A slag intelligent transportation control system and method
By introducing dynamic path optimization algorithm and double-layer adaptive ant colony algorithm into the slag transportation system, combined with GIS and GPS technology, real-time monitoring and optimization of transportation paths solves the problem of the existing system's inability to adapt to traffic changes, improves transportation efficiency and safety and reduced transportation costs.
Patent Information
- Application Number
- CN202411102883.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-13
AI Technical Summary
The existing slag transportation system is difficult to adapt to the dynamically changing traffic environment and cannot dynamically adjust routes based on real-time traffic data, resulting in the inability to guarantee transportation efficiency and safety. It lacks real-time monitoring and evaluation of vehicle status, which affects the optimization of vehicle dispatching and management. Resource utilization is low, and the adaptability and predictive capabilities of intelligent transportation control systems are insufficient.
Adopt a slag intelligent transportation control system, introduce dynamic path optimization algorithm and double-layer adaptive ant colony algorithm, and combine GIS, GPS and sensor technology to collect and analyze geographical information and traffic data in real time, calculate vehicle status scores and path scores, and dynamically adjust Transportation routes enable intelligent dispatching and management of transportation vehicles and optimize resource utilization.
It realizes dynamic adjustment of transportation routes based on real-time traffic data, improves transportation efficiency and safety, reduces transportation costs, ensures smooth and efficient transportation process, and enhances the adaptability and prediction capabilities of the system.
Smart Images

Figure CN118642498B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent traffic management, and in particular to a slag intelligent transportation control system and method. Background Art
[0002] With the acceleration of industrialization, the demand for slag transportation is increasing. As an industrial by-product, the transportation of slag involves complex logistics and transportation management. Traditional slag transportation methods rely on fixed transportation routes and simple scheduling management, which presents many challenges and problems in actual operations. Traffic jams, road construction, bad weather and other factors will have a significant impact on the transportation process, resulting in low transportation efficiency, increased costs and safety hazards.
[0003] At the same time, with the rapid development of modern information technology, geographic information systems (GIS), global positioning systems (GPS) and sensor technologies have been widely used in various industries. These technologies can provide real-time geographic information data and traffic data, providing new solutions for transportation management. However, the existing slag transportation system has not yet made full use of these technologies, making it difficult to achieve real-time optimization and intelligent management of the transportation process.
[0004] The existing technology has at least the following technical problems: it is difficult to adapt to the dynamically changing traffic environment and cannot dynamically adjust the route according to real-time traffic data, resulting in the inability to ensure transportation efficiency and safety; there is a lack of real-time monitoring and evaluation of vehicle status, which affects the optimization of vehicle scheduling and management; it is impossible to achieve intelligent scheduling and management of transport vehicles, resulting in low resource utilization; there is a lack of data-driven optimization mechanism, the adaptability and predictive ability of the intelligent transportation control system is insufficient, and there is a lack of dynamic adjustment and real-time optimization capabilities, resulting in a less smooth and efficient transportation process. Summary of the invention
[0005] The present invention provides a slag intelligent transportation control system and method to solve the problems that the prior art is difficult to adapt to the dynamically changing traffic environment, cannot dynamically adjust the path according to real-time traffic data, resulting in the inability to ensure transportation efficiency and safety; lacks real-time monitoring and evaluation of vehicle status, affecting the optimization of vehicle scheduling and management; cannot achieve intelligent scheduling and management of transportation vehicles, resulting in low resource utilization; and lacks a data-driven optimization mechanism, the adaptability and prediction ability of the intelligent transportation control system is insufficient, and the lack of dynamic adjustment and real-time optimization capabilities leads to the problem that the transportation process is not smooth and efficient enough.
[0006] The present invention provides a slag intelligent transportation control system and method, which specifically includes the following technical solutions:
[0007] A slag intelligent transportation control method comprises the following steps:
[0008] S1. Perform preliminary path planning for the slag transportation path and calculate the status score of each slag transportation vehicle; score the transportation path based on the status score of the slag transportation vehicle; dynamically adjust the status score of the slag transportation vehicle, update the path score in real time, and adjust the transportation path according to the new path score;
[0009] S2. Input the status score and path score of the slag transport vehicle into the double-layer adaptive ant colony algorithm to perform global search and local optimization to generate the optimal slag transportation path.
[0010] Preferably, the S1 specifically includes:
[0011] A dynamic path optimization algorithm is introduced to perform preliminary path planning; by constructing a road network diagram, setting the starting point and end point, and calculating the weight of each edge, the preliminary optimal path from the starting point to the end point is found.
[0012] Preferably, the S1 specifically includes:
[0013] By constructing a vehicle condition assessment model, the condition score of each slag transport vehicle is calculated.
[0014] Preferably, the S1 specifically includes:
[0015] When performing preliminary path planning, the status score of the slag transport vehicle is used as the weight adjustment factor of the edge; when constructing the road network graph, the weight of each edge is calculated based on the status score of the slag transport vehicle.
[0016] Preferably, the S2 specifically includes:
[0017] The state score and path score of the slag transport vehicle are taken as input parameters and input into the double-layer adaptive ant colony algorithm to generate an initial population; each individual in the initial population represents a scheduling scheme, and each individual is represented by a weight vector composed of the state score and path score of the slag transport vehicle; the pheromone concentration matrix is initialized based on the state score and path score of the slag transport vehicle.
[0018] Preferably, the S2 specifically includes:
[0019] The two-layer adaptive ant colony algorithm is divided into a global layer and a local layer, which perform global search and local optimization respectively; by designing a global layer search method, pheromone concentration update and path selection are performed.
[0020] Preferably, the S2 specifically includes:
[0021] The pheromone concentration is updated based on the volatilization of pheromones and the amount of new pheromones left by ants on the path. The change in pheromone concentration affects the probability of ants choosing a path in the next step; the probability of each ant choosing a path is calculated, and the probability of an ant choosing a path is proportional to the priority of the path in the global search.
[0022] Preferably, the S2 specifically includes:
[0023] According to the probability of selecting a path, a new scheduling plan is generated, and the path with the highest probability is selected as the optimal transportation path; the new scheduling plan is passed to the local layer for optimization, and the optimal transportation path is adjusted.
[0024] Preferably, the S2 specifically includes:
[0025] By designing a local optimization method, local search is performed and the local pheromone concentration is adjusted; the local search optimizes each newly generated scheduling plan; after the local search and adjustment of the local pheromone concentration are completed, the pheromone concentration matrix is updated and the updated pheromone concentration is passed back to the global layer.
[0026] A slag intelligent transportation control system, comprising the following parts:
[0027] Data collection module, preliminary path planning module, transportation scheduling module, global search module, local optimization module;
[0028] The data acquisition module collects the real-time location, speed, fuel status information of the vehicle, as well as the transportation demand and real-time traffic data of the slag, and obtains geographic information data; the data acquisition module is connected to the preliminary path planning module and the transportation scheduling module;
[0029] The preliminary path planning module performs preliminary path planning by introducing a dynamic path optimization algorithm, combining geographic information data and real-time traffic data; the preliminary path planning module is connected to the transportation scheduling module;
[0030] The transport scheduling module establishes a vehicle status evaluation model based on real-time traffic data and the real-time location of the vehicle, and calculates the status score of each slag transport vehicle; scores the transport path by combining real-time traffic data, geographic information data and the status score of the slag transport vehicle; dynamically adjusts the status score of the slag transport vehicle through the vehicle scheduling algorithm, and updates the path score in real time; adjusts the transport path according to the new path score; the transport scheduling module is connected to the global search module;
[0031] The global search module inputs the status score and path score of the slag transport vehicle into the two-layer adaptive ant colony algorithm; the two-layer adaptive ant colony algorithm is divided into a global layer and a local layer, which respectively perform global search and local optimization; a global layer search method is designed to perform pheromone concentration update and path selection; the global search module is connected to the local optimization module;
[0032] The local optimization module designs a local optimization method, performs local search and adjusts the local pheromone concentration; after local search and adjustment of the local pheromone concentration, the pheromone concentration matrix is updated and the updated pheromone concentration is passed back to the global layer; the local optimization module is connected to the global search module.
[0033] The beneficial effects of the technical solution of the present invention are:
[0034] 1. By integrating GIS, sensors and GPS equipment, geographic information, road conditions and traffic data can be obtained in real time to realize intelligent planning and optimization of slag transportation routes. The dynamic path optimization algorithm can dynamically adjust the transportation route according to real-time traffic data to ensure the efficiency of the transportation process; real-time collection and analysis of traffic accidents, construction information, weather conditions and other data, timely adjustment of transportation routes, avoid transportation delays and safety hazards caused by emergencies, thereby ensuring the safety of transportation vehicles and drivers.
[0035] 2. By establishing a vehicle status evaluation model, the vehicle maintenance status, fuel status and driving time are comprehensively considered, the vehicle status score is calculated, and the vehicle scheduling is optimized in combination with the path score. A double-layer adaptive ant colony algorithm is used to realize intelligent scheduling and management of transport vehicles and optimize the utilization rate of vehicle resources. During the transportation process, the vehicle status score and path score of the slag transport vehicle are dynamically adjusted according to the status data and real-time traffic data of the transport vehicle, and the transportation path is updated in real time. The real-time position, speed, fuel status and other information of the vehicle, as well as the transportation demand and real-time traffic data of slag are continuously collected and analyzed, and the accuracy and adaptability of path planning are improved by continuously optimizing the dynamic path optimization algorithm.
[0036] 3. By optimizing the transportation route and vehicle scheduling, the driving distance and time of slag transportation can be reduced, thereby reducing fuel consumption and vehicle wear and tear, and further reducing transportation costs; at the same time, the intelligent transportation control system can effectively avoid delays caused by traffic congestion and emergencies, further saving transportation costs; through the integration of GIS, the transportation route and traffic conditions can be displayed in real time, and the intelligent scheduling and management of transportation vehicles can be realized through the vehicle scheduling algorithm to ensure the smoothness and efficiency of the transportation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 This is a structural diagram of a slag intelligent transportation control system according to the present invention;
[0038] Figure 2 This is a flow chart of the slag intelligent transportation control method described in the present invention. DETAILED DESCRIPTION
[0039] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
[0041] The specific scheme of a slag intelligent transportation control system and method provided by the present invention is described in detail below with reference to the accompanying drawings.
[0042] See attached Figure 1 , which shows a structural diagram of a slag intelligent transportation control system provided by an embodiment of the present invention, the system includes the following parts:
[0043] Data collection module, preliminary path planning module, transportation scheduling module, global search module, local optimization module;
[0044] The data acquisition module collects information such as the real-time location, speed, fuel status, etc. of the vehicle, as well as the transportation demand and real-time traffic data of slag through sensors and GPS devices, and uses the Geographic Information System (GIS) to obtain geographic information data; the data acquisition module is connected to the preliminary path planning module and the transportation scheduling module;
[0045] The preliminary path planning module uses the Dijkstra algorithm or the A* algorithm to perform preliminary path planning by introducing a dynamic path optimization algorithm, combining geographic information data and real-time traffic data. The preliminary path planning module is connected to the transportation scheduling module.
[0046] The transport scheduling module establishes a vehicle status evaluation model based on real-time traffic data and the real-time location of the vehicle, and calculates the status score of each slag transport vehicle; it scores the transport route by combining the real-time traffic data, geographic information data and the status score of the slag transport vehicle, and dynamically adjusts the status score of the slag transport vehicle based on the status data of the slag transport vehicle (such as maintenance status data, fuel status data, driving time, etc.) and real-time traffic data through the vehicle scheduling algorithm, and updates the path score in real time, and adjusts the transport route based on the new path score, so as to realize the intelligent scheduling and management of transport vehicles; the transport scheduling module is connected to the global search module;
[0047] The global search module takes the status score and path score of the slag transport vehicle as input parameters and inputs them into the two-layer adaptive ant colony algorithm, which is divided into a global layer and a local layer to perform global search and local optimization respectively; a global layer search method is designed to perform pheromone concentration update and path selection; the global search module is connected to the local optimization module;
[0048] The local optimization module designs local optimization methods, conducts local searches and adjusts local pheromone concentrations, and refines and optimizes each newly generated scheduling plan through local searches. After local searches and adjustments to local pheromone concentrations, the pheromone concentration matrix is updated, and the updated pheromone concentration is passed back to the global layer to affect subsequent path selection. The local optimization module is connected to the global search module.
[0049] See attached Figure 2 , which shows a flow chart of a slag intelligent transportation control method provided by an embodiment of the present invention, the method comprising the following steps:
[0050] S1. Perform preliminary path planning for the slag transportation path and calculate the status score of each slag transportation vehicle; score the transportation path based on the status score of the slag transportation vehicle; dynamically adjust the status score of the slag transportation vehicle, update the path score in real time, and adjust the transportation path according to the new path score;
[0051] The data acquisition module integrates geographic information system (GIS) technology to obtain geographic information data and road conditions of the slag transportation route, providing a data basis for route planning; it collects real-time traffic data through sensors and GPS equipment, including road congestion, traffic accidents, construction information and weather conditions, and connects with the data interface of the traffic management department. It can dynamically adjust the transportation route according to real-time traffic data to ensure the efficiency and safety of the transportation process.
[0052] The preliminary path planning module realizes intelligent planning and optimization of slag transportation paths by introducing dynamic path optimization algorithms and combining geographic information data and real-time traffic data. algorithm (Dijkstra's algorithm) or The algorithm performs preliminary path planning. The algorithm is suitable for finding the shortest path and is suitable for situations where the road network structure is relatively stable. The algorithm is The algorithm adds a heuristic function to make it more suitable for dynamic road network environments. By building a road network diagram, setting the starting point and end point, and calculating the weight of each edge (such as distance, travel time, etc.), the execution or The algorithm finds the initial optimal path from the starting point to the end point. Furthermore, it makes dynamic adjustments based on real-time traffic data.
[0053] Integrated GIS displays the transportation route and traffic conditions in real time, and installs GPS devices on the transportation vehicles to obtain the real-time location of the vehicles. During the slag transportation process, the transportation scheduling module uses the vehicle scheduling algorithm to realize intelligent scheduling and management of the transportation vehicles and dynamically adjust the transportation route based on real-time traffic data and the real-time location of the vehicles.
[0054] As an example, suppose a slag transport vehicle is in motion and a traffic accident occurs on the main road ahead, causing severe congestion. The intelligent transportation control system obtains accident information in a timely manner through sensors and the traffic management department interface, and immediately recalculates the path, selects a smooth suboptimal path, and sends the new path to the vehicle terminal. The driver drives according to the new path, avoiding delays caused by the traffic accident. Based on the actual situation during the transportation process, the intelligent transportation control system continuously collects and analyzes the vehicle's real-time position, speed, fuel status and other information, as well as the transportation demand and real-time traffic data of slag, and continuously optimizes the dynamic path optimization algorithm. Through accumulated data and experience, it can more accurately predict traffic conditions and improve the accuracy of path planning.
[0055] Specifically, sensors and GPS devices are used to collect information such as the vehicle's real-time location, speed, fuel status, and slag transportation demand and real-time traffic data. The collected data is pre-processed, including data cleaning and formatting, to ensure data accuracy and consistency.
[0056] A vehicle status evaluation model is established to calculate the status score of each slag transport vehicle, mainly considering the maintenance status, fuel status, driving time and other transport vehicle status data. The status score formula is:
[0057] ,
[0058] in, For the Condition score of each slag transport vehicle; For the The speed of the slag truck; For the The fuel status of the slag transport trucks; For the Maintenance status of slag transport vehicles; and are the mean and standard deviation of the speed of the slag trucks; and are the mean and standard deviation of the fuel status of the slag transport trucks; and are the mean and standard deviation of the maintenance status of slag transport vehicles; , , To adjust the parameters. The status scoring formula combines the speed, fuel status and maintenance status of the slag transport vehicle, and realizes nonlinear conversion through exponential function to make the score more in line with the actual situation. The score of each factor uses the logistic function to ensure that the score is between 0 and 1.
[0059] The transportation route is scored by combining real-time traffic data, geographic information data and the status score of the slag transport vehicle. The route scoring formula is:
[0060] ,
[0061] in, For the The route score of the slag transport truck; For the The slag transport truck arrived distance to destination; For transportation time; for the cost of traffic congestion; and is the weight coefficient; is the total number of destinations. The path scoring formula takes into account the distance, transportation time, traffic congestion cost and the status score of the slag transport vehicle, and scores the path through weighted summation.
[0062] In execution or When developing the algorithm, the status score of the slag transport vehicle is used as the weight adjustment factor of the edge to ensure that the slag transport vehicle with a higher status score has priority in choosing a better path. In the process of constructing the road network graph, the status score is considered when calculating the weight of each edge:
[0063] ,
[0064] in, It is The slag transport truck arrived During the transportation process, the status score is dynamically adjusted according to the real-time status data of the vehicle, and the path score is updated in real time, and the transportation path is adjusted according to the new path score.
[0065] S2. Input the status score and path score of the slag transport vehicle into the double-layer adaptive ant colony algorithm to perform global search and local optimization to generate the optimal slag transportation path.
[0066] In order to optimize the transportation scheduling plan, the status score and path score of the slag transport vehicle are used as input parameters and input into the double-layer adaptive ant colony algorithm to generate an initial population (i.e., vehicle scheduling plan). Each individual in the initial population represents a scheduling plan. Each individual is determined by the status score of the slag transport vehicle. and path scoring The weight vector composed of: , is the total number of vehicles; specifically, the condition score of the slag transport vehicles and path scoring It is used to initialize the pheromone concentration matrix, thereby affecting the path selection probability of the ants in the initial iteration, ensuring that the state and path of the slag transport vehicle with better performance can be given priority from the beginning, thereby accelerating the convergence process and improving the efficiency and effect of scheduling optimization. Initialize the pheromone concentration matrix:
[0067] ,
[0068] in, It is Path to The initial pheromone concentration of each path; and are the maximum and minimum values of pheromone concentration, respectively; and is the weight parameter.
[0069] The two-layer adaptive ant colony algorithm is divided into a global layer and a local layer, which perform global search and local optimization respectively; the global search module designs a global layer search method to update pheromone concentration and select paths. The formula for updating pheromone concentration is:
[0070] ,
[0071] in, for Moment Path to Pheromone concentration of each path; for Moment Path to Pheromone concentration of each path; is the pheromone volatility coefficient; For the The ant is in the Path to The amount of pheromone left on the path; is the total number of ants. The updated pheromone concentration takes into account the volatilization of pheromones and the amount of new pheromones left by ants on the path. The change in pheromone concentration affects the probability of ants choosing a path in the next step. The path selection formula is:
[0072] ,
[0073] in, For the The ant chooses Path to The probability of the path; For the Path to Heuristic information about the paths; and are the pheromone importance and heuristic information importance parameters, respectively; is a set of optional paths. The probability of each ant choosing a path is calculated, taking into account the importance of pheromone concentration and heuristic information. The higher the probability of an ant choosing a path, the higher the priority of the path in the global search.
[0074] Based on the path selection probability, a new generation of scheduling plan is generated, that is, the path with the highest probability is selected as the optimal transportation path. The new scheduling plan will be passed to the local layer for further optimization, and the details on the optimal transportation path will be adjusted, such as speed control points, stop points, etc.; and in the actual transportation process, the environment and traffic conditions will change. Local search can better respond to sudden changes and provide real-time fine-tuning optimization.
[0075] The local optimization module designs a local optimization method, performs local search and adjusts the local pheromone concentration. Each newly generated scheduling plan is refined and optimized through local search. The adjustment formula is:
[0076] ,
[0077] in, for Moment Path to The amount of adjustment of the local pheromone concentration of the path; for Moment Path to The amount of adjustment of the local pheromone concentration of the path; is the adaptive adjustment coefficient; For the Path to The length of the path; is the average length of all paths.
[0078] After performing local search and adjusting the local pheromone concentration, the pheromone concentration matrix is updated and the updated pheromone concentration is passed back to the global layer to affect the subsequent path selection. After the global pheromone concentration matrix is updated, a new scheduling plan is generated based on the new pheromone concentration and the path selection formula. Through repeated iterations, the path selection is gradually optimized, so that the final selected slag transportation path is optimal.
[0079] In summary, a slag intelligent transportation control system and method are completed.
[0080] The order of the embodiments of the invention is for description only and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0081] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.
[0082] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. A slag intelligent transportation control method, characterized in that: The following steps are involved: S1. Perform preliminary path planning by constructing a road network diagram, setting the starting point and the end point, and calculating the weight of each edge to find the preliminary optimal path from the starting point to the end point. Then, calculate the status score of each slag transport vehicle by constructing a vehicle status evaluation model. The status score formula is: , in, For the Condition score of each slag transport vehicle; For the The speed of the slag truck; For the The fuel status of the slag transport trucks; For the Maintenance status of slag transport vehicles; and are the mean and standard deviation of the speed of the slag trucks; and are the mean and standard deviation of the fuel status of the slag transport trucks; and are the mean and standard deviation of the maintenance status of slag transport vehicles; , , To adjust the parameters; The transportation route is scored based on the status score of the slag transport vehicle; the route scoring formula is: , in, For the The route score of the slag transport truck; is the total number of destinations; For the The slag transport truck arrived distance to destination; For transportation time; for the cost of traffic congestion; and is the weight coefficient; Dynamically adjust the status score of the slag transport vehicle, update the path score in real time, and adjust the transport path according to the new path score; S2. Input the status score and path score of the slag transport vehicle into the double-layer adaptive ant colony algorithm to initialize the pheromone concentration matrix. The formula for initializing the pheromone concentration matrix is as follows: , in, It is Path to The initial pheromone concentration of each path; and are the maximum and minimum values of pheromone concentration, respectively; and is the weight parameter; Perform global search and local optimization to generate the optimal slag transportation route.
2. The slag intelligent transportation control method according to claim 1, characterized in that: The S1 specifically includes: When performing preliminary path planning, the status score of the slag transport vehicle is used as the weight adjustment factor of the edge; when constructing the road network graph, the weight of each edge is calculated based on the status score of the slag transport vehicle.
3. The slag intelligent transportation control method according to claim 1, characterized in that: The S2 specifically includes: The two-layer adaptive ant colony algorithm is divided into a global layer and a local layer, which perform global search and local optimization respectively. By designing a global layer search method, pheromone concentration update and path selection are performed. The pheromone concentration update formula is: , in, for Moment Path to Pheromone concentration of each path; for Moment Path to Pheromone concentration of each path; is the pheromone volatility coefficient; For the The ant is in the Path to The amount of pheromone left on the path; is the total number of ants.
4. The slag intelligent transportation control method according to claim 3, characterized in that: The S2 specifically includes: The pheromone concentration is updated based on the volatilization of pheromones and the amount of new pheromones left by ants on the path. The change in pheromone concentration affects the probability of ants choosing a path in the next step; the probability of each ant choosing a path is calculated, and the probability of an ant choosing a path is proportional to the priority of the path in the global search.
5. The slag intelligent transportation control method according to claim 4, characterized in that: The S2 specifically includes: According to the probability of selecting a path, a new scheduling plan is generated, and the path with the highest probability is selected as the optimal transportation path; the new scheduling plan is passed to the local layer for optimization, and the optimal transportation path is adjusted.
6. The slag intelligent transportation control method according to claim 3, characterized in that: The S2 specifically includes: By designing a local optimization method, local search is performed and the local pheromone concentration is adjusted; the local search optimizes each newly generated scheduling plan; after the local search and adjustment of the local pheromone concentration are completed, the pheromone concentration matrix is updated and the updated pheromone concentration is passed back to the global layer.
7. A slag intelligent transportation control system, applied to the slag intelligent transportation control method according to claim 1, characterized in that: Includes the following sections: Data collection module, preliminary path planning module, transportation scheduling module, global search module, local optimization module; The data acquisition module collects the real-time location, speed, fuel status information of the vehicle, as well as the transportation demand and real-time traffic data of the slag, and obtains geographic information data; the data acquisition module is connected to the preliminary path planning module and the transportation scheduling module; The preliminary path planning module performs preliminary path planning by introducing a dynamic path optimization algorithm, combining geographic information data and real-time traffic data; the preliminary path planning module is connected to the transportation scheduling module; The transport scheduling module establishes a vehicle status evaluation model based on real-time traffic data and the real-time location of the vehicle, and calculates the status score of each slag transport vehicle; scores the transport path by combining real-time traffic data, geographic information data and the status score of the slag transport vehicle; dynamically adjusts the status score of the slag transport vehicle through the vehicle scheduling algorithm, and updates the path score in real time; adjusts the transport path according to the new path score; the transport scheduling module is connected to the global search module; The global search module inputs the status score and path score of the slag transport vehicle into the two-layer adaptive ant colony algorithm; the two-layer adaptive ant colony algorithm is divided into a global layer and a local layer, which respectively perform global search and local optimization; a global layer search method is designed to perform pheromone concentration update and path selection; the global search module is connected to the local optimization module; The local optimization module designs a local optimization method, performs local search and adjusts the local pheromone concentration; after local search and adjustment of the local pheromone concentration, the pheromone concentration matrix is updated and the updated pheromone concentration is passed back to the global layer; the local optimization module is connected to the global search module.
