During the assembly process of the upper section of the guide frame through counter-fabrication technology, prefabrication and precise docking solve the problems of assembly deformation and accuracy of the guide frame, improve installation efficiency and accuracy, and ensure structural stability.

CN118622601BActive Publication Date: 2024-10-18GUANGZHOU WENCHUAN HEAVY IND
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411119699.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-18
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The upper section of the guide frame is prone to deformation during the assembly process, making it difficult to ensure accuracy requirements, especially since the panel structure is thin and the upper and lower sections are closed with high accuracy requirements.

Method used

The counter-invention process is adopted, including ground pattern marking, panel structure pre-assembly, main truss segment installation, steel pipe column and wing frame assembly, overall assembly welding and turning steps. Through prefabrication and precise docking, installation deformation is controlled and accuracy is improved.

Benefits of technology

It effectively reduces assembly deformation, improves the installation accuracy and structural stability of the upper section of the guide frame, meets the accuracy requirements of the subsequent assembly, and improves installation efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118622601B_ABST
    Figure CN118622601B_ABST
Patent Text Reader

Abstract

The present application discloses a method for assembling the upper section of a guide frame, which relates to the technical field of guide frames for wind turbines. The overall method adopts a reverse manufacturing process, including the following steps: ground sample marking and tire frame arrangement steps; panel structure pre-assembly step, placing the manufactured main panel and outer panel on the horizontal tire frame for pre-assembly; main truss sub-assembly step, installing each main truss sub-component on the main panel in turn, and welding and assembling the main frame; steel pipe column installation and wing frame assembly step, positioning each manufactured outer panel with the main panel, inserting the steel pipe column into the steel pipe column hole, positioning and welding each steel pipe column with the main frame and each outer panel, and installing each outer truss sub-component on the outer panel in turn; overall assembly welding step, welding and fixing the main frame, steel pipe column, and wing frame; turning over step. The present application can control the installation deformation and installation accuracy of the upper section structural parts of the guide frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of guide frames for wind turbines, and in particular to a method for assembling an upper section of a guide frame. Background Art

[0002] With the transformation of the global energy structure and the increasing demand for renewable energy, wind power has developed rapidly as a clean energy source. Especially in the field of offshore wind power, due to its abundant and stable wind energy resources, the development and utilization of offshore wind power has received attention. The construction environment of offshore wind farms is relatively complex, including multiple factors such as seawater depth, seabed geology, wind speed, etc. These factors have put forward higher requirements on the stability and safety of wind turbines.

[0003] In order to meet these challenges, guide frames are widely used as an auxiliary structure. Guide frames are generally divided into upper and lower parts during production. The upper section structure of the guide frame is mainly composed of panels, platform ribs, truss structures, steel pipe columns, hanging systems and hanging points. Among them, due to the thin thickness of the panel structure of the upper section of the guide frame, it is easy to deform during assembly, and the accuracy of the closing position of the upper and lower sections is required to be high during the overall assembly of the guide frame. Therefore, during the middle assembly process of the upper section of the guide frame, it is necessary to strictly control the process and control the deformation to meet the subsequent overall assembly accuracy requirements. However, the current middle assembly of the upper section of the guide frame adopts a conventional assembly process, which has a large deformation and is difficult to guarantee the accuracy requirements. Summary of the invention

[0004] The present application aims to solve at least one of the above technical problems in the prior art to a certain extent. To this end, the present application provides a guide frame upper section assembly method, which can control the installation deformation and installation accuracy of the guide frame upper section structural parts.

[0005] According to the guide frame upper section assembly method of the embodiment of the present application, the overall reverse manufacturing process is adopted, including the following steps:

[0006] Steps for marking the ground sample and arranging the tire frame: Draw the ground sample line and the height reference line, and then arrange the horizontal tire frame;

[0007] Panel structure pre-assembly steps: the panel structure is divided into a main panel and a plurality of outer panels arranged on the left and right sides of the main panel for prefabrication, wherein the main panel is provided with a plurality of first platform small ribs, the outer panel is provided with a plurality of second platform small ribs, and a plurality of steel pipe column holes are provided between the main panel and the plurality of the outer panels; the manufactured main panel and the outer panel are placed on a horizontal tire frame for pre-assembly, and the overall pre-assembly size of the panel structure is checked to see whether it is qualified, whether there is misalignment between the first platform small rib and the second platform small rib, and whether the positioning of the steel pipe column holes is accurate; after the inspection is qualified, the main truss installation line is drawn on the inner side of the main panel with the steel pipe column holes of the panel structure as a reference;

[0008] The main truss sub-section installation steps are as follows: the truss structure is divided into a plurality of main truss sub-sections and a plurality of outer truss sub-sections for prefabrication, each of the main truss sub-sections is sequentially installed on the main panel with reference to the main truss installation line, and is spot-welded and fixed on the first platform small rib of the main panel; each of the main truss sub-sections constitutes a main truss sub-section; the main panel, the first platform small rib and the main truss sub-section constitute a main frame, and the main frame is measured; after the overall size of the main frame is qualified, the main panel, the first platform small rib and the main truss sub-section are welded and fixed to each other, and the main frame is assembled by welding;

[0009] The steps of installing the steel tube columns and assembling the wing frames are as follows: placing the prepared outer panels on the horizontal frame and positioning them with the main panel, inserting the steel tube columns into the holes of the steel tube columns, and fixing the steel tube columns to the main frame and the outer panels by positioning welding. After checking that the dimensions are qualified, the outer truss installation line is drawn on the inner side of the outer panel based on the holes of the steel tube columns of the panel structure; installing the outer truss components on the outer panel in sequence with reference to the outer truss installation line, and spot welding them to the second platform rib of the outer panel; the outer truss components form an outer truss section, and the outer panel and the outer truss section form two wing frames located on the left and right sides of the main frame, and the main frame and the two wing frames form the upper section of the guide frame; the upper section of the guide frame is assembled and measured according to the middle group inspection table to ensure that the installation dimensions of the steel tube columns and the overall dimensions of the upper section of the guide frame are qualified;

[0010] Overall assembly welding steps: after the assembly dimensions are inspected and qualified, the main frame, the steel pipe columns, the outer panels, the second platform ribs, and the outer truss sections are welded and fixed;

[0011] Turning over steps: Turn over the upper part of the guide frame.

[0012] In an optional or preferred embodiment, in the overall assembly welding step, the main body frame and one of the wing frames are assembled and welded to form an upper main body platform, and the other wing frame is assembled and welded separately; in the turning over step, the upper main body platform and the wing frame are turned over separately; after the turning over step, the upper main body platform and the wing frame are closed. Turning over the upper main body platform includes the following steps: firstly setting and installing a plurality of turning over ears on the upper main body platform, and then turning over the whole body after the turning over ears are inspected and qualified, first turning over the upper section of the guide frame 90°, and then turning over 90° to achieve overall turning over.

[0013] In the embodiment of the present disclosure, the upper main body platform is provided with a turning-over lifting lug, including: a side where the main body frame and the cantilever frame have been assembled, a plurality of first lifting lugs are provided at the top of the main body truss section, and a third lifting lug is provided at the bottom of the two steel pipe columns respectively; a side where the main body frame is not assembled with the cantilever frame, a plurality of second lifting lugs are provided at the bottom side of the main body truss section. Further, the upper main body platform is turned over by using a first hook and a second hook, including the following steps: the first hook is connected to the first lifting lug by a rope, the second hook is connected to the second lifting lug by a rope, the first hook and the second hook are lifted, and then the second lifting lug is continued to be lifted to turn the upper main body platform over 90°; then the first hook is released, the first hook is re-routed to the third lifting lug, the first hook and the second hook are lifted, and then the third lifting lug is continued to be lifted to turn the upper main body platform over again 90°, thereby completing the overall turning over of the upper main body platform.

[0014] In an optional or preferred embodiment, in the main body truss section installation step, the main body truss sections are installed in an order from the middle position of the main body panel toward the periphery.

[0015] In an optional or preferred embodiment, in the main truss section installation step, temporary supports are provided at intervals to support the main truss sections so as to improve the installation accuracy of the main truss sections after welding.

[0016] In an optional or preferred embodiment, at the location where the main panel and the outer panel are connected, there is a small rib butt weld between the first platform small rib and the second platform small rib, and there is a panel butt weld between the main panel and the outer panel, wherein some of the small rib butt welds are staggered with the panel butt welds.

[0017] In an optional or preferred embodiment, in the main truss segment installation step, the welding direction of the main frame is from the middle position of the structure to the periphery.

[0018] In an optional or preferred embodiment, the accuracy requirements of the truss structure are: truss section width ±3mm, node length ±3mm, truss diagonal ±4mm, truss flatness ≤3mm, axis bending sagitta ≤5mm; the overall accuracy of the upper section of the guide frame: full length ±5mm, diagonal ±3mm, center distance of the main truss components ±3mm, overall flatness ≤10mm, unit flatness per meter ≤6mm, verticality ≤3mm.

[0019] Based on the above technical scheme, the embodiments of the present application have at least the following beneficial effects: the upper section of the guide frame adopts the reverse manufacturing process as a whole, which is convenient for the installation of the first platform small rib and the second platform small rib of the panel structure, and is also convenient for the installation of the truss structure; the panel structure is divided into a main panel and an outer panel, and the local panels are prefabricated first, and then the whole panels are assembled to reduce assembly deformation, wherein, after the main truss section and the main panel are assembled, the steel pipe columns are installed, and finally the outer panel and the outer truss section are installed, such an installation sequence can facilitate the smooth installation of each component, and the main panel, the outer panel, the main truss section, the outer truss section and the steel pipe column are designed with appropriate positioning timing, spot welding fixing timing, and welding fixing timing, which can control the installation deformation and ensure the installation accuracy. The present application improves the installation efficiency by improving the assembly method of the upper section of the guide frame, and improves the installation accuracy and structural stability of the upper section of the guide frame through prefabrication and precise docking. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present application is further described below with reference to the accompanying drawings and embodiments;

[0021] Figure 1 is a top view of the upper section of the guide frame in an embodiment of the present application;

[0022] Figure 2 is a front view of the upper section of the guide frame in the embodiment of the present application;

[0023] Figure 3 is a side view of the upper section of the guide frame in an embodiment of the present application;

[0024] Figure 4 It is a schematic diagram of the structure of the main panel in the embodiment of the present application;

[0025] Figure 5 is a schematic structural diagram of the outer panel in an embodiment of the present application;

[0026] Figure 6 It is a schematic diagram of the pre-assembly of the main panel and the outer panel in the embodiment of the present application;

[0027] Figures 7 to 11 This is a schematic diagram of the installation of the main truss sub-section in the embodiment of the present application;

[0028] Fig.12It is a schematic diagram of the installation of the outer panel and the steel pipe column in the embodiment of the present application;

[0029] Fig.13 is a schematic diagram of the installation of the outer truss division in the embodiment of the present application;

[0030] Fig.14 It is a schematic diagram of the whole assembly in sections in the embodiment of the present application;

[0031] Fig.15 This is a diagram showing the arrangement of the lifting lugs of the upper main platform in the embodiment of the present application;

[0032] Fig.16 yes Fig.15 Sectional view along AA direction;

[0033] Fig.17 yes Fig.15 Cross-sectional view along the BB direction;

[0034] Fig.18 yes Fig.15 Sectional view along CC direction;

[0035] Fig.19 This is a schematic diagram of the turning over of the upper main platform in the embodiment of the present application. Figure 1 ;

[0036] Fig. 20 This is a schematic diagram of the turning over of the upper main platform in the embodiment of the present application. Figure 2 ;

[0037] Fig.21 It is a schematic diagram of the step flow of an embodiment of the present application.

[0038] Reference numerals: guide frame upper section 100, main frame 101, wing frame 102, upper section main platform 103;

[0039] Panel structure 110, main panel 1110, first platform rib 1111, outer panel 1120, first outer plate 1121, second outer plate 1122, third outer plate 1123, fourth outer plate 1124, second platform rib 1125, steel pipe column hole 1130;

[0040] Truss structure 120, main truss section 1210, main truss sub-component 1211, outer truss section 1220, outer truss sub-component 1221;

[0041] Steel pipe column 130;

[0042] A first hanging ear 211, a second hanging ear 212, and a third hanging ear 213;

[0043] A first hook 221 and a second hook 222 . DETAILED DESCRIPTION

[0044] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0045] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0046] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0047] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0048] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0049] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.

[0050] In offshore wind power construction, the guide frame is widely used as an auxiliary structure for positioning and guiding piles. The guide frame is generally divided into two parts, the upper and the lower parts, during production. Figures 1 to 3 The guide frame upper section 100 includes a panel structure 110 , a truss structure 120 and steel pipe columns 130 . The truss structure 120 supports the panel structure. The steel pipe columns 130 are arranged at four corners of the panel structure 110 and pass through the panel structure 110 and the truss structure 120 .

[0051] However, since the panel structure 110 of the upper section 100 of the guide frame is relatively thin, it is easy to deform during assembly, and the upper and lower sections have high precision requirements for closing positions during the overall assembly of the guide frame. Therefore, during the middle assembly of the upper section of the guide frame, it is necessary to strictly control the process and control the deformation to meet the subsequent overall assembly precision requirements. However, the current middle assembly of the upper section of the guide frame adopts a conventional assembly process, which has a large deformation and is difficult to ensure precision requirements.

[0052] Reference Figures 4 to 21 , this embodiment describes a method for assembling the upper section of a guide frame, which adopts a reverse manufacturing process as a whole.

[0053] In the assembly method of this embodiment, the panel structure 110 is prefabricated into a main panel 1110 and a plurality of outer panels 1120 disposed on the left and right sides of the main panel 1110. Figure 4 As shown, the main panel 1110 is provided with a plurality of first platform small ribs 1111; Figure 5 As shown, the outer panel 1120 is provided with a plurality of second platform small ribs 1125 .

[0054] In this embodiment, Figure 5 As shown, the outer panels 1120 are provided with four pieces, namely, a first outer panel 1121, a second outer panel 1122, a third outer panel 1123, and a fourth outer panel 1124. Figure 6 It is understood that the first outer panel 1121 and the second outer panel 1122 are installed on the left side of the main panel 1110, and the third outer panel 1123 and the fourth outer panel 1124 are installed on the right side of the main panel 1110. It should be noted that the left and right sides of the main panel 1110 are described based on the orientation shown in the drawings, and do not refer to a specific orientation.

[0055] The truss structure 120 is prefabricated into a plurality of main truss segments 1211 and a plurality of outer truss segments 1221. The main truss segments 1211 are located inside the main panel 1110, and the outer truss segments 1221 are located inside the outer panel 1120.

[0056] Guide frame upper section middle assembly method, refer to Fig.21 , specifically including the following steps:

[0057] S1, ground sample marking and tire frame layout steps:

[0058] Set up ground sample blocks and baseline poles on the ground in the middle group area, then use laser to draw the height baseline of the middle group on the baseline pole, put foreign prints on the baseline pole, draw the ground sample line, and then arrange the horizontal tire frame. Among them, the accuracy of the ground sample line, the deviation is ≤1.5mm; the accuracy of the height baseline, the deviation is ≤1.5mm.

[0059] S2, panel structure pre-assembly steps:

[0060] Reference Figure 6 , the prepared main body panel 1110 and the outer side panel 1120 are placed on a horizontal tire frame for pre-assembly, wherein, Figure 6 There are multiple steel pipe column holes 1130 between the main panel 1110 and multiple outer panels 1120. Then, check whether the overall pre-assembly size of the panel structure 110 is qualified, whether there is misalignment between the first platform small rib 1111 and the second platform small rib 1125, and whether the positioning of the steel pipe column holes 1130 is accurate.

[0061] After passing the inspection, the main truss installation line is drawn on the inner side of the main panel 1110 based on the steel pipe column hole 1130 of the panel structure 110.

[0062] S3, main truss section installation steps:

[0063] Reference Figures 7 to 11, each main truss component 1211 is installed on the main panel 1110 in sequence with reference to the main truss installation line, and is spot welded and fixed on the first platform rib 1111 of the main panel 1110.

[0064] In order to reduce the deformation of the main truss sub-components 1211 on the main panel 1110 during the installation process, in this embodiment, the main truss sub-components 1211 are installed from the middle position of the main panel 1110 to the outer periphery. Figures 7 to 9 , each main truss component 1211 is installed from the middle position of the main panel 1110 to the left and right sides; Figure 10 to Figure 11 , each main truss sub-component 1211 is installed from the middle position of the main panel 1110 to the front and rear sides. Each main truss sub-component 1211 constitutes a main truss sub-section 1210. In some embodiments, the main truss sub-section 1210 is split into main truss sub-components. It needs to be split according to the overall size of the main truss sub-section 1210. Those skilled in the art can refer to Figures 7 to 11 Understand and make reasonable adjustments accordingly. Among them, the spacing error between two adjacent main truss components 1211 is controlled within ±3mm. The verticality between the main truss component 1211 and the main panel 1110 is controlled to be ≤3mm. Preferably, in the main truss sub-assembly installation step, temporary supports are set every 5 meters to support the main truss component 1211 to improve the installation accuracy of the main truss component after welding.

[0065] The main body panel 1110, the first platform small rib 1111 and the main body truss section 1210 constitute the main body frame 101, and the main body frame 101 is measured.

[0066] After the overall size of the main frame 101 is qualified, the main panel 1110, the first platform rib 1111, and the main truss section 1210 are welded and fixed to assemble the main frame 101. In order to reduce the welding deformation of the main frame 101, the welding direction of the main frame 101 is from the middle position of the structure to the outer periphery.

[0067] S4, steel pipe column installation and wing frame assembly steps:

[0068] Reference Fig.12 , place the prepared outer panels 1120 on the horizontal frame and position them with the main panel 1110, insert the steel pipe column 130 into the steel pipe column hole 1130, and fix the steel pipe column 130 to the main frame 101 and the outer panels 1120 by positioning welding. After checking that the dimensions are qualified, draw the outer truss installation line on the inner side of the outer panel based on the steel pipe column hole 1130 of the panel structure 110.

[0069] Reference Fig.13 , each outer truss sub-component 1221 is sequentially installed on the outer panel 1120 with reference to the outer truss installation line, and is spot welded to the second platform rib 1125 of the outer panel. Each outer truss sub-component 1221 constitutes an outer truss sub-section 1220, and the outer panel and the outer truss sub-section constitute two cantilever frames 102 located on the left and right sides of the main frame 101, and the main frame 101 and the two cantilever frames 102 constitute the guide frame upper section 100.

[0070] The overall assembly dimensions of the guide frame upper section 100 are measured according to the mid-group inspection table to ensure that the installation dimensions of the steel pipe column 130 and the overall dimensions of the guide frame upper section 100 are qualified.

[0071] S5, overall assembly welding steps:

[0072] After the assembly dimensions are inspected and found to be qualified, the main frame 101, the steel pipe column 130, the outer panel, the second platform ribs, and the outer truss sections are welded and fixed.

[0073] Among them, refer to Fig.14 The main frame 101 and the right wing frame 102 are assembled and welded to form an upper main platform 103, and the left wing frame 102 is assembled and welded separately.

[0074] In the above steps, the assembly welding of the main frame 101, the integral welding of the wing frame 102 inside and between the main frame 101 and the steel pipe column 130 are implemented according to the following requirements: the main panel 1110 and the outer panel 1120, the panel structure 110 and the truss structure 120, and the panel structure 110 and the steel pipe column 130 are all welded with hf=8mm fillet welds; the main truss components 1211 and the corresponding main truss components 1211 and the steel pipe column 130 are welded with groove welding, using V-shaped grooves; the outer truss components 1221, the outer truss components 1221 and the main truss components 1211, and the outer truss components 1221 and the steel pipe column 130 are welded with hf=10mm double-sided fillet welds. The groove welds must be fully melted, and the appearance quality standard of the fillet welds is level three. The above welding requirements can be adaptively adjusted by those skilled in the art according to the welding requirements of the upper section of the guide frame.

[0075] S6, turning over steps:

[0076] The entire upper section of the guide frame is turned over. In this embodiment, the upper section main body platform 103 and the wing frame 102 are turned over separately.

[0077] Specifically, to turn over the upper main body platform 103, a plurality of turning ears are first installed on the upper main body platform 103, and the entire platform 103 is turned over after the turning ears are inspected and qualified. First, the upper section of the guide frame is turned over 90°, and then turned over 90° to achieve overall turning.

[0078] Reference Figures 15 to 18 The upper main platform 103 is provided with turning over lugs, including: a plurality of first lugs 211 are provided at the top of the main truss section 1210 on the side where the main frame 101 and the wing frame 102 have been assembled, and a third lug 213 is provided at the bottom of the two steel pipe columns 130. A plurality of second lugs 212 are provided at the bottom side of the main truss section 1210 on the side where the main frame 101 is not assembled with the wing frame 102.

[0079] The first hook 221 and the second hook 222 are used to turn over the upper main body platform 103, including the following steps:

[0080] Reference Fig.19 The first hook 221 is connected to the first lifting lug 211 through a rope, and the second hook 222 is connected to the second lifting lug 212 through a rope. The first hook 221 and the second hook 222 are lifted, and then the second lifting lug 212 is further lifted to turn the upper main body platform 103 90 degrees. Fig. 20 , release the first hook 221, re-rope the first hook 221 and connect it to the third lifting ear 213, lift the first hook 221 and the second hook 222, and then continue to lift the third lifting ear 213 to turn the upper main platform 103 over by another 90°, thereby completing the overall turning of the upper main platform 103.

[0081] After the turning over step, the upper main body platform 103 and the wing frame 102 are closed.

[0082] In some of the embodiments, at the connection position between the main panel 1110 and the outer panel 1120, there is a rib butt weld between the first platform rib 1111 and the second platform rib 1125, and there is a panel butt weld between the main panel 1110 and the outer panel 1120, wherein some of the rib butt welds are staggered with the panel butt welds.

[0083] During the assembly process and after the closing of the upper section of the guide frame, the accuracy requirements of the truss structure 120 are: truss section width ±3mm, inter-node length ±3mm, truss diagonal ±4mm, truss flatness ≤3mm, axis bending sagitta ≤5mm; the overall accuracy of the upper section of the guide frame: full length ±5mm, diagonal ±3mm, center distance of the main truss components ±3mm, overall flatness ≤10mm, unit flatness per meter ≤6mm, verticality ≤3mm.

[0084] The method for assembling the upper section of the guide frame of the present application adopts the overall reverse manufacturing process, which is convenient for the installation of the first platform small rib and the second platform small rib of the panel structure, and is also convenient for the installation of the truss structure. In addition, the panel structure is divided into a main panel and an outer panel, and the local panels are prefabricated first, and then the whole panels are assembled to reduce assembly deformation. Among them, after the main truss division and the main panel are assembled, the steel pipe column is installed, and finally the outer panel and the outer truss division are installed. This installation sequence can facilitate the smooth installation of various components.

[0085] The above-mentioned middle assembly method adopts an overall reverse manufacturing process, first assembling the main frame, then positioning and installing the steel pipe columns, and finally installing and assembling the cantilever frame. In this way, the deformation and installation accuracy of the panel structure and truss structure can be controlled, and at the same time, the positioning accuracy of the steel pipe columns can be improved to meet the accuracy requirements of the subsequent overall assembly. It is important to note that this embodiment designs appropriate positioning timing, spot welding fixing timing, and welding fixing timing for the main panel, outer panel, main truss section, outer truss section, and steel pipe column. Different from the conventional middle assembly method, it can control installation deformation and ensure installation accuracy. The present application improves installation efficiency by improving the middle assembly method of the upper section of the guide frame, and improves the installation accuracy and structural stability of the upper section of the guide frame through prefabrication and precise docking.

[0086] The embodiments of the present application are described in detail above in conjunction with the accompanying drawings, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present application.

Claims

1. A method for assembling the upper section of a guide frame, It is characterized in that The overall reverse manufacturing process includes the following steps: Steps for marking the ground sample and arranging the tire frame: Draw the ground sample line and the height reference line, and then arrange the horizontal tire frame; Panel structure pre-assembly steps: the panel structure is divided into a main panel and a plurality of outer panels arranged on the left and right sides of the main panel for prefabrication, wherein the main panel is provided with a plurality of first platform small ribs, the outer panel is provided with a plurality of second platform small ribs, and a plurality of steel pipe column holes are provided between the main panel and the plurality of the outer panels; the manufactured main panel and the outer panel are placed on a horizontal tire frame for pre-assembly, and the overall pre-assembly size of the panel structure is checked to see whether it is qualified, whether there is misalignment between the first platform small rib and the second platform small rib, and whether the positioning of the steel pipe column holes is accurate; after the inspection is qualified, the main truss installation line is drawn on the inner side of the main panel with the steel pipe column holes of the panel structure as a reference; The main truss sub-section installation steps are as follows: the truss structure is divided into a plurality of main truss sub-sections and a plurality of outer truss sub-sections for prefabrication, each of the main truss sub-sections is sequentially installed on the main panel with reference to the main truss installation line, and is spot-welded and fixed on the first platform small rib of the main panel; each of the main truss sub-sections constitutes a main truss sub-section; the main panel, the first platform small rib and the main truss sub-section constitute a main frame, and the main frame is measured; after the overall size of the main frame is qualified, the main panel, the first platform small rib and the main truss sub-section are welded and fixed to each other, and the main frame is assembled by welding; The steps of installing the steel tube columns and assembling the wing frames are as follows: placing the prepared outer panels on the horizontal frame and positioning them with the main panel, inserting the steel tube columns into the holes of the steel tube columns, and fixing the steel tube columns to the main frame and the outer panels by positioning welding. After checking that the dimensions are qualified, the outer truss installation line is drawn on the inner side of the outer panel based on the holes of the steel tube columns of the panel structure; installing the outer truss components on the outer panel in sequence with reference to the outer truss installation line, and spot welding them to the second platform rib of the outer panel; the outer truss components form an outer truss section, and the outer panel and the outer truss section form two wing frames located on the left and right sides of the main frame, and the main frame and the two wing frames form the upper section of the guide frame; the upper section of the guide frame is assembled and measured according to the middle group inspection table to ensure that the installation dimensions of the steel tube columns and the overall dimensions of the upper section of the guide frame are qualified; Overall assembly welding steps: after the assembly dimensions are inspected and qualified, the main frame, the steel pipe columns, the outer panels, the second platform ribs, and the outer truss sections are welded and fixed; Turning over steps: Turn over the upper part of the guide frame.

2. The guide frame upper section assembly method according to claim 1, Features: In the overall assembly welding step, the main body frame and one of the cantilever frames are assembled and welded to form an upper main body platform, and the other cantilever frame is assembled and welded separately; in the turning over step, the upper main body platform and the cantilever frame are turned over separately; after the turning over step, the upper main body platform and the cantilever frame are closed.

3. The guide frame upper section assembly method according to claim 2, It is characterized in that Turning over the upper main body platform comprises the following steps: firstly setting and installing a plurality of turning over lifting ears on the upper main body platform, and then turning over the whole body after the turning over lifting ears are inspected and qualified, first turning over the upper section of the guide frame 90°, and then turning over 90° to realize turning over the whole body.

4. The guide frame upper section assembly method according to claim 3, It is characterized in that The upper main body platform is provided with a turning lug, including: On the side where the main frame and the wing frame have been assembled, a plurality of first lifting ears are arranged on the top of the main truss section, and third lifting ears are arranged on the bottoms of the two steel pipe columns respectively; A plurality of second lifting ears are arranged on the bottom side of the main body truss section at a side of the main body frame that is not assembled with the wing frame.

5. The guide frame upper section assembly method according to claim 4, Features: The upper main body platform is turned over by using a first hook and a second hook, comprising the following steps: The first hook is connected to the first lifting eye through a rope, and the second hook is connected to the second lifting eye through a rope. The first hook and the second hook are lifted, and then the second lifting eye is further lifted to turn the upper main body platform over by 90 degrees. Then release the first hook, re-rope the first hook and connect it to the third lifting ear, lift with the first hook and the second hook, and then continue to lift the third lifting ear to turn the upper main platform over by another 90°, thereby completing the overall turning of the upper main platform.

6. The method for assembling the upper section of a guide frame according to any one of claims 1 to 5, Features: In the main body truss sub-assembly installation step, the main body truss sub-assemblies are installed in the order of being installed from the middle position of the main body panel toward the periphery.

7. The guide frame upper section assembly method according to claim 6, Features: In the main truss section installation step, temporary supports are arranged at intervals to support the main truss sections so as to improve the installation accuracy of the main truss sections after welding.

8. The method for assembling the upper section of a guide frame according to any one of claims 1 to 5, Features: At the position where the main panel and the outer panel are connected, there is a rib butt weld between the first platform small rib and the second platform small rib, and there is a panel butt weld between the main panel and the outer panel, wherein some of the rib butt welds are staggered with the panel butt welds.

9. The method for assembling the upper section of a guide frame according to any one of claims 1 to 5, Features: In the main truss segment installation step, the welding direction of the main frame is from the middle position of the structure to the periphery.

10. The guide frame upper section assembly method according to any one of claims 1 to 5, Features: The accuracy requirements of the truss structure are: truss section width ±3mm, internode length ±3mm, truss diagonal ±4mm, truss flatness ≤3mm, axis bending sagittal ≤5mm; The overall accuracy of the upper section of the guide frame: total length ±5mm, diagonal ±3mm, center distance of main truss components ±3mm, overall flatness ≤10mm, unit flatness per meter ≤6mm, verticality ≤3mm.

Citation Information

Patent Citations

  • Annular double-layer truss and manufacture method thereof

    CN103321296A

  • Large-span parallel truss steel connective corridor construction method

    CN103410322A