltaic power generation planning and operation method, system, equipment and medium, which can optimize the operating status of cascade hydropower, wind power and photovoltaic power generation under the synergistic effect of pumped storage power stations and thermal power generation, so as to reduce the amount of abandoned electricity and improve the operating efficiency and stability of the system.
[0006] In order to solve the above technical problems, the present invention provides a cascade hydro-storage, wind-solar-solar-fire planning and operation method, system, equipment and medium.
[0007] In a first aspect, the present invention provides a cascade hydropower storage, wind power, solar power and fire power planning and operation method, the method comprising the following steps:
[0008] Taking minimizing the system's annual comprehensive cost and power abandonment rate as the optimization goal, a cascade multi-energy coordination multi-objective optimization function is established, and the cascade hydropower storage, wind power, solar power and thermal power constraint conditions are established considering the upstream and downstream cascade hydropower constraints;
[0009] The nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the constraints of cascade hydropower, wind power, solar power and fire power are linearized to construct a mixed integer linear programming model for the optimal configuration of cascade hydropower, wind power, solar power and fire power capacity.
[0010] The normal boundary intersection method is used to transform the cascade multi-energy coordination multi-objective optimization function into a single-objective optimization problem, and the mixed integer linear programming model is solved to obtain the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system;
[0011] The operation status of the cascade hydro-storage, wind-solar-thermal system is controlled according to the operation and dispatching strategy configured according to the capacity of the cascade multi-energy complementary system.
[0012] In a further embodiment, the cascade multi-energy collaborative multi-objective optimization function is specifically:
[0013]
[0014]
[0015]
[0016] in,
[0017]
[0018]
[0019]
[0020]
[0021] Where F is the objective function; is the annual comprehensive cost of the system; is the power abandonment rate; is the annual investment cost of the system; is the annual operating cost; is the actual wind power output at time t in the sth scenario; is the actual output of photovoltaic power generation at time t in the sth scenario; is the predicted output coefficient of wind power at time t in the sth scenario; is the output coefficient of photovoltaic power generation predicted at time t in the sth scenario; Building capacity for wind farm planning; Plan and build capacity for photovoltaic power plants; is the number of scenarios; T is the number of running hours for each scenario; is the annual interest rate; The planned operating life of the pumped storage unit; is the unit investment cost of the pumped storage unit; Plan and construct capacity for pumped storage units; The planned operating life of the wind farm; is the unit investment cost of the wind farm; Building capacity for wind farm planning; The planned operating life of the photovoltaic power station; is the unit investment cost of the photovoltaic power station; Plan and build capacity for photovoltaic power plants; is the probability of the sth scenario occurring; is the number of thermal power units; Output of the g-th thermal power unit at the s-th scenario and time t; is the startup operation variable of the g-th thermal power unit at the s-th scenario and time t; is the startup cost of the g-th thermal power unit; is the shutdown operation variable of the g-th thermal power unit at the s-th scenario and time t; is the shutdown cost of the g-th thermal power unit; is the number of cascade hydropower stages; is the number of hydropower units in the i-th hydropower station; is the startup operation variable of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; is the startup cost of the jth hydropower unit in the i-th hydropower station; is the cost of water abandonment of the jth hydropower station of the i-th level; is the water abandonment flow of the jth hydropower station of the i-th hydropower station at the s-th scenario at time t; is the time interval; is the startup operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; The startup cost of the pumped storage unit under pumping conditions; is the startup operation variable of the pumped storage unit generating condition at time t in the sth scenario; is the startup cost of the pumped storage unit under power generation conditions; a, b, and c are the correlation coefficients of coal consumption cost of thermal power units; is the peak load cost function; P is the output variable of the thermal power unit; is the coal consumption cost function of thermal power units; The purchase cost of thermal power units; is the number of rotor cracking cycles at time t; for fuel prices; is the oil injection amount; is the unit coal price; It is the maximum output of thermal power unit; It is the first intermediate limit of thermal power unit output; It is the second intermediate limit of thermal power unit output; It is the lower limit of the output of thermal power units; is the resource consumption rate; is the time-integrated variable; is the risk rate; is the reference time point.
[0022] In a further implementation scheme, the cascade hydropower, wind, solar and thermal power constraints include upstream and downstream cascade hydropower constraints; wherein the upstream and downstream cascade hydropower constraints include water balance constraints, hydropower output constraints, flow constraints, head characteristic constraints, water level-storage capacity relationship constraints, tail water level-discharge flow relationship constraints, pumped storage capacity constraints, pumped storage start-stop constraints, pumped storage power upper and lower limit constraints and pumped storage output constraints;
[0023] The water balance constraints are specifically:
[0024]
[0025]
[0026]
[0027] In the formula, is the capacity of the i-th reservoir at time t in the s-th scenario; is the interval flow of the i-th reservoir at time t in the s-th scenario; is the outflow of the i-th reservoir at time t in the s-th scenario; is the flow rate of the pumped storage unit at time t in the sth scenario; is the time interval; and are the minimum and maximum storage capacities of the i-th level reservoir respectively; and are the initial and final storage capacity coefficients of the annual regulating reservoir respectively; is the capacity of the i-th reservoir at the initial moment of the s-th scenario; is the capacity of the i-th reservoir at time T in the s-th scenario;
[0028] The specific constraints on hydropower output are:
[0029]
[0030] In the formula, Contribute to hydropower; is the density of water; g is the acceleration due to gravity; is the power generation efficiency of the jth hydropower unit in the i-th hydropower station; is the water head height of the i-th hydropower station at the s-th scenario at time t; is the power generation flow of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t;
[0031] The traffic constraints are as follows:
[0032]
[0033]
[0034]
[0035]
[0036] In the formula, is the pumping flow of the pumped storage unit at time t in the sth scenario; is the power generation flow of the pumped storage unit at the sth scenario at time t; is the discharge flow of the i-th level hydropower station of the j-th level hydropower station; The power generation flow of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; is the abandoned water flow of the i-th hydropower station at the jth stage; is the state variable of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; and are the minimum power generation flow and the maximum power generation flow of the j-th hydropower unit in the i-th hydropower station respectively; is the maximum water discharge of the i-th hydropower station;
[0037] The specific head characteristic constraints are:
[0038]
[0039]
[0040] In the formula, is the water level of the i-th reservoir at time t in the s-th scenario; is the tailwater level of the i-th reservoir at time t in the s-th scenario; is the minimum head of the i-th reservoir; is the maximum hydraulic head of the i-th reservoir;
[0041] The water level-reservoir capacity relationship constraints are as follows:
[0042]
[0043] In the formula, is the relationship function between the water level and storage capacity of the i-th reservoir;
[0044] The tailwater level-discharge flow relationship constraints are as follows:
[0045]
[0046] In the formula, is the relationship function between the tailwater level of the i-th reservoir and the discharge flow;
[0047] The specific constraints of pumped storage capacity are:
[0048]
[0049] In the formula, is the capacity of the pumped storage unit; is the maximum pumped storage unit capacity; is the minimum pumped storage unit capacity;
[0050] The specific constraints for pumped storage start and stop are:
[0051]
[0052]
[0053]
[0054]
[0055]
[0056] In the formula, is the state variable of the pumped storage unit under the power generation condition at time t in the sth scenario; is the state variable of the pumped storage unit under the pumping condition at the sth scenario at time t; is the stop operation variable of the pumped storage unit generating condition at time t in the sth scenario; is the stop operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; is the startup operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; is the startup operation variable of the pumped storage unit generating condition at time t in the sth scenario;
[0057] The upper and lower limits of pumped storage power are as follows:
[0058]
[0059]
[0060] In the formula, is the lower limit power factor of the pumped storage unit under power generation conditions; is the actual output of the pumped storage unit in the sth scenario at time t; is the lower limit power coefficient of the pumped storage unit under pumping conditions; is the actual output of the pumped storage unit in the sth scenario at time t;
[0061] The specific constraints of pumped storage output are:
[0062]
[0063]
[0064] In the formula, is the power generation efficiency of the pumped storage unit under power generation conditions; h is the average water head of the pumped storage unit; It is the pumping efficiency of the pumped storage unit under pumping conditions.
[0065] In a further implementation scheme, the cascade hydropower, wind power, photovoltaic power and thermal power constraints also include thermal power operation constraints, wind power and photovoltaic power generation constraints and system power balance constraints;
[0066] The thermal power operation constraints are specifically:
[0067]
[0068]
[0069]
[0070]
[0071]
[0072] In the formula, is the state constraint of the g-th thermal power unit at the s-th scenario and time t; is the minimum output of the g-th thermal power unit; is the maximum output of the g-th thermal power unit; Output of the g-th thermal power unit at the s-th scenario and time t; is the minimum startup time of the g-th thermal power unit; is the minimum shutdown time of the g-th thermal power unit;
[0073] The specific constraints for wind power and photovoltaic power generation are:
[0074]
[0075]
[0076]
[0077] In the formula, The lower limit ratio coefficient of the installed capacity of new energy; is the total installed capacity of the multi-energy complementary system;
[0078] The system power balance constraints are as follows:
[0079]
[0080] In the formula, is the load at time t of the sth scenario.
[0081] In a further implementation scheme, the steps of linearizing the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower storage, wind power, solar power and fire power constraint conditions to construct a mixed integer linear programming model for the optimal configuration of the cascade hydropower storage, wind power, solar power and fire power capacity include:
[0082] The piecewise linear method is used to linearize the water level-reservoir capacity relationship constraints, tailwater level-discharge flow relationship constraints, and the coal consumption cost function of the thermal power unit in the cascade multi-energy collaborative multi-objective optimization function, and the corresponding water level-reservoir capacity relationship linear constraints, tailwater level-discharge flow relationship linear constraints, and thermal power unit coal consumption cost linear function are obtained;
[0083] The convex envelope relaxation method is used to linearize the hydropower output constraint and the upper and lower limit constraints of the pumped storage power, and the corresponding hydropower output linear constraint and the upper and lower limit linear constraint of the pumped storage power are obtained;
[0084] The linear constraints of water level-storage capacity relationship, tailwater level-discharge flow relationship, coal consumption cost linear function of thermal power unit, hydropower output linear constraints and pumped storage power upper and lower limit linear constraints are constructed as a linearized set;
[0085] Based on the linearized set, cascade multi-energy coordinated multi-objective optimization function and cascade hydro-storage, wind-solar-solar-firepower constraints, a mixed integer linear programming model for the optimal configuration of cascade hydro-storage, wind-solar-firepower power capacity is constructed.
[0086] In a further embodiment, the step of converting the cascade multi-energy synergistic multi-objective optimization function into a single-objective optimization problem using the normal boundary intersection method comprises:
[0087] Solve the minimum value of each single objective function in the cascade multi-energy collaborative multi-objective optimization function to obtain the single objective optimal solution;
[0088] Substitute the single-objective optimal solution into each single-objective function of the cascade multi-energy collaborative multi-objective optimization function, construct a payment matrix, and connect the diagonal points of the payment matrix to obtain a Utopia line;
[0089] The single objective function of the cascade multi-energy collaborative multi-objective optimization function is normalized to obtain the normalized objective function value of any solution;
[0090] Normalize the payment matrix to obtain the normalized payment matrix and the normalized utopia line;
[0091] An arbitrary point is selected as the target point on the normalized Utopia line using the normal boundary intersection method. The distance from the target point to each point on the Pareto frontier is calculated according to the normalized objective function value. The Pareto frontier point that maximizes the distance is found by changing the target point. The Pareto solution set of the cascade multi-energy collaborative multi-objective optimization function is obtained to convert the cascade multi-energy collaborative multi-objective optimization function into a single objective optimization problem.
[0092] In a further implementation scheme, the cascade multi-energy synergistic multi-objective optimization function is transformed into a single-objective optimization problem and is specifically expressed as:
[0093]
[0094] in,
[0095]
[0096]
[0097] In the formula, is the distance from the target point to each point on the Pareto frontier; are the coordinates of the points on the normalized Utopia line; , They are single objective functions , The normalized objective function value of ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The optimal solution for a single objective.
[0098] In a second aspect, the present invention provides a cascade hydropower storage, wind power, solar power and fire power planning and operation system, the system comprising:
[0099] The optimization target establishment module is used to establish a cascade multi-energy coordination multi-objective optimization function with the optimization target of minimizing the system annual comprehensive cost and power abandonment rate, and to establish cascade hydropower storage, wind power, solar power and thermal power constraint conditions that take into account the upstream and downstream cascade hydropower constraints;
[0100] The planning model building module is used to linearize the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the constraints of the cascade hydropower storage, wind power, solar power and fire power, and to build a mixed integer linear programming model for the optimal configuration of the cascade hydropower storage, wind power, solar power and fire power capacity;
[0101] A planning model solving module is used to transform the cascade multi-energy collaborative multi-objective optimization function into a single-objective optimization problem by using the normal boundary intersection method, solve the mixed integer linear programming model, and obtain the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system;
[0102] The operation and dispatching control module is used to control the operation status of the cascade hydro-storage, wind-solar-thermal system according to the capacity configuration of the cascade multi-energy complementary system.
[0103] In a third aspect, the present invention further provides a computer device, comprising a processor and a memory, wherein the processor is connected to the memory, the memory is used to store a computer program, and the processor is used to execute the computer program stored in the memory so that the computer device performs the steps of implementing the above method.
[0104] In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and the computer program implements the steps of the above method when executed by a processor.
[0105] The present invention provides a cascade hydropower storage, wind, light, and fire planning and operation method, system, equipment, and medium. The method takes minimizing the system annual comprehensive cost and power abandonment rate as the optimization target, establishes a cascade multi-energy coordinated multi-objective optimization function, and establishes cascade hydropower storage, wind, light, and fire constraint conditions that consider upstream and downstream cascade hydropower constraints; linearizes the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower storage, wind, light, and fire constraint conditions, and constructs a mixed integer linear programming model for the optimal configuration of cascade hydropower storage, wind, light, and fire capacity; uses the normal boundary intersection method to convert the cascade multi-energy coordinated multi-objective optimization function into a single-objective optimization problem, solves the mixed integer linear programming model, and obtains the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system; and controls the operation state of the cascade hydropower storage, wind, light, and fire system according to the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system. Compared with the prior art, the method realizes the optimized operation of the cascade hydropower storage, wind, light, and fire system under the influence of pumped storage and thermal power, effectively reduces the amount of abandoned electricity under various power generation modes, improves the operating efficiency and stability of the system, realizes the full utilization and complementarity of energy, and provides strong support for the optimization of energy structure and sustainable development. BRIEF DESCRIPTION OF THE DRAWINGS
[0106] Figure 1 It is a flow chart of a cascade hydropower storage, wind power, solar power and fire power planning and operation method provided by an embodiment of the present invention;
[0107] Figure 2 It is a block diagram of a cascade hydropower storage, wind power, solar power and fire power planning and operation system provided by an embodiment of the present invention;
[0108] Figure 3 It is a schematic diagram of the structure of a computer device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0109] The following specifically illustrates the implementation mode of the present invention in conjunction with the accompanying drawings. The embodiments are provided for illustrative purposes only and cannot be understood as limiting the present invention. The accompanying drawings are provided for reference and illustration only and do not constitute a limitation on the scope of patent protection of the present invention, because many changes can be made to the present invention without departing from the spirit and scope of the present invention.
[0110] refer to Figure 1 The embodiment of the present invention provides a cascade hydropower storage, wind power, solar power and fire power planning and operation method, such as Figure 1 As shown, the method comprises the following steps:
[0111] S1. Taking minimizing the system annual comprehensive cost and power abandonment rate as the optimization goal, a cascade multi-energy coordinated multi-objective optimization function is established, and the cascade hydropower storage, wind power, solar power and fire power constraint conditions are established considering the upstream and downstream cascade hydropower constraints.
[0112] The cascade hydropower system is formed by transforming the traditional cascade hydropower system into a pumped storage unit. This transformation not only adds the ability of pumping water to the system on the original basis, but also expands the power generation capacity. Specifically, when the capacity of the pumped storage unit configured in the cascade hydropower system is large, the power abandonment rate can be effectively reduced, that is, the power waste caused by grid scheduling or demand fluctuations can be reduced. However, since blindly increasing the capacity will bring about the problem of rising costs, the capacity of the pumped storage unit is not necessarily the larger the better. This embodiment constructs a cascade multi-energy collaborative multi-objective system based on comprehensive consideration of the two key factors of system cost and power abandonment rate. An optimization function is used to optimize the planning and operation of the cascade hydro-storage, wind-solar-light-fire system. Through the cascade multi-energy collaborative multi-objective optimization function, while ensuring the economy and reliability of the system, efficient use of energy and sustainable development of the environment can be achieved, and a balance can be found between improving the power generation efficiency of the system and reducing energy waste. The cascade hydro-storage, wind-solar-light-fire system adopted in this embodiment includes three cascade hydropower stations and one thermal power plant, a new wind farm, a photovoltaic power station and a cascade pumped storage power station. The total installed capacity of the cascade hydropower station is 436MW, and the total installed capacity of the thermal power station is 432MW. The cascade multi-energy collaborative multi-objective optimization function is specifically as follows:
[0113]
[0114]
[0115]
[0116] in,
[0117]
[0118]
[0119] Medium Function Specifically:
[0120]
[0121]
[0122] Where F is the objective function; is the annual comprehensive cost of the system; is the power abandonment rate; is the annual investment cost of the system; is the annual operating cost; is the actual wind power output at time t in the sth scenario; is the actual output of photovoltaic power generation at time t in the sth scenario; is the predicted output coefficient of wind power at time t in the sth scenario; is the output coefficient of photovoltaic power generation predicted at time t in the sth scenario; Building capacity for wind farm planning; Plan and build capacity for photovoltaic power plants; is the number of scenes; T is the running hours of each scene, for example, T is 24 hours; is the annual interest rate; The planned operating life of the pumped storage unit; is the unit investment cost of the pumped storage unit; Plan and construct capacity for pumped storage units; The planned operating life of the wind farm; is the unit investment cost of the wind farm; Building capacity for wind farm planning; The planned operating life of the photovoltaic power station; is the unit investment cost of the photovoltaic power station; Plan and build capacity for photovoltaic power plants; is the probability of the sth scenario occurring; is the number of thermal power units; Output of the g-th thermal power unit at the s-th scenario and time t; is the startup operation variable of the g-th thermal power unit at the s-th scenario and time t; is the startup cost of the g-th thermal power unit; is the shutdown operation variable of the g-th thermal power unit at the s-th scenario and time t; is the shutdown cost of the g-th thermal power unit; is the number of cascade hydropower stages; is the number of hydropower units in the i-th hydropower station; is the startup operation variable of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; is the startup cost of the jth hydropower unit in the i-th hydropower station; is the cost of water abandonment of the jth hydropower station of the i-th level; is the water abandonment flow of the jth hydropower station of the i-th hydropower station at the s-th scenario at time t; is the time interval, since the unit of flow is m 3 / s, so specifically 3600 seconds; is the startup operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; The startup cost of the pumped storage unit under pumping conditions; is the startup operation variable of the pumped storage unit generating condition at time t in the sth scenario; is the startup cost of the pumped storage unit under power generation conditions; a, b, and c are the coal consumption cost coefficients of thermal power units; is the peak load cost function; P is the output variable of the thermal power unit; is the coal consumption cost function of thermal power units; The purchase cost of thermal power units; is the number of rotor cracking cycles at time t, which is related to the output P of the thermal power unit; for fuel prices; is the oil injection amount; is the unit coal price; It is the maximum output of thermal power unit; It is the first intermediate limit of thermal power unit output; It is the second intermediate limit of thermal power unit output; It is the lower limit of the output of thermal power units; is the resource consumption rate, which can represent the change in the availability of a resource (such as coal) over time; is the time-integrated variable; is the reference time point; D is the risk rate. In this embodiment, D can represent the rate at which equipment failure increases over time, so that the model can consider the impact of risk factors over the entire time period. The coal consumption cost function of the thermal power unit adopted in this embodiment uses the resource consumption rate and the risk rate so that the coal consumption cost function of the thermal power unit not only considers the static factors of cost, but also considers the dynamic factors of time and risk, ensuring that while meeting the power demand, the impact of these uncertainties on the operating costs of the thermal power units can be better evaluated and responded to, helping the power system to better adapt to these changes. At the same time, the dynamic coal consumption cost function of the thermal power unit can more effectively identify the complementary relationship between thermal power and other energy forms (such as wind power) and optimize the overall energy portfolio.
[0123] In this embodiment, the cascade hydropower, wind, solar and thermal constraints include upstream and downstream cascade hydropower constraints, thermal power operation constraints, wind power and photovoltaic power generation constraints and system power balance constraints; wherein, the upstream and downstream cascade hydropower constraints include water balance constraints, hydropower output constraints, flow constraints, head characteristic constraints, water level-storage capacity relationship constraints and tail water level-discharge flow relationship constraints. Since the cascade hydropower constraints after the pumped storage unit transformation are different from those of the untransformed system, this embodiment adds new pumped storage constraints, that is, the upstream and downstream cascade hydropower constraints also include pumped storage capacity constraints, pumped storage start and stop constraints, pumped storage power upper and lower limit constraints and pumped storage output constraints. Each constraint condition will be specifically described below:
[0124] The water balance constraints are specifically:
[0125]
[0126]
[0127]
[0128] In the formula, is the capacity of the i-th reservoir at time t in the s-th scenario; is the interval flow of the i-th reservoir at time t in the s-th scenario; is the outflow of the i-th reservoir at time t in the s-th scenario; is the flow rate of the pumped storage unit at time t in the sth scenario; is the time interval; and are the minimum and maximum storage capacities of the i-th level reservoir respectively; and are the initial and final storage capacity coefficients of the annual regulating reservoir respectively; is the capacity of the i-th reservoir at the initial moment of the s-th scenario; is the capacity of the i-th reservoir at time T in the s-th scenario.
[0129] The specific constraints on hydropower output are:
[0130]
[0131] In the formula, Contribute to hydropower; is the density of water; g is the acceleration due to gravity; is the power generation efficiency of the jth hydropower unit in the i-th hydropower station; is the water head height of the i-th hydropower station at the s-th scenario at time t; is the power generation flow of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t.
[0132] The traffic constraints are as follows:
[0133]
[0134]
[0135]
[0136]
[0137] In the formula, is the pumping flow of the pumped storage unit at time t in the sth scenario; is the power generation flow of the pumped storage unit at the sth scenario at time t; is the discharge flow of the i-th level hydropower station of the j-th level hydropower station; The power generation flow of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; is the abandoned water flow of the i-th hydropower station at the jth stage; is the state variable of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; and are the minimum power generation flow and the maximum power generation flow of the j-th hydropower unit in the i-th hydropower station respectively; is the maximum water discharge of the i-th-level hydropower station.
[0138] The specific head characteristic constraints are:
[0139]
[0140]
[0141] In the formula, is the water level of the i-th reservoir at time t in the s-th scenario; is the tailwater level of the i-th reservoir at time t in the s-th scenario; is the minimum head of the i-th reservoir; is the maximum head of the ith reservoir.
[0142] The water level-reservoir capacity relationship constraints are as follows:
[0143]
[0144] In the formula, is the relationship function between the water level and storage capacity of the i-th reservoir.
[0145] The tailwater level-discharge flow relationship constraints are as follows:
[0146]
[0147] In the formula, is the relationship function between the tail water level of the i-th reservoir and the discharge flow.
[0148] The specific constraints of pumped storage capacity are:
[0149]
[0150] In the formula, is the capacity of the pumped storage unit; is the maximum pumped storage unit capacity; is the minimum pumped storage unit capacity.
[0151] The specific constraints for pumped storage start and stop are:
[0152]
[0153]
[0154]
[0155]
[0156]
[0157] In the formula, is the state variable of the pumped storage unit under the power generation condition at time t in the sth scenario; is the state variable of the pumped storage unit under the pumping condition at the sth scenario at time t; is the stop operation variable of the pumped storage unit generating condition at time t in the sth scenario; is the stop operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; is the startup operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; is the startup operation variable of the pumped storage unit generating condition at time t in the sth scenario.
[0158] The upper and lower limits of pumped storage power are as follows:
[0159]
[0160]
[0161] In the formula, is the lower limit power factor of the pumped storage unit under power generation conditions; is the actual output of the pumped storage unit in the sth scenario at time t; is the lower limit power coefficient of the pumped storage unit under pumping conditions; is the actual output of the pumped storage unit in the sth scenario at time t.
[0162] The specific constraints of pumped storage output are:
[0163]
[0164]
[0165] In the formula, is the power generation efficiency of the pumped storage unit under power generation conditions; h is the average water head of the pumped storage unit; It is the pumping efficiency of the pumped storage unit under pumping conditions.
[0166] The thermal power operation constraints are specifically:
[0167]
[0168]
[0169]
[0170]
[0171]
[0172] In the formula, is the state constraint of the g-th thermal power unit at the s-th scenario and time t; is the minimum output of the g-th thermal power unit; is the maximum output of the g-th thermal power unit; Output of the g-th thermal power unit at the s-th scenario and time t; is the minimum startup time of the g-th thermal power unit; is the minimum shutdown time of the g-th thermal power unit.
[0173] The specific constraints for wind power and photovoltaic power generation are:
[0174]
[0175]
[0176]
[0177] In the formula, The lower limit ratio coefficient of the installed capacity of new energy; is the total installed capacity of the multi-energy complementary system.
[0178] The system power balance constraints are as follows:
[0179]
[0180] In the formula, is the load at time t of the sth scenario.
[0181] S2. Linearize the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the constraints of cascade hydropower, wind power, solar power and fire power, and construct a mixed integer linear programming model for the optimal configuration of cascade hydropower, wind power, solar power and fire power capacity.
[0182] In this embodiment, the steps of linearizing the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower storage, wind power, solar power and fire power constraint conditions to construct a mixed integer linear programming model for the optimal configuration of the cascade hydropower storage, wind power, solar power and fire power capacity include:
[0183] The piecewise linear method is used to linearize the water level-reservoir capacity relationship constraints, tailwater level-discharge flow relationship constraints, and the coal consumption cost function of the thermal power unit in the cascade multi-energy collaborative multi-objective optimization function, and the corresponding water level-reservoir capacity relationship linear constraints, tailwater level-discharge flow relationship linear constraints, and thermal power unit coal consumption cost linear function are obtained;
[0184] The convex envelope relaxation method is used to linearize the hydropower output constraint and the upper and lower limit constraints of the pumped storage power, and the corresponding hydropower output linear constraint and the upper and lower limit linear constraint of the pumped storage power are obtained;
[0185] The linear constraints of water level-storage capacity relationship, tailwater level-discharge flow relationship, coal consumption cost linear function of thermal power unit, hydropower output linear constraints and pumped storage power upper and lower limit linear constraints are constructed as a linearized set;
[0186] Based on the linearized set, cascade multi-energy coordinated multi-objective optimization function and cascade hydro-storage, wind-solar-solar-firepower constraints, a mixed integer linear programming model for the optimal configuration of cascade hydro-storage, wind-solar-firepower power capacity is constructed.
[0187] Specifically, the present embodiment can use the piecewise linear method of the special order set of type 2 (SOS2) constraint to linearize the parts including the water level-reservoir capacity relationship constraint, the tailwater level-discharge flow relationship constraint and the coal consumption cost function of the thermal power unit, wherein the coal consumption cost function of the thermal power unit can also use other piecewise linear methods, and for the integral term of the coal consumption cost function of the thermal power unit, a numerical integration method such as the trapezoidal method or the Simpson method can be used in the linearization process to approximate the calculation; and for the hydropower output constraint and the upper and lower limit constraints of the pumped storage power, the present embodiment can use the McCormick convex envelope relaxation method to linearize the hydropower output constraint and the upper and lower limit constraints of the pumped storage power. In order to facilitate the understanding of the linearization process, for the part linearized by the piecewise linear method based on the SOS2 constraint, the present embodiment will specifically explain the linearization of the water level-reservoir capacity relationship constraint, and the other two constraints are linearized by the same method, which will not be repeated:
[0188] For the water level-reservoir capacity relationship constraint, this embodiment uses a piecewise linear method based on SOS2 constraints for linearization, and the steps are as follows:
[0189] Assumed water level and Ku Rong The relationship between can be approximated as a K-segment mapping function to determine the linear range of water level and reservoir capacity. Assuming that the reservoir capacity The linearization range is divided into K segments, storage capacity The linearization range is , then the storage capacity The endpoints of each segment of the linearization range are ,correspond The segment point can be written as , introduce auxiliary variables , the water level and reservoir capacity can be expressed as:
[0190]
[0191]
[0192] Introduce a 0-1 variable to determine the water level and reservoir capacity in the kth segment ,like , it means that the water level and reservoir capacity are operating in the kth stage, as follows:
[0193]
[0194]
[0195]
[0196]
[0197]
[0198] .
[0199] For the hydropower output constraint and the upper and lower limit constraints of the pumped storage power, this embodiment adopts the McCormick convex envelope relaxation method for linearization. For ease of understanding, this embodiment will specifically explain the linearization of the hydropower output constraint, and the upper and lower limit constraints of the pumped storage power are linearized using the same method, which will not be repeated:
[0200] In the hydropower output constraints, and To multiply two variables, linearization is required for easy solution. McCormick convex envelope relaxation method is used. The linearization process is as follows:
[0201]
[0202]
[0203]
[0204]
[0205] Through the above steps, this embodiment can linearize nonlinear parts such as nonlinear water level-reservoir capacity relationship constraints, which not only simplifies the complexity of the model, but also makes the model suitable for an efficient mixed integer linear programming solver, significantly improving the efficiency of solving subsequent target optimization problems and ensuring the accuracy and reliability of the solution results. At the same time, the establishment of the mixed integer linear programming model fully considers the integer variables existing in the system (such as equipment capacity, unit start and stop status, etc.), making the optimization results closer to the actual operating conditions.
[0206] S3. The cascade multi-energy collaborative multi-objective optimization function is transformed into a single-objective optimization problem using the normal boundary intersection method, and the mixed integer linear programming model is solved to obtain the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system.
[0207] In this embodiment, the step of converting the cascade multi-energy collaborative multi-objective optimization function into a single-objective optimization problem using the normal boundary intersection method includes:
[0208] Solve the minimum value of each single objective function in the cascade multi-energy collaborative multi-objective optimization function to obtain the single objective optimal solution;
[0209] Substitute the single-objective optimal solution into each single-objective function of the cascade multi-energy collaborative multi-objective optimization function, construct a payment matrix, and connect the diagonal points of the payment matrix to obtain a Utopia line;
[0210] The single objective function of the cascade multi-energy collaborative multi-objective optimization function is normalized to obtain the normalized objective function value of any solution;
[0211] Normalize the payment matrix to obtain the normalized payment matrix and the normalized utopia line;
[0212] The normal boundary intersection (NBI) method is used to randomly select a point on the normalized Utopia line as the target point. The distance from the target point to each point on the Pareto frontier is calculated according to the normalized objective function value. The Pareto frontier point that maximizes the distance is found by changing the target point. The Pareto solution set of the cascade multi-energy collaborative multi-objective optimization function is obtained to convert the cascade multi-energy collaborative multi-objective optimization function into a single objective optimization problem.
[0213] Specifically, for the two single objective functions of the cascade multi-energy collaborative multi-objective optimization function , , respectively solve the optimal solutions of two single objective functions, where the single objective function To minimize the annual comprehensive cost of the system, the single objective function To minimize the power abandonment rate, x is a decision variable; in this embodiment, a single objective function can be found through an optimization algorithm (such as genetic algorithm, particle swarm optimization, etc.) The minimum value of The optimal solution is denoted as , the corresponding x is , similarly, find the single objective function The minimum value of The optimal solution is denoted as , the corresponding x is .
[0214] Will , Substitute the two single objective functions respectively and solve them to get and , and obtain the payment matrix:
[0215]
[0216] Connect two diagonal points in the payoff matrix ( , )and( , ), we get the Utopia line, which represents the boundary where both goals are optimally achieved at the same time under ideal circumstances.
[0217] In this embodiment, the separately solved objective function values are normalized so that the two single objective functions can be compared on the same scale. For any solution x, the normalized objective function is as follows:
[0218]
[0219]
[0220] The normalized payment matrix becomes:
[0221]
[0222] The normalized payment matrix represents the relative position of the two objective functions between the optimal solution and the suboptimal solution. This embodiment uses the NBI algorithm to select any point on the normalized utopia line. , and calculate the distance from this point to each point on the Pareto Front (i.e. the set of all Pareto optimal solutions) ( , ) To find the Pareto solution set, where + = 1 and , , by changing and The value of (maintain + = 1) Solve to maximize the distance , find the distance The largest point is the Pareto solution under the current NBI algorithm. Through the above steps, the original multi-objective optimization problem is transformed into a single-objective optimization problem. Each problem attempts to find a Pareto solution that is closest to the Utopia line, that is, to maximize the distance λ:
[0223]
[0224] In the formula, is the distance from the target point to each point on the Pareto frontier; are the coordinates of the points on the normalized Utopia line, and are the horizontal and vertical coordinates on the normalized Utopia line. The normalized Utopia line is a line segment in the first interval formed by connecting the two points (0, 1) and (1, 0); , They are single objective functions , The normalized objective function value of ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The optimal solution for a single objective.
[0225] This embodiment continuously adjusts and , and solve the corresponding maximization The problem can be solved by a series of Pareto solutions, which can be converted into a series of single-objective optimization problems through the NBI algorithm to solve the original multi-objective optimization problem. This embodiment takes the annual comprehensive cost of the system and the power abandonment rate as the targets, establishes a multi-objective function for the planning and operation of cascade hydropower, wind power, solar power and fire power, and linearizes the nonlinear part in the model at the same time. Then, Yalmip (Yet Another LMIParser, a MATLAB toolbox for modeling and solving convex optimization problems) is used to call the Gurobi solver (GurobiOptimization, a mathematical programming solver) to solve the mixed integer linear programming model, and obtains the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system. The capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system can include the specific capacity of wind, light and storage, as well as the operation method of cascade hydropower, wind power and solar power, which can optimize the operation mode of cascade hydropower, wind power and photovoltaic power generation, reduce the amount of power abandoned, and realize the optimized operation of the system.
[0226] This embodiment can transform the multi-objective optimization problem into a series of easy-to-solve single-objective optimization problems through the NBI algorithm or other multi-objective optimization solving strategies. This step not only reduces the difficulty of solving, helps to balance the conflicts between different objectives and achieve overall optimization of the system, but also can select one or more optimal solutions from the Pareto frontier according to different system requirements, and extract the specific capacity of wind, light, storage and other energy sources and the operation method of cascade water storage, wind, light and fire, ensuring that the system can operate in the most optimized manner.
[0227] S4. Control the operating status of the cascade hydro-storage, wind-solar-thermal system according to the capacity configuration operation and dispatching strategy of the cascade multi-energy complementary system.
[0228] This embodiment can convert the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system into specific scheduling instructions, such as starting / stopping a specific generator set, adjusting power generation, etc., and dynamically adjust the operation status of the cascade hydro-storage, wind-solar-light-fired system through scheduling instructions. For example, after receiving the scheduling instruction, each energy subsystem performs corresponding adjustment operations, such as adjusting the outflow flow of the hydropower station, increasing the output of photovoltaic power generation when wind power generation is insufficient, and the charging and discharging strategy of the energy storage power station, so as to adapt to the changes in grid demand and fluctuations in energy supply, balance the relationship between multiple objectives, and realize precise control of the power system. It not only improves the operation efficiency and stability of the system, ensures that the cascade hydro-storage, wind-solar-light-fired system achieves the optimal balance while meeting energy demand, but also further reduces the amount of abandoned electricity, improves the utilization rate of renewable energy, and realizes the overall optimization of the system.
[0229] In this embodiment, the pumped storage power station, as a high-quality peak-shaving and frequency-regulating resource, together with thermal power, provides the necessary flexibility and reliability for the system. Under the regulation of the pumped storage power station and the support of thermal power, by constructing and solving a mixed integer linear programming model, combined with technologies such as the NBI algorithm, the optimal solution set with the lowest economic cost and the smallest amount of abandoned electricity is found under the premise of meeting the safe and stable operation of the system. This not only reduces the operating cost of the system, but also improves the overall operating efficiency and stability of the system. When the output of intermittent renewable energy such as wind power and photovoltaics fluctuates, the pumped storage power station can respond quickly, smooth out power fluctuations, ensure the stability of the grid frequency and voltage, and at the same time reduce the phenomenon of cascade hydropower being forced to abandon water due to regulation needs.
[0230] An embodiment of the present invention provides a planning and operation method for cascade hydropower, wind, solar, and firepower. The method takes minimizing the system's annual comprehensive cost and power abandonment rate as optimization objectives, establishes a cascade multi-energy coordinated multi-objective optimization function, and establishes cascade hydropower, wind, solar, and firepower constraint conditions that take into account upstream and downstream cascade hydropower constraints; linearizes the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower, wind, solar, and firepower constraint conditions, and constructs a mixed integer linear programming model for the optimal configuration of cascade hydropower, wind, solar, and firepower capacity; uses the normal boundary intersection method to transform the cascade multi-energy coordinated multi-objective optimization function into a single-objective optimization problem, solves the mixed integer linear programming model, and obtains the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system; and controls the operation status of the cascade hydropower, wind, solar, and firepower system according to the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system. Compared with the existing technology, this method, based on comprehensive consideration of the regulation capacity of pumped storage and thermal power, optimizes the operating status of cascade hydropower, wind power and photovoltaic power generation, effectively reducing the amount of abandoned electricity from renewable energy power generation. This optimization adjustment not only improves the utilization rate of power resources, but also promotes the operating efficiency of the entire energy system. Through a comprehensive scheduling strategy, it achieves the optimization of system operation, significantly improves energy utilization efficiency and reduces operating costs.
[0231] It should be noted that the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0232] In one embodiment, Figure 2 As shown, an embodiment of the present invention provides a cascade hydropower storage, wind power, solar power and fire power planning and operation system, the system comprising:
[0233] The optimization target establishment module 101 is used to establish a cascade multi-energy coordination multi-objective optimization function with minimization of the system annual comprehensive cost and power abandonment rate as the optimization target, and to establish cascade hydropower storage, wind power, solar power and thermal power constraint conditions that take into account the upstream and downstream cascade hydropower constraints;
[0234] The planning model building module 102 is used to linearize the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower storage, wind power, solar power and fire power constraint conditions, and build a mixed integer linear programming model for the optimal configuration of the cascade hydropower storage, wind power, solar power and fire power capacity;
[0235] The planning model solving module 103 is used to transform the cascade multi-energy coordination multi-objective optimization function into a single-objective optimization problem by using the normal boundary intersection method, solve the mixed integer linear programming model, and obtain the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system;
[0236] The operation scheduling control module 104 is used to control the operation status of the cascade hydro-storage, wind-solar-thermal system according to the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system.
[0237] For the specific limitations of a cascade hydro-storage, wind, solar, and fire planning and operation system, please refer to the above-mentioned limitations on a cascade hydro-storage, wind, solar, and fire planning and operation method, which will not be repeated here. A person of ordinary skill in the art can appreciate that the various modules and steps described in conjunction with the embodiments disclosed in this application can be implemented in hardware, software, or a combination of both. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0238] An embodiment of the present invention provides a cascade hydropower, wind, solar, and firepower planning and operation system, wherein the system establishes a cascade multi-energy coordinated multi-objective optimization function through an optimization target establishment module, and establishes cascade hydropower, wind, solar, and firepower constraint conditions that take into account upstream and downstream cascade hydropower constraints; the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower, wind, solar, and firepower constraint conditions are linearized through a planning model construction module, and a mixed integer linear programming model for the optimal configuration of the cascade hydropower, wind, solar, and firepower capacity is constructed; the cascade multi-energy coordinated multi-objective optimization function is converted into a single-objective optimization problem through a planning model solving module, and the mixed integer linear programming model is solved to obtain the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system; the operation scheduling control module controls the operation status of the cascade hydropower, wind, solar, and firepower system according to the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system. Compared with the existing technology, this system, based on comprehensive consideration of pumped storage and thermal power regulation capabilities, optimizes the operating status of cascade hydropower, wind power, and photovoltaic power generation, effectively reducing the amount of power abandoned by renewable energy power generation. This optimization adjustment not only improves the utilization rate of power resources, but also promotes the operating efficiency of the entire energy system. Through a comprehensive scheduling strategy, it achieves the optimization of system operation, significantly improves energy utilization efficiency, and reduces operating costs.
[0239] Figure 3 A computer device provided by an embodiment of the present invention includes a memory, a processor and a transceiver, which are connected via a bus; the memory is used to store a set of computer program instructions and data, and can transmit the stored data to the processor, and the processor can execute the program instructions stored in the memory to perform the steps of the above method.
[0240] The memory may include a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories; the processor may be a central processing unit, a microprocessor, an application-specific integrated circuit, a programmable logic device, or a combination thereof. By way of example but not limitation, the programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic, or any combination thereof.
[0241] Additionally, the memory may be a physically separate unit or may be integrated with the processor.
[0242] It can be understood by those skilled in the art that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have the same component arrangement.
[0243] In one embodiment, the present invention provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above method are implemented.
[0244] An embodiment of the present invention provides a cascade hydro-storage, wind, solar, and fire planning and operation method, system, equipment, and medium. The cascade hydro-storage, wind, solar, and fire planning and operation method linearizes the nonlinear parts of the cascade multi-energy collaborative multi-objective optimization function and the cascade hydro-storage, wind, solar, and fire constraint conditions, and constructs a mixed integer linear programming model for the optimal configuration of the cascade hydro-storage, wind, solar, and fire capacity; the cascade multi-energy collaborative multi-objective optimization function is converted into a single-objective optimization problem, the mixed integer linear programming model is solved, and the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system is obtained; the operating state of the cascade hydro-storage, wind, solar, and fire system is controlled according to the capacity configuration and operation scheduling strategy of the cascade multi-energy complementary system. Under the synergistic effect of pumped-storage power stations and thermal power generation, the cascade hydro-storage, wind, solar, and fire planning and operation method optimizes the operating state of cascade hydropower, wind power, and photovoltaic power generation to reduce the amount of abandoned electricity and achieve economical, efficient, and stable optimized operation of the system.
[0245] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line) or wireless (e.g., infrared, wireless, microwave, etc.) mode. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., an SSD), etc.
[0246] Those skilled in the art will appreciate that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing related hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods.
[0247] The above-mentioned embodiments only express several preferred implementation modes of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in the technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be regarded as the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be based on the protection scope of the claims.
Claims
1. A planning and operation method for cascade hydropower storage, wind power, solar power and fire power. It is characterized in that The following steps are involved: Taking minimizing the system's annual comprehensive cost and power abandonment rate as the optimization goal, a cascade multi-energy coordination multi-objective optimization function is established, and the cascade hydropower storage, wind power, solar power and thermal power constraint conditions are established considering the upstream and downstream cascade hydropower constraints; The nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the constraints of cascade hydropower, wind power, solar power and fire power are linearized to construct a mixed integer linear programming model for the optimal configuration of cascade hydropower, wind power, solar power and fire power capacity. The normal boundary intersection method is used to transform the cascade multi-energy coordination multi-objective optimization function into a single-objective optimization problem, and the mixed integer linear programming model is solved to obtain the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system; According to the capacity configuration operation and dispatching strategy of the cascade multi-energy complementary system, the operation status of the cascade hydro-storage, wind-solar-thermal system is controlled; The cascade multi-energy collaborative multi-objective optimization function is specifically: in, Where F is the objective function; is the annual comprehensive cost of the system; is the power abandonment rate; is the annual investment cost of the system; is the annual operating cost; is the actual wind power output at time t in the sth scenario; is the actual output of photovoltaic power generation at time t in the sth scenario; is the predicted output coefficient of wind power at time t in the sth scenario; is the output coefficient of photovoltaic power generation predicted at time t in the sth scenario; Building capacity for wind farm planning; Plan and build capacity for photovoltaic power plants; is the number of scenarios; T is the number of running hours for each scenario; is the annual interest rate; The planned operating life of the pumped storage unit; is the unit investment cost of the pumped storage unit; Plan and construct capacity for pumped storage units; The planned operating life of the wind farm; is the unit investment cost of the wind farm; Building capacity for wind farm planning; The planned operating life of the photovoltaic power station; is the unit investment cost of the photovoltaic power station; Plan and build capacity for photovoltaic power plants; is the probability of the sth scenario occurring; is the number of thermal power units; Output of the g-th thermal power unit at the s-th scenario and time t; is the startup operation variable of the g-th thermal power unit at the s-th scenario and time t; is the startup cost of the g-th thermal power unit; is the shutdown operation variable of the g-th thermal power unit at the s-th scenario and time t; is the shutdown cost of the g-th thermal power unit; is the number of cascade hydropower stages; is the number of hydropower units in the i-th hydropower station; is the startup operation variable of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; is the startup cost of the jth hydropower unit in the i-th hydropower station; is the cost of water abandonment of the jth hydropower station of the i-th level; is the water abandonment flow of the jth hydropower station of the i-th hydropower station at the s-th scenario at time t; is the time interval; is the startup operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; The startup cost of the pumped storage unit under pumping conditions; is the startup operation variable of the pumped storage unit generating condition at time t in the sth scenario; is the startup cost of the pumped storage unit under power generation conditions; a, b, and c are the correlation coefficients of coal consumption cost of thermal power units; is the peak load cost function; P is the output variable of the thermal power unit; is the coal consumption cost function of thermal power units; The purchase cost of thermal power units; is the number of rotor cracking cycles at time t; for fuel prices; is the oil injection amount; is the unit coal price; It is the maximum output of thermal power unit; It is the first intermediate limit of thermal power unit output; It is the second intermediate limit of thermal power unit output; It is the lower limit of the output of thermal power units; is the resource consumption rate; is the time-integrated variable; is the risk rate; is the reference time point; The step of converting the cascade multi-energy synergistic multi-objective optimization function into a single-objective optimization problem by using the normal boundary intersection method comprises: Solve the minimum value of each single objective function in the cascade multi-energy collaborative multi-objective optimization function to obtain the single objective optimal solution; Substitute the single-objective optimal solution into each single-objective function of the cascade multi-energy collaborative multi-objective optimization function, construct a payment matrix, and connect the diagonal points of the payment matrix to obtain a Utopia line; The single objective function of the cascade multi-energy collaborative multi-objective optimization function is normalized to obtain the normalized objective function value of any solution; Normalize the payment matrix to obtain the normalized payment matrix and the normalized utopia line; An arbitrary point is selected as the target point on the normalized Utopia line using the normal boundary intersection method. The distance from the target point to each point on the Pareto frontier is calculated according to the normalized objective function value. The Pareto frontier point that maximizes the distance is found by changing the target point. The Pareto solution set of the cascade multi-energy collaborative multi-objective optimization function is obtained to convert the cascade multi-energy collaborative multi-objective optimization function into a single objective optimization problem.
2. A cascade hydropower storage, wind, solar, and fire planning and operation method as claimed in claim 1, Features: The cascade hydropower, wind, solar and thermal power constraints include upstream and downstream cascade hydropower constraints; wherein the upstream and downstream cascade hydropower constraints include water balance constraints, hydropower output constraints, flow constraints, head characteristic constraints, water level-storage capacity relationship constraints, tail water level-discharge flow relationship constraints, pumped storage capacity constraints, pumped storage start-stop constraints, pumped storage power upper and lower limit constraints and pumped storage output constraints; The water balance constraints are specifically: In the formula, is the capacity of the i-th reservoir at time t in the s-th scenario; is the interval flow of the i-th reservoir at time t in the s-th scenario; is the outflow of the i-th reservoir at time t in the s-th scenario; is the flow rate of the pumped storage unit at time t in the sth scenario; is the time interval; and are the minimum and maximum storage capacities of the i-th level reservoir respectively; and are the initial and final storage capacity coefficients of the annual regulating reservoir respectively; is the capacity of the i-th reservoir at the initial moment of the s-th scenario; is the capacity of the i-th reservoir at time T in the s-th scenario; The specific constraints on hydropower output are: In the formula, Contribute to hydropower; is the density of water; g is the acceleration due to gravity; is the power generation efficiency of the jth hydropower unit in the i-th hydropower station; is the water head height of the i-th hydropower station at the s-th scenario at time t; is the power generation flow of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; The traffic constraints are as follows: In the formula, is the pumping flow of the pumped storage unit at time t in the sth scenario; is the power generation flow of the pumped storage unit at the sth scenario at time t; is the discharge flow of the i-th level hydropower station of the j-th level hydropower station; The power generation flow of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; is the abandoned water flow of the i-th hydropower station at the jth stage; is the state variable of the jth hydropower unit of the i-th hydropower station at the s-th scenario at time t; and are the minimum power generation flow and the maximum power generation flow of the j-th hydropower unit in the i-th hydropower station respectively; is the maximum water discharge of the i-th hydropower station; The specific head characteristic constraints are: In the formula, is the water level of the i-th reservoir at time t in the s-th scenario; is the tailwater level of the i-th reservoir at time t in the s-th scenario; is the minimum head of the i-th reservoir; is the maximum hydraulic head of the i-th reservoir; The water level-reservoir capacity relationship constraints are as follows: In the formula, is the relationship function between the water level and storage capacity of the i-th reservoir; The tailwater level-discharge flow relationship constraints are as follows: In the formula, is the relationship function between the tailwater level of the i-th reservoir and the discharge flow; The specific constraints of pumped storage capacity are: In the formula, is the capacity of the pumped storage unit; is the maximum pumped storage unit capacity; is the minimum pumped storage unit capacity; The specific constraints for pumped storage start and stop are: In the formula, is the state variable of the pumped storage unit under the power generation condition at time t in the sth scenario; is the state variable of the pumped storage unit under the pumping condition at the sth scenario at time t; is the stop operation variable of the pumped storage unit generating condition at time t in the sth scenario; is the stop operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; is the startup operation variable of the pumping condition of the pumped storage unit at time t in the sth scenario; is the startup operation variable of the pumped storage unit generating condition at time t in the sth scenario; The upper and lower limits of pumped storage power are as follows: In the formula, is the lower limit power factor of the pumped storage unit under power generation conditions; is the actual output of the pumped storage unit in the sth scenario at time t; is the lower limit power coefficient of the pumped storage unit under pumping conditions; is the actual output of the pumped storage unit in the sth scenario at time t; The specific constraints of pumped storage output are: In the formula, is the power generation efficiency of the pumped storage unit under power generation conditions; h is the average water head of the pumped storage unit; It is the pumping efficiency of the pumped storage unit under pumping conditions.
3. A cascade hydropower storage, wind, solar and fire planning and operation method as claimed in claim 2, Features: The cascade hydropower storage, wind power, photovoltaic power and thermal power constraints also include thermal power operation constraints, wind power and photovoltaic power generation constraints and system power balance constraints; The thermal power operation constraints are specifically: In the formula, is the state constraint of the g-th thermal power unit at the s-th scenario and time t; is the minimum output of the g-th thermal power unit; is the maximum output of the g-th thermal power unit; Output of the g-th thermal power unit at the s-th scenario and time t; is the minimum startup time of the g-th thermal power unit; is the minimum shutdown time of the g-th thermal power unit; The specific constraints for wind power and photovoltaic power generation are: In the formula, The lower limit ratio coefficient of the installed capacity of new energy; is the total installed capacity of the multi-energy complementary system; The system power balance constraints are as follows: In the formula, is the load at time t of the sth scenario.
4. A cascade hydropower storage, wind, solar and fire planning and operation method as claimed in claim 3, It is characterized in that The steps of linearizing the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the cascade hydropower storage, wind power, solar power and fire power constraint conditions to construct a mixed integer linear programming model for the optimal configuration of the cascade hydropower storage, wind power, solar power and fire power capacity include: The piecewise linear method is used to linearize the water level-reservoir capacity relationship constraints, tailwater level-discharge flow relationship constraints, and the coal consumption cost function of the thermal power unit in the cascade multi-energy collaborative multi-objective optimization function, and the corresponding water level-reservoir capacity relationship linear constraints, tailwater level-discharge flow relationship linear constraints, and thermal power unit coal consumption cost linear function are obtained; The convex envelope relaxation method is used to linearize the hydropower output constraint and the upper and lower limit constraints of the pumped storage power, and the corresponding hydropower output linear constraint and the upper and lower limit linear constraint of the pumped storage power are obtained; The linear constraints of water level-storage capacity relationship, tailwater level-discharge flow relationship, coal consumption cost linear function of thermal power unit, hydropower output linear constraints and pumped storage power upper and lower limit linear constraints are constructed as a linearized set; Based on the linearized set, cascade multi-energy coordinated multi-objective optimization function and cascade hydro-storage, wind-solar-solar-firepower constraints, a mixed integer linear programming model for the optimal configuration of cascade hydro-storage, wind-solar-firepower power capacity is constructed.
5. A cascade hydropower storage, wind, solar and fire planning and operation method as claimed in claim 1, It is characterized in that The cascade multi-energy collaborative multi-objective optimization function is transformed into a single-objective optimization problem as follows: in, In the formula, is the distance from the target point to each point on the Pareto frontier; are the coordinates of points on the normalized Utopia line; , They are single objective functions , The normalized objective function value of ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The single objective optimal solution when ; A single objective function When the decision variable is The optimal solution for a single objective.
6. A cascade hydropower storage, wind, solar and thermal power planning and operation system, It is characterized in that The cascade hydropower storage, wind power, solar power and fire power planning and operation method as claimed in any one of claims 1 to 5 is applied, and the system comprises: The optimization target establishment module is used to establish a cascade multi-energy coordination multi-objective optimization function with the optimization target of minimizing the system annual comprehensive cost and power abandonment rate, and to establish cascade hydropower storage, wind power, solar power and thermal power constraint conditions that take into account the upstream and downstream cascade hydropower constraints; The planning model building module is used to linearize the nonlinear parts of the cascade multi-energy coordinated multi-objective optimization function and the constraints of the cascade hydropower storage, wind power, solar power and fire power, and to build a mixed integer linear programming model for the optimal configuration of the cascade hydropower storage, wind power, solar power and fire power capacity; A planning model solving module is used to transform the cascade multi-energy collaborative multi-objective optimization function into a single-objective optimization problem by using the normal boundary intersection method, solve the mixed integer linear programming model, and obtain the capacity configuration operation scheduling strategy of the cascade multi-energy complementary system; The operation and dispatching control module is used to control the operation status of the cascade hydro-storage, wind-solar-thermal system according to the capacity configuration of the cascade multi-energy complementary system.
7. A computer device, Features: The computer device comprises a processor and a memory, wherein the processor is connected to the memory, the memory is used to store a computer program, and the processor is used to execute the computer program stored in the memory, so that the computer device executes the method according to any one of claims 1 to 5.
8. A computer-readable storage medium, Features: The computer-readable storage medium stores a computer program, and when the computer program is executed, the method according to any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Capacity planning method of heat storage tank and sensitivity analysis method of electricity-to-gas parameters
CN110729720A
Short-term interval optimization scheduling method for water-fire-wind-light multi-energy system
CN114243710A
Resource scheduling method and device for wind-light-fire-pumped storage complementary power generation system
CN115173476A
Wind-solar-thermal storage combined delivery optimal configuration method, system, equipment and medium
CN115313482A
Optimized scheduling and cost compensation allocation method for improving source load multivariate peak regulation initiative
CN116826867A