Geological hazard risk assessment platform and method based on big data

Through a geological disaster risk assessment platform based on big data and comprehensive analysis based on terrain and historical data, the problem of insufficient geological disaster assessment in the existing technology is solved, and more accurate and timely geological disaster risk assessment and early warning are achieved.

CN118644091BActive Publication Date: 2024-10-29山东省地质矿产勘查开发局第七地质大队
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411123809.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-29
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

Existing geological disaster risk assessment methods have limitations and cannot comprehensively and accurately respond to the complex and changing environments of different geographical regions, resulting in low reliability of assessment results and insufficient practicability and adaptability.

Method used

The geological disaster risk assessment platform based on big data includes a regional geological data statistics module, a monitoring point layout module, a geological monitoring module, a geological disaster risk assessment module and a geological disaster early warning module. By analyzing terrain data, historical disaster data, surface and underground geology Monitor data, calculate geological disaster risk index, and issue early warning information.

Benefits of technology

It improves the level of geological disaster monitoring and early warning, enhances the comprehensiveness and scientificity of regional monitoring, ensures the scientificity and timeliness of geological disaster risk assessment, enables dynamic tracking of risk changes, and provides key basis for preventive measures and emergency response.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118644091B_ABST
    Figure CN118644091B_ABST
Patent Text Reader

Abstract

The present invention discloses a geological disaster risk assessment platform and method based on big data, and relates to the technical field of geological disaster risk assessment. The geological disaster risk assessment platform based on big data includes: a regional geological data statistics module, a monitoring point layout module, a geological monitoring module, a geological disaster risk assessment module and a geological disaster early warning module. The present invention can grasp the geological basic information of the region by statistically analyzing the geological data of the pre-monitoring area, and accurately analyze the monitoring point layout data based on this, and then reasonably layout the monitoring points, and at the same time comprehensively collect the surface and underground geological monitoring data of the pre-monitoring area, analyze the regional geological disaster risk level, effectively improve the accuracy and timeliness of geological disaster risk assessment, and ensure the stable development of the region.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of geological disaster risk assessment, and in particular to a geological disaster risk assessment platform and method based on big data. Background Art

[0002] Geological disasters such as landslides, mudslides, and earthquakes can cause significant casualties and property losses. Through risk assessment, high-risk areas can be identified and preventive measures can be taken in advance to reduce the damage that may be caused when disasters occur.

[0003] The prior art, such as the invention patent with announcement number: CN118013428B, is a method and system for assessing geological hazards risk based on artificial intelligence, including: splicing the first example category result and the newly added item category directory to obtain an example splicing directory; loading the newly added example geological hazard data into the geological hazard hazard analysis thread to perform item category analysis processing to obtain a second example category result; combining the comparison result between the second example category result and the example splicing directory, configuring the geological hazard hazard analysis thread, the configured geological hazard hazard analysis thread is used to determine the item category analysis thread, and combining the item category analysis thread to determine the geological hazard risk assessment result. In the process of thread optimization configuration, this application does not need to obtain the original example geological hazard data, but only uses the newly added example geological hazard data to configure the original item category analysis thread, which can improve the thread performance when learning new data, thereby improving the accuracy and precision of geological hazard assessment.

[0004] The prior art, such as the invention patent with announcement number: CN107957982B, is a method and system for rapid assessment of the susceptibility of post-earthquake secondary geological disasters, including determining the evaluation index of the susceptibility of post-earthquake geological disasters, digitizing each evaluation index, discretizing the continuous variables, obtaining sample points in the sample area, calculating the proportion of geological disasters in the discrete partition corresponding to the evaluation index, determining the fitting function corresponding to each evaluation index, inputting the values ​​of each evaluation index in each sample point into the corresponding fitting function, obtaining the sensitivity calculation result, determining the assessment model for rapid assessment of the susceptibility of post-earthquake secondary geological disasters, and for any point to be assessed, substituting the sensitivity calculation results corresponding to each evaluation index of the point to be assessed into the assessment model. The closer the obtained value is to 0, the less likely the assessment point is to have post-earthquake geological disasters, and the closer the obtained value is to 1, the more likely the assessment point is to have post-earthquake geological disasters. Through this invention, the accuracy of the assessment of the susceptibility of post-earthquake secondary geological disasters is improved.

[0005] From the above scheme, it can be seen that the current geological disaster risk assessment is relatively limited and not comprehensive. Usually, the monitoring area is directly evaluated as a whole. Due to the terrain differences in different geographical areas, the overall assessment cannot guarantee the accuracy of monitoring, resulting in low reliability of the assessment results. It is difficult to cope with the complex and changeable geological environment and diverse assessment needs, and the overall practicality and adaptability are insufficient. Summary of the invention

[0006] In view of the deficiencies of the prior art, the present invention provides a geological disaster risk assessment platform and method based on big data, which can effectively solve the problems involved in the above-mentioned background technology.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: On the one hand, the present invention is a geological hazard risk assessment platform based on big data, including: a regional geological data statistics module, which is used to record the area that needs geological monitoring as a pre-monitoring area, and to count the geological data of the pre-monitoring area.

[0008] The monitoring point layout module is used to layout geological disaster monitoring points based on the geological data of the pre-monitoring area and obtain the monitoring point layout data of the pre-monitoring area through analysis.

[0009] The geological monitoring module is used to carry out geological monitoring of the pre-monitoring area and obtain surface geological monitoring data and underground geological monitoring data of the pre-monitoring area.

[0010] The geological disaster risk assessment module is used to analyze and process the collected surface geological monitoring data and underground geological monitoring data of the pre-monitoring area to obtain the geological disaster risk index of the pre-monitoring area at each time point.

[0011] The geological disaster early warning module is used to assess the geological disaster risk in the pre-monitoring area according to the geological disaster risk index in the pre-monitoring area at each time point and issue early warning information.

[0012] As a preferred technical solution, the geological data of the pre-monitoring area includes topographic data and historical disaster data of the pre-monitoring area; the topographic data includes the average altitude and maximum terrain difference of the pre-monitoring area.

[0013] The historical disaster data include the historical frequency of geological disasters and the historical average monthly precipitation in the pre-monitoring area.

[0014] As an optimal technical solution, the monitoring point layout data of the pre-monitoring area is obtained through analysis, and the specific analysis process is as follows: extract the reference geological data stored in the cloud database, the reference geological data includes reference terrain data and reference historical disaster data, wherein the reference terrain data includes the reference average altitude and the reference maximum terrain difference, and the reference historical disaster data includes the reference frequency of geological disasters and the reference average monthly precipitation.

[0015] Based on the geological data and reference geological data of the pre-monitoring area, a comprehensive analysis is conducted to obtain the indicator coefficient for the layout of monitoring points in the pre-monitoring area.

[0016] The monitoring point layout indicator coefficient of the pre-monitoring area is a numerical result of quantifying the geological data and reference geological data of the pre-monitoring area, and is used to characterize the degree of demand for monitoring point layout in the pre-monitoring area.

[0017] The monitoring point layout indicator coefficients of the pre-monitoring area are matched with the monitoring point layout data corresponding to each monitoring point layout indicator coefficient interval stored in the cloud database to obtain the monitoring point layout data of the pre-monitoring area.

[0018] The monitoring point layout data of the pre-monitoring area includes the number of surface monitoring points and the number of underground monitoring points.

[0019] As an optimal technical solution, the surface geological monitoring data and underground geological monitoring data of the pre-monitoring area collected are analyzed and processed to obtain the geological disaster risk index of the pre-monitoring area at each time point. The specific analysis process is as follows: the surface geological monitoring data include the vertical displacement change, slope change, vibration frequency and soil moisture content of each surface monitoring point in the pre-monitoring area at each time point.

[0020] Based on the analysis and processing of surface geological monitoring data, the surface risk index of the pre-monitoring area at each time point is obtained.

[0021] The underground geological monitoring data include the change in groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure at each underground monitoring point in the pre-monitoring area at each time point.

[0022] Based on the analysis and processing of underground geological monitoring data, the underground risk index of the pre-monitoring area at each time point is obtained.

[0023] Based on the surface risk index of the pre-monitoring area at each time point and the underground risk index of the pre-monitoring area at each time point, a comprehensive analysis is conducted to obtain the geological hazard risk index of the pre-monitoring area at each time point.

[0024] The geological disaster risk index of the pre-monitoring area at each time point is a numerical result of quantifying the surface risk index of the pre-monitoring area at each time point and the underground risk index of the pre-monitoring area at each time point, and is used to characterize the risk level of geological disasters occurring in the pre-monitoring area.

[0025] As an optimal technical solution, the surface risk index of the pre-monitored area at each time point is specifically analyzed as follows: extract the reference surface geological monitoring data stored in the cloud database, and the reference surface geological monitoring data includes reference vertical displacement change, slope reference change, reference vibration frequency and reference soil moisture content.

[0026] Based on the surface geological monitoring data and reference surface geological monitoring data, comprehensive analysis and processing are performed to obtain the surface risk index of the pre-monitoring area at each time point.

[0027] The surface risk index of the pre-monitoring area at each time point is a numerical result of quantifying the surface geological monitoring data and the reference surface geological monitoring data, and is used to characterize the degree of geological risk of the surface of the pre-monitoring area.

[0028] As a preferred technical solution, the underground risk index of the pre-monitored area at each time point is specifically analyzed as follows: extract the reference underground geological monitoring data stored in the cloud database, and the reference underground geological monitoring data includes the reference groundwater level height change, the reference groundwater flow rate change, the reference underground temperature change and the reference underground rock and soil pressure change.

[0029] Based on the underground geological monitoring data and reference underground geological monitoring data, the underground risk index of the pre-monitoring area at each time point is obtained through comprehensive analysis and processing.

[0030] The underground risk index of the pre-monitoring area at each time point is a numerical result of quantifying the underground geological monitoring data and the reference underground geological monitoring data, and is used to characterize the degree of underground geological risk in the pre-monitoring area.

[0031] As a preferred technical solution, the geological hazard risk assessment of the pre-monitoring area is carried out and early warning information is issued. The specific process is as follows: the geological hazard risk index of the pre-monitoring area at each time point is compared with the geological hazard risk index threshold of the pre-monitoring area stored in the cloud database. If the geological hazard risk index of the pre-monitoring area at a certain time point is greater than or equal to the geological hazard risk index threshold of the pre-monitoring area, then the time point is marked as a risk time point, and early warning information is generated at the risk time point for early warning.

[0032] As a preferred technical solution, the monitoring point layout indicator coefficient of the pre-monitoring area is specifically formulated as follows: ,

[0033] , , , ,

[0034] in, Set indicator coefficients for monitoring points in the pre-monitoring area. is the characterization factor of the average altitude, is the maximum terrain difference characterization factor, is the factor representing the frequency of historical geological disasters, is the characterization factor of historical monthly average precipitation, is the average altitude of the pre-monitoring area, For reference, the average altitude is is the maximum terrain difference in the pre-monitoring area, is the reference maximum terrain difference, To monitor the frequency of historical geological disasters in the region, For reference to the frequency of geological disasters, is the historical average monthly precipitation in the pre-monitoring area. For reference, the average monthly precipitation is is the average altitude weight, is the maximum terrain difference weight, is the frequency weight of historical geological disasters, is the weight of historical monthly average precipitation, is a natural constant.

[0035] As a preferred technical solution, the specific formula of the geological disaster risk index of the pre-monitoring area at each time point is as follows:

[0036] ,in, is the geological disaster risk index of the pre-monitoring area at the i-th time point, is the surface risk index of the pre-monitoring area at the i-th time point, is the underground risk index of the pre-monitoring area at the i-th time point, is the surface risk index weight, is the underground risk index weight, i is the number of each time point, , m is the number of time points, is a natural constant.

[0037] The second aspect of the present invention provides a geological disaster risk assessment method based on big data, comprising the following steps: S1, recording the area that needs geological monitoring as a pre-monitoring area, and collecting statistics on the geological data of the pre-monitoring area.

[0038] S2, according to the geological data of the pre-monitoring area, the monitoring point layout data of the pre-monitoring area is obtained through analysis, thereby arranging geological disaster monitoring points based on the monitoring point layout data of the pre-monitoring area.

[0039] S3, conducting geological monitoring on the pre-monitoring area to obtain surface geological monitoring data and underground geological monitoring data of the pre-monitoring area.

[0040] S4, analyzing and processing the collected surface geological monitoring data and underground geological monitoring data of the pre-monitoring area to obtain the geological disaster risk index of the pre-monitoring area at each time point.

[0041] S5. According to the geological disaster risk index of the pre-monitoring area at each time point, conduct a geological disaster risk assessment on the pre-monitoring area and issue early warning information.

[0042] Compared with the prior art, the embodiments of the present invention have at least the following beneficial effects:

[0043] (1) The present invention provides a geological disaster risk assessment platform and method based on big data, conducts a comprehensive analysis of the geological conditions in the pre-monitoring area and performs accurate risk assessment, thereby improving the monitoring and early warning level of geological disasters, further enhancing the comprehensiveness of regional monitoring, and fully ensuring the scientificity and timeliness of geological disaster risk assessment.

[0044] (2) The present invention arranges geological disaster monitoring points based on the monitoring point layout data of the pre-monitoring area, which effectively improves the rationality and scientificity of the monitoring point layout, and can obtain geological data more comprehensively and accurately, providing a solid data foundation for subsequent risk assessment and early warning work.

[0045] (3) The present invention realizes dynamic tracking and accurate assessment of geological disaster risks by analyzing the geological disaster risk index of the pre-monitoring area at each time point, and can timely discover potential risk change trends, providing a key basis for taking effective preventive measures and emergency response.

[0046] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a schematic diagram of system module connection of the present invention.

[0048] Figure 2 It is a schematic diagram of the method flow of the present invention.

[0049] Figure 3 It is a scatter plot of the relationship between the surface risk index of the pre-monitoring area and the geological disaster risk index of the pre-monitoring area involved in the embodiment of the present invention. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] See also Figure 1 As shown, the first aspect of an embodiment of the present invention provides a geological disaster risk assessment platform based on big data, including: a regional geological data statistics module, which is used to record the area that needs geological monitoring as a pre-monitoring area, and to count the geological data of the pre-monitoring area.

[0052] In this embodiment, the geological data of the pre-monitoring area includes topographic data and historical disaster data of the pre-monitoring area.

[0053] The terrain data include the average altitude and the maximum terrain difference of the pre-monitoring area, and the historical disaster data include the historical frequency of geological disasters and the historical average monthly precipitation in the pre-monitoring area.

[0054] It should be understood that the terrain data of the pre-monitoring area is collected by a laser ranging sensor, and in an embodiment, it can also be directly extracted from a geographic mapping platform corresponding to the area.

[0055] It should also be noted that the average altitude is obtained by measuring the height of the monitoring points with a laser rangefinder, and then calculating the average value after obtaining the height data of each measuring point.

[0056] The maximum terrain difference is obtained by comparing the altitude values ​​of all measuring points, finding the maximum value and the minimum value therein, and then calculating the difference between the two.

[0057] In this embodiment, the statistical geological data of the pre-monitoring area refers to the comprehensive collection and organization of geological data in the area. Through the accurate statistics of these geological data, a solid and reliable foundation can be provided for the subsequent deployment of monitoring points, geological disaster risk assessment and early warning, thereby improving the scientificity and effectiveness of geological disaster prevention and control work.

[0058] The monitoring point layout module is used to layout geological disaster monitoring points based on the geological data of the pre-monitoring area and obtain the monitoring point layout data of the pre-monitoring area through analysis.

[0059] The present invention arranges geological disaster monitoring points based on the monitoring point layout data of the pre-monitoring area, which effectively improves the rationality and scientificity of the monitoring point layout, can obtain geological data more comprehensively and accurately, and provides a solid data foundation for subsequent risk assessment and early warning work.

[0060] In this embodiment, the monitoring point layout data of the pre-monitoring area is obtained through analysis, and the specific analysis process is as follows: extract the reference geological data stored in the cloud database, the reference geological data includes reference terrain data and reference historical disaster data, wherein the reference terrain data includes the reference average altitude and the reference maximum terrain difference, and the reference historical disaster data includes the reference frequency of geological disasters and the reference average monthly precipitation.

[0061] It should be noted that the cloud database is used to store reference indicator data, and the reference indicator data includes first reference indicator data, second reference indicator data and third reference indicator data.

[0062] The first reference indicator data includes reference geological data and monitoring point layout data corresponding to the indicator coefficient interval of each monitoring point layout, reference surface geological monitoring data and reference underground geological monitoring data, and also includes the threshold value of the geological disaster risk index in the pre-monitoring area.

[0063] The second reference indicator data includes the weight of the average altitude, the weight of the maximum terrain difference, the weight of the frequency of historical geological disasters and the weight of the historical average monthly precipitation, as well as the weight of the vertical displacement change, the weight of the slope change, the weight of the vibration frequency, the weight of the soil moisture content, and the weight of the groundwater level height, the weight of the groundwater flow velocity, the temperature weight and the pressure weight.

[0064] The third reference indicator data includes a surface risk index weight and an underground risk index weight.

[0065] It should be noted that the reference data stored in the above-mentioned cloud database is collected through a large amount of field monitoring and experiments, and is obtained by integrating research results in related fields.

[0066] Based on the geological data and reference geological data of the pre-monitoring area, a comprehensive analysis is conducted to obtain the indicator coefficient for the layout of monitoring points in the pre-monitoring area.

[0067] The monitoring point layout indicator coefficient of the pre-monitoring area is a numerical result of quantifying the geological data and reference geological data of the pre-monitoring area, and is used to characterize the degree of demand for monitoring point layout in the pre-monitoring area.

[0068] In a specific embodiment, the monitoring point layout indicator coefficient of the pre-monitoring area is specifically formulated as follows:

[0069] ,

[0070] , , , ,

[0071] in, Set indicator coefficients for monitoring points in the pre-monitoring area. is the characterization factor of the average altitude, is the maximum terrain difference characterization factor, is the factor representing the frequency of historical geological disasters, is the characterization factor of historical monthly average precipitation, is the average altitude of the pre-monitoring area, For reference, the average altitude is is the maximum terrain difference in the pre-monitoring area, is the reference maximum terrain difference, To monitor the frequency of historical geological disasters in the region, For reference to the frequency of geological disasters, is the historical average monthly precipitation in the pre-monitoring area. For reference, the average monthly precipitation is is the average altitude weight, is the maximum terrain difference weight, is the frequency weight of historical geological disasters, is the weight of historical monthly average precipitation, is a natural constant.

[0072] It should be noted that the weight of the average altitude, the weight of the maximum terrain difference, the weight of the frequency of historical geological disasters, and the weight of the historical average monthly precipitation all have a value range between 0 and 1, and are pre-set values ​​extracted directly from the database. In a specific embodiment, a mapping comparison set of the average altitude, the maximum terrain difference, the frequency of historical geological disasters, and the historical average monthly precipitation and the weights can be constructed through historical data according to the relationship between the average altitude, the maximum terrain difference, the frequency of historical geological disasters, and the historical average monthly precipitation and the monitoring point layout indicator coefficients of the pre-monitoring area, and the actual average altitude, the maximum terrain difference, the frequency of historical geological disasters, and the historical average monthly precipitation are input one by one into the corresponding mapping comparison set, and the weight of the average altitude, the maximum terrain difference, the frequency of historical geological disasters, and the historical average monthly precipitation are obtained through the mapping comparison set.

[0073] It should also be noted that in this embodiment, the monitoring point layout indicator coefficient of the pre-monitoring area is obtained by processing the average altitude, maximum terrain difference, historical frequency of geological disasters and historical average monthly precipitation of the pre-monitoring area. The mutual influence between these parameters is taken into account. For example, a higher average altitude may be associated with a more complex geological structure, thereby increasing the potential risk of geological disasters. The size of the maximum terrain difference will affect the distribution of geological stress and thus affect the possibility of geological disasters. The frequency of historical geological disasters directly reflects the geological stability of the area, while the amount of historical average monthly precipitation will affect the stability of the rock and soil body. The monitoring point layout indicator coefficient obtained by comprehensively analyzing the average altitude, maximum terrain difference, historical frequency of geological disasters and historical average monthly precipitation can reflect the potential risk status of geological disasters in the pre-monitoring area and indirectly affect the decision-making of monitoring point layout. If the geological conditions in the pre-monitoring area are relatively complex, even if there are no obvious signs of disasters at present, the layout of monitoring points should be optimized to ensure that potential geological changes can be monitored comprehensively and accurately to avoid the inability to issue timely warnings or take countermeasures due to insufficient monitoring. If the decision on the layout of monitoring points is unreasonable, the best time to discover and respond to geological disasters in advance may be missed.

[0074] Taking the four different data involved in this embodiment as an example, when the frequency of historical geological disasters in these four pre-monitoring areas is 3 times per year and the historical average monthly precipitation in the pre-monitoring areas is 150 mm, the reference average altitude is defined as 1000 meters, the reference maximum terrain difference is defined as 300 meters, the reference frequency of geological disasters is defined as 1 time per year, the reference average monthly precipitation is defined as 100 mm, the average altitude weight is defined as 0.2, the maximum terrain difference weight is defined as 0.1, the historical geological disaster frequency weight is defined as 0.4, and the historical average monthly precipitation weight is defined as 0.3. Based on the different average altitudes of the pre-monitoring areas and the maximum terrain differences of the pre-monitoring areas, the monitoring point layout indicator coefficients of the pre-monitoring areas are obtained by processing as shown in the following table:

[0075] Table 1 Monitoring point layout indicator coefficients in the pre-monitoring area

[0076]

[0077] Combined with the above table, it can be seen that the monitoring point layout indicator coefficient of the fourth group of pre-monitoring areas is at the highest value, indicating that compared with other groups, the fourth group of pre-monitoring areas has the most urgent need for the layout of monitoring points. In a specific embodiment, in areas with high altitudes and large terrain differences, there may be a variety of geological structures, such as faults and folds. These geological structures increase the possibility of disasters such as rock fractures, landslides and mud-rock flows. Therefore, more monitoring points are needed to accurately capture these potential dangers.

[0078] A high monitoring point layout indicator coefficient usually means that under the same conditions, the area requires a more dense and precise monitoring point layout. It also means that there may be complex geological conditions and high potential risks, requiring increased investment in monitoring equipment and optimization of the distribution of monitoring points. At the same time, more manpower and technical resources should be invested in the analysis and processing of monitoring data to ensure that the geological changes in the area can be grasped in a timely and accurate manner, ensuring the safety and stability of the region and the rational and efficient use of resources.

[0079] By analyzing the monitoring point layout indicator coefficients in the pre-monitoring area, the present invention can plan the layout of the monitoring points more scientifically and reasonably, thereby improving the accuracy and comprehensiveness of the monitoring data and laying a solid foundation for the accurate assessment of geological disaster risks.

[0080] The monitoring point layout indicator coefficients of the pre-monitoring area are matched with the monitoring point layout data corresponding to each monitoring point layout indicator coefficient interval stored in the cloud database to obtain the monitoring point layout data of the pre-monitoring area.

[0081] It should be noted that the monitoring point layout indicator coefficient of the pre-monitoring area is matched with the monitoring point layout data corresponding to the intervals of the monitoring point layout indicator coefficients stored in the cloud database. The specific process is as follows: the monitoring point layout indicator coefficient of the pre-monitoring area is compared with the intervals of the monitoring point layout indicator coefficients stored in the cloud database one by one. If the monitoring point layout indicator coefficient of the pre-monitoring area falls within a certain interval, it is considered that the coefficient matches the interval, and the monitoring point layout data corresponding to the interval stored in the cloud database is obtained.

[0082] The monitoring point layout data of the pre-monitoring area includes the number of surface monitoring points and the number of underground monitoring points.

[0083] The geological monitoring module is used to carry out geological monitoring of the pre-monitoring area and obtain surface geological monitoring data and underground geological monitoring data of the pre-monitoring area.

[0084] In this embodiment, the surface geological monitoring data includes the vertical displacement change, slope change, vibration frequency and soil moisture content of each surface monitoring point in the pre-monitoring area at each time point.

[0085] It should be noted that the time points refer to nodes with certain time intervals that are pre-set in the pre-monitoring area.

[0086] It should be understood that the surface geological monitoring data is collected by a surface geological monitoring sensor device, which includes a displacement sensor, a slope sensor, a vibration frequency sensor and a neutron moisture meter.

[0087] The neutron moisture meter determines the soil moisture content by measuring the scattering and slowing down of slow neutrons.

[0088] The vertical displacement change refers to the difference between the vertical displacement of the ground surface at the current time point in the pre-monitoring area and the vertical displacement of the ground surface at the previous time point.

[0089] The slope change refers to the difference between the slope of the ground surface at the current time point in the pre-monitoring area and the slope of the ground surface at the previous time point.

[0090] The underground geological monitoring data include the change in groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure at each underground monitoring point in the pre-monitoring area at each time point.

[0091] It should be understood that the underground geological monitoring data is collected by underground geological monitoring sensing devices, and the underground geological monitoring sensing devices include pressure water level gauges, electromagnetic flow velocity sensors, thermistor temperature sensors and strain gauge pressure sensors.

[0092] The pressure water level gauge calculates the underground water level by measuring the pressure of water on the sensor probe.

[0093] The electromagnetic flow velocity sensor measures groundwater flow velocity based on the principle of electromagnetic induction.

[0094] The changes in groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure are all obtained by subtracting the groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure at the previous time point from the groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure at the current time point.

[0095] The geological disaster risk assessment module is used to analyze and process the collected surface geological monitoring data and underground geological monitoring data of the pre-monitoring area to obtain the geological disaster risk index of the pre-monitoring area at each time point.

[0096] In this embodiment, the analysis and processing obtains the geological disaster risk index of the pre-monitoring area at each time point. The specific analysis process is as follows: based on the surface geological monitoring data, the surface risk index of the pre-monitoring area at each time point is obtained through analysis and processing.

[0097] In this embodiment, the surface risk index of the pre-monitored area at each time point is specifically analyzed as follows: extract the reference surface geological monitoring data stored in the cloud database, and the reference surface geological monitoring data includes a reference vertical displacement change, a reference slope change, a reference vibration frequency and a reference soil moisture content.

[0098] Based on the surface geological monitoring data and reference surface geological monitoring data, comprehensive analysis and processing are performed to obtain the surface risk index of the pre-monitoring area at each time point.

[0099] The surface risk index of the pre-monitoring area at each time point is a numerical result of quantifying the surface geological monitoring data and the reference surface geological monitoring data, and is used to characterize the degree of geological risk of the surface of the pre-monitoring area.

[0100] In a specific embodiment, the surface risk index of the pre-monitored area at each time point is specifically expressed as follows:

[0101] ,

[0102] , ,

[0103] , ,

[0104] in, is the surface risk index of the pre-monitoring area at the i-th time point, Determine the characterization factor for the vertical displacement change of the jth surface monitoring point at the i-th time point, Determine the characteristic factor for the slope change of the jth surface monitoring point at the i-th time point, is the vibration frequency determination characterization factor of the jth surface monitoring point at the i-th time point, is the soil moisture content characterization factor of the jth surface monitoring point at the i-th time point, is the vertical displacement change of the jth surface monitoring point in the pre-monitoring area at the i-th time point, is the reference vertical displacement change, is the slope change of the jth surface monitoring point in the pre-monitoring area at the i-th time point, is the reference slope change, is the vibration frequency of the jth surface monitoring point in the pre-monitoring area at the i-th time point, is the reference vibration frequency, is the soil moisture content of the jth surface monitoring point in the pre-monitoring area at the i-th time point, is the reference soil moisture content, is the weight of vertical displacement change, is the slope change weight, is the vibration frequency weight, is the weight of soil moisture content, i is the number of each time point, , m is the number of time points, j is the number of each surface monitoring point, , n is the number of surface monitoring points, and e is a natural constant.

[0105] It should be noted that the vertical displacement change weight, slope change weight, vibration frequency weight, and soil moisture content weight all have a value range between 0 and 1, and are pre-set values ​​extracted directly from the database. In a specific embodiment, historical data can be used to construct a mapping comparison set of vertical displacement change, slope change, vibration frequency, and soil moisture content and weights based on the relationship between the vertical displacement change, slope change, vibration frequency, and soil moisture content and the surface risk index, and the actual vertical displacement change, slope change, vibration frequency, and soil moisture content are input one by one into the corresponding mapping comparison set, and the vertical displacement change weight, slope change weight, vibration frequency weight, and soil moisture content weight are obtained through the mapping comparison set.

[0106] It should also be noted that in this embodiment, the surface risk index of the pre-monitoring area at each time point is obtained by processing the vertical displacement change, slope change, vibration frequency and soil moisture content of each surface monitoring point in the pre-monitoring area at each time point. This is based on the mutual influence between these parameters. For example, a large vertical displacement change may indicate instability of the stratum, thereby increasing the surface risk. An increase in the slope change will change the stress conditions of the surface and may cause disasters such as landslides. Abnormal vibration frequency may be related to underground activities or external vibration sources, posing a threat to surface stability. An increase in soil moisture content will reduce the integrity of the surface. The surface risk index obtained by comprehensively analyzing the change in vertical displacement, slope, vibration frequency and soil moisture content can reflect the surface stability of the pre-monitoring area at each time point and indirectly affect the subsequent risk response decisions. If the changes in these parameters in the pre-monitoring area at a certain time point are more complex, even if there is no obvious surface damage at present, monitoring and analysis should be strengthened to ensure that potential risks can be discovered in time to avoid the occurrence or expansion of disasters due to negligence. If the judgment and response decision of the surface risk index are unreasonable, the best time to take protective and control measures in advance may be missed.

[0107] By analyzing the surface risk index of the pre-monitoring area at each time point, the present invention can clearly grasp the changing rules and trends of surface risks, help identify potential dangerous areas and risk peaks in advance, and provide strong support for formulating targeted prevention and response strategies.

[0108] In this embodiment, the underground risk index of the pre-monitoring area at each time point is obtained based on the analysis and processing of the underground geological monitoring data.

[0109] The specific analysis process of the underground risk index of the pre-monitoring area at each time point is as follows: extract the reference underground geological monitoring data stored in the cloud database, and the reference underground geological monitoring data includes the reference groundwater level height change, the reference groundwater flow rate change, the reference underground temperature change and the reference underground rock and soil pressure change.

[0110] In a specific embodiment, the underground risk index of the pre-monitored area at each time point is specifically expressed as follows:

[0111] ,

[0112] , ,

[0113] , ,

[0114] in, is the underground risk index of the pre-monitoring area at the i-th time point, Determine the characterization factor for the change in groundwater level at the kth underground monitoring point at the i-th time point, is the characterization factor for the change in groundwater velocity at the kth underground monitoring point at the i-th time point, Determine the characterization factor for the temperature change of the kth underground monitoring point at the i-th time point, Determine the characterization factor for the pressure change at the kth underground monitoring point at the i-th time point, is the groundwater level height of the kth underground monitoring point in the pre-monitoring area at the i-th time point, is the reference groundwater level change, is the groundwater velocity of the kth underground monitoring point in the pre-monitoring area at the i-th time point, is the reference groundwater velocity change, is the underground temperature change of the kth underground monitoring point in the pre-monitoring area at the i-th time point, is the reference underground temperature change, is the change in underground rock and soil pressure at the kth underground monitoring point in the pre-monitoring area at the i-th time point, is the reference underground rock and soil pressure change. is the groundwater level height weight, is the groundwater flow velocity weight, is the temperature weight, is the pressure weight, i is the number of each time point, , m is the number of time points, k is the number of underground monitoring points, , s is the number of underground monitoring points, and e is a natural constant.

[0115] It should be noted that the groundwater level weight, groundwater flow rate weight, temperature weight and pressure weight all have a value range between 0 and 1, and are pre-set values ​​extracted directly from the database. In a specific embodiment, historical data can be used to construct a mapping comparison set of groundwater level, groundwater flow rate, temperature and pressure with weights based on the relationship between groundwater level, groundwater flow rate, temperature and pressure and the underground risk index, and the actual groundwater level, groundwater flow rate, temperature and pressure are input into the corresponding mapping comparison set one by one, and the groundwater level weight, groundwater flow rate weight, temperature weight and pressure weight are obtained through the mapping comparison set.

[0116] It should also be noted that in this embodiment, the underground risk index of the pre-monitoring area at each time point is obtained by processing the change in groundwater level height, groundwater flow rate, underground temperature and underground rock and soil pressure at each underground monitoring point in the pre-monitoring area at each time point. This takes into account the mutual influence between these parameters. For example, a significant change in groundwater level height may lead to changes in the structure of the rock and soil body, increasing the risk of underground cavities or collapse. Changes in groundwater flow rate will affect the stability of the rock and soil body and accelerate the erosion or scouring process. Abnormal fluctuations in underground temperature may be related to geothermal activity or external heat exchange, affecting the rock and soil. The physical and mechanical properties of underground rock and soil pressure may cause deformation and rupture of rock and soil. The underground risk index obtained by comprehensively analyzing the changes in groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure can reflect the underground stability of the pre-monitoring area at various time points and indirectly affect the corresponding risk prevention decisions. If these parameters in the pre-monitoring area fluctuate greatly at a certain time point, even if there is no obvious underground accident at present, we must be vigilant, strengthen monitoring and evaluation, ensure that potential dangers can be detected in time, and avoid serious underground disasters due to neglect.

[0117] By analyzing the underground risk index of the pre-monitoring area at each time point, the present invention can deeply understand the evolution trend of underground geological conditions, timely detect potential risks underground, and provide a reliable reference basis for taking effective underground engineering protection and resource development measures.

[0118] In this embodiment, the underground risk index of the pre-monitoring area at each time point is obtained through comprehensive analysis and processing based on the underground geological monitoring data and the reference underground geological monitoring data.

[0119] The underground risk index of the pre-monitoring area at each time point is a numerical result of quantifying the underground geological monitoring data and the reference underground geological monitoring data, and is used to characterize the degree of underground geological risk in the pre-monitoring area.

[0120] Based on the surface risk index of the pre-monitoring area at each time point and the underground risk index of the pre-monitoring area at each time point, a comprehensive analysis is conducted to obtain the geological hazard risk index of the pre-monitoring area at each time point.

[0121] The geological disaster risk index of the pre-monitoring area at each time point is a numerical result of quantifying the surface risk index of the pre-monitoring area at each time point and the underground risk index of the pre-monitoring area at each time point, and is used to characterize the risk level of geological disasters occurring in the pre-monitoring area.

[0122] In a specific embodiment, the geological disaster risk index of the pre-monitoring area at each time point is specifically formulated as follows:

[0123] ,in, is the geological disaster risk index of the pre-monitoring area at the i-th time point, is the surface risk index of the pre-monitoring area at the i-th time point, is the underground risk index of the pre-monitoring area at the i-th time point, is the surface risk index weight, is the underground risk index weight, i is the number of each time point, , m is the number of time points, is a natural constant.

[0124] It should be noted that the surface risk index weight and the underground risk index weight both have a value range of 0 to 1, and are pre-set values ​​extracted directly from the database. In a specific embodiment, historical data can be used to construct a mapping comparison set of the surface risk index, the underground risk index and the weight based on the relationship between the surface risk index, the underground risk index and the geological hazard risk index, and the actual surface risk index and the underground risk index are input into the corresponding mapping comparison set one by one, and the surface risk index weight and the underground risk index weight are obtained through the mapping comparison set.

[0125] It should also be noted that in this embodiment, the geological disaster risk index of the pre-monitoring area at each time point is obtained by processing the surface risk index and underground risk index of the pre-monitoring area at each time point, taking into account the mutual influence between these parameters. For example, a higher surface risk index may mean that the instability of the surface is increased, which is easy to cause disasters such as landslides and collapses, while a higher underground risk index may imply the fragility of the underground structure, and there are dangers such as ground subsidence and karst collapse. The combined effect of the surface risk index and the underground risk index will significantly affect the probability and severity of geological disasters. The geological disaster risk index obtained by comprehensively analyzing the surface risk index and the underground risk index can fully reflect the potential risk status of geological disasters in the pre-monitoring area at each time point, and directly provide key basis for disaster prevention and response strategies. If at a certain time point, both the surface and underground risk indices are high, even if there are no obvious signs of disasters, it is necessary to attach great importance to strengthen monitoring, early warning and emergency preparedness to ensure that possible geological disasters can be responded to in a timely and effective manner to avoid major losses due to insufficient preparation.

[0126] See also Figure 3 As shown, the relationship between the surface risk index of the pre-monitoring area and the geological disaster risk index of the pre-monitoring area involved in the embodiment of the present invention is a scatter diagram, wherein the horizontal axis is the surface risk index of the pre-monitoring area, and the vertical axis is the geological disaster risk index of the pre-monitoring area. The multiple scattered points in the figure are the surface risk index of the pre-monitoring area measured at different time points involved in this embodiment and the geological disaster risk index of the pre-monitoring area measured at the corresponding time points. It can be clearly seen from the figure that with the increase of the surface risk index of the pre-monitoring area, the geological disaster risk index of the pre-monitoring area generally shows an upward trend. This shows that when the instability of the surface increases, the risk of geological disasters in the entire area also increases accordingly. Specifically, the increase in the surface risk index may mean that the topography of the surface has changed, such as the formation of steep slopes, the increase in the landslide surface of the mountain, the expansion of surface cracks, etc. These changes will weaken the structural stability of the surface, making the geological body more susceptible to displacement, collapse and other disaster phenomena under the action of external factors. However, the distribution of the scattered points does not show a strict linear relationship, but has a certain degree of discreteness. This reflects that in the actual pre-monitoring area environment, in addition to the surface risk index, there are many other factors that will affect the geological hazard risk index. For example, the complexity of the underground geological structure, the physical and mechanical properties of the rock and soil, the impact of human activities, and the frequency of regional seismic activities will also interfere with the size of the geological hazard risk index to a certain extent.

[0127] The present invention realizes dynamic tracking and accurate assessment of geological disaster risks by analyzing the geological disaster risk index of the pre-monitoring area at each time point, can timely discover potential risk change trends, and provides a key basis for taking effective preventive measures and emergency response.

[0128] The geological disaster early warning module is used to assess the geological disaster risk in the pre-monitoring area according to the geological disaster risk index in the pre-monitoring area at each time point and issue early warning information.

[0129] In this embodiment, the geological hazard risk assessment of the pre-monitoring area is carried out, and early warning information is issued. The specific process is as follows: the geological hazard risk index of the pre-monitoring area at each time point is compared with the geological hazard risk index threshold of the pre-monitoring area stored in the cloud database. If the geological hazard risk index of the pre-monitoring area at a certain time point is greater than or equal to the geological hazard risk index threshold of the pre-monitoring area, then the time point is marked as a risk time point, and early warning information is generated at the risk time point for early warning.

[0130] Taking this embodiment as an example, the warning information is specifically: the geological disaster risk index of the current pre-monitoring area has reached or exceeded the preset threshold, and you need to be highly vigilant and take corresponding preventive measures immediately. There may be a high risk of geological disasters in this area, which may pose a threat to the safety of people and property. Please take timely action to reduce potential losses and ensure the stability and safety of the area.

[0131] See also Figure 2 As shown, the second aspect of an embodiment of the present invention provides a geological disaster risk assessment method based on big data, including the following steps: S1, recording the area that needs geological monitoring as a pre-monitoring area, and collecting statistics on the geological data of the pre-monitoring area.

[0132] S2, according to the geological data of the pre-monitoring area, the monitoring point layout data of the pre-monitoring area is obtained through analysis, thereby arranging geological disaster monitoring points based on the monitoring point layout data of the pre-monitoring area.

[0133] S3, conducting geological monitoring on the pre-monitoring area to obtain surface geological monitoring data and underground geological monitoring data of the pre-monitoring area.

[0134] S4, analyzing and processing the collected surface geological monitoring data and underground geological monitoring data of the pre-monitoring area to obtain the geological disaster risk index of the pre-monitoring area at each time point.

[0135] S5. According to the geological disaster risk index of the pre-monitoring area at each time point, conduct a geological disaster risk assessment on the pre-monitoring area and issue early warning information.

[0136] The present invention provides a geological disaster risk assessment platform and method based on big data, conducts a comprehensive analysis of the geological conditions in the pre-monitoring area and performs accurate risk assessment, thereby improving the monitoring and early warning level of geological disasters, further enhancing the comprehensiveness of regional monitoring, and fully ensuring the scientificity and timeliness of geological disaster risk assessment.

[0137] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0138] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. As long as they do not deviate from the structure of the present invention or exceed the scope defined by the present invention, they should all belong to the protection scope of the present invention.

Claims

1. A geological disaster risk assessment platform based on big data, characterized by: include: A regional geological data statistics module is used to record the area that needs geological monitoring as a pre-monitoring area and to count the geological data of the pre-monitoring area; A monitoring point layout module is used to obtain monitoring point layout data of the pre-monitoring area according to the geological data of the pre-monitoring area through analysis, thereby arranging geological disaster monitoring points based on the monitoring point layout data of the pre-monitoring area; The geological monitoring module is used to perform geological monitoring on the pre-monitoring area and obtain surface geological monitoring data and underground geological monitoring data of the pre-monitoring area; The geological disaster risk assessment module is used to analyze and process the collected surface geological monitoring data and underground geological monitoring data of the pre-monitoring area to obtain the geological disaster risk index of the pre-monitoring area at each time point; The geological disaster early warning module is used to assess the geological disaster risk in the pre-monitoring area according to the geological disaster risk index in the pre-monitoring area at each time point and issue early warning information; The geological data of the pre-monitoring area includes topographic data and historical disaster data of the pre-monitoring area; The terrain data includes the average altitude and the maximum terrain difference of the pre-monitoring area; The historical disaster data include the historical frequency of geological disasters and the historical average monthly precipitation in the pre-monitoring area; The monitoring point layout data of the pre-monitoring area is obtained through analysis, and the specific analysis process is as follows: Extracting reference geological data stored in a cloud database, wherein the reference geological data includes reference terrain data and reference historical disaster data, wherein the reference terrain data includes a reference average altitude and a reference maximum terrain difference, and the reference historical disaster data includes a reference frequency of occurrence of geological disasters and a reference average monthly precipitation; Based on the geological data and reference geological data of the pre-monitoring area, the monitoring point layout indicator coefficient of the pre-monitoring area is obtained through comprehensive analysis; The monitoring point layout indicator coefficient of the pre-monitoring area is a numerical result of quantifying the geological data and reference geological data of the pre-monitoring area, and is used to characterize the degree of demand for monitoring point layout in the pre-monitoring area; Matching the monitoring point layout indicator coefficient of the pre-monitoring area with the monitoring point layout data corresponding to each monitoring point layout indicator coefficient interval stored in the cloud database to obtain the monitoring point layout data of the pre-monitoring area; The monitoring point layout data of the pre-monitoring area includes the number of surface monitoring points and the number of underground monitoring points; The surface geological monitoring data and underground geological monitoring data of the pre-monitoring area collected are analyzed and processed to obtain the geological disaster risk index of the pre-monitoring area at each time point. The specific analysis process is as follows: The surface geological monitoring data include the vertical displacement change, slope change, vibration frequency and soil moisture content of each surface monitoring point in the pre-monitoring area at each time point; Based on the analysis and processing of surface geological monitoring data, the surface risk index of the pre-monitoring area at each time point is obtained; The underground geological monitoring data includes the change in groundwater level height, groundwater flow velocity, underground temperature and underground rock and soil pressure at each underground monitoring point in the pre-monitoring area at each time point; Based on the analysis and processing of underground geological monitoring data, the underground risk index of the pre-monitoring area at each time point is obtained; Based on the surface risk index of the pre-monitoring area at each time point and the underground risk index of the pre-monitoring area at each time point, a comprehensive analysis is performed to obtain the geological disaster risk index of the pre-monitoring area at each time point; The geological disaster risk index of the pre-monitoring area at each time point is a numerical result of quantifying the surface risk index of the pre-monitoring area at each time point and the underground risk index of the pre-monitoring area at each time point, and is used to characterize the risk level of geological disasters occurring in the pre-monitoring area; The specific analysis process of the surface risk index of the pre-monitoring area at each time point is as follows: Extracting reference surface geological monitoring data stored in a cloud database, wherein the reference surface geological monitoring data includes reference vertical displacement change, reference slope change, reference vibration frequency, and reference soil moisture content; Based on the surface geological monitoring data and reference surface geological monitoring data, the surface risk index of the pre-monitoring area at each time point is obtained through comprehensive analysis and processing; The surface risk index of the pre-monitoring area at each time point is a numerical result of quantifying the surface geological monitoring data and the reference surface geological monitoring data, and is used to characterize the degree of geological risk of the surface of the pre-monitoring area; The specific analysis process of the underground risk index of the pre-monitoring area at each time point is as follows: Extracting reference underground geological monitoring data stored in a cloud database, wherein the reference underground geological monitoring data includes a reference groundwater level height change, a reference groundwater flow velocity change, a reference underground temperature change, and a reference underground rock and soil pressure change; Based on the underground geological monitoring data and reference underground geological monitoring data, the underground risk index of the pre-monitoring area at each time point is obtained through comprehensive analysis and processing; The underground risk index of the pre-monitoring area at each time point is a numerical result of quantifying the underground geological monitoring data and the reference underground geological monitoring data, and is used to characterize the degree of underground geological risk in the pre-monitoring area; The monitoring point layout indicator coefficient of the pre-monitoring area is as follows: , , , , , in, Set indicator coefficients for monitoring points in the pre-monitoring area. is the characterization factor of the average altitude, is the maximum terrain difference characterization factor, is the factor representing the frequency of historical geological disasters, is the characterization factor of historical monthly average precipitation, is the average altitude of the pre-monitoring area, For reference, the average altitude is is the maximum terrain difference in the pre-monitoring area, is the reference maximum terrain difference, To monitor the frequency of historical geological disasters in the region, For reference to the frequency of geological disasters, is the historical average monthly precipitation in the pre-monitoring area. For reference, the average monthly precipitation is is the average altitude weight, is the maximum terrain difference weight, is the frequency weight of historical geological disasters, is the weight of historical monthly average precipitation, is a natural constant; The specific formula of the geological disaster risk index of the pre-monitoring area at each time point is as follows: , in, is the geological disaster risk index of the pre-monitoring area at the i-th time point, is the surface risk index of the pre-monitoring area at the i-th time point, is the underground risk index of the pre-monitoring area at the i-th time point, is the surface risk index weight, is the underground risk index weight, i is the number of each time point, , m is the number of time points, is a natural constant.

2. The geological disaster risk assessment platform based on big data according to claim 1 is characterized by: The specific process of conducting geological disaster risk assessment in the pre-monitoring area and issuing early warning information is as follows: The geological hazard risk index of the pre-monitoring area at each time point is compared with the threshold of the geological hazard risk index of the pre-monitoring area stored in the cloud database. If the geological hazard risk index of the pre-monitoring area at a certain time point is greater than or equal to the threshold of the geological hazard risk index of the pre-monitoring area, the time point is marked as a risk time point, and warning information is generated at the risk time point for warning.

3. A method for applying the geological disaster risk assessment platform based on big data as described in any one of claims 1-2, characterized in that: The following steps are involved: S1, record the area that needs geological monitoring as the pre-monitoring area, and collect the geological data of the pre-monitoring area; S2, according to the geological data of the pre-monitoring area, and by analyzing the monitoring point layout data of the pre-monitoring area, the geological disaster monitoring points are laid out based on the monitoring point layout data of the pre-monitoring area; S3, performing geological monitoring on the pre-monitoring area to obtain surface geological monitoring data and underground geological monitoring data of the pre-monitoring area; S4, analyzing and processing the collected surface geological monitoring data and underground geological monitoring data of the pre-monitoring area to obtain the geological disaster risk index of the pre-monitoring area at each time point; S5. According to the geological disaster risk index of the pre-monitoring area at each time point, conduct a geological disaster risk assessment on the pre-monitoring area and issue early warning information.

Citation Information

Patent Citations

  • Rapid assessment methods and systems for the susceptibility to secondary geological hazards after earthquakes

    CN107957982B

  • Geological hazard risk assessment method and system based on artificial intelligence

    CN118013428B

  • Geological disaster early warning method and system

    CN108109346A

  • Regional land subsidence early warning method based on multi-source heterogeneous data

    CN114812496A