Intelligent positioning method and system for trains in mines
By collecting and analyzing the characteristic data of underground trains and shafts, combined with distance sensors and signal detection devices, the problem of inaccurate positioning of underground trains caused by weak GPS signals has been solved, the positioning accuracy and adaptability have been improved, and the risk of accidents has been reduced.
Patent Information
- Application Number
- CN202411111330.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-14
AI Technical Summary
In mines, GPS positioning signal transmission is weak, making it difficult for trains under the mine to achieve precise positioning, increasing the risk of collision accidents.
By collecting characteristic data of underground trains and mine shafts, we evaluate operational stability and shaft complexity, determine the positioning mode and accuracy, and use distance sensors and signal detection devices to make positioning adjustments to ensure accurate positioning when signal transmission is weak.
It improves the accuracy and adaptability of underground train positioning, ensures accurate positioning in complex mine environments, and reduces the risk of collision accidents.
Smart Images

Figure CN118636952B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of train positioning under a mine, and in particular to an intelligent train positioning method and system under a mine. Background Art
[0002] Currently in the field of mineral mining, rail-mounted mine trains generally have their own simple power or rely on power traction equipment to transport ore. Due to their ease of use, rail-mounted mine trains have been widely used.
[0003] However, in the field of complex mines, the tracks of rail trains under rail mines are often complicated. Therefore, how to arrange the tracks of rail trains under rail mines has become a tedious daily task. Once the arrangement is improper, it is easy to cause a collision accident of rail trains under rail mines. At the same time, once a rail train under rail mine fails, if it cannot be cleaned up in time, it may also cause a chain collision accident, causing serious consequences to production.
[0004] Chinese patent application publication number: CN107065848A discloses an unmanned driving system and method for underground mining locomotives based on a high-precision positioning and navigation terminal, which relates to the field of mining, and is characterized in that the system includes: a central processing unit for controlling the operation of the system; a radio frequency positioning module for radio frequency positioning; a wireless communication module for wireless communication; a lighting device for lighting in a mine cave; an image acquisition device for image acquisition; a GPS positioning module for GPS positioning; a motion control system for controlling the operation of the motor of the mine car and a mine model library with a mine model and a fixed coordinate reader node group for a common reference point for the radio frequency positioning module; the central processing unit is respectively connected to the radio frequency positioning module, the wireless communication module, the lighting device, the image acquisition device, the GPS positioning module, the motion control system and the mine model library. The present invention has the advantages of accurate positioning, high intelligence and high safety; it can be seen that the unmanned driving system and method for underground mining locomotives based on a high-precision positioning and navigation terminal need to be positioned by GPS when applied in a complex mine environment, but the GPS positioning signal has a weak signal transmission in the mine, so it is difficult to achieve accurate positioning of the train under the mine. Summary of the invention
[0005] To this end, the present invention provides an intelligent positioning method and system for trains under a mine, so as to overcome the problem in the prior art that it is difficult to accurately position trains under a mine due to weak signal transmission in the mine.
[0006] To achieve the above object, the present invention provides a method for intelligent positioning of trains in a mine, the method comprising the following steps:
[0007] Collect at least one set of operation characteristic data and at least one set of mine characteristic data within a train train time period under the mine;
[0008] Determining an operation stability evaluation value of the mine train according to the operation characteristic data;
[0009] Determine the mine extension position and the mine shaft complexity evaluation value according to the mine extension characteristic data;
[0010] Determine the eligibility of the train operation process under the mine according to the operation stability evaluation value, and determine the positioning of the train under the mine based on the eligibility;
[0011] Determine the position base point of the temporary position of the train under the mine according to the mine extension position, so as to preliminarily determine the real-time position of the train under the mine;
[0012] Whether the positioning process of the train under the mine meets the preset positioning accuracy is determined according to the shaft complexity evaluation value, and the positioning process is adjusted if it does not meet the preset positioning accuracy.
[0013] Further, determining the eligibility of the train operation process under the mine according to the operation stability evaluation value includes determining that the train operation process under the mine is qualified according to a comparison result that the operation stability evaluation value is greater than a preset stability evaluation value.
[0014] Further, the determining of positioning the train under the mine based on the qualification includes determining a positioning mode for positioning the train under the mine according to a comparison result of a difference between the stability evaluation value and a preset stability evaluation value and a preset difference when the operation process is qualified.
[0015] Furthermore, the positioning mode for positioning the train under the mine determined according to the comparison result between the difference and the preset difference includes determining the positioning mode as the first positioning mode under the condition that the difference is less than or equal to the preset difference, and the first positioning mode is to determine the straight-line distance between the mine extension position and the mine entrance position according to the coordinates of the mine extension position and the coordinates of the mine entrance position, and preliminarily determine the temporary position of the train under the mine on the straight line according to the straight-line distance and the running time of the train under the mine, and use the temporary position as the position base point to extend to the corresponding position of the shaft of the mine, and extend the collection device at the corresponding position to both ends to enable a preset number of distance sensors, and locate the real-time position of the train under the mine based on the distance sensors.
[0016] Further, the positioning mode for positioning the train under the mine determined according to the comparison result of the difference with the preset difference includes determining the positioning mode as a second positioning mode under the condition that the difference is less than or equal to the preset difference, and the second positioning mode is to determine the real-time position of the train under the mine according to the position of the real-time signal change of the signal detection device.
[0017] Further, the determining the real-time position of the train under the mine according to the position of the real-time signal change includes determining the real-time position of the train under the mine according to the comparison result that the signal frequency change exceeds the preset signal frequency change.
[0018] Further, determining whether the positioning process of the train under the mine meets the preset positioning accuracy according to the shaft complexity evaluation value includes determining the preset positioning accuracy according to a comparison result of the shaft complexity evaluation value and a preset complexity evaluation value.
[0019] Further, determining the preset positioning accuracy according to the comparison result includes determining the preset positioning accuracy as the first positioning accuracy under the condition that the complexity evaluation value is less than or equal to the preset complexity evaluation value;
[0020] Determining the preset positioning accuracy according to the comparison result includes determining that the preset positioning accuracy is a second positioning accuracy under the condition that the complexity evaluation value is greater than the preset complexity evaluation value.
[0021] Furthermore, the adjustment of the positioning process when the preset positioning accuracy is not met includes calculating the absolute value of the difference between the complexity evaluation value and the preset complexity evaluation value, and determining an adjustment coefficient based on the absolute value of the difference to adjust the preset number of the positioning process or the preset signal frequency change.
[0022] Another aspect of the present invention provides a positioning system using the intelligent positioning method for trains in mines, comprising:
[0023] A data collection module, which is used to collect at least one set of operation characteristic data and at least one set of mine characteristic data within a train train time period;
[0024] A stability evaluation module, connected to the data acquisition module, for determining an evaluation value of the operation stability of the train under the mine according to the operation characteristic data;
[0025] A shaft evaluation module, connected to the data acquisition module, for determining the shaft extension position and the shaft complexity evaluation value of the shaft according to the shaft extension characteristic data;
[0026] A qualification determination module, connected to the stability evaluation module, for determining the qualification of the train operation process under the mine according to the operation stability evaluation value, and positioning the train under the mine based on the qualification determination;
[0027] A mine train positioning module, which is connected to the data acquisition module and the eligibility determination module respectively, determines the position base point of the temporary position of the mine train according to the mine extension position, so as to preliminarily determine the real-time position of the mine train;
[0028] A positioning adjustment module is connected to the mine train positioning module, and determines whether the positioning process of the mine train meets the preset positioning accuracy according to the shaft complexity evaluation value, and adjusts the positioning process if it does not meet the preset positioning accuracy.
[0029] Compared with the prior art, the beneficial effect of the present invention lies in that the present invention collects characteristic data of the train under the mine and the operation characteristic data of the mine, and analyzes the operation characteristic data and the mine characteristic data to determine the actual situation of the mine and the actual situation of the train under the mine, and determines how to position the train under the mine, and determines whether the positioning process of the train under the mine meets the pre-set positioning accuracy based on the complexity of the mine shaft, and adjusts the positioning process when it does not meet the corresponding positioning accuracy, thereby improving the control accuracy of the positioning process, thereby ensuring that the train under the mine can achieve accurate positioning of the train under the mine when the signal transmission is weak.
[0030] Furthermore, the present invention determines the positioning mode for positioning the train under the mine according to the comparison result of the difference between the stability evaluation value and the preset stability evaluation value and the preset difference, under the condition that the operation process of the train under the mine is qualified by comparing the operation stability evaluation value with the preset stability evaluation value. This differentiated positioning strategy can be flexibly adjusted according to the actual operating status of the train under the mine, thereby improving the accuracy of the positioning of the train under the mine, thereby realizing the precise positioning of the train under the mine.
[0031] Furthermore, the present invention determines different positioning modes for positioning the train under the mine by comparing the difference with the preset difference, and determines different positioning methods under different positioning modes, thereby improving the accuracy and adaptability of positioning the train under the mine, thereby ensuring accurate positioning of the train under the mine when the signal transmission is weak.
[0032] Furthermore, the present invention determines a preset positioning accuracy by comparing the complexity evaluation value of the shaft with a preset complexity evaluation value, thereby improving the positioning accuracy of trains under the mine when the signal transmission is weak, thereby ensuring that trains under the mine can be accurately positioned when the signal transmission is weak. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a flow chart of the intelligent positioning method for trains in mines according to an embodiment of the present invention;
[0034] Figure 2 This is a schematic diagram of the structure of a system for applying an intelligent positioning method for trains in mines according to an embodiment of the present invention;
[0035] Figure 3 A flowchart of a positioning mode for determining positioning of a train under a mine according to an embodiment of the present invention;
[0036] Figure 4 The present invention is a flowchart for determining a preset positioning accuracy according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0038] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0039] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0040] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] See also Figure 1-Figure 4 As shown, Figure 1 This is a flow chart of the intelligent positioning method for trains in mines according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the structure of a system for applying an intelligent positioning method for trains in mines according to an embodiment of the present invention; Figure 3 A flowchart of a positioning mode for determining positioning of a train under a mine according to an embodiment of the present invention; Figure 4The present invention is a flowchart for determining a preset positioning accuracy according to an embodiment of the present invention.
[0042] The intelligent positioning method for trains in a mine according to an embodiment of the present invention comprises the following steps:
[0043] Step S1, collecting at least one set of operation characteristic data and at least one set of mine characteristic data within a train train time period;
[0044] Step S2, determining the running stability evaluation value of the mine train according to the running characteristic data;
[0045] Step S3, determining the mine extension position and the mine shaft complexity evaluation value according to the mine extension characteristic data;
[0046] Step S4, determining the eligibility of the train operation process under the mine according to the operation stability evaluation value, and determining the positioning of the train under the mine based on the eligibility;
[0047] Step S5, determining the position base point of the temporary position of the train under the mine according to the mine extension position, so as to preliminarily determine the real-time position of the train under the mine;
[0048] Step S6: determining whether the positioning process of the train under the mine meets the preset positioning accuracy according to the shaft complexity evaluation value, and adjusting the positioning process if it does not meet the preset positioning accuracy.
[0049] Specifically, determining the eligibility of the train operation process under the mine according to the operation stability evaluation value includes determining that the train operation process under the mine is qualified according to a comparison result that the operation stability evaluation value is greater than a preset stability evaluation value.
[0050] In the embodiment of the present invention, the preset stability evaluation value is 1.5.
[0051] Specifically, the operation stability evaluation value is calculated according to the following formula:
[0052] ,
[0053] Among them, P represents the operation stability evaluation value, J represents the average value of the vibration amplitude of the mine train during operation, Jmax represents the maximum value of the vibration amplitude of the mine train during operation, G represents the average value of the running speed of the mine train during operation, Gmax represents the maximum value of the running speed of the mine train during operation, Gmin represents the minimum value of the running speed of the mine train during operation, and T represents the stop time of the mine train during operation.
[0054] Specifically, the determining of positioning the train under the mine based on the qualification includes determining a positioning mode for positioning the train under the mine according to a comparison result of a difference between the stability evaluation value and a preset stability evaluation value and a preset difference when the operation process is qualified.
[0055] In the embodiment of the present invention, the preset difference value is 0.6.
[0056] Specifically, the present invention determines the positioning mode for positioning the train under the mine according to the comparison result of the difference between the stability evaluation value and the preset stability evaluation value and the preset difference, under the condition that the operation process of the train under the mine is qualified by comparing the operation stability evaluation value with the preset stability evaluation value. This differentiated positioning strategy can be flexibly adjusted according to the actual operating status of the train under the mine, thereby improving the accuracy of the positioning of the train under the mine, thereby realizing the precise positioning of the train under the mine.
[0057] Specifically, the positioning mode for determining the positioning of the train under the mine based on the comparison result between the difference and the preset difference includes determining that the positioning mode is the first positioning mode under the condition that the difference is less than or equal to the preset difference, and the first positioning mode is to determine the straight-line distance between the mine extension position and the mine entrance position according to the coordinates of the mine extension position and the coordinates of the mine entrance position, and preliminarily determine the temporary position of the train under the mine on the straight line according to the straight-line distance and the running time of the train under the mine, and use the temporary position as the position base point to extend to the corresponding position of the shaft of the mine, and extend the collection device at the corresponding position to both ends to enable a preset number of distance sensors, and locate the real-time position of the train under the mine based on the distance sensors.
[0058] In the embodiment of the present invention, the value of the preset number is 5, but the above value is not limited thereto, and those skilled in the art may also set the above value according to actual conditions.
[0059] Specifically, the positioning mode for determining the positioning of the train under the mine based on the comparison result of the difference with the preset difference includes determining the positioning mode as the second positioning mode under the condition that the difference is less than or equal to the preset difference. The second positioning mode is to determine the real-time position of the train under the mine based on the position of the real-time signal change of the signal detection device.
[0060] In an embodiment of the present invention, the signal detection device is a laser radar, which measures the distance by emitting a laser beam and receiving a light signal reflected from the train under the mine to determine the real-time position of the train under the mine.
[0061] Specifically, determining the real-time position of the train under the mine according to the position of the real-time signal change includes determining the real-time position of the train under the mine according to the comparison result that the signal frequency change exceeds the preset signal frequency change.
[0062] In the embodiment of the present invention, the value of the preset signal frequency variation is 100 Hz.
[0063] Specifically, the signal frequency change is calculated according to the following formula:
[0064] ,
[0065] Among them, F represents the change in signal frequency, C represents the speed of the radio waves that transmit real-time signals, V represents the speed of the train moving under the mine, and f0 represents the signal frequency received by the train under the mine.
[0066] Specifically, the present invention determines different positioning modes for positioning the train under the mine by comparing the difference with the preset difference, and determines different positioning methods under different positioning modes, thereby improving the accuracy and adaptability of positioning the train under the mine, thereby ensuring accurate positioning of the train under the mine when the signal transmission is weak.
[0067] Specifically, determining whether the positioning process of the train under the mine meets the preset positioning accuracy according to the shaft complexity evaluation value includes determining the preset positioning accuracy according to a comparison result of the shaft complexity evaluation value and the preset complexity evaluation value.
[0068] Specifically, determining the preset positioning accuracy according to the comparison result includes determining that the preset positioning accuracy is the first positioning accuracy under the condition that the complexity evaluation value is less than or equal to the preset complexity evaluation value.
[0069] Specifically, determining the preset positioning accuracy according to the comparison result includes determining that the preset positioning accuracy is the second positioning accuracy under the condition that the complexity evaluation value is greater than the preset complexity evaluation value.
[0070] In the embodiment of the present invention, the first positioning accuracy is not less than 5 meters for positioning the train under the mine, and the second positioning accuracy is not less than 2 meters for positioning the train under the mine.
[0071] Specifically, the complexity evaluation value of the well is calculated according to the following formula:
[0072] ,
[0073] Among them, C represents the evaluation value of the complexity of the well, Nb represents the number of bends in the well, Sg represents the change value of the slope in the well, Indicates the average height of obstacles in the shaft.
[0074] Specifically, the adjustment of the positioning process when the preset positioning accuracy is not met includes calculating the absolute value of the difference between the complexity evaluation value and the preset complexity evaluation value, and determining the adjustment coefficient based on the absolute value of the difference to adjust the preset number or preset signal frequency change of the positioning process.
[0075] In an embodiment of the present invention, the preset complexity evaluation value is 0.8, and the adjustment coefficient includes a first adjustment coefficient for adjusting the preset number, the value of the first adjustment coefficient is 1.2, and a second adjustment coefficient for adjusting the preset signal frequency change, the value of the second adjustment coefficient is 0.9.
[0076] Specifically, the present invention determines the preset positioning accuracy by comparing the complexity evaluation value of the shaft with the preset complexity evaluation value, thereby improving the positioning accuracy of the train under the mine when the signal transmission is weak, thereby ensuring that the train under the mine can be accurately positioned when the signal transmission is weak.
[0077] See also Figure 2 As shown, it is a structural diagram of a system for applying an intelligent positioning method for trains under mines according to an embodiment of the present invention.
[0078] Specifically, the positioning system of the embodiment of the present invention using the above-mentioned intelligent positioning method for trains in mines includes:
[0079] A data collection module, which is used to collect at least one set of operation characteristic data and at least one set of mine characteristic data within a train train time period;
[0080] A stability evaluation module, connected to the data acquisition module, for determining an evaluation value of the operation stability of the train under the mine according to the operation characteristic data;
[0081] A shaft evaluation module, connected to the data acquisition module, for determining the shaft extension position and the shaft complexity evaluation value of the shaft according to the shaft extension characteristic data;
[0082] A qualification determination module, connected to the stability evaluation module, for determining the qualification of the train operation process under the mine according to the operation stability evaluation value, and positioning the train under the mine based on the qualification determination;
[0083] A mine train positioning module, which is connected to the data acquisition module and the eligibility determination module respectively, determines the position base point of the temporary position of the mine train according to the mine extension position, so as to preliminarily determine the real-time position of the mine train;
[0084] A positioning adjustment module is connected to the mine train positioning module, and determines whether the positioning process of the mine train meets the preset positioning accuracy according to the shaft complexity evaluation value, and adjusts the positioning process if it does not meet the preset positioning accuracy.
[0085] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
[0086] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for intelligent positioning of trains in mines, characterized in that: The method comprises the following steps: Collect at least one set of operation characteristic data and at least one set of mine characteristic data within a train train time period under the mine; The running stability evaluation value of the mine train is determined according to the running characteristic data, wherein the running stability evaluation value is calculated according to the following formula and is set: , Among them, P represents the running stability evaluation value, J represents the average value of the vibration amplitude of the train under the mine during operation, Jmax represents the maximum value of the vibration amplitude of the train under the mine during operation, G represents the average value of the running speed of the train under the mine during operation, Gmax represents the maximum value of the running speed of the train under the mine during operation, Gmin represents the minimum value of the running speed of the train under the mine during operation, and T represents the parking time of the train under the mine during operation; The mine extension position and the mine shaft complexity evaluation value are determined according to the mine extension characteristic data, wherein the shaft complexity evaluation value is calculated according to the following formula and is set: , Among them, C represents the evaluation value of the complexity of the well, Nb represents the number of bends in the well, Sg represents the change value of the slope in the well, Indicates the average height of obstacles in the well; Determine the eligibility of the train operation process under the mine according to the operation stability evaluation value, and determine the positioning of the train under the mine based on the eligibility; Determine the position base point of the temporary position of the train under the mine according to the mine extension position, so as to preliminarily determine the real-time position of the train under the mine; Determine whether the positioning process of the train under the mine meets the preset positioning accuracy according to the shaft complexity evaluation value, and adjust the positioning process if it does not meet the preset positioning accuracy; Determining the eligibility of the train operation process under the mine according to the operation stability evaluation value includes determining that the train operation process under the mine is qualified according to a comparison result that the operation stability evaluation value is greater than a preset stability evaluation value; The determining of positioning the train under the mine based on the qualification includes determining a positioning mode for positioning the train under the mine according to a comparison result of a difference between the stability evaluation value and a preset stability evaluation value and a preset difference when the operation process is qualified; The positioning mode for positioning the train under the mine according to the comparison result of the difference between the stability evaluation value and the preset stability evaluation value and the preset difference includes determining the positioning mode as the first positioning mode under the condition that the difference is less than or equal to the preset difference, and the first positioning mode is to determine the straight-line distance between the mine extension position and the mine entrance position according to the coordinates of the mine extension position and the coordinates of the mine entrance position, and preliminarily determine the temporary position of the train under the mine on the straight line according to the straight-line distance and the running time of the train under the mine, and use the temporary position as the position base point to extend to the corresponding position of the shaft of the mine, and extend to both ends with the acquisition device at the corresponding position to enable a preset number of distance sensors, and locate the real-time position of the train under the mine based on the distance sensors; The method of determining the positioning mode for positioning the train under the mine according to the comparison result between the difference and the preset difference includes determining the positioning mode as a second positioning mode under the condition that the difference is greater than the preset difference, and the second positioning mode is to determine the real-time position of the train under the mine according to the position of the real-time signal change of the signal detection device; The method of determining the real-time position of the train under the mine according to the position of the real-time signal change of the signal detection device comprises determining the real-time position of the train under the mine according to the comparison result that the signal frequency change exceeds the preset signal frequency change; The determining, according to the shaft complexity evaluation value, whether the positioning process of the train under the mine meets the preset positioning accuracy comprises determining the preset positioning accuracy according to a comparison result of the shaft complexity evaluation value and the preset complexity evaluation value; Determining the preset positioning accuracy according to the comparison result between the complexity evaluation value of the well and the preset complexity evaluation value includes determining the preset positioning accuracy as the first positioning accuracy under the condition that the complexity evaluation value is less than or equal to the preset complexity evaluation value; Determining the preset positioning accuracy according to the comparison result includes determining the preset positioning accuracy as the second positioning accuracy under the condition that the complexity evaluation value is greater than the preset complexity evaluation value; The adjustment of the positioning process when the preset positioning accuracy is not met includes calculating the absolute value of the difference between the complexity evaluation value and the preset complexity evaluation value, and determining an adjustment coefficient based on the absolute value of the difference to adjust the preset number or preset signal frequency change of the positioning process.
2. A positioning system using the intelligent positioning method for trains under a mine as claimed in claim 1, characterized in that: include: A data collection module, which is used to collect at least one set of operation characteristic data and at least one set of mine characteristic data within a train train time period; A stability evaluation module, connected to the data acquisition module, for determining an evaluation value of the operation stability of the train under the mine according to the operation characteristic data; A shaft evaluation module, which is connected to the data acquisition module and is used to determine the mine extension position and the shaft complexity evaluation value of the mine according to the mine extension characteristic data; A qualification determination module, connected to the stability evaluation module, for determining the qualification of the train operation process under the mine according to the operation stability evaluation value, and positioning the train under the mine based on the qualification determination; A mine train positioning module, which is connected to the data acquisition module and the eligibility determination module respectively, determines the position base point of the temporary position of the mine train according to the mine extension position, so as to preliminarily determine the real-time position of the mine train; A positioning adjustment module is connected to the mine train positioning module, and determines whether the positioning process of the mine train meets the preset positioning accuracy according to the shaft complexity evaluation value, and adjusts the positioning process if it does not meet the preset positioning accuracy.