A composite tension insulator manufacturing method and equipment

By preheating and cleaning the steel with guide cylinders and ventilation groove systems in composite tension insulator manufacturing equipment, the problem of deformation and cracks of steel during bending is solved, manufacturing quality and efficiency are improved, and energy consumption is reduced.

CN118645322BActive Publication Date: 2024-12-20江西佳鸿电瓷制造有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410925146.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-12-20
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

The existing composite tension insulator production equipment does not preheat the steel during bending treatment, resulting in deformation or cracks of the steel and reducing working efficiency.

Method used

The method of preheating the steel is adopted to provide high-temperature gas for heating and cleaning through the guide cylinder and ventilation tank system to ensure that the steel is subjected to uniform force when bending, avoid deformation and cracks, and achieve continuous production at the same time.

Benefits of technology

It improves the manufacturing quality and working efficiency of composite tension insulators, reduces the waste of heat and energy, and reduces the cost of equipment use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118645322B_ABST
    Figure CN118645322B_ABST
Patent Text Reader

Abstract

The present invention discloses a composite tension insulator manufacturing method and equipment, which relates to the composite tension insulator manufacturing technology field, and includes the following operation steps: S1, loading: the steel is preheated to achieve the effects of cleaning, heating, straightening and heat preservation, and then enters the bending station to improve the manufacturing efficiency; S2, bending: the heated steel is cut, and then extruded to complete the bending process of the steel; S3, unloading: the U-shaped ring formed by preheating and bending slides down to unload, and continuous production is achieved; S4, assembly: two U-shaped rings are taken and butt-jointed with an insulator to form a finished composite tension insulator. The composite tension insulator manufacturing method and equipment, by setting structures such as guide cylinders, ventilation grooves, sliding columns, arc blocks and arc plates, simultaneously achieves the effects of preheating, impurity cleaning and straightening, avoids steel fractures, etc., improves work efficiency, and ensures the manufacturing quality of composite tension insulators.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of composite tension insulator manufacturing, and in particular to a composite tension insulator manufacturing method and equipment. Background Art

[0002] Composite tension insulators are used in AC transmission lines to insulate pole guy wires or tension conductors. During the manufacturing process of composite tension insulators, the steel is bent and formed into a U-shaped ring.

[0003] However, the existing composite tension insulator manufacturing equipment generally does not preheat the steel during the bending process, which often causes quality problems such as deformation or cracks in the steel during bending, and even breaks the steel in severe cases, reducing work efficiency.

[0004] Therefore, it is necessary to propose a composite tension insulator manufacturing method and equipment to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a composite tension insulator manufacturing method and equipment to solve the problem that the existing composite tension insulator manufacturing equipment generally does not preheat the steel during the bending process, resulting in quality problems such as deformation or cracks of the steel when bending the steel, and even breakage in severe cases, thereby reducing work efficiency.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for manufacturing a composite tension insulator, comprising the following steps:

[0007] S1. Loading: The steel is preheated to achieve the effects of cleaning, heating, straightening and heat preservation, and then enters the bending station to improve manufacturing efficiency;

[0008] S2, Bending: Cut the heated steel and then extrude it to complete the bending process of the steel;

[0009] S3, unloading: The U-shaped ring formed by preheating and bending slides down to unload, realizing continuous production;

[0010] S4. Assembly: Take two U-shaped rings and butt them with the insulator to form a finished composite tension insulator.

[0011] The present invention also discloses a composite tension insulator manufacturing device, using the above composite tension insulator manufacturing method, comprising a chassis, a first rotating tube for suction is rotatably arranged above the chassis, a plurality of first rotating tubes are arranged, a second rotating tube for conveying high-temperature gas is rotatably arranged below the first rotating tube, the ends of the first rotating tube and the second rotating tube are both connected to a guide cylinder, an annular groove is provided on the outer ring of the guide cylinder, a sliding groove is provided on the inner wall of the annular groove, a heating zone for steel to pass through is formed between the upper and lower annular grooves, and a guide cylinder is provided on the inner wall of the annular groove. A ventilation component is provided, which includes a ventilation groove, wherein two ventilation grooves are provided, the ventilation groove is opened on the inner wall of the annular groove, the ventilation groove is connected with the guide cylinder, a slide groove is provided between the two ventilation grooves, the slide groove is opened on the inner wall of the annular groove, the annular groove is connected with the guide cylinder through the slide groove, a slide column is provided for sliding inside the slide groove, one end of the slide column located inside the annular groove is fixedly connected with an arc block that slides by extrusion of steel, the arc block is in an arc shape, and one end of the slide column away from the arc block is fixedly connected with an arc plate, and the arc plate is sealed with the ventilation groove.

[0012] Preferably, the ventilation components are provided in plurality, and the plurality of ventilation components are evenly distributed around the annular groove.

[0013] Preferably, a circular groove is provided on the inner wall of the slide groove, the circular groove surrounds the outer side of the sliding column, a slide plate is provided inside the circular groove, the slide plate is fixedly connected to the sliding column, a spring is sleeved on the outside of the sliding column, one end of the spring is fixedly connected to the slide plate, and the other end of the spring is fixedly connected to the inner wall of the circular groove.

[0014] Preferably, a vertical plate is fixedly connected to the upper surface of the chassis, and a plurality of evenly distributed sliding channels are provided in the upper half of the vertical plate, a sliding box is slidably provided inside the sliding channel, and the sliding box is H-shaped, a suction chamber and an air supply chamber are provided inside the vertical plate, a through groove is provided on the sliding box, and the sliding box is connected with the suction chamber through the through groove, the first rotating tube is rotatably connected to the corresponding sliding box, a first square groove is provided on the first rotating tube, and the first rotating tube is connected with the sliding box through the first square groove, the second rotating tube is rotatably connected to the vertical plate, a second square groove is provided on the second rotating tube, and the second rotating tube is connected with the air supply chamber through the second square groove.

[0015] Preferably, the chassis is provided with a wind power component that cooperates with the suction chamber and the air supply chamber, and the wind power component includes a fan, a first air duct, a processing box and a second air duct. The fan and the processing box are fixedly connected to the upper surface of the chassis, the processing box is connected to the air inlet end of the fan, one end of the first air duct is connected to the air outlet end of the fan, the other end of the first air duct is connected to the air supply chamber, one end of the second air duct is connected to the processing box, and the other end of the second air duct is connected to the suction chamber.

[0016] Preferably, an adjusting member is provided above the sliding box, the adjusting member is threadedly connected to the vertical plate, and the adjusting member cooperates with the sliding box.

[0017] Preferably, one end of the vertical plate is fixedly connected to a first support plate, a cleaning cylinder for steel materials to pass through is fixedly connected to the first support plate, and a wire brush is fixedly provided inside the cleaning cylinder.

[0018] Preferably, the other end of the vertical plate is fixedly connected to a second support plate, and the second support plate is fixedly connected to a heat-insulating tube through which the steel material passes.

[0019] Preferably, a cutting device and a bending device are fixedly provided on the chassis, and a discharge plate is fixedly connected to the chassis.

[0020] Technical effects and advantages of the present invention:

[0021] 1. The present invention achieves the effects of preheating, impurity cleaning and straightening at the same time by arranging structures such as guide cylinders, ventilation slots, sliding columns, arc blocks and arc plates, thereby avoiding the occurrence of steel fractures, improving work efficiency, and ensuring the manufacturing quality of composite tension insulators. In addition, under the extrusion and matching effect of steel, the high-temperature gas flow rate blowing toward the steel position is ensured to be large, so that the heat transfer speed is fast, the utilization efficiency of the high-temperature gas is improved, and the waste of heat energy is avoided;

[0022] 2. High-temperature gas is sprayed toward the steel from the guide tube and ventilation slot at the bottom, so that high-temperature airflow is formed in the heating area to preheat the steel, facilitate bending and deformation, reduce the internal stress generated by the steel during bending, and prevent quality problems such as deformation or cracks of the steel caused by bending;

[0023] 3. When the high-temperature gas is sprayed toward the steel from the guide cylinder and ventilation slot at the lower position, the impurities can be blown away; at the same time, the impurities are sucked away by the guide cylinder and ventilation slot at the upper position. Blowing away and sucking are carried out simultaneously to realize the cleaning of impurities;

[0024] 4. Multiple sets of first rotating tubes and second rotating tubes are provided, so that the steel passes through multiple horizontally distributed heating zones, which can straighten the steel while preheating, thus improving the bending efficiency;

[0025] 5. Multiple first rotating tubes are distributed in a horizontal straight line and move up and down synchronously, which is suitable for steel of various sizes and improves the applicability of the equipment;

[0026] 6. Set up a single fan, and with the cooperation of the processing box and other structures, it can simultaneously supply air and extract air, reducing energy consumption and equipment use costs;

[0027] 7. The steel is transported through the cleaning cylinder, multiple heating zones and the insulation cylinder in sequence. When the steel is slid and transported inside the cleaning cylinder, the wire brush is attached to its outside to scrape off dust, iron filings and other impurities on the outside to avoid slipping during bending and prevent heating from being affected;

[0028] 8. By setting up structures such as cleaning cylinder, guide cylinder, insulation cylinder and bending device, continuous processing can be achieved and production efficiency can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 The present invention is a flow chart of the manufacturing method of the structural composite tension insulator.

[0030] Figure 2 It is a schematic diagram from one perspective of the structure of the composite tension insulator manufacturing equipment of the present invention.

[0031] Figure 3 This is a schematic structural diagram of the composite tension insulator manufacturing equipment from another perspective of the present invention.

[0032] Figure 4 For the present invention Figure 2 A schematic diagram of the enlarged structure in the middle.

[0033] Figure 5 It is a schematic diagram of the structure of the cleaning cylinder and the heat preservation cylinder of the present invention.

[0034] Figure 6 For the present invention Figure 5 Enlarged schematic diagram of the structure at point B in the middle.

[0035] Figure 7 It is a schematic diagram of the structure of the suction chamber and the air supply chamber of the present invention.

[0036] Figure 8 It is a schematic diagram of the guide cylinder and arc plate structure of the present invention.

[0037] Fig. 9 For the present invention Figure 8 Enlarged schematic diagram of the structure at point C in the middle.

[0038] Fig.10 It is a schematic diagram of the structure of the first rotating tube and the second rotating tube of the present invention.

[0039] Fig.11 For the present invention Fig.10 Enlarged schematic diagram of the structure at point D in the middle.

[0040] In the figure: 1, chassis; 2, vertical plate; 3, sliding channel; 4, sliding box; 5, first rotating tube; 6, second rotating tube; 7, suction chamber; 8, air supply chamber; 9, first square groove; 10, second square groove; 11, guide cylinder; 12, sliding column; 13, sliding groove; 14, ring groove; 15, arc block; 16, arc plate; 17, ventilation groove; 18, circular groove; 19, slide plate; 20, spring; 21, adjusting member; 22, first support plate; 23, cleaning cylinder; 24, wire brush; 25, second support plate; 26, insulation cylinder; 27, discharge plate; 28, bending device; 29, cutting device; 30, through groove; 31, fan; 32, first air duct; 33, processing box; 34, second air duct. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clarify the technical solutions in the embodiments of the present invention; it is clearly described in detail. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] The present invention provides Figure 1 A method for manufacturing a composite tension insulator is shown, comprising the following steps:

[0043] S1. Loading: The steel is preheated to achieve the effects of cleaning, heating, straightening and heat preservation, and then enters the bending station to improve manufacturing efficiency;

[0044] S2, Bending: Cut the heated steel and then extrude it to complete the bending process of the steel;

[0045] S3, unloading: The U-shaped ring formed by preheating and bending slides down to unload, realizing continuous production;

[0046] S4. Assembly: Take two U-shaped rings and butt them with the insulator to form a finished composite tension insulator.

[0047] The present invention also provides Figure 2 to Figure 11 A composite tension insulator manufacturing device shown uses the above-mentioned composite tension insulator manufacturing method, including a chassis 1, on which a cutting device 29 and a bending device 28 are fixedly arranged. The cutting device 29 includes a cylinder, a cutter and other structures, which are used to cut the conveyed steel for easy bending; the bending device 28 includes a cylinder, a U-shaped pressing block and other structures, which squeeze the cut steel into a U-shaped ring. The cutting device 29 and the bending device 28 are both existing technologies and are not described here. A discharge plate 27 is fixedly connected to the chassis 1, which is used for the U-shaped ring to slide down and discharge after bending and forming; when it is used specifically, a mechanical arm can be set to cooperate with the discharge to realize automated production.

[0048] Considering that the existing composite tension insulator manufacturing equipment generally does not preheat the steel during the bending process, the steel is often subjected to excessive or uneven force when being bent, causing the steel to break and pop out, which is easy to cause personal injury to the staff and reduce work efficiency. In order to achieve the preheating treatment of the steel, a first rotating tube 5 for suction is rotatably arranged above the chassis 1. The first rotating tube 5 is arranged in multiple numbers, and the multiple first rotating tubes 5 are distributed in a horizontal straight line and move synchronously up and down. A second rotating tube 6 for conveying high-temperature gas is rotatably arranged below the first rotating tube 5. The ends of the first rotating tube 5 and the second rotating tube 6 are both connected to a guide cylinder 11, and an annular groove 14 is provided on the outer ring of the guide cylinder 11. A heating zone for the steel to pass through is formed between the upper and lower annular grooves 14. A ventilation assembly is provided on the inner wall of the annular groove 14 , and the ventilation assembly includes two ventilation grooves 17 . The ventilation grooves 17 are opened on the inner wall of the annular groove 14 . The ventilation grooves 17 are connected to the guide cylinder 11 , and the two ventilation grooves 17 are respectively located on both sides of the annular groove 14 .

[0049] Specifically, high-temperature gas is sprayed toward the steel from the guide cylinder 11 and the ventilation slots 17 in the lower position, so that a high-temperature airflow is formed in the heating zone to preheat the steel, facilitate bending and deformation, reduce the internal stress generated by the steel during bending, and prevent quality problems such as deformation or cracks in the steel due to bending; at the same time, the guide cylinder 11 and the ventilation slots 17 in the upper position suck the sprayed gas, and the high-temperature gas flows in the steel to realize high-temperature gas circulation and avoid heat waste.

[0050] At the same time, when the high-temperature gas is sprayed toward the steel from the guide cylinder 11 and the ventilation slot 17 at the lower position, the impurities can be blown away; at the same time, the impurities are sucked away by the guide cylinder 11 and the ventilation slot 17 at the upper position, and the blowing and suction are carried out simultaneously to achieve the cleaning of impurities.

[0051] And the high temperature gas softens some impurities, making them easier to clean.

[0052] A plurality of groups of first rotating tubes 5 and second rotating tubes 6 are provided, so that the steel passes through a plurality of horizontally distributed heating zones, which can straighten the steel while preheating it, thereby improving the bending efficiency.

[0053] Since the guide cylinder 11 is a circular structure, the ventilation slot 17 is an arc shape. Fig. 9 In the middle state, even if the middle section of the ventilation slot 17 may be blocked by the steel, both ends thereof are still in an open state; and during the steel conveying process, preheating treatment is achieved at all positions.

[0054] By providing the first rotating tube 5, the second rotating tube 6, the guide cylinder 11 and the ventilation slot 17 and other structures, the effects of preheating, impurity cleaning and straightening are achieved at the same time, the steel is prevented from breaking, the work efficiency is improved, and the manufacturing quality of the composite tension insulator is guaranteed.

[0055] In addition, the plurality of first rotating tubes 5 are distributed in a horizontal straight line and move synchronously up and down, which is suitable for steels of various sizes, thereby improving the applicability of the equipment.

[0056] Moreover, after the guide tube 11 structure is heated up, the heat can also be transferred to the steel.

[0057] A slide groove 13 is provided between the two ventilation grooves 17. The slide groove 13 is provided on the inner wall of the annular groove 14. The annular groove 14 is connected with the guide cylinder 11 through the slide groove 13. A plurality of ventilation components are provided, and the plurality of ventilation components are evenly distributed around the annular groove 14, so that the slide grooves 13 are also multiple, and the plurality of slide grooves 13 are distributed one-to-one with the plurality of ventilation components.

[0058] In order to prevent all the ventilation slots 17 on the guide cylinder 11 from opening at the same time, so that the wind force is dispersed and the efficiency of air supply and suction is reduced, a sliding column 12 is provided inside the slide groove 13 for sliding. One end of the sliding column 12 located inside the annular groove 14 is fixedly connected to an arc block 15 that slides by extrusion of steel. The arc block 15 is arc-shaped. The end of the sliding column 12 away from the arc block 15 is fixedly connected to an arc plate 16, and the arc plate 16 is sealed with the ventilation slot 17.

[0059] In order to realize the reset of the arc block 15 and the arc plate 16, a circular groove 18 is provided on the inner wall of the slide groove 13, and the circular groove 18 surrounds the outer side of the slide column 12. A slide plate 19 is provided inside the circular groove 18, and the slide plate 19 is fixedly connected to the slide column 12. A spring 20 is sleeved on the outside of the slide column 12, one end of the spring 20 is fixedly connected to the slide plate 19, and the other end of the spring 20 is fixedly connected to the inner wall of the circular groove 18. The elastic supporting force of the spring 20 is appropriate, and does not affect the steel in the conveying process, and drives the upper and lower guide cylinders 11 to rotate.

[0060] Specifically, the steel is heated in multiple zones in sequence. At this time, the steel is located between the upper and lower annular grooves 14. The arc block 15 squeezes the sliding column 12 to move toward the axial direction of the corresponding guide cylinder 11, and the sliding column 12 drives the arc plate 16 to move synchronously, and the ventilation slot 17 is opened.

[0061] During the conveying process, the steel drives the upper and lower guide cylinders 11 to rotate. When the arc block 15 contacts the steel, the corresponding ventilation slot 17 opens, and high-temperature gas is ejected from the ventilation slot 17. When the arc block 15 is offset from the steel, the restoring elastic force of the spring 20 drives the arc plate 16 to reset through the slide plate 19, separating the corresponding ventilation slot 17 from the inner cavity of the guide cylinder 11, and the ventilation slot 17 remains closed, ensuring that the high-temperature gas flow rate blowing to the steel position is large, making the heat transfer speed faster, improving the utilization efficiency of the high-temperature gas, and avoiding the waste of heat energy.

[0062] By arranging structures such as the sliding column 12, the arc block 15 and the arc plate 16, under the extrusion and matching effect of the steel, the high-temperature gas flow rate blown to the steel position is ensured to be large, so that the heat transfer speed is fast, the utilization efficiency of the high-temperature gas is improved, and the waste of heat energy is avoided.

[0063] And in the specific use process, a conveying device is provided to convey the steel. The conveying device includes structures such as clamps, etc., which often clamp and convey the steel. The conveying device is an existing common technology and will not be described in detail here.

[0064] The upper surface of the chassis 1 is fixedly connected with a vertical plate 2. The upper half of the vertical plate 2 is provided with a plurality of evenly distributed sliding channels 3. A sliding box 4 is slidably provided inside the sliding channel 3. The sliding box 4 is H-shaped. A suction chamber 7 and an air supply chamber 8 are provided inside the vertical plate 2. A through slot 30 is provided on the sliding box 4. The sliding box 4 is connected to the suction chamber 7 through the through slot 30. The first rotating tube 5 is rotatably connected to the corresponding sliding box 4. The first rotating tube 5 is provided with a first square slot 9. The first rotating tube 5 is connected to the sliding box 4 through the first square slot 9. Even in the rotating state, the first rotating tube 5 can always be connected to the suction chamber 7. An adjusting member 21 is provided above the sliding box 4. The adjusting member 21 is threadedly connected to the vertical plate 2. The adjusting member 21 cooperates with the sliding box 4. The adjusting member 21 includes a threaded rod and a turning handle. Specifically, the adjusting member 21 is rotated to drive the slide box 4 to slide inside the slide channel 3, so that the first rotating tube 5 drives the guide cylinder 11 at the upper position to move synchronously, and the distance between the upper and lower guide cylinders 11 is adjusted according to the size of the steel.

[0065] The second rotating tube 6 is rotatably connected to the vertical plate 2, and a second square groove 10 is provided on the second rotating tube 6. The second rotating tube 6 is connected to the air supply chamber 8 through the second square groove 10. Even in the rotating state, the second rotating tube 6 can always be connected to the air supply chamber 8. A sealing ring and other structures (not shown in the figure) are provided at the connection between the first rotating tube 5 and the sliding box 4 and at the connection between the second rotating tube 6 and the air supply chamber 8.

[0066] The chassis 1 is provided with a wind power component that cooperates with the suction chamber 7 and the air supply chamber 8. The wind power component includes a fan 31, a first air duct 32, a processing box 33 and a second air duct 34. The fan 31 and the processing box 33 are both fixedly connected to the upper surface of the chassis 1. The processing box 33 is connected to the air inlet end of the fan 31. The processing box 33 is provided with a filtering device and a heating device (not shown in the figure) inside the processing box 33. The filtering device includes a filter screen and other structures, which can filter impurities; the heating device includes an electric heating wire and other structures, which can quickly heat the gas passing through the processing box 33. The filtering device and the heating device are both existing common technologies and are not described here. One end of the first air duct 32 is connected to the air outlet end of the fan 31, and the other end of the first air duct 32 is connected to the air supply chamber 8. One end of the second air duct 34 is connected to the processing box 33, and the other end of the second air duct 34 is connected to the suction chamber 7.

[0067] Specifically, the air outlet end of the fan 31 transports the high-temperature gas from the first air duct 32 to the interior of the air supply chamber 8, and enters the second rotating tube 6 from the second square slot 10, and then is sprayed toward the steel from the guide cylinder 11 and the ventilation slot 17 at the lower position to preheat the steel; at the same time, the air inlet end of the fan 31 sucks the ejected gas through the second air duct 34, the suction chamber 7, the first square slot 9, the first rotating tube 5, the guide cylinder 11 at the upper position and the ventilation slot 17.

[0068] A single fan 31 is provided, and with the cooperation of structures such as a processing box 33, air supply and suction are performed simultaneously, thereby reducing energy consumption and equipment use costs.

[0069] Taking into account that dust, iron filings and other impurities adhere to the outside of the steel, it is easy to slip during bending and affect the heating efficiency. In order to clean the impurities, a first support plate 22 is fixedly connected to one end of the vertical plate 2, and a cleaning cylinder 23 for the steel to pass through is fixedly connected to the first support plate 22, and a wire brush 24 is fixedly arranged inside the cleaning cylinder 23.

[0070] The other end of the vertical plate 2 is fixedly connected to a second support plate 25, and the second support plate 25 is fixedly connected to an insulation tube 26 through which the steel passes. The insulation tube 26 can be made of but not limited to insulation cotton material, and has an insulation effect to insulate the steel part that is preheated and about to enter the bending station.

[0071] During operation, the steel is sequentially conveyed through the cleaning cylinder 23, multiple heating zones and the heat preservation cylinder 26. When the steel is slid and conveyed inside the cleaning cylinder 23, the wire brush 24 is attached to the outside to scrape off dust, iron filings and other impurities on the outside to avoid slipping during bending and prevent heating from being affected.

[0072] When the scraped impurities adhere to the steel and are transported with it, after entering the heating zone, the high-temperature gas is sprayed toward the steel from the guide cylinder 11 and the ventilation groove 17 at the lower position to blow away the impurities; at the same time, the impurities are sucked away by the guide cylinder 11 and the ventilation groove 17 at the upper position, and the blowing and suction are carried out simultaneously.

[0073] The preheated steel passes through the interior of the heat preservation tube 26 to achieve the heat preservation effect, and then enters the bending work, and is made into a U-shaped ring under the cooperation of the cutting device 29 and the bending device 28.

[0074] By arranging structures such as the cleaning cylinder 23, the guide cylinder 11, the heat-insulating cylinder 26 and the bending device 28, continuous processing is achieved and the manufacturing efficiency is improved.

[0075] Working principle: Rotate the adjusting member 21 to drive the slide box 4 to slide inside the slide channel 3, so that the first rotating tube 5 drives the guide cylinder 11 in the upper position to move synchronously, and adjust the distance between the upper and lower guide cylinders 11 according to the size of the steel; the steel passes through the cleaning cylinder 23, multiple heating zones and the insulation cylinder 26 in sequence and is transported. At this time, the steel is located between the upper and lower annular grooves 14, and the sliding column 12 is squeezed by the arc block 15 to move toward the axial direction of the corresponding guide cylinder 11, and the arc plate 16 is driven to move synchronously through the sliding column 12, and the ventilation slot 17 is opened.

[0076] Start the fan 31, and the air outlet of the fan 31 transports the high-temperature gas from the first air duct 32 to the inside of the air supply chamber 8, and enters the second rotating tube 6 from the second square groove 10, and then is sprayed to the steel from the guide cylinder 11 and the ventilation groove 17 at the lower position, so as to preheat the steel to facilitate bending and deformation, reduce the internal stress generated by the steel during bending, and prevent quality problems such as deformation or cracks of the steel due to bending; at the same time, the air inlet end of the fan 31 sucks the ejected gas through the second air duct 34, the suction chamber 7, the first square groove 9, the first rotating tube 5, the guide cylinder 11 at the upper position and the ventilation groove 17, so that the high-temperature gas flows at the steel, realizes the circulation of the high-temperature gas, and avoids heat waste.

[0077] During the conveying process, the steel drives the upper and lower guide cylinders 11 to rotate. When the arc block 15 contacts the steel, the corresponding ventilation slot 17 opens, and high-temperature gas is ejected from the ventilation slot 17. When the arc block 15 is offset from the steel, the restoring elastic force of the spring 20 drives the arc plate 16 to reset through the slide plate 19, separating the corresponding ventilation slot 17 from the inner cavity of the guide cylinder 11, and the ventilation slot 17 remains closed, ensuring that the high-temperature gas flow rate blowing to the steel position is large, making the heat transfer speed faster, improving the utilization efficiency of the high-temperature gas, and avoiding the waste of heat energy.

[0078] When the steel is slid and transported inside the cleaning cylinder 23, the wire brush 24 is attached to the outside thereof to scrape off dust, iron filings and other impurities on the outside thereof to avoid slipping during bending and to prevent influence on heating.

[0079] When the scraped impurities adhere to the steel and are transported with it, after entering the heating zone, the high-temperature gas is sprayed toward the steel from the guide cylinder 11 and the ventilation slot 17 at the lower position to blow away the impurities, and the high-temperature gas softens some of the impurities, making them easier to clean. At the same time, the impurities are sucked away by the guide cylinder 11 and the ventilation slot 17 at the upper position, and the blowing and suction are carried out simultaneously to achieve the cleaning of the impurities.

[0080] The impurities are filtered and processed inside the processing box 33 .

[0081] At the same time, since a plurality of groups of first rotating tubes 5 and second rotating tubes 6 are arranged on the vertical plate 2, the steel passes through a plurality of horizontally distributed heating zones, which can straighten the steel while preheating, thereby improving the bending efficiency.

[0082] The preheated steel passes through the interior of the heat preservation tube 26 to achieve the heat preservation effect, and then enters the bending work, and is made into a U-shaped ring under the cooperation of the cutting device 29 and the bending device 28.

Claims

1. A method for manufacturing a composite tension insulator, Features: The steps include: S1. Loading: The steel is preheated to achieve the effects of cleaning, heating, straightening and heat preservation, and then enters the bending station to improve manufacturing efficiency; S2, Bending: Cut the heated steel and then extrude it to complete the bending process of the steel; S3, unloading: The U-shaped ring formed by preheating and bending slides down to unload, realizing continuous production; S4, assembly: take two U-shaped rings and butt them with the insulator to form a finished composite tension insulator; The composite tension insulator manufacturing method is implemented using a composite tension insulator manufacturing device, the composite tension insulator manufacturing device comprising a chassis (1), a first rotating tube (5) for suction is rotatably arranged above the chassis (1), a plurality of first rotating tubes (5) are arranged, a second rotating tube (6) for conveying high-temperature gas is rotatably arranged below the first rotating tube (5), the ends of the first rotating tube (5) and the second rotating tube (6) are both connected to a guide cylinder (11), an annular groove (14) is provided on the outer ring of the guide cylinder (11), a heating zone for steel to pass through is formed between the upper and lower annular grooves (14), a ventilation component is arranged on the inner wall of the annular groove (14), the ventilation component comprises a ventilation groove (17), and the ventilation groove (17) is arranged There are two ventilation grooves (17), the ventilation grooves (17) are arranged on the inner wall of the annular groove (14), the ventilation grooves (17) are connected with the guide cylinder (11), a slide groove (13) is arranged between the two ventilation grooves (17), the slide groove (13) is arranged on the inner wall of the annular groove (14), the annular groove (14) is connected with the guide cylinder (11) through the slide groove (13), a slide column (12) is arranged inside the slide groove (13) for sliding, one end of the slide column (12) located inside the annular groove (14) is fixedly connected with an arc block (15) which slides by extrusion of steel, the arc block (15) is in an arc shape, one end of the slide column (12) away from the arc block (15) is fixedly connected with an arc plate (16), the arc plate (16) is sealed and matched with the ventilation groove (17); A circular groove (18) is provided on the inner wall of the slide groove (13), and the circular groove (18) surrounds the outer side of the slide column (12). A slide plate (19) is provided inside the circular groove (18), and the slide plate (19) is fixedly connected to the slide column (12). A spring (20) is sleeved on the outside of the slide column (12), and one end of the spring (20) is fixedly connected to the slide plate (19), and the other end of the spring (20) is fixedly connected to the inner wall of the circular groove (18).

2. A method for manufacturing a composite tension insulator according to claim 1, Features: The ventilation components are arranged in plurality, and the plurality of ventilation components are evenly distributed around the annular groove (14).

3. A method for manufacturing a composite tension insulator according to claim 1, Features: The upper surface of the chassis (1) is fixedly connected to a vertical plate (2), and the upper half of the vertical plate (2) is provided with a plurality of evenly distributed sliding channels (3). A sliding box (4) is slidably arranged inside the sliding channel (3), and the sliding box (4) is H-shaped. A suction chamber (7) and an air supply chamber (8) are arranged inside the vertical plate (2). A through groove (30) is arranged on the sliding box (4), and the sliding box (4) is connected to the suction chamber (7) through the through groove (30). The first rotating tube (5) is rotatably connected to the corresponding sliding box (4), and the first rotating tube (5) is provided with a first square groove (9), and the first rotating tube (5) is connected to the sliding box (4) through the first square groove (9). The second rotating tube (6) is rotatably connected to the vertical plate (2), and the second rotating tube (6) is provided with a second square groove (10), and the second rotating tube (6) is connected to the air supply chamber (8) through the second square groove (10).

4. A method for manufacturing a composite tension insulator according to claim 3, Features: The chassis (1) is provided with a wind power component that cooperates with the suction chamber (7) and the air supply chamber (8), and the wind power component comprises a fan (31), a first air duct (32), a processing box (33) and a second air duct (34); the fan (31) and the processing box (33) are both fixedly connected to the upper surface of the chassis (1); the processing box (33) is connected to the air inlet end of the fan (31); one end of the first air duct (32) is connected to the air outlet end of the fan (31); the other end of the first air duct (32) is connected to the air supply chamber (8); one end of the second air duct (34) is connected to the processing box (33); and the other end of the second air duct (34) is connected to the suction chamber (7).

5. A method for manufacturing a composite tension insulator according to claim 3, Features: An adjusting member (21) is arranged above the sliding box (4), the adjusting member (21) is threadedly connected to the vertical plate (2), and the adjusting member (21) cooperates with the sliding box (4).

6. A method for manufacturing a composite tension insulator according to claim 3, Features: One end of the vertical plate (2) is fixedly connected to a first support plate (22), and a cleaning cylinder (23) for steel materials to pass through is fixedly connected to the first support plate (22), and a wire brush (24) is fixedly arranged inside the cleaning cylinder (23).

7. A method for manufacturing a composite tension insulator according to claim 6, Features: The other end of the vertical plate (2) is fixedly connected to a second support plate (25), and the second support plate (25) is fixedly connected to a heat preservation tube (26) through which steel passes.

8. A method for manufacturing a composite tension insulator according to claim 1, Features: A cutting device (29) and a bending device (28) are fixedly arranged on the chassis (1), and a discharge plate (27) is fixedly connected to the chassis (1).