A geomembrane anti-seepage performance detection device and detection method

By designing a rectangular box with an open top and a pressurized component, combined with a linear drive unit and an air pump, flexible clamping and efficient pressurized detection of geomembranes are achieved, which solves the problem of slow detection speed and inflexible clamping structure in the existing technology. problems, improving the accuracy and application scope of detection.

CN118624501BActive Publication Date: 2024-10-29KUNMING PROSPECTING DESIGN INSTITUTE OF CHINA NONFERROUS METALS INDUSTRY CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411077498.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-29
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

Existing geomembrane anti-seepage performance testing devices have problems such as slow detection speed, unsuitable for qualitative testing, easy damage, and difficulty in clamping structure to cope with membranes of different widths.

Method used

A detection device including a rectangular box with an open top, a pressurized component and a fixed component is designed. Through a linear drive unit, an air pump and an adjustable movable plate and splint structure, the flexible clamping and efficient processing of the geomembrane are achieved. pressure detection.

Benefits of technology

It improves the detection speed and accuracy, has a wide range of applications, can reliably fix and detect geomembranes of different widths, and avoids damage and side leakage problems during the detection process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118624501B_ABST
    Figure CN118624501B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of geomembrane detection technology, and specifically discloses a geomembrane anti-seepage performance detection device and detection method. The detection device includes a rectangular box with an open top, and through grooves and rectangular grooves are symmetrically provided on the four walls of the box. The top of the U-shaped frame of the fixed component is provided with an installation groove and a plurality of fixed rods are provided therein. Movable sleeves are slidably provided on both sides of the fixed rods, and the movable sleeves on the same side are fixed to the movable plates on the same side. A linear drive unit II connected to the U-shaped frame at the driving end is provided above the through groove of the box; the fixed component includes a clamping plate symmetrically fixed under the U-shaped frame, and a horizontal plate is slidably provided between the two clamping plates. A bidirectional threaded rod I is provided under the horizontal plate in the box, and threaded sleeves I are provided on both sides, and the threaded sleeves I on the same side are fixed to the horizontal plate on the same side. The bidirectional threaded rod I rotates through the box and is respectively fixed with pulleys I and pulleys II. The detection method includes width adaptation, fixing, and testing steps. The present invention has the characteristics of wide application range, reliable fixing, simple operation, and high detection accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geomembrane detection, and specifically relates to a geomembrane anti-seepage performance detection device and a detection method which have wide application range, reliable fixation, simple operation and high detection accuracy. Background Art

[0002] Geomembrane, also known as anti-seepage membrane, is a geotechnical anti-seepage material that uses plastic film as an anti-seepage substrate and is composited with non-woven fabrics. Because geomembranes have anti-seepage and strong tensile strength, they are often used in landfills, tailings storage sites, rivers, reservoirs, dams, subways and other projects that require anti-seepage treatment. As the most important technical indicator of geomembranes, anti-seepage performance requires quantitative sampling of geomembrane anti-seepage performance during the production process, and qualitative testing is required before use to determine whether the anti-seepage performance meets the requirements.

[0003] Quantitative testing during the production process of geomembranes is carried out using existing permeameters. Since quantitative testing requires random sampling of test membrane segments for laboratory testing, this not only causes a certain amount of testing loss in the geomembrane, but also a relatively slow testing speed. This is not suitable for qualitative testing of anti-seepage performance, and is especially not suitable for rapid testing on site.

[0004] In the prior art, for the qualitative detection of the anti-seepage performance of the geomembrane, a liquid collecting tank for collecting the seepage water is set on the upper end surface of the base, and a clamp formed by the upper clamping plate and the lower clamping plate are set on the liquid collecting tank to fix the geomembrane, and then a bucket for holding water is set on the clamping device, and a specified height of water is injected into the bucket, and the water accumulation in the liquid collecting tank is observed after a period of time, so as to determine whether the anti-seepage performance of the geomembrane is qualified. Although the aforementioned anti-seepage performance qualitative detection device has a relatively simple structure and can meet the detection requirements, since the water pressure applied to the geomembrane needs to be generated by a natural water column, this not only makes the height of the device high, but also makes it difficult to complete the anti-seepage performance detection under a higher pressure. For this reason, in the prior art, the pressure plate is generally driven downward by a cylinder to press the liquid to detect the anti-seepage performance of the geomembrane under the preset water pressure, but this pressurization method does not change the volume of the water body when it is squeezed, so the downward pressure will cause a large squeezing force on the geomembrane below, making the geomembrane very easy to be damaged and affecting the accuracy of its anti-seepage performance test results. Therefore, the prior art also has a method of uniformly pressurizing the liquid by providing an air plate, a high-pressure air pump and an air cylinder, and adjusting the air cylinder so that the air plate is located above the liquid but not in contact with it, and then the external gas is introduced into the air plate through the high-pressure air pump and blown toward the liquid through the air holes, and the liquid is pressurized by air pressure, thereby achieving the effect of pressurization without changing the volume of the liquid, thereby reducing the possibility of damage caused by external factors during the performance testing of the geomembrane. However, in actual use, the above-mentioned technical solution fixes the geomembrane through a clamping plate. After liquid is added above the geomembrane, the geomembrane cannot be fixed on both sides inside the test box. Therefore, the liquid may flow through both sides of the geomembrane to the support plate, thereby affecting the accuracy of the test results; although the flow measurement problem can be solved by setting a structure that can clamp and seal both sides of the geomembrane inside the test box, geomembranes of different widths will be produced according to usage requirements during the production process. Therefore, the fixed geomembrane clamping and sealing structure on both sides is difficult to flexibly respond to the detection needs of geomembranes of different widths, and often requires temporary replacement of clamping mechanisms of different widths to meet the test, which in turn leads to a long test time and a more complicated test process. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a device for detecting the anti-seepage performance of geomembranes with a wide range of applications, reliable fixation, simple operation and high detection accuracy, and also provides a method for detecting the anti-seepage performance of geomembranes.

[0006] The device for detecting the anti-seepage performance of geomembrane of the present invention is realized as follows: it comprises a rectangular box with an open top, a pressurizing component arranged above the box, and fixing components arranged inside and outside the box.

[0007] The pressurizing assembly includes two fixing frames symmetrically fixed on the two side walls of the box body and extending upward, a linear drive unit I fixedly arranged on the upper part of the fixing frame, a rectangular installation frame arranged above the box body and open at the bottom, an air pump fixedly arranged on the top of the installation frame, and a water supply pipe fixedly arranged on the top of the installation frame. The installation frame is respectively connected to the driving ends of the linear drive unit I on the two fixing frames, the pipeline connected to the air outlet end of the air pump passes through the top wall of the installation frame, the water supply pipe passes through the top wall of the installation frame, and a water outlet is arranged at the bottom of the box body;

[0008] The two side walls of the box body are symmetrically penetrated with through grooves, and the two side walls in the other direction are symmetrically penetrated with rectangular grooves, the fixed assembly includes a U-shaped frame with two through grooves at both ends and opening downward, and two movable plates slidably arranged in parallel with each other in the U-shaped frame, the top of the U-shaped frame is penetrated with mounting grooves corresponding to the openings of the mounting frame, a number of fixing rods parallel to each other and perpendicular to the movable plates are fixedly arranged inside the mounting grooves at intervals, movable sleeves are slidably arranged on the fixing rods at intervals, and the movable sleeves on the same side of the fixing rods are fixedly connected to the movable plates on the same side, and at least two linear drive units II are fixedly arranged on the outer walls of the box body above the two through grooves, and the driving ends of the linear drive units II on the same side of the box body are connected to the U-shaped frame on the same side extending from the through groove;

[0009] The fixing assembly also includes a clamping plate symmetrically fixedly arranged below the U-shaped frame in the box and corresponding to the side plates on both sides of the U-shaped frame, two horizontal plates corresponding to the movable plates are slidingly arranged parallel to each other between the two clamping plates, and two bidirectional threaded rods I perpendicular to the horizontal plates are symmetrically and rotatably arranged below the two horizontal plates in the box, and threaded sleeves I are respectively sleeved on both sides of the bidirectional threaded rods I, and the threaded sleeves I on the same side of the two bidirectional threaded rods I are fixedly connected to the horizontal plates on the same side, and one end of the same side of the two bidirectional threaded rods I rotates through the side wall of the box and coaxially fixedly provided with pulleys I and II outside the side wall, and the rectangular groove is horizontally arranged and the height is equivalent to the up and down movable range between the clamping plate and the side plate.

[0010] Furthermore, an elastic sealing strip I is fixedly provided around the bottom of the mounting frame, elastic sealing strips II are fixedly provided at the bottom of the side panels and the bottom of the movable panel respectively, elastic sealing strips III are fixedly provided at the top of the splint and the top of the cross panel respectively, the elastic sealing strips II at the bottom ends of the side panels on both sides of the U-shaped frame correspond to the elastic sealing strips III at the top ends of the splints, and the elastic sealing strips II at the bottom end of the movable panel correspond to the elastic sealing strips III at the top ends of the cross panel.

[0011] Furthermore, the open outline of the mounting frame is larger than the outline of the mounting groove and smaller than the outer outline of the top of the U-shaped frame, the bottom end of the rectangular groove is lower than the upper end surfaces of the clamping plate and the cross plate, and the top end of the rectangular groove is higher than the lower end surfaces of the movable plate and the side plate.

[0012] Furthermore, a rotating rod parallel to the bidirectional threaded rod I is rotatably arranged on the outer wall of the box body between the pulley I and the pulley II, a handwheel is coaxially fixed to the end of the rotating rod away from the outer wall of the box body, and a pulley III is coaxially fixed to the rotating rod on the inner side of the handwheel, and the pulley I and the pulley II are rotatably connected to the pulley III through a belt.

[0013] Furthermore, a plurality of guide rods extending upward are fixedly arranged at intervals on the inner side surfaces of the two horizontal plates close to each other, the sliding sleeves on the guide rods are provided with fixed sleeves, and the fixed sleeves on the plurality of guide rods fixed to the same horizontal plate are respectively fixedly connected to the movable plate on the same side.

[0014] Furthermore, mounting sleeves are fixedly provided on the two outermost guide rods of the plurality of guide rods fixed to the same horizontal plate, and the mounting sleeves are slidably provided with a movable rod that can be moved horizontally, and a telescopic spring is provided on the side of the movable rod away from the clamping plate, and both ends of the telescopic spring are respectively connected to the mounting sleeve and the movable rod; support frames are fixedly provided on the inner side surfaces of the two movable plates close to each other at the side plates on both sides close to the U-shaped frame, and the support frame is slidably provided with a sliding rod that can be moved horizontally, and an elastic sealing plate parallel to the side plate is provided between the side plate and the support frame, and the sliding rods on the same side of the two movable plates are fixedly connected to the elastic sealing plate on the same side, and a connecting rod is provided between the support frame and the guide rod, and both ends of the connecting rod are hinged to the sliding rod and the movable rod respectively.

[0015] Furthermore, the movable rod is a "T"-shaped rod formed by a central main rod and a secondary rod vertically connected to the central main rod. The central main rod slides through the mounting sleeve and extends toward the nearest clamp. The telescopic spring sleeve is arranged on the central main rod and close to one side of the secondary rod. The two ends of the telescopic spring are respectively fixedly connected to the mounting sleeve and the secondary rod.

[0016] Furthermore, it also includes a centering component, which includes fixed blocks symmetrically arranged above and below the rectangular grooves on the outer walls of both sides of the box body, a two-way threaded rod II is rotatably connected between the fixed blocks on both sides below the rectangular groove, threaded sleeves II are respectively sleeved on both sides of the two-way threaded rod II, a mounting plate extending outward is vertically arranged on the threaded sleeve II, vertical mounting blocks are spaced apart on the inner side surfaces of the two mounting plates close to each other, and a roller is rotatably arranged between the two mounting blocks on the same mounting plate; a positioning rod is fixedly connected between the fixed blocks on both sides above the rectangular groove, positioning sleeves are slidably arranged on both sides of the positioning rod, and the two positioning sleeves are fixedly connected to the two mounting plates respectively.

[0017] Furthermore, one end of the bidirectional threaded rod II close to the pulley I passes through the fixed block and a pulley IV is coaxially fixed to the outer extension section, and the pulley IV is rotationally connected to the pulley II through a belt.

[0018] The method for detecting the anti-seepage performance of geomembrane of the present invention is implemented as follows: Based on the aforementioned anti-seepage performance detection device of geomembrane, the detection steps are as follows:

[0019] A. Width adaptation: According to the width of different geomembranes, the hand wheel is turned to drive the pulley III to rotate, and the pulley III drives the pulley I and the pulley II to rotate through the belt, so that the two bidirectional threaded rods I rotate at the same time, and then the threaded sleeve I drives the two horizontal plates to move between the clamping plates to adjust the spacing. When the two horizontal plates move, the guide rods and fixed sleeves on them respectively drive the movable plates to move, thereby adjusting the spacing of the movable plates at the same time, so that the two movable plates correspond to the two horizontal plates up and down and the spacing is adapted to the width of the geomembrane;

[0020] B. Fixing of geomembrane: Pass the front end of the geomembrane through the two rectangular grooves in sequence, then start the linear drive unit II connected to both ends of the U-shaped frame to drive the U-shaped frame to move downward, so that the elastic sealing strip II at the bottom of the side plates on both sides of the U-shaped frame cooperates with the elastic sealing strip III at the top of the two clamping plates to clamp and fix the front and back sides of the geomembrane. At the same time, the elastic sealing strip II at the bottom of the two movable plates cooperates with the elastic sealing strip III at the top of the two horizontal plates to clamp and fix the left and right sides of the geomembrane to complete the fixation of the geomembrane;

[0021] C. Geomembrane test: The two side plates of the U-shaped frame cooperate with the two movable plates that slide inside to surround and seal the top of the clamped geomembrane. Then add water through the water pipe or directly between the two movable plates and the two side plates of the U-shaped frame. Then start the linear drive unit I to drive the installation frame to move downward, so that the elastic sealing strip I at the bottom of the installation frame fits the top of the U-shaped frame. Then start the air pump to ventilate the installation frame through the pipe connected to the air outlet end to pressurize the water on the top of the geomembrane. Finally, observe whether there is any leakage at the bottom of the geomembrane to detect the anti-seepage performance of the geomembrane.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] 1. The present invention sets a fixing assembly inside and outside the box. The fixing assembly is provided with a U-shaped frame and a movable plate with adjustable spacing at the upper part, and a fixed clamping plate and a horizontal plate with adjustable spacing at the lower part. The U-shaped frame and the movable plate can be driven up and down by a linear drive unit II, so that the U-shaped frame with fixed spacing can cooperate with the clamping plate to clamp and fix the front and rear sides of the geomembrane, and the movable plate with adjustable spacing and the horizontal plate can cooperate to clamp and fix the two sides of the geomembrane. Not only does it not need to intercept the geotextile during detection, but it can also ensure the integrity of the geomembrane. Moreover, according to the different widths of the geomembrane, the spacing between the movable plate and the horizontal plate can be adjusted to form a reliable clamping and fixation and complete the detection, so the applicable range of the width of the geomembrane is improved. In particular, the movable plate is fixedly connected to the horizontal plate on the same side through a guide rod, and the two horizontal plates are threadedly connected through a bidirectional threaded rod I, and one end of the bidirectional threaded rod I rotates through the side wall of the box and is fixed with a pulley, so that the spacing between the movable plate and the horizontal plate can be conveniently and synchronously adjusted by rotating the pulley, which effectively simplifies the spacing adjustment operation process.

[0024] 2. The present invention provides an installation groove through the top of the U-shaped frame, and two movable plates are slidably arranged in the U-shaped frame, and a rectangular groove driven by a linear drive unit I is arranged above the U-shaped frame, and the U-shaped frame can be driven up and down by a linear drive unit II fixedly arranged on the outer wall of the box body, so that after the geomembrane is clamped, the bottom end of the rectangular groove abuts against the top of the U-shaped frame, so that a closed cavity can be formed above the geomembrane, so that the detection liquid is gathered on the top of the geomembrane without the problem of side leakage, which effectively improves the accuracy of the detection result, and the closed cavity can also pressurize the liquid with gas through the air pump on the top of the rectangular groove, avoiding the problem of geomembrane fragility caused by directly pressurizing the liquid.

[0025] 3. The present invention further rotatably sets a rotating rod between pulley I and pulley II, and coaxially fixes a handwheel and pulley III at one end of the rotating rod, and pulley I and pulley II are rotatably connected to pulley III through a belt, so that through handwheel adjustment and belt connection, the efficiency of adjusting the distance between the two movable plates and the two horizontal plates can be improved, and the synchronization of adjustment on both sides can be ensured, further improving the convenience of adjustment.

[0026] 4. The present invention further fixes an installation sleeve on the outermost guide rod of the same horizontal plate, then slides a movable rod on the installation sleeve and sleeves a telescopic spring, and support frames and sliding rods are fixedly arranged at the inner sides of the two movable plates near the side plates on both sides of the U-shaped frame, and elastic sealing plates are arranged in parallel between the side plates and the support frames, and the sliding rods on the same side of the two movable plates are fixed to the elastic sealing plates on the same side, and the sliding rods are connected to the movable rods through a hinged connecting rod, so that when the movable plate moves downward, the sliding rods can make the elastic sealing plate fit the connection between the movable plate and the U-shaped frame through the connecting rod and the movable rod to seal, thereby avoiding leakage at the connection during pressurized testing, and further improving the accuracy of the test results.

[0027] 5. The present invention further arranges a centering component on the outside of the rectangular groove on the outer wall of the box body, and the distance between the rollers on both sides can be synchronously adjusted through the bidirectional threaded rod II, so that the geomembrane entering the detection device can be limited and centered by the rollers on both sides, avoiding the side leakage problem caused by the side edges of the geomembrane being unable to be clamped by the side plates of the U-shaped frame due to the center of the geomembrane being unable to be aligned with the U-shaped frame during the fixing process, thereby further improving the accuracy of the detection results.

[0028] In summary, the present invention has the characteristics of wide application range, reliable fixation, simple operation and high detection accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a structural schematic diagram of the present invention;

[0030] Figure 2 for Figure 1 CC section view;

[0031] Figure 3 for Figure 1 Left view of

[0032] Figure 4 It is a schematic diagram of the three-dimensional structure of the U-shaped frame of the present invention;

[0033] Figure 5 It is a schematic structural diagram of the U-shaped frame and its connection structure in a non-detection state of the present invention;

[0034] Figure 6 It is a schematic diagram of the structure of the U-shaped frame and its connection structure detection state of the present invention;

[0035] Figure 7 for Figure 5 Enlarged view of point A in the middle;

[0036] Figure 8 for Figure 6 Enlarged view of point B in the middle;

[0037] Fig. 9It is a schematic diagram of the three-dimensional structure of the elastic sealing plate of the present invention;

[0038] In the figure: 1-box, 101-through groove, 102-rectangular groove, 2-pressurizing component, 201-fixed frame, 202-linear drive unit I, 203-installation frame, 204-air pump, 205-water pipe, 206-elastic sealing strip I, 3-fixed component, 301-U-shaped frame, 3011-side plate, 302-movable plate, 303-installation groove, 304-fixed rod, 305-movable sleeve, 306-linear drive unit II, 307-clamp, 308-cross plate, 309-bidirectional threaded rod I, 310-threaded sleeve I, 311-pulley I, 312-pulley II, 313 -Elastic sealing strip II, 314-Elastic sealing strip III, 315-Rotating rod, 316-Handwheel, 317-Pulley III, 318-Belt, 319-Guide rod, 320-Fixed sleeve, 321-Mounting sleeve, 322-Moveable rod, 323-Telescopic spring, 324-Support frame, 325-Sliding rod, 326-Elastic sealing plate, 327-Connecting rod, 4-Centering assembly, 401-Fixed block, 402-Bidirectional threaded rod II, 403-Threaded sleeve II, 404-Mounting plate, 405-Mounting block, 406-Roller, 407-Positioning rod, 408-Positioning sleeve, 409-Pulley IV. DETAILED DESCRIPTION

[0039] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but the present invention is not limited in any way. Any changes or improvements made based on the teachings of the present invention belong to the protection scope of the present invention.

[0040] like Figures 1 to 9 As shown, the device for detecting the anti-seepage performance of geomembrane of the present invention comprises a rectangular box 1 with an open top, a pressurizing component 2 arranged above the box 1, and a fixing component 3 arranged inside and outside the box 1.

[0041] The pressurizing component 2 includes two fixing frames 201 symmetrically fixedly arranged on the two side walls of the box body 1 and extending upward, a linear driving unit I 202 fixedly arranged on the upper part of the fixing frame 201, a rectangular installation frame 203 arranged above the box body 1 and open at the bottom, an air pump 204 fixedly arranged on the top of the installation frame 203, and a water supply pipe 205 fixedly arranged on the top of the installation frame 203, the installation frame 203 is respectively connected to the driving ends of the linear driving unit I 202 on the two fixing frames 201, the pipeline connected to the air outlet end of the air pump 204 passes through the top wall of the installation frame 203, the water supply pipe 205 passes through the top wall of the installation frame 203, and a water outlet is arranged at the bottom of the box body 1;

[0042] The two side walls of the box body 1 are symmetrically penetrated with through grooves 101, and the two side walls in the other direction are symmetrically penetrated with rectangular grooves 102. The fixing assembly 3 includes a U-shaped frame 301 with two ends respectively penetrated with two through grooves 101 and opened downward, and two movable plates 302 slidably arranged in parallel with each other in the U-shaped frame 301. The top of the U-shaped frame 301 is penetrated with a mounting groove 303 corresponding to the opening of the mounting frame 203. A plurality of fixing rods 304 parallel to each other and perpendicular to the movable plate 302 are fixedly arranged inside the mounting groove 303 at intervals, and movable sleeves 305 are slidably arranged on the fixing rods 304 at intervals. The movable sleeves 305 on the same side of the fixing rods 304 are fixedly connected to the movable plate 302 on the same side. At least two linear drive units II 306 are fixedly arranged on the outer wall above the two through grooves 101 of the box body 1, and the driving end of each linear drive unit II 306 on the same side of the box body 1 is connected to the U-shaped frame 301 on the same side extending out of the through groove 101;

[0043] The fixing assembly 3 also includes a clamping plate 307 which is symmetrically fixedly arranged below the U-shaped frame 301 in the box body 1 and corresponds to the side plates 3011 on both sides of the U-shaped frame 301. Two horizontal plates 308 corresponding to the movable plate 302 are slidingly arranged between the two clamping plates 307 in parallel with each other. Two bidirectional threaded rods I309 perpendicular to the horizontal plates 308 are symmetrically and rotatably arranged below the two horizontal plates 308 in the box body 1. Threaded sleeves I310 are respectively sleeved on both sides of the bidirectional threaded rods I309. The threaded sleeves I310 on the same side of the two bidirectional threaded rods I309 are fixedly connected to the horizontal plates 308 on the same side. One end of the same side of the two bidirectional threaded rods I309 rotates through the side wall of the box body 1 respectively, and pulleys I311 and pulleys II312 are coaxially fixedly arranged outside the side wall. The rectangular groove 102 is horizontally arranged and the height is equivalent to the up and down range of motion between the clamping plate 307 and the side plate 3011.

[0044] An elastic sealing strip I206 is fixedly provided around the bottom of the installation frame 203, elastic sealing strips II313 are fixedly provided at the bottom of the side panel 3011 and the bottom of the movable panel 302, elastic sealing strips III314 are fixedly provided at the top of the splint 307 and the top of the cross panel 308, the elastic sealing strip II313 at the bottom of the side panel 3011 corresponds to the elastic sealing strip III314 at the top of the splint 307, and the elastic sealing strip II313 at the bottom of the movable panel 302 corresponds to the elastic sealing strip III314 at the top of the cross panel 308.

[0045] The open outline of the mounting frame 203 is larger than the outline of the mounting groove 303 and smaller than the outer outline of the top of the U-shaped frame 301. The bottom end of the rectangular groove 102 is lower than the upper end surfaces of the clamping plate 307 and the cross plate 308, and the top end of the rectangular groove 102 is higher than the lower end surfaces of the movable plate 302 and the side plate 3011.

[0046] A rotating rod 315 parallel to the bidirectional threaded rod Ⅰ309 is rotatably arranged on the outer wall of the box body 1 between the pulley Ⅰ311 and the pulley Ⅱ312, a handwheel 316 is coaxially fixed to the end of the rotating rod 315 away from the outer wall of the box body 1, and a pulley Ⅲ317 is coaxially fixed to the inner side of the handwheel 316 of the rotating rod 315, and the pulley Ⅰ311 and the pulley Ⅱ312 are rotatably connected to the pulley Ⅲ317 through a belt 318.

[0047] A plurality of guide rods 319 extending upward are fixedly arranged at intervals on the inner side surfaces of the two horizontal plates 308 close to each other, and a fixing sleeve 320 is slidably sleeved on the guide rods 319. The fixing sleeves 320 on the plurality of guide rods 319 fixed to the same horizontal plate 308 are respectively fixedly connected to the movable plate 302 on the same side.

[0048] The present invention provides that the outermost two guide rods 319 of the plurality of guide rods 319 fixed to the same horizontal plate 308 are respectively fixedly provided with mounting sleeves 321, and the mounting sleeves 321 are slidably provided with a movable rod 322 that can be moved horizontally, and a telescopic spring 323 is sleeved on the side of the movable rod 322 away from the clamping plate 307, and the two ends of the telescopic spring 323 are respectively connected to the mounting sleeve 321 and the movable rod 322; the inner sides of the two movable plates 302 that are close to each other are fixedly provided at the side plates 3011 on both sides of the U-shaped frame 301. A support frame 324 is provided, and a horizontally movable sliding rod 325 is slidably provided on the support frame 324. Elastic sealing plates 326 parallel to the side plates 3011 are provided between the side plates 3011 of the U-shaped frame 301 and the support frame 324. The sliding rods 325 on the same side of the two movable plates 302 are fixedly connected to the elastic sealing plates 326 on the same side. A connecting rod 327 is provided between the support frame 324 and the guide rod 319, and the two ends of the connecting rod 327 are respectively hinged to the sliding rod 325 and the movable rod 322.

[0049] The movable rod 322 is a "T"-shaped rod formed by a central main rod and a secondary rod vertically connected to the central main rod. The central main rod slides through the mounting sleeve 321 and extends toward the nearest clamping plate 307. The telescopic spring 323 is sleeved on the central main rod and close to one side of the secondary rod. The two ends of the telescopic spring 323 are fixedly connected to the mounting sleeve 321 and the secondary rod respectively.

[0050] It also includes a centering component 4, which includes fixed blocks 401 symmetrically arranged above and below the rectangular grooves 102 on the outer walls of both sides of the box body 1, a two-way threaded rod II 402 is rotatably connected between the fixed blocks 401 on both sides below the rectangular groove 102, and threaded sleeves II 403 are respectively sleeved on both sides of the two-way threaded rod II 402, and a mounting plate 404 extending outward is vertically arranged on the threaded sleeve II 403, and vertical mounting blocks 405 are respectively spaced apart on the inner side surfaces of the two mounting plates 404 close to each other, and a roller 406 is rotatably arranged between the two mounting blocks 405 on the same mounting plate 404; a positioning rod 407 is fixedly connected between the fixed blocks 401 on both sides above the rectangular groove 102, and positioning sleeves 408 are slidably arranged on both sides of the positioning rod 407, and the two positioning sleeves 408 are respectively fixedly connected to the two mounting plates 404.

[0051] One end of the bidirectional threaded rod II 402 close to the pulley I 311 passes through the fixed block 401 and a pulley IV 409 is coaxially fixed to the outer extension section. The pulley IV 409 is rotationally connected to the pulley II 312 through a belt 318 .

[0052] The linear drive unit I 202 and the linear drive unit II 306 are respectively hydraulic cylinders, pneumatic cylinders or electric push rods.

[0053] Contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0054] like Figures 1 to 9 As shown, the geomembrane anti-seepage performance detection method of the present invention is based on the above-mentioned geomembrane anti-seepage performance detection device, and the detection steps are as follows:

[0055] A. Width adaptation: According to the width of different geomembranes, the hand wheel 316 is rotated to drive the pulley III 317 to rotate, and the pulley III 317 drives the pulley I 311 and the pulley II 312 to rotate through the belt 318, so that the two bidirectional threaded rods I 309 rotate at the same time, and then the two horizontal plates 308 are driven to move between the clamping plates 307 through the threaded sleeve I 310 to adjust the spacing. When the two horizontal plates 308 move, the guide rods 319 and the fixed sleeves 320 thereon respectively drive the movable plates 302 to move, thereby adjusting the spacing of the movable plates 302 at the same time, so that the two movable plates 302 correspond to the two horizontal plates 308 up and down, and the spacing is adapted to the width of the geomembrane;

[0056] B. Fixing the geomembrane: Pass the front end of the geomembrane through the two rectangular grooves 102 in sequence, then start the linear drive unit II306 connected to the two ends of the U-shaped frame 301, drive the U-shaped frame 301 to move downward, so that the elastic sealing strip II313 at the bottom of the side plates 3011 on both sides of the U-shaped frame 301 cooperates with the elastic sealing strip III314 at the top of the two clamping plates 307 to clamp and fix the front and back sides of the geomembrane. At the same time, the elastic sealing strip II313 at the bottom of the two movable plates 302 cooperates with the elastic sealing strip III314 at the top of the two horizontal plates 308 to clamp and fix the left and right sides of the geomembrane, thereby completing the fixing of the geomembrane;

[0057] C. Geomembrane test: The side plates 3011 on both sides of the U-shaped frame 301 cooperate with the two movable plates 302 that are slidably arranged inside to surround and seal the top of the clamped geomembrane, and then water is added between the two movable plates 302 and the side plates 3011 on both sides of the U-shaped frame 301 through the water adding pipe 205 or directly. Then, the linear drive unit I 202 is started to drive the installation frame 203 to move downward, so that the elastic sealing strip I 206 at the bottom of the installation frame 203 fits the top of the U-shaped frame 301, and then the air pump 204 is started to ventilate the installation frame 203 through the pipe connected to the air outlet end to pressurize the water on the top of the geomembrane. Finally, the anti-seepage performance of the geomembrane is detected by observing whether there is any leakage at the bottom of the geomembrane.

[0058] The step A also includes: pulley II 312 drives pulley IV 409 to rotate through belt 318, so that the bidirectional threaded rod II 402 rotates between the fixed block 401 and the rotation direction is consistent with that of the bidirectional threaded rod I 309, thereby moving the threaded sleeves II 403 on both sides, and then driving the two mounting plates 404 and the positioning sleeves 408 thereon to slide along the positioning rod 407 to adjust the distance between the two rollers 406. The two rollers 406 can guide and limit the left and right sides of the geomembrane to avoid the two sides of the geomembrane being unable to align with the two movable plates 302 during the fixing process, thereby affecting the sealing effect after fixing, thereby improving the accuracy of the detection results.

[0059] There is a sealing enhancement step between step B and step C: as the U-shaped frame 301 descends, the movable plate 302 drives the fixed sleeve 320 and the support frame 324 thereon to move downward, so that the fixed sleeve 320 slides on the guide rod 319, and at the same time, the sliding rod 325 slides on the support frame 324 under the restriction of the connecting rod 327, so that the elastic sealing plate 326 fixedly connected to the end face of the connecting rod 327 fits with the connection between the movable plate 302 and the U-shaped frame 301, and the movable plate 302 continues to descend so that the elastic sealing plate 326 is elastically deformed by compression and fits tightly with the connection between the movable plate 302 and the U-shaped frame 301 to form a seal, and the movable rod 322 slides on the installation sleeve 321 and stretches the telescopic spring 323; since the bottom of the movable plate 302 and the U-shaped frame 301 can be sealed after the geomembrane is fixed, water seepage due to poor sealing during detection can be avoided, thereby effectively improving the accuracy of detection.

[0060] Embodiment 1

[0061] like Figures 1 to 9 As shown, the permeability testing process of geomembrane is as follows:

[0062] S100: According to the width of different geomembranes, the hand wheel 316 is rotated to drive the pulley III317 to rotate, and the pulley III317 drives the pulley I311 and the pulley II312 to rotate through the belt 318, so that the two bidirectional threaded rods I309 rotate at the same time, and then drive the two cross plates 308 to move between the clamping plates 307 through the threaded sleeve I310 to adjust the spacing. When the two cross plates 308 move, the movable plates 302 are driven to move through the cooperation of the guide rods 319 and the fixed sleeves 320 thereon, thereby adjusting the spacing of the movable plates 302, so that the two movable plates 302 correspond to the two cross plates 308 up and down and the spacing is adapted to the width of the geomembrane.

[0063] S200: Pass the geomembrane through the two rectangular grooves 102 in sequence, and then start the linear drive unit II306 connected to the two ends of the U-shaped frame 301 to drive the U-shaped frame 301 to move downward, so that the elastic sealing strip II313 at the bottom of the side plates 3011 on both sides of the U-shaped frame 301 cooperates with the elastic sealing strip III314 of the two clamping plates 307 to clamp and fix the front and back sides of the geomembrane. At the same time, the elastic sealing strip II313 at the bottom of the two movable plates 302 cooperates with the elastic sealing strip III314 at the top of the two horizontal plates 308 to clamp and fix the left and right sides of the geomembrane, thereby completing the fixation of the geomembrane.

[0064] S300: The side plates 3011 on both sides of the U-shaped frame 301 cooperate with the two movable plates 302 that are slidably arranged inside to surround and seal the top of the clamped geomembrane, and then water is added between the two movable plates 302 and the side plates 3011 on both sides of the U-shaped frame 301 through the water supply pipe 205 or directly, and then the linear drive unit Ⅰ202 is started to drive the installation frame 203 to move downward, so that the elastic sealing strip Ⅰ206 at the bottom of the installation frame 203 fits with the top of the U-shaped frame 301, and then the air pump 204 is started to ventilate the installation frame 203 through the pipe connected to the air outlet end to pressurize the water on the top of the geomembrane, and finally the anti-seepage performance of the geomembrane is detected by observing whether there is any water leakage at the bottom of the geomembrane.

[0065] Embodiment 2

[0066] like Figures 1 to 9 As shown, the permeability testing process of geomembrane is as follows:

[0067] The contents of steps S100 and S200 are the same as those in the first embodiment.

[0068] S300: As the U-shaped frame 301 descends, the movable plate 302 drives the fixed sleeve 320 and the support frame 324 thereon to move downward, so that the fixed sleeve 320 slides on the guide rod 319, and at the same time, the sliding rod 325 slides on the support frame 324 under the restriction of the connecting rod 327, so that the elastic sealing plate 326 fixedly connected to the end face of the connecting rod 327 fits with the connection between the movable plate 302 and the U-shaped frame 301, and the movable plate 302 continues to descend so that the elastic sealing plate 326 fits with the movable plate 302 and The connection of the U-shaped frame 301 fits tightly, and the movable rod 322 slides in the installation sleeve 321 and stretches the telescopic spring 323; since the elastic sealing plate 326 is made of elastic material, the elastic sealing plate 326 is deformed after being squeezed to seal the connection between the movable plate 302 and the U-shaped frame 301, and after the geomembrane is fixed, the bottom of the movable plate 302 and the U-shaped frame 301 can be sealed, thereby avoiding water seepage due to poor sealing during detection, and effectively improving the accuracy of detection.

[0069] S400: The side plates 3011 on both sides of the U-shaped frame 301 cooperate with the two movable plates 302 that are slidably arranged inside to surround and seal the top of the clamped geomembrane, and then water is added between the two movable plates 302 and the side plates 3011 on both sides of the U-shaped frame 301 through the water supply pipe 205 or directly, and then the linear drive unit Ⅰ202 is started to drive the installation frame 203 to move downward, so that the elastic sealing strip Ⅰ206 at the bottom of the installation frame 203 fits with the top of the U-shaped frame 301, and then the air pump 204 is started to ventilate the installation frame 203 through the pipe connected to the air outlet end to pressurize the water on the top of the geomembrane, and finally the anti-seepage performance of the geomembrane is detected by observing whether there is any water leakage at the bottom of the geomembrane.

[0070] Embodiment 3

[0071] like Figures 1 to 9 As shown, the permeability testing process of geomembrane is as follows:

[0072] S100: According to the width of different geomembranes, the hand wheel 316 is rotated to drive the pulley III 317 to rotate, and the pulley III 317 drives the pulley I 311 and the pulley II 312 to rotate through the belt 318, so that the two bidirectional threaded rods I 309 rotate at the same time, and then the two horizontal plates 308 are driven to move between the clamping plates 307 through the threaded sleeve I 310 to adjust the spacing. When the two horizontal plates 308 move, the guide rods 319 and the fixed sleeves 320 thereon respectively drive the movable plates 302 to move, thereby adjusting the spacing of the movable plates 302, so that the two movable plates 302 correspond to the two horizontal plates 308 up and down and the spacing is consistent with the width of the geomembrane. Adapt; at the same time, pulley II 312 drives pulley IV 409 to rotate through belt 318, so that the two-way threaded rod II 402 rotates between the fixed blocks 401 and the rotation direction is consistent with that of the two-way threaded rod I 309, thereby moving the threaded sleeves II 403 on both sides, and then driving the two mounting plates 404 and the positioning sleeves 408 thereon to slide along the positioning rod 407 to adjust the distance between the two rollers 406. The two rollers 406 can guide and limit the left and right sides of the geomembrane to avoid the two sides of the geomembrane being unable to align with the two movable plates 302 during the fixing process, thereby affecting the sealing effect after fixing, thereby improving the accuracy of the detection results.

[0073] The contents of steps S200, S300 and S400 are the same as those in the second embodiment.

[0074] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A device for detecting the anti-seepage performance of a geomembrane, comprising a rectangular box (1) with an open top, a pressurizing component (2) arranged above the box (1), and fixing components (3) arranged inside and outside the box (1), The pressurizing component (2) comprises two fixing frames (201) symmetrically fixedly arranged on the two side walls of the box body (1) and extending upward, a linear drive unit I (202) fixedly arranged on the upper part of the fixing frames (201), a rectangular installation frame (203) arranged above the box body (1) and open at the bottom, an air pump (204) fixedly arranged at the top of the installation frame (203), and a water supply pipe (205) fixedly arranged at the top of the installation frame (203), wherein the installation frame (203) is respectively connected to the driving ends of the linear drive units I (202) on the two fixing frames (201), the pipeline connected to the air outlet end of the air pump (204) passes through the top wall of the installation frame (203), the water supply pipe (205) passes through the top wall of the installation frame (203), and the bottom of the box body (1) is provided with a water outlet; It is characterized in that The two side walls of the box body (1) are symmetrically penetrated with through slots (101) and the two side walls in the other direction are symmetrically penetrated with rectangular slots (102). The fixing assembly (3) comprises a U-shaped frame (301) with two through slots (101) respectively penetrated at both ends and opened downward, and two movable plates (302) slidably arranged in parallel with each other in the U-shaped frame (301). The top of the U-shaped frame (301) is penetrated with a mounting slot (303) corresponding to the opening of the mounting frame (203). The interior of the mounting slot (303) is fixedly provided with a plurality of parallel and fixed plates. A fixed rod (304) is perpendicular to the movable plate (302), and movable sleeves (305) are slidably arranged at intervals on the fixed rod (304), and the movable sleeves (305) on the same side of a plurality of the fixed rods (304) are fixedly connected to the movable plate (302) on the same side, and at least two linear drive units II (306) are fixedly arranged on the outer wall of the box body (1) above the two through slots (101), respectively, and the driving ends of the linear drive units II (306) on the same side of the box body (1) are connected to the U-shaped frame (301) on the same side extending out of the through slot (101); The fixing assembly (3) further comprises clamping plates (307) symmetrically fixedly arranged below the U-shaped frame (301) in the box body (1) and corresponding to the side plates (3011) on both sides of the U-shaped frame (301); two horizontal plates (308) corresponding to the movable plate (302) are slidably arranged between the two clamping plates (307) in parallel with each other; two bidirectional threaded rods I (309) perpendicular to the horizontal plates (308) are symmetrically rotatably arranged below the two horizontal plates (308) in the box body (1); the bidirectional threaded rods I (309) 09), threaded sleeves I (310) are respectively sleeved on both sides of the two bidirectional threaded rods I (309), the threaded sleeves I (310) on the same side of the two bidirectional threaded rods I (309) are fixedly connected to the horizontal plate (308) on the same side, one end of the two bidirectional threaded rods I (309) on the same side rotates to penetrate the side wall of the box body (1) and a pulley I (311) and a pulley II (312) are respectively fixedly arranged coaxially outside the side wall, and the rectangular groove (102) is horizontally arranged and the height is equivalent to the vertical range of movement between the clamping plate (307) and the side plate (3011).

2. The device for detecting the anti-seepage performance of geomembrane according to claim 1, characterized in that: An elastic sealing strip I (206) is fixedly provided around the bottom of the installation frame (203), an elastic sealing strip II (313) is fixedly provided at the bottom of the side panel (3011) and the bottom of the movable panel (302), and an elastic sealing strip III (314) is fixedly provided at the top of the clamping panel (307) and the top of the transverse panel (308), respectively. The elastic sealing strip II (313) at the bottom of the side panel (3011) corresponds to the elastic sealing strip III (314) at the top of the clamping panel (307) in upper and lower correspondence, and the elastic sealing strip II (313) at the bottom of the movable panel (302) corresponds to the elastic sealing strip III (314) at the top of the transverse panel (308) in upper and lower correspondence.

3. The device for detecting the anti-seepage performance of geomembrane according to claim 1, characterized in that: The open outline of the installation frame (203) is larger than the outline of the installation groove (303) and smaller than the outer outline of the top of the U-shaped frame (301); the bottom end of the rectangular groove (102) is lower than the upper end surfaces of the clamping plate (307) and the horizontal plate (308); and the top end of the rectangular groove (102) is higher than the lower end surfaces of the movable plate (302) and the side plate (3011).

4. The device for detecting the anti-seepage performance of geomembrane according to claim 2, characterized in that: A rotating rod (315) parallel to the bidirectional threaded rod I (309) is rotatably arranged on the outer wall of the box body (1) between the pulley I (311) and the pulley II (312); a hand wheel (316) is coaxially fixed to one end of the rotating rod (315) away from the outer wall of the box body (1); a pulley III (317) is coaxially fixed to the inner side of the hand wheel (316) of the rotating rod (315); and the pulley I (311) and the pulley II (312) are both rotatably connected to the pulley III (317) via a belt (318).

5. The device for detecting the anti-seepage performance of geomembrane according to claim 4, characterized in that: A plurality of guide rods (319) extending upward are fixedly arranged at intervals on the inner side surfaces of the two horizontal plates (308) close to each other, and a fixing sleeve (320) is provided on the sliding sleeve of the guide rod (319). The fixing sleeves (320) on the plurality of guide rods (319) fixed to the same horizontal plate (308) are respectively fixedly connected to the movable plate (302) on the same side.

6. The device for detecting the anti-seepage performance of geomembrane according to claim 5, characterized in that: The two outermost guide rods (319) of the plurality of guide rods (319) fixed to the same horizontal plate (308) are respectively fixedly provided with mounting sleeves (321), and the mounting sleeves (321) are slidably provided with a horizontally movable movable rod (322), and a telescopic spring (323) is sleeved on the side of the movable rod (322) away from the clamping plate (307), and the two ends of the telescopic spring (323) are respectively connected to the mounting sleeve (321) and the movable rod (322); the inner side surfaces of the two movable plates (302) close to each other are fixed at the side plates (3011) close to the U-shaped frame (301) A support frame (324) is fixedly provided, and a sliding rod (325) that can be moved horizontally is slidably provided on the support frame (324); an elastic sealing plate (326) parallel to the side plate (3011) is provided between the side plate (3011) and the support frame (324); the sliding rods (325) on the same side of the two movable plates (302) are fixedly connected to the elastic sealing plate (326) on the same side; a connecting rod (327) is provided between the support frame (324) and the guide rod (319); and two ends of the connecting rod (327) are respectively hinged to the sliding rod (325) and the movable rod (322).

7. The device for detecting the anti-seepage performance of geomembrane according to claim 6, characterized in that: The movable rod (322) is a "T"-shaped rod formed by a central main rod and a secondary rod vertically connected to the central main rod. The central main rod slides through the mounting sleeve (321) and extends toward the nearest clamping plate (307). The telescopic spring (323) is sleeved on the central main rod and close to one side of the secondary rod. The two ends of the telescopic spring (323) are respectively fixedly connected to the mounting sleeve (321) and the secondary rod.

8. The device for detecting the anti-seepage performance of geomembrane according to claim 4, characterized in that: The box body (1) further comprises a centering assembly (4), the centering assembly (4) comprising fixed blocks (401) symmetrically arranged above and below the rectangular groove (102) on the outer walls of both sides of the box body (1), a bidirectional threaded rod II (402) being rotatably connected between the fixed blocks (401) on both sides below the rectangular groove (102), threaded sleeves II (403) being respectively sleeved on both sides of the bidirectional threaded rod II (402), and a mounting plate (404) extending outwardly being vertically arranged on the threaded sleeve II (403), and the two mounting plates (404) being rotatably connected to each other. Vertical mounting blocks (405) are arranged at intervals on the inner side surfaces of the plates (404) that are close to each other, and a roller (406) is rotatably arranged between the two mounting blocks (405) on the same mounting plate (404); a positioning rod (407) is fixedly connected between the fixing blocks (401) on both sides above the rectangular groove (102), and positioning sleeves (408) are slidably arranged on both sides of the positioning rod (407), and the two positioning sleeves (408) are fixedly connected to the two mounting plates (404) respectively.

9. The device for detecting the anti-seepage performance of geomembrane according to claim 8, characterized in that: One end of the bidirectional threaded rod II (402) close to the pulley I (311) passes through the fixed block (401) and a pulley IV (409) is coaxially fixed to the outer extension section. The pulley IV (409) is rotationally connected to the pulley II (312) via a belt (318).

10. A method for detecting the anti-seepage performance of geomembrane, characterized in that: Based on the geomembrane anti-seepage performance detection device of claim 5, 6 or 7, the detection steps are as follows: A. Width adaptation: According to the width of different geomembranes, the hand wheel (316) is rotated to drive the pulley III (317) to rotate, and the pulley III (317) drives the pulley I (311) and the pulley II (312) to rotate through the belt (318), so that the two bidirectional threaded rods I (309) rotate at the same time, and then drive the two horizontal plates (308) to move between the clamping plates (307) through the threaded sleeve I (310) to adjust the spacing. When the two horizontal plates (308) move, the guide rods (319) and the fixed sleeves (320) thereon respectively drive the movable plates (302) to move, thereby adjusting the spacing of the movable plates (302) at the same time, so that the two movable plates (302) correspond to the two horizontal plates (308) up and down and the spacing is adapted to the width of the geomembrane; B. Fixing the geomembrane: the front end of the geomembrane is passed through the two rectangular grooves (102) in sequence, and then the linear drive unit II (306) connected to the two ends of the U-shaped frame (301) is started to drive the U-shaped frame (301) to move downward, so that the elastic sealing strip II (313) at the bottom of the side plates (3011) on both sides of the U-shaped frame (301) cooperates with the elastic sealing strip III (314) at the top of the two clamping plates (307) to clamp and fix the front and back sides of the geomembrane. At the same time, the elastic sealing strip II (313) at the bottom of the two movable plates (302) cooperates with the elastic sealing strip III (314) at the top of the two horizontal plates (308) to clamp and fix the left and right sides of the geomembrane, thereby completing the fixing of the geomembrane; C. Geomembrane test: The side plates (3011) on both sides of the U-shaped frame (301) cooperate with the two movable plates (302) slidably arranged inside to surround and seal the top of the clamped geomembrane. Then, water is added through the water supply pipe (205) or directly between the two movable plates (302) and the side plates (3011) on both sides of the U-shaped frame (301). Then, the linear drive unit I (202) is started to drive the installation frame (203) to move downward, so that the elastic sealing strip I (206) at the bottom end of the installation frame (203) fits the top of the U-shaped frame (301). Then, the air pump (204) is started to ventilate the installation frame (203) through the pipe connected to the air outlet end to pressurize the water on the top of the geomembrane. Finally, the anti-seepage performance of the geomembrane is tested by observing whether there is water leakage at the bottom of the geomembrane.

Citation Information

Patent Citations

  • Novel bulldozing device for soil test

    CN211668790U

  • Fixing device for garment fabric processing

    CN218711719U