A multi-layer steel corridor suspended assembly device and implementation method
By combining suspension frames and hydraulic cylinder support structures, stable suspension and precise connection of multi-story steel corridors are achieved, solving the problems of low efficiency and poor safety in traditional construction and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202411139791.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-20
AI Technical Summary
Traditional steel corridor suspension construction suffers from problems such as low construction efficiency, significant safety hazards, low positioning accuracy, and difficult assembly, especially visual and physical interference caused by steel cable deformation and building structure limitations during the suspension and assembly of upper and lower steel corridors.
The suspension system employs four suspension frames and steel cable clamps, combined with a support structure of hydraulic cylinders and synchronous rods. Through hydraulic fine-tuning of the support seats and top columns, stable suspension and precise connection of the upper and lower steel connecting corridors are achieved.
It improves the safety and efficiency of steel corridor construction, reduces assembly difficulty, ensures precise connection and stability of upper and lower steel corridors, and avoids swaying and safety hazards during the suspension process of steel corridors.
Smart Images

Figure CN118653696B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a multi-story steel corridor suspended assembly device and an implementation method. Background Art
[0002] The steel corridor structure is an important component used to connect different building spaces in the field of modern architecture. With its unique design concept and practicality, it has become a part of the urban architectural landscape. When designing a steel corridor, it is necessary to consider its combination of lightness and stability. Due to its high strength and light weight, steel allows the corridor to maintain an elegant shape even with a large span, and at the same time has good plasticity to adapt to different design requirements. In the past, aerial corridors were often constructed using an overall lifting process. However, as the functions and structures of buildings become increasingly complex, the traditional construction process of assembling steel corridors once and then lifting them as a whole has the problem of implementation difficulties. In engineering practice, in order to reduce the difficulty of assembling steel corridors, it is possible to assemble the steel corridors on partial floors, then lift them as a whole to a certain height, and then assemble them at the bottom again.
[0003] This assembly method has the following problems: when the upper steel corridor is suspended, the lower steel corridor is visually and physically interfered with by the assembled steel corridor on the upper level during assembly and hoisting, resulting in low construction efficiency and great safety hazards; as the upper steel corridor is suspended, the steel ropes undergo different deformations, resulting in difficulty in assembling the upper and lower steel corridors due to skewed positions when they are docked; since the steel ropes are too long, it is very difficult to adjust the upper steel corridor by contracting the steel ropes, and the accuracy is low. The existing upper steel corridor adjustment structure needs to be fixed on the sides of the buildings on both sides, and the determination of the fixed position is limited by the building structure. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a multi-story steel corridor suspended assembly device and implementation method, which has flexible installation, high positioning accuracy and high safety.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] A multi-story steel corridor suspension assembly device comprises four suspension frames, wherein the suspension frames are fixed in pairs to the tops of buildings on both sides, the suspension frames extend steel ropes for suspension, the ends of the steel ropes are fixed with clamping seats, and the clamping seats are clamped on the lower end side of the upper steel corridor; a pillar is fixed at the lower end of the clamping seat, and a support seat is provided at the end of the pillar; and a docking base is also included, wherein the docking base comprises a plurality of straight rails arranged on the ground and an operating table slidably arranged on the straight rails, and a plurality of support rods are provided on the operating table, and the lower steel corridor is constructed by the plurality of the support rods, so that the lower steel corridor is vertical In the direct docking state, four steel cylinders are also provided on the operating table, and a top column is vertically slidably provided on the top of the steel cylinder. A hydraulic cylinder is also provided in the steel cylinder, and the hydraulic cylinder pushes the top column to move vertically. The four steel cylinders are respectively located below the clamping seat, and the top column includes a lower column and an upper column. Synchronous rods are connected in sequence between the four lower columns; an oil chamber is provided on the top of the lower column, and the lower end of the upper column is slidably provided in the oil chamber. An adjusting cylinder is provided in the oil chamber, and an adjusting column is threadedly connected to the adjusting cylinder. The adjusting column is rotated to fine-tune the length of the top column by oil pressure. A base supporting the supporting seat is provided on the top of the upper column.
[0007] Furthermore, a ball head is provided at the end of the pillar, a ball groove is provided on the support seat, and the ball head is rotatably arranged in the ball groove.
[0008] Furthermore, it also includes a translation part and a passive part, the passive part includes a fixed clamp seat for fixing on the lower edge of the side of the upper steel corridor, and the fixed clamp seat extends a cross bar outward; the translation part includes a moving vehicle movably arranged on the synchronization rod, the moving vehicle is provided with a telescopic device, the end of the telescopic device is provided with a vertical rod extending upward, the end of the cross bar is provided with a through hole for the vertical rod to be inserted, and when the upper steel corridor and the lower steel corridor are connected, the vertical rod is inserted into the through hole.
[0009] Furthermore, a horizontal axis is rotatably provided on the horizontal rod, and a swivel seat is rotatably provided on the horizontal axis. The rotation axis of the horizontal axis is perpendicular to the outer side surface of the upper steel corridor, and the rotation axis of the swivel seat is perpendicular to the rotation axis of the horizontal axis. The through hole is opened on the swivel seat.
[0010] Furthermore, the clamping seat includes a seat body and a T-shaped platform fixed to the side of the seat body, a plurality of threaded columns extend from the lower sides and the top side of the T-shaped platform respectively, and clamping blocks are provided on the lower sides and the top side of the T-shaped platform respectively. The clamping blocks are slidably mounted on the threaded columns, and nuts are threadedly connected to the threaded columns. The T-shaped platform is provided with a baffle plate which is placed on the outside of the upper steel corridor.
[0011] Furthermore, the bottom surface of the support seat is in a disc structure, and the top surface of the pedestal is provided with a countersunk hole with an inner diameter larger than the outer diameter of the support seat.
[0012] A method for implementing a multi-story steel corridor suspension assembly device, the steps of which are as follows:
[0013] S1. Install the suspension frame at the top suspension position of the buildings on both sides, lower the steel rope, and clamp it on the lower end side of the upper steel corridor through the steel rope clamping seat. Four steel ropes are respectively suspended at the four ends of the upper steel corridor to suspend the upper steel corridor;
[0014] S2, retrieving the steel rope and suspending the upper steel corridor to a high altitude;
[0015] S3. Arrange straight rails and an operating platform on the straight rails, and place the operating platform outside the upper steel corridor;
[0016] S4. Install support rods on the operating table, and use the support rods to support the construction of the lower steel corridor, so that the lower steel corridor is in a vertical docking state with the upper steel corridor;
[0017] S5. Move the entire operating platform so that the lower steel corridor moves to below the upper steel corridor;
[0018] S6. Move the upper steel corridor downwards so that the support bases at the four ends are docked on the pedestal;
[0019] S7, inserting the vertical rod into the through hole, and aligning the upper steel corridor with the lower steel corridor by moving the translation part;
[0020] S8. Lift the steel rope, rotate the adjustment column, adjust the support height of the synchronization rod, and fine-tune the vertical alignment of the upper steel corridor and the lower steel corridor through the cooperation of the steel rope and the adjustment cylinder;
[0021] S9. Use the hydraulic cylinder to push the top column to move so that the upper steel corridor and the lower steel corridor can be spliced.
[0022] The beneficial effects of the present invention are:
[0023] The present invention is used for suspending and splicing the upper and lower layers of the steel corridor, and steel ropes are extended through four suspension frames, and the two ends of the bottom sides of the two outer sides of the upper steel corridor are clamped by the clamping seats at the ends of the steel ropes, so that the upper steel corridor is stably suspended, wherein each clamping seat is provided with a pillar and a supporting seat, and the lower steel corridor is moved to the bottom of the upper steel corridor along the straight rail after the operating table is built by the support rods of different lengths. By arranging a movable operating table, the lower steel corridor is located outside the range below the upper steel corridor during construction, thereby avoiding the safety hazard of falling of the upper steel corridor, and also eliminating the visual and physical interference of the upper steel corridor. The upper and lower steel corridors can also be built simultaneously, thereby improving the construction efficiency of the steel corridor; after the upper and lower steel corridors are built, the operating table is moved to the bottom of the upper steel corridor, and the next step of leveling the steel corridor can be carried out; by arranging steel cylinders and supporting The top column of the clamping seat is used to fine-tune the splicing position of the upper steel corridor before vertically splicing the two-layer steel corridor. The specific fine-tuning method is as follows: one of the steel ropes is suspended and subjected to force to make the support seat away from the support of the pedestal, and the adjusting column is rotated to adjust the length of the top column through the change of oil pressure. After the adjustment is completed, the support seat is placed on the pedestal. The deflection of the upper steel corridor caused by the suspension can be adjusted and removed by adjusting the four supporting points. In the subsequent splicing, as the hydraulic cylinder is retracted, the four top columns are lowered at the same time, so that the upper steel corridor can be accurately spliced with the lower steel corridor; after this structure is supported by the supporting points, the upper steel corridor is supported by four steel cylinders. Compared with direct steel rope suspension splicing, this method can avoid the shaking of the steel corridor during splicing, and reduce the difficulty of splicing and safety hazards of the steel corridor; the hydraulic fine-tuning structure of the top column is set on the steel cylinder, which will not interfere with the buildings on both sides, with strong flexibility and high docking accuracy.
[0024] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:
[0026] Figure 1 This is an overall schematic diagram of a hovering re-control device according to an embodiment of the present invention;
[0027] Figure 2 for Figure 1 Detailed schematic diagram of point A;
[0028] Figure 3 for Figure 1 Detailed diagram of point B;
[0029] Figure 4 This is a cross-sectional view of the top column and the steel cylinder of an embodiment of the present invention;
[0030] Figure 5 It is a cross-sectional view of a T-shaped platform of an embodiment of the present invention;
[0031] The markings in the attached figure are as follows: 1. Upper steel corridor; 2. Lower steel corridor; 3. Suspension frame; 31. Steel rope; 4. Clamping seat; 41. Pillar; 42. Support seat; 421. Ball groove; 43. Seat body; 44. T-shaped platform; 45. Threaded column; 46. Clamp block; 47. Nut; 48. Baffle; 49. Ball head; 5. Docking base; 51. Straight rail; 52. Operating table; 53. Support rod; 54. Steel cylinder ; 55, top column; 551, upper column; 552, lower column; 553, oil chamber; 554, adjusting cylinder; 555, adjusting column; 556, pedestal; 5561, countersunk hole; 56, hydraulic cylinder; 57, synchronization rod; 6, translation part; 61, moving vehicle; 62, telescopic device; 63, vertical rod; 7, passive part; 71, fixed clamp seat; 72, cross bar; 73, horizontal axis; 74, swivel seat; 741, through hole. DETAILED DESCRIPTION
[0032] like Figure 1~Figure 5 As shown, the present invention discloses a multi-layer steel corridor suspension assembly device and implementation method, comprising four suspension frames 3, wherein the suspension frames 3 are fixed to the top of the buildings on both sides in pairs, and the suspension frames 3 extend the steel rope 31 for suspension through the electric winding device, and the end of the steel rope 31 is fixed with a clamping seat 4, and the clamping seat 4 is clamped on the lower end side of the upper steel corridor 1. Through the clamping of the four clamping seats 4, the upper steel corridor 1 is suspended horizontally and stably, as shown in FIG. Figure 2 As shown, a pillar 41 is fixedly provided at the lower end of the clamping seat 4, and a support seat 42 is provided at the end of the pillar 41; it also includes a docking base 5, and the docking base 5 includes a plurality of straight rails 51 arranged on the ground and an operating table 52 slidably arranged on the straight rails 51, and the movement of the operating table 52 can be towed and moved by a traction machine or other equipment; a plurality of support rods 53 are provided on the operating table 52, and the lower steel corridor 2 is constructed by the plurality of support rods 53, so that the lower steel corridor 2 is in a vertical docking state, and the length of the support rods 53 is selected according to the bottom structure of the lower steel corridor 2, and four steel cylinders 54 are also provided on the operating table 52, as shown in FIG. Figure 4As shown, a top column 55 is vertically slidably provided at the top of the steel cylinder 54, and a hydraulic cylinder 56 is also provided in the steel cylinder 54. The hydraulic cylinder 56 pushes the top column 55 to move vertically. The four steel cylinders 54 are respectively located below the clamping seat 4. The top column 55 includes a lower column 552 and an upper column 551. The four lower columns 552 are sequentially connected with a synchronization rod 57; an oil chamber 553 is provided at the top of the lower column 552, and the lower end of the upper column 551 is slidably provided in the oil chamber 553. An adjusting cylinder 554 is provided in the oil chamber 553. The adjusting cylinder 554 is threadedly connected with an adjusting column 555. The adjusting column 555 is rotated to fine-tune the length of the top column 55 by oil pressure. A pedestal 556 for supporting the support seat 42 is provided at the top of the upper column 551.
[0033] This device is used to suspend and splice the upper and lower layers of multi-layer steel corridors. Steel ropes 31 are extended through four suspension frames 3, and the bottom ends of the two outer sides of the upper steel corridor 1 are clamped by the clamping seats 4 at the ends of the steel ropes 31, so that the upper steel corridor 1 is stably suspended. Each clamping seat 4 is provided with a support 41 and a support seat 42. After the lower steel corridor 2 is built on the operating table 52 through support rods 53 of different lengths, it moves to the bottom of the upper steel corridor 1 along the straight rail 51. By setting a movable operating table 52, so that the lower steel corridor 2 is located outside the lower range of the upper steel corridor 1 during construction, avoiding the safety hazard of the upper steel corridor 1 falling, and also eliminating the visual and physical interference of the upper steel corridor 1. The upper steel corridor 1 and the lower steel corridor 2 can also be built simultaneously, thereby improving the construction efficiency of the steel corridor; after the upper steel corridor 1 and the lower steel corridor 2 are built, the operating platform 52 is moved to the lower side of the upper steel corridor 1, and the next step of steel corridor leveling can be carried out; by setting the steel cylinder 54 and the support The top column 55 of the support clamping seat 4 is used to fine-tune the splicing position of the upper steel corridor 1 before vertically splicing the two-layer steel corridor. The specific fine-tuning method is as follows: one of the steel ropes 31 is suspended and stressed to make the support seat 42 away from the support of the pedestal 556, and the adjusting column 555 is rotated to adjust the length of the top column 55 through the change of oil pressure. After the adjustment is completed, the support seat 42 is placed on the pedestal 556. By adjusting the four supporting points, the deflection of the upper steel corridor 1 caused by the suspension can be adjusted and removed. During the splicing, as the hydraulic cylinder 56 is retracted, the four top columns 55 are simultaneously lowered, so that the upper steel corridor 1 can be precisely spliced with the lower steel corridor 2; after this structure is supported at the supporting point, the upper steel corridor 1 is supported by four steel cylinders 54. Compared with the direct steel rope 31 suspension splicing, this method can avoid the shaking of the steel corridor during splicing, and reduce the difficulty of splicing the steel corridor and the safety hazard; the hydraulic fine-tuning structure of the top column 55 is set on the steel cylinder 54, which will not interfere with the buildings on both sides, has strong flexibility and high docking accuracy.
[0034] In a further solution, Figure 2 and Figure 4As shown, a ball head 49 is provided at the end of the support column 41 , a ball groove 421 is provided on the support seat 42 , and the ball head 49 is rotatably disposed in the ball groove 421 .
[0035] After the clamping seat 4 is clamped on the side of the steel corridor, due to the special-shaped structure of the steel corridor and the clamping structure factors, the bottom surface of the support seat 42 may not be absolutely parallel to the pedestal 556. Therefore, a ball structure is provided to neutralize the deflection of the bottom surface of the support seat 42 caused by the clamping of the clamping seat 4 and the steel corridor, thereby ensuring the surface contact and uniform force between the support seat 42 and the pedestal 556, and ensuring that the support is stable after the upper steel corridor 1 is leveled.
[0036] In a further solution, Figure 3 As shown, it also includes a translation part 6 and a passive part 7, the passive part 7 includes a fixed clamp seat 71 for fixing on the lower edge of the side of the upper steel corridor 1, and the fixed clamp seat 71 extends a cross bar 72 outward; the translation part 6 includes a moving vehicle 61 movably arranged on the synchronization rod 57, and the moving structure of the moving vehicle 61 and the synchronization rod 57 can select a gear rack meshing structure driven by a motor, and the moving vehicle 61 is provided with a telescopic device 62, and the telescopic device 62 can select a telescopic cylinder and other equipment, and the end of the telescopic device 62 is provided with a vertical rod 63 extending upward, and the end of the cross bar 72 is provided with a through hole 741 for the vertical rod 63 to be inserted, and when the upper steel corridor 1 and the lower steel corridor 2 are connected, the vertical rod 63 is inserted into the through hole 741.
[0037] In this structure, by moving the mobile vehicle 61 along the synchronization rod 57 and extending and retracting the telescopic device 62, the vertical rod 63 at the end of the telescopic device 62 can be moved arbitrarily in the horizontal direction. By inserting the vertical rod 63 into the through hole 741, the vertical rod 63 can drive the fixed clamp seat 71 connected to the upper steel corridor 1 to move, so that the upper steel corridor 1 can move horizontally. Through the translation of the translation part 6, the horizontal position of the upper steel corridor 1 when suspended and docked with the lower steel corridor 2 can be adjusted, instead of manual traction, to avoid problems such as shaking of the steel corridor.
[0038] In a further solution, Figure 3 As shown, a horizontal axis 73 is rotatably provided on the horizontal rod 72, and a swivel seat 74 is also rotatably provided on the horizontal axis 73. The rotation axis of the horizontal axis 73 is perpendicular to the outer side surface of the upper steel corridor 1, and the rotation axis of the swivel seat 74 is perpendicular to the rotation axis of the horizontal axis 73. The through hole 741 is opened on the swivel seat 74.
[0039] In this structure, a dual-axis rotation structure is provided so that the vertical rod 63 can vertically pass through the through hole 741, thereby avoiding the problem that the vertical rod 63 cannot directly penetrate the through hole 741 due to the error caused by the structural clamping when the fixed clamp seat 71 is clamped on the side of the steel corridor. Moreover, after this structure vertically penetrates the through hole 741, there will be no shaking, and the fixed clamp seat 71 is only pulled by the movement of the vertical rod 63.
[0040] In a further solution, Figure 5 As shown, the clamping seat 4 includes a seat body 43 and a T-shaped platform 44 fixed to the side of the seat body 43, a plurality of threaded columns 45 are extended from the lower two sides and the top side of the T-shaped platform 44, and clamping blocks 46 are respectively provided on the lower two sides and the top side of the T-shaped platform 44. The clamping blocks 46 are slidably arranged on the threaded columns 45, and nuts 47 are threadedly connected to the threaded columns 45. The T-shaped platform 44 is provided with a baffle 48 which is placed on the outside of the upper steel corridor 1.
[0041] This structure is provided with two horizontal clamping blocks and one vertical clamping block 46, and cooperates with a baffle 48, so that the clamping seat 4 can be clamped at the bottom intersection position of any steel beam of the steel corridor of the steel frame structure, and will not produce rotation and translation relative to the steel corridor, providing pre-fixing conditions for subsequent positioning and support.
[0042] In a further solution, Figure 2 As shown, the bottom surface of the support seat 42 is a disc structure, and the top surface of the pedestal 556 is provided with a countersunk hole 5561 with an inner diameter larger than the outer diameter of the support seat 42. By providing the countersunk hole 5561, the support seat 42 can move along the plane of the pedestal 556 within a certain range in the countersunk hole 5561, and is blocked by the edge of the countersunk hole 5561 to prevent the support seat 42 from falling from the pedestal 556 and causing support failure.
[0043] Through the above structure, the present invention proposes an implementation method of a multi-layer steel corridor suspension assembly device, and the steps are as follows:
[0044] S1. Install the suspension frame 3 at the top suspension position of the buildings on both sides, lower the steel rope 31, and clamp it on the lower end side of the upper steel corridor 1 through the clamping seat 4 of the steel rope 31. Four steel ropes 31 are respectively suspended at the four ends of the upper steel corridor 1 to suspend the upper steel corridor 1;
[0045] S2, retrieving the steel rope 31, and suspending the upper steel corridor 1 to a high altitude;
[0046] S3, arranging the straight rail 51 and the operating platform 52 on the straight rail 51, and placing the operating platform 52 on the outer side of the upper steel corridor 1;
[0047] S4, installing a support rod 53 on the operating platform 52, and supporting and building the lower steel corridor 2 through the support rod 53, so that the lower steel corridor 2 is in a vertical docking state with the upper steel corridor 1;
[0048] S5, move the entire operating platform 52, so that the lower steel corridor 2 moves to below the upper steel corridor 1;
[0049] S6, move the upper steel corridor 1 downward so that the support bases 42 at the four ends are docked on the pedestal 556;
[0050] S7, insert the vertical rod 63 into the through hole 741, and align the upper steel corridor 1 with the lower steel corridor 2 by moving the translation part 6;
[0051] S8, lifting the steel rope 31, rotating the adjusting column 555, adjusting the supporting height of the synchronization rod 57, and fine-tuning the vertical alignment of the upper steel corridor 1 and the lower steel corridor 2 through the cooperation between the steel rope 31 and the adjusting cylinder 554;
[0052] S9. Push the top column 55 to move through the hydraulic cylinder 56 to splice the upper steel corridor 1 and the lower steel corridor 2.
[0053] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A multi-layer steel corridor suspension assembly device, characterized in that: The invention comprises four suspension frames (3), wherein the suspension frames (3) are fixed in pairs to the tops of buildings on both sides, the suspension frames (3) extend steel ropes (31) for suspension, and the ends of the steel ropes (31) are fixed with clamping seats (4), and the clamping seats (4) are clamped on the lower end side of the upper steel corridor (1); a pillar (41) is fixedly provided at the lower end of the clamping seat (4), and a support seat (42) is provided at the end of the pillar (41); and the docking base (5), wherein the docking base (5) comprises a plurality of straight rails (51) arranged on the ground and an operating table (52) slidably arranged on the straight rails (51), and a plurality of support rods (53) are provided on the operating table (52), and the lower steel corridor (2) is constructed by means of the plurality of support rods (53), so that the lower steel corridor (2) is in a vertical docking state, and the operating table (52) is also provided with four steel cylinders (54), and the steel cylinders (55) are provided on the operating table (52). A top column (55) is vertically slidably provided at the top of the cylinder (54). A hydraulic cylinder (56) is also provided in the steel cylinder (54). The hydraulic cylinder (56) pushes the top column (55) to move vertically. The four steel cylinders (54) are respectively located below the clamping seat (4). The top column (55) includes a lower column (552) and an upper column (551). Synchronous rods (57) are sequentially connected between the four lower columns (552). An oil chamber (553) is provided at the top of the lower column (552). The lower end of the upper column (551) is slidably provided in the oil chamber (553). An adjusting cylinder (554) is provided in the oil chamber (553). The adjusting cylinder (554) is threadedly connected with an adjusting column (555). The adjusting column (555) is rotated to fine-tune the length of the top column (55) through oil pressure. A pedestal (556) for supporting the support seat (42) is provided at the top of the upper column (551).
2. The multi-story steel corridor suspension assembly device according to claim 1 is characterized in that: A ball head (49) is provided at the end of the support column (41), a ball groove (421) is provided on the support seat (42), and the ball head (49) is rotatably disposed in the ball groove (421).
3. The multi-story steel corridor suspension assembly device according to claim 2 is characterized in that: The invention also comprises a translation part (6) and a passive part (7), wherein the passive part (7) comprises a fixing clamp seat (71) for fixing to the lower edge of the side of the upper steel corridor (1), and a cross bar (72) is extended outward from the fixing clamp seat (71); the translation part (6) comprises a moving vehicle (61) movably arranged on the synchronization rod (57), the moving vehicle (61) is provided with a telescopic device (62), the end of the telescopic device (62) is provided with a vertical rod (63) extending upward, and the end of the cross bar (72) is provided with a through hole (741) for inserting the vertical rod (63), and when the upper steel corridor (1) and the lower steel corridor (2) are connected, the vertical rod (63) is inserted into the through hole (741).
4. The multi-storey steel corridor suspension assembly device according to claim 3 is characterized by: A horizontal axis (73) is rotatably provided on the horizontal bar (72), and a rotating seat (74) is also rotatably provided on the horizontal axis (73). The rotating axis of the horizontal axis (73) is perpendicular to the outer side surface of the upper steel corridor (1), and the rotating axis of the rotating seat (74) is perpendicular to the rotating axis of the horizontal axis (73). The through hole (741) is provided on the rotating seat (74).
5. The multi-story steel corridor suspension assembly device according to claim 4 is characterized in that: The clamping seat (4) comprises a seat body (43) and a T-shaped platform (44) fixedly mounted on the side of the seat body (43), a plurality of threaded columns (45) extending from the lower two sides and the top side of the T-shaped platform (44), a clamping block (46) being provided on the lower two sides and the top side of the T-shaped platform (44), the clamping block (46) being slidably mounted on the threaded column (45), a nut (47) being threadedly connected to the threaded column (45), and the T-shaped platform (44) being provided with a baffle (48) disposed on the outside of the upper steel corridor (1).
6. The multi-story steel corridor suspension assembly device according to claim 5 is characterized by: The bottom surface of the support seat (42) is in the form of a disc structure, and the top surface of the pedestal (556) is provided with a countersunk hole (5561) facing inwards, the inner diameter of which is larger than the outer diameter of the support seat (42).
7. A method for implementing a multi-story steel corridor suspension assembly device, using a multi-story steel corridor suspension assembly device as claimed in claim 6, wherein the steps are as follows: S1. Install a suspension frame (3) at the suspension position at the top of the buildings on both sides, lower the steel rope (31), and clamp the steel rope (31) to the lower side of the upper steel corridor (1) through the clamping seat (4). Four steel ropes (31) are respectively suspended at the four ends of the upper steel corridor (1), so that the upper steel corridor (1) is suspended; S2, retrieving the steel rope (31) and suspending the upper steel corridor (1) to a high altitude position; S3, arranging a straight rail (51) and an operating platform (52) on the straight rail (51), and placing the operating platform (52) outside the upper steel corridor (1); S4, installing a support rod (53) on the operating table (52), and supporting and building the lower steel corridor (2) through the support rod (53), so that the lower steel corridor (2) is in a vertical docking state with the upper steel corridor (1); S5, moving the entire operating platform (52) so that the lower steel corridor (2) moves below the upper steel corridor (1); S6, move the upper steel corridor (1) downward so that the support bases (42) at the four ends are docked on the pedestal (556); S7, inserting the vertical rod (63) into the through hole (741), and aligning the upper steel corridor (1) with the lower steel corridor (2) by moving the translation part (6); S8, lifting the steel rope (31), rotating the adjustment column (555), adjusting the support height of the synchronization rod (57), and fine-tuning the vertical alignment of the upper steel corridor (1) and the lower steel corridor (2) through the cooperation between the steel rope (31) and the adjustment cylinder (554); S9. Push the top column (55) to move by means of the hydraulic cylinder (56), so that the upper steel corridor (1) and the lower steel corridor (2) are spliced.
Citation Information
Patent Citations
Hydraulic lifting and upside-down construction method for internal steel tube of chimney
CN105507652A
Construction method of suspended steel gallery
CN106930541A
Steel structure assembling mechanism and steel structure vertical assembling method
CN116641477A
Erection method of steel-structure dwelling house
JP1994042186A
Elevating method and device of power transmission line steel tower
JP2005256343A