An integrated smart microgrid collaborative control system
By introducing monitoring units and edge servers into the microgrid collaborative control system to analyze the status and radiation data of energy storage equipment, the problems of energy storage equipment stability and grid load balance are solved, and more efficient grid collaborative control and equipment monitoring are achieved. , reducing operating costs.
Patent Information
- Application Number
- CN202411130351.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The existing microgrid collaborative control system lacks radiation data monitoring when the energy storage equipment is running, resulting in a decrease in equipment stability, the central server is too heavy to balance the grid load in time, and the energy storage order of the energy storage equipment is unreasonable, affecting the grid load. Stability and user power stability.
Design an integrated smart microgrid collaborative control system, adopting monitoring units, edge servers and servers. The monitoring units include power consumption monitoring modules, power storage monitoring modules and equipment monitoring modules. The edge server analyzes the status of energy storage equipment, and the server performs power allocation and Charging control ensures grid load balance and the safety of energy storage equipment.
Monitor the status and radiation data of energy storage equipment through edge servers, reduce the burden on the central server, improve the monitoring accuracy and stability of energy storage equipment, ensure the stability and benefits of grid load during peak electricity consumption, and reduce the grid operation cost.
Smart Images

Figure CN118646167B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of microgrid control, and in particular to an integrated smart microgrid collaborative control system. Background Art
[0002] Microgrid collaborative regulation is an important component of modern power systems. It integrates advanced information technology, communication technology and control strategies to achieve efficient collaborative operation between energy storage equipment, distribution networks and users. Energy storage equipment can release electricity during peak power demand and store electricity during low power demand to balance the grid load and improve energy utilization efficiency. Therefore, it ensures the safety of energy storage equipment operation and is conducive to the stability of grid operation.
[0003] Prior art, such as the invention patent disclosed in the application with publication number CN118040911A, discloses a storage microgrid monitoring system and monitoring method, storage medium, and computer equipment. The system includes: an intelligent control terminal, a photovoltaic power generation monitoring module, an energy storage device monitoring module, a battery pack monitoring module, a visualization terminal, and multiple video acquisition modules; the photovoltaic power generation monitoring module collects the first operating data of the photovoltaic power generation monitoring point; the energy storage device monitoring module collects the second operating data of the energy storage device monitoring point; the battery pack monitoring module collects the third operating data of the battery pack monitoring point; the intelligent control terminal receives and records the first operating data, the second operating data, and the third operating data, and obtains the information to be displayed; the visualization terminal displays the information to be displayed, and / or, based on the user input data, determines the target display information for display; the video acquisition module collects the video; the intelligent control terminal receives and stores the video file, and determines the target fault type based on the video file.
[0004] The above scheme has at least the following deficiencies: 1. The energy storage device will generate an electromagnetic field during operation, but the electromagnetic field will interfere with the internal circuits and components of the energy storage device, thereby affecting the operation of the energy storage device. However, in the above scheme, when monitoring the operating data of the energy storage device, there is a lack of monitoring of the radiation data of the energy storage device, and the cause of the abnormal operation of the energy storage device cannot be confirmed, so the corresponding protection device in the energy storage device cannot be activated for protection, resulting in a decrease in the stability of the energy storage device.
[0005] 2. According to the actual situation of the distribution network, the distribution network is generally divided into different areas to form a partitioned structure. However, the central server needs to receive and process the monitoring data of the energy storage devices in all partitions, which greatly increases the operating pressure and burden of the central server. When problems occur in the central server, it affects the monitoring of the energy storage devices in all partitions, resulting in the instability of the grid load and increasing the operating cost of the grid.
[0006] 3. When a certain energy storage device in a single partition is abnormal and needs to be shut down for maintenance, in order to ensure the stability of the grid charge, it is necessary to regulate the power of other energy storage devices to balance the grid load in the area of the abnormal energy storage device. However, the above scheme lacks analysis of power regulation after the energy storage device is abnormal, so it is impossible to balance the grid charge in time, affecting the stability of user power consumption.
[0007] 4. Energy storage devices can store electric energy during low periods, but in traditional technologies, the order of electric energy storage in energy storage devices is mostly based on the amount of remaining electric energy. The order of normal energy storage devices is not analyzed based on the location of high loads in the partition, the location of various electricity prices, and abnormal energy storage devices in the partition. As a result, it is impossible to ensure the stability of the grid load and revenue in the high-load area during the subsequent peak electricity consumption, and it is also impossible to ensure the stability of the grid load in the area with abnormal energy storage devices. Summary of the invention
[0008] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide an integrated smart microgrid collaborative control system.
[0009] In order to solve the above technical problems, the present invention adopts the following technical solution: The present invention provides an integrated smart microgrid collaborative control system, including: a monitoring unit, an edge server and a server.
[0010] The monitoring unit includes a power consumption monitoring module, a power storage monitoring module and an equipment monitoring module.
[0011] The power consumption monitoring module is used to monitor the power consumption data in each partition.
[0012] The power storage monitoring module is used to monitor the power storage data in each partition.
[0013] The equipment monitoring module is used to monitor the power storage data of each partition and the power storage equipment status data of each partition.
[0014] The edge server is used to use the power storage device status data of each partition to analyze whether the status of each energy storage device in each partition is normal, and if the status of at least one energy storage device in at least one partition is abnormal, power allocation is performed.
[0015] The server includes a power control module and an execution module.
[0016] The power control module is used to classify each partition into Class I areas and Class II areas according to the power consumption data and power storage data in each partition, and use the power consumption data in each partition to obtain the high-negative center position of each power consumption corresponding to each Class II area, and confirm the charging control plan of the energy storage device based on the power storage device status data of each partition.
[0017] The execution module is used to execute the energy storage device charging control scheme.
[0018] The beneficial effects of the present invention are as follows: 1. The present invention provides an integrated smart microgrid collaborative control system, which allocates an edge server to all energy storage devices in each partition, and is used to control the monitoring equipment in each energy storage device to collect the status data and radiation data of the energy storage device, and process and analyze whether each energy storage device is abnormal, and then start the corresponding device to protect the energy storage device, find out the energy storage device with serious faults, and regulate the electric energy in other energy storage devices in the partition to ensure the balance of the grid load. The edge server sends the energy storage device with serious faults to the server, and the server analyzes the charging sequence of each partition and the normal energy storage devices in each partition during the low power consumption period, to ensure the stability of the grid load and the benefits during the subsequent peak power consumption period, and improve the efficiency and effect of microgrid collaborative control.
[0019] In the embodiment of the present invention, an edge server is allocated to all energy storage devices in each partition, which is used to control the monitoring device in each energy storage device to collect the status data and radiation data of the energy storage device and process it, thereby reducing the operating pressure and burden of the central server. When a problem occurs in the central server, the monitoring impact of the energy storage devices in all partitions is reduced, thereby reducing the cost of monitoring the energy storage devices.
[0020] The present invention increases the monitoring of radiation data when monitoring the energy storage device, and can accurately discover the type of equipment abnormality during subsequent abnormality analysis, and then start the corresponding device for protection, thereby improving the accuracy of energy storage device operation monitoring, reducing equipment downtime, and ensuring the safety and stability of the energy storage device.
[0021] The present invention analyzes the order of normal energy storage devices according to the location of high loads in the partition, the location of each electricity price and the abnormal energy storage devices in the partition, so as to ensure the stability of the grid load and revenue in the high-load area during the subsequent peak power consumption, and at the same time ensure the stability of the grid load in the area with abnormal energy storage devices. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is a schematic diagram of the system structure connection of the present invention. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1 As shown, an integrated smart microgrid collaborative control system includes a monitoring unit, an edge server and a server.
[0026] Herein, server refers to a central server.
[0027] The monitoring unit includes a power consumption monitoring module, a power storage monitoring module and an equipment monitoring module.
[0028] The power consumption monitoring module is used to monitor the power consumption data in each partition.
[0029] In the above, the microgrid collaborative control system is connected to the power grid monitoring system of each partition to obtain the power consumption data in each partition. The power consumption data includes power load, the location of each high power load and the location of the three-tier electricity price. The high-load location is the location where the power consumption in the current year is greater than the preset power consumption of the power grid. For example: assuming that the preset power consumption of the power grid is 4000 kWh, and the power consumption of a certain location in the current year is 4390 kWh, 4390>4000, this location is the location of high power load. The power grid staff divides the electricity price into three tiers according to the amount of electricity consumed. If the amount of electricity consumed in the current year is less than or equal to the first electricity threshold, the electricity price is in the first tier. If the amount of electricity consumed in the current year is greater than the first electricity threshold and less than or equal to the second electricity threshold, the electricity price is in the second tier. If the amount of electricity consumed in the current year is greater than the second electricity threshold, the electricity price is in the third tier. For example, assuming that the first electricity threshold is 2100 kWh and the second electricity threshold is 4200 kWh, the first tier electricity price is 0.51 yuan / kWh, the second tier electricity price is 0.62 yuan / kWh, and the third tier electricity price is 0.89 yuan / kWh. When the amount of electricity consumed in the current year at a certain location is 4390, and 4390>4200, the electricity price at that location is in the third tier.
[0030] The power storage monitoring module is used to monitor the power storage data in each partition.
[0031] In the above, each energy storage device in each partition is equipped with an integrated monitoring system, such as a battery management system, a programmable logic controller, etc., to monitor the voltage, current and storage capacity parameters of the battery pack in real time. The power storage data in each partition includes the storage capacity of each energy storage device.
[0032] The equipment monitoring module is used to monitor the power storage data of each partition and the power storage equipment status data of each partition.
[0033] In a specific embodiment, the specific process of monitoring the status data of the power storage device in each partition is as follows: a number of sensors are deployed in each energy storage device in each partition, and each sensor in each energy storage device in each partition is connected to the edge server of each partition through the Internet of Things. The edge server of each partition controls the collection frequency of each sensor in each energy storage device, and uses each sensor to collect a number of status data of each energy storage device, and then transmits it to the edge server of each partition for data cleaning and screening to obtain the status data of each energy storage device in each partition.
[0034] It should be noted that the sensors include but are not limited to temperature sensors, vibration sensors and voltage sensors, and the status data include but are not limited to temperature, vibration frequency and voltage.
[0035] The staff can set the collection frequency of each sensor in each energy storage device in each partition in the server, and then the server sends it to the edge server in each partition. If the staff does not set it, the edge server in each partition can use the frequency of each sensor in each historical collection of each energy storage device and the deep learning algorithm to set the collection frequency of each sensor in each energy storage device.
[0036] Among them, the data cleaning and screening process is carried out in the edge servers of each partition: abnormal values are identified through methods such as cluster analysis or statistical tests, and a decision is made whether to correct or delete them, and then the maximum value collected by each sensor is selected as the data collected by each sensor, thereby forming the status data.
[0037] A circle is drawn with each energy storage device in each partition as the center and a preset length as the radius. The area inside the circle is the radiation monitoring area. Several monitoring points are arranged in the radiation monitoring area. Electromagnetic radiation monitoring instruments are arranged at each monitoring point. The electromagnetic radiation monitoring instruments at each monitoring point corresponding to each energy storage device in each partition are connected to the edge server of each partition through the Internet of Things. The edge server of each partition controls the frequency of the electromagnetic radiation monitoring instruments at each monitoring point corresponding to each energy storage device in each partition, collects radiation data of each monitoring point in the radiation monitoring area corresponding to each energy storage device in each partition, and then transmits it to the edge server of each partition for data cleaning and screening to obtain the radiation data of each energy storage device in each partition.
[0038] In the above, the preset length can be 1 meter, 1.5 meters or 2 meters, etc.
[0039] In the above, the radiation data includes electromagnetic field intensity and radiation intensity, etc.
[0040] The state data and radiation data of each energy storage device in each partition are used as the state data of the energy storage device in each partition.
[0041] In the embodiment of the present invention, an edge server is allocated to all energy storage devices in each partition, which is used to control the monitoring device in each energy storage device to collect the status data and radiation data of the energy storage device and process it, thereby reducing the operating pressure and burden of the central server. When a problem occurs in the central server, the monitoring impact of the energy storage devices in all partitions is reduced, thereby reducing the cost of monitoring the energy storage devices.
[0042] The present invention increases the monitoring of radiation data when monitoring the energy storage device, and can accurately discover the type of equipment abnormality during subsequent abnormality analysis, and then start the corresponding device for protection, thereby improving the accuracy of energy storage device operation monitoring, reducing equipment downtime, and ensuring the safety and stability of the energy storage device.
[0043] The edge server is used to use the power storage device status data of each partition to analyze whether the status of each energy storage device in each partition is normal, and if the status of at least one energy storage device in at least one partition is abnormal, power allocation is performed.
[0044] In a specific embodiment, the analysis of whether the status of each energy storage device in each partition is normal is performed as follows: the status data and radiation data of each energy storage device are obtained from the status data of the power storage device in each partition, and the status data safety interval and radiation data safety interval of each energy storage device in each partition are obtained from the edge server of each partition, and input into the expression of the status assessment model:
[0045] , output the status assessment results of each energy storage device in each partition ,in , , , They respectively represent the state data, state data safety interval, radiation data, and radiation data safety interval of the f-th energy storage device in the i-th partition, i represents the number of each partition, f represents the number of each energy storage device, and both i and f are positive integers.
[0046] The status evaluation result includes values of 1 and 0. When the status evaluation result is 1, it indicates that the status is normal, and when the status evaluation result is 0, it indicates that the status is abnormal.
[0047] In another specific embodiment, the specific process of the power allocation is as follows: the abnormal type of each marked device whose radiation data is not within the radiation data safety interval is recorded as radiation abnormality, and the abnormal type of each marked device whose radiation data is within the radiation data safety interval but the status data is not within the status data safety interval is recorded as status abnormality; each marked device with radiation abnormality is recorded as a Class I device; each marked device with status abnormality is recorded as a Class II device.
[0048] The edge server of each partition controls the electromagnetic shielding function of each Class I device to be turned on, and after waiting for a preset period of time, collects the status data and radiation data of each Class I device again, and obtains the status evaluation result of each Class I device. Each Class I device with a status evaluation result of 0 is regarded as a serious device, and then the emergency shutdown device of each serious device is started through the edge server of each partition; each Class I device with a status evaluation result of 1 is regarded as a normal operating device.
[0049] It should be noted that the analysis method of the status evaluation results of each type of equipment is the same as the analysis method of the status evaluation results of each energy storage device in each partition, which will not be repeated here.
[0050] The edge server of each partition starts the safety protection device of each Class II device, and after waiting for a preset period of time, collects the status data of each Class II device again, and treats each Class II device whose status data is within the status data safety interval as a Class II device and a normal operating device; treats each Class II device whose status data is not within the status data safety interval as a serious device, and then starts the emergency shutdown device of each serious device through the edge server of each partition.
[0051] Obtain the partition corresponding to each critical device, and obtain the load range of each critical device from the edge server of the corresponding partition, and obtain the power load of the load range corresponding to each critical device from the power consumption data of the corresponding partition; similarly, obtain the power storage capacity and power load of the load range of other normally operating devices in the partition corresponding to each critical device as the power storage capacity and power load of the load range of each backup device corresponding to each critical device.
[0052] The power load threshold and the power storage threshold of each backup device are obtained from the edge server of the partition corresponding to each critical device; if the power storage of a backup device corresponding to a critical device is greater than the power storage threshold, and the power load in the load range is less than the power load threshold, then the backup device is used as an adjustable device, thereby obtaining the adjustable devices of each critical device.
[0053] Each critical device corresponds to each deployable device according to the distance from the critical device from near to far, and the stored electricity is transmitted to the load range of each critical device in sequence until the power in the load range corresponding to each critical device is balanced.
[0054] It should be noted that the power grid monitoring system monitors whether the power in the corresponding load range of each critical equipment is balanced, and feeds back to the microgrid coordinated control system.
[0055] The server includes a power control module and an execution module.
[0056] The power control module is used to classify each partition into Class I areas and Class II areas according to the power consumption data and power storage data in each partition, and use the power consumption data in each partition to obtain the high-negative center position of each power consumption corresponding to each Class II area, and confirm the charging control plan of the energy storage device based on the power storage device status data of each partition.
[0057] In a specific embodiment, the classification process of each partition in the power control module is as follows: obtaining a power load threshold from a server, and obtaining a power storage threshold of each energy storage device in each partition from an edge server of each partition.
[0058] The power storage capacity of each normally operating device in each partition is extracted from the power storage data of each partition, the power load of each partition is obtained from the power consumption data in each partition, and the power storage state characteristic value of each partition is analyzed. The power storage state characteristic value includes values 1 and 0. When the power storage state characteristic value of a partition is 1, the partition is classified as a first-class partition. When the power storage state characteristic value of a partition is 0, the partition is classified as a second-class partition. In this way, each partition is classified.
[0059] In the above, the specific analysis process of the power storage state characteristic value of each partition is as follows: the number of critical devices in each partition is counted, recorded as , subtract the storage capacity threshold from the storage capacity of each normally operating device in each partition, and then add them up to get the available power of the energy storage device in each partition, recorded as , subtract the power load threshold from the power load in each partition to get the power load difference of each partition, recorded as .
[0060] According to the characteristic value analysis formula of the power storage state:
[0061] , get the characteristic value of the storage state of the i-th partition , where Represents the average value of available power of the energy storage device in the zone, It represents the average value of the power load difference in each partition. represents the number of energy storage devices in the ith partition, e represents a natural constant, , They represent the preset proportional coefficient of available power and the proportional coefficient of power load respectively. Indicates the preset power storage state coefficient threshold.
[0062] It should be noted that the available power and power load difference of the energy storage equipment of each partition at each power consumption peak are obtained from the historical records of each partition, and the available power of the energy storage equipment of each partition at each power consumption peak is divided by the average value of the available power to obtain the change value of the available power of each partition at each power consumption peak, and then the mean calculation is performed to obtain the average change value of the available power; the power load difference of the energy storage equipment of each partition at each power consumption peak is divided by the average value of the power load difference to obtain the change value of the power load difference, and then the mean calculation is performed to obtain the average change value of the power load difference; the average value of the power load difference is divided by the sum of the average value of the power load difference and the average change value of the power load difference to obtain the proportional coefficient of the available power; the average change value of the power load difference is divided by the sum of the average value of the power load difference and the average change value of the power load difference to obtain the proportional coefficient of the power load.
[0063] The threshold of the power storage state coefficient is used to judge whether the power storage capacity and power consumption of the partition are large, and to provide a reference for the subsequent analysis of the order of the energy storage equipment in the partition during the power consumption valley. The threshold of the power storage state coefficient is set by power grid experts based on historical data. When there is more available power in a partition and the power load difference is smaller, it means that the energy storage equipment in the partition has a larger storage capacity and a smaller power load difference. When the energy storage equipment is charged during the power consumption valley, the charging order of the energy storage equipment in the partition is relatively late. On the contrary, when there is less available power in a partition and the power load difference is larger, it means that the energy storage equipment in the partition has less available power and a larger power load. At this time, when the energy storage equipment is charged during the power consumption valley, the charging order of the energy storage equipment in the partition is relatively early.
[0064] For example, the storage state coefficient threshold is 50, and The value of is 40, 40<50, which means that the available power of the energy storage device in the i-th partition is small and the power load is large. When the energy storage device is charged at the low power consumption, the charging order of the energy storage device in this partition is relatively high.
[0065] In another specific embodiment, the specific process of confirming the charging control plan of the energy storage device is as follows: S1. The location of each high-power load in each second-class partition and the location of each of the three-tier electricity prices in each partition are obtained from the electricity consumption data in each second-class partition, and the location of each high-load cluster center and the location of each high-electricity price cluster center are obtained through cluster analysis.
[0066] S2. Calculate the priority value of each normally operating energy storage device in each second-class partition according to the location of each normally operating energy storage device in each second-class partition, the storage capacity, the location of each serious device, the location of each high-load cluster center, and the location of each high-electricity price cluster center, and sort them in descending order of the priority value to obtain the charging order of each normally operating energy storage device in each second-class partition.
[0067] In the above, the calculation process of the priority value of each normally operating energy storage device in each of the second-class partitions is as follows:
[0068] According to the position of each normally operating energy storage device and the position of each severe device in each second-class partition, the distance between each normally operating energy storage device and each severe device is obtained, and the average value is calculated. The calculation result is used as the first distance of each normally operating energy storage device, which is recorded as , z represents the number of each second-class partition, a represents the number of each normally operating energy storage device, and both z and a are positive integers.
[0069] According to the position of each normally operating energy storage device and the position of each high-load cluster center in each second-class partition, the distance between each normally operating energy storage device and each high-load cluster center is obtained, and the mean value is calculated. The calculation result is used as the second distance of each normally operating energy storage device, which is recorded as .
[0070] According to the position of each normally operating energy storage device in each second-class partition and the position of each high electricity price cluster center, the distance between each normally operating energy storage device and each high electricity price cluster center is obtained, and the mean value is calculated. The calculation result is used as the third distance of each normally operating energy storage device, which is recorded as .
[0071] According to the calculation formula , get the priority value of the a-th normally operating energy storage device in the z-th second-class partition , where , , represent the average value of the first spacing, the average value of the second spacing, and the average value of the third spacing, respectively. , , are respectively a preset proportional coefficient of the first spacing, a preset proportional coefficient of the second spacing, and a preset proportional coefficient of the third spacing, , They respectively represent the storage capacity threshold and storage capacity of the a-th normally operating energy storage device in the z-th second-class partition.
[0072] It should be noted that the first spacing, the second spacing and the third spacing of the energy storage device first charged at each historical power consumption valley are obtained from the server and are recorded as , and , b represents the number of each historical electricity consumption valley, calculated by the formula:
[0073] , get the change rate of the first interval of the bth historical electricity consumption valley , and then perform mean calculation to obtain the average change rate of the first spacing, recorded as d1. Similarly, calculate the average change rate of the second spacing and the average change rate of the third spacing, recorded as d2 and d3 respectively. , , .
[0074] S3. Obtain the average electricity price and electricity load of each second-class partition from the electricity consumption data in each second-class partition. At the same time, analyze the priority value of each second-class partition according to the number of serious equipment in each second-class partition, and sort them in descending order of priority value to obtain the charging order of each second-class partition.
[0075] In the above, the calculation process of the priority value of each second-class partition is as follows: the average electricity price, power load and number of critical equipment of each second-class partition are marked as , and , substitute into the calculation formula
[0076] , get the priority value of the z-th second-class partition, where, , They represent the average value of the average electricity price of the second-class partition and the average value of the electricity load of the second-class partition, respectively. represents the number of energy storage batteries in the zth second-class partition, , They are respectively the proportional coefficient of the preset average electricity price of the second-class partition and the proportional coefficient of the electricity load of the second-class partition.
[0077] It should be noted that the average electricity price and the average electricity load of the first charging corresponding partition at each historical electricity consumption valley are obtained from the server, and then the average change rate of the average electricity price and the average change rate of the average electricity load are obtained according to the analysis process of the average change rate of the first interval, which are recorded as c1 and c2 respectively. , .
[0078] S4. According to the analysis method of S2 and S3, the charging sequence of each normally operating energy storage device in each first-class partition and the charging sequence of each first-class partition are obtained, and they are arranged behind each normally operating energy storage device in each second-class partition and each second-class partition respectively, and then a charging sequence table of energy storage devices is generated as a charging control plan for energy storage devices.
[0079] The present invention analyzes the order of normal energy storage devices according to the location of high loads in the partition, the location of each electricity price and the abnormal energy storage devices in the partition, so as to ensure the stability of the grid load and revenue in the high-load area during the subsequent peak power consumption, and at the same time ensure the stability of the grid load in the area with abnormal energy storage devices.
[0080] The execution module is used to execute the energy storage device charging control plan, receive the location of each critical device, and issue an early warning to each critical device, prompting staff to check and repair it.
[0081] In the embodiment of the present invention, an edge server is allocated to all energy storage devices in each partition, which is used to control the monitoring device in each energy storage device to collect the status data and radiation data of the energy storage device, process it, analyze whether each energy storage device is abnormal, and then start the corresponding device to protect the energy storage device, find out the energy storage device with serious faults, and then regulate the electric energy in other energy storage devices in the partition to ensure the balance of the power grid load. The edge server sends the energy storage device with serious faults to the server, and the server analyzes the charging sequence of each partition and the normal energy storage devices in each partition during the low power consumption period, so as to ensure the stability of the power grid load and the benefits during the subsequent peak power consumption period, and improve the efficiency and effect of the coordinated regulation of the microgrid.
[0082] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this specification, they shall all fall within the protection scope of the present invention.
Claims
1. An integrated smart microgrid collaborative control system, characterized in that: include: Monitoring units, edge servers, and servers; The monitoring unit includes a power consumption monitoring module, a power storage monitoring module and an equipment monitoring module; The power consumption monitoring module is used to monitor the power consumption data in each partition; The power storage monitoring module is used to monitor the power storage data in each partition; The equipment monitoring module is used to monitor the power storage data of each partition and the power storage equipment status data of each partition; The specific process of monitoring the status data of the power storage device in each partition is as follows: Several sensors are arranged in each energy storage device in each partition. Each sensor in each energy storage device in each partition is connected to the edge server of each partition through the Internet of Things. The edge server of each partition controls the collection frequency of each sensor in each energy storage device, and uses each sensor to collect several status data of each energy storage device, and then transmits it to the edge server of each partition for data cleaning and screening, so as to obtain the status data of each energy storage device in each partition; A circle is drawn with each energy storage device in each partition as the center and a preset length as the radius. The area inside the circle is the radiation monitoring area. Several monitoring points are arranged in the radiation monitoring area. Electromagnetic radiation monitoring instruments are arranged at each monitoring point. The electromagnetic radiation monitoring instruments corresponding to each monitoring point of each energy storage device in each partition are connected to the edge server of each partition through the Internet of Things. The edge server of each partition controls the frequency of the electromagnetic radiation monitoring instruments corresponding to each monitoring point of each energy storage device in each partition, collects radiation data of each monitoring point in the radiation monitoring area corresponding to each energy storage device in each partition, and then transmits the data to the edge server of each partition for data cleaning and screening to obtain radiation data of each energy storage device in each partition. The state data and radiation data of each energy storage device in each partition are used as the state data of the energy storage device in each partition; The edge server is used to use the power storage device status data of each partition to analyze whether the status of each energy storage device in each partition is normal, and if the status of at least one energy storage device in at least one partition is abnormal, power allocation is performed; The server includes a power control module and an execution module; The power control module is used to classify each partition into each first-class area and each second-class area according to the power consumption data and power storage data in each partition, and use the power consumption data in each partition to obtain the high-negative center position of each power consumption corresponding to each second-class area, and confirm the charging control plan of the energy storage device based on the power storage device status data of each partition; The specific process of confirming the charging control scheme of the energy storage device is as follows: S1. Obtain the locations of each high-load electricity consumption in each second-class partition and the locations of each of the three-tier electricity prices in each partition from the electricity consumption data in each second-class partition, and obtain the locations of each high-load cluster center and each high-price cluster center through cluster analysis; S2. Calculate the priority value of each normally operating energy storage device in each second-class partition according to the location, storage capacity, location of each critical device, location of each high-load cluster center, and location of each high-price cluster center of each normally operating energy storage device in each second-class partition, and sort them in descending order of priority value to obtain the charging order of each normally operating energy storage device in each second-class partition; S3. Obtain the average electricity price and electricity load of each second-class partition from the electricity consumption data in each second-class partition, and analyze the priority value of each second-class partition according to the number of serious equipment in each second-class partition, and sort them in descending order of priority value to obtain the charging order of each second-class partition; S4. According to the analysis method of S2 and S3, the charging sequence of each normally operating energy storage device in each first-class partition and the charging sequence of each first-class partition are obtained, and they are arranged behind each normally operating energy storage device in each second-class partition and each second-class partition, and then a charging sequence table of energy storage devices is generated as a charging control scheme for energy storage devices; The calculation process of the priority value of each normally operating energy storage device in each of the second-class partitions is as follows: According to the position of each normally operating energy storage device and the position of each severe device in each second-class partition, the distance between each normally operating energy storage device and each severe device is obtained, and the average value is calculated. The calculation result is used as the first distance of each normally operating energy storage device, which is recorded as , z represents the number of each second-class partition, a represents the number of each normally operating energy storage device, and both z and a are positive integers; According to the position of each normally operating energy storage device and the position of each high-load cluster center in each second-class partition, the distance between each normally operating energy storage device and each high-load cluster center is obtained, and the mean value is calculated. The calculation result is used as the second distance of each normally operating energy storage device, which is recorded as ; According to the position of each normally operating energy storage device in each second-class partition and the position of each high electricity price cluster center, the distance between each normally operating energy storage device and each high electricity price cluster center is obtained, and the mean value is calculated. The calculation result is used as the third distance of each normally operating energy storage device, which is recorded as ; According to the calculation formula , get the priority value of the a-th normally operating energy storage device in the z-th second-class partition , where , , represent the average value of the first spacing, the average value of the second spacing, and the average value of the third spacing, respectively. , , are respectively a preset proportional coefficient of the first spacing, a preset proportional coefficient of the second spacing, and a preset proportional coefficient of the third spacing, , They respectively represent the storage capacity threshold and storage capacity of the a-th normally operating energy storage device in the z-th second-class partition; The calculation process of the priority value of each second-class partition is as follows: The average electricity price, electricity load and number of critical equipment in each second-class partition are marked as , and , substitute into the calculation formula , get the priority value of the z-th second-class partition, where, , They represent the average value of the average electricity price of the second-class partition and the average value of the electricity load of the second-class partition, respectively. represents the number of energy storage batteries in the zth second-class partition, , They are respectively the proportional coefficient of the preset average electricity price of the second-class partition and the proportional coefficient of the electricity load of the second-class partition; The execution module is used to execute the energy storage device charging control scheme.
2. The integrated smart microgrid collaborative control system according to claim 1 is characterized in that: The specific process of analyzing whether the status of each energy storage device in each partition is normal is as follows: The status data and radiation data of each energy storage device are obtained from the status data of the power storage device in each partition, and the status data safety interval and radiation data safety interval of each energy storage device in each partition are obtained from the edge server of each partition, and input into the expression of the status assessment model: , output the status assessment results of each energy storage device in each partition ,in , , , Respectively represent the state data, state data safety interval, radiation data, and radiation data safety interval of the f-th energy storage device in the i-th partition, i represents the number of each partition, f represents the number of each energy storage device, and both i and f are positive integers; The status evaluation result includes values of 1 and 0. When the status evaluation result is 1, it indicates that the status is normal, and when the status evaluation result is 0, it indicates that the status is abnormal.
3. The integrated smart microgrid collaborative control system according to claim 2 is characterized in that: The specific process of power allocation is as follows: The abnormal type of each marking device whose radiation data is not within the radiation data safety interval is recorded as radiation abnormality, and the abnormal type of each marking device whose radiation data is within the radiation data safety interval but whose state data is not within the state data safety interval is recorded as state abnormality; Each marked device with abnormal radiation is recorded as a Class I device; each marked device with abnormal status is recorded as a Class II device; The edge server of each partition controls the electromagnetic shielding function of each Class I device to be turned on, and after waiting for a preset period of time, collects the status data and radiation data of each Class I device again, and obtains the status evaluation result of each Class I device, and regards each Class I device with a status evaluation result of 0 as a serious device, and then starts the emergency shutdown device of each serious device through the edge server of each partition; and regards each Class I device with a status evaluation result of 1 as a normal operating device; The edge server of each partition starts the safety protection device of each Class II device, and after waiting for a preset time, collects the status data of each Class II device again, and regards each Class II device whose status data is within the status data safety range as a Class II device as a normal operating device; Class II devices whose status data is not within the status data safety range are regarded as critical devices, and then the emergency shutdown device of each critical device is started through the edge server of each partition; Obtain the partition corresponding to each critical device, and obtain the load range of each critical device from the edge server of the corresponding partition, and obtain the power load of the load range corresponding to each critical device from the power consumption data of the corresponding partition; similarly, obtain the power storage and load range of other normally operating devices in the partition corresponding to each critical device as the power storage and load range of each standby device corresponding to each critical device; Obtain the power load threshold and the power storage threshold of each backup device from the edge server of the partition corresponding to each critical device; if the power storage of a backup device corresponding to a critical device is greater than the power storage threshold, and the power load of the load range is less than the power load threshold, then the backup device is used as an adjustable device, thereby obtaining each adjustable device of each critical device; Each critical device corresponds to each deployable device according to the distance from each critical device from near to far, and the stored electricity is transmitted to the load range of each critical device in sequence until the power of the load range corresponding to each critical device is balanced. At the same time, each partition edge server sends the location of each critical device to the server.
4. The integrated smart microgrid coordinated control system according to claim 3 is characterized in that: The execution module in the server is also used to receive the location of each critical device, and issue an early warning to each critical device, prompting staff to check and repair it.
5. The integrated smart microgrid coordinated control system according to claim 3 is characterized in that: The classification process of each partition in the power control module is as follows: Obtaining a power load threshold from the server, and obtaining a power storage threshold of each energy storage device in each partition from the edge server of each partition; The power storage capacity of each normally operating device in each partition is extracted from the power storage data of each partition, the power load of each partition is obtained from the power consumption data in each partition, and the power storage state characteristic value of each partition is analyzed. The power storage state characteristic value includes values 1 and 0. When the power storage state characteristic value of a partition is 1, the partition is classified as a first-class partition. When the power storage state characteristic value of a partition is 0, the partition is classified as a second-class partition. In this way, each partition is classified.
6. The integrated smart microgrid coordinated control system according to claim 5 is characterized in that: The specific analysis process of the power storage state characteristic value of each partition is as follows: Count the number of critical devices in each partition, recorded as , subtract the storage capacity threshold from the storage capacity of each normally operating device in each partition, and then add them up to get the available power of the energy storage device in each partition, recorded as , subtract the power load threshold from the power load in each partition to get the power load difference of each partition, recorded as ; According to the characteristic value analysis formula of the power storage state: , get the characteristic value of the power storage state of the i-th partition , where Represents the average value of available power of the energy storage device in the zone, It represents the average value of the power load difference in each partition. represents the number of energy storage devices in the ith partition, e represents a natural constant, , They represent the preset proportional coefficient of available power and the proportional coefficient of power load respectively. Indicates the preset power storage state coefficient threshold.