Stability monitoring method and bearing mechanism of cap beam clamps
By monitoring and adjusting the lateral pressure of the hoop components in real time to prevent sliding, the problem of sliding risk in the traditional hoop support system is solved, and the safety and stability of bridge construction are improved.
Patent Information
- Application Number
- CN202411077053.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-08-07
AI Technical Summary
During bridge construction, the traditional hoop support system has the risk of slipping, which may cause the formwork support system to tilt and affect construction safety.
Through a cover beam hoop stability monitoring method and a hoop carrying mechanism, using pressure monitoring components and control devices, the lateral pressure and load of the hoop component are obtained in real time, the downward trend is predicted, and the adjustment locking strategy is output to adjust the hoop Side pressure on components to prevent sliding down.
It effectively improves the stability of the hoop, prevents sliding and tilting of the formwork support system, and improves the safety and reliability of construction.
Smart Images

Figure CN118603535B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction safety protection, and in particular to a method for monitoring the stability of a cap beam clamp and a clamp bearing mechanism. Background Art
[0002] In the field of bridge engineering, the cap beam is an important structural component that supports, distributes and transfers the load of the superstructure. The cap beam is usually set on the top of the bent pile pier to ensure the stability and bearing capacity of the structure. In order to construct the cap beam, a formwork is required for casting, and the stability and accuracy of the formwork are crucial to the quality of the cap beam.
[0003] At present, the formwork support system for cap beam construction widely adopts the hoop support system. This system installs hoops on the piers and uses the maximum static friction between the hoops and the piers to fix the formwork. In this way, the formwork can bear the weight of temporary facilities during construction and the weight of the cap beam itself, thereby ensuring the smooth progress of construction. The reliability of the hoops during construction directly determines the safety of construction.
[0004] In order to improve the stability of the clamp during construction, the traditional implementation method is generally to set a double clamp on a pier to improve the reliability of the clamp on the pier. However, although this method improves the reliability of the clamp to a certain extent, the clamp still has the risk of sliding down, and the sliding down may also cause the risk of the formwork support system tilting. Summary of the invention
[0005] Based on this, it is necessary to provide a cap beam clamp stability monitoring method and a clamp bearing mechanism to improve the stability of the clamp during construction in order to address the above problems.
[0006] A cap beam hoop stability monitoring method, the cap beam hoop stability monitoring method comprising:
[0007] Respectively obtain a first current side pressure applied by the first clamp assembly to the pier column and a second current side pressure applied by the second clamp assembly to the pier column, and obtain a current load borne by the clamp bearing mechanism;
[0008] Obtaining a current downward trend of the hoop bearing mechanism according to the first current side pressure, the second current side pressure and the current borne load;
[0009] A strategy for adjusting and locking the first clamp assembly and the second clamp assembly is output according to the current downward trend.
[0010] In one embodiment, obtaining the current downward trend of the hoop bearing mechanism according to the first current side pressure, the second current side pressure and the current borne load includes:
[0011] Get the current side pressure of the first matching hoop plate of the first hoop assembly on the pier column and the current lateral pressure of the first connecting hoop plate on the pier column , obtain the current lateral pressure of the second matching hoop plate of the second hoop assembly on the pier column and the current lateral pressure of the second connecting hoop plate on the pier column ; The current total lateral pressure of the hoop bearing mechanism on the pier column is = , the current total friction force between the hoop bearing mechanism and the pier column is obtained as ;
[0012] According to the current total friction force, the net force of the hoop bearing mechanism in the vertical direction is obtained as follows: ;
[0013] like >0, the hoop bearing mechanism has a downward trend, then according to , predicting the safe time for the hoop bearing mechanism to slide down to a preset safe distance;
[0014] Among them, c is the damping coefficient, k is the elastic coefficient of the contact surface between the hoop and the pier, is the current load, μ is the friction coefficient between the hoop and the pier, m is the total mass of the hoop bearing mechanism, D is the preset safety distance, t 0 The predicted safety time.
[0015] In one embodiment, the predicting of the safe time for the hoop bearing mechanism to slide down to a preset safe distance further includes:
[0016] Within the predicted safety time, the strategy of locking the first clamp assembly and the second clamp assembly is adjusted according to the output to complete the adjustment of the side pressure of the first clamp assembly and the second clamp assembly.
[0017] The step of respectively obtaining a first current side pressure applied by the first clamp assembly to the pier column and a second current side pressure applied by the second clamp assembly to the pier column further includes:
[0018] The current displacement distances of the first clamp assembly and the second clamp assembly on the two piers are respectively obtained to determine if the current displacement distances of the first clamp assembly and the second clamp assembly are both less than the preset safety distance.
[0019] In one embodiment, the step of obtaining the net force of the hoop supporting mechanism in the vertical direction according to the current total friction force further includes:
[0020] like <0, then according to the historical construction Predicted changes time close to zero;
[0021] when When it approaches zero, a warning is issued to adjust and lock the first clamp assembly and the second clamp assembly.
[0022] In one embodiment, the strategy for adjusting and locking the first clamp assembly and the second clamp assembly includes:
[0023] The current side pressure will be obtained , Current side pressure , Current side pressure And the current side pressure Respectively Compare, among them ;
[0024] like and / or Less than When the tensioner is adjusted, and Both greater than Then, the current side pressure and and Compare;
[0025] like Less than When the first locking member is adjusted, the first matching hoop plate and the first connecting hoop plate are locked;
[0026] like Less than When the second locking piece is adjusted, the second matching hoop plate and the second connecting hoop plate are locked.
[0027] In one embodiment, the strategy for adjusting and locking the first clamp assembly and the second clamp assembly includes:
[0028] The current side pressure will be obtained , Current side pressure , Current side pressure And the current side pressure Respectively Compare, among them ;
[0029] If you judge Less than When the first locking member is adjusted, the first matching hoop plate and the first connecting hoop plate are locked together until Greater than ;
[0030] Compare Is it greater than If not, adjust the tensioner until Greater than ;
[0031] If you judge Less than When the second locking piece is adjusted, the second matching hoop plate and the second connecting hoop plate are locked until Greater than ;
[0032] Compare Is it greater than If not, adjust the tensioner until Greater than .
[0033] A clamp bearing mechanism, the clamp bearing mechanism includes a first clamp assembly, a second clamp assembly, a tensioning assembly, a pressure monitoring assembly and a control device, the first clamp assembly is used to be adjustably clamped on a first pier column; the second clamp assembly is spaced apart from the first clamp assembly, and the second clamp assembly is used to be adjustably clamped on the second pier column; the tensioning assembly is arranged between the first clamp assembly and the second clamp assembly, and the two ends of the tensioning assembly are respectively connected to the first clamp assembly and the second clamp assembly, and the tensioning assembly is used to apply adjustable pressure away from each other to the first clamp assembly and the second clamp assembly respectively; the pressure monitoring assembly includes a first pressure monitoring unit and a second pressure monitoring unit, the first pressure monitoring unit is arranged on the inner wall of the first clamp assembly, and the second pressure monitoring unit is arranged on the inner wall of the second clamp assembly; the pressure monitoring assembly is electrically connected to the control device, and the control device is used to implement the cap beam clamp stability monitoring method as described above.
[0034] In one embodiment, the first hoop assembly includes a first matching hoop plate, a first connecting hoop plate and a first locking piece, the first matching hoop plate and the first connecting hoop plate are used to be matched on the first pier column, and the first matching hoop plate and the first connecting hoop plate can be adjustably connected and locked by the first locking piece;
[0035] In one embodiment, the second hoop assembly includes a second matching hoop plate, a second connecting hoop plate and a second locking piece, the second matching hoop plate and the second connecting hoop plate are used to match on the second pier column, and the second matching hoop plate and the second connecting hoop plate can be adjustably connected and locked through the second locking piece; the first connecting hoop plate and the second connecting hoop plate are arranged opposite to each other, and the two ends of the tensioning assembly are respectively connected to the first connecting hoop plate and the second connecting hoop plate;
[0036] In one embodiment, the first pressure monitoring unit includes at least two first pressure sensors, wherein at least one of the first pressure sensors is disposed on the inner wall of the first mating hoop plate and the first connecting hoop plate, and the second pressure monitoring unit includes at least two second pressure sensors, wherein at least one of the second pressure sensors is disposed on the inner wall of the second mating hoop plate and the second connecting hoop plate.
[0037] In one embodiment, the tensioning assembly includes a first tensioning unit, a second tensioning unit and an adjusting unit, the first tensioning unit and the second tensioning unit are respectively connected to two ends of the adjusting unit, the end of the first tensioning unit away from the adjusting unit is connected to the first connecting hoop plate, the end of the second tensioning unit away from the adjusting unit is connected to the second connecting hoop plate, the adjusting unit is used to adjust the distance between the first tensioning unit and the second tensioning unit, the first tensioning unit is used to adjust the pressure applied to the first connecting hoop plate, and the second tensioning unit is used to adjust the pressure applied to the second connecting hoop plate.
[0038] In one embodiment, the adjustment unit includes a driving member, a transmission member and a locking member, the locking member and the driving member are both arranged on the first tensioning unit, the transmission member is connected to the second tensioning unit, the driving member is used to drive the transmission member to drive the second tensioning unit to move relative to the first tensioning unit, and the locking member is used to be unlockably connected to the transmission member or the second tensioning unit.
[0039] In one embodiment, the first tensioning unit includes a first mounting member, a first adjusting member and a first tensioning member, the first tensioning member is movably mounted on the first mounting member, and one end of the first tensioning member is connected to the first connecting hoop plate, and the first adjusting member can adjust the extension of the first tensioning member relative to the first mounting member.
[0040] In one embodiment, the second tensioning unit includes a second mounting member, a second adjusting member and a second tensioning member, the second tensioning member is movably mounted on the second mounting member, and one end of the second tensioning member is connected to the second connecting hoop plate, and the second adjusting member can adjust the extension of the second tensioning member relative to the second mounting member.
[0041] In the above-mentioned cap beam hoop stability monitoring method and hoop bearing mechanism, during construction, the first hoop assembly is clamped on the first pier column, and the second hoop assembly is clamped on the second pier column. Since the two ends of the tensioning assembly are respectively connected to the first hoop assembly and the second hoop assembly, the lateral pressure applied by the first hoop assembly on the first pier column and the lateral pressure applied by the second hoop assembly on the second pier column can be adjusted by adjusting the tensioning assembly to apply thrusts away from each other to the first hoop assembly and the second hoop assembly. Then, the first current side pressure of the first hoop assembly is detected by the first pressure monitoring unit, and the second current side pressure of the second hoop assembly is detected by the second pressure monitoring unit. The control device analyzes the current downward trend of the hoop bearing mechanism based on the acquired first current side pressure, the second current side pressure and the current load, and outputs the corresponding strategy for adjusting and locking the first hoop assembly and the second hoop assembly. The above-mentioned cap beam clamp stability monitoring method and clamp bearing mechanism can predict the current downward trend of the clamp bearing mechanism, and output a strategy for adjusting and locking the first clamp assembly and the second clamp assembly before the clamp bearing mechanism slides down to a preset safety distance, so as to facilitate the adjustment and locking of the first clamp assembly and the second clamp assembly to prevent sliding or continued sliding, thereby avoiding the risk of tilting of the formwork support system due to sliding. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application.
[0043] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0044] In addition, the drawings are not drawn to a 1:1 scale, and the relative sizes of the various elements are drawn only as examples in the drawings and are not necessarily drawn according to the true scale.
[0045] Figure 1 It is a top view of the clamp support mechanism in one embodiment.
[0046] Figure 2 for Figure 1 The front view of the clamp support mechanism is shown.
[0047] Figure 3 for Figure 2 A partial enlarged view of the regulating unit in .
[0048] Figure 4 for Figure 2 A side section view of the clamp support is shown.
[0049] Figure 5 for Figure 2 Enlarged view of point A in the middle.
[0050] Figure 6 The present invention is a flow chart of a method for monitoring the stability of a cap beam clamp in one embodiment.
[0051] Figure 7 FIG. 4 is a structural block diagram of a control device in one embodiment.
[0052] Description of reference numerals:
[0053] A clamp support mechanism 10; a first clamp assembly 100; a first matching hoop plate 110; a first connecting hoop plate 120; a first locking member 130; a second clamp assembly 200; a second matching hoop plate 210; a second connecting hoop plate 220; a second locking member 230; a tensioning assembly 300; a first tensioning unit 310; a first mounting member 311; a first adjusting member 312; a first tensioning member 313; a first elastic member 314; an adjusting hole 315; a second tensioning unit 320; a second mounting member 321; a second adjusting member 322; a second tensioning member 323; a second elastic member 324; an adjusting unit 330; a driving member 331; a transmission member 332; a locking member 333; a locking handle 334; a locking pressing tooth 335; an adjusting box 400; a control device 500; a pressure acquisition module 510; a downward movement analysis module 520; and a strategy output module 530. DETAILED DESCRIPTION
[0054] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0055] See also Figure 1 and Figure 2 In one embodiment of the present application, a hoop bearing mechanism 10 is used in cap beam construction. The hoop bearing mechanism 10 can effectively support the formwork support system in the cap beam construction, at least improve the reliability of the support, and thus improve the safety of the construction.
[0056] Specifically, the clamp bearing mechanism 10 includes a first clamp assembly 100, a second clamp assembly 200, a tensioning assembly 300 and a pressure monitoring assembly (not shown). The first clamp assembly 100 is used to adjustably clamp on the first pier column; the second clamp assembly 200 is arranged at a distance from the first clamp assembly 100, and the second clamp assembly 200 is used to adjustably clamp on the second pier column; the tensioning assembly 300 is arranged between the first clamp assembly 100 and the second clamp assembly 200, and the two ends of the tensioning assembly 300 are respectively connected to the first clamp assembly 100 and the second clamp assembly 200, and the tensioning assembly 300 is used to apply adjustable pressure away from each other to the first clamp assembly 100 and the second clamp assembly 200. The pressure monitoring assembly includes a first pressure monitoring unit and a second pressure monitoring unit, the first pressure monitoring unit is arranged on the inner wall of the first clamp assembly 100, and the second pressure monitoring unit is arranged on the inner wall of the second clamp assembly 200.
[0057] During construction, the first hoop assembly 100 is clamped on the first pier column, and the second hoop assembly 200 is clamped on the second pier column. By adjusting the tensioning assembly 300 to apply thrusts away from each other to the first hoop assembly 100 and the second hoop assembly 200, the lateral pressure applied by the first hoop assembly 100 on the first pier column and the lateral pressure applied by the second hoop assembly 200 on the second pier column can be adjusted. Then, the first current lateral pressure of the first hoop assembly 100 is detected by the first pressure monitoring unit, and the second current lateral pressure of the second hoop assembly 200 is detected by the second pressure monitoring unit. According to the first current lateral pressure, the second current lateral pressure and the current load obtained, after analyzing the current downward trend of the hoop bearing mechanism 10, the corresponding strategy for adjusting and locking the first hoop assembly 100 and the second hoop assembly 200 is output. The above-mentioned clamp support mechanism 10 can predict the current downward trend of the clamp support mechanism 10, and output a strategy for adjusting and locking the first clamp assembly 100 and the second clamp assembly 200 before the clamp support mechanism 10 slides down to a preset safety distance, so as to facilitate adjustment and locking of the first clamp assembly 100 and the second clamp assembly 200 to prevent downward sliding or continued downward sliding, thereby avoiding the risk of tilting of the formwork support system due to downward sliding.
[0058] In this embodiment, the first hoop assembly 100 and the second hoop assembly 200 are pulled together by the tensioning assembly 300. If the friction between the first hoop assembly 100 and the first pier column decreases and there is a downward trend, the second hoop assembly 200 is firmly connected to the second pier column. The possibility of the first hoop assembly 100 sliding down can be reduced by the traction of the tensioning assembly 300, thereby reducing the possibility of the formwork support system tilting due to the sliding of the first hoop assembly 100 or the second hoop assembly 200, thereby avoiding affecting the reliability of the construction.
[0059] In one embodiment, the first clamp assembly 100 includes a first matching clamp plate 110, a first connecting clamp plate 120 and a first locking piece 130. The first matching clamp plate 110 and the first connecting clamp plate 120 are used to match on the first pier column, and the first matching clamp plate 110 and the first connecting clamp plate 120 can be adjustably connected and locked by the first locking piece 130. One end of the tensioning assembly 300 is connected to the first connecting clamp plate 120. After the first matching clamp plate 110 and the first connecting clamp plate 120 are clamped on the first pier column, the first locking piece 130 is used to adjust the locking so that the first matching clamp plate 110 and the first connecting clamp plate 120 are both pressed against the first pier column. By adjusting the locking force of the first locking piece 130, the lateral pressure applied by the first matching clamp plate 110 to the first pier column can be adjusted, and the lateral pressure applied by the first connecting clamp plate 120 to the first pier column can be adjusted.
[0060] Specifically, the first pressure monitoring unit includes at least two first pressure sensors, wherein at least one first pressure sensor is disposed on the inner wall of the first matching hoop plate 110 and the inner wall of the first connecting hoop plate 120. Through the at least two first pressure sensors, the lateral pressure of the first matching hoop plate 110 on the first pier column and the lateral pressure of the first connecting hoop plate 120 on the first pier column can be obtained respectively, so as to facilitate the selection of adjusting the first locking member 130 or adjusting the tensioning assembly 300 according to the two lateral pressures. By adjusting the tensioning assembly 300, the lateral pressure of the first connecting hoop plate 120 on the first pier column can be directly adjusted, and by adjusting the first locking member 130, the lateral pressure of the first matching hoop plate 110 on the first pier column can be directly connected.
[0061] In one embodiment, the first locking member 130 is a screw structure, and the purpose of adjusting the side pressure on the first pier column can be achieved by adjusting the tightening degree of the screw, thereby achieving the purpose of adjusting the friction force of the first clamp assembly 100 on the first pier column. In other embodiments, the first locking member 130 can also be other structures that can lock the first matching hoop plate 110 and the first connecting hoop plate 120.
[0062] In one embodiment, the second hoop assembly 200 includes a second matching hoop plate 210, a second connecting hoop plate 220 and a second locking piece 230. The second matching hoop plate 210 and the second connecting hoop plate 220 are used to match on the second pier column, and the second matching hoop plate 210 and the second connecting hoop plate 220 can be adjustably connected and locked by the second locking piece 230. The first connecting hoop plate 120 and the second connecting hoop plate 220 are arranged opposite to each other, and the two ends of the tensioning assembly 300 are respectively connected to the first connecting hoop plate 120 and the second connecting hoop plate 220. After the second matching hoop plate 210 and the second connecting hoop plate 220 are held on the second pier column, the second locking piece 230 is used to adjust the locking so that the second matching hoop plate 210 and the second connecting hoop plate 220 are both pressed against the second pier column. By adjusting the locking force of the second locking piece 230, the lateral pressure applied by the second matching hoop plate 210 on the second pier column can be adjusted, and the lateral pressure applied by the second connecting hoop plate 220 on the second pier column can be adjusted.
[0063] Specifically, the second pressure monitoring unit includes at least two second pressure sensors, wherein at least one second pressure sensor is disposed on the inner wall of the second matching hoop plate 210 and the second connecting hoop plate 220. Through the at least two second pressure sensors, the lateral pressure of the second matching hoop plate 210 on the second pier column and the lateral pressure of the second connecting hoop plate 220 on the second pier column can be obtained respectively, so as to facilitate the selection of adjusting the second locking member 230 or adjusting the tensioning assembly 300 according to the two lateral pressures. By adjusting the tensioning assembly 300, the lateral pressure of the second connecting hoop plate 220 on the second pier column can be directly adjusted, and by adjusting the second locking member 230, the lateral pressure of the second matching hoop plate 210 on the second pier column can be directly connected.
[0064] In this embodiment, the second locking member 230 is a screw structure, and the tightening degree of the screw can be adjusted to adjust the pressure on the second pier column side, thereby adjusting the friction force of the second hoop assembly 200 on the second pier column. In other embodiments, the second locking member 230 can also be other structures that can lock the second matching hoop plate 210 and the second connecting hoop plate 220.
[0065] See also Figure 1 and Figure 2In one embodiment, the tensioning assembly 300 includes a first tensioning unit 310, a second tensioning unit 320 and an adjusting unit 330. The first tensioning unit 310 and the second tensioning unit 320 are connected to two ends of the adjusting unit 330, respectively. One end of the first tensioning unit 310 away from the adjusting unit 330 is connected to the first connecting hoop plate 120, and one end of the second tensioning unit 320 away from the adjusting unit 330 is connected to the second connecting hoop plate 220. The adjusting unit 330 is used to adjust the distance between the first tensioning unit 310 and the second tensioning unit 320. The first tensioning unit 310 is used to adjust the pressure applied to the first connecting hoop plate 120, and the second tensioning unit 320 is used to adjust the pressure applied to the second connecting hoop plate 220. When in use, the distance between the first connecting hoop plate 120 and the second connecting hoop plate 220 can be adjusted by the adjusting unit 330, so that the first connecting hoop plate 120 and the second connecting hoop plate 220 are respectively abutted against the first pier column and the second pier column. The first tensioning unit 310 can be used to fine-tune the position of the first connecting hoop plate 120 to adjust the lateral pressure against the first pier column, and the second tensioning unit 320 can be used to fine-tune the position of the second connecting hoop plate 220 to adjust the lateral pressure on the second pier column.
[0066] See also Figures 2 to 4 In one embodiment, the adjustment unit 330 includes a driving member 331, a transmission member 332 and a locking member 333. The locking member 333 and the driving member 331 are both arranged on the first tensioning unit 310. The transmission member 332 is connected to the second tensioning unit 320. The driving member 331 is used to drive the transmission member 332 to drive the second tensioning unit 320 to move relative to the first tensioning unit 310. The locking member 333 is used to be unlockably connected to the transmission member 332 or the second tensioning unit 320. When in use, the driving member 331 drives the transmission member 332 to adjust the distance between the first tensioning unit 310 and the second tensioning unit 320, and then the locking member 333 is used to lock the first connection hoop plate 120 and the second connection hoop plate 220, so that the first pier column and the second pier column are respectively abutted.
[0067] Specifically, the transmission member 332 includes a transmission rack, the driving member 331 includes a driving gear, the driving gear is meshed with the transmission rack, and the transmission rack is connected to the second tensioning unit 320. The purpose of driving the second tensioning unit 320 to move relative to the first tensioning unit 310 can be achieved through the driving gear transmission. In one embodiment, the driving gear can be rotated by manual drive, and in another embodiment, the driving gear can also be driven by other automatic control methods such as electric drive.
[0068] In one embodiment, the locking member 333 includes a locking handle 334 and a locking pressing tooth 335. In the adjustment state, the locking pressing tooth 335 is spaced apart from the transmission rack, and the locking handle 334 is eccentrically and rotatably arranged on the first tensioning unit 310. When the adjustment unit 330 is adjusted to the right position, the locking handle 334 is rotated so that the locking handle 334 presses the locking pressing tooth 335 in the direction of the transmission rack, so that the locking pressing tooth 335 is pressed on the transmission rack to limit the transmission rack from moving further. By setting the locking member 333, the adjustment unit 330 can be kept stable after the adjustment is completed. In other embodiments, the locking member 333 can also be implemented by other means, as long as the adjustment unit 330 can be kept stable after the adjustment is completed.
[0069] See also Figure 1 , Figure 2 and Figure 5 In one embodiment, the first tensioning unit 310 includes a first mounting member 311, a first adjusting member 312 and a first tensioning member 313. The first tensioning member 313 is movably mounted on the first mounting member 311, and one end of the first tensioning member 313 is connected to the first connecting hoop plate 120. The first adjusting member 312 can adjust the extension of the first tensioning member 313 relative to the first mounting member 311. By adjusting the first adjusting member 312 to move the first tensioning member 313 relative to the first mounting member 311, the lateral pressure of the first connecting hoop plate 120 on the pier column can be adjusted.
[0070] Specifically, the first tensioning member 313 includes a first screw rod, and the first adjusting member 312 includes a first nut. One end of the first screw rod is movably inserted into the first mounting member 311, and the other end is connected to the first connecting hoop plate 120. The first nut is arranged on the first screw rod and abuts against a side of the first mounting member 311 facing the first connecting hoop plate 120. By adjusting the movement of the first nut on the first screw rod, the extension of the first screw rod relative to the first mounting member 311 can be adjusted, thereby achieving the purpose of adjusting the pressure of the first connecting hoop plate 120 on the first pier column side.
[0071] Furthermore, the first tensioning unit 310 also includes a first elastic member 314, which is sleeved on the first screw and located between the first nut and the first mounting member 311. The first elastic member 314 can absorb vibrations and reduce the impact of construction vibrations on the clamp bearing mechanism 10.
[0072] In one embodiment, the second tensioning unit 320 includes a second mounting member 321, a second adjusting member 322, and a second tensioning member 323. The second tensioning member 323 is movably mounted on the second mounting member 321, and one end of the second tensioning member 323 is connected to the second connecting hoop plate 220. The second adjusting member 322 can adjust the extension of the second tensioning member 323 relative to the second mounting member 321. By adjusting the second tensioning member 323 relative to the second mounting member 321 through the second adjusting member 322, the lateral pressure of the second connecting hoop plate 220 on the pier column can be adjusted.
[0073] In this embodiment, the structure of the second tensioning unit 320 is consistent with that of the first tensioning unit 310. The second tensioning member 323 includes a second screw rod, and the second adjusting member 322 includes a second nut. One end of the second screw rod is movably inserted into the second mounting member 321, and the other end is connected to the second connecting hoop plate 220. The second nut is arranged on the second screw rod and abuts against the side of the second mounting member 321 facing the second connecting hoop plate 220. Further, the second tensioning unit 320 also includes a second elastic member 324, which is sleeved on the second screw rod and located between the second nut and the second mounting member 321.
[0074] See again Figure 3 and Figure 4 In one embodiment, an adjustment hole 315 is formed on one side of the first mounting member 311 facing the second tensioning unit 320, one end of the transmission rack is inserted into the adjustment hole 315, and the other end is connected to the second mounting member 321. An opening communicating with the adjustment hole 315 is formed on the side wall of the first mounting member 311, a locking handle 334 is rotatably mounted on the first mounting member 311 and located at the opening, a locking pressing tooth 335 is located in the opening, and one end of the locking pressing tooth 335 is elastically connected to the first mounting member 311, and the locking pressing tooth 335 can elastically move from the opening toward the adjustment hole 315.
[0075] In one embodiment, the hoop bearing mechanism 10 further includes an adjustment box 400, which is connected to one end of the first mounting member 311 having the adjustment hole 315, the other end of the transmission rack is inserted into the adjustment box 400, the end of the second mounting member 321 connected to the transmission rack is movably inserted into the adjustment box 400, and the driving member 331 is arranged on the adjustment box 400. By providing the adjustment box 400, it is convenient to protect the transmission cooperation of the driving member 331 and the transmission rack.
[0076] In some embodiments, if the first hoop assembly 100 and the second hoop assembly 200 are adjusted simultaneously only by the tensioning assembly 300 so that the first hoop assembly 100 and the second hoop assembly 200 exert the same lateral pressure on the pier, then when the construction load is unbalanced, the hoop assembly on one side may slide down, the formwork support system may be easily tilted, and the tensioning assembly 300 may be easily damaged by tensile stress. The hoop bearing mechanism 10 in the above embodiment can separately adjust the lateral pressure of the first matching hoop plate 110, the first connecting hoop plate 120, the second matching hoop plate 210 and the second connecting hoop plate 220 on the pier, and the adjustment is more flexible and can be adjusted accordingly according to the detection data.
[0077] See also Figure 1 , Figure 2 and Figure 6 In one embodiment, the present application also provides a cap beam hoop stability monitoring method, which can at least improve the reliability of hoop setting during cap beam construction. Specifically, the cap beam hoop stability monitoring method includes:
[0078] Step S1: respectively obtain the current displacement distances of the first clamp assembly 100 and the second clamp assembly 200 on the two piers, and determine if the current displacement distances of the first clamp assembly 100 and the second clamp assembly 200 are both less than a preset safety distance.
[0079] Displacement sensors can be set on the first clamp assembly 100 and the second clamp assembly 200, and the displacement sensors are used to monitor the displacement of the first clamp assembly 100 and the second clamp assembly 200 on the first pier and the second pier, respectively, so as to judge the current status of the first clamp assembly 100 and the second clamp assembly 200. When the current displacement distance of one of them is greater than or equal to the preset safety distance, it can be judged that it is not easy to continue the construction in the current state. If it is judged that the current displacement distances of the first clamp assembly 100 and the second clamp assembly 200 are both less than the preset safety distance, the following steps can be continued.
[0080] Step S2: respectively obtain the first current side pressure applied by the first clamp assembly 100 on the pier column and the second current side pressure applied by the second clamp assembly 200 on the pier column, and obtain the current load borne by the clamp bearing mechanism 10 .
[0081] Specifically, the current side pressure of the first matching hoop plate 110 of the first hoop assembly 100 on the pier column is obtained. and the current lateral pressure of the first connecting hoop plate 120 on the pier column , and The sum of the first current side pressure is obtained by obtaining the current side pressure of the second matching hoop plate 210 of the second hoop assembly 200 on the pier column. and the current lateral pressure of the second connecting hoop plate 220 on the pier column , and The sum of the first and second current lateral pressures is the second current lateral pressure; the current total lateral pressure of the hoop bearing mechanism 10 on the pier column can be understood as the sum of the first and second current lateral pressures, and thus the current total lateral pressure = .
[0082] Step S3: obtaining the current downward trend of the clamp bearing mechanism 10 according to the first current side pressure, the second current side pressure and the current borne load.
[0083] Specifically, step S31: according to the current total lateral pressure of the hoop bearing mechanism 10 on the pier column = , the current total friction force between the hoop bearing mechanism 10 and the pier column is obtained as ;
[0084] Step S32: According to the current total friction force, the net force of the hoop bearing mechanism in the vertical direction is obtained as ;
[0085] Step S33: If >0, the hoop bearing mechanism 10 has a downward trend, then according to , predict the safe time for the hoop bearing mechanism 10 to slide down to the preset safe distance; where c is the damping coefficient, k is the elastic coefficient of the contact surface between the hoop and the pier, is the current load, μ is the friction coefficient between the clamp and the pier, m is the total mass of the clamp bearing mechanism 10, D is the preset safety distance, t 0 The predicted safety time;
[0086] Step S34: within the predicted safety time, adjusting the strategy of locking the first clamp assembly 100 and the second clamp assembly 200 according to the output, and completing the adjustment of the side pressure of the first clamp assembly 100 and the second clamp assembly 200.
[0087] By evaluating the safe time for the clamp support mechanism 10 to slide down to the preset safe distance, the time for adjusting the first clamp assembly 100 and the second clamp assembly 200 can be given to avoid safety problems caused by excessive sliding distance during the adjustment process.
[0088] In one embodiment, step S3 further includes:
[0089] Step S35: If <0, then according to the historical construction Predicted changes time close to zero;
[0090] Step S36: When When it approaches zero, a warning is issued to adjust and lock the first clamp assembly 100 and the second clamp assembly 200.
[0091] By analyzing The changing trend of Predicted changes The time close to zero can predict in advance the time when the hoop bearing mechanism 10 starts to slide down, so as to complete the construction or adjust the hoop bearing mechanism 10 before the time when it starts to slide down, thereby reducing the risk of sliding down.
[0092] Step S4: According to the current downward trend, the strategy for adjusting the locking of the first clamp assembly 100 and the second clamp assembly 200 is output. The adjustment strategy includes locking the first locking member 130, locking the second locking member 230, and locking the tensioning assembly 300 to adjust the lateral pressure of the first clamp assembly 100 and the second clamp assembly 200 at different positions on the pier.
[0093] In one embodiment, step S41: obtaining the current side pressure , Current side pressure , Current side pressure And the current side pressure Respectively Compare, among them To compare the average pressure, ;
[0094] Step S42: If and / or Less than When the tensioning assembly 300 is adjusted, and Both greater than Then, the current side pressure and and Compare;
[0095] like Less than When the first locking member 130 is adjusted to lock the first matching hoop plate 110 and the first connecting hoop plate 120;
[0096] like Less than When the second locking member 230 is adjusted, the second matching hoop plate 210 and the second connecting hoop plate 220 are locked.
[0097] When judging and / or Less than , the first connecting hoop plate 120 and / or the second connecting hoop plate 220 do not exert enough lateral pressure on the pier column, so it is necessary to adjust the tensioning assembly 300 for tensioning. Less than , then adjust the first tensioning unit 310 of the tensioning assembly 300 until Greater than ;like Less than , then adjust the second tensioning unit 320 of the tensioning assembly 300 until Greater than Since the lateral pressure of the first connecting hoop plate 120 and / or the second connecting hoop plate 220 on the pier column changes, the lateral pressure of the first matching hoop plate 110 and the second matching hoop plate 210 on the pier column may change accordingly, so the first locking member 130 and the second locking member 230 are adjusted until , , and Both greater than .
[0098] In another embodiment, step S41 further includes:
[0099] Step S43: If it is determined Less than When the first locking member 130 is adjusted to lock the first matching hoop plate 110 and the first connecting hoop plate 120, Greater than ;
[0100] Compare Is it greater than If not, adjust the tensioning assembly 300 until Greater than ;
[0101] Step S44: If it is determined Less than When the second locking member 230 is adjusted to lock the second matching hoop plate 210 and the second connecting hoop plate 220, Greater than ;
[0102] Compare Is it greater than If not, adjust the tensioning assembly 300 until Greater than .
[0103] Through the above adjustment strategy, the clamp load-bearing mechanism can be locked before the clamp load-bearing mechanism 10 slides down, and at the same time, excessive local side pressure can be avoided to affect the reliability of the structure itself, thereby ensuring the safety of the cap beam construction.
[0104] See also Figure 7 In one embodiment, the clamp support mechanism 10 further includes a control device 500, the pressure monitoring assembly is electrically connected to the control device 500, and the control device 500 is used to execute the cap beam clamp stability monitoring method in any of the above embodiments.
[0105] In one embodiment, the control device 500 includes a pressure acquisition module 510, a downward slide analysis module 520, and a strategy output module 530. The pressure acquisition module 510 is used to obtain the first current side pressure applied by the first clamp assembly 100 on the pier column and the second current side pressure applied by the second clamp assembly 200 on the pier column, and obtain the current load borne by the clamp bearing mechanism 10; the downward slide analysis module 520 is used to obtain the current downward slide trend of the clamp bearing mechanism 10 according to the first current side pressure, the second current side pressure and the current load; the strategy output module 530 is used to output a strategy for adjusting and locking the first clamp assembly 100 and the second clamp assembly 200 according to the current downward slide trend.
[0106] For the specific definition of the control device 500, please refer to the definition of the cap beam clamp stability monitoring method above, which will not be repeated here. The various modules in the above-mentioned control device 500 can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0107] In the description of the present application, it should be understood that if the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. appear, the orientation or position relationship indicated by these terms is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.
[0108] In addition, if the terms "first" or "second" appear, these terms are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, if the term "plurality" appears, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0109] In this application, unless otherwise clearly specified and limited, if the terms "installed", "connected", "connected", "fixed" and the like appear, these terms should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0110] In the present application, unless otherwise clearly specified and limited, if there is a description that a first feature is "above" or "below" a second feature, etc., or similar descriptions appear, it may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0111] It should be noted that if an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. If an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. If any, the terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used in this application are for illustrative purposes only and do not represent the only implementation method.
[0112] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0113] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A method for monitoring the stability of a cap beam hoop, characterized in that: The cap beam hoop stability monitoring method is applied to a hoop bearing mechanism, the hoop bearing mechanism includes a first hoop assembly, a second hoop assembly and a tensioning assembly, the first hoop assembly includes a first matching hoop plate, a first connecting hoop plate and a first locking piece, the first matching hoop plate and the first connecting hoop plate are used to match on the first pier column, and the first matching hoop plate and the first connecting hoop plate can be adjustably connected and locked through the first locking piece; the second hoop assembly is arranged at intervals from the first hoop assembly, the second hoop assembly includes a second matching hoop plate, a second connecting hoop plate and a second locking piece, the second matching hoop plate and the second connecting hoop plate are used to match on the second pier column, and the second matching hoop plate and the second connecting hoop plate can be adjustably connected and locked through the second locking piece; the first connecting hoop plate and the second connecting hoop plate are arranged opposite to each other, the tensioning assembly is arranged between the first hoop assembly and the second hoop assembly, and the two ends of the tensioning assembly are respectively connected to the first connecting hoop plate and the second connecting hoop plate, and the tensioning assembly is used to apply adjustable pressure away from each other to the first hoop assembly and the second hoop assembly respectively; Wherein, the cap beam hoop stability monitoring includes: Get the current side pressure exerted on the pier column by the first matching hoop plate of the first hoop assembly and the current lateral pressure of the first connecting hoop plate on the pier column , obtain the current lateral pressure exerted on the pier by the second matching hoop plate of the second hoop assembly and the current lateral pressure of the second connecting hoop plate on the pier column ; The current total lateral pressure of the hoop bearing mechanism on the pier column is = , the current total friction force between the hoop bearing mechanism and the pier column is obtained as ; and obtain the current load borne by the clamp bearing mechanism ; According to the current total friction force, the net force of the hoop bearing mechanism in the vertical direction is obtained as follows: , where μ is the friction coefficient between the hoop and the pier column, and m is the total mass of the hoop bearing mechanism; like >0, the hoop bearing mechanism has a downward trend, then according to , predicting the safe time for the hoop bearing mechanism to slide down to a preset safe distance; wherein c is the damping coefficient, k is the elastic coefficient of the contact surface between the hoop and the pier, D is the preset safe distance, and t0 is the predicted safe time; The current side pressure will be obtained , Current side pressure , Current side pressure And the current side pressure Respectively Compare, among them To compare the average pressure, ; like and / or Less than When the tensioner is adjusted, and Both greater than Then, the current side pressure and and Compare; like Less than When the first locking member is adjusted, the first matching hoop plate and the first connecting hoop plate are locked; like Less than When the second locking piece is adjusted, the second matching hoop plate and the second connecting hoop plate are locked.
2. The cap beam hoop stability monitoring method according to claim 1 is characterized in that: The method further includes predicting the safe time for the hoop bearing mechanism to slide down to a preset safe distance: Within the predicted safety time, according to the output, the strategy of locking the first clamp assembly and the second clamp assembly is adjusted to complete the adjustment of the side pressure of the first clamp assembly and the second clamp assembly; The step of respectively obtaining a first current side pressure applied by the first clamp assembly to the pier column and a second current side pressure applied by the second clamp assembly to the pier column further includes: The current displacement distances of the first clamp assembly and the second clamp assembly on the two piers are respectively obtained to determine if the current displacement distances of the first clamp assembly and the second clamp assembly are both less than the preset safety distance.
3. The cap beam hoop stability monitoring method according to claim 1 is characterized in that: The method further comprises: obtaining a net force of the hoop bearing mechanism in a vertical direction according to the current total friction force; and then: like <0, then according to the historical construction Predicted changes time close to zero; when When it approaches zero, a warning is issued to adjust and lock the first clamp assembly and the second clamp assembly.
4. The cap beam hoop stability monitoring method according to any one of claims 1 to 3, characterized in that: The current side pressure will be obtained , Current side pressure , Current side pressure And the current side pressure Respectively Compare, among them To compare the average pressure, , and later: If you judge Less than When the first locking member is adjusted, the first matching hoop plate and the first connecting hoop plate are locked together until Greater than ; Compare Is it greater than If not, adjust the tensioner until Greater than ; If you judge Less than When the second locking piece is adjusted, the second matching hoop plate and the second connecting hoop plate are locked until Greater than ; Compare Is it greater than If not, adjust the tensioner until Greater than .
5. A hoop bearing mechanism, characterized in that: The hoop bearing mechanism comprises: A first hoop assembly, the first hoop assembly comprising a first matching hoop plate, a first connecting hoop plate and a first locking piece, the first matching hoop plate and the first connecting hoop plate are used to be matched on the first pier column, and the first matching hoop plate and the first connecting hoop plate can be adjustably connected and locked through the first locking piece; a second hoop assembly, the second hoop assembly being spaced apart from the first hoop assembly, the second hoop assembly comprising a second matching hoop plate, a second connecting hoop plate and a second locking piece, the second matching hoop plate and the second connecting hoop plate being used to be matched on the second pier column, and the second matching hoop plate and the second connecting hoop plate can be adjustably connected and locked through the second locking piece; A tensioning assembly, the tensioning assembly is arranged between the first hoop assembly and the second hoop assembly, and two ends of the tensioning assembly are respectively connected to the first connecting hoop plate and the second connecting hoop plate, and the tensioning assembly is used to apply an adjustable pressure to the first hoop assembly and the second hoop assembly away from each other; A pressure monitoring assembly, the pressure monitoring assembly comprising a first pressure monitoring unit and a second pressure monitoring unit, the first pressure monitoring unit comprising at least two first pressure sensors, wherein at least one of the first pressure sensors is disposed on the inner wall of the first matching hoop plate and the first connecting hoop plate; the second pressure monitoring unit comprising at least two second pressure sensors, wherein at least one of the second pressure sensors is disposed on the inner wall of the second matching hoop plate and the second connecting hoop plate; and A control device, wherein the pressure monitoring component is electrically connected to the control device, and the control device is used to implement the cap beam clamp stability monitoring method as described in any one of claims 1 to 4.
6. The clamp support mechanism according to claim 5, characterized in that: The tensioning assembly includes a first tensioning unit, a second tensioning unit and an adjusting unit, wherein the first tensioning unit and the second tensioning unit are respectively connected to two ends of the adjusting unit, an end of the first tensioning unit away from the adjusting unit is connected to the first connecting hoop plate, an end of the second tensioning unit away from the adjusting unit is connected to the second connecting hoop plate, the adjusting unit is used to adjust the distance between the first tensioning unit and the second tensioning unit, the first tensioning unit is used to adjust the pressure applied to the first connecting hoop plate, and the second tensioning unit is used to adjust the pressure applied to the second connecting hoop plate.
7. The clamp support mechanism according to claim 6, characterized in that: The adjusting unit includes a driving member, a transmission member and a locking member, wherein the locking member and the driving member are both arranged on the first tensioning unit, the transmission member is connected to the second tensioning unit, the driving member is used to drive the transmission member to drive the second tensioning unit to move relative to the first tensioning unit, and the locking member is used to be unlockably connected to the transmission member or the second tensioning unit.
8. The clamp support mechanism according to claim 6, characterized in that: The first tensioning unit includes a first mounting member, a first adjusting member and a first tensioning member. The first tensioning member is movably mounted on the first mounting member, and one end of the first tensioning member is connected to the first connecting hoop plate. The first adjusting member can adjust the extension of the first tensioning member relative to the first mounting member.
9. The clamp support mechanism according to claim 6, characterized in that: The second tensioning unit includes a second mounting member, a second adjusting member and a second tensioning member. The second tensioning member is movably mounted on the second mounting member, and one end of the second tensioning member is connected to the second connecting hoop plate. The second adjusting member can adjust the extension of the second tensioning member relative to the second mounting member.