A construction method for a steel-concrete combined section of a bridge tower and a structure of a steel-concrete combined section of a bridge tower

Through the use of prefabricated annular steel bars and hoisting equipment, combined with closed and open pressure-bearing steel plates, the problems of difficult and poor density of existing steel-concrete combination bridge towers are solved, and efficient and compact steel-concrete combined section construction is achieved.

CN118653382BActive Publication Date: 2024-11-08CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411145394.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-08
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

The construction of existing steel-concrete combination bridge towers is difficult, the shear key installation is complex, the cast-in-place concrete volume is large and easy to accumulate air, resulting in the untightening of the bonding section, which affects the overall performance and construction efficiency.

Method used

Prefabricated circumferential steel bars are used to carry out pre-embedding operations through circumferential steel bar lifting equipment, and the concrete transition section and tower columns are poured as a whole. Closed and open pressure-bearing steel plates and shear keys are used to ensure that the concrete and steel plates are closely fitted and the concrete is reduced. and improve compactness.

Benefits of technology

The construction process of the steel-concrete bonding section is simplified, the construction difficulty and cost are reduced, the overall performance and construction efficiency are improved, and the compactness of the steel-concrete bonding section is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118653382B_ABST
    Figure CN118653382B_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a steel-concrete combination section of a bridge tower and the structure of the steel-concrete combination section of a bridge tower, and relates to the field of bridge engineering. The construction method of the steel-concrete combination section of the bridge tower includes the following steps: Step S1: Use the hoisting equipment of the hoisting equipment of the steel-concrete combination section of the bridge tower to implement the pre-embedding operation of the hoisting equipment, and cast the concrete transition section and the concrete tower column on site as a whole; Step S2: Weld the perforated steel plate shear key and the bolt shear key to the inner surface of the outer wall steel plate, and then weld the outer wall steel plate and the lower surface of the perforated pressure steel plate into a whole; Step S3: Ensure that the hoisting equipment passes through the shear key holes of the perforated steel plate, and the vertical steel bars pass through the holes of the perforated pressure steel plate, and then weld them into a whole; Step S4: Anchor the steel bar anchor plate to the upper surface of the perforated pressure steel plate, and weld the annular connecting steel bar and the hoisting equipment into a whole. The invention has the advantages of high prefabrication degree of the steel-concrete combination section structure, clear construction process, and low construction difficulty.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge engineering, and in particular to a construction method of a steel-concrete combined section of a bridge tower and the structure of the steel-concrete combined section of a bridge tower. Background Art

[0002] The bridge tower is an important load-bearing component of the cable-stayed bridge. With the continuous increase in the span of the bridge, higher requirements are placed on the stress performance of the bridge tower. The steel-concrete composite bridge tower adopts a steel structure in the tower column above the anchorage area and a concrete structure below the anchorage area. The steel tower column is connected to the concrete tower column through a steel-concrete joint section to form a composite structure. The steel-concrete joint section refers to a tower column section with steel plates and filled concrete on the same cross section, and the two materials bear stress together. Compared with traditional concrete bridge towers and steel bridge towers, this composite bridge tower can give full play to the advantages of both steel and concrete materials, making the structure more reasonably stressed, and has the advantages of high bearing capacity, good toughness, and good seismic performance.

[0003] Steel-concrete composite bridge towers have broad application prospects in improving the performance of bridge towers, and the structure and construction methods of the steel-concrete joint section are gradually being improved. In the existing related technologies, there are some problems with the steel-concrete joint section of the steel-concrete composite bridge tower, which limits the overall performance and construction efficiency of the bridge tower and makes the construction difficult. The existing shear keys are complex to install and difficult to position and fix, which increases the construction difficulty and cost of the project; the cast-in-place concrete of the steel-concrete joint section is large, and air is easily accumulated, resulting in the looseness of the joint section.

[0004] In view of the above problems, the present invention provides a construction method for a steel-concrete combined section of a bridge tower and a structure of the steel-concrete combined section of a bridge tower, which can overcome the shortcomings of the prior art and improve the overall performance and construction efficiency of a cylindrical steel-concrete composite bridge tower. Summary of the invention

[0005] The present invention aims to solve the problems in the prior art and provides a construction method for a steel-concrete combined section of a bridge tower and a structure of the steel-concrete combined section of a bridge tower, so as to improve the overall performance and construction efficiency of a cylindrical steel-concrete combined bridge tower.

[0006] To achieve the above objectives, the present invention provides a construction method for a bridge tower steel-concrete combined section, the method comprising the following steps:

[0007] Step S1: prefabricate the annular steel bars, perform the pre-embedding operation of the annular steel bars, so that the roots of the annular steel bars are pre-embedded in the concrete transition section, cast the concrete transition section and the concrete tower column as a whole on site, and fix the closed pressure-bearing steel plate to the top of the concrete transition section through bolt shear keys;

[0008] Step S2: welding the perforated steel plate shear key and the stud shear key to the inner surface of the outer wall steel plate, and then welding the outer wall steel plate and the lower surface of the perforated pressure-bearing steel plate into a whole;

[0009] Step S3: Ensure that the annular steel bars pass through the shear key holes of the perforated steel plate, and the vertical steel bars pass through the holes of the perforated pressure-bearing steel plate, so that the edge of the perforated pressure-bearing steel plate is closely fitted with the edge of the closed pressure-bearing steel plate, and then welded into a whole;

[0010] Step S4: Anchoring the steel bar anchor plate to the upper surface of the perforated pressure-bearing steel plate, and welding the annular connecting steel bar and the annular steel bar into a whole;

[0011] Step S5: pouring concrete in the cavity surrounded by the concrete transition section, the outer wall steel plate and the perforated pressure-bearing steel plate, ensuring that the concrete is closely attached to the outer wall steel plate and the perforated pressure-bearing steel plate respectively, to form a steel-concrete combined section tower column;

[0012] Step S6: welding steel tower columns on the upper surfaces of the closed pressure-bearing steel plate and the open pressure-bearing steel plate;

[0013] In the step S1, the annular steel bars are divided into a plurality of shorter annular steel bars and a longer annular steel bar during the prefabrication process, and the shorter annular steel bars are connected to the opposite ends of the longer annular steel bars by annular connecting steel bars;

[0014] The pre-embedding operation of the annular steel bars in step S1 is completed by annular steel bar lifting equipment. After the annular steel bar lifting equipment simultaneously lifts the shorter annular steel bars and the longer annular steel bars that need to be pre-embedded and connected to the docking area, the opposite ends of the shorter annular steel bars and the longer annular steel bars are respectively inserted into the concrete transition sections on both sides, and a gap of connecting annular connecting steel bars is formed between the opposite ends of the shorter annular steel bars and the corresponding longer annular steel bars. At this time, the annular steel bar lifting equipment of the steel-concrete joint section of the bridge tower fixes the longer annular steel bars and the shorter annular steel bars in the pre-embedded state.

[0015] Furthermore, the hoisting equipment for the annular steel bars of the steel-concrete combined section of the bridge tower comprises a hanging beam, a clamping unit arranged on the hanging beam at equal distances in the height direction, and a rotating shaft arranged on the hanging beam, the clamping unit comprises a first clamp for clamping two inner and outer circles of shorter annular steel bars at the same height and a second clamp for clamping two inner and outer circles of longer annular steel bars at the same height, the first clamp comprises a first bracket and a first clamping wheel pair, the second clamp comprises a second bracket and a second clamping wheel pair, the first bracket comprises a first inner plate portion, a first outer plate portion and a first middle plate portion connecting the first inner plate portion and the first outer plate portion, the second bracket It includes a second inner plate portion, a second outer plate portion and a second middle plate portion connecting the second inner plate portion and the second outer plate portion, the inner surfaces of the first inner plate portion and the second inner plate portion are each provided with two first clamping wheel pairs, the outer side surfaces of the first outer plate portion and the second outer plate portion are each provided with two second clamping wheel pairs, wherein the first clamp and the second clamp are both slidably mounted on the suspension beam, and the first clamp and the second clamp have a first state of being distributed up and down, and a second state of being distributed left and right in parallel, the rotating shaft is rotatably mounted on the suspension beam, and the rotating shaft is used to drive the first clamp and the second clamp to switch between the first state and the second state.

[0016] Furthermore, a first connecting rod is provided at the top of the second clamping wheel pair located on the same side as the second middle plate portion in the first clamp, and a second connecting rod is provided at the bottom of the first clamping wheel pair located on the same side as the first middle plate portion in the second clamp, and a first rocker arm and a second rocker arm are respectively sleeved on the first connecting rod and the second connecting rod, and opposite ends of the first rocker arm and the second rocker arm are connected to the rotating shaft, and the first rocker arm and the second rocker arm are located on the same straight line.

[0017] Furthermore, a first locking block and a second locking block are respectively provided at the bottom of the first clamping wheel pair and the top of the second clamping wheel pair. When the first clamp and the second clamp are in the first state, the opposite ends of the first locking block and the second locking block distributed up and down squeeze each other, and the first locking block and the second locking block respectively press the shorter annular steel bars and the longer annular steel bars.

[0018] According to another aspect of the present invention, there is also provided a structure of a steel-concrete combined section of a bridge tower, which is obtained by the construction method of the steel-concrete combined section of a bridge tower, wherein the structure of the steel-concrete combined section of the bridge tower comprises:

[0019] Concrete tower columns;

[0020] A steel tower column connected to the concrete tower column via a steel-concrete combined section tower column;

[0021] The steel-concrete combined section tower column comprises a concrete transition section, an outer wall steel plate, annular steel bars, annular connecting steel bars, vertical steel bars, steel bar anchor plates, closed pressure-bearing steel plates, stud shear keys, perforated steel plate shear keys, and perforated pressure-bearing steel plates.

[0022] Furthermore, the concrete transition section and the concrete tower column are cast as a whole, the roots of the annular steel bars are embedded in the concrete transition section, the roots of the vertical steel bars are embedded in the concrete tower column, and the bolt shear keys are welded to the lower surface of the closed pressure-bearing steel plate and embedded in the concrete transition section, so that the upper surface of the concrete transition section and the lower surface of the closed pressure-bearing steel plate are tightly fitted.

[0023] Furthermore, the outer wall steel plate is welded to the lower surface of the perforated pressure-bearing steel plate into a whole, and the perforated steel plate shear key and the bolt shear key are welded to the inner surface of the outer wall steel plate.

[0024] Furthermore, the annular steel bars pass through the shear key holes of the perforated steel plate, and at the same time, the vertical steel bars pass through the holes of the perforated pressure-bearing steel plate, so that the edge of the perforated pressure-bearing steel plate is closely fitted with the edge of the closed pressure-bearing steel plate, the steel bar anchor plate is anchored to the upper surface of the perforated pressure-bearing steel plate, and the annular connecting steel bars and the annular steel bars are welded into a whole.

[0025] Furthermore, concrete is poured in the cavity surrounded by the concrete transition section, the outer wall steel plate and the perforated pressure-bearing steel plate, so that the concrete is closely fitted to the outer wall steel plate and the perforated pressure-bearing steel plate respectively.

[0026] Furthermore, the steel tower column is welded to the upper surface of the closed pressure-bearing steel plate and the open pressure-bearing steel plate.

[0027] The beneficial effects brought about by the technical solution provided by the present invention include:

[0028] The present invention reduces the volume of inner filling concrete pouring by integrally pouring the concrete transition section and the concrete tower column in the steel-concrete joint section, makes it easier to exhaust the air, and ensures that the steel-concrete joint section is poured densely; the annular steel bars that penetrate the steel bars in the perforated steel plate shear key are pre-buried in the concrete transition section, making it easier to install and position the shear key, thereby improving construction efficiency.

[0029] The hoisting device for the circumferential steel bars of the steel-concrete combined section of the bridge tower of the present invention can realize the one-time hoisting, laying and positioning operations of the shorter circumferential steel bars and the longer circumferential steel bars in the single pre-embedded circumferential steel bar components, making the pre-embedding of the circumferential steel bars easier and improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0031] Figure 1 A schematic diagram of the hoisting equipment for the circumferential reinforcement of the steel-concrete combined section of the bridge tower in step S1 of the construction method for the steel-concrete combined section of the bridge tower provided by the embodiment of the present invention when hoisting the circumferential reinforcement;

[0032] Figure 2 For the present invention Figure 1 A magnified image of point A;

[0033] Figure 3 For the present invention Figure 2 Another perspective of the picture;

[0034] Figure 4 For the present invention Figure 3 The enlarged view of point B in the figure;

[0035] Figure 5 A schematic diagram of a hoisting device for hoisting circumferential steel bars of a bridge tower steel-concrete combined section in step S1 of a construction method for a bridge tower steel-concrete combined section provided by an embodiment of the present invention;

[0036] Figure 6 is a schematic diagram of a hanging beam of the present invention;

[0037] Figure 7 For the present invention Figure 6 The enlarged view of point C in the figure;

[0038] Figure 8 For the present invention Figure 6 Rear view of

[0039] Fig. 9 For the present invention Figure 7 The enlarged view of D in the figure;

[0040] Fig.10 For the present invention Figure 6 Cross-sectional view of the middle hanging beam;

[0041] Fig.11 For the present invention Fig.10 The enlarged view of point E in the figure;

[0042] Fig.12 is a schematic diagram of a clamping unit of the present invention;

[0043] Fig.13 For the present invention Fig.12 Another perspective of the picture;

[0044] Fig.14 For the present invention Fig.13 The enlarged view of F in the figure;

[0045] Fig.15 For the present invention Fig.13 The enlarged view of G in the figure;

[0046] Fig.16 It is a schematic diagram of the first locking block, the second locking block, the first guide block and the second guide block of the present invention;

[0047] Fig.17 A schematic diagram of the overall structure of a steel-concrete combined section of a bridge tower provided in an embodiment of the present invention;

[0048] Fig.18 A schematic diagram of the construction process of a bridge tower steel-concrete combined section provided in an embodiment of the present invention Figure 1 ;

[0049] Fig.19 A schematic diagram of the construction process of a bridge tower steel-concrete combined section provided in an embodiment of the present invention Figure 2 ;

[0050] Fig. 20 A schematic diagram of the construction process of a bridge tower steel-concrete combined section provided in an embodiment of the present invention Figure 3 ;

[0051] Fig.21 A schematic diagram of the construction process of a bridge tower steel-concrete combined section provided in an embodiment of the present invention Figure 4 ;

[0052] Fig. 22 A schematic diagram of the construction process of a bridge tower steel-concrete combined section provided in an embodiment of the present invention Figure 5 .

[0053] In the figure: 1. concrete tower column; 2. steel-concrete combined section tower column; 21. concrete transition section; 22. outer wall steel plate; 24. annular reinforcement; 25. annular connecting reinforcement; 26. vertical reinforcement; 27. reinforcement anchor plate; 28. closed pressure-bearing steel plate; 29. ​​stud shear key; 210. perforated steel plate shear key; 211. perforated pressure-bearing steel plate; 3. steel tower column; 4. hanging beam; 5. rotating shaft; 6. first clamp; 61. first clamping wheel pair; 62. first inner plate; 63. first outer plate; 64. first middle plate; 65. first connecting rod; 7. second clamp; 71. second clamping wheel pair; 72. second inner plate; 73. second outer plate; 74. second middle plate; 75. second connecting rod; 8. first rocker arm; 9. second rocker arm; 10. bushing; 11. axial slider; 12. axial slide groove; 13. operating rod; 14. channel groove; 151. first circumferential slider; 152. first circumferential slide groove; 153. lifting groove; 154. second circumferential slider; 155. second circumferential slide groove; 16. groove; 171. first locking block; 172. second locking block; 173. first guide block; 174. second guide block. DETAILED DESCRIPTION

[0054] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] An embodiment of the present invention provides a construction method for the structure of a steel-concrete combined section of a bridge tower, the method comprising the following steps:

[0056] Step S1: prefabricate the annular steel bars 24, use the annular steel bar hoisting equipment of the bridge tower steel-concrete combined section to carry out the pre-embedding operation of the annular steel bars 24, so that the roots of the annular steel bars 24 are pre-embedded in the concrete transition section 21, and the concrete transition section 21 and the concrete tower column 1 are integrally cast on site, and the closed pressure-bearing steel plate 28 is fixed to the top of the concrete transition section 21 by the bolt shear key 29;

[0057] Step S2: Weld the perforated steel plate shear key 210 and the stud shear key 29 to the inner surface of the outer wall steel plate 22, and then weld the outer wall steel plate 22 and the lower surface of the perforated pressure-bearing steel plate 211 into a whole;

[0058] Step S3: Ensure that the annular steel bars 24 pass through the holes of the perforated steel plate shear key 210, and the vertical steel bars 26 pass through the holes of the perforated pressure-bearing steel plate 211, so that the edge of the perforated pressure-bearing steel plate 211 fits tightly with the edge of the closed pressure-bearing steel plate 28, and then weld them into a whole;

[0059] Step S4: Anchoring the steel bar anchor plate 27 to the upper surface of the perforated pressure-bearing steel plate 211, and welding the annular connecting steel bar 25 and the annular steel bar 24 into a whole;

[0060] Step S5: pouring concrete in the cavity surrounded by the concrete transition section 21, the outer wall steel plate 22 and the perforated pressure-bearing steel plate 211, ensuring that the concrete is closely attached to the outer wall steel plate 22 and the perforated pressure-bearing steel plate 211, respectively, to form a steel-concrete combined section tower column 2;

[0061] Step S6: welding the steel tower column 3 on the upper surface of the closed pressure-bearing steel plate 28 and the open pressure-bearing steel plate 211;

[0062] The annular reinforcement 24 in step S1 is divided into a plurality of shorter annular reinforcements and a longer annular reinforcement during the prefabrication process, and the shorter annular reinforcements are connected to the opposite ends of the longer annular reinforcements by annular connecting reinforcements 25;

[0063] The pre-embedding operation of the annular reinforcement 24 in the step S1 is implemented by annular reinforcement lifting equipment. After the annular reinforcement lifting equipment simultaneously lifts the shorter annular reinforcement and the longer annular reinforcement that need to be pre-embedded and connected to the docking area, the opposite ends of the shorter annular reinforcement and the longer annular reinforcement are respectively inserted into the concrete transition sections 21 on both sides, and a gap of connecting annular connecting reinforcement 25 is formed between the opposite ends of the shorter annular reinforcement and the corresponding longer annular reinforcement. At this time, the annular reinforcement lifting equipment of the steel-concrete joint section of the bridge tower fixes the longer annular reinforcement and the shorter annular reinforcement in the pre-embedded state.

[0064] like Figures 1 to 16As shown, the hoisting equipment for the circumferential reinforcement of the steel-concrete combined section of the bridge tower includes a hanging beam 4, a clamping unit equidistantly arranged on the hanging beam 4 in the height direction, and a rotating shaft 5 arranged on the hanging beam 4, the clamping unit includes a first clamp 6 for clamping two inner and outer circles of shorter circumferential reinforcement at the same height and a second clamp 7 for clamping two inner and outer circles of longer circumferential reinforcement at the same height, the first clamp 6 includes a first bracket and a first clamping wheel pair 61, the second clamp 7 includes a second bracket and a second clamping wheel pair 71, the first bracket includes a first inner plate portion 62, a first outer plate portion 63 and a first middle plate portion 64 connecting the first inner plate portion 62 and the first outer plate portion 63, and the second bracket includes a second inner plate portion Part 72, a second outer plate part 73 and a second middle plate part 74 connecting the second inner plate part 72 and the second outer plate part 73, the inner surfaces of the first inner plate part 62 and the second inner plate part 72 are each provided with two first clamping wheel pairs 61, the outer side surfaces of the first outer plate part 63 and the second outer plate part 73 are each provided with two second clamping wheel pairs 71, wherein the first clamp 6 and the second clamp 7 are both slidably installed on the suspension beam 4, and the first clamp 6 and the second clamp 7 have a first state in which they are distributed up and down, and a second state in which they are distributed in parallel left and right, the rotating shaft 5 is rotatably installed on the suspension beam 4, and the rotating shaft 5 is used to drive the first clamp 6 and the second clamp 7 to switch between the first state and the second state.

[0065] refer to Figure 1 and Figure 3 In the process of pre-embedded annular steel bars 24, the shorter annular steel bars can be directly inserted into the first clamp 6, and the longer annular steel bars can be inserted into the second clamp 7, and the shorter annular steel bars and the longer annular steel bars can be clamped by the first clamp 6 and the second clamp 7.

[0066] Specifically, the spacing between the longer annular steel bars clamped in two adjacent clamping units is adapted to the distance value in the height direction of the pre-embedded annular steel bars 24. In this way, the number of clamping units on the hanging beam 4 can be set according to the number of annular steel bars 24 that need to be pre-embedded at a time. A lifting ring is provided at the top of the hanging beam 4. After the shorter annular steel bars and the longer annular steel bars are hoisted to the preset position, the height of the longer annular steel bars on the second clamp 7 is the pre-embedded height of the annular steel bars 24. Then, the hanging beam 4 can be directly displaced to the side of the pre-embedded longer annular steel bars. Then, the first clamp 6 and the second clamp 7 are switched from the first state to the second state by rotating the rotating shaft 5. When the first clamp 6 and the second clamp 7 are in a staggered state in the circumferential direction, the shorter annular steel bars and the longer annular steel bars in the same clamping unit are staggered in the circumferential direction. Then, the first clamp 6 is driven to descend by the rotating shaft 5, so that the shorter annular steel bars descend to the same height as the longer annular steel bars. After that, the hanging beam 4, the first clamp 6 and the second clamp 7 can be moved circumferentially by hoisting to adjust the positions of the shorter annular steel bars and the longer annular steel bars, thereby completing the positioning operation of the shorter annular steel bars and the longer annular steel bars.

[0067] refer to Figure 1 and Figure 3 During the hoisting of the annular steel bars 24, the shorter annular steel bars are located above the longer annular steel bars, which can reduce the space occupied by the shorter annular steel bars and the longer annular steel bars during hoisting, making the hoisting operation more convenient. The hoisting operation of the shorter annular steel bars and the longer annular steel bars that need to be pre-buried can be achieved at one time, thereby improving the efficiency of the pre-buried operation. During the positioning of the shorter annular steel bars and the longer annular steel bars, the cooperation of the hanging beam 4, the first clamp 6 and the second clamp 7 has the function of supporting and positioning the shorter annular steel bars and the longer annular steel bars.

[0068] refer to Figure 2 , Fig.12 and Fig.13 A first connecting rod 65 is provided at the top of the second clamping wheel pair 71 located on the same side as the second middle plate portion 74 in the first clamp 6, and a second connecting rod 75 is provided at the bottom of the first clamping wheel pair 61 located on the same side as the first middle plate portion 64 in the second clamp 7. The first connecting rod 65 and the second connecting rod 75 are respectively sleeved with a first swing rod 8 and a second swing rod 9. The opposite ends of the first swing rod 8 and the second swing rod 9 are connected to the rotating shaft 5, and the first swing rod 8 and the second swing rod 9 are located on the same straight line.

[0069] Specifically, by rotating the rotating shaft 5, the rotating shaft 5 drives the first swing rod 8 and the second swing rod 9 to swing, and the first swing rod 8 and the second swing rod 9 respectively drive the first clamp 6 and the second clamp 7 to move on the suspension beam 4. More specifically, the first clamp 6 and the second clamp 7 move away from each other in the circumferential direction, so that the first clamp 6 and the second clamp 7 are staggered in the circumferential direction, and then the first clamp 6 moves to the same height as the second clamp 7 by descending.

[0070] refer to Fig.10 , Fig.11 , Fig.13 and 14 The first swing rod 8 is fixedly sleeved on the rotating shaft 5 at one end facing the suspension beam 4, and the second swing rod 9 is fixedly sleeved on the one end facing the suspension beam 4 with a sleeve 10. The sleeve 10 is rotatably installed on the suspension beam 4, and an axial slider 11 is provided on the inner surface of the sleeve 10. The rotating shaft 5 is inserted into the sleeve 10, and an axial slide groove 12 for the sliding of the axial slider 11 is opened on the surface of the rotating shaft 5.

[0071] Specifically, by providing the shaft sleeve 10, the rotating shaft 5 can be raised and lowered in the shaft sleeve 10, and then, during the raising and lowering process of the first clamp 6, the second clamp 7 can maintain a constant height, and then, the shorter annular steel bar can be adjusted to a state of being equal in height to the longer annular steel bar. In addition, by adjusting the height of the first clamp 6 to move the shorter annular steel bar to a state of being equal in height to the longer annular steel bar, the operation is more labor-saving and convenient because the shorter annular steel bar is lighter in weight.

[0072] refer to Figure 4 and Fig. 9 The bottom end of the rotating shaft 5 is fixedly sleeved with an operating rod 13, and the operating rod 13 is used to drive the rotating shaft 5 to rotate and rise and fall. The hanging beam 4 is provided with a channel groove 14 for the operating rod 13 to swing and rise and fall.

[0073] Specifically, by rotating the operating rod 13 in the circumferential direction, the operating rod 13 can be used to drive the rotating shaft 5 to rotate, thereby realizing the circumferential displacement of the first clamp 6 and the second clamp 7. By raising and lowering the operating rod 13, the rotating shaft 5 is driven to rise and fall, thereby realizing the raising and lowering of the first clamp 6.

[0074] refer to Figures 6 to 9 and Fig.12 A first circumferential slider 151 is fixedly provided on the opposite sides of the first inner plate portion 62 and the first outer plate portion 63, a first circumferential slide groove 152 is provided on the suspension beam 4 for the first circumferential slide slider 151 to be displaced along the circumferential direction, and a lifting groove 153 for lifting and lowering the first clamp 6 is provided at one end of the first circumferential slide groove 152, a second circumferential slider 154 is fixedly provided on the opposite sides of the second inner plate portion 72 and the second outer plate portion 73, a second circumferential slide groove 155 is provided on the suspension beam 4 for the second circumferential slide slider 154 to be displaced along the circumferential direction, and one end of the second circumferential slide groove 155 is connected to the bottom end of the lifting groove 153.

[0075] Specifically, the first circumferential slot 152 cooperates with the first circumferential slider 151, so that the hanging beam 4 can effectively support and guide the first fixture 6. The second circumferential slot 155 cooperates with the second circumferential slider 154, so that the hanging beam 4 can effectively support and guide the second fixture 7.

[0076] Grooves 16 adapted to the first middle plate portion 64 and the second middle plate portion 74 are formed on both sides of the suspension beam 4 , and when the first clamp 6 and the second clamp 7 are in the first state, the first middle plate portion 64 and the second middle plate portion 74 are both located in the grooves 16 .

[0077] Specifically, the groove 16 supports and limits the first middle plate portion 64 and the second middle plate portion 74, so that during the lifting operation, the first clamp 6 and the second clamp 7 are more stable, thereby improving the stability and safety of the lifting operation of the shorter annular steel bars and the longer annular steel bars.

[0078] refer to Fig.13 , Fig.15 and Fig.16 The bottom of the first clamping wheel pair 61 and the top of the second clamping wheel pair 71 are respectively provided with a first locking block 171 and a second locking block 172. When the first clamp 6 and the second clamp 7 are in the first state, the opposite ends of the first locking block 171 and the second locking block 172 distributed up and down squeeze each other, and the first locking block 171 and the second locking block 172 respectively press the shorter annular steel bars and the longer annular steel bars.

[0079] Specifically, when the first clamp 6 and the second clamp 7 are in the first state, the first locking block 171 and the second locking block 172 are distributed up and down between the first bracket and the second bracket, so that the first locking block 171 is squeezed upward by the second bracket, and the second locking block 172 is squeezed downward by the first bracket, and then the first locking block 171 and the second locking block 172 are used to clamp and fix the shorter annular steel bars and the longer annular steel bars, further improving the stability and safety of the hoisting operation. In the process of arranging the shorter annular steel bars and the longer annular steel bars, after the first clamp 6 and the second clamp 7 are staggered in the circumferential direction, the first locking block 171 and the second locking block 172 remove the pressure on the shorter annular steel bars and the longer annular steel bars, and then, the shorter annular steel bars and the longer annular steel bars can be pulled out more conveniently, which is more convenient for the arrangement and position adjustment of the steel bars.

[0080] refer to Fig.16 The bottom of the first locking block 171 and the top of the second locking block 172 are respectively provided with a first guide block 173 and a second guide block 174. When the first clamp 6 moves to the top of the second clamp 7, the first guide block 173 and the second guide block 174 squeeze each other so that the first locking block 171 and the second locking block 172 are respectively displaced into the first clamping wheel pair 61 and the second clamping wheel pair 71.

[0081] Specifically, both sides of the lower surface of the first guide block 173 and both sides of the upper surface of the second guide block 174 are set as inclined surfaces, and the middle of the lower surface of the first guide block 173 and the middle of the upper surface of the second guide block 174 are set as planes. Through the arrangement of the first guide block 173 and the second guide block 174, in the process of switching the first clamp 6 and the second clamp 7 from the second state to the first state, the first locking block 171 and the second locking block 172 can be automatically pressed against the shorter annular steel bar and the longer annular steel bar respectively.

[0082] The first clamping wheel pair 61 and the second clamping wheel pair 71 both include a wheel bracket and a wheel body. Two wheel bodies are provided in the wheel bracket, and a space for inserting and pulling the shorter annular steel bars and the longer annular steel bars is formed between the two wheel bodies. The distance between the two wheel bodies is set to match the outer diameters of the shorter annular steel bars and the longer annular steel bars, and the surface of the wheel body is provided with a wheel groove that can be sleeved on the surface of the shorter annular steel bars and the longer annular steel bars. In the process of pulling the shorter annular steel bars and the longer annular steel bars, the movement trajectories of the shorter annular steel bars and the longer annular steel bars are adapted to the circumference of the two themselves.

[0083] The first locking block 171 is arranged on the bottom edge of the wheel frame in the first clamping wheel pair 61, and the second locking block 172 is arranged on the top edge of the wheel frame in the second clamping wheel pair 71. The width of the wheel body is smaller than the outer diameter of the shorter annular steel bar and the longer annular steel bar, so that the side of the shorter annular steel bar away from the first locking block 171 and the side of the longer annular steel bar away from the second locking block 172 are respectively in contact with the corresponding inner side surface of the wheel frame. At this time, the first locking block 171 and the second locking block 172 can cooperate with the corresponding inner surface of the wheel frame to clamp the shorter annular steel bar and the longer annular steel bar respectively, thereby realizing the bidirectional clamping of the shorter annular steel bar and the longer annular steel bar during the hoisting operation, further improving the stability of the hoisting operation.

[0084] like Figure 17-22 As shown, the embodiment of the present invention also provides a structure of a steel-concrete combined section of a bridge tower, including a lower concrete tower column 1, an upper steel tower column 3, and a steel-concrete combined section tower column 2 connecting the concrete tower column 1 and the steel tower column 3. The steel-concrete combined section tower column 2 includes a concrete transition section 21, an outer wall steel plate 22, annular steel bars 24, annular connecting steel bars 25, vertical steel bars 26, steel bar anchor plates 27, closed pressure-bearing steel plates 28, stud shear keys 29, perforated steel plate shear keys 210, and perforated pressure-bearing steel plates 211.

[0085] like Fig.18 As shown, in the embodiment of the present invention, the stud shear key 29 is welded to the lower surface of the closed pressure-bearing steel plate 28, the annular steel bars 24 and the stud shear key 29 are embedded in the concrete transition section 21, the vertical steel bars 26 are embedded in the concrete tower column 1, the concrete transition section 21 and the concrete tower column 2 are cast as a whole, and the lower surface of the closed pressure-bearing steel plate 28 is tightly fitted with the upper surface of the concrete transition section 21.

[0086] like Fig.19 As shown, in the embodiment of the present invention, the outer wall steel plate 22 is welded to the lower surface of the perforated pressure-bearing steel plate 211 into a whole, and the perforated steel plate shear key 210 and the stud shear key 29 are welded to the inner surface of the outer wall steel plate 22 .

[0087] like Fig. 20As shown, in the embodiment of the present invention, the annular steel bars 24 pass through the holes of the shear key 210 of the perforated steel plate, and the vertical steel bars 26 pass through the holes of the perforated pressure-bearing steel plate 211, so that the edge of the perforated pressure-bearing steel plate 211 and the edge of the closed pressure-bearing steel plate 28 fit tightly and have the same height, and are welded into a whole. The steel bar anchor plate 27 is anchored to the upper surface of the perforated pressure-bearing steel plate 211, and the annular connecting steel bars 25 and the annular steel bars 24 are welded into a whole.

[0088] like Fig.21 As shown, in the embodiment of the present invention, in the cavity surrounded by the middle of the concrete transition sections 21 on both sides, the inside of the outer ring outer wall steel plate 22, the lower part of the perforated pressure-bearing steel plate 211 and the upper part of the concrete tower column 1, the inner ring formwork is used to pour concrete until it is dense. The concrete can be poured into the cavity from the holes of the perforated pressure-bearing steel plate 211. Concrete with good fluidity is used for pouring to ensure that the perforated steel plate shear key 210, the bolt shear key 29, the annular steel bar 24, the annular connecting steel bar 25 and the vertical steel bar 26 are buried therein, and to ensure that the concrete is tightly fitted to the outer wall steel plate 22 and the perforated pressure-bearing steel plate 211 respectively.

[0089] like Fig. 22 As shown, in the embodiment of the present invention, the steel tower column 3 is welded to the upper surface of the closed pressure-bearing steel plate 28 and the open pressure-bearing steel plate 211 .

[0090] In the embodiment of the present invention, in order to ensure the safety of the tower column structure, the bolt shear key 29 and the perforated steel plate shear key 210 must have sufficient shear strength. The bolt shear key 29 has a diameter of 16-22 mm, a length of 150-220 mm, and a vertical spacing of no more than 300 mm between two adjacent bolts; the perforated steel plate shear key 210 has a hole diameter of 45-60 mm, a hole spacing of no more than 250 mm, and a plate thickness of no less than 30 mm.

[0091] In the embodiment of the present invention, in order to ensure that the outer wall steel plate 22, the closed pressure-bearing steel plate 28, and the open hole pressure-bearing steel plate 211 have greater rigidity, their thickness is not less than 36 mm.

[0092] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A construction method for a bridge tower steel-concrete combined section, characterized in that: The structure of the steel-concrete combined section of the bridge tower includes: Concrete tower column (1); A steel tower column (3) connected to the concrete tower column (1) via a steel-concrete combined section tower column (2); A steel-concrete combined section tower column (2), comprising a concrete transition section (21), an outer wall steel plate (22), annular steel bars (24), annular connecting steel bars (25), vertical steel bars (26), a steel bar anchor plate (27), a closed pressure-bearing steel plate (28), a stud shear key (29), a perforated steel plate shear key (210), and a perforated pressure-bearing steel plate (211); The concrete transition section (21) and the concrete tower column (1) are cast as a whole, the roots of the annular steel bars (24) are pre-buried in the concrete transition section (21), the roots of the vertical steel bars (26) are pre-buried in the concrete tower column (1), the bolt shear keys (29) are welded to the lower surface of the closed pressure-bearing steel plate (28) and pre-buried in the concrete transition section (21), so that the upper surface of the concrete transition section (21) and the lower surface of the closed pressure-bearing steel plate (28) are closely fitted; The outer wall steel plate (22) and the lower surface of the perforated pressure-bearing steel plate (211) are welded into a whole, and the perforated steel plate shear key (210) and the stud shear key (29) are welded to the inner surface of the outer wall steel plate (22); The annular steel bars (24) pass through the holes of the perforated steel plate shear key (210), and at the same time, the vertical steel bars (26) pass through the holes of the perforated pressure-bearing steel plate (211), so that the edge of the perforated pressure-bearing steel plate (211) is closely fitted with the edge of the closed pressure-bearing steel plate (28), the steel bar anchor plate (27) is anchored to the upper surface of the perforated pressure-bearing steel plate (211), and the annular connecting steel bars (25) and the annular steel bars (24) are welded into a whole; The method comprises the following steps: Step S1: prefabricate the annular steel bars (24), perform pre-embedding operations on the annular steel bars (24), so that the roots of the annular steel bars (24) are pre-embedded in the concrete transition section (21), the concrete transition section (21) and the concrete tower column (1) are integrally cast on site, and the closed pressure-bearing steel plate (28) is fixed to the top of the concrete transition section (21) by means of bolt shear keys (29); Step S2: welding the perforated steel plate shear key (210) and the stud shear key (29) to the inner surface of the outer wall steel plate (22), and then welding the outer wall steel plate (22) and the lower surface of the perforated pressure-bearing steel plate (211) into a whole; Step S3: ensuring that the annular steel bars (24) pass through the holes of the perforated steel plate shear key (210), and the vertical steel bars (26) pass through the holes of the perforated pressure-bearing steel plate (211), so that the edge of the perforated pressure-bearing steel plate (211) is closely attached to the edge of the closed pressure-bearing steel plate (28), and then welding them into a whole; Step S4: Anchoring the steel bar anchor plate (27) to the upper surface of the perforated pressure-bearing steel plate (211), and welding the annular connecting steel bar (25) and the annular steel bar (24) into a whole; Step S5: pouring concrete into the cavity enclosed by the concrete transition section (21), the outer wall steel plate (22) and the perforated pressure-bearing steel plate (211), ensuring that the concrete is tightly fitted to the outer wall steel plate (22) and the perforated pressure-bearing steel plate (211), respectively, to form a steel-concrete combined section tower column (2); Step S6: Welding the steel tower column (3) on the upper surface of the closed pressure-bearing steel plate (28) and the open hole pressure-bearing steel plate (211); The annular steel bars (24) in step S1 are divided into a plurality of shorter annular steel bars and a longer annular steel bar during the prefabrication process, and the shorter annular steel bars are connected to the opposite ends of the longer annular steel bars by annular connecting steel bars (25); The pre-embedding operation of the annular reinforcement (24) in step S1 is completed by using an annular reinforcement lifting device. After the annular reinforcement lifting device simultaneously lifts the shorter annular reinforcement and the longer annular reinforcement to be pre-embedded and connected to the connection area, the opposite ends of the shorter annular reinforcement and the longer annular reinforcement are respectively inserted into the concrete transition sections (21) on both sides, so that a gap for connecting the annular connecting reinforcement (25) is formed between the opposite ends of the shorter annular reinforcement and the corresponding longer annular reinforcement. At this time, the annular reinforcement lifting device of the steel-concrete joint section of the bridge tower fixes the longer annular reinforcement and the shorter annular reinforcement in a pre-embedded state; The circumferential steel bar lifting equipment for the steel-concrete combined section of a bridge tower comprises a hanging beam (4), a clamping unit arranged on the hanging beam (4) at equal distances in the height direction, and a rotating shaft (5) arranged on the hanging beam (4), the clamping unit comprising a first clamp (6) for clamping two inner and outer circles of shorter circumferential steel bars at the same height and a second clamp (7) for clamping two inner and outer circles of longer circumferential steel bars at the same height, the first clamp (6) comprising a first bracket and a first clamping wheel pair (61), the second clamp (7) comprising a second bracket and a second clamping wheel pair (71), the first bracket comprising a first inner plate portion (62), a first outer plate portion (63) and a first middle plate portion (64) connecting the first inner plate portion (62) and the first outer plate portion (63), the second bracket comprising a second inner plate portion (72), a first clamping wheel pair (61) and a second clamping wheel pair (71), two outer plates (73) and a second middle plate (74) connecting the second inner plate (72) and the second outer plate (73); the inner surfaces of the first inner plate (62) and the second inner plate (72) are both provided with two first clamping wheel pairs (61); the outer side surfaces of the first outer plate (63) and the second outer plate (73) are both provided with two second clamping wheel pairs (71); wherein the first clamp (6) and the second clamp (7) are both slidably mounted on the suspension beam (4); and the first clamp (6) and the second clamp (7) have a first state in which they are distributed up and down, and a second state in which they are distributed side by side left and right; the rotating shaft (5) is rotatably mounted on the suspension beam (4); and the rotating shaft (5) is used to drive the first clamp (6) and the second clamp (7) to switch between the first state and the second state; A first connecting rod (65) is provided at the top of the second clamping wheel pair (71) located on the same side as the second middle plate portion (74) in the first clamp (6), and a second connecting rod (75) is provided at the bottom of the first clamping wheel pair (61) located on the same side as the first middle plate portion (64) in the second clamp (7), and a first swing rod (8) and a second swing rod (9) are sleeved on the first connecting rod (65) and the second connecting rod (75) respectively, and opposite ends of the first swing rod (8) and the second swing rod (9) are connected to the rotating shaft (5), and the first swing rod (8) and the second swing rod (9) are located on the same straight line; A first locking block (171) and a second locking block (172) are respectively arranged at the bottom of the first clamping wheel pair (61) and the top of the second clamping wheel pair (71); when the first clamp (6) and the second clamp (7) are in the first state, the opposite ends of the first locking block (171) and the second locking block (172) which are distributed up and down squeeze each other, and the first locking block (171) and the second locking block (172) respectively press the shorter annular steel bar and the longer annular steel bar; A first circumferential slider (151) is fixedly provided on opposite sides of the first inner plate portion (62) and the first outer plate portion (63); a first circumferential slide groove (152) for circumferential displacement of the first circumferential slider (151) is provided on the suspension beam (4); and a lifting groove (153) for lifting and lowering the first clamp (6) is provided at one end of the first circumferential slide groove (152); a second circumferential slider (154) is fixedly provided on opposite sides of the second inner plate portion (72) and the second outer plate portion (73); a second circumferential slide groove (155) for circumferential displacement of the second circumferential slider (154) is provided on the suspension beam (4); and one end of the second circumferential slide groove (155) is connected to the bottom end of the lifting groove (153).

2. The construction method of a bridge tower steel-concrete combined section according to claim 1 is characterized in that: Concrete is poured into the cavity enclosed by the concrete transition section (21), the outer wall steel plate (22) and the perforated pressure-bearing steel plate (211), so that the concrete is closely fitted to the outer wall steel plate (22) and the perforated pressure-bearing steel plate (211), respectively.

3. The construction method of a bridge tower steel-concrete combined section according to claim 1 is characterized in that: The steel tower column (3) is welded to the upper surface of the closed pressure-bearing steel plate (28) and the open-hole pressure-bearing steel plate (211).