Distributed photovoltaic power generation cluster intelligent control method, system and medium
Through the intelligent regulation method of distributed photovoltaic power generation cluster, the photovoltaic panel is adjusted based on the search voltage and control voltage, and the inadequate energy output caused by local occlusion of the photovoltaic panel is solved, achieving more efficient energy output.
Patent Information
- Application Number
- CN202411118123.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-15
Smart Images

Figure CN118646095B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of solar photovoltaic power generation, and in particular to a distributed photovoltaic power generation cluster intelligent control method, system and medium. Background Art
[0002] In order to reduce environmental pollution, the development of clean energy has become an important global issue, and solar energy, as an easily accessible clean energy, is becoming more and more valuable for research. The panel of a solar photovoltaic panel acts as a solar receiver, and the amount of solar energy it collects is determined by the amount of light it receives. However, in real life, after the installation of solar photovoltaic panels, the panels may be partially blocked due to various reasons such as inadequate cleaning and debris on the panels (such as leaves, plastic bags), resulting in uneven light exposure on the panels.
[0003] When a solar photovoltaic panel is exposed to uneven light, the PV curve of the photovoltaic panel may have multiple peaks. If the global maximum power point cannot be accurately found, the photovoltaic panel will not be able to obtain the maximum energy output, resulting in waste. However, most of the current methods for tracking the maximum power point with high accuracy are complicated and have low tracking efficiency. Summary of the invention
[0004] In view of the shortcomings of the prior art, this application provides a distributed photovoltaic power generation cluster intelligent control method, system and medium, aiming to solve the technical problem in the prior art that the maximum power point cannot be tracked efficiently and accurately when the photovoltaic panel is partially blocked. Specifically:
[0005] In a first aspect, an embodiment of the present application provides a method for intelligent control of a distributed photovoltaic power generation cluster, the method comprising: determining a first maximum power of a target cluster; wherein the target cluster includes at least one photovoltaic panel; obtaining the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment, determining the search voltage corresponding to each photovoltaic panel, and determining the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and a first search method; determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster; if the power difference between the third maximum power and the first maximum power is greater than or equal to a difference threshold, determining the third maximum power of each photovoltaic panel in the target cluster according to the control voltage and the first search method. The method comprises the following steps: determining a second maximum power corresponding to each photovoltaic panel in the target cluster, adjusting the photovoltaic panels in the target cluster based on the control voltage, and returning to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps; wherein the control voltage is determined according to the third maximum power and the first maximum power; if the power difference between the third maximum power and the first maximum power is less than a difference threshold, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to a second search method, adjusting the photovoltaic panels in the target cluster based on the control voltage, and returning to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps.
[0006] In some embodiments, the control voltage is determined based on the third maximum power and the first maximum power, including: if the third maximum power is greater than or equal to the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to a difference threshold, then obtaining the voltage corresponding to the third maximum power as the control voltage; if the third maximum power is less than the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, then obtaining the voltage corresponding to the first maximum power as the control voltage.
[0007] In some embodiments, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method includes: if the third maximum power is less than the first maximum power, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the first maximum power and the second search method; if the third maximum power is greater than or equal to the first maximum power, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the third maximum power and the second search method.
[0008] In some embodiments, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the first maximum power and the second search method includes: obtaining the first voltage corresponding to the first maximum power; adjusting the first voltage to the left according to a first initial adjustment value; if the power value corresponding to the first voltage after adjustment is greater than the first maximum power, continuing to adjust according to the first initial adjustment value in the same adjustment direction on the basis of the adjustment; if the adjusted power value is less than the power value corresponding to the previous adjustment, taking the voltage corresponding to the power value corresponding to the previous adjustment as the marking voltage, reducing the first initial adjustment value by one quarter, and adjusting the marking voltage in the opposite adjustment direction according to the reduced first initial adjustment value, and repeating this step until the first initial adjustment value is less than or equal to the adjustment threshold.
[0009] In some embodiments, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the third maximum power and the second search method includes: obtaining a third voltage corresponding to the third maximum power; adjusting the fourth voltage to the right according to the second initial adjustment value; if the power value corresponding to the third voltage after adjustment is greater than the third maximum power, continuing to adjust according to the second initial adjustment value in the same adjustment direction on the basis of the adjustment; if the adjusted power value is less than the power value corresponding to the previous adjustment, taking the voltage corresponding to the power value corresponding to the previous adjustment as the marking voltage, reducing the second initial adjustment value by one half, and adjusting the marking voltage in the opposite adjustment direction according to the reduced second initial adjustment value, and repeating this step until the second initial adjustment value is less than or equal to the adjustment threshold.
[0010] In some embodiments, obtaining the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment and determining the search voltage corresponding to each photovoltaic panel include: obtaining the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment; determining the current season, and determining the light intensity interval and temperature interval to which the light intensity and the temperature belong; and determining the search voltage corresponding to each photovoltaic panel according to the current season, the light intensity interval, the temperature interval and the third search method.
[0011] In some embodiments, the search voltage corresponding to each photovoltaic panel is determined according to the current season, the light intensity range, the temperature range and the third search method, including: determining a reference voltage according to the current season, the light intensity range and the temperature range; obtaining the current actual voltage, and determining the voltage difference between the reference voltage and the actual voltage; determining the current power corresponding to each photovoltaic panel according to the voltage difference, the light intensity and the temperature, and determining the corresponding search voltage according to the current power.
[0012] In some embodiments, before determining the first maximum power of the target cluster, the method further includes: acquiring power generation and peak-shaving information of each photovoltaic panel; and dividing the clusters according to the power generation and the peak-shaving information.
[0013] In a second aspect, an embodiment of the present application provides a distributed photovoltaic power generation cluster intelligent control system, the system comprising: a cluster module and a photovoltaic panel module, the cluster module comprising a cluster control unit, the photovoltaic panel module comprising a photovoltaic panel control unit, the cluster control unit being used to control all the photovoltaic panel control units included in the current cluster; the cluster module further comprising a first determination unit, a second determination unit, a third determination unit, a first control unit, and a second control unit;
[0014] Among them, the first determination unit is used to determine the first maximum power of the target cluster; the second determination unit is used to obtain the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment, determine the search voltage corresponding to each photovoltaic panel, and determine the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and the first search method; the third determination unit is used to determine the third maximum power of the target cluster based on all the second maximum powers in the target cluster; the first control unit is used to determine the target cluster according to the control voltage and the first search method if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold The second maximum power corresponding to each photovoltaic panel in the group is adjusted based on the control voltage, and the photovoltaic panels in the target cluster are returned to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps; the second control unit is used to determine the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to a second search method if the power difference between the third maximum power and the first maximum power is less than the difference threshold, adjust the photovoltaic panels in the target cluster based on the control voltage, and return to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps.
[0015] In a third aspect, an embodiment of the present application further provides a computer-readable storage medium, in which a program code is stored, and the program code can be called by a processor to execute the method of the first aspect.
[0016] The distributed photovoltaic power generation cluster intelligent control method provided by the present application determines the first maximum power of the target cluster; wherein the target cluster includes at least one photovoltaic panel; obtains the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment, determines the search voltage corresponding to each photovoltaic panel, and determines the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and the first search method; determines the third maximum power of the target cluster based on all the second maximum powers in the target cluster; if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, determines the second maximum power corresponding to each photovoltaic panel in the target cluster according to the control voltage and the first search method, adjusts the photovoltaic panels in the target cluster based on the control voltage, and returns to perform the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and the steps thereafter; wherein the control voltage is determined according to the third maximum power and the first maximum power; if the power difference between the third maximum power and the first maximum power is less than the difference threshold, determines the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method, adjusts the photovoltaic panels in the target cluster based on the control voltage, and returns to perform the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and the steps thereafter. Therefore, not only can the maximum power point be quickly approached at the beginning, but different search methods can be selected according to the power difference afterwards, so that the efficiency can be taken into account while ensuring the search accuracy, which effectively solves the problems existing in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present application, not all embodiments. Based on the embodiments of the present application, all other embodiments and drawings obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] Figure 1 A schematic diagram of the process of an intelligent control method for a distributed photovoltaic power generation cluster proposed in an embodiment of the present application is shown.
[0019] Figure 2 The structural block diagram of the distributed photovoltaic power generation cluster intelligent control system proposed in one embodiment of the present application is shown.
[0020] Figure 3A structural block diagram of a computer-readable storage medium proposed in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0022] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0023] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0024] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0025] The following describes it in conjunction with specific embodiments.
[0026] See also Figure 1 , Figure 1 The distributed photovoltaic power generation cluster intelligent control method provided by an embodiment of the present application is shown. The method may include steps S110 to S150. Specifically:
[0027] In step S110 , a first maximum power of the target cluster is determined.
[0028] In the embodiment of the present application, the target cluster is any cluster that can be controlled in the distributed photovoltaic power generation cluster intelligent control system, and each cluster includes at least one photovoltaic panel.
[0029] As an embodiment, the first maximum power is the largest historical maximum power among the historical maximum powers of each photovoltaic panel in the target cluster.
[0030] In step S120, the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment are obtained, the search voltage corresponding to each photovoltaic panel is determined, and the second maximum power corresponding to each photovoltaic panel in the target cluster is determined based on the search voltage and the first search method.
[0031] In the embodiment of the present application, the second maximum power is the current maximum power corresponding to each photovoltaic panel at the current moment.
[0032] Specifically, the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment are obtained; the current season is determined, and the light intensity range and temperature range to which the light intensity and temperature belong are determined; according to the current season, light intensity range, temperature range and the third search method, the search voltage corresponding to each photovoltaic panel is determined.
[0033] In the embodiment of the present application, the light intensity interval and the temperature interval are set to smooth the light intensity and the temperature, so as to avoid accidental factors causing sudden changes in the light intensity and the temperature, thereby causing the obtained search voltage to have no reference value.
[0034] Furthermore, the reference voltage can be determined according to the current season, light intensity range and temperature range; the current actual voltage is obtained, and the voltage difference between the reference voltage and the actual voltage is determined; the current power corresponding to each photovoltaic panel is determined according to the voltage difference, light intensity and temperature, and the corresponding search voltage is determined according to the current power.
[0035] In some implementations, the current season, light intensity range, and temperature range may be fuzzily classified to obtain a reference voltage, and the processed reference voltage may be compared again with the current actual voltage to further improve the reference value of the final search voltage.
[0036] In some embodiments, different voltage difference intervals to which different voltage difference values belong may correspond to different models to improve the accuracy of the output result. That is, after obtaining the voltage difference value, the corresponding model may be selected to input the voltage difference value, light intensity and temperature, and the model may output the current power corresponding to each photovoltaic panel according to the input data, and finally determine the corresponding search voltage according to the current power.
[0037] In step S130 , a third maximum power of the target cluster is determined based on all second maximum powers in the target cluster.
[0038] In the embodiment of the present application, the third maximum power is the maximum power value among the current maximum powers corresponding to all photovoltaic panels in the target cluster at the current moment.
[0039] It can be understood that the photovoltaic panel corresponding to the first maximum power was previously closest to the global maximum power value, and the photovoltaic panel corresponding to the third maximum power is currently closest to the global maximum power value. Therefore, when subsequently judging the search method, the first maximum power or the third maximum power can be directly used as the basis for selection, which can speed up the speed of approaching the global maximum power value.
[0040] In step S140, if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the second maximum power corresponding to each photovoltaic panel in the target cluster is determined according to the control voltage and the first search method, the photovoltaic panels in the target cluster are adjusted based on the control voltage, and the process of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps is returned.
[0041] In the embodiment of the present application, adjusting the photovoltaic panels in the target cluster based on the control voltage means adjusting the working voltage of the photovoltaic panels to the control voltage so that the photovoltaic panels can operate at the maximum power point as much as possible.
[0042] In some embodiments, the control voltage is determined according to the third maximum power and the first maximum power. Specifically, if the third maximum power is greater than or equal to the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the voltage corresponding to the third maximum power is obtained as the control voltage; if the third maximum power is less than the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the voltage corresponding to the first maximum power is obtained as the control voltage.
[0043] It can be understood that if the third maximum power is greater than or equal to the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, it means that the third maximum power is closer to the global maximum power value, and therefore the voltage corresponding to the third maximum power is used as the control voltage; if the third maximum power is less than the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, it means that the first maximum power is closer to the global maximum power value, and therefore the voltage corresponding to the first maximum power is used as the control voltage.
[0044] In an embodiment of the present application, when the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, it means that the power value changes greatly at this time. Using the first search method twice in a row can quickly approach the area where the power change is gentle, and then quickly approach the global maximum power value.
[0045] In some implementations, the first search method may be a conventional PSO search model, which will not be elaborated on herein.
[0046] Furthermore, in order to speed up the convergence of the model and improve the local search capability, the PSO search model can be improved so that it can dynamically adjust the inertia weight w and the learning factors c1 and c2. Specifically, the dynamic adjustment formula is: )+ ;in, is the initial value of X, is the final value of X, is the maximum number of iterations, X can be replaced by w, c1 and c2. Furthermore, in order to ensure the accuracy of the output results, the model needs to ensure 0.03 2 , where p1 is the actual measured power and p2 is the calculated power.
[0047] In step S150, if the power difference between the third maximum power and the first maximum power is less than the difference threshold, the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster are determined according to the second search method, the photovoltaic panels in the target cluster are adjusted based on the control voltage, and the process of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps is returned.
[0048] In some embodiments, the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster are determined according to the second search method, including: if the third maximum power is less than the first maximum power, the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster are determined according to the first maximum power and the second search method; if the third maximum power is greater than or equal to the first maximum power, the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster are determined according to the third maximum power and the second search method.
[0049] In some embodiments, if the third maximum power is less than the first maximum power, the first voltage corresponding to the first maximum power is obtained; the first voltage is adjusted to the left according to the first initial adjustment value; if the power value corresponding to the adjusted first voltage is greater than the first maximum power, the adjustment is continued according to the first initial adjustment value in the same adjustment direction on the basis of the adjustment; if the adjusted power value is less than the power value corresponding to the previous adjustment, the voltage corresponding to the power value corresponding to the previous adjustment is used as the marking voltage, the first initial adjustment value is reduced by one quarter, and the marking voltage is adjusted in the opposite adjustment direction according to the reduced first initial adjustment value, and this step is repeated until the first initial adjustment value is less than or equal to the adjustment threshold.
[0050] In some embodiments, if the third maximum power is greater than or equal to the first maximum power, the third voltage corresponding to the third maximum power is obtained; the fourth voltage is adjusted to the right according to the second initial adjustment value; if the power value corresponding to the third voltage after adjustment is greater than the third maximum power, the adjustment is continued according to the second initial adjustment value in the same adjustment direction on the basis of the adjustment; if the adjusted power value is less than the power value corresponding to the previous adjustment, the voltage corresponding to the power value corresponding to the previous adjustment is used as the marking voltage, the second initial adjustment value is reduced by one half, and the marking voltage is adjusted in the opposite adjustment direction according to the reduced second initial adjustment value, and this step is repeated until the second initial adjustment value is less than or equal to the adjustment threshold.
[0051] It should be noted that, since the growth rate of the PV curve before reaching the maximum power value is smaller than the decline rate after exceeding the maximum power value, in order to approach the maximum power value as quickly as possible and finally stop at a position close to the maximum power value, the first initial adjustment value for adjusting to the left is set to be smaller than the second initial adjustment value for adjusting to the right, and the reduction rate of the first initial adjustment value is also set to be smaller than the reduction rate of the second initial adjustment value.
[0052] It can be understood that the second search method is more detailed than the first search method, and is suitable for situations close to the area where power changes smoothly. The second search method can more accurately find the global maximum power value.
[0053] In some embodiments, before determining the first maximum power of the target cluster, the method further includes: obtaining power generation and peak-shaving information of each photovoltaic panel; and dividing the clusters according to the power generation and peak-shaving information.
[0054] In the embodiment of the present application, the peak-shaving information is used to indicate the power supply status of each photovoltaic panel at various times of the day.
[0055] In some embodiments, the electrical distance between nodes may be determined according to the power generation of the photovoltaic panel, wherein the electrical distance between nodes may be expressed by the following formula:
[0056] ;
[0057] Among them, A mt represents the output of node m at time t, A nt Represents the output of node n at time t.
[0058] It is understandable that after determining the electrical distance and peak shaving information, the photovoltaic panels may be clustered according to actual conditions. In some embodiments, after determining the electrical distance and peak shaving information, the photovoltaic panels may be clustered using a fuzzy clustering algorithm.
[0059] In the distributed photovoltaic power generation cluster intelligent control method provided in the present application, the first maximum power of the target cluster is determined; wherein the target cluster includes at least one photovoltaic panel; the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment are obtained, the search voltage corresponding to each photovoltaic panel is determined, and the second maximum power corresponding to each photovoltaic panel in the target cluster is determined based on the search voltage and the first search method; the third maximum power of the target cluster is determined based on all the second maximum powers in the target cluster; if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the second maximum power corresponding to each photovoltaic panel in the target cluster is determined according to the control voltage and the first search method, the photovoltaic panels in the target cluster are adjusted based on the control voltage, and the third maximum power of the target cluster is determined based on all the second maximum powers in the target cluster and the subsequent steps; wherein the control voltage is determined according to the third maximum power and the first maximum power; if the power difference between the third maximum power and the first maximum power is less than the difference threshold, the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster are determined according to the second search method, the photovoltaic panels in the target cluster are adjusted based on the control voltage, and the third maximum power of the target cluster is determined based on all the second maximum powers in the target cluster and the subsequent steps are returned. Therefore, not only can the maximum power point be quickly approached at the beginning, but different search methods can be selected according to the power difference afterwards, so that the efficiency can be taken into account while ensuring the search accuracy, which effectively solves the problems existing in the prior art.
[0060] See also Figure 2 , Figure 2 A distributed photovoltaic power generation cluster intelligent control system 100 proposed in the present application is shown, the system includes: a cluster module 110 and a photovoltaic panel module 120, the cluster module 110 is used to execute a distributed photovoltaic power generation cluster intelligent control method, the cluster module 110 includes a cluster control unit, the photovoltaic panel module 120 includes a photovoltaic panel control unit, and the cluster control unit is used to control all photovoltaic panel control units included in the current cluster.
[0061] Furthermore, in some embodiments, the cluster module 110 further includes a first determination unit, a second determination unit, a third determination unit, a first control unit, and a second control unit.
[0062] In some embodiments, the first determining unit is configured to determine a first maximum power of the target cluster.
[0063] In some embodiments, the second determination unit is used to obtain the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment, determine the search voltage corresponding to each photovoltaic panel, and determine the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and the first search method.
[0064] In some embodiments, the third determining unit is configured to determine a third maximum power of the target cluster based on all second maximum powers in the target cluster.
[0065] In some embodiments, the first control unit is used to determine the second maximum power corresponding to each photovoltaic panel in the target cluster according to the control voltage and the first search method if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, adjust the photovoltaic panels in the target cluster based on the control voltage, and return to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps.
[0066] In some embodiments, the second control unit is used to determine the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method if the power difference between the third maximum power and the first maximum power is less than the difference threshold, adjust the photovoltaic panels in the target cluster based on the control voltage, and return to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps.
[0067] It should be noted that each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can be referred to each other. For the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. Any processing method described in the method embodiment can be implemented by the corresponding processing module in the system embodiment, and will not be repeated one by one in the system embodiment.
[0068] An embodiment of the present application further proposes an electronic device, which may be a distributed photovoltaic power generation cluster intelligent control device, and the device may specifically be, for example, a computer, a mobile phone, etc. The electronic device in the present application may include one or more of the following components: a processor, a memory, and one or more application programs, wherein the one or more application programs may be stored in the memory and configured to be executed by one or more processors, and the one or more application programs are configured to execute the method described in the aforementioned method embodiment.
[0069] The processor may include one or more processing cores. The processor uses various interfaces and lines to connect the various parts of the entire electronic device, and executes various functions of the electronic device and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory, and calling data stored in the memory. Optionally, the processor can be implemented in at least one hardware form of digital signal processing (DSP), field-programmable gate array (FPGA), and programmable logic array (PLA). The processor can integrate one or a combination of a central processing unit (CPU), a graphics processing unit (GPU), and a modem. Among them, the CPU mainly processes the operating system, user interface, and application programs; the GPU is responsible for rendering and drawing display content; and the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor, but may be implemented separately through a communication chip.
[0070] The memory may include a random access memory (RAM) or a read-only memory (ROM). The memory may be used to store instructions, programs, codes, code sets or instruction sets. The memory may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for implementing at least one function (such as a search function, a control function, an acquisition function, etc.), instructions for implementing the following various method embodiments, etc. The data storage area may also store data (such as power information, voltage information, temperature information, etc.) created by the electronic device during use.
[0071] See also Figure 3 , Figure 3 The structure block diagram of a computer-readable storage medium proposed in an embodiment of the present application is shown. The computer-readable storage medium 200 stores program codes, which can be called by a processor to execute the method described in the above method embodiment.
[0072] The computer-readable storage medium 200 may be an electronic memory such as a flash memory, an EEPROM (electrically erasable programmable read-only memory), an EPROM, a hard disk or a ROM. Optionally, the computer-readable storage medium 200 includes a non-transitory computer-readable storage medium. The computer-readable storage medium 200 has storage space for program code 210 for executing any method steps in the above method. These program codes can be read from or written to one or more computer program products. The program code 210 can be compressed, for example, in a suitable form.
[0073] The distributed photovoltaic power generation cluster intelligent control method provided by the present application determines the first maximum power of the target cluster; wherein the target cluster includes at least one photovoltaic panel; obtains the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment, determines the search voltage corresponding to each photovoltaic panel, and determines the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and the first search method; determines the third maximum power of the target cluster based on all the second maximum powers in the target cluster; if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, determines the second maximum power corresponding to each photovoltaic panel in the target cluster according to the control voltage and the first search method, adjusts the photovoltaic panels in the target cluster based on the control voltage, and returns to perform the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and the steps thereafter; wherein the control voltage is determined according to the third maximum power and the first maximum power; if the power difference between the third maximum power and the first maximum power is less than the difference threshold, determines the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method, adjusts the photovoltaic panels in the target cluster based on the control voltage, and returns to perform the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and the steps thereafter. Therefore, not only can the maximum power point be quickly approached at the beginning, but different search methods can be selected according to the power difference afterwards, so that the efficiency can be taken into account while ensuring the search accuracy, which effectively solves the problems existing in the prior art.
[0074] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A distributed photovoltaic power generation cluster intelligent control method, It is characterized in that The method comprises: Determine a first maximum power of a target cluster; wherein the target cluster includes at least one photovoltaic panel, and the first maximum power is the largest historical maximum power among the historical maximum powers of all photovoltaic panels in the target cluster; Obtain the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment; determine the current season, and determine the light intensity interval and temperature interval to which the light intensity and temperature belong; perform fuzzy classification based on the current season, the light intensity interval and the temperature interval to determine the reference voltage; obtain the current actual voltage, and determine the voltage difference between the reference voltage and the actual voltage; select a corresponding model according to the voltage difference interval to which the voltage difference belongs, input the voltage difference, the light intensity and the temperature into the corresponding model to determine the current power corresponding to each photovoltaic panel, determine the corresponding search voltage according to the current power, and determine the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and the first search method; wherein the second maximum power is the current maximum power corresponding to each photovoltaic panel in the target cluster at the current moment; Determine a third maximum power of the target cluster based on all the second maximum powers in the target cluster; wherein the third maximum power is the maximum value of all the second maximum powers in the target cluster at the current moment; If the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the second maximum power corresponding to each photovoltaic panel in the target cluster is determined according to the control voltage and the first search method, the photovoltaic panels in the target cluster are adjusted based on the control voltage, and the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps are returned to execute; wherein, if the third maximum power is greater than or equal to the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the voltage corresponding to the third maximum power is obtained as the control voltage; if the third maximum power is less than the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, the voltage corresponding to the first maximum power is obtained as the control voltage; If the power difference between the third maximum power and the first maximum power is less than the difference threshold, the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster are determined according to the second search method, the photovoltaic panels in the target cluster are adjusted based on the control voltage, and the step of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps is returned; wherein, the step of determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method includes: if the third maximum power is less than the first maximum power, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the first maximum power and the second search method; if the third maximum power is greater than or equal to the first maximum power, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the third maximum power and the second search method.
2. The method according to claim 1, It is characterized in that The determining of the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the first maximum power and the second search method includes: Acquire a first voltage corresponding to the first maximum power; Adjust the first voltage to the left according to a first initial adjustment value; If the power value corresponding to the first voltage after adjustment is greater than the first maximum power, continue to adjust according to the first initial adjustment value in the same adjustment direction on the basis of the adjusted power value; If the adjusted power value is less than the power value corresponding to the previous adjustment, the voltage corresponding to the power value corresponding to the previous adjustment is used as the marking voltage, the first initial adjustment value is reduced by one quarter, and the marking voltage is adjusted in the opposite adjustment direction according to the reduced first initial adjustment value, and this step is repeated until the first initial adjustment value is less than or equal to the adjustment threshold.
3. The method according to claim 1, It is characterized in that The step of determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the third maximum power and the second search method includes: Acquire a third voltage corresponding to the third maximum power; Adjust the third voltage rightward according to the second initial adjustment value; If the power value corresponding to the third voltage after adjustment is greater than the third maximum power, then continue to adjust according to the second initial adjustment value in the same adjustment direction on the basis of the adjusted power value; If the adjusted power value is less than the power value corresponding to the previous adjustment, the voltage corresponding to the power value corresponding to the previous adjustment is used as the marking voltage, the second initial adjustment value is reduced by one half, and the marking voltage is adjusted in the opposite adjustment direction according to the reduced second initial adjustment value, and this step is repeated until the second initial adjustment value is less than or equal to the adjustment threshold.
4. The method according to any one of claims 1 to 3, It is characterized in that Before determining the first maximum power of the target cluster, the method further includes: Obtain the power generation and peak-shaving information of each photovoltaic panel; Clusters are divided according to the power generation and the peak load information.
5. A distributed photovoltaic power generation cluster intelligent control system, It is characterized in that The system comprises: a cluster module and a photovoltaic panel module, wherein the cluster module comprises a cluster control unit, the photovoltaic panel module comprises a photovoltaic panel control unit, and the cluster control unit is used to control all the photovoltaic panel control units included in the current cluster; the cluster module further comprises a first determination unit, a second determination unit, a third determination unit, a first control unit, and a second control unit; The first determination unit is used to determine a first maximum power of the target cluster, where the first maximum power is the largest historical maximum power among the historical maximum powers of all photovoltaic panels in the target cluster; The second determination unit is used to obtain the light intensity and temperature corresponding to each photovoltaic panel in the target cluster at the current moment; determine the current season, and determine the light intensity interval and temperature interval to which the light intensity and temperature belong; perform fuzzy classification based on the current season, the light intensity interval and the temperature interval to determine the reference voltage; obtain the current actual voltage, and determine the voltage difference between the reference voltage and the actual voltage; select a corresponding model according to the voltage difference interval to which the voltage difference belongs, input the voltage difference, the light intensity and the temperature into the corresponding model to determine the current power corresponding to each photovoltaic panel, determine the corresponding search voltage according to the current power, and determine the second maximum power corresponding to each photovoltaic panel in the target cluster based on the search voltage and the first search method; wherein the second maximum power is the current maximum power corresponding to each photovoltaic panel in the target cluster at the current moment; The third determination unit is used to determine the third maximum power of the target cluster based on all the second maximum powers in the target cluster; wherein the third maximum power is the maximum value of all the second maximum powers in the target cluster at the current moment; The first control unit is used for determining the second maximum power corresponding to each photovoltaic panel in the target cluster according to the control voltage and the first search method if the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, adjusting the photovoltaic panels in the target cluster based on the control voltage, and returning to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and thereafter; wherein, if the third maximum power is greater than or equal to the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, obtaining the voltage corresponding to the third maximum power as the control voltage; if the third maximum power is less than the first maximum power, and the power difference between the third maximum power and the first maximum power is greater than or equal to the difference threshold, obtaining the voltage corresponding to the first maximum power as the control voltage; The second control unit is used to determine the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method if the power difference between the third maximum power and the first maximum power is less than the difference threshold, adjust the photovoltaic panels in the target cluster based on the control voltage, and return to execute the steps of determining the third maximum power of the target cluster based on all the second maximum powers in the target cluster and subsequent steps; wherein, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the second search method includes: if the third maximum power is less than the first maximum power, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the first maximum power and the second search method; if the third maximum power is greater than or equal to the first maximum power, determining the control voltage and the second maximum power corresponding to each photovoltaic panel in the target cluster according to the third maximum power and the second search method.