Converter parallel system and load distribution method thereof
By obtaining the total load power and efficiency curve of the parallel system of the power electronic converter, and using appropriate load distribution methods, some converters work at the highest efficiency point, solving the problem of low efficiency when the system runs inadequate capacity and realizing system efficiency Increase and loss reduction.
Patent Information
- Application Number
- CN202411117620.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2024-07-30
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-15
AI Technical Summary
When the system operation capacity of the existing power electronic converter parallel system is insufficient, the power equalization characteristics undertaken by each converter lead to a lack of control and optimization capabilities in the system efficiency, which cannot effectively reduce the total loss and improve the operating efficiency.
By obtaining the total load power of the converter parallel system and the efficiency curve of each converter, different load distribution methods (such as full input allocation method and partial input allocation method) are used to optimize the load power distribution, so that some converters can work at the highest efficiency point , achieve the improvement of the overall system efficiency.
By optimizing load power distribution, the system operation efficiency is improved, the total loss and heat generation are reduced, and the system reliability and stability are enhanced.
Smart Images

Figure CN118646245B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of electronic power conversion, and in particular to a converter parallel system and a load distribution method thereof. Background Art
[0002] As a tool for converting electric energy, the capacity of a single power electronic converter is limited. In order to adapt to applications with larger capacities, several converters usually need to be used in parallel. In order to balance the characteristics of the converters after parallel connection, power or current is usually evenly distributed to each converter so that the parallel system can achieve stable balance.
[0003] Assume that the total system capacity is S , the rated capacity of each converter is P , the number of parallel connections is n , then it needs to satisfy S<n*P , so that each converter has a certain capacity redundancy. Special and frequent, the system operating capacity S’ Less than the designed total capacity S At this time, due to the existence of the equal distribution characteristic, the power borne by each converter is P'=S' / n , so each converter in the parallel system has the same power condition. Assume that the function of the efficiency of each converter to the load rate is f(p) , then the system operating capacity S’ Under the condition of F=f(P')=f(S' / n) Therefore, it does not have the ability to regulate and optimize system efficiency. Summary of the invention
[0004] In order to address the deficiencies of the prior art, the purpose of the present application is to provide a converter parallel system and a load distribution method thereof, which can achieve optimal distribution of the total load power of the converter parallel system, which is beneficial to reducing the total loss of the converter parallel system and improving the operating efficiency of the system.
[0005] To achieve the above objectives, this application adopts the following technical solutions:
[0006] In a first aspect, the present application provides a load distribution method for a converter parallel system, the converter parallel system comprising at least two converters in parallel mode, the load distribution method comprising:
[0007] Obtain the total load power of the converter parallel system;
[0008] Obtain the number of converters in the converter parallel system and the efficiency curve of each converter, where the efficiency curve describes the efficiency of the converter at different load levels;
[0009] Combining the efficiency curves, obtaining the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted;
[0010] Comparing the total efficiency of the converter parallel system when the first load distribution method is adopted and the second load distribution method is adopted, and selecting the load distribution method with higher total efficiency to distribute the load power;
[0011] Among them, when the first load distribution method is adopted, all converters in the converter parallel system evenly share the total load power, and when the second load distribution method is adopted, at least some converters in the converter parallel system operate at the highest efficiency point or only one converter operates.
[0012] The load distribution method of the converter parallel system obtains the total load power of the converter parallel system, the number of converters in the converter parallel system and the efficiency curve of each converter, so as to serve as the basis for subsequent load distribution; further combined with the efficiency curve, the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted, so as to comprehensively consider the efficiency characteristics of the converter parallel system; further, the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted are compared, and the load distribution method with higher total efficiency is selected for load power distribution, thereby realizing the optimal distribution of the total load power of the converter parallel system, which is beneficial to improving the system operation efficiency.
[0013] Furthermore, the second load distribution method includes a converter full-investment distribution method. When the converter full-investment distribution method is adopted, all n converters of the converter parallel system are put into operation, wherein m converters operate at the highest efficiency point, and the remaining nm converters evenly share the remaining power, where m and n are positive integers, and m is less than n; the converter full-investment distribution method includes: using the enumeration method to obtain a full-investment distribution combination of m and nm when the number of converters operating at the highest efficiency point is the largest, and obtaining the full-investment total efficiency of the converter parallel system when the full-investment distribution combination is adopted.
[0014] Furthermore, when the converter full-power allocation method is adopted, the power allocated to the converter that is not operating at the highest efficiency point is greater than or equal to q times the rated capacity of the converter, and q is greater than 0 and less than or equal to 0.4.
[0015] Furthermore, when the converter full input allocation method is adopted, the power allocated to the converter that is not working at the highest efficiency point satisfies the following relationship:
[0016] ;
[0017] In the formula, S Indicates the total load power, m represents the number of converters working at the highest efficiency point, n represents the number of converters in the converter parallel system, P M It represents the power corresponding to the converter working at the highest efficiency point. P N Indicates the rated capacity of the converter.
[0018] Furthermore, the second load distribution method also includes a converter partial input distribution method. When the converter partial input distribution method is adopted, k converters in the converter parallel system are put into operation, wherein r converters operate at the highest efficiency point, and the remaining kr converters evenly share the remaining power, k and r are positive integers, k is less than n, and r is less than k; the converter partial input distribution method includes: using the enumeration method to obtain a partial input distribution combination of k and kr when the number of converters put into operation is the least, and obtaining the partial input total efficiency of the converter parallel system when the partial input distribution combination is adopted.
[0019] Furthermore, when the total load power is greater than or equal to a preset threshold, the converter full-time distribution method is selected as the second load distribution method, and the total efficiency of the converter parallel system using the first load distribution method is compared with that using the converter full-time distribution method, and the load distribution method with higher total efficiency is selected for load power distribution; when the total load power is less than a preset threshold, the converter partial-time distribution method is selected as the second load distribution method, and the total efficiency of the converter parallel system using the first load distribution method is compared with that using the converter partial-time distribution method, and the load distribution method with higher total efficiency is selected for load power distribution.
[0020] Furthermore, the preset threshold is expressed by the following formula:
[0021] ;
[0022] In the formula, y Indicates the preset threshold value, P N Indicates the rated capacity of the converter. αP N It represents the power corresponding to the converter working at the highest efficiency point. βP N Indicates the power corresponding to the converter working at the preset efficiency. n Indicates the number of converters in a converter parallel system.
[0023] In a second aspect, the present application further provides a converter parallel system, the converter parallel system comprising at least two converters in parallel mode, and the converter parallel system further comprising:
[0024] A control module, the control module is used to obtain the total load power of the converter parallel system, the number of converters in the converter parallel system, and the efficiency curve of each converter, the efficiency curve describing the efficiency of the converter under different load levels; the control module is also used to obtain the total efficiency of the converter parallel system when a first load distribution method is adopted, and the total efficiency of the converter parallel system when a second load distribution method is adopted, in combination with the efficiency curve; the control module compares the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted, and the control module selects the load distribution method with higher total efficiency to distribute the load power; wherein, when the first load distribution method is adopted, all converters in the converter parallel system evenly share the total load power, and when the second load distribution method is adopted, at least some of the converters in the converter parallel system operate at the highest efficiency point or only one converter operates.
[0025] The converter parallel system includes at least two converters in parallel mode and a control module. The control module is used to obtain the total load power of the converter parallel system, the number of converters in the converter parallel system and the efficiency curve of each converter, and is further used to combine the efficiency curves to obtain the total efficiency of the converter parallel system when a first load distribution method is adopted, and the total efficiency of the converter parallel system when a second load distribution method is adopted, so as to comprehensively consider the efficiency characteristics of the converter parallel system; further, it is used to compare the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted, and select a load distribution method with higher total efficiency to distribute load power, thereby realizing the optimal distribution of the total load power of the converter parallel system, which is beneficial to improving the system operation efficiency.
[0026] Furthermore, the second load distribution method includes a converter full-investment distribution method. When the converter full-investment distribution method is adopted, all n converters of the converter parallel system are put into operation, wherein m converters operate at the highest efficiency point, and the remaining nm converters evenly share the remaining power, where m and n are positive integers, and m is less than n; the converter full-investment distribution method includes: using the enumeration method to obtain a full-investment distribution combination of m and nm when the number of converters operating at the highest efficiency point is the largest, and obtaining the full-investment total efficiency of the converter parallel system when the full-investment distribution combination is adopted.
[0027] Furthermore, the second load distribution method also includes a converter partial input distribution method. When the converter partial input distribution method is adopted, k converters in the converter parallel system are put into operation, wherein r converters operate at the highest efficiency point, and the remaining kr converters evenly share the remaining power, k and r are positive integers, k is less than n, and r is less than k; the converter partial input distribution method includes: using the enumeration method to obtain a partial input distribution combination of k and kr when the number of converters put into operation is the least, and obtaining the partial input total efficiency of the converter parallel system when the partial input distribution combination is adopted. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 is an application scenario diagram of a load distribution method for a converter parallel system provided in the present application;
[0029] Figure 2 is a flow chart of a load distribution method for a converter parallel system provided by the present application;
[0030] Figure 3 is an efficiency curve diagram of the first load distribution method provided by the present application;
[0031] Figure 4 is an efficiency curve diagram of the converter full input allocation method provided by the present application;
[0032] Figure 5 is an efficiency curve diagram of the converter partial input allocation method provided by the present application;
[0033] Figure 6 is a flow chart of another load distribution method for a converter parallel system provided by the present application;
[0034] Figure 7 is a judgment flow chart of a load distribution method for a converter parallel system provided by the present application;
[0035] Figure 8 is a comparison diagram of the efficiency curves of the first load distribution method and the converter provided in the present application;
[0036] Fig. 9 is a comparison diagram of efficiency curves of the first load distribution method and the second load distribution method provided by the present application;
[0037] Fig.10 It is a structural schematic diagram of a converter parallel system provided in the present application. DETAILED DESCRIPTION
[0038] The present application will be described in detail below in conjunction with the specific implementation modes shown in the accompanying drawings, but these implementation modes do not limit the present application. Structural, methodological, or functional changes made by ordinary technicians in the field based on these implementation modes are included in the protection scope of the present application.
[0039] The application scenario of the load distribution method of the converter parallel system provided by the embodiment of the present application is as follows: Figure 1 As shown, the converter parallel system in this application scenario includes three converters 11 in parallel mode and a load 21, the load 21 is directly connected to the output bus of the parallel converter, and the parallel converter 11 is used to power the load. It should be noted that in a specific application, the converter parallel system includes at least two converters 11 in parallel mode. Among them, the converter 11 can be but not limited to a matrix converter, a DC-DC converter, a rectifier, an inverter and other types of converters 11. For example, in a solar power generation system, the converter 11 is used to convert DC power into AC power that can be incorporated into the power grid. Among them, the load 21 can be but not limited to a power-consuming element such as a resistor, a light bulb, a motor, an electric furnace, etc., and the load 21 can also be but not limited to an inductive load, a capacitive load or a resistive load, etc.
[0040] Figure 2 A flow chart of a load distribution method for a converter parallel system provided in one embodiment of the present application, the method comprising the following steps:
[0041] Step S201, obtaining the total load power of the converter parallel system.
[0042] Among them, the total load power is the load demand power, which is determined by factors such as the system usage scenario and the load 21 itself. Accurately obtaining the total load power of the converter parallel system is the basis for subsequent load distribution.
[0043] Step S202 , obtaining the number of converters 11 in the converter parallel system and the efficiency curve of each converter 11 , where the efficiency curve represents the efficiency of the converter 11 at different load levels.
[0044] The number of converters 11 represents the number of converters 11 connected in parallel in the converter parallel system. Figure 1 In the example application scenario, the number of converters 11 is 3. The efficiency curve of the converter 11 represents the working efficiency of the converter 11 at different load levels. The efficiency curve of each converter 11 can be obtained by actual monitoring or experimental measurement, and the efficiency curve can also be smoothed by polynomial fitting to more accurately describe the efficiency of the converter 11 at different load levels.
[0045] For example, the total load power of the converter parallel system is defined as S, the number of converters 11 in the converter parallel system is n, and the power of converter 11 is P i , the efficiency of the i-th converter 11 and the power of the converter 11 P i The relationship is f i (P i ) , where i=1,2,3...n, and the efficiency curves of the converters are consistent or approximately consistent. Based on this, a schematic diagram of the efficiency curve of all converters 11 in a converter parallel system sharing the total load power is shown as follows: Figure 3 As shown, it can be seen that all converters 11 in the converter parallel system evenly share the total load power, and the converter parallel system efficiency is the average value of the efficiencies of each parallel converter 11.
[0046] Step S203, combining the efficiency curves, obtaining the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted.
[0047] Wherein, when the first load distribution method is adopted, all converters 11 in the converter parallel system share the total load power equally, and when the second load distribution method is adopted, at least some converters 11 in the converter parallel system operate at the highest efficiency point. Alternatively, when the total load power is lower than the power value corresponding to the optimal efficiency of any converter 11, only one of the converters 11 may be operated.
[0048] Specifically, the efficiency curve is combined with the total efficiency of the converter parallel system under the first load distribution method and the second load distribution method, so as to realize the diversified load distribution later. It can be understood that the first load distribution method focuses on simple and equal load distribution, and the second load distribution method focuses on considering the efficiency characteristics and the current working state to adjust the load distribution accordingly, so as to maximize the overall efficiency of the converter parallel system.
[0049] For example, the total load power of the converter parallel system is defined as S , the number of converters 11 in the converter parallel system is n, and the power of converter 11 is P i , the efficiency of the i-th converter 11 and its power P i The relationship is f i (P i ), where i=1,2,3...n. The total efficiency of the converter parallel system can be obtained as shown in formula (1):
[0050] Formula (1);
[0051] In the formula, represents the total efficiency of the converter parallel system, n represents the number of converters 11 in the converter parallel system, f i (P i ) represents the efficiency and power of the i-th converter 11 P i relationship, P i Indicates the power of the converter 11.
[0052] Combined with formula (1), when the first load distribution method is adopted, that is, when the power of each converter 11 in the converter parallel system is evenly distributed, the total efficiency of the converter parallel system can be shown as formula (2):
[0053] Formula (2);
[0054] In the formula, represents the total efficiency of the converter parallel system, S Indicates the total load power, n represents the number of converters 11 in the converter parallel system, represents the load power shared equally by each converter 11, represents the efficiency and power of the i-th converter 11 relationship.
[0055] Step S204, comparing the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted, and selecting the load distribution method with higher total efficiency to distribute the load power.
[0056] Specifically, when the total efficiency of the first load distribution method is higher than the total efficiency of the converter parallel system when the second load distribution method is used, the first load distribution method is selected for load power distribution; otherwise, the second load distribution method is used for load power distribution to improve the operating efficiency and overall performance of the converter parallel system.
[0057] According to the above description, the load distribution method of the converter parallel system of this embodiment obtains the total load power of the converter parallel system, obtains the number of converters 11 in the converter parallel system and the efficiency curve of each converter 11, so as to serve as the basis for subsequent load distribution. Further combined with the efficiency curve, the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted, so as to comprehensively consider the efficiency characteristics of the converter parallel system. Further, the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted are compared, and the load distribution method with higher total efficiency is selected for load power distribution, thereby realizing the optimal distribution of the load power of the converter parallel system, so as to optimize the system operation efficiency under different requirements, reduce the total loss and heat generation of the system, and improve the reliability and stability of the system.
[0058] As an optional implementation, the second load distribution method includes a full-input distribution method for the converter 11. In the case of the full-input distribution method for the converter 11, all the loads of the converter parallel system are n The number of converters 11 is put into operation, among which m The converter 11 works at the highest efficiency point, and the remaining nm The converters 11 evenly distribute the remaining power. m、n is a positive integer, m Less than n The method for distributing the full input of the converter 11 includes: using an enumeration method to obtain the maximum number of converters 11 running at the highest efficiency point. m and nm The full-input allocation combination is obtained to obtain the full-input total efficiency of the converter parallel system when the full-input allocation combination is adopted.
[0059] Specifically, Figure 4 As shown in FIG. 1 , the efficiency curve of the converter 11 is a diagram of the efficiency curve of the converter 11 when the converter 11 is fully invested in the allocation method. The efficiency curve of the converter 11 is an efficiency curve with a single efficiency extreme point. At this extreme point, the efficiency of the converter 11 is optimized. f=f(P) Represents the relationship function between efficiency and power. Define the rated capacity of each converter 11 as P N , the power corresponding to the efficiency extreme point of converter 11 is P M , the total load power of the converter parallel system is preferentially allocated to the number m converter 11, so that the number m The remaining load power of the converter parallel system is evenly distributed to nmConverters 11, each converter 11 has an average power of P R , then the relationship between the total load power of the converter parallel system and the efficiency extreme point power and the average power of each converter 11 is as shown in formula (3):
[0060] Formula (3);
[0061] In the formula, , S Indicates the total load power, m represents the number of converters 11 operating at the highest efficiency point, n represents the number of converters 11 in the converter parallel system, P M represents the power corresponding to the converter 11 operating at the highest efficiency point, P R Indicates the remaining nm The remaining power is evenly shared by the converters 11.
[0062] Based on this, the efficiency of the converter parallel system is shown in formula (4):
[0063] Formula (4);
[0064] In the formula, represents the total efficiency of the converter parallel system, S Indicates the total load power, m represents the number of converters 11 operating at the highest efficiency point, n represents the number of converters 11 in the converter parallel system, P M It represents the power corresponding to the case where the converter 11 operates at the highest efficiency point.
[0065] In this embodiment, by adopting the full input distribution method of the converter 11, all the converter parallel system n The number of converters 11 is put into operation, among which m The converters 11 work at the highest efficiency point. By m By making adjustments, the efficiency of the converter parallel system can be optimized.
[0066] As an optional embodiment, when the full-investment allocation method of converter 11 is adopted, the power allocated to converter 11 that is not operating at the highest efficiency point is greater than or equal to q times the rated capacity of converter 11, and q is greater than 0 and less than or equal to 0.4, so that converter 11 that is not operating at the highest efficiency point has a higher efficiency.
[0067] It should be noted that the value of q may be different for different efficiency curves of the converter 11 , and q in the embodiment of the present application is preferably 1 / 3.
[0068] Specifically, when the converter 11 is fully switched on, all the converters in the parallel system are n The converters 11 are put into operation. In order to avoid low efficiency and performance problems under light load conditions, the remaining load power of the converter parallel system is allocated to the converters that are not operating at the highest efficiency point. nm The power value after each converter 11 should not be too small, which means that these converters 11 carry at least a part of their rated capacity. Therefore, the power allocated to the converter 11 that is not working at the highest efficiency point is greater than or equal to 1 / 3 of the rated capacity of the converter 11, that is, the minimum power of the converter 11 that is not working at the highest efficiency point is 1 / 3 P N Based on this, the remaining load power of the converter parallel system satisfies the equation (5):
[0069] Formula (5);
[0070] In the formula, P N represents the rated capacity of the converter 11, S Indicates the total load power, m represents the number of converters 11 operating at the highest efficiency point, n represents the number of converters 11 in the converter parallel system, P M It represents the power corresponding to the case where the converter 11 operates at the highest efficiency point.
[0071] In this embodiment, by limiting the power allocated to the converter 11 that is not operating at the highest efficiency point to be greater than or equal to 1 / 3 of the rated capacity of the converter 11, it can be ensured that the converter parallel system pursues the highest efficiency while also taking into account the operating constraints of the converter 11, thereby avoiding the decrease in efficiency of the converter parallel system and potential safety risks caused by too low load.
[0072] As an optional implementation, in the case of using the full-power allocation method for the converter 11, the power allocated to the converter 11 that is not working at the highest efficiency point satisfies the formula (6):
[0073] Formula (6);
[0074] In the formula, S Indicates the total load power, m represents the number of converters 11 operating at the highest efficiency point, nrepresents the number of converters 11 in the converter parallel system, P M represents the power corresponding to the converter 11 operating at the highest efficiency point, P N Indicates the rated capacity of the converter 11.
[0075] In this embodiment, the power allocated to the converter 11 that is not working at the highest efficiency point is further limited to avoid the number of converters 11 working at the highest efficiency point being too large. m Continue to increase to avoid excess power S-mP M The problem is further decomposed into extreme point and minimum power point to optimize the overall efficiency of the converter parallel system.
[0076] As an optional implementation, the second load distribution method further includes a partial input distribution method of the converter 11. When the partial input distribution method of the converter 11 is adopted, the converters in the parallel system k The number of converters 11 is put into operation, among which r The converter 11 works at the highest efficiency point, and the remaining k-r The converters 11 evenly distribute the remaining power. k、r is a positive integer, k Less than n , r Less than k .
[0077] The method for allocating part of the converter 11 includes: using an enumeration method to obtain the minimum number of converters 11 put into operation. k and k-r The partial input allocation combination is used to obtain the partial input total efficiency of the converter parallel system when the partial input allocation combination is adopted.
[0078] Specifically, Figure 5 As shown in FIG. 1 , the efficiency curve of the converter 11 is shown in FIG. 1 , when the converter 11 is partially put into operation and allocated. n The converters in parallel are 11. k 11 converters were put into operation, the number r The converter 11 works at the highest efficiency point, and the remaining k-r The remaining power is evenly distributed among the converters 11, which can be expressed as shown in formula (7):
[0079] Formula (7);
[0080] In the formula, , k represents the number of converters 11 put into operation,r represents the number of converters 11 operating at the highest efficiency point, S Indicates the total load power, P M represents the power corresponding to the converter 11 operating at the highest efficiency point, P R Indicates the remaining nm The remaining power is evenly shared by the converters 11.
[0081] At this time, the total efficiency of the converter parallel system is shown in formula (8):
[0082] Formula (8);
[0083] In the formula, , k represents the number of converters 11 put into operation, r represents the number of converters 11 operating at the highest efficiency point, S Indicates the total load power, P M represents the power corresponding to the converter 11 working at the highest efficiency point. Observing formula (8), it can be seen that by adjusting k and r The value of can optimize the overall efficiency of the converter parallel system.
[0084] In this embodiment, the partial input allocation of the converter 11 is performed, and the allocation combination of the number of converters 11 put into operation is obtained by enumeration method, and the partial input total efficiency of the converter parallel system under the condition of adopting the partial input allocation combination is obtained, so that the partial input total efficiency of the converter parallel system can be achieved by allocating k and r , optimizing the overall efficiency of the converter parallel system, and enabling the converter parallel system to operate at the highest efficiency point.
[0085] As an optional implementation, Figure 6 As shown, the load distribution method of the converter parallel system also includes:
[0086] Step S601, when the total load power is greater than or equal to a preset threshold, select the full-time distribution method of converter 11 as the second load distribution method, compare the total efficiency of the converter parallel system using the first load distribution method and the converter 11 full-time distribution method, and select the load distribution method with higher total efficiency for load power distribution.
[0087] Step S602, when the total load power is less than a preset threshold, select the partial input distribution method of converter 11 as the second load distribution method, compare the total efficiency of the converter parallel system using the first load distribution method and the partial input distribution method of converter 11, and select the load distribution method with higher total efficiency for load power distribution.
[0088] The preset threshold value may be set based on factors such as the efficiency and cost of the converter parallel system.
[0089] Specifically, the converter parallel system determines whether the total load power of the system is greater than or equal to a preset threshold, and selects the most appropriate load distribution method according to the comparison result between the total load power of the system and the preset threshold.
[0090] When the total load power is greater than or equal to the preset threshold, the full-input distribution method of converter 11 is selected as the second load distribution method. Then, the total efficiency of the converter parallel system under the first load distribution method and the full-input distribution method of converter 11 is compared, and the load distribution method with higher total efficiency is selected to distribute the load power, so as to optimize the working efficiency of the converter parallel system.
[0091] When the total power load is less than the preset threshold, the partial input distribution method of converter 11 is selected as the second load distribution method. Then, the total efficiency of the converter parallel system under the first load distribution method and the partial input distribution method of converter 11 is compared, and the load distribution method with higher total efficiency is selected to distribute the load power, so as to optimize the working efficiency of the converter parallel system.
[0092] In this embodiment, by comparing the total load power with a preset threshold, a suitable load distribution method is selected as the second load distribution method, and then the total system efficiency of the first load distribution method and the second load distribution method is compared, and a load distribution method with higher total efficiency is selected for load power distribution, so that the converter parallel system can dynamically adjust the load distribution method to ensure the optimal system working efficiency.
[0093] The load distribution method of the converter parallel system, the preset threshold is expressed by the following formula (9):
[0094] Formula (9);
[0095] In the formula, y Indicates the preset threshold value, P N represents the rated capacity of the converter 11, αP N represents the power corresponding to the converter 11 operating at the highest efficiency point, βP Nrepresents the power corresponding to the converter 11 working at the preset efficiency, n Indicates the number of converters 11 in the converter parallel system.
[0096] In this embodiment, the preset threshold value can be dynamically adjusted according to the actual application of the converter 11, so that the load distribution method of the converter parallel system has better flexibility and adaptability.
[0097] like Figure 7 FIG. 1 is a flow chart of a load distribution method for a converter parallel system according to an embodiment of the present application, which specifically includes the following steps:
[0098] Step S701, obtaining the total load power of the converter parallel system.
[0099] Step S702 , obtaining the number of converters 11 in the converter parallel system and the efficiency curve of each converter 11 .
[0100] Step S703 , combining the efficiency curves, respectively obtaining the total efficiency of the converter parallel system under the first load distribution method and the second load distribution method.
[0101] Step S704, determine whether the total load power is greater than or equal to a preset threshold; if the determination result is yes, execute step S705, if the determination result is no, execute step S706.
[0102] Step S705, selecting the full-on distribution method of the converter 11 as the second load distribution method.
[0103] Step S706, selecting the partial input distribution method of converter 11 as the second load distribution method.
[0104] Step S707, determining whether the total efficiency of the first load distribution method is greater than the total efficiency of the full-load distribution method; if the determination result is yes, executing step S710, if the determination result is no, executing step S709.
[0105] Step S708, determining whether the total efficiency of the first load distribution method is greater than that of the partial input distribution method; if the determination result is yes, executing step S710, if the determination result is no, executing step S711.
[0106] Step S709: use the full-input allocation method to distribute the load power.
[0107] Step S710: Distribute load power using a first load distribution method.
[0108] Step S711, using a partial input allocation method to distribute load power.
[0109] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0110] As a specific implementation, it is defined that the converter parallel system includes 5 identical converters 11 connected in parallel, and the rated capacity of the 5 converters 11 is 10 kilowatts (kW). When the load rate of the converter 11 is 65%, the converter parallel system achieves a maximum efficiency of 98.5%. The load rate represents the ratio of the actual load power of the converter 11 to the rated capacity.
[0111] Specifically, the operating power of the converter parallel system is defined as P x , P x ∈[5kW, 50kW]. Figure 8 As shown in FIG. 1 , it is a comparison diagram of the efficiency curve of the fitted converter parallel system and the efficiency curve of converter 11. The efficiency of load balancing using the first load distribution method is ,in n =5. P x ∈[5kW,50kW], according to the first load distribution method, each converter 11 evenly shares the total load power of the converter parallel system, and the load efficiency corresponding to each converter 11 is ∈[5%,100%], so the efficiency curve of the converter parallel system is consistent with the efficiency curve of each converter 11.
[0112] P N represents the rated capacity of the converter 11, αP N represents the power corresponding to the converter 11 operating at the highest efficiency point, βP N represents the power corresponding to the converter 11 working at the preset efficiency, n Indicates the number of converters 11 in the converter parallel system.
[0113] Furthermore, when the number of converters 11 is 5 and the rated capacity of converter 11 is 10 kW, the load rate of converter 11 is 65% when converter 11 works at the highest efficiency point, that is, the power corresponding to converter 11 working at the highest efficiency point is 6.5 kW, thus obtaining =0.65. Setting the converter 11 to operate at an efficiency of more than 90% can maintain a high efficiency of the system. Figure 8 It can be seen that in order to keep the efficiency of the converter 11 above 90%, the load rate should be maintained above 30%, that is, the power corresponding to the converter 11 at the preset efficiency of 90% is at least 3kW, thus obtaining =0.3. According to formula (9), the preset threshold of the total load power of the converter parallel system can be determined, as shown in formula (10):
[0114] Formula (10);
[0115] In the formula, The preset threshold value of this embodiment is 29 kW, and for the convenience of explanation, the preset threshold value is set to 30 kW.
[0116] when P x ∈[5kW, 30kW], the converter 11 is partially put into operation, and 6 power points are selected for detailed calculation. The operation of the converter 11 is shown in Table 1, where: P i Represents the load power of the i-th converter. The unit of each power in the table is kW, and each efficiency is an approximate value.
[0117] Table 1
[0118]
[0119] when P x ∈[30kW, 50kW], all converters 11 are put into operation, and 7 power points are selected for detailed calculation. The operation status of the 5 converters 11 is shown in Table 2. Among them, P i Represents the load power of the i-th converter. The unit of each power in the table is kW, and each efficiency is an approximate value.
[0120] Table 2
[0121]
[0122] like Fig. 9As shown, this embodiment also provides a comparison diagram of the efficiency curve of the converter parallel system and the efficiency curve of each converter 11 when the second load distribution method is adopted and the first load distribution method is adopted. Fig. 9 , it can be seen from Table 1 and Table 2 that, when the load is heavy, the first load distribution method has better overall efficiency characteristics and has certain advantages because each converter 11 needs to work under a larger load; when the load is light, the load power shared by each converter 11 is very small, and the working efficiency is low. The second load distribution method operates a part of the converter 11 at a higher efficiency point, and the remaining part does not work, which has obvious advantages in efficiency. It can be seen that the load distribution method of the converter parallel system of the embodiment of the present application adopts different load distribution methods for different working conditions, which can keep the efficiency of the converter parallel system in the optimal state, have strong regulation and optimization capabilities, and thus reduce system losses.
[0123] It should be noted that the results of this embodiment are based on the set example values. For converters 11 with different efficiency curves, the distribution methods and efficiency comparison results are quite different. Therefore, it is necessary to perform detailed calculations using the method of the embodiment of this application before comparing the differences between the two load distribution methods and selecting the best load distribution method to obtain the most optimized efficiency of the converter parallel system.
[0124] Based on the same inventive concept, Fig.10 As shown, an embodiment of the present application further provides a converter parallel system, which includes at least two converters 11 in parallel mode and a control module 12.
[0125] The control module 12 may include a memory and a processor, and is used to execute the above load distribution method, specifically, to obtain the total load power of the converter parallel system, the number of converters 11 in the converter parallel system, and the efficiency curve of each converter 11, the efficiency curve describing the efficiency of the converter 11 at different load levels. The control module 12 is also used to obtain the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted, in combination with the efficiency curve. The control module 12 compares the total efficiency of the converter parallel system when the first load distribution method is adopted and the second load distribution method is adopted, and the control module 12 selects the load distribution method with higher total efficiency to distribute the load power; wherein, when the first load distribution method is adopted, all converters 11 in the converter parallel system share the total load power equally, and when the second load distribution method is adopted, at least some converters 11 in the converter parallel system work at the highest efficiency point or only one converter 11 works.
[0126] As an optional implementation, the second load distribution method includes a full-input distribution method for the converter 11. In the case of the full-input distribution method for the converter 11, all the loads of the converter parallel system are n The number of converters 11 is put into operation, among which m The converter 11 works at the highest efficiency point, and the remaining nm The converters 11 evenly distribute the remaining power. m , n is a positive integer, m Less than n The method for distributing the full input of the converter 11 includes: using an enumeration method to obtain the maximum number of converters 11 running at the highest efficiency point. m and nm The full-input allocation combination is obtained to obtain the full-input total efficiency of the converter parallel system when the full-input allocation combination is adopted.
[0127] As an optional implementation, the second load distribution method further includes a partial input distribution method of the converter 11. When the partial input distribution method of the converter 11 is adopted, the converters in the parallel system k The number of converters 11 is put into operation, among which r The converter 11 works at the highest efficiency point, and the remaining k-r The converters 11 evenly distribute the remaining power. k , r is a positive integer, k Less than n , r Less than k The method for allocating the converter 11 to partial operation includes: using an enumeration method to obtain the minimum number of converters 11 to be put into operation. k Combined with the partial input allocation of kr, the partial input total efficiency of the converter parallel system is obtained when the partial input allocation combination is adopted.
[0128] In summary, the converter parallel system and its load distribution method of the embodiment of the present application obtain the total load power of the converter parallel system, obtain the number of converters 11 in the converter parallel system and the efficiency curve of each converter 11, so as to serve as the basis for subsequent load distribution. Further combined with the efficiency curve, the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted are obtained, so as to comprehensively consider the efficiency characteristics of the converter parallel system. Further, the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted are compared, and the load distribution method with higher total efficiency is selected for load power distribution, thereby realizing the optimal distribution of the load power of the converter parallel system, so as to optimize the system operation efficiency under different requirements, reduce the total loss and heat generation of the system, and improve the reliability and stability of the system.
[0129] In the description of this application, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. "Multiple" means two or more, unless otherwise clearly and specifically defined.
[0130] The above disclosure is only the preferred embodiment of the present application, but it is not intended to limit the scope of rights of the present application. A person of ordinary skill in the art can understand that without departing from the spirit and scope of the present application and the appended claims, changes, modifications, substitutions, combinations, and simplifications should all be equivalent replacement methods and still fall within the scope of the invention.
[0131] The application field of the technology of the present invention is not limited to the field of electronic power conversion technology. As long as the essence of the technical solution does not deviate from the scope of the technical solution of each embodiment of the present invention, it belongs to the protection scope of the present invention.
[0132] Although the preferred embodiments of the present application have been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the application as disclosed in the accompanying claims.
Claims
1. A load distribution method for a converter parallel system, wherein the converter parallel system comprises at least two converters in parallel mode, characterized in that: The method comprises: Obtaining the total load power of the converter parallel system; Acquire the number of the converters in the converter parallel system and an efficiency curve of each converter, wherein the efficiency curve represents the efficiency of the converter at different load levels; Combining the efficiency curves, obtaining the total efficiency of the converter parallel system when the first load distribution method is adopted, and the total efficiency of the converter parallel system when the second load distribution method is adopted; Comparing the total efficiency of the converter parallel system when the first load distribution method is used and the second load distribution method is used, and selecting the load distribution method with higher total efficiency to distribute load power; Wherein, when the first load distribution method is adopted, all converters in the converter parallel system share the total load power equally; when the second load distribution method is adopted, at least some converters in the converter parallel system operate at the highest efficiency point or only one converter operates; The second load distribution method includes a converter full-on distribution method. When the converter full-on distribution method is adopted, all n converters of the converter parallel system are put into operation, wherein m converters operate at the highest efficiency point, and the remaining nm converters evenly share the remaining power, where m and n are positive integers and m is less than n. The converter full input allocation method comprises: using an enumeration method to obtain a full input allocation combination of m and nm when the number of converters operating at the highest efficiency point is the largest, and obtaining a full input total efficiency of the converter parallel system when the full input allocation combination is adopted; The second load distribution method also includes a converter partial input distribution method. When the converter partial input distribution method is adopted, k converters in the converter parallel system are put into operation, wherein r converters operate at the highest efficiency point, and the remaining kr converters evenly share the remaining power, k and r are positive integers, k is less than n, and r is less than k; The converter partial input allocation method includes: using enumeration method to obtain the partial input allocation combination of k and kr when the number of converters put into operation is the least, and obtaining the partial input total efficiency of the converter parallel system when the partial input allocation combination is adopted.
2. The load distribution method of the converter parallel system according to claim 1, characterized in that: When the converter full-investment allocation method is adopted, the power allocated to the converter that is not operating at the highest efficiency point is greater than or equal to q times the rated capacity of the converter, and q is greater than 0 and less than or equal to 0.
4.
3. The load distribution method of the converter parallel system according to claim 2, characterized in that: When the converter full-time allocation method is adopted, the power allocated to the converter that is not working at the highest efficiency point satisfies the following relationship: ; In the formula, S represents the total load power, m represents the number of converters operating at the highest efficiency point, n represents the number of converters in the converter parallel system, P M It represents the power corresponding to the converter working at the highest efficiency point. P N Indicates the rated capacity of the converter.
4. The load distribution method of the converter parallel system according to claim 1, characterized in that: The method further comprises: When the total load power is greater than or equal to a preset threshold, the converter full-input distribution method is selected as the second load distribution method, the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter full-input distribution method is compared, and the load distribution method with higher total efficiency is selected for load power distribution; When the total load power is less than the preset threshold, the converter partial input distribution method is selected as the second load distribution method, and the total efficiency of the converter parallel system using the first load distribution method and the converter partial input distribution method is compared, and the load distribution method with higher total efficiency is selected for load power distribution.
5. The load distribution method of the converter parallel system according to claim 4, characterized in that: The preset threshold is expressed by the following formula: ; In the formula, y represents the preset threshold value, P N represents the rated capacity of the converter, αP N represents the power corresponding to the converter working at the highest efficiency point, βP N represents the power corresponding to the converter working at a preset efficiency, n Represents the number of converters in the converter parallel system.
6. A converter parallel system, comprising at least two converters in parallel mode, characterized in that: The converter parallel system further includes: a control module; The control module is used to obtain the total load power of the converter parallel system, the number of the converters in the converter parallel system, and the efficiency curve of each converter, wherein the efficiency curve describes the efficiency of the converter at different load levels; The control module is further used to obtain the total efficiency of the converter parallel system when the first load distribution method is adopted and the total efficiency of the converter parallel system when the second load distribution method is adopted in combination with the efficiency curve; The control module is also used to compare the total efficiency of the converter parallel system when the first load distribution method is adopted and the second load distribution method is adopted, and select the load distribution method with higher total efficiency to distribute the load power; Wherein, when the first load distribution method is adopted, all converters in the converter parallel system share the total load power equally, and when the second load distribution method is adopted, at least some converters in the converter parallel system operate at the highest efficiency point or only one converter operates; The second load distribution method includes a converter full-on distribution method. When the converter full-on distribution method is adopted, all n converters of the converter parallel system are put into operation, wherein m converters operate at the highest efficiency point, and the remaining nm converters evenly share the remaining power, where m and n are positive integers and m is less than n. The converter full input allocation method comprises: using an enumeration method to obtain a full input allocation combination of m and nm when the number of converters operating at the highest efficiency point is the largest, and obtaining a full input total efficiency of the converter parallel system when the full input allocation combination is adopted; The second load distribution method also includes a converter partial input distribution method. When the converter partial input distribution method is adopted, k converters in the converter parallel system are put into operation, wherein r converters operate at the highest efficiency point, and the remaining kr converters evenly share the remaining power, k and r are positive integers, k is less than n, and r is less than k; The converter partial input allocation method includes: using enumeration method to obtain the partial input allocation combination of k and kr when the number of converters put into operation is the least, and obtaining the partial input total efficiency of the converter parallel system when the partial input allocation combination is adopted.
