A plateau-plain water resource diversion device
By designing the plateau-plain water resources diversion device and using components such as pebble pits, rainwater pipelines, and sewage pipelines, the problem of insufficient water capacity in the plateau drainage paths has been solved, and effective diversion and filtration of water flow have been achieved, improving water resources utilization efficiency and water quality.
Patent Information
- Application Number
- CN202410781517.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2044-06-18
AI Technical Summary
The existing technology is difficult to effectively undertake the concentrated convergence of water in the plateau water discharge path, resulting in the challenge of the carrying capacity of the water discharge ditch and the pollution problem at the bottom of the ditch has not been effectively solved.
A plateau-plain water resources guidance device is designed, including water-destruction of water flood ditch, pebble pits, rainwater water pipelines, sewage water pipelines, water diversion baffles, water gate collection, switching door cavity rooms, and pipeline ports. The synergy of components realizes the effective diversion, filtering and adjustment of water flow.
This device can effectively divert and filter rainwater and sewage, improve water quality, regulate water flow, prevent flooding of the flood, and improve the collection efficiency and cleanliness of water resources.
Smart Images

Figure CN118653551B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water resource engineering, and in particular to a plateau-plain water resource dredging device. Background Art
[0002] Floods often originate in mountainous areas. The rainwater received by each mountain converges into streams and eventually flows into the branches of the drainage paths used by the contiguous mountains. The fall flow in mountainous areas cannot be stopped artificially due to its natural characteristics. Proper management of plateau water flow is the key to the complete utilization of natural water resources by rainwater resource projects. However, for plain areas, whether their rainwater resource projects can effectively receive the concentrated water in the plateau drainage paths poses a severe test to the receiving capacity of the drainage ditch.
[0003] As time goes by, the phenomenon of "nine droughts in ten years" has made many flood ditches lack practical functions. Although humans are well aware of the disastrous consequences of droughts and floods caused by abnormal climate, and dare not easily change the basic structure of mountain flood ditches, people still carry out extensive tidying and modification of the walls of mountain flood ditches. This measure is mainly to obtain clearer water sources and prevent soil from being lost with water. However, it is worth noting that when people modify the walls of the ditches, they often ignore the tidying of the bottom of the ditches. Due to its soft soil, the bottom of the ditches grows plants and accumulates garbage all year round. These plants and garbage become lush and fertile under the nourishment of mountain water.
[0004] The water problem of people at the foot of the mountain is mainly solved by flood ditches. However, this long-term reliance on flood ditches inevitably leads to soil pollution in the ditches. When mountain water flows down, it is directly affected by the polluted soil in the ditches.
[0005] In view of the complexity of plateau topography and geology and the natural flow characteristics of the erratic instantaneous rainfall, disaster prevention work must be rigorous and meticulous. The main task of rainwater resource engineering in connecting the plateau section of the water resource diversion system in the plain area is to avoid disasters caused by the change of water flow patterns caused by terrain changes. Summary of the invention
[0006] The object of the present invention is to provide a plateau-plain water resource diversion device to solve at least one technical problem existing in the prior art.
[0007] In order to solve the above technical problems, the present invention provides a plateau-plain water resource diversion device, comprising a flood discharge ditch, a pebble pit, a first mesh screen, a rainwater water delivery pipeline, a sewage water delivery pipeline, a water diversion baffle, a water collection gate, a switch gate chamber and a pipeline port;
[0008] The flood discharge ditch is an expanded structure;
[0009] The rainwater conveying pipeline is arranged above the sewage conveying pipeline;
[0010] A pebble pit is provided at the inlet of the sewage water delivery pipeline, and a plurality of pebbles are provided in the pebble pit;
[0011] The first mesh screen is arranged at the edge of the pebble pit to limit pebbles and impurities in the water body from entering the rainwater conveying pipe and the sewage conveying pipe;
[0012] The water collecting door is arranged on the mesh grate, and its position height corresponds to the rainwater conveying pipeline;
[0013] The water diversion baffle is a detachable triangular enclosure with an empty center, which is used to guide water into the pebble pits on both sides and into the rainwater water delivery pipeline and the sewage water delivery pipeline;
[0014] The inlet ends of the rainwater conveying pipeline and the sewage conveying pipeline are pipeline openings;
[0015] A switch door chamber is provided between the rainwater delivery pipe and the water receiving door;
[0016] The water collecting door is arranged on the side wall of the switch door chamber through a hinge;
[0017] The water receiving door is provided with a door opening and closing rope pulling hole and a door locking ring.
[0018] Furthermore, it also includes a water filter plate, a floating object lifting chamber, a blocking plate and a two-chamber partition;
[0019] A water filter plate is also provided on the first screen corresponding to the height position of the sewage water delivery pipeline;
[0020] A floating object lifting chamber is provided between the water filter plate and the sewage water delivery pipeline;
[0021] The floating object lifting chamber and the switch door chamber are separated by the two chamber partitions;
[0022] A blocking plate and a second mesh screen are provided on one side of the floating object lifting chamber close to the sewage water delivery pipeline;
[0023] The blocking plate is arranged below the second mesh grate;
[0024] The blocking plate is provided with a drainage hole.
[0025] Furthermore, it also includes a floating plate, a spring, a barb lock hook, a lock-releasing rope and a rod body;
[0026] The rod body comprises: a hook removal rod, a hook locking rod, a door closing rope rod, a door opening rope rod and a spring stabilizing rod;
[0027] There are two door-opening rope rods, namely a first door-opening rope rod and a second door-opening rope rod;
[0028] The floating plate is arranged in the floating object lifting chamber;
[0029] The hook unloading rod, hook locking rod, door closing rope rod, door closing rope, door opening rope rod and spring stabilizing rod are arranged on the floating plate;
[0030] The spring stabilizing rod is sleeved with a spring;
[0031] The end of the lock hook rod is provided with a lock hook;
[0032] The end of the hook-removing rod is connected with a lock hook via a lock-removing rope;
[0033] The two chamber partitions are provided with perforations corresponding to the rod bodies;
[0034] The perforations include: a hook-removing rod perforation, a hook-locking rod perforation, a door-closing rope hole, a door-opening rope hole, and a spring-stabilizing rod perforation, which are respectively used to allow the hook-removing rod, the hook-locking rod, the door-closing rope rod, the second door-closing rope, the door-opening rope rod and the spring-stabilizing rod to pass through;
[0035] There are two door opening rope holes, namely a first door opening rope hole and a second door opening rope hole;
[0036] The first door-opening rope rod passes through the first door-opening rope hole;
[0037] The second door-opening rope rod passes through the second door-opening rope hole;
[0038] There are two door closing rope holes, namely a first door closing rope hole and a second door closing rope hole;
[0039] The door closing rope rod passes through the first door closing rope hole;
[0040] The second door-closing rope also passes through the second door-closing rope hole;
[0041] Each through hole on the two chamber partitions is provided with a hollow screw;
[0042] Nuts are provided at both ends of the hollow screw for fixing the hollow screw on the two-chamber partition;
[0043] All rod bodies are also provided with plastic film bags, and only the door-closing ropes passing through the door-closing rope holes are covered with the plastic film bags and tied together by the binding ropes.
[0044] Further, the top of the switch door chamber is the switch door chamber ceiling, and the side wall thereof is the switch door chamber side wall;
[0045] Three hanging rope loops are installed on the top of the switch door chamber;
[0046] The positions of the three rope loops correspond to the positions of the first door opening rope hole, the first door closing rope hole and the unhooking rod through hole on the chamber partition plate respectively;
[0047] A rope stabilizing ring is arranged on the side wall of the switch door chamber.
[0048] Furthermore, there are two opening and closing door rope pulling holes, which are respectively arranged at the upper end and the lower end of the water receiving door;
[0049] The first door-opening rope rod and the second door-opening rope rod are respectively tied with a first door-opening rope and a second door-opening rope;
[0050] A rope pressing ring is arranged beside each of the door opening rope holes;
[0051] The first door-opening rope and the second door-opening rope pass through two rope-pressing loops respectively;
[0052] The first door opening rope passes through a rope ring installed on the top of the switch door chamber corresponding to the first door opening rope hole, and continues to pass through the switch door rope pulling hole at the upper end of the water receiving door surface and is fixedly connected to the switch door rope pulling hole;
[0053] The second door opening rope passes through the door opening and closing rope pulling hole at the lower end of the water receiving door and is fixedly connected to the door opening and closing rope pulling hole;
[0054] A rope pressing ring is arranged beside the first door closing rope hole;
[0055] The door-closing rope rod is provided with a first door-closing rope;
[0056] The first door-closing rope tied to the door-closing rope rod passes through the rope loop corresponding to the position of the first door-closing rope hole, and continues to pass through the door-opening and closing rope pulling hole at the upper end of the water receiving door, and is fixedly connected to the door-opening and closing rope pulling hole;
[0057] The door-closing rope on the floating plate and the door-closing rope rod on the floating plate and the door-closing rope tied to the rod have the same function and move the same distance;
[0058] The second door closing rope directly passing through the door closing rope hole passes through the rope pressing ring beside the first door closing rope hole and then passes through the door opening and closing rope pulling hole at the lower end of the water collecting door surface, and is fixedly connected with the door opening and closing rope pulling hole.
[0059] Furthermore, a first locking hook with a hook body facing downward is provided at the end of the locking hook rod;
[0060] In the initial state, the first locking hook hooks downwardly onto the locking ring at the lower end of the water receiving door;
[0061] After the floating plate rises, the first locking hook escapes from the locking ring;
[0062] The end of the hook-removing rod is provided with a lock-removing rope;
[0063] The end of the unloading rope away from the unloading hook rod is fastened with a second locking hook with the hook body facing upward;
[0064] The unloading rope is arranged in the stabilizing rope ring and the lifting rope ring;
[0065] In the initial state, the second lock hook is hooked upward into the lock door circle at the upper end of the water receiving door;
[0066] After the floating plate rises, the unhooking rod rises accordingly to loosen the unhooking rope, thereby causing the second locking hook to fall down by its own weight and escape from the locking door ring.
[0067] Furthermore, the total area of the drainage holes is smaller than the total water inlet area of the water filter plates.
[0068] Furthermore, ditch wall cement supports are provided on both sides of the flood discharge ditch;
[0069] The ditch wall cement support is filled with crushed stone;
[0070] The ditch wall cement support comprises a ditch surface wall plate and a support beam;
[0071] The groove surface wall plates are provided with two for limiting the position of the crushed stones;
[0072] The support beam is arranged between the groove surface wall plates;
[0073] It also includes rainwater grates with mesh and switch doors;
[0074] The rainwater grate with mesh and switch door is arranged on the road surface above the ditch wall cement support.
[0075] Further, it includes a rainwater grate body;
[0076] An upper mesh screen is provided at the upper end of the rainwater screen body for filtering large pieces of garbage;
[0077] A cast iron permeable grate is provided between the rainwater grate body and the upper mesh grate for bearing weight;
[0078] The water-permeable grate comprises a cast iron grate frame, cast iron grate strips and cast iron drainage holes;
[0079] The cast iron grate frame is rectangular, a plurality of cast iron grate strips are arranged at intervals, and the gap between the cast iron grate frame and the cast iron grate strips is the cast iron drain hole;
[0080] The rainwater grate main body is also provided with rainwater grate drain holes, and the positions of the rainwater grate drain holes correspond one to one with the cast iron drain holes in the vertical direction;
[0081] The side wall of the rainwater grate body is provided with a gate shaft rod hole;
[0082] Also includes barrier doors and door shafts;
[0083] The object-blocking door is provided with a door shaft ring;
[0084] The door shaft ring is coaxially arranged with the door shaft rod hole;
[0085] The door shaft rod is inserted into the door shaft rod hole and the door shaft ring;
[0086] It also includes corner platforms;
[0087] There are two types of corner platforms, namely, a first corner platform and a second corner platform;
[0088] The first corner platform is provided with a fixing rod through hole and a water-permeable hole;
[0089] The second corner platform is provided with a water-permeable hole;
[0090] The rainwater grate body is provided with a mounting hole inside, and the first corner platform and the second corner platform are fixed in the rainwater grate body through the mounting hole;
[0091] The first corner platform is installed on the corner platform installation hole at the lower end of the door shaft rod;
[0092] The second corner platform is installed on the corner platform installation hole on the other side;
[0093] The first corner platform and the second corner platform are both provided with brushes;
[0094] It also includes a water tank, which is arranged below the rainwater grate body;
[0095] The water tank is connected to the rainwater grate body through the water permeable hole;
[0096] A drainage hole is arranged at the bottom of the water tank.
[0097] Furthermore, it also includes a pull rope, a rain grate float and a float rod;
[0098] The rainwater grate float is arranged in the water tank, and the float rod is arranged on the rainwater grate float, and the upper end of the float rod passes through the through hole of the fixing rod;
[0099] The object-blocking door is provided with a door-pulling rope hole, one end of the pull rope is tied in the door-pulling rope hole, and the other end is connected to the floating rod;
[0100] The top of the water tank is provided with a water tank buckle, which is used to be clamped on the bottom edge of the corner platform so that the water tank is firmly connected to the rainwater grate body.
[0101] By adopting the above technical solution, the present invention has the following beneficial effects:
[0102] (1) By setting up rainwater pipes and sewage pipes, and setting up pebble pits and mesh screens at the entrance of the sewage pipes, effective diversion of rainwater and sewage is achieved. At the same time, the pebbles in the pebble pits can filter and precipitate some impurities in the sewage, thereby improving the water quality.
[0103] (2) By introducing the design of water diversion baffles and water collection gates, the path and flow of water flow can be adjusted according to actual needs. Especially in flood seasons, the water flow can be effectively guided and controlled to prevent flooding.
[0104] (3) A water filter plate and a floating object lifting chamber are set on the mesh corresponding to the sewage water pipe, which can collect and store floating objects in the water body, prevent them from entering the water pipe, and reduce the risk of pipe blockage. At the same time, the design of the blocking plate and the drainage hole can facilitate the cleaning and drainage of floating objects.
[0105] (4) The linkage mechanism composed of floating plates, springs, rods, etc. realizes the automatic opening and closing of the floating lifting chamber without manual intervention, which improves the convenience and efficiency of operation. At the same time, the design of hollow screws and plastic film bags enhances the structural stability and durability of the device.
[0106] (5) The device is not only suitable for water resource drainage in plateau areas, but also can be used in plain areas. It has good adaptability and broad application prospects. At the same time, its modular design makes it easy to replace and repair various components, reducing maintenance costs.
[0107] (6) By setting structures such as the door opening and closing rope pull hole, the door opening rope rod and the door closing rope rod, the opening and closing operation of the water receiving gate is made more flexible and convenient, especially in flood or rainstorm conditions that require rapid response, the flow rate and direction of the water flow can be quickly adjusted.
[0108] (7) By introducing the design of a lock hook and a hook-removing rod, a double locking mechanism of the water-receiving door is realized, which enhances the safety and stability of the device. Even in harsh environmental conditions, it can ensure that the water-receiving door remains closed to prevent water from overflowing.
[0109] (8) The pebble pit, mesh, filter plate and floating lifting chamber are used to effectively filter and collect impurities and floating objects in the water, thus improving the cleanliness of the water. At the same time, the design of the floating plate and drainage holes can facilitate the cleaning and drainage of floating objects.
[0110] (9) The structural stability of the flood discharge ditch is enhanced by the cement support and gravel filling of the ditch wall, enabling it to withstand greater water impact and scouring. In addition, the design of the rainwater grate with mesh and switch gate also improves the bearing capacity and drainage efficiency of the potential energy pavement.
[0111] (10) The combination of the main body of the rainwater grate, the upper mesh grate, the cast iron permeable grate and the barrier gate not only has the ability to filter large pieces of garbage and bear weight, but also can control the direction of water flow by opening and closing the barrier gate. At the same time, the design of the water tank and the floating rod allows the barrier gate to be automatically opened or closed according to the water level, realizing intelligent rainwater discharge management.
[0112] (11) The components of the entire technical solution are reasonably designed and easy to disassemble and replace, reducing maintenance costs and difficulties. In particular, the modular design of the rainwater grate and flood discharge ditch makes it easy and quick to operate when maintenance or replacement is required. BRIEF DESCRIPTION OF THE DRAWINGS
[0113] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0114] Figure 1 This is the main view of the current plain water discharge flood ditch connecting to the plateau water discharge path;
[0115] Figure 2 It is a side view of the current plain flood discharge ditch connecting to the plateau discharge path;
[0116] Figure 3 This is a bird's-eye view of the current plain flood discharge ditch connecting to the plateau discharge path;
[0117] Figure 4 It is the main structural diagram of the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0118] Figure 5 It is a top view structural diagram of the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0119] Figure 6 yes Figure 4 AA cross-sectional structure diagram;
[0120] Figure 7 yes Figure 4 Schematic diagram of the cross-sectional structure of the middle BB;
[0121] Figure 8 yes Figure 6 Middle C-C section structure schematic diagram;
[0122] Fig. 9 yes Figure 8 Middle D-D closed door section structure diagram;
[0123] Fig.10 yes Figure 8 Middle D-D door opening section structure diagram;
[0124] Fig.11 yes Fig. 9 , Fig.10 Schematic diagram of the center water gate structure;
[0125] Fig.12 yes Fig. 9 , Fig.10 A top view of the mid-floating plate structure;
[0126] Fig.13 yes Fig. 9 , Fig.10 Schematic diagram of the structure of the partition between the two chambers;
[0127] Fig.14 yes Fig. 9 , Fig.10 Schematic diagram of the structure of the complete set of unhooking rod;
[0128] Fig.15 yes Fig. 9 , Fig.10 Schematic diagram of the whole set of lock hook rod structure;
[0129] Fig.16 yes Fig.13 Schematic diagram of the hollow screw and nut structure used on each through hole of the two chamber partitions;
[0130] Fig.17 yes Fig. 9 Fig.10 A schematic diagram of the location of the rope loop installed on the top of the switch door chamber;
[0131] Fig.18 yes Fig. 9 Fig.10 Schematic diagram of the location structure of the stabilizing rope loop on the side wall of the door opening side of the switch door chamber;
[0132] Fig.19 yes Figure 8 Schematic diagram of the blocking plate structure;
[0133] Fig. 20 This is a schematic diagram of the overhead structure of adding a water diversion baffle in the flood discharge ditch in the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention
[0134] Fig.21It is a left-side structural schematic diagram of a water diversion baffle added to a flood discharge ditch in a water resource diversion system connecting a plain to a plateau section in a rainwater resource project of the present invention;
[0135] Fig. 22 It is a side view of the ditch wall cement support structure used in the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0136] Fig.23 It is a top view of the ditch wall cement support structure used in the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0137] Fig.24 This is a schematic diagram of the cast iron permeable grate structure currently used in rainwater resource projects;
[0138] Fig.25 It is a schematic diagram of the overall structure of a rainwater grate with a mesh and a switch door, in which the permeable grate used in the original rainwater resource project in the water resource diversion system connecting the plain to the plateau in the rainwater resource project of the present invention is replaced with a complete set of rainwater grate with a mesh and a switch door;
[0139] Fig.26 It is a schematic side view of the overall structure of a rainwater grate with a mesh belt and a switch door, in which the permeable grate used in the original rainwater resource project in the water resource diversion system connecting the plain to the plateau in the rainwater resource project of the present invention is replaced with a complete set of rainwater grate with a mesh belt and a switch door;
[0140] Fig. 27 It is a schematic diagram of the overall structure of a rainwater grate with a mesh belt and a switch door, in which the permeable grate used in the original rainwater resource project in the water resource diversion system connecting the plain to the plateau in the rainwater resource project of the present invention is replaced with a complete set of rainwater grate with a mesh belt and a switch door;
[0141] Fig.28 It is a schematic diagram of the main structure of the rainwater grate with mesh belt switch door in a complete set of rainwater grate with mesh belt switch door in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0142] Fig.29 It is a top view schematic diagram of the main structure of the rainwater grate with mesh belt switch door in a complete set of rainwater grate with mesh belt switch door in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0143] Fig.30 yes Fig.26 Middle E—E is a schematic diagram of the cross-sectional structure of the door body in the closed state;
[0144] Fig.31 yes Fig. 27 Middle F-F door body open state cross-sectional structure diagram;
[0145] Fig.32It is a schematic diagram of the main view of the structure of the barrier door in the rainwater grate with a mesh belt and a switch door used in the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0146] Fig.33 It is a left-side schematic diagram of the structure of the barrier door in the rainwater grate with a mesh belt and a switch door used in the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0147] Fig.34 It is a top view schematic diagram of the structure of the barrier door in the rainwater grate with a mesh belt switch door used in the water resource diversion system connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0148] Fig.35 It is a schematic diagram of the main view of the water collecting corner platform structure in the rainwater grate with a mesh belt and a switch door used in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0149] Fig.36 It is a left-side schematic diagram of a water collecting corner platform structure in a rainwater grate with a mesh and a switch door used in a water resource diversion system for connecting a plain to a plateau section in a rainwater resource project of the present invention;
[0150] Fig.37 It is a top view schematic diagram of the water collecting corner platform structure in the rainwater grate with a mesh belt switch door used in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0151] Fig.38 It is a schematic diagram of the brush structure in the rainwater grate with a mesh belt and a switch door used in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0152] Fig.39 It is a schematic diagram of the main view of the water tank structure of the rainwater grate with a mesh and a switch door used in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0153] Fig.40 It is a left view schematic diagram of the water tank structure of the rainwater grate with a mesh and a switch door used in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0154] Fig.41 It is a top view schematic diagram of the water tank structure in the rainwater grate with a mesh and a switch door used in the water resource diversion system for connecting the plain to the plateau section in the rainwater resource project of the present invention;
[0155] Fig.42 yes Fig. 9 , Fig.10 Front view of the mid-floating plate structure;
[0156] Fig.43 This is a photo from the main angle of the rain grate with mesh and switch door;
[0157] Fig.44 This is a side-view photo of the rain grate with mesh and switch door;
[0158] Fig.45 This is a bird's-eye view photo of the rain grate with a mesh and a switchable door.
[0159] Reference numerals:
[0160] 1- flood discharge ditch; 2- downstream rainwater; 3- sidewalk; 4- highway; 6- land beside the ditch; 7- permeable grate; 8- rainwater grate with mesh and switch gate; 9- rainwater pipeline; 10- sewage pipeline; 11- pebble pit; 12- mesh grate; 12a- first mesh grate; 12b- second mesh grate; 13- pebbles; 14- water collection gate; 15- switch gate chamber; 16- pipe opening; 17- two chamber partition; 18- filter plate; 19- floating object lifting chamber; 20- door closing rope; 20a- first door closing rope; 20b- second door closing rope; 21- closing Page; 22a-first door opening rope; 22b-second door opening rope; 23-locking door ring; 24-hanging rope ring; 25-stabilizing rope ring; 26-unhooking rod; 27-locking hook rod; 28a-door closing rope rod; 29-stabilizing spring rod; 30-spring; 31-door opening rope rod; 31a-first door opening rope rod; 31b-second door opening rope rod; 32-floating plate; 33-door opening rope hole; 33a-first door opening rope hole; 33b-second door opening rope hole; 34-door closing rope hole 34a-first door closing rope hole; 34b-second door closing rope hole; 35-spring rod hole; 36 -Hook-off rod hole; 37-door-opening rope pulling hole; 38-lock hook rod hole; 39-lock-off rope; 40-pressure rope ring; 41-lock hook; 41a-first lock hook; 41b-second lock hook; 42-hollow screw; 43-nut; 44-plastic film bag; 45-binding rope; 46-door-opening chamber top; 47-door-opening chamber side wall; 48-blocking plate; 49-drainage hole; 50-water diversion baffle; 51-ditch wall cement support; 52-ditch surface wall plate; 53-support beam; 54-gravel; 55-upper mesh; 56-cast iron grate frame; 5 7- cast iron grate strips; 58- cast iron drain holes; 59- rainwater grate body; 60- rainwater grate strips; 61- rainwater grate drain holes; 62- corner platform installation holes; 63- door axis hole; 64- object-blocking door; 65- door axis ring; 66- door axis; 67- door rope hole; 68- corner platform; 68a- first corner platform; 68b- second corner platform; 69- fixing rod through hole; 70- water-permeable hole; 71- brush; 72- pull rope; 73- floating rod; 74- rainwater grate floating block; 75- water tank; 76- drainage hole at the bottom of the tank; 77- water tank buckle. DETAILED DESCRIPTION
[0161] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0162] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0163] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0164] like Figure 1-3 The figure shows a water resource diversion device disclosed in the prior art, which includes: a flood discharge ditch 1, downstream rainwater 2, a sidewalk 3, a highway 4, an original domestic sewage pipe 5, ditch side land 6, and a permeable grate 7.
[0165] The flood discharge ditch 1 is directly connected to the downstream rainwater 2 originating from the plateau path. During operation, the flood discharge ditch 1 maintains a constant cross-section and capacity to ensure smooth reception and guidance of the plateau potential energy flow. If the flow of the downstream rainwater 2 is small, when it reaches the flood discharge ditch 1 in the plain section, the water flow may decrease rapidly due to the absorption of the soil and plants at the bottom of the ditch, and it may even be difficult to detect its existence. However, if the flow of the downstream rainwater 2 surges to a disaster level, since the shape of the ditch design has not been adjusted, and the flow rate is naturally slowed down when the high mountain potential energy flow is converted into horizontal flow, the excessive downstream rainwater 2 will cause serious overflow at the connection point between the plateau drainage path and the plain flood discharge ditch 1, directly scouring the environment under the land slope, causing a serious disaster and causing serious losses.
[0166] Example 1
[0167] In order to solve the problems existing in the water resource diversion device in the prior art, the present application discloses a plateau-plain water resource diversion device.
[0168] Mountains are the most ideal places for water accumulation in nature. When mountain water flows through the mountain and reaches the junction of the foot of the mountain and the plain land, the flow speed will naturally slow down. Because the water flow slows down when it first reaches the plain, the subsequent mountain potential energy water gradually superimposes on the plain land, forming an expanding beach. If the water flow area out of the beach is not dredged and treated in time, the continuous mountain potential energy water will accumulate at the junction of the plain land, eventually forming a flood. The water will continue to spread with the help of the terrain until it cannot be controlled.
[0169] In dry years, if the rainwater resources accumulated in the mountains are not properly collected, these slow-flowing and limited mountain water will soon be absorbed by the soil and plants in the ditch, and eventually disappear without a trace with the evaporation of the environment and climate. In rainwater resource projects, water resource diversion devices in plains and plateaus should follow the laws of natural water flow to ensure the effective use of water resources and environmental protection.
[0170] like Figure 4-8 20-21 show a plateau-plain water resource diversion device disclosed in the present application, including a flood discharge ditch 1, a pebble pit 11, a mesh grating 12, a rainwater delivery pipeline 9, a sewage delivery pipeline 10, a water diversion baffle 50, a water receiving gate 14, a switch gate chamber 15 and a pipeline port 16;
[0171] The mesh grate 12 includes a first mesh grate 12a and a second mesh grate 12b;
[0172] The flood discharge ditch 1 is an expanded structure;
[0173] The rainwater delivery pipe 9 is arranged above the sewage delivery pipe 10;
[0174] A pebble pit 11 is provided at the entrance of the sewage water delivery pipe 10, and a plurality of pebbles 13 are provided in the pebble pit;
[0175] The first screen 12a is arranged at the edge of the pebble pit to prevent the pebbles 13 and impurities in the water from entering the rainwater pipe 9 and the sewage pipe 10;
[0176] The water collecting door 14 is arranged on the mesh grate, and its position height corresponds to the rainwater conveying pipe 9;
[0177] The water diversion baffle 50 is a detachable triangular enclosure with an empty center, used to guide water into the pebble pits 11 on both sides and into the rainwater water delivery pipe 9 and the sewage water delivery pipe 10;
[0178] The inlet ends of the rainwater conveying pipe 9 and the sewage conveying pipe 10 are pipe openings 16;
[0179] A switch door chamber 15 is provided between the rainwater delivery pipe 9 and the water receiving door 14;
[0180] The water collecting door 14 is arranged on the side wall of the switch door chamber 15 through a hinge 21;
[0181] The water receiving door 14 is provided with a door opening and closing rope pulling hole 37 and a door locking ring 23 .
[0182] The water diversion baffle 50 is set up to effectively solve the flood and drought problems for this engineering system. For flood and drought situations without potential energy flow, it is only necessary to ensure that the rainwater water delivery pipe 9 is facing the flowing water so that water flows into the pipe naturally. However, when facing natural forces such as floods and wind, various factors must be considered comprehensively and carefully to avoid greater catastrophic accidents caused by improper design.
[0183] The newly installed rainwater pipes 9 on both sides of the flood discharge ditch 1 are designed to receive the water falling from the plain expansion area and to deal with the flowing water carrying various environmental items and potential energy in the mountain environment. According to the characteristics of potential energy flowing water, the flowing substances are most entrained on both sides of the water surface and the flow rate is slower, while the entrained substances are less and the flow rate is faster in the middle of the water surface. In view of the principle that "the clearer the water, the better the flow performance", on limited rainy days, the rainwater pipes 9 cannot just wait to collect rainwater. If the collected water is insufficient due to climate and other reasons, the internal environment of the pipe may be damaged.
[0184] Therefore, a pebble pit 11 is set at the bottom of the flood discharge ditch 1 at the front end of the water collection gate 14 of the rainwater conveying pipe 9. The downhill flood is difficult to intercept directly due to its potential energy, but the pebbles 13 are placed in the pit, and the water will flow into the pit first after hitting the pebbles. Only when the amount of water in the pit reaches a certain level will a horizontal flow be formed and flow to the water collection gate 14. The hinge 21 of the water collection gate 14 is installed on the side wall of the switch door chamber 15. Two switch door rope pulling holes 37 are respectively provided above and below the door surface of the water collection gate 14 to facilitate the balanced switch operation of the door through the rope. In addition, the door lock ring 23 is installed at the upper and lower positions of the side frame of the door body to ensure the stable locking of the door.
[0185] These pebbles 13 not only help the water gate 14 reduce the impact of the water flow, but also cooperate with the mesh 12 to keep the debris carried by the downstream rainwater 2 in the newly set reserved space of the flood discharge ditch 1, thereby naturally reducing the volume of the subsequent water flow and preventing the water quality from being further polluted. This design helps to reduce the difficulty of water pollution control and environmental protection.
[0186] When the water potential is low, a water diversion baffle 50 is set to allow all the water to enter the rainwater water delivery pipe 9 and the sewage water delivery pipe 10, which can prevent the water from volatilizing or entering the soil during water transportation, which is conducive to water collection. When the water potential is high, the water diversion baffle 50 is removed so that the water can be discharged from the middle flood discharge ditch 1. The main function of the water baffle 50 is to block the ditch cross-section directly opposite the original flood discharge ditch 1 and limit its capacity. At the same time, the newly widened rainwater water delivery pipes 9 on both sides can naturally slow down, receive and respond to problems such as sudden flood water volume. When the flood flows to the expanded area section, its flow rate will naturally slow down, and then pass through the pebble pit 11 and the mesh 12 to filter, and then enter the rainwater water delivery pipe 9. The rainwater 2 flowing down from the mountain environment is regulated and sorted by the facilities and devices in the engineering system of this case, so that it can maintain high quality and then smoothly enter the subsequent water delivery project to ensure that no unexpected situations occur. The entire process not only ensures the stability and safety of water flow, but also delivers high-quality water to areas in need, ensuring a long-term supply of water.
[0187] By adopting the above technical solution, the present invention has the following beneficial effects:
[0188] (1) By setting up pebble pits and mesh grates, this technical solution can effectively collect water falling from the plain expansion area and filter out impurities in the water body, thereby improving the collection efficiency and cleanliness of water resources.
[0189] (2) By introducing the water diversion baffle, this technical solution can flexibly control the direction and flow of water. It can ensure that all water enters the water pipeline when the water level is low to prevent water evaporation or loss. It can also remove the water diversion baffle to drain excess flood water when the water level is high, thereby enhancing the ability to respond to sudden flood water.
[0190] (3) The design of the expanded flood discharge ditch structure and the pebble pit effectively reduced the flow rate of the flood. At the same time, the filtering effect of pebbles and mesh grates reduced impurities in the water flow, optimized the water flow structure, and ensured the smooth progress of the subsequent water transfer project.
[0191] (4) The design of the water-collecting door, especially the setting of the opening and closing rope pull hole and the door lock ring, allows the door to open and close automatically without human operation, ensuring the flexibility and safety of system operation. At the same time, the design avoids the need to quickly close or open the water-collecting door in maintenance or emergency situations.
[0192] (5) Through the filtering effect of the pebble pit and the mesh, as well as the separation design of the rainwater pipeline and the sewage pipeline, this technical solution can ensure the quality of the collected water resources, reduce the difficulty of subsequent water pollution control, and is conducive to environmental protection and the sustainable use of water resources.
[0193] (6) This technical solution enhances the natural adaptability and reliability of the system by introducing a variety of structures and equipment, such as water diversion baffles, pebble pits, and mesh grates, enabling it to cope with changes in water flow under different environmental conditions and ensure the stable operation of the system.
[0194] like Figure 8 , 9 19 is a further embodiment of the present application, further comprising a water filter plate 18, a floating object lifting chamber 19, a blocking plate 48 and a two-chamber partition 17;
[0195] A water filter plate 18 is also provided on the first screen 12a corresponding to the height position of the sewage water delivery pipe 10;
[0196] A floating object lifting chamber 19 is provided between the water filter plate 18 and the sewage water delivery pipe 10;
[0197] The floating object lifting chamber 19 and the door opening and closing chamber 15 are separated by the two-chamber partition 17;
[0198] The floating object lifting chamber 19 is provided with a blocking plate 48 and a second screen 12b on one side close to the sewage water delivery pipe 10;
[0199] The blocking plate 48 is arranged below the second mesh grate 12b;
[0200] The blocking plate 48 is provided with a drainage hole 49 .
[0201] A mesh screen 12 is arranged on the water outlet surface of the pebble pit 11, followed by a water filter plate 18, which is used to further filter water quality and gravity. Behind the water filter plate 18, a floating object lifting chamber 19 is arranged, and its rear wall is composed of a blocking plate 48, and behind the blocking plate 48 is a newly installed sewage water delivery pipeline 10. There are two drainage holes 49 at the lower end of the blocking plate 48, and a permeable second mesh screen 12b is installed at the upper end of the blocking plate 48. The blocking plate 48 controls the lifting and lowering of the floating plate 32 in the floating object lifting chamber 19. The top plate of the floating object lifting chamber 19 is separated by a two-chamber partition 17.
[0202] As for the downstream rainwater 2, it first flows to the water collection gate 14. The water collection gate 14 uses natural hydraulic force to open the gate body toward the pipeline. A mesh grating 12 is also provided outside the water collection gate 14, which not only protects the gate body but also plays a role in filtering water. In this way, the volume and potential energy of rainwater entering the rainwater conveying pipeline 9 are reduced, thereby accelerating the flow rate and reducing destructiveness, ensuring the long-term and stable operation of the water collection gate 14. In order to match the square water collection gate 14 with the circular rainwater conveying pipeline 9, a switch door chamber 15 is provided in front of the rainwater conveying pipeline 9. The bottom plate of the chamber is the top plate of the floating object lifting chamber 19, which is separated by a two-chamber partition 17. The water collection gate 14 is installed on the side wall of the switch door chamber 15 through a hinge 21, and a door lock ring 23 is provided to prevent the wind from damaging the water collection gate 14.
[0203] It is worth mentioning that the pebbles 13 in the pebble pit 11 are an excellent natural water filtration material. After being filtered by the pebbles 13, the downstream rainwater 2 directly enters the floating object lifting chamber 19, providing a high-quality water source for subsequent water delivery work.
[0204] By adopting the above technical solution, the present invention has the following beneficial effects:
[0205] (1) By setting a water filter plate and a floating object lifting chamber in front of the sewage water supply pipeline, combined with the use of pebble pits and mesh grates, this technical solution can effectively filter out impurities and floating objects in the water body, significantly improve the cleanliness of the water quality, and provide a high-quality water source for subsequent water supply projects.
[0206] (2) The design of the floating lifting chamber, combined with the configuration of the plugging plate and the drainage hole, can flexibly control the water flow, ensuring that the system can operate stably and efficiently under different water potentials. This design is particularly suitable for the complex and changeable hydrological environment in the plateau-plain area.
[0207] (3) The mesh installed outside the water-collecting door not only filters water, but also protects the water-collecting door from the impact of debris in the water flow, thus extending the service life of the water-collecting door. At the same time, the installation of the hinge and the design of the door lock also enhance the stability of the water-collecting door, further preventing the water-collecting door from being damaged by natural factors such as wind.
[0208] (4) By rationally arranging the various components, this technical solution optimizes the water flow structure, allowing the water to flow smoothly and stably in the system, reducing the impact and destructiveness of the water flow, and ensuring the stable operation of the entire system.
[0209] like Fig. 9 , 10 , 12-16, 42 show further embodiments of the present application, further comprising a floating plate 32, a spring 30, a barb lock hook 41, a lock-releasing rope 39 and a rod body;
[0210] The rod body includes: a hook removal rod 26, a hook locking rod 27, a door closing rope rod 28a, a door opening rope rod 31 and a spring stabilizing rod 29;
[0211] There are two door-opening rope rods 31, namely a first door-opening rope rod 31a and a second door-opening rope rod 31b;
[0212] The second door-closing rope 20b on the floating plate 32 is combined with the door-closing rope rod 28a and the first door-closing rope 20a tied to the rod and has the same moving distance;
[0213] The floating plate 32 is disposed in the floating object lifting chamber 19;
[0214] The unhooking rod 26, the locking hook rod 27, the door closing rope rod 28a, the second door closing rope 20b, the door opening rope rod 31 and the spring stabilizing rod 29 are arranged on the floating plate 32;
[0215] The spring stabilizing rod 29 is sleeved with a spring 30;
[0216] The end of the lock hook rod 27 is provided with a lock hook 41;
[0217] The end of the hook-removing rod 26 is connected to a lock hook 41 via a lock-removing rope 39;
[0218] The two-chamber partition 17 is provided with holes corresponding to the rod and the rope;
[0219] The perforations include: a hook-removing rod perforation 36, a hook-locking rod perforation 38, a door-closing rope hole 34, a door-opening rope hole 33, and a spring-stabilizing rod perforation 35, which are respectively used to allow the hook-removing rod 26, the hook-locking rod 27, the door-closing rope rod 28a, the second door-closing rope 20b, the door-opening rope rod 31 and the spring-stabilizing rod 29 to pass through;
[0220] There are two door opening rope holes 33, namely a first door opening rope hole 33a and a second door opening rope hole 33b;
[0221] The first door-opening rope rod 31a passes through the first door-opening rope hole 33a;
[0222] The second door-opening rope rod 31b passes through the second door-opening rope hole 33b;
[0223] There are two door closing rope holes 34, namely a first door closing rope hole 34a and a second door closing rope hole 34b;
[0224] The door closing rope rod 28a passes through the first door closing rope hole 34a;
[0225] The second door closing rope 20b passes through the second door closing rope hole 34b;
[0226] Each through hole on the two-chamber partition 17 is provided with a hollow screw 42;
[0227] Nuts 43 are provided at both ends of the hollow screw 42 for fixing the hollow screw 42 on the two-chamber partition 17;
[0228] All rod bodies are also provided with plastic film bags 44, and the plastic film bags 44 passing through the second door-closing rope hole 34b and being sleeved on the second door-closing rope 20b are tied together with a binding rope 45.
[0229] The two diagonal positions of the floating plate 32 are mainly equipped with door opening and closing structural components. Specifically, the unhooking rod 26, the locking hook rod 27 and the door closing rope rod 28a are installed on the plate corner on one side; and the two door opening rope rods 31 are installed on the plate corner on the other side opposite thereto. In addition, the structural components used to balance the force of the floating plate are arranged at the other two diagonal positions of the floating plate 32. Specifically, the stabilizing spring rod 29 is set on the plate corner on one side, and the spring 30 is sleeved on the outside of the stabilizing spring rod 29; and the second door closing rope 20b and the stabilizing spring rod 29 are installed on the plate corner opposite thereto, and similarly, the spring 30 is also sleeved on the outside of the stabilizing spring rod 29.
[0230] The upper ends of the rod heads of the unhooking rod 26, the door closing rope rod 28a and the door opening rope rod 31 are all tied with respective required pull ropes for easy operation and control. It is worth noting that the rod head of the lock hook rod 27 is not tied with a pull rope, but is directly connected to the barb lock hook 41 to ensure the stability of the lock.
[0231] In particular, the rod head of the unhooking rod 26 is not only tied with a lock unloading rope 39, but the other end of the lock unloading rope 39 is also connected to a lock hook 41. This design makes the unhooking process more convenient and safer.
[0232] In summary, as the core component of the engineering system of this case, the floating plate 32 has a high degree of professionalism and practicality in its structural design and functional configuration, ensuring the efficient operation and stability of the entire system.
[0233] The two-chamber partition 17 is fixed to the upper end of the floating plate 32 as the top plate of the floating object lifting chamber 19 and the bottom plate of the door opening and closing chamber 15. The floating rods and the second door closing rope 20b on the floating plate 32 can only move up and down. In order to optimize the righting and stabilizing performance of the floating rod, the two-chamber partition 17 is provided with corresponding perforated structures, which are the best adaptation design to ensure the smooth work of the floating rod.
[0234] On one diagonal side of the two chamber partitions 17, there are provided a hook-removing rod through hole 36, a hook-locking rod through hole 38 and a first door-closing rope hole 34a. On the other side of the plate corner opposite thereto, two door-opening rope holes 33 are arranged side by side. In addition, on one side of the plate corners of the other two diagonal sides, there are provided a spring-stabilizing rod through hole 35, and on the opposite plate corners, there are provided a second door-closing rope hole 34b and another spring-stabilizing rod through hole 35.
[0235] Each perforation on the two-chamber partition 17 is provided with Fig.13 and 16 The hollow screws 42 shown in the drawings have nuts 43 at both ends of each hollow screw 42 that can be tightened. The perforations correspond one by one to the floating rods and ropes on the floating plates 32, and the floating rods can freely move up and down in the hollow screws 42.
[0236] As the bottom plate of the switch door chamber 15, the two-chamber partition 17 bears the impact and washing of the not-so-clear and chaotic water in the filtering environment. In order to prevent impurities in the water from depositing and jamming the floating rods and ropes that need to be moved, we have taken the following measures: First, use plastic film bags 44 to wrap each rod, and then use the binding rope 45 to tightly bind one side of the bag opening of the plastic film bag 44 to the rod head of each rod, or tie the pull rope tied to the connecting rod together; then, put the remaining bag opening of the plastic film bag 44 on the hollow screw 42 of the two-chamber partition 17, and use the nut 43 to tightly fix the bag opening of the plastic film bag 44 to the hollow screw 42. Similarly, each rod and rope under the two-chamber partition 17 can also be covered with a plastic film bag in the same way and tightly fixed. This design ensures that the floating rod and rope will not be adversely affected by the chaotic water when moving in the plastic film bag 44.
[0237] The floating plate 32 has a significant balanced buoyancy characteristic. However, in the structural design, the force is applied only through the two diagonal corners of the floating plate 32, while the remaining two diagonal corners do not bear the force. Without the need to apply additional force, the stability of the floating plate is ensured by adding a balancing device, namely a stabilizing spring rod 29, to the diagonal corners of the floating plate 32. The stabilizing spring rod 29 is covered with a spring 30, which enables the stabilizing spring rod 29 to move synchronously with other floating rods according to the amount of force, thereby achieving four-corner balance of the floating plate 32 during the rising and falling process. This design ensures that various types of floating rods and ropes can operate naturally and stably during operation.
[0238] By adopting the above technical solution, the present invention has the following beneficial effects:
[0239] (1) The movement of the floating plate can be precisely controlled through the rod body and rope structure and the supporting perforation system. The rod body includes a hook removal rod, a hook locking rod, a door closing rope rod, a door opening rope rod and a spring stabilizing rod, which are fixed to the two-chamber partition by hollow screws and nuts to ensure that the floating plate is stable and smooth when moving up and down.
[0240] (2) The design of the spring stabilizer rod is used in conjunction with the spring to provide additional balancing force for the floating plate, ensuring that the four corners of the floating plate are balanced during the rising and falling process, effectively preventing the system from becoming unstable or damaged due to uneven force.
[0241] (3) Plastic film bags are used to wrap each rod and rope, which not only protects the rod and rope from the influence of water quality, but also facilitates the cleaning and maintenance of the system.
[0242] like Fig. 9 , 10 , 17 and 18 show further embodiments of the present application, wherein the top of the switch door chamber 15 is a switch door chamber top 46, and the side wall thereof is a switch door chamber side wall 47;
[0243] Three hanging rope loops 24 are installed on the top 46 of the switch door chamber;
[0244] The positions of the three rope loops 24 correspond to the positions of the first door opening rope hole 33a, the first door closing rope hole 34a and the unhooking rod through hole 36 on the chamber partition 17 respectively.
[0245] A rope stabilizing ring 25 is provided on the side wall 47 of the switch door chamber.
[0246] A rope ring 24 has been installed on the top 46 of the door opening and closing chamber, which is intended to prevent the impact of flood water entering the pipe on the rope and ensure that the working efficiency of the rope is not affected. Specifically, one rope ring 24 on the top 46 needs to be installed vertically corresponding to a door opening rope hole 33 on the two-chamber partition 17; at the same time, another rope ring 24 also needs to be installed vertically corresponding to the first door closing rope hole 34a on the partition 17; and another rope ring 24 needs to be installed vertically corresponding to the unhooking rod through hole 36.
[0247] Regarding the position and layout of the stabilizing rope ring 25 on the side wall 47 of the switch door chamber, the working efficiency of this engineering system mainly depends on the energy buoyancy provided by the floating plate 32, the hard directional movement of each floating rod, and the structural transmission function of the rope. The lock door ring 23 installed on the edge of the door side frame, due to the soft characteristics of the rope, when the lock hook 41 autonomously confirms the position of the lock door ring 23, it needs the assistance of the stabilizing rope ring 25 to ensure that the lock hook 41 can accurately penetrate the lock door ring 23. Therefore, the stabilizing rope ring 25 must be installed at the upper end of the unhooking rod hole 36, and it also needs to be additionally supported by the hanging rope ring 24 on the top 46 of the switch door chamber.
[0248] like Figure 9-13 The figure shows a further embodiment of the present application, wherein there are two opening and closing door rope pulling holes 37, which are respectively arranged at the upper end and the lower end of the water receiving door 14;
[0249] The first door-opening rope rod 31a and the second door-opening rope rod 31b are respectively tied with a first door-opening rope 22a and a second door-opening rope 22b;
[0250] A rope pressing ring 40 is provided beside each of the door opening rope holes 33;
[0251] The first door-opening rope 22a and the second door-opening rope 22b pass through two rope-pressing loops 40 respectively;
[0252] The first door opening rope 22a passes through the rope ring 24 installed on the top 46 of the switch door chamber corresponding to the first door opening rope hole 33a, and continues to pass through the switch door rope pulling hole 37 at the upper end of the water receiving door 14 and is fixedly connected to the switch door rope pulling hole 37;
[0253] The second door opening rope 22b passes through the door opening and closing rope pulling hole 37 at the lower end of the water receiving door 14 and is fixedly connected to the door opening and closing rope pulling hole 37;
[0254] A rope pressing ring 40 is provided next to the first door closing rope hole 34a;
[0255] The door closing rope rod 28a is connected with a first door closing rope 20a;
[0256] The first door closing rope 20a passes through the first door closing rope hole 34a corresponding to the position of the rope ring 24, and continues to pass through the door opening and closing rope pull hole 37 at the upper end of the water receiving door 14, and is fixedly connected with the door opening and closing rope pull hole 37;
[0257] The second door-closing rope 20b on the floating plate 32 is combined with the door-closing rope rod 28a and the first door-closing rope 20a tied to the rod and has the same moving distance;
[0258] After the second door closing rope 20b passes upward through the second door closing rope hole 34b, it passes through the rope pressing ring 40 next to the first door closing rope hole 34a and then passes through the door opening and closing rope pulling hole 37 at the lower end of the water receiving door 14, and is fixedly connected to the door opening and closing rope pulling hole 37.
[0259] Before the implementation of the engineering system of this case, the flood discharge ditch 1 received the flood water from the plateau path with a constant area capacity until it reached the plain area. In this process, the flood discharge ditch 1 could only change the flow rate, overflow the water that exceeded the capacity of the ditch body, and let it flow freely in the land environment outside the ditch body. However, the introduction of the engineering system of this case has transformed the plain flood discharge ditch 1, especially at the point where the plateau path is discharged, to achieve timely and effective control and treatment of the change in flow rate and the expansion of water area. As long as the water does not overflow the ditch body, this precious opportunistic water resource can be effectively retained.
[0260] Based on the characteristics of potential energy flowing water, when the flowing water flows downward, it carries more substances on both sides and flows slowly, while it carries less substances in the middle of the flowing water and flows quickly. According to the principle that "the clearer the water, the better the flow performance", when the water flows to the pebble pit 11, it will inevitably flow into the pit. The pebbles 13 in the pit play a filtering role, and directly transport the filtered clean water to the floating lifting chamber 19. The water level in the floating lifting chamber 19 is stable, ensuring the smooth rise of the floating plate 32. The rising action of the floating plate 32 then drives all the floating rods and rope structures installed thereon to rise synchronously.
[0261] In order to ensure the stable working ability of various floating rods on the floating plate 32, the rod head of each floating rod is carefully designed to pass through the perforations on the two chamber partitions 17. This design ensures that there will be no jamming when each floating rod and rope moves up and down in the switch door chamber 15. The two door opening rope rods 31 pass through the two door opening rope holes 33 respectively, and are each tied with a first door opening rope 22a and a second door opening rope 22b. A pressure rope ring 40 is provided next to the door opening rope hole 33, and the first door opening rope 22a and the second door opening rope 22b need to pass through the pressure rope ring 40. The first door opening rope 22a passes through the hanging rope ring 24 upwards and ends in the switch door rope pulling hole 37 at the upper end of the water receiving door 14; the second door opening rope 22b passes through the pressure rope ring 40 and directly passes into the switch door rope pulling hole 37 at the lower end of the water receiving door 14, and also ends at the pulling hole.
[0262] Through the action of the rope pressing ring 40, the door opening rope, which was originally loose at the same time, becomes tightened under the action of the rope pressing force. Under the tightening force of the upper and lower door opening ropes, the water collecting door 14 can be smoothly opened during the rotation of the hinge 21. The whole system has achieved effective management and utilization of flood resources through careful design and optimization.
[0263] The door-closing rope rod 28a passes through the first door-closing rope hole 34a and is tied with the first door-closing rope 20a. The first door-closing rope 20a passes vertically upward through the corresponding hanging rope ring 24, which is installed on the top 46 of the door-opening and closing chamber. Subsequently, the first door-closing rope 20a continues to pass through the door-opening and closing rope pulling hole 37 at the upper end of the water receiving door 14 and is fixedly terminated at the hole. The second door-closing rope 20b passes through the second door-closing rope hole 34b and then passes into the rope pressing ring 40 located next to the first door-closing rope hole 34a, and then passes through the door-opening and closing rope pulling hole 37 at the lower end of the water receiving door 14 and is also fixedly terminated at the hole.
[0264] When the floating plate 32 rises, the door closing rope rod 28a and the second door closing rope 20b rise simultaneously, and the tension of the first door closing rope 20a and the second door closing rope 20b is completely relaxed; when the floating plate 32 falls, the door closing rope rod 28a and the second door closing rope 20b fall simultaneously, and the tension of the first door closing rope 20a and the second door closing rope 20b is directly applied. Under the rotation of the hinge 21, the water collecting door 14 is closed. This opening and closing process is achieved by alternately relaxing and tightening the door opening rope and the door closing rope 20, that is, when one rope is relaxed, the other rope is tightened, and vice versa, thereby controlling the opening and closing of the water collecting door 14.
[0265] By adopting the above technical solution, the present invention has the following beneficial effects:
[0266] (1) By installing rope hoisting loops and rope stabilizing loops on the top and side walls of the switch door chamber, the impact of flood water entering the pipe on the rope is effectively prevented, the working efficiency of the rope is improved, and the stability of the entire system is enhanced.
[0267] (2) Through the carefully designed floating rod structure and rope layout, combined with the use of rope pressure rings, the water gate can be opened and closed smoothly, improving the convenience of operation.
[0268] like Figure 9-18 The figure shows a further embodiment of the present application, in which the end of the lock hook rod 27 is provided with a first lock hook 41a with the hook body facing downward;
[0269] In the initial state, the first locking hook 41a hooks downwardly the locking ring 23 at the lower end of the water receiving door 14;
[0270] After the floating plate 32 rises, the first locking hook 41a escapes from the locking ring 23;
[0271] The end of the unhooking rod 26 is provided with an unhooking rope 39;
[0272] The end of the unloading rope 39 away from the unloading hook rod 26 is fastened with a second locking hook 41b with the hook body facing upward;
[0273] The unloading rope 39 is arranged in the stabilizing rope ring 25 and the lifting rope ring 24;
[0274] In the initial state, the second locking hook 41b is hooked upward into the locking door ring 23 at the upper end of the water receiving door 14;
[0275] After the floating plate 32 rises, the unhooking rod 26 rises accordingly, so that the unhooking rope 39 is loosened, so that the second locking hook 41 b falls down by its own weight and escapes from the locking door ring 23 .
[0276] It is particularly important to install wind-resistant devices for rotating doors set in natural environments. The edge of the door frame of the water-collecting door 14 is equipped with a door lock ring 23. According to the design concept of the natural way adopted by this engineering system to avoid natural disasters, the opening and closing operations of the water-collecting door 14 also follow the natural principles. The core operation is that the entire system is built on the entire floating plate 32, through forward and reverse movement operations, and accurately controls the time allocation of program steps. The water flow first enters the pebble pit 11 to ensure that the floating object lifting chamber 19 receives the water source first.
[0277] The lock hook rod 27 is an upright floating rod, which passes through the lock hook rod hole 38 of the two chamber partitions 17 on the floating plate 32. The rod head of the lock hook rod 27 is connected to the lock hook 41 with a hook body downward, and the lock hook 41 can hook downward to the lock door ring 23 at the lower end of the water receiving door 14 frame. Once the floating plate 32 rises slightly, the downward lock hook 41 can quickly break away from the lock door ring 23 and continue to rise with the floating plate 32. When the floating plate 32 falls back to the bottom of the floating object lifting chamber 19, the lock hook 41 with a hook body downward will penetrate the lock door ring 23 again to achieve the locking of the water receiving door 14.
[0278] Another unhooking rod 26 is also mounted on the floating plate 32 and passes through the unhooking rod hole 36 on the two-chamber partition 17. The rod head of the unhooking rod 26 is tied with an unhooking rope 39, and the other end of the unhooking rope 39 is connected to the lock hook 41 with the hook body upward. Fig.18 and Fig.17 The instructions are arranged in the stabilizing rope ring 25 and the hanging rope ring 24 of the side wall 47 and the top 46 of the switch door chamber. When the floating plate 32 rises, the unloading hook rod 26 rises accordingly, causing the unloading lock rope 39 to loosen, so that the lock hook 41 falls due to its own weight and detaches from the lock door ring 23. When the floating plate 32 falls back to the bottom of the floating object lifting chamber 19, the lock hook 41 will be lifted by the unloading lock rope 39 and penetrate into the lock door ring 23 again to achieve the locking of the water receiving door 14.
[0279] This engineering system cleverly utilizes the phenomenon that water flows smoothly after entering the pebble pit, providing protection for the water gate 14 from flood impact damage. After being filtered by the pebbles 13 in the pebble pit 11, the water quality of the flood becomes more stable and the quality is improved. This design not only provides an appropriate path for the water flow, but also ensures the precise execution of the sequence and steps of the movement of each structure of the system, thereby ensuring the stable operation of the entire system.
[0280] By adopting the above technical solution, the present invention has the following beneficial effects:
[0281] (1) The technical solution uses the natural phenomenon of water flowing into the pebble pit and flowing smoothly to drive the floating plate up and down, thereby controlling the opening and closing of the water intake gate. This design enables the system to respond efficiently to environmental changes without the need for an external power source, thus achieving natural resource utilization and energy conservation and emission reduction.
[0282] (2) Through the design of the locking hook rod and the unhooking rod, combined with the movement of the floating plate, the water gate can be reliably locked and unlocked. This design not only ensures the stability of the water gate under the impact of floods, but also automatically returns to the locked state after the flood recedes, providing an effective protection mechanism for the system.
[0283] (3) The technical solution ensures the precise execution of the sequence of movement of each structure and the steps through the carefully designed structural layout and time allocation control program steps. This not only improves the operating efficiency of the system, but also ensures the stability and reliability of the system.
[0284] (4) The natural force of water flow and buoyancy is used to realize the automatic opening and closing operation of the water gate, avoiding the environmental pollution and energy consumption that may be caused by traditional mechanical drive.
[0285] (5) This technical solution has the ability to intelligently adapt to environmental changes and can automatically adjust the opening and closing degree of the water gate according to the water level and flow rate of the flood. After the flood recedes, the system can automatically restore to its initial state and prepare for the next flood. This automatic recovery function reduces the need for manual intervention and improves the intelligence level of the system.
[0286] like Figure 8 , 19 The figure shows a preferred embodiment of the present application, in which the total area of the drainage holes 49 is smaller than the total water inlet area of the water filter plate 18 .
[0287] In the engineering system of the present application, the function of the original flood discharge ditch 1 is modified on site. The position of the sewage water delivery pipeline 10 is exactly at the same level as the floating object lifting chamber 19. In order to solve the problem of the floating plate 32 in the floating object lifting chamber 19 falling, two drainage holes 49 are opened under the isolation plugging plate 48 between the sewage water delivery pipeline 10 and the floating object lifting chamber 19. The total area of the two drainage holes 49 is smaller than the total water inlet area of the water filter plate 18, thereby ensuring that the rising ability and energy of the floating plate 32 can be maintained.
[0288] The diameter of the drainage hole 49 is designed to be larger than the diameter of the water filter plate 18. This design ensures the engineering quality of the floating plate 32 and effectively prevents excessive internal pressure in the floating object lifting chamber 19 due to excessive water inflow. In addition, a section of mesh 12 is opened at the upper end of the blocking plate 48. This measure can assist the floating object lifting chamber 19 in draining excess water, further ensuring the stable operation of the system.
[0289] By adopting the above technical solution, the present invention has the following beneficial effects:
[0290] (1) By ensuring that the total area of the drainage holes is smaller than the total water inlet area of the filter plate, the rising capacity and energy of the floating plate are effectively maintained, thereby ensuring that the system can operate continuously and stably.
[0291] (2) The aperture of the drainage hole is designed to be larger than that of the water filter plate. This design not only ensures the engineering quality of the floating plate, but more importantly, effectively prevents the floating object lifting chamber from being over-pressurized due to excessive water inflow, thus protecting the safety of the system.
[0292] (3) A mesh screen is provided at the upper end of the isolation plug to assist the floating object lifting chamber in draining excess water, further ensuring the stable operation of the system and extending the service life of the system.
[0293] (4) This technical solution has transformed the function of the original flood discharge ditch on site. By adding an isolation plug and drainage hole between the sewage water pipe and the floating object lifting chamber, it has achieved effective separation of sewage and floating objects and optimized the performance of the engineering system.
[0294] like Figure 2-7 22-23 show a further embodiment of the present application, in which ditch wall cement supports 51 are provided on both sides of the flood discharge ditch 1;
[0295] The trench wall cement support 51 is filled with crushed stones 54;
[0296] The trench wall cement support 51 includes a trench surface wall plate 52 and a support beam 53;
[0297] The groove surface wall plates 52 are provided with two for limiting the crushed stones 54;
[0298] The support beam 53 is arranged between the groove surface wall plates 52;
[0299] Also includes a rainwater grate 8 with a mesh and a switch door;
[0300] The rainwater grate 8 with mesh and switch door is arranged on the road surface above the ditch wall cement support 51.
[0301] On both sides of the flood discharge ditch 1, there are usually roads 4. In order to ensure the cleanliness and safety of the public road environment, the project system cleverly designed the layout of the rainwater conveying pipeline 9 and placed it under the public road environment. On both sides of the flood discharge ditch 1, the original ditch walls made of broken rocks were removed and replaced with ditch wall cement brackets 51. These brackets 51 are directly installed at the position of the original ditch wall, so as to ensure that the discharge volume is consistent with the original design.
[0302] The structure of the trench wall cement support 51 is exquisite, with two trench wall panels 52 as vertical frames, and three support beams 53 as cross beams on each layer, forming an upper, middle and lower three-layer structure. The trench wall panels 52 and the support beams 53 are cast into one piece by cement, ensuring the stability and durability of the structure.
[0303] On the top layer of the support, we laid a sidewalk 3 that is level with the original ground, and installed a rainwater grate 8 with a mesh and a switch door to replace the existing permeable grate 7, so as to effectively collect and discharge the potential ground rainwater resources outside the flood discharge ditch 1, while ensuring the water quality of the water pipeline. A rainwater water pipeline 9 is placed on the middle support beam 53, and its bottom edge is aligned with the horizontal position of the bottom of the flood discharge ditch 1, which can quickly absorb, divert and unload the rainwater 2 flowing down from the plateau potential energy, while collecting the potential rainwater resources outside the flood discharge ditch 1 along the road.
[0304] On the third-layer support beam 53, we placed the sewage water pipe 10. The initial pipe opening of the sewage water pipe 10 was blocked by the plugging plate 48, and buried in the soil 6 at the bottom of the flood discharge ditch 1, thus realizing the connection with the domestic sewage pipe 5 at the side of the original flood discharge ditch 1. This design effectively solved the conflicting relationship between the original domestic sewage and the environment.
[0305] Each support layer is equipped with at least three support beams 53, which are used to support the trench wall cement support 51 composed of two trench wall panels 52. After installation, we use the original trench wall gravel 54 removed to fill the gap between the support and the pipe, thus forming a stable overall structure, so that floods cannot shake the combination of trench wall cement support 51, rainwater water pipe 9, sewage water pipe 10 and gravel 54.
[0306] By adopting the above technical solution, the present invention has the following beneficial effects:
[0307] (1) The ditch wall cement support adopts a cement casting structure of ditch wall panels and support beams, forming a stable and durable three-layer support system, which effectively improves the overall stability of the flood discharge ditch and can withstand the impact of floods.
[0308] (2) The design of the rainwater grate with mesh and switch gate can effectively collect and discharge the potential ground rainwater resources outside the flood discharge ditch, while ensuring the water quality of the water pipeline. The setting of the rainwater pipeline can quickly absorb, divert and unload the rainwater flowing down from the plateau potential, thus improving the efficiency of rainwater discharge.
[0309] (3) The sewage water pipeline is cleverly laid out. The initial pipe opening is blocked by a plugging plate and buried in the soil at the bottom of the ditch, thus achieving connection with the domestic sewage pipeline. This effectively resolves the contradiction between domestic sewage and the environment and improves the surrounding environment.
[0310] (4) The rubble from the demolition of the original trench wall was reused and filled in the gaps between the bracket and the pipe, which not only formed a stable overall structure but also saved the cost of building materials, reflecting the environmental protection concept of resource recycling.
[0311] Example 2
[0312] exist Figure 1-3 In the above, the ground outside the flood discharge ditch 1 is used to collect water from the water source with a low position by using a permeable grate 7 which is level with the ground, which is an indispensable and important facility for rainwater resource engineering. Fig.24 In the structure of the load-bearing cast iron water-permeable grate 7, we can clearly see that its structure and function are relatively simple and open. The cast iron grate ribs 57 mainly bear the load-bearing function, while the cast iron drain holes 58 are in a non-selective open state and have no screening effect on the quality of the water flowing in.
[0313] In order to ensure the water quality of the overall engineering system and the capacity of the plain water collection and storage project, we decided to use a rainwater grate 8 with a mesh and a switch door to directly replace the original permeable grate 7. This replacement is based on an in-depth analysis of the shortcomings of the existing system and an urgent consideration of the need for improvement.
[0314] The system disclosed in this application is a key link in connecting plateau water flow and plain rainwater resource collection and storage projects. Its performance directly determines the effect of the plain rainwater resource collection and storage project. In view of the decisive role of the system in this case on the subsequent engineering capacity, we considered and planned a set of possible pollution cleaning and sorting facilities in the initial design stage of the system.
[0315] like Figure 25-31 Shown is a further embodiment of the present application, comprising a rainwater grate body 59;
[0316] The upper end of the rainwater grate body 59 is provided with an upper mesh grate 55 for filtering large pieces of garbage;
[0317] A cast iron permeable grate 7 is provided between the rainwater grate body 59 and the upper mesh grate 55 for bearing weight;
[0318] The water-permeable grate 7 comprises a cast iron grate frame 56, cast iron grate strip edges 57 and cast iron drainage holes 58;
[0319] The cast iron grate frame 56 is rectangular, and a plurality of cast iron grate strips 57 are arranged at intervals, and the gap between the cast iron grate frame 56 and the cast iron grate strips 57 is the cast iron drain hole 58;
[0320] The rainwater grate body 59 is also provided with rainwater grate drain holes 61, and the positions of the rainwater grate drain holes 61 correspond one-to-one with the cast iron drain holes 58 in the vertical direction;
[0321] The side wall of the rainwater grate body 59 is provided with a gate shaft hole 63;
[0322] It also includes a barrier door 64 and a door shaft 66;
[0323] The object blocking door 64 is provided with a door shaft ring 65;
[0324] The door shaft ring 65 is coaxially arranged with the door shaft rod hole 63;
[0325] The door shaft rod 66 penetrates into the door shaft rod hole 63 and the door shaft ring 65;
[0326] Also included is a corner platform 68;
[0327] There are two types of corner platforms 68, namely, a first corner platform 68a and a second corner platform 68b;
[0328] The first corner platform 68a is provided with a fixing rod through hole 69 and a water permeable hole 70;
[0329] The second corner platform 68b is provided with a water-permeable hole 70;
[0330] The rainwater grate body 59 is provided with a mounting hole 62 inside, and the first corner platform 68a and the second corner platform 68b are fixed in the rainwater grate body 59 through the mounting hole 62;
[0331] The first corner platform 68a is installed on the corner platform installation hole 62 at the lower end of the door shaft rod 66;
[0332] The second corner platform 68b is installed on the corner platform installation hole 62 on the other side;
[0333] The first corner platform 68a and the second corner platform 68b are both provided with brushes 71;
[0334] It also includes a water tank 75, which is arranged below the rainwater grate body 59;
[0335] The water tank 75 is connected to the rainwater grate body 59 through the water permeable hole 70;
[0336] The bottom of the water tank 75 is provided with a bottom drainage hole 76 .
[0337] At the upper end of the rainwater grate body 59, an upper mesh grate 55 is provided, which is used to filter large pieces of garbage and ensure that they cannot enter the drainage hole 61 of the rainwater grate. Below the upper mesh grate 55, the original cast iron permeable grate 7 bears the load-bearing task, and its load-bearing function ensures the flat use of the upper mesh grate 55 and prevents it from being damaged. The flatness of the upper mesh grate 55 is conducive to mechanical cleaning, thereby effectively controlling the amount of load-bearing materials on the surface of the object-blocking door 64.
[0338] The main body 59 of the rainwater grate is made of discarded and recycled old plastics, and the drainage holes 61 of the rainwater grate correspond one to one with the cast iron drainage holes 58. This not only realizes the recycling of waste, but also solves the problem of waste plastic degradation occupying arable land.
[0339] The gate shaft rod 66 passes through the gate shaft rod hole 63 on one side of the rainwater grate body 59, passes through the door shaft ring 65 of the object-blocking door 64, and then enters the gate shaft rod hole 63 on the other side, thereby movably suspending the object-blocking door 64 at the water receiving port at the upper end of the rainwater grate drain hole 61 of the rainwater grate 8 with a mesh belt switch door.
[0340] There are two designs of the corner platform 68, and the platform surface is covered with 1mm water-permeable holes 70. One corner platform surface has a fixing rod through hole 69 and water-permeable holes 70, while the other has only water-permeable holes 70. The corner platform 68 is installed in the corner platform mounting hole 62 of the rainwater grate body 59 frame, located on both sides of the rainwater grate ridge 60. In the corner platform mounting hole 62 of the rainwater grate ridge 60 below the gate shaft rod 66, the corner platform 68 with the fixing rod through hole 69 is installed; and in the corner platform mounting hole 62 of the rainwater grate ridge 60 below the gate shaft rod 66, the corner platform 68 with only water-permeable holes 70 is installed. Brushes 71 are attached to the corner platforms 68 on both sides.
[0341] After testing, the coordinated use of the corner platform 68, the brush 71 and the water-permeable hole 70 has achieved the best water collection effect. The round stick-shaped brush 71 is placed close to the facade of the corner platform 68, and forms a concave angle with the facade of the corner platform 68 and the upper surface of the brush 71. When the downstream water flows through the facade, it will be close to the concave angle. Here, the water cannot flow out naturally (especially in a low water state), and can only infiltrate or flow down by superimposing and squeezing. The brush 71 is located above the water-permeable hole 70, and the natural density of its bristles helps the water-permeable hole 70 to filter out particles greater than the bristle density, so that they roll out of the brush body. The mud and sand in the downstream water are intercepted by the brush and retained in the brush body, thereby preventing the mud and sand from forming hard mud balls on the corner platform 68. The brush body of this structure is easy to loosen and fall off when encountering cement sand, and flows out of the brush with water. However, soil particles smaller than 1mm can easily pass through the water-permeable hole 70 and enter the water tank 75 with water. It is worth noting that there are only two 2mm drainage holes 76 at the bottom of the water tank 75, so 1mm particles cannot be retained after entering the water tank, thereby ensuring the purity of the water in the tank and not affecting the normal operation of the rainwater grate float 74 in the tank.
[0342] By adopting the above technical solution, the present invention has the following beneficial effects:
[0343] (1) By introducing a rainwater grate with a mesh and a switch door to replace the original permeable grate, the system has added a screening function for the inflow water quality. The upper mesh grate can effectively filter large pieces of garbage and prevent them from entering the drainage system. The design of the cast iron drainage holes and the rainwater grate drainage holes, combined with the permeable holes and brushes on the corner platform, can further filter out silt and fine particles, significantly improving the water quality of the rainwater resources entering the plain.
[0344] (2) The main body of the rainwater grate is made of recycled waste plastic, which not only achieves the reuse of waste but also improves the durability of the system. The cast iron permeable grate 7 ensures the load-bearing function, prevents the upper mesh from being damaged, and maintains the stability of the system.
[0345] (3) The corresponding design of the rainwater grate drain hole and the cast iron drain hole ensures that rainwater can flow smoothly into the system, improving the rainwater collection efficiency. At the same time, the design of the corner platform and the brush 71 optimizes the water flow path, prevents the sediment from forming hard mud balls on the corner platform, and further ensures the collection of rainwater.
[0346] (4) The flatness of the upper mesh is conducive to mechanical cleaning, which can effectively control the amount of material on the surface of the barrier door, reducing the workload and difficulty of manual maintenance. At the same time, the corresponding design of the rainwater grate drain hole and the cast iron drain hole makes the system easy to clean and maintain, reducing management costs.
[0347] like Figure 25-41 The figure shows a further embodiment of the present application, further comprising a pull rope 72, a rain grate float 74 and a float rod 73;
[0348] The rainwater grate float 74 is disposed in the water tank 75, and the float rod 73 is disposed on the rainwater grate float 74, with the upper end thereof passing through the fixing rod through hole 69;
[0349] The object blocking door 64 is provided with a door rope hole 67, one end of the pull rope 72 is tied in the door rope hole 67, and the other end is connected to the floating rod 73;
[0350] The top of the water tank 75 is provided with a water tank buckle 77 for clamping on the bottom edge of the corner platform 68 to firmly connect the water tank 75 to the rainwater grate body 59.
[0351] The object-blocking door 64 is installed at the water inlet at the upper end of the rain grate drain hole 61 through the mobility of the door shaft rod 66. One end of the pull rope 72 is fixed in the door rope hole 67 of the object-blocking door 64, and the other end is connected to the floating rod 73. After passing through the fixed rod through hole 69 of the corner platform 68, the floating rod 73 is installed or adhered to the rain grate floating block 74, which is located inside the water tank 75. The object-blocking door 64 is designed to open downward, and is fixed to the upper end of the water inlet through the door shaft rod 66 as a lever balance fulcrum. The rain grate floating block 74 is used as a counterweight, and its weight is increased as much as possible to ensure that when the floating block floats up, the door pulling force is reduced to zero, thereby realizing the automatic opening of the door.
[0352] The two sides of the rainwater grate rib 60 are tightly clamped by the two angle platforms 68 fixed in the angle platform mounting holes 68 to form a stable whole. The width of the water tank 75 is based on the sum of the bottom edges of the two angle platforms 68 and the width of the rainwater grate rib 60. Water tank buckles 77 are provided on both sides of the box opening of the water tank 75 to fix the bottom edges of the angle platforms 68 to ensure that the water tank 75 is firmly installed under the rainwater grate rib 60.
[0353] In the case of water accumulation in the grate mouth, the water flow is blocked by the obstruction door 64 and can only penetrate into the grate body through the low side gap of the door, and then flow to the brush 71 on the corner platform 68. After being filtered by the brush 71, the water continues to flow to the water-permeable hole 70 on the corner platform 68. Since the diameter of the water-permeable hole 70 is 1 mm, water can easily pass through and directly enter the water tank 75. The water in the water tank 75 generates buoyancy, which causes the rainwater grate float 74 to rise, thereby driving the float rod 73 to rise. The rise of the float rod 73 causes the relaxation of the pull rope 72, and at this time, the pull rope hole 67 is close to the fulcrum of the door shaft rod 66. Since the weight of the rainwater grate float 74 plays a major role in the control of the obstruction door 64, the relaxation of the pull rope 72 causes the obstruction door 64 to lose balance at the fulcrum of the door shaft rod 66, and the side without the pull rope rotates and falls due to its own weight, thereby realizing the door opening and water discharge.
[0354] When the accumulated water in the water tank 75 is completely drained through the 2mm bottom drainage hole 76, the rainwater grate float block 74 and the connected float rod 73 fall down. The tightening of the float rod 73 causes the pull rope 72 to generate a pulling force on the barrier door 64, pulling it back to the original equilibrium position, thereby closing the rainwater grate 8 with the mesh belt switch door.
[0355] The design of the corner platform installation hole 62, the door shaft rod hole 63, the object blocking door 64, the door shaft ring 65, the door shaft rod 66 and the corner platform 68 all follow the principle of dispersion and re-combination, so that the entire rainwater grate with mesh and switch door 8 is easy to repair and replace parts, avoiding the entire scrapping due to minor collision damage. The water collection capacity of the water tank 75 depends on the dense 1mm water permeable holes 70 on the corner platform 68, whose total area is larger than the total area of the two 2mm bottom drainage holes 76 at the bottom of the water tank, ensuring that the water collection capacity of the water tank 75 is always greater than the drainage capacity, thereby maintaining the buoyancy of the rainwater grate float 74 and the water quality in the water tank 75.
[0356] By adopting the above technical solution, the present invention has the following beneficial effects:
[0357] (1) This technical solution realizes the automatic opening and closing function of the rainwater grate with a mesh and switch door by designing a linkage mechanism of the rainwater grate float, float rod and pull rope. When water accumulates in the water tank, the rainwater grate float rises to drive the float rod and pull rope to automatically open the barrier door to drain water; after the water tank is emptied, the rainwater grate float falls and the pull rope automatically pulls back the barrier door to close. This automated process greatly improves operational efficiency and reduces the need for manual intervention.
[0358] (2) The combination of the upper mesh and the brush on the corner platform effectively filters out large pieces of garbage, sand and other impurities, ensuring that the quality of rainwater flowing into the water tank is significantly improved. This double filtration design allows rainwater to be effectively purified during the collection process.
[0359] (3) The stable connection design of the rainwater grate body, corner platform and water tank, as well as the weight configuration of the rainwater grate float, ensure the stability and reliability of the entire system. Even in extreme weather conditions, the system can maintain normal operation and effectively prevent rainwater flooding.
[0360] (4) This technical solution follows the design principle of dispersion and reassembly, making each component easy to repair and replace. When a component is damaged, there is no need to replace the entire system, only the corresponding component needs to be replaced, which reduces the cost and difficulty of repair.
[0361] (5) Through the design of automatic opening and closing, as well as effective filtering function, the system not only improves the efficiency of rainwater collection, but also ensures the quality of the collected rainwater, providing a reliable guarantee for the subsequent use of rainwater. This helps to improve the utilization efficiency of water resources and promote sustainable development.
[0362] (6) By comparing the total area of the 1mm water-permeable holes at the corners of the water tank with the area of the two 2mm drainage holes at the bottom of the water tank, the water tank naturally and perfectly maintains all its functions.
[0363] (7) The overall system is integrated through the fixed connection of the floating block (buoyancy), the floating rod (clear moving direction), and the pull rope (a single move affects the whole body). Each part plays its role and is solved step by step without disrupting the order, thus solving the environmental disaster problem in a simple and effective way.
[0364] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A plateau-plain water resource diversion device, characterized in that: The utility model comprises a flood discharge ditch, a pebble pit, a first mesh grate, a rainwater water delivery pipe, a sewage water delivery pipe, a water diversion baffle, a water collection gate, a switch gate chamber and a pipe mouth; the flood discharge ditch is an expansion structure; the rainwater water delivery pipe is arranged above the sewage water delivery pipe; a pebble pit is arranged at the entrance of the sewage water delivery pipe, and a plurality of pebbles are arranged in the pebble pit; the first mesh grate is arranged at the edge of the pebble pit, and is used to limit pebbles and impurities in the water body from entering the rainwater water delivery pipe and the sewage water delivery pipe; the water collection gate is arranged on the mesh grate, and its position height corresponds to the rainwater water delivery pipe; the water diversion baffle is a detachable central vacant triangular enclosure, which is used to introduce water into the pebble pits on both sides and enter Into the rainwater water conveyance pipeline and the sewage water conveyance pipeline; the inlet ends of the rainwater water conveyance pipeline and the sewage water conveyance pipeline are pipeline openings; a switch door chamber is arranged between the rainwater water conveyance pipeline and the water receiving door; the water receiving door is arranged on the side wall of the switch door chamber through a hinge; a switch door rope pulling hole and a door locking ring are arranged on the water receiving door; it also includes a water filter plate, a floating object lifting chamber, a blocking plate and a two-chamber partition; it also includes a floating plate, a spring, a barb lock hook, a lock rope and a rod body; the rod body includes: a hook removal rod, a lock hook rod, a door closing rope rod, a door opening rope rod and a spring stabilizing rod; there are two door opening rope rods, namely a first door opening rope rod and a second door opening rope rod; the floating plate is arranged in the floating object lifting chamber; the hook removal rod , a lock hook rod, a door closing rope rod, a door opening rope rod and a stabilizing spring rod are arranged on the floating plate; a spring is sleeved on the stabilizing spring rod; a lock hook is arranged at the end of the lock hook rod; the end of the unhooking rod is connected to the lock hook by the unhooking rope; the two-chamber partitions are provided with perforations corresponding to the rod body; the perforations include: a unhooking rod perforation, a lock hook rod perforation, a door closing rope hole, a door opening rope hole, and a stabilizing spring rod perforation, which are respectively used to allow the unhooking rod, the lock hook rod, the door closing rope rod, the second door closing rope, the door opening rope rod and the stabilizing spring rod to pass through; there are two door opening rope holes, namely the first door opening rope hole and the second door opening rope hole; there are two door closing rope holes, namely the first door closing rope hole and the second door closing rope hole; there are two door opening and closing rope pulling holes, respectively arranged The upper end and the lower end of the water receiving door; the first door opening rope rod and the second door opening rope rod are respectively fastened with the first door opening rope and the second door opening rope; a rope pressure ring is arranged next to each door opening rope hole; the first door opening rope and the second door opening rope pass through the two rope pressure rings respectively; the first door opening rope passes through the hanging rope ring installed on the top of the switch door chamber corresponding to the first door opening rope hole, and continues to pass through the switch door rope pulling hole at the upper end of the water receiving door surface and is fixedly connected to the switch door rope pulling hole; the second door opening rope passes through the switch door rope pulling hole at the lower end of the water receiving door and is fixedly connected to the switch door rope pulling hole; a rope pressure ring is arranged next to the first door closing rope hole; the first door closing rope is tied to the door closing rope rod;The first door-closing rope passes through the hanging rope loop corresponding to the position of the first door-closing rope hole, and continues to pass through the switch door rope pulling hole at the upper end of the water receiving door, and is fixedly connected to the switch door rope pulling hole; after the second door-closing rope passes upward through the second door-closing rope hole, the second door-closing rope passes through the pressing rope loop beside the first door-closing rope hole and then passes through the switch door rope pulling hole at the lower end of the water receiving door surface, and is fixedly connected to the switch door rope pulling hole. ; 2. The water resource diversion device according to claim 1, characterized in that: A water filter plate is also provided on the first mesh screen corresponding to the height position of the sewage water supply pipeline; a floating object lifting chamber is provided between the water filter plate and the sewage water supply pipeline; the floating object lifting chamber and the switch door chamber are separated by the two chamber partitions; a blocking plate and a second mesh screen are provided on the side of the floating object lifting chamber close to the sewage water supply pipeline; the blocking plate is arranged under the second mesh screen; and a drainage hole is provided on the blocking plate.
3. The water resource diversion device according to claim 2, characterized in that: The first door-opening rope rod passes through the first door-opening rope hole; the second door-opening rope rod passes through the second door-opening rope hole; the door-closing rope rod passes through the first door-closing rope hole; the second door-closing rope passes through the second door-closing rope hole; each through hole on the two-chamber partition is provided with a hollow screw; nuts are provided at both ends of the hollow screw for fixing the hollow screw on the two-chamber partition; plastic film bags are also provided on all rod bodies.
4. The water resource diversion device according to claim 3, characterized in that: The top of the switch door chamber is the switch door chamber roof, and its side wall is the switch door chamber side wall; three hanging rope loops are installed on the switch door chamber roof; the positions of the three hanging rope loops correspond to the positions of the first door opening rope hole, the first door closing rope hole and the unhooking rod through-hole on the chamber partition respectively; a stabilizing rope loop is arranged on the switch door chamber side wall.
5. The water resource diversion device according to claim 4, characterized in that: A first locking hook with a hook body pointing downward is provided at the end of the locking hook rod; in an initial state, the first locking hook hooks downwardly onto the locking door circle at the lower end of the water receiving gate; after the floating plate rises, the first locking hook escapes from the locking door circle; a locking rope is fastened to the end of the unhooking rod; a second locking hook with a hook body pointing upward is fastened to the end of the unhooking rope away from the unhooking rod; the unhooking rope is arranged in the stabilizing rope circle and the lifting rope circle; in an initial state, the second locking hook is hooked upward into the locking door circle at the upper end of the water receiving gate; after the floating plate rises, the unhooking rod rises accordingly to loosen the locking rope, thereby allowing the second locking hook to fall down by its own weight and escape from the locking door circle.
6. The water resource diversion device according to claim 5, characterized in that: The total area of the drainage holes is smaller than the total water inlet area of the water filter plates.
7. The water resource diversion device according to claim 6, characterized in that: Cement supports for the ditch walls are arranged on both sides of the flood discharge ditch; the cement supports for the ditch walls are filled with gravel; the cement supports for the ditch walls include ditch surface wall panels and support beams; two ditch surface wall panels are arranged for limiting the gravel; the support beams are arranged between the ditch surface wall panels; and a rainwater grate with a mesh and a switch door is also included; the rainwater grate with a mesh and a switch door is arranged on the road surface above the cement supports for the ditch walls.
Citation Information
Patent Citations
Permeable pebble ditch and permeable structure
CN107246057A