A distribution network simulation optimization method and system
By collecting and preprocessing equipment parameters and telemetry data, modifying the topology structure and establishing a simulation calculation model, the high power consumption and voltage fluctuations of the distribution network are solved, the grid operation strategy is optimized, the energy utilization efficiency is improved, and the power grid is ensured. Safe and stable.
Patent Information
- Application Number
- CN202411066839.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-06
AI Technical Summary
The high power consumption of the distribution network, voltage fluctuations and harmonic problems have affected the safety and stability of the power grid. The existing technology is insufficient in supporting the professional application scenarios of distribution networks, the construction and operation and maintenance costs are high and the construction cycle is long, so it cannot be implemented effectively. .
By collecting and preprocessing equipment parameters and telemetry data, building data models, correcting topological structures, establishing algorithm models for simulation calculations, using the two-way convergence forward-back generation method to perform data deduction, calculate the power grid current distribution, and optimize the power grid operation strategy.
It improves the accuracy of simulation calculations, optimizes the grid operation strategy, reduces losses, improves energy utilization efficiency, and ensures the safe and stable operation of the power grid.
Smart Images

Figure CN118586209B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power distribution network simulation calculation, and in particular to a power distribution network simulation optimization method and system. Background Art
[0002] Distribution network simulation calculation is an important part of power system analysis and design. It uses computer simulation technology to simulate the behavior and performance of distribution networks under various operating conditions.
[0003] The main purpose of distribution network simulation calculation is: first, to ensure the safety of the power grid. Through simulation calculation, the response of the power grid under different fault conditions can be predicted, so that measures can be taken in advance to avoid or reduce the impact of faults on the power grid. Secondly, to improve the quality of power supply, simulation calculation helps to optimize the structure of the power grid, reduce voltage fluctuations and harmonics, and improve the reliability and stability of power supply. Finally, to reduce operating costs, through reasonable simulation calculation, the operation strategy of the power grid can be optimized, losses can be reduced, and energy efficiency can be improved.
[0004] Although existing technologies have completed the access of telemetry, telesignaling, and event data for dispatching automation, distribution automation, and electricity consumption information collection systems, and have built shared services based on real-time measurement centers, they are still insufficient in supporting professional application scenarios of distribution networks.
[0005] First, due to the large number and wide range of distribution network points, the transparency of the distribution network can only be achieved by installing a full set of data collection devices. This method not only has high construction and operation and maintenance costs and a long construction period, but also cannot be effectively implemented; second, with the access of distributed renewable energy power generation to the distribution network, the distribution network has shifted towards source-grid-load interaction and multi-functional coupling operation, resulting in voltage exceeding the limit at key nodes in some local areas, and even the phenomenon of reverse power transmission on the outgoing lines. The distribution network has high power consumption, which affects the safe and stable operation of the power grid, and brings the dual uncertainty of source and load to the power grid.
[0006] In view of this, a solution is urgently needed to solve the above problems. Summary of the invention
[0007] The purpose of the present invention is to provide a distribution network simulation optimization method and system, which improves the problems of high power consumption, voltage fluctuation and harmonics in the distribution network operation, optimizes the operation strategy of the power grid, reduces losses and improves energy utilization efficiency.
[0008] The present invention provides a distribution network simulation optimization method and system, which adopts the following technical solutions:
[0009] In a first aspect, a distribution network simulation optimization method includes:
[0010] Collect and preprocess equipment parameters and telemetry data, and build data models based on the preprocessed equipment parameters and telemetry data;
[0011] Acquire a topology file based on the data model, and build a topology relationship model after correcting the topology framework in the topology file;
[0012] An algorithm model for simulation calculation is built based on the topological relationship model, and the algorithm model is configured to calculate and update the power and current of each node from the end node forward, calculate and update the voltage of each node from the root node backward, iteratively update each node until the convergence condition is met, and obtain the algorithm model for simulation calculation.
[0013] The beneficial effects of a distribution network simulation optimization method provided by the present invention are: by checking and completing equipment parameters and telemetry data, the integrity and rationality of the data model are ensured; by correcting the topological structure, the correctness of the topological structure is verified, and the accuracy of the simulation calculation is improved; an algorithm model for simulation calculation is established, and a batch processing component is used to perform data deduction based on a bidirectional convergence forward and backward method to calculate the power grid flow distribution, which can provide a basis for selecting power supply schemes and electrical equipment, as well as the installation and optimization of collection points.
[0014] Optionally, when collecting and preprocessing equipment parameters and telemetry data, including:
[0015] Obtain device parameters based on the business middle platform, and verify and complete the device parameters;
[0016] Acquire telemetry data based on a remote sensing platform, and verify and complete the telemetry data;
[0017] The equipment parameters include: parameter data of lines, distribution transformers, and switchgear;
[0018] The telemetry data includes: voltage, current, and power of load nodes, power supply nodes, and circuit breaker nodes.
[0019] Optionally, when preprocessing device parameters and telemetry data, the preprocessing steps include:
[0020] Complete missing data, missing fields, and data with zero values;
[0021] Increase the weight of the data involved in the simulation calculation and correct the abnormal data;
[0022] The equipment list and attributes with abnormal parameters are classified and stored in the abnormal information table; among them, the parameter information with multiple field abnormalities is stored in the form of a list.
[0023] Optionally, when building a data model based on preprocessed equipment parameters and telemetry data, the data model includes: feeder information entity model, line information entity model, transformer information entity model, medium voltage access point information entity model, meter parameter information entity model, starting feeder voltage entity model, terminal load collection information entity model, ledger abnormal information entity model, data abnormal information entity model, distribution network simulation calculation entity model, and distribution network simulation calculation abnormality entity model.
[0024] Optionally, obtaining a topology file based on the data model, and building a topology relationship model after correcting a topology framework in the topology file includes:
[0025] Obtain and parse the topology file based on the data model interface to obtain all equipment information and topology connection information on the feeder;
[0026] Correcting the device information and topological connection information to obtain a corrected topological network;
[0027] Based on the revised topological grid, build a topological relationship model;
[0028] Wherein, the topological relationship model includes: a single-line diagram analysis model and a topological relationship entity model.
[0029] Optionally, when correcting the device information and the topological connection information to obtain a corrected topological network, the method includes:
[0030] Based on the electrical connection and distance characteristics between the feeder and its transformer and the Pearson algorithm, the temporal and spatial similarity of the voltage fluctuation curves of the feeder and the transformer are analyzed;
[0031] Island and loop monitoring of medium voltage topology, simplified processing of virtual lines and straight lines connected, non-T-connected overhead wires, and dedicated transformer distribution rooms;
[0032] The correctness of the topology structure is verified and corrected based on the power outage event; wherein, the power outage event verification refers to using the power outage event combined with the topological relationship to analyze whether the power distribution is out of power, and the power distribution that is not out of power is determined to be abnormal in the line transformer.
[0033] Optionally, building an algorithm model for simulation calculation based on the topological relationship model and configuring the algorithm model include:
[0034] Building an algorithm model for simulation calculation, taking the pre-processed telemetry data, equipment parameters, head-end voltage, terminal current, power node equipment parameters and topology information as inputs of the algorithm model;
[0035] Configure the execution cycle and execution conditions of each simulation task. When the time cycle meets the conditions, the algorithm model automatically performs calculations according to the configured tasks and outputs calculation logs;
[0036] Among them, the algorithm model includes: a line node calculation model, a switch node calculation model, and a transformer node calculation model.
[0037] Optionally, each node is iteratively updated until a convergence condition is satisfied, wherein the convergence condition includes: Calculation and The calculated voltage error is less than the set value, or the error between the converged voltage value of the first and last nodes and the collected value is less than the set value.
[0038] Optionally, after obtaining the algorithm model of the simulation calculation, the simulation calculation results are output, wherein the simulation calculation results include: the power of the power supply node, the voltage of the load node, the voltage, current and power of the unknown node, and the power and loss of each branch.
[0039] In a second aspect, the present invention provides a distribution network simulation optimization system, comprising:
[0040] A data model unit is used to collect and preprocess equipment parameters and telemetry data, and build a data model based on the preprocessed equipment parameters and telemetry data;
[0041] A topology relationship unit, used for acquiring a topology file based on the data model, and building a topology relationship model after correcting the topology framework in the topology file;
[0042] The algorithm model unit is used to build an algorithm model for simulation calculation based on the topological relationship model, configure the algorithm model, calculate and update the power and current of each node from the end node forward, calculate and update the voltage of each node from the root node backward, iteratively update each node until the convergence condition is met, and obtain the algorithm model for simulation calculation.
[0043] The beneficial effects of the second aspect may refer to the description of the beneficial effects of the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a flow chart of the steps of a distribution network simulation optimization method provided by the present invention;
[0045] Figure 2 It is a node position schematic diagram of a distribution network simulation optimization method provided by the present invention. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Unless otherwise defined, the technical terms or scientific terms used herein should be understood by people with general skills in the field to which the present invention belongs. "Including" and similar words used in this article mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects.
[0047] See also Figure 1 The embodiment of the present invention provides a distribution network simulation optimization method, the specific steps of which include:
[0048] Step S1: Collect and preprocess equipment parameters and telemetry data, and build a data model based on the preprocessed equipment parameters and telemetry data;
[0049] Step S2: acquiring a topology file based on the data model, and building a topology relationship model after correcting the topology framework in the topology file;
[0050] Step S3, building an algorithm model for simulation calculation based on the topological relationship model, configuring the algorithm model, calculating and updating the power and current of each node from the end node forward, calculating and updating the voltage of each node from the root node backward, iteratively updating each node until the convergence condition is met, and obtaining the algorithm model for simulation calculation;
[0051] In some embodiments, when executing step S1, collecting and preprocessing equipment parameters and telemetry data includes:
[0052] Step S1-1, obtaining device parameters based on the business middle station, and verifying and completing the device parameters;
[0053] Step S1-2, acquiring telemetry data based on the remote sensing platform, and verifying and completing the telemetry data;
[0054] Step S1-3: Build a data model based on the preprocessed equipment parameters and telemetry data.
[0055] Furthermore, the equipment parameters include: parameter data of lines, distribution transformers, and switchgear; the telemetry data include: voltage, current, and power of load nodes, power supply nodes, and circuit breaker nodes.
[0056] Specifically, when preprocessing equipment parameters and telemetry data, the preprocessing steps include:
[0057] Complete missing data, missing fields, and data with zero values;
[0058] Increase the weight of the data involved in the simulation calculation and correct the abnormal data;
[0059] Classify the equipment list and attributes with abnormal parameters and store them in the abnormal information table;
[0060] Furthermore, parameter information of multiple field exceptions is stored in a list format.
[0061] In fact, when executing step S1-2 to process telemetry data, stream processing technology and clustering algorithm are used, and weighted average algorithm is used to complete the data.
[0062] Furthermore, stream processing technology is a method for real-time processing of data streams, which can process and analyze data immediately when the data source generates it, without storing the data or waiting for the data set to be complete. Cluster analysis is a data analysis method that aims to divide objects in a data set into different groups so that the similarity between objects in a group is high, while the similarity between groups is low.
[0063] Specifically, when executing step S1-3, the constructed data model includes: feeder information entity model, line information entity model, transformer information entity model, medium voltage access point information entity model, meter parameter information entity model, starting feeder voltage entity model, terminal load collection information entity model, ledger abnormal information entity model, data abnormal information entity model, distribution network simulation calculation entity model, and distribution network simulation calculation abnormal entity model.
[0064] In some embodiments, when executing step S2, it includes:
[0065] Step S2-1, acquiring and parsing the topology file based on the interface of the data model to obtain all device information and topology connection information on the feeder;
[0066] Step S2-2, correcting the device information and topological connection information to obtain a corrected topological network;
[0067] Step S2-3: Building a topological relationship model based on the revised topological grid.
[0068] Specifically, when executing step S2-1, parsing refers to calling the feeder CIM file based on the business middle station feeder topology service interface to parse the CIM file, thereby obtaining all feeder equipment information and topology connection information.
[0069] Specifically, when executing step S2-2, the device information and the topology connection information are corrected to obtain a corrected topology network, including:
[0070] Based on the electrical connection and distance characteristics between the feeder and its transformer and the Pearson algorithm, the temporal and spatial similarity of the voltage fluctuation curves of the feeder and the transformer are analyzed;
[0071] Island and loop monitoring of medium voltage topology, simplified processing of virtual lines and straight lines connected, non-T-connected overhead wires, and dedicated transformer distribution rooms;
[0072] Verify the correctness of the topology and make corrections based on power outage events.
[0073] Furthermore, power outage event verification refers to using power outage events combined with topological relationships to analyze whether the power distribution has been out of power, and the power distribution that has not been out of power is judged as line transformer abnormality.
[0074] Specifically, when executing step S2-3, the topological relationship model includes: a single-line diagram analysis model and a topological relationship entity model.
[0075] Furthermore, the single-line diagram parsing is used to parse the CIM file to obtain the equipment topology information, and the topology relationship entity model is built based on the Hive database.
[0076] In some embodiments, when executing step S3, it includes:
[0077] Step S3-1, building an algorithm model for simulation calculation based on the topological relationship model, and configuring the algorithm model;
[0078] Step S3-2, calculate and update the power and current of each node from the end node forward, calculate and update the voltage of each node from the root node backward, iteratively update each node until the convergence condition is met, and obtain the algorithm model of the simulation calculation.
[0079] Specifically, when executing step S3-1, an algorithm model for simulation calculation is built based on the topological relationship model, and the algorithm model is configured, including:
[0080] Building an algorithm model for simulation calculation, taking the pre-processed telemetry data, equipment parameters, head-end voltage, terminal current, power node equipment parameters and topology information as inputs of the algorithm model;
[0081] Configure the execution cycle and execution conditions of each simulation task. When the time cycle meets the conditions, the algorithm model automatically performs calculations according to the configured tasks and outputs calculation logs;
[0082] Furthermore, the algorithm model includes: a line node calculation model, a switch node calculation model, and a transformer node calculation model.
[0083] Specifically, when executing step S3-2, the power and current of each node are calculated and updated from the end node forward, and the voltage of each node is calculated and updated from the root node backward, including:
[0084] See also Figure 2 , for The front-end node, for The front-end node, For The node is the set of all associated nodes in the starting direction, for Active and reactive power of the connected load; among them, node is the head end node, node is the line node, node is the terminal load node;
[0085] node No. The formula for calculating the secondary power is:
[0086] ;
[0087] In the formula, , are the injected active power and reactive power of the node respectively, is the branch impedance, is the node voltage amplitude;
[0088] node No. The secondary current calculation formula is:
[0089] ;
[0090] In the formula represents the complex form of node voltage, It means taking conjugate;
[0091] node No. The secondary voltage calculation formula is:
[0092] ;
[0093] The parameters are described above.
[0094] Specifically, when executing step S3-2, each node is iteratively updated until a convergence condition is satisfied, and each node is iteratively updated until a convergence condition is satisfied, wherein the convergence condition includes: Calculation and The calculated voltage error is less than the set value, or the error between the converged voltage value of the first and last nodes and the collected value is less than the set value.
[0095] In some embodiments, after executing step S3, after obtaining the algorithm model of the simulation calculation, the simulation calculation results can be output, wherein the simulation calculation results include: the power of the power supply node, the voltage of the load node, the voltage, current and power of the unknown node, and the power and loss of each branch.
[0096] The present invention provides a distribution network simulation optimization system, comprising: a data model unit, which is used to collect and preprocess equipment parameters and telemetry data, and build a data model based on the preprocessed equipment parameters and telemetry data;
[0097] A topology relationship unit is used to obtain a topology file based on the data model, and to build a topology relationship model after correcting the topology framework in the topology file.
[0098] The algorithm model unit is used to build an algorithm model for simulation calculation based on the topological relationship model, configure the algorithm model, calculate and update the power and current of each node from the end node forward, calculate and update the voltage of each node from the root node backward, iteratively update each node until the convergence condition is met, and obtain the algorithm model for simulation calculation.
[0099] Although the embodiments of the present invention are described in detail above, it is obvious to those skilled in the art that various modifications and variations can be made to these embodiments. However, it should be understood that such modifications and variations are within the scope and spirit of the present invention as described in the claims. Moreover, the present invention described herein may have other embodiments and may be implemented or realized in a variety of ways.
Claims
1. A distribution network simulation optimization method, characterized in that: include: Collect and preprocess equipment parameters and telemetry data, and build data models based on the preprocessed equipment parameters and telemetry data; Acquire and parse the topology file based on the interface of the data model to obtain all equipment information and topology connection information on the feeder, correct the equipment information and topology connection information to obtain a corrected topology grid, and build a topology relationship model including a single-line diagram analysis model and a topology relationship entity model based on the corrected topology grid; An algorithm model for simulation calculation is built based on the topological relationship model, and the pre-processed telemetry data, equipment parameters, head-end voltage, terminal current, power node equipment parameters and topological information are used as inputs of the algorithm model. The algorithm model is configured to calculate and update the power and current of each node from the terminal node forward, and calculate and update the voltage of each node from the root node backward, and iteratively update each node until the convergence condition is met to obtain the algorithm model for simulation calculation; wherein, the algorithm model includes: line node calculation model, switch node calculation model, transformer node calculation model; After obtaining the algorithm model of simulation calculation, the output includes the power of power supply node, voltage of load node, voltage, current and power of unknown node, and simulation calculation results of power and loss of each branch.
2. The distribution network simulation optimization method according to claim 1, characterized in that: When collecting and preprocessing equipment parameters and telemetry data, including: Obtain device parameters based on the business middle platform, and verify and complete the device parameters; Acquire telemetry data based on a remote sensing platform, and verify and complete the telemetry data; The equipment parameters include: parameter data of lines, distribution transformers, and switchgear; The telemetry data includes: voltage, current, and power of load nodes, power supply nodes, and circuit breaker nodes.
3. The distribution network simulation optimization method according to claim 2, characterized in that: When preprocessing equipment parameters and telemetry data, the preprocessing steps include: Complete missing data, missing fields, and data with zero values; Increase the weight of the data involved in the simulation calculation and correct the abnormal data; The equipment list and attributes with abnormal parameters are classified and stored in the abnormal information table; among them, the parameter information with multiple field abnormalities is stored in the form of a list.
4. The distribution network simulation optimization method according to claim 1, characterized in that: When building a data model based on preprocessed equipment parameters and telemetry data, the data model includes: feeder information entity model, line information entity model, transformer information entity model, medium voltage access point information entity model, meter parameter information entity model, starting feeder voltage entity model, terminal load collection information entity model, ledger abnormal information entity model, data abnormal information entity model, distribution network simulation calculation entity model, distribution network simulation calculation abnormal entity model.
5. The distribution network simulation optimization method according to claim 1, characterized in that: When the device information and topology connection information are corrected to obtain a corrected topology network, the method includes: Based on the electrical connection and distance characteristics between the feeder and its transformer and the Pearson algorithm, the temporal and spatial similarity of the voltage fluctuation curves of the feeder and the transformer are analyzed; Island and loop monitoring of medium voltage topology, simplified processing of virtual lines and straight lines connected, non-T-connected overhead wires, and dedicated transformer distribution rooms; The correctness of the topology structure is verified and corrected based on the power outage event; wherein, the power outage event verification refers to using the power outage event combined with the topological relationship to analyze whether the power distribution is out of power, and the power distribution that is not out of power is determined to be abnormal in the line transformer.
6. The distribution network simulation optimization method according to claim 1, characterized in that: Configuring the algorithm model includes: The execution cycle and execution conditions of each simulation task are configured. When the time cycle meets the conditions, the algorithm model automatically performs calculations according to the configured tasks and outputs calculation logs.
7. The distribution network simulation optimization method according to claim 1, characterized in that: Iterate and update each node until the convergence condition is met, wherein the convergence condition includes: Calculation and The calculated voltage error is less than the set value, or the error between the converged voltage value of the first and last nodes and the collected value is less than the set value.
8. A distribution network simulation optimization system, characterized in that: include: A data model unit is used to collect and preprocess equipment parameters and telemetry data, and build a data model based on the preprocessed equipment parameters and telemetry data; A topology relationship unit, which acquires and parses the topology file based on the interface of the data model, obtains all equipment information and topology connection information on the feeder, corrects the equipment information and topology connection information to obtain a corrected topology grid, and builds a topology relationship model including a single-line diagram analysis model and a topology relationship entity model based on the corrected topology grid; An algorithm model unit builds an algorithm model for simulation calculation based on a topological relationship model, takes preprocessed telemetry data, equipment parameters, head-end voltage, terminal current, power node equipment parameters, and topology information as inputs of the algorithm model, configures the algorithm model, calculates and updates the power and current of each node from the terminal node forward, calculates and updates the voltage of each node from the root node backward, iteratively updates each node until the convergence condition is met, and obtains an algorithm model for simulation calculation; wherein, the algorithm model includes: a line node calculation model, a switch node calculation model, and a transformer node calculation model. After obtaining the algorithm model for simulation calculation, the output includes the power of the power supply node, the voltage of the load node, the voltage, current and power of the unknown node, and the simulation calculation results of the power and loss of each branch.