A method for determining the boundary of karst underground river system

Through a multi-step method, combined with topographic maps, stratigraphic lithologic and geological structure data, combined with field surveys and water chemistry measurements, the boundary of karst underground river system is determined by using underground communication experiments, which solves the problems of deviation and high cost of boundary division of traditional methods. High-precision and low-cost boundary determination are achieved.

CN118626783BActive Publication Date: 2024-11-26CHINA UNIV OF MINING & TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410657143.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-25
Publication Date
2024-11-26
Estimated Expiration
2044-05-25

AI Technical Summary

Technical Problem

The boundaries of karst underground river systems are difficult to accurately divide, and traditional methods have deviations and are costly, which leads to difficulties in karst hydrogeological research, water resource development and protection.

Method used

A multi-step method was adopted: the surface watershed was extracted based on a large-scale topographic map, and the formation lithologic and geological structure data were revised, the water chemistry and water level measurements were investigated on-site, and the final boundary was determined through underground communication experiments.

Benefits of technology

The high-precision and low-cost karst underground river system boundary determination is achieved, and the groundwater attributes and precipitation interference are taken into account, which improves the reliability and scope of application of boundary division.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118626783B_ABST
    Figure CN118626783B_ABST
Patent Text Reader

Abstract

The present invention provides a method for determining the boundary of a karst underground river system, comprising: extracting a surface watershed based on a large-scale topographic map, delineating the initial boundary of a karst underground river system, comprehensively analyzing the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, making a first correction to the initial boundary of the underground river system according to the analysis result, and conducting a field supplementary investigation, a typical water point water chemistry test comparison, and a water level elevation measurement comparison according to the initial boundary of the underground river system after the first correction, and making a second correction to the initial boundary of the underground river system after the first correction according to the result, and carrying out an underground connection test on the uncertain section of the system boundary obtained by the second correction, and making a third correction to the initial boundary of the underground river system after the second correction according to the test result, so as to obtain the final boundary of the underground river system. The method for determining the boundary of a karst underground river system provided by the present invention can determine the boundary of a karst underground river system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of karst hydrogeological exploration, and in particular to a method for determining the boundary of a karst underground river system. Background Art

[0002] Karst underground rivers, also known as dark rivers, are karst underground channels with the main characteristics of rivers. They often have turbulent movement characteristics and their own catchment area. Their dynamic changes are significantly affected by local atmospheric precipitation. The underground channel system composed of the main stream of the underground river and its tributaries is collectively referred to as the underground river system. Multiple factors such as stratigraphic lithology, geological structure, topography, regional climate and neotectonic movement control the development and distribution of karst underground rivers. Due to the heterogeneity of karst development, the boundaries of karst underground river systems are often difficult to accurately demarcate, which brings great difficulties to karst hydrogeological research, karst underground river water resource development and protection, and water environment restoration and management.

[0003] The determination of the boundary of karst underground river system involves two specific boundary property issues: one is that the boundary of karst underground water system can move (also known as free boundary), that is, the migration of watershed or the problem of capture between systems; the other is that the boundary of karst underground river system is often inconsistent with the surface water divide (also known as non-closed hydrological basin), that is, the surface watershed exceeds the boundary of groundwater basin or the boundary of groundwater basin exceeds the surface watershed. Traditional methods generally divide the boundary of underground river system according to surface watershed, stratigraphic lithology, and geological structure, and the division results often deviate greatly from the actual situation; some scholars also combine hydrogeological drilling and geophysical exploration to revise the above division results, but the labor cost, time cost, and material cost are greatly increased. Therefore, it is very necessary to design a high-precision, high-efficiency, and low-cost method for determining the boundary of karst underground river system. Summary of the invention

[0004] The purpose of the present invention is to provide a method for determining the boundary of a karst underground river system, which can determine the boundary of a karst underground river system and provide basic data for the construction of an underground river system monitoring network and the development, utilization and protection of water resources.

[0005] To achieve the above object, the present invention provides the following solutions:

[0006] A method for determining the boundary of a karst underground river system comprises the following steps:

[0007] Step 1: Extract the surface watershed based on the large-scale topographic map and delineate the initial boundary of the karst underground river system;

[0008] Step 2: Comprehensively analyze the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, and make the first correction to the initial boundary of the underground river system based on the analysis results;

[0009] Step 3: Based on the initial boundary of the underground river system after the first revision, conduct additional field surveys, hydrochemical tests and comparisons of typical water points, and water level measurement and comparisons, and make a second revision of the initial boundary of the underground river system after the first revision based on the results;

[0010] Step 4: Conduct an underground interconnection test on the uncertain segment of the system boundary obtained from the second correction. According to the test results, make a third correction to the initial boundary of the underground river system after the second correction to obtain the final boundary of the underground river system.

[0011] Optionally, in step 1, the surface watershed is extracted based on a large-scale topographic map to delineate the initial boundary of the karst underground river system, specifically:

[0012] Collect basic data, including topographic data, stratigraphic data, structural data and hydrogeological data, extract the contour lines on the large-scale topographic map, and delineate the surface watershed of the karst underground river system as the initial boundary of the karst underground river system.

[0013] Optionally, the accuracy of the large-scale topographic map is greater than or equal to 1:50,000.

[0014] Optionally, in step 2, a comprehensive analysis is performed on the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, and a first correction is made to the initial boundary of the underground river system according to the analysis results, specifically:

[0015] A comparative analysis was conducted on the initial boundary of the underground river system and the carbonate and non-carbonate strata on both sides of the underground river system. Combined with the fault structure and stratigraphic occurrence, the length of the impermeable boundary dominated by clastic rocks and the length of the impermeable boundary controlled by the fault structure were determined, completing the first correction of the initial boundary of the underground river system.

[0016] Optionally, in step 3, based on the initial boundary of the underground river system after the first revision, additional field investigation, water chemistry test comparison of typical water points, and water level elevation measurement comparison are carried out, and based on the results, the initial boundary of the underground river system after the first revision is revised for the second time, specifically:

[0017] According to the initial boundary of the underground river system after the first revision, a field stratigraphic, structural, lithological and topographic survey was conducted to obtain the distribution characteristics of typical water points and karst landform points along the initial boundary of the underground river system and the characteristics of groundwater movement in the dry and wet seasons. The hydrochemical test data and water level elevation data of typical water points along the initial boundary of the underground river system in the dry season were analyzed, the length of the system boundary in the carbonate rock distribution area was confirmed, the uncertain section of the system initial boundary was circled, and the second revision of the initial boundary of the underground river system was completed.

[0018] Optionally, the water chemistry test data includes EC, pH, Ca 2+、HCO3 - , the water level elevation data is measured by an RTK height measuring instrument.

[0019] Optionally, in step 4, an underground interconnection test is conducted on the uncertain segment of the system boundary obtained by the second correction, and the initial boundary of the underground river system after the second correction is corrected for the third time according to the test results to obtain the final boundary of the underground river system, specifically:

[0020] For the uncertain areas of the underground river system boundary obtained by the second revision, groundwater connectivity tests were carried out to determine the connectivity between karst water points, karst landform points in the uncertain areas and the surrounding karst cave springs and underground river outlets, to verify the system boundaries of the uncertain areas, complete the third revision of the initial boundaries of the underground river system, and obtain the final boundaries of the underground river system.

[0021] Optionally, the tracer used in the groundwater connectivity test is a chemical ion tracer or a fluorescent tracer, and the tracing method used is univariate tracing or multivariate tracing.

[0022] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects: the method for determining the boundary of a karst underground river system provided by the present invention comprises extracting a surface watershed based on a large-scale topographic map, delineating the initial boundary of the karst underground river system, comprehensively analyzing the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, making a first correction to the initial boundary of the underground river system according to the analysis results, conducting a field supplementary investigation, a typical water point water chemistry test comparison, and a water level elevation measurement comparison according to the initial boundary of the underground river system after the first correction, making a second correction to the initial boundary of the underground river system after the first correction according to the results, conducting an underground connection test on the uncertain segment of the system boundary obtained by the second correction, and making a third correction to the initial boundary of the underground river system after the second correction according to the test results. The final boundary of the underground river system is obtained through data collection, field investigation and interviews on various factors controlling the development of underground rivers, as well as comprehensive analysis of water chemical index test data of typical water points, water level elevation measurement data and interconnection test data. This method can accurately identify the boundary information of the karst underground river system. Compared with the previous "surface watershed determination method" and "surface watershed + stratum lithology + geological structure combination determination method", the multiple revisions of the system boundary additionally consider the properties of the groundwater itself (water chemistry, water level elevation) and the interference of precipitation on groundwater. It has the advantages of comprehensive consideration of factors, strong operability, wide application range and high reliability. Compared with previous methods such as geophysical detection and drilling detection, the multiple revisions of the system boundary have the advantages of low cost investment and strong anti-interference. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1This is a schematic diagram of a flow chart of a method for determining the boundary of a karst underground river system according to an embodiment of the present invention;

[0024] Figure 2 This is a schematic diagram of the second revised process. DETAILED DESCRIPTION

[0025] The purpose of the present invention is to provide a method for determining the boundary of a karst underground river system, which can determine the boundary of a karst underground river system and provide basic data for the construction of an underground river system monitoring network and the development, utilization and protection of water resources.

[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0027] like Figure 1 As shown, the method for determining the boundary of a karst underground river system provided by an embodiment of the present invention includes the following steps:

[0028] Step 1: Extract the surface watershed based on the large-scale topographic map and delineate the initial boundary of the karst underground river system;

[0029] Step 2: Comprehensively analyze the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, and make the first correction to the initial boundary of the underground river system based on the analysis results;

[0030] Step 3: Based on the initial boundary of the underground river system after the first revision, conduct additional field surveys, hydrochemical tests and comparisons of typical water points, and water level measurement and comparisons, and make a second revision of the initial boundary of the underground river system after the first revision based on the results;

[0031] Step 4: Conduct an underground interconnection test on the uncertain segment of the system boundary obtained from the second correction. According to the test results, make a third correction to the initial boundary of the underground river system after the second correction to obtain the final boundary of the underground river system.

[0032] In step 1, the surface watershed is extracted based on the large-scale topographic map, and the initial boundary of the karst underground river system is delineated, specifically:

[0033] The initial boundary is the basis for the study of karst underground rivers. The initial boundary determines the scope of the investigation and study of karst underground rivers. With the existing pipelines of karst underground rivers as the center, the surface watershed is drawn on the large-scale topographic map, that is, the initial boundary of the karst underground river system, and the recharge-runoff-discharge range of the karst underground river is preliminarily determined;

[0034] Collect basic data, including topographic data, stratigraphic data, structural data and hydrogeological data, extract contour lines on large-scale topographic maps, delineate the surface watershed of the karst underground river system, and use it as the initial boundary of the karst underground river system;

[0035] The accuracy of the large-scale topographic map is greater than or equal to 1:50,000.

[0036] In step 2, the stratigraphic lithology and geological structure data of the initial boundary of the underground river system are comprehensively analyzed, and the initial boundary of the underground river system is first corrected according to the analysis results, specifically:

[0037] A comparative analysis was conducted on the initial boundary of the underground river system and the carbonate and non-carbonate strata on both sides. Combined with the fault structure and the occurrence of the strata, the length of the water-blocking boundary dominated by clastic rocks and the length of the water-blocking boundary controlled by the fault structure were determined, completing the first revision of the initial boundary of the underground river system.

[0038] Among them, when comparing and analyzing carbonate strata with non-carbonate strata, strata dominated by clastic rocks should comprehensively consider the influence of surface watersheds and stratum occurrence, and are usually used as the water-isolating boundary of underground river systems;

[0039] When comparing and analyzing carbonate strata and non-carbonate strata, the strata dominated by carbonate rocks should comprehensively consider the surface watershed, stratum occurrence, structural location and karst development characteristics.

[0040] like Figure 2 As shown, in step 3, according to the initial boundary of the underground river system after the first revision, additional field investigation, water chemistry test comparison of typical water points, and water level measurement comparison are carried out. According to the results, the initial boundary of the underground river system after the first revision is revised for the second time, specifically:

[0041] According to the initial boundary of the underground river system after the first revision, a field investigation of stratigraphy, structure, lithology and topography was conducted to obtain the distribution characteristics of typical water points (springs, karst pools, boreholes, folk wells, etc.) and karst geomorphic points (water-dissipating holes, sinkholes or underground river entrances, etc.) along the initial boundary of the underground river system, as well as the characteristics of groundwater movement in dry and wet seasons. The water chemistry test data and water level elevation data of typical water points along the initial boundary of the underground river system in the dry season were analyzed, the length of the system boundary in the carbonate rock distribution area was verified, and the uncertain section of the initial boundary of the system was circled to complete the second revision of the initial boundary of the underground river system.

[0042] Among them, the distribution characteristics of typical water points (springs, karst pools, boreholes, folk wells, etc.) along the boundary of the underground river system and the characteristics of groundwater movement in the dry and wet seasons are mastered, mainly for the system boundary sections dominated by carbonate rocks;

[0043] The water chemistry test data includes EC, pH, Ca 2+ 、HCO3 - , the water level elevation data is measured by an RTK height measuring instrument.

[0044] In step 4, an underground interconnection test is carried out on the uncertain segment of the system boundary obtained by the second correction. According to the test results, the initial boundary of the underground river system after the second correction is corrected for the third time to obtain the final boundary of the underground river system, which is specifically:

[0045] For the uncertain areas of the underground river system boundary obtained by the second revision, a groundwater connectivity test was carried out to determine the connectivity between the karst water points and karst geomorphic points in the uncertain areas and the surrounding karst cave springs and underground river outlets, to verify the system boundary of the uncertain areas, complete the third revision of the initial boundary of the underground river system, and obtain the final boundary of the underground river system;

[0046] The tracers used in the groundwater interconnection test are chemical ion tracers (molybdenum, tungsten, chlorine, iodine, lithium ions, etc.) or fluorescent tracers (rhodamine B, sodium fluorescein, ammonium molybdate, etc.), and the tracing methods used are univariate tracing (using one tracer) or multivariate tracing (using two or more tracers).

[0047] The present invention provides an embodiment to introduce the method described in detail:

[0048] Step 1: Extract the surface watershed through a large-scale topographic map and delineate the initial boundary of the karst underground river system:

[0049] Based on the contour lines in the 1:10000 land use map of the third land use survey, the contour lines were inserted into the corresponding 1:50000 hydrogeological map. The surface watershed around the target underground river pipeline was drawn with the target underground river pipeline as the center. Combined with the underground river recharge, runoff and discharge information, the initial boundary of the underground river system was delineated, a preliminary outline of the target underground river system was given, and the direction of further work was indicated.

[0050] Step 2: Through comprehensive analysis of stratum lithology and geological structure data, the first correction of the initial boundary of the underground river system is achieved:

[0051] On the basis of step 1, further comparative analysis is conducted on the initial boundary of the target underground river system and the carbonate and non-carbonate strata on both sides thereof. Combined with the fault structure and the occurrence of the strata, the length of the water-blocking boundary dominated by clastic rocks and the length of the water-blocking boundary controlled by the fault structure are determined to achieve the first correction of the initial boundary of the target underground river system.

[0052] Step 3: Through additional field investigations, hydrochemical testing and comparison of typical water points, and water level measurement and comparison, the initial boundary of the underground river system was revised for the second time:

[0053] On the basis of step 2, further on-site hydrogeological supplementary surveys of the target underground river system were conducted to understand the distribution characteristics of typical water points (springs, karst pools, boreholes, folk wells, etc.) and karst landform points (water-dissipating caves, skylights, sinkholes, etc.) along the boundary of the underground river system, as well as the characteristics of groundwater movement in the dry and wet seasons. In the dry season, the EC, pH, and Ca of typical water points were tested using WTW water quality meters and calcium-bicarbonate test kits. 2+ 、HCO3 - The water level of typical water points was tested by RTK elevation measuring instrument (with measurement accuracy of centimeters). Combined with the two laws of "EC, pH and other typical water chemical indexes of upstream and downstream water points of underground river system in dry season showed a gradual increase" and "water level of upstream and downstream water points of underground river system in dry season showed a gradual decrease", the relationship between the replenishment and discharge of typical water points and karst landform points was revealed, so as to determine the system boundary of carbonate rock distribution area, circle out the uncertain section of system boundary, and realize the second correction of the initial boundary of target underground river system.

[0054] Step 4: Carry out groundwater interconnection test on the uncertain section of the system boundary to realize the third correction of the initial boundary of the underground river system, so as to determine the final boundary of the underground river system:

[0055] On the basis of step 3, a groundwater connectivity test is carried out for the uncertain area of ​​the boundary of the target underground river system. The most likely one or several upstream water points or karst landform points are selected as tracer delivery points to deliver tracers (rhodamine B, sodium fluorescein, ammonium molybdate, etc.). The most likely one or several downstream water points are selected as tracer receiving points to install tracer instruments for dynamic monitoring. Combined with the rule that "if the type of tracer received by the downstream receiving point is consistent with the type of tracer delivered by the upstream delivery point, there is a hydraulic connection between the receiving point and the delivery point, otherwise there is no hydraulic connection", the hydraulic connection between the delivery point and the receiving point is revealed, thereby determining the connectivity between the karst water points and karst landform points in the uncertain section and the surrounding karst caves, springs, and underground river outlets, confirming the system boundary of the uncertain section, and realizing the third correction of the initial boundary of the target underground river system.

[0056] The method for determining the boundary of a karst underground river system provided by the present invention comprises extracting a surface watershed based on a large-scale topographic map, delineating the initial boundary of the karst underground river system, comprehensively analyzing the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, making a first correction to the initial boundary of the underground river system according to the analysis result, conducting a field supplementary investigation, a typical water point water chemistry test comparison, and a water level elevation measurement comparison according to the initial boundary of the underground river system after the first correction, making a second correction to the initial boundary of the underground river system after the first correction according to the result, carrying out an underground connection test on the uncertain section of the system boundary obtained by the second correction, and making a third correction to the initial boundary of the underground river system after the second correction according to the test result to obtain the final boundary of the underground river system. This method can accurately identify the boundary information of the karst underground river system by collecting information and conducting field investigations on various factors that control the development of underground rivers, as well as comprehensive analysis of water chemical index test data of typical water points, water level elevation measurement data, and interconnection test data. Compared with the previous "surface watershed determination method" and "surface watershed + stratum lithology + geological structure combination determination method", the multiple revisions to the system boundary additionally consider the properties of the groundwater itself (water chemistry, water level elevation), as well as the interference of precipitation on groundwater. It has the advantages of comprehensive consideration of factors, strong operability, wide application range, and high reliability. Compared with previous geophysical detection and drilling detection methods, the multiple revisions to the system boundary have the advantages of low cost investment and strong anti-interference ability.

[0057] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A method for determining the boundary of a karst underground river system, characterized in that: The steps include: Step 1: Extract the surface watershed based on the large-scale topographic map and delineate the initial boundary of the karst underground river system; Step 2: Comprehensively analyze the stratigraphic lithology and geological structure data of the initial boundary of the underground river system, and make the first correction to the initial boundary of the underground river system based on the analysis results; Specifically, we conducted comparative analysis on the initial boundary of the underground river system and the carbonate and non-carbonate strata on both sides of it, and combined the fault structure and the occurrence of the strata to determine the length of the water-blocking boundary dominated by clastic rocks and the length of the water-blocking boundary controlled by the fault structure, thus completing the first revision of the initial boundary of the underground river system. Step 3: Based on the initial boundary of the underground river system after the first revision, conduct additional field surveys, hydrochemical tests and comparisons of typical water points, and water level measurement and comparisons, and make a second revision of the initial boundary of the underground river system after the first revision based on the results; Specifically: Based on the initial boundary of the underground river system after the first revision, conduct field stratigraphic, structural, lithological and topographic surveys to obtain the distribution characteristics of typical water points and karst geomorphic points along the initial boundary of the underground river system and the characteristics of groundwater movement in the dry and wet seasons. Analyze the hydrochemical test data and water level elevation data of typical water points along the initial boundary of the underground river system in the dry season, verify the length of the system boundary in the carbonate rock distribution area, circle the uncertain section of the initial boundary of the system, and complete the second revision of the initial boundary of the underground river system. Step 4: Conduct underground interconnection tests on the uncertain segments of the system boundary obtained by the second correction, and make a third correction to the initial boundary of the underground river system after the second correction based on the test results to obtain the final boundary of the underground river system; Specifically: For the uncertain areas of the underground river system boundary obtained by the second revision, a groundwater connectivity test is carried out to determine the connectivity between the karst water points, karst landform points in the uncertain areas and the surrounding karst cave springs and underground river outlets, to verify the system boundaries of the uncertain areas, to complete the third revision of the initial boundaries of the underground river system, and to obtain the final boundaries of the underground river system.

2. The method for determining the boundary of a karst underground river system according to claim 1, characterized in that: In step 1, the surface watershed is extracted based on the large-scale topographic map, and the initial boundary of the karst underground river system is delineated, specifically: Collect basic data, including topographic data, stratigraphic data, structural data and hydrogeological data, extract the contour lines on the large-scale topographic map, and delineate the surface watershed of the karst underground river system as the initial boundary of the karst underground river system.

3. The method for determining the boundary of a karst underground river system according to claim 2, characterized in that: The accuracy of the large-scale topographic map is greater than or equal to 1:50,000.

4. The method for determining the boundary of a karst underground river system according to claim 1, characterized in that: The water chemistry test data includes EC, pH, Ca 2+ 、HCO3 - , the water level elevation data is measured by an RTK height measuring instrument.

5. The method for determining the boundary of a karst underground river system according to claim 1, characterized in that: The tracers used in the groundwater interconnection test are chemical ion tracers or fluorescent tracers, and the tracing methods used are univariate tracing or multivariate tracing.