Electric energy meter operation status evaluation method and system combined with big data analysis
Through big data analysis technology, the abnormal operation status of electric meters is automatically detected, which solves the problem of relying on manual intervention in electric meter maintenance in the existing technology, and improves the degree of intelligence and the stability of the power system.
Patent Information
- Application Number
- CN202411139208.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-08-20
AI Technical Summary
In the existing technology, abnormal maintenance of electric meters relies on users' active intervention and analysis, and lacks autonomous auxiliary detection, resulting in a low level of intelligence.
By combining big data analysis, the historical power consumption information of electric energy meters is retrieved for cluster analysis of the same electric meters, generating a weekly power consumption benchmark curve and a daily power consumption benchmark curve, and performing clustering of different power meters, distribution density analysis and intra-cluster frequency analysis. Generate anomaly analysis components to realize automated abnormal detection of electric meter operating status.
It realizes the intelligent detection of electric meter abnormalities, improves the intelligence of electric meter maintenance, and can automatically identify and deal with abnormal operation status of electric meters to ensure the stability of the power system.
Smart Images

Figure CN118656672B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to an electric energy meter operating status evaluation method and system combined with big data analysis. Background Art
[0002] With the rapid development of smart grids and the widespread application of big data technology, the operating status evaluation of electric energy meters in power systems has become a key link in improving power supply quality, optimizing energy management, and ensuring safe and stable operation of power grids. In the current power system, as the basic equipment for measuring electricity, the operating status of electric energy meters directly affects the accuracy and reliability of power data. However, due to the wide variety and large number of electric energy meters, and the fact that their power consumption patterns are affected by many factors (such as weather, seasons, holidays, etc.), the operating status evaluation of electric energy meters becomes complicated and difficult. Traditional methods of electric energy meter status evaluation mainly rely on manual inspections and regular calibration, which is not only inefficient, but also difficult to cope with the growing number of electric energy meters and complex power consumption patterns. Summary of the invention
[0003] The embodiments of the present application provide a method and system for evaluating the operating status of an electric energy meter combined with big data analysis, which solves the technical problem in the prior art that abnormal maintenance of electric meters relies on users' active intervention in analysis and lacks autonomous auxiliary detection, resulting in a low level of intelligence.
[0004] In view of the above problems, the embodiments of the present application provide an electric energy meter operating status evaluation method and system combined with big data analysis.
[0005] In a first aspect of an embodiment of the present application, a method for evaluating an electric energy meter operating status in combination with big data analysis is provided, the method comprising:
[0006] Retrieving several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated for same-meter clustering analysis, generating several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, and the several groups of historical electricity consumption information are healthy electricity consumption information; performing heterogeneous meter clustering analysis on the several weekly electricity consumption benchmark curves and the several groups of daily electricity consumption benchmark curves, generating multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves; traversing the multiple clusters of weekly electricity consumption benchmark curves and the multiple clusters of daily electricity consumption benchmark curves respectively for distribution density analysis, generating multiple weekly center meters and multiple daily center meters; Perform intra-cluster frequency analysis on the multiple clusters of weekly electricity consumption benchmark curves and the multiple clusters of daily electricity consumption benchmark curves to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves; perform intra-cluster migration configuration based on the multiple weekly central electricity meters and the multiple groups of weekly intra-cluster fuzzy fault-tolerant curves to generate multiple groups of weekly operation abnormality analysis components; perform intra-cluster migration configuration based on the multiple daily central electricity meters, the multiple groups of daily intra-cluster fuzzy fault-tolerant curves and the multiple groups of week identifiers to generate multiple groups of daily operation abnormality analysis components; perform operation status abnormality detection on the multiple electric energy meters based on the multiple groups of weekly operation abnormality analysis components and the multiple groups of daily operation abnormality analysis components.
[0007] A second aspect of the embodiment of the present application provides an electric energy meter operation status evaluation system combined with big data analysis, the system comprising:
[0008] The first analysis module is used to retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated, perform same-meter clustering analysis, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of week identifiers, and the several groups of historical electricity consumption information are healthy electricity consumption information; the second analysis module is used to perform different-meter clustering analysis on the several weekly electricity consumption benchmark curves and the several groups of daily electricity consumption benchmark curves, and generate multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves; the density analysis module is used to traverse the multiple clusters of weekly electricity consumption benchmark curves and the multiple clusters of daily electricity consumption benchmark curves respectively to perform distribution density analysis, and generate multiple weekly center meters and multiple daily center meters. electrocardiogram meter; a frequency analysis module, the frequency analysis module is used to perform intra-cluster frequency analysis on the multiple clusters of weekly electricity consumption benchmark curves and the multiple clusters of daily electricity consumption benchmark curves, and generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves; a configuration module, the configuration module is used to perform intra-cluster migration configuration according to the multiple weekly center meters and the multiple groups of weekly intra-cluster fuzzy fault-tolerant curves, and generate multiple groups of weekly operation abnormality analysis components, perform intra-cluster migration configuration according to the multiple daily center meters, the multiple groups of daily intra-cluster fuzzy fault-tolerant curves and the multiple groups of week identifiers, and generate multiple groups of daily operation abnormality analysis components; a detection module, the detection module is used to detect abnormal operation status of the multiple electric energy meters according to the multiple groups of weekly operation abnormality analysis components and the multiple groups of daily operation abnormality analysis components.
[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0010] First, retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated for same-meter clustering analysis, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, where several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, and several groups of historical electricity consumption information are healthy electricity consumption information. Next, perform heterogeneous meter clustering analysis on several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves to generate multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves. Traverse multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves for distribution density analysis, and generate multiple weekly center meters and multiple daily center meters. Perform intra-cluster frequency analysis on multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves to generate multiple groups of intra-weekly fuzzy fault-tolerant curves and multiple groups of intra-daily fuzzy fault-tolerant curves. Then, according to multiple weekly center meters and multiple groups of weekly intra-cluster fuzzy fault-tolerant curves, intra-cluster migration configuration is performed to generate multiple groups of weekly operation abnormality analysis components. According to multiple daily center meters, multiple groups of daily intra-cluster fuzzy fault-tolerant curves and several groups of week identifiers, intra-cluster migration configuration is performed to generate multiple groups of daily operation abnormality analysis components. Finally, according to multiple groups of weekly operation abnormality analysis components and multiple groups of daily operation abnormality analysis components, the operation status abnormality of several electric energy meters is detected. The technical problem that the abnormal maintenance of electric meters in the prior art depends on the user's active intervention analysis and lacks autonomous auxiliary detection, resulting in a low degree of intelligence is solved, and the technical effect of intelligent detection of electric meter abnormalities is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0012] Figure 1 A schematic flow chart of a method for evaluating the operating status of an electric energy meter combined with big data analysis provided in an embodiment of the present application.
[0013] Figure 2 A schematic diagram of the structure of an electric energy meter operating status evaluation system combined with big data analysis provided in an embodiment of the present application.
[0014] Explanation of the reference numerals: first analysis module 11 , second analysis module 12 , density analysis module 13 , frequency analysis module 14 , configuration module 15 , detection module 16 . DETAILED DESCRIPTION
[0015] The embodiments of the present application provide an electric energy meter operating status assessment method and system combined with big data analysis, thereby solving the technical problem in the prior art that abnormal maintenance of electric energy meters relies on active user intervention and analysis, lacks autonomous auxiliary detection, and results in a low level of intelligence.
[0016] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0017] It should be noted that the terms "including" and "having" are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or are inherent to these processes, methods, products or devices.
[0018] Embodiment 1
[0019] like Figure 1 As shown, the embodiment of the present application provides a method for evaluating the operating status of an electric energy meter in combination with big data analysis, wherein the method includes:
[0020] Retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated for same-meter clustering analysis, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, and the several groups of historical electricity consumption information are healthy electricity consumption information.
[0021] Several groups of historical electricity consumption information are obtained from several electric energy meters in the area to be evaluated. The historical electricity consumption information includes weekly historical electricity consumption information and daily historical electricity consumption information. Weekly historical electricity consumption information refers to weekly electricity consumption data, and daily historical electricity consumption information refers to daily electricity consumption data. Several groups of historical electricity consumption information are clustered for the same meter, and similar weekly electricity consumption information is clustered into one category using algorithms such as K-means and hierarchical clustering. A representative is selected from each cluster as a weekly electricity consumption benchmark curve to generate several weekly electricity consumption benchmark curves. Cluster analysis is performed on the daily historical electricity consumption information of each day of the week to generate the daily electricity consumption benchmark curve of that day of the week. The daily electricity consumption benchmark curves of all days of the week are combined to form several groups of daily electricity consumption benchmark curves, and the corresponding week mark is added to each group of curves. Several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves can be used to evaluate the electricity consumption of electric energy meters, discover abnormal electricity consumption patterns, etc.
[0022] Further, several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated are retrieved for same-meter cluster analysis to generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, including:
[0023] Obtain a first electric energy meter of the plurality of electric energy meters in the area to be evaluated; extract a first group of weekly historical electric energy information and a first group of daily historical electric energy information from the plurality of groups of historical electric energy information according to the first electric energy meter; traverse the first group of weekly historical electric energy information and the first group of daily historical electric energy information to build curves, and construct a first group of weekly historical electric energy curves and a first group of daily historical electric energy curves; perform pairwise curve distance analysis on the first group of weekly historical electric energy curves to generate a weekly historical electric energy curve distance set, perform single centroid curve analysis on the first group of weekly historical electric energy curves according to the weekly historical electric energy curve distance set, generate a first weekly electric energy benchmark curve, and add it to the plurality of weekly electric energy benchmark curves; perform pairwise curve distance analysis on the first group of daily historical electric energy curves to generate a daily historical electric energy curve distance set, perform multi-centroid curve analysis on the first group of daily historical electric energy curves according to the daily historical electric energy curve distance set, generate a first group of daily electric energy benchmark curves, and add it to the plurality of daily electric energy benchmark curves; obtain a first group of week identifiers of the first group of daily electric energy benchmark curves, and add it to the plurality of week identifiers.
[0024] From several electric energy meters in the area to be evaluated, select an electric energy meter as the first electric energy meter. According to the first electric energy meter, extract the corresponding first group of weekly historical electric energy information and the first group of daily historical electric energy information from several groups of historical electric energy information. Traverse the first group of weekly historical electric energy information, and construct the first group of weekly historical electric energy curves in time order (usually Monday to Sunday). Each curve represents the electric energy consumption of a week. Traverse the first group of daily historical electric energy information, and construct the first group of daily historical electric energy curves in date order. Each curve represents the electric energy consumption of a day. Perform pairwise curve distance analysis on the first group of weekly historical electric energy curves. Usually, a distance measurement method (such as Euclidean distance, dynamic time warping DTW, etc.) is used to calculate the distance between curves to generate a distance set of weekly historical electric energy curves. Perform a similar pairwise curve distance analysis on the first group of daily historical electric energy curves to generate a distance set of daily historical electric energy curves. According to the distance set of weekly historical electric energy curves, cluster the weekly historical electric energy curves using a clustering algorithm (such as K-Medoids, hierarchical clustering, etc.). Since weekly curves are usually periodic, the cluster center (centroid) can be selected as the first week's electricity consumption benchmark curve, which usually represents the typical electricity consumption pattern within a week. Add the first week's electricity consumption benchmark curve to several weekly electricity consumption benchmark curves. Since the daily historical electricity consumption curves may vary depending on the day of the week (such as weekdays and weekends), multi-centroid curve analysis can be used. According to the daily historical electricity consumption curve distance set, the daily historical electricity consumption curves are clustered, and the centroid of each cluster represents a typical daily electricity consumption pattern (such as weekday pattern, weekend pattern, etc.). Generate a daily electricity consumption benchmark curve for each cluster, and add these curves to several groups of daily electricity consumption benchmark curves. For the first group of daily electricity consumption benchmark curves, add the corresponding week mark (such as Monday, Tuesday, etc.) to each benchmark curve according to the date information of the historical data. Add the first group of week marks to several groups of week marks.
[0025] Furthermore, pairwise curve distance analysis is performed on the first group of weekly historical electricity consumption curves to generate a weekly historical electricity consumption curve distance set, including:
[0026] According to the first set of weekly historical electricity consumption curves, randomly extract the first week's historical electricity consumption curve to construct a first 7-dimensional coordinate; calculate the first average daily electricity consumption of the first week's historical electricity consumption curve, and compare each coordinate of the first 7-dimensional coordinate with the first average daily electricity consumption to generate a first 7-dimensional reconstructed coordinate; according to the first set of weekly historical electricity consumption curves, randomly extract the second week's historical electricity consumption curve to construct a second 7-dimensional coordinate; calculate the second average daily electricity consumption of the second week's historical electricity consumption curve, and compare each coordinate of the second 7-dimensional coordinate with the second average daily electricity consumption to generate a second 7-dimensional reconstructed coordinate; calculate the Euclidean distance between the first 7-dimensional reconstructed coordinate and the second 7-dimensional reconstructed coordinate, set it as the distance of the first week's historical electricity consumption curve, and add it to the weekly historical electricity consumption curve distance set.
[0027] A curve is randomly extracted from the first set of weekly historical electricity consumption curves as the first weekly historical electricity consumption curve. The first weekly historical electricity consumption curve contains 7 data points (representing the seven days of a week). These 7 data points (daily electricity consumption) are used as coordinate values to construct a 7-dimensional coordinate, namely the first 7-dimensional coordinate. The average daily electricity consumption of the first weekly historical electricity consumption curve is calculated, namely the first average daily electricity consumption. Each coordinate value of the first 7-dimensional coordinate is compared with the first average daily electricity consumption to generate the first 7-dimensional reconstructed coordinate. Similarly, another different curve is randomly extracted from the first set of weekly historical electricity consumption curves as the second weekly historical electricity consumption curve, and a second 7-dimensional coordinate is constructed. The second average daily electricity consumption of the second weekly historical electricity consumption curve is calculated. Each coordinate value of the second 7-dimensional coordinate of the second weekly historical electricity consumption curve is compared with the second average daily electricity consumption to generate the second 7-dimensional reconstructed coordinate. The Euclidean distance between the first 7-dimensional reconstructed coordinate and the second 7-dimensional reconstructed coordinate is calculated, set as the distance of the first weekly historical electricity consumption curve, and added to the weekly historical electricity consumption curve distance set.
[0028] Furthermore, performing a single centroid curve analysis on the first group of weekly historical electricity consumption curves according to the weekly historical electricity consumption curve distance set to generate a first weekly electricity consumption reference curve includes:
[0029] Based on the weekly curve distance threshold, the first group of weekly historical electricity consumption curves are clustered and analyzed in combination with the weekly historical electricity consumption curve distance set to generate the first group of weekly historical electricity consumption curve clustering results; the clusters whose number of curves in the first category of the first group of weekly historical electricity consumption curve clustering results is less than or equal to the threshold of the number of curves in the first category are deleted to obtain concentrated weekly historical electricity consumption curves; the mean distance between the first concentrated weekly historical electricity consumption curve of the concentrated weekly historical electricity consumption curve and other curves of the concentrated weekly historical electricity consumption curve is calculated, and set as the first centroid coefficient; the mean distance between the Nth concentrated weekly historical electricity consumption curve of the concentrated weekly historical electricity consumption curve and other curves of the concentrated weekly historical electricity consumption curve is calculated, and set as the Nth centroid coefficient; the concentrated weekly historical electricity consumption curves with the first centroid coefficient up to the minimum value of the Nth centroid coefficient are extracted, and set as the first weekly electricity consumption reference curve.
[0030] The weekly curve distance threshold is used to determine which weekly curves should be considered similar or belong to the same category during cluster analysis. Specifically, when clustering a set of weekly historical electricity consumption curves, the Euclidean distance between these curves is calculated. If the distance between two curves is less than or equal to the weekly curve distance threshold, they are considered similar or belong to the same category and are classified into the same cluster during the clustering process. The weekly curve distance threshold is set, and the first set of weekly historical electricity consumption curves are clustered in combination with the weekly historical electricity consumption curve distance set. After clustering, multiple clusters are obtained, each cluster contains a set of similar weekly historical electricity consumption curves, that is, the clustering results of the first set of weekly historical electricity consumption curves. The threshold of the number of curves in the first category is set, and all clusters are traversed. The clusters whose number of curves in the clusters is less than or equal to the threshold of the number of curves in the first category are deleted in the clustering results of the first set of weekly historical electricity consumption curves, so as to remove those small clusters that may be formed due to noise or outliers and are not representative, thereby obtaining a more concentrated and representative concentrated weekly historical electricity consumption curve. Select a curve from the concentrated weekly historical electricity consumption curves as the first concentrated weekly historical electricity consumption curve, calculate the average distance between the first concentrated weekly historical electricity consumption curve and other curves in the concentrated weekly historical electricity consumption curves, and this distance average is called the centroid coefficient of the first concentrated weekly historical electricity consumption curve, that is, the first centroid coefficient. The first centroid coefficient represents the degree of proximity between the first concentrated weekly historical electricity consumption curve and the center of the entire concentrated weekly historical electricity consumption curve set. Repeat this process, calculate the centroid coefficient for each curve, and obtain the first centroid coefficient until the Nth centroid coefficient. From the first centroid coefficient to the Nth centroid coefficient, select the smallest centroid coefficient, and extract the concentrated weekly historical electricity consumption curve corresponding to the smallest centroid coefficient as the first weekly electricity consumption benchmark curve. The first weekly electricity consumption benchmark curve is the most representative curve in the concentrated weekly historical electricity consumption curve set because it has the smallest average distance from other curves in the set.
[0031] Furthermore, performing a multi-centroid curve analysis on the first group of daily historical electricity consumption curves according to the daily historical electricity consumption curve distance set to generate a first group of daily electricity consumption reference curves includes:
[0032] Based on the daily curve distance threshold, the first group of daily historical electricity consumption curves is clustered and analyzed in combination with the daily historical electricity consumption curve distance set to generate a first group of daily historical electricity consumption curve clustering results; the clusters whose number of curves in the second category of the first group of daily historical electricity consumption curve clustering results is less than or equal to the threshold of the number of curves in the second category are deleted to obtain multiple clusters of daily historical electricity consumption curves; the multiple clusters of daily historical electricity consumption curves are traversed to perform single centroid curve analysis to generate the first group of daily electricity consumption benchmark curves.
[0033] The daily curve distance threshold is used to determine which daily curves are considered to be close in distance or belong to the same category. Specifically, when comparing and analyzing a group of daily curves, the Euclidean distance between these curves is calculated. If the distance between two daily curves is less than or equal to the daily curve distance threshold, they are considered to be similar and belong to the same group or the same category. The daily curve distance threshold is set, and the first group of daily historical electricity consumption curves are clustered in combination with the daily historical electricity consumption curve distance set. Through clustering, similar daily historical electricity consumption curves are clustered into the same cluster to form multiple clusters, which are the clustering results of the first group of daily historical electricity consumption curves. Each cluster represents a daily electricity consumption pattern. The threshold for the number of curves in the second category is set to filter out clusters with a small number of curves that may not be representative. All clusters are traversed, the number of curves in each cluster is calculated, and the clusters whose number of curves in the second category of the clustering results of the first group of daily historical electricity consumption curves is less than or equal to the threshold for the number of curves in the second category are deleted to obtain multiple clusters of daily historical electricity consumption curves. A single centroid curve analysis is performed on multiple clusters of daily historical electricity consumption curves using a method similar to the single centroid curve analysis of the first group of weekly historical electricity consumption curves to generate the first group of daily electricity consumption benchmark curves.
[0034] Perform heterometer clustering analysis on the plurality of weekly electricity consumption reference curves and the plurality of groups of daily electricity consumption reference curves to generate a plurality of clusters of weekly electricity consumption reference curves and a plurality of clusters of daily electricity consumption reference curves.
[0035] Perform heterogeneous meter cluster analysis on several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, that is, compare the weekly electricity consumption benchmark curves and daily electricity consumption benchmark curves of different meters. Based on the above same-meter cluster analysis, a similar method is adopted to perform heterogeneous meter cluster analysis, and then generate multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves. Multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves are used to compare and identify whether new electricity consumption data belongs to known electricity consumption patterns or behaviors.
[0036] The plurality of weekly power consumption reference curves and the plurality of daily power consumption reference curves are respectively traversed to perform distribution density analysis, and a plurality of weekly central electricity meters and a plurality of daily central electricity meters are generated.
[0037] Traverse each cluster in the multiple clusters of weekly electricity consumption benchmark curves, and for each cluster, calculate the distribution density of each weekly electricity consumption benchmark curve. In each cluster of weekly electricity consumption benchmark curves, find the curve with the highest distribution density, and use the curve with the highest distribution density as the weekly center meter, which represents the center or typical characteristics of the weekly electricity consumption pattern. Use a similar method to traverse each cluster in the multiple clusters of daily electricity consumption benchmark curves, calculate the distribution density of each daily electricity consumption benchmark curve, find the curve with the highest distribution density in each cluster of daily electricity consumption benchmark curves, and use the curve with the highest distribution density as the daily center meter, which represents the center or typical characteristics of the daily electricity consumption pattern.
[0038] Furthermore, the plurality of weekly power consumption reference curves and the plurality of daily power consumption reference curves are respectively traversed to perform distribution density analysis to generate a plurality of weekly central electricity meters and a plurality of daily central electricity meters, including:
[0039] Obtain a weekly electricity consumption benchmark curve distance set of a first cluster of weekly electricity consumption benchmark curves of the multiple clusters of weekly electricity consumption benchmark curves; perform a single centroid analysis on the weekly electricity consumption benchmark curve distance set to generate a first weekly center electricity meter, which is added to the multiple weekly center electricity meters; obtain a daily electricity consumption benchmark curve distance set of a first cluster of daily electricity consumption benchmark curves of the multiple clusters of daily electricity consumption benchmark curves; perform a single centroid analysis on the daily electricity consumption benchmark curve distance set to generate a first daily center electricity meter, which is added to the multiple daily center electricity meters.
[0040] A cluster is selected from multiple clusters of weekly electricity consumption benchmark curves as the first cluster of weekly electricity consumption benchmark curves, and a weekly electricity consumption benchmark curve distance set of the first cluster of weekly electricity consumption benchmark curves is obtained by a method similar to that of obtaining the weekly historical electricity consumption curve distance set. Single centroid analysis is performed on the weekly electricity consumption benchmark curve distance set, and a single centroid curve is obtained as the first weekly central electricity meter, and the first weekly central electricity meter is added to multiple weekly central electricity meters. Similar to the steps of the weekly central electricity meter, the daily electricity consumption benchmark curve distance set of the first cluster of daily electricity consumption benchmark curves is obtained from multiple clusters of daily electricity consumption benchmark curves. Single centroid analysis is performed on the daily electricity consumption benchmark curve distance set to generate the first daily central electricity meter, and add it to multiple daily central electricity meters. Repeat the above steps and perform similar processing on each cluster of multiple clusters of weekly electricity consumption benchmark curves and daily electricity consumption benchmark curves until all clusters have generated corresponding central electricity meters, that is, multiple weekly central electricity meters and multiple daily central electricity meters. Multiple weekly central electricity meters and multiple daily central electricity meters represent the center or typical features of different weekly electricity consumption patterns and daily electricity consumption patterns, respectively.
[0041] The multiple clusters of weekly power consumption reference curves and the multiple clusters of daily power consumption reference curves are subjected to intra-cluster frequency analysis to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves.
[0042] The frequency within a cluster refers to the frequency at which the benchmark curve in each cluster appears at a specific time point or time period. For each cluster in the multiple clusters of weekly electricity benchmark curves, the probability distribution of all benchmark curves in the cluster at each time point is calculated to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves. Multiple groups of weekly intra-cluster fuzzy fault-tolerant curves reflect the typical characteristics and variation range of the benchmark curves within the cluster. For each cluster in the multiple clusters of daily electricity benchmark curves, similar calculations are performed to generate multiple groups of daily intra-cluster fuzzy fault-tolerant curves. Multiple groups of daily intra-cluster fuzzy fault-tolerant curves reflect the typical characteristics and variation range of the benchmark curves within each daily electricity cluster.
[0043] Furthermore, performing intra-cluster frequency analysis on the multiple cluster weekly power consumption reference curves and the multiple cluster daily power consumption reference curves to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves includes:
[0044] Obtain a first-day historical electricity consumption set of a first weekly electricity consumption benchmark curve of a first cluster of weekly electricity consumption benchmark curves of the multiple clusters of weekly electricity consumption benchmark curves; perform a central trend analysis on the first-day historical electricity consumption set to generate the first-day centralized electricity consumption; construct a fuzzy fault-tolerant electricity consumption of the first day according to the distribution interval of the first-day centralized electricity consumption until the fuzzy fault-tolerant electricity consumption of the seventh day is obtained; construct a fuzzy fault-tolerant curve of the first weekly electricity consumption benchmark curve of the first cluster of weekly electricity consumption benchmark curves according to the fuzzy fault-tolerant electricity consumption of the first day until the fuzzy fault-tolerant electricity consumption of the seventh day, add it into the fuzzy fault-tolerant curve in the first group of weekly clusters, and add it into the fuzzy fault-tolerant curve in the multiple groups of weekly clusters.
[0045] The first day historical electricity consumption data set of the first week electricity consumption benchmark curve of the first cluster weekly electricity consumption benchmark curve is obtained from the multi-cluster weekly electricity consumption benchmark curve. The first day historical electricity consumption data set contains electricity consumption data for multiple periods of the first day. The first day historical electricity consumption set is subjected to a central trend analysis, and the first day concentrated electricity consumption is obtained by calculating the average value. According to the distribution interval of the first day concentrated electricity consumption, the first day fuzzy fault-tolerant electricity consumption is constructed, and the first day fuzzy fault-tolerant electricity consumption covers the normal fluctuation range of the first day electricity consumption, that is, the electricity consumption of different users. For the remaining days of the first week electricity consumption benchmark curve of the first cluster weekly electricity consumption benchmark curve (i.e., the second day to the seventh day), the above process is repeated to obtain the fuzzy fault-tolerant electricity consumption of each day. According to the fuzzy fault-tolerant electricity consumption of the first day until the fuzzy fault-tolerant electricity consumption of the seventh day, the first week electricity consumption benchmark curve fuzzy fault-tolerant curve of the first cluster weekly electricity consumption benchmark curve is constructed. The first week electricity consumption benchmark curve fuzzy fault-tolerant curve reflects the normal fluctuation range of electricity consumption every day of the week. The constructed first week electricity consumption benchmark curve fuzzy fault-tolerant curve is added to the fuzzy fault-tolerant curve in the first group of weekly clusters. The first set of weekly intra-cluster fuzzy fault-tolerant curves contains multiple fuzzy fault-tolerant curves of weekly power consumption benchmark curves, each corresponding to a different cluster. The first set of weekly intra-cluster fuzzy fault-tolerant curves is added to the set of multiple sets of weekly intra-cluster fuzzy fault-tolerant curves, which contains the fuzzy fault-tolerant curves of weekly power consumption benchmark curves of all clusters. Multiple sets of daily intra-cluster fuzzy fault-tolerant curves will be obtained using a method similar to that of multiple sets of weekly intra-cluster fuzzy fault-tolerant curves.
[0046] Intra-cluster migration configuration is performed based on the multiple weekly central electricity meters and the multiple groups of weekly intra-cluster fuzzy fault-tolerant curves to generate multiple groups of weekly operation abnormality analysis components; intra-cluster migration configuration is performed based on the multiple daily central electricity meters, the multiple groups of daily intra-cluster fuzzy fault-tolerant curves and the several groups of week identifiers to generate multiple groups of daily operation abnormality analysis components.
[0047] According to multiple weekly central electricity meters and multiple groups of weekly intra-cluster fuzzy fault tolerance curves, intra-cluster migration configuration is performed to generate multiple groups of weekly operation abnormality analysis components. According to multiple daily central electricity meters, multiple groups of daily intra-cluster fuzzy fault tolerance curves and several groups of weekday identifiers, intra-cluster migration configuration is performed to generate multiple groups of daily operation abnormality analysis components.
[0048] Further, performing intra-cluster migration configuration according to the multiple weekly central electricity meters and the multiple groups of weekly intra-cluster fuzzy fault tolerance curves to generate multiple groups of weekly operation abnormality analysis components, performing intra-cluster migration configuration according to the multiple daily central electricity meters, the multiple groups of daily intra-cluster fuzzy fault tolerance curves and the multiple groups of weekday identifiers to generate multiple groups of daily operation abnormality analysis components, including:
[0049] Extract the first week central meter of the first cluster weekly electricity consumption benchmark curve and the first group of fuzzy fault tolerance curves within the weekly cluster;
[0050] Based on the central electricity meter of the first week, a positive sample weekly electricity consumption curve data set and a negative sample weekly electricity consumption curve data set are collected and randomly mixed to train a special-shaped curve recognition channel;
[0051] According to the first group of fuzzy fault-tolerant curves in the surrounding cluster, constructing an anomaly curve recognition channel;
[0052] The abnormal curve identification channel and the abnormal quantity curve identification channel are combined to generate a first week central electric meter weekly operation abnormality analysis component;
[0053] The non-weekly central electric meter of the first cluster of weekly electricity consumption reference curves is used to perform migration training on the special-shaped curve recognition channel, and a non-weekly central electric meter weekly operation abnormality analysis component set is constructed in combination with the multiple groups of fuzzy fault-tolerant curves within the weekly clusters;
[0054] The first weekly central electricity meter weekly operation abnormality analysis component and the non-weekly central electricity meter weekly operation abnormality analysis component set are added into the first group of weekly operation abnormality analysis components, and added into the multiple groups of weekly operation abnormality analysis components.
[0055] Taking the generation of multiple groups of weekly operation anomaly analysis components as an example, a similar method will be used to generate multiple groups of daily operation anomaly analysis components. A cluster of weekly electricity consumption benchmark curves is extracted from multiple clusters of weekly electricity consumption benchmark curves as the first cluster of weekly electricity consumption benchmark curves, and the first week central meter and the first group of weekly cluster fuzzy fault tolerance curves are extracted from the first cluster of weekly electricity consumption benchmark curves. Based on the first week central meter, a positive sample weekly electricity consumption curve data set (i.e., data that conforms to the normal electricity consumption mode) and a negative sample weekly electricity consumption curve data set (i.e., data that does not conform to the normal electricity consumption mode) are collected. The positive sample and negative sample weekly electricity consumption curve data sets are randomly mixed to ensure that the model can learn various possible electricity consumption modes. The mixed data set is used to train the special curve recognition channel to identify electricity consumption curves that are different from the normal electricity consumption mode. According to the fuzzy fault tolerance curves in the first group of weekly clusters, an abnormal amount curve recognition channel is constructed. The abnormal amount curve recognition channel is used to identify those curves whose electricity consumption exceeds the normal fluctuation range. According to the range of the fuzzy fault tolerance curve, a reasonable threshold is set to determine which electricity consumption is considered abnormal. The special-shaped curve recognition channel and the abnormal quantity curve recognition channel are combined to form a complete weekly operation anomaly analysis component, namely, the first weekly central meter weekly operation anomaly analysis component. The special-shaped curve recognition channel is transferred and trained through the non-weekly central meter data of the first cluster weekly power consumption benchmark curve. In this way, even the power consumption curve of the non-central meter can be effectively identified as abnormal. Combined with multiple groups of fuzzy fault-tolerant curves within weekly clusters, a corresponding weekly operation anomaly analysis component is constructed for each non-weekly central meter. These components are combined to form a non-weekly central meter weekly operation anomaly analysis component set. The first weekly central meter weekly operation anomaly analysis component and the non-weekly central meter weekly operation anomaly analysis component set are integrated and added to the first group of weekly operation anomaly analysis components. The first group of weekly operation anomaly analysis components are added to the multiple groups of weekly operation anomaly analysis component sets together with the weekly operation anomaly analysis components of other clusters.
[0056] The abnormal operation status of the plurality of electric energy meters is detected based on the plurality of groups of weekly operation abnormality analysis components and the plurality of groups of daily operation abnormality analysis components.
[0057] According to multiple groups of weekly operation abnormality analysis components and multiple groups of daily operation abnormality analysis components, the operation status abnormalities of several electric energy meters are detected. Specifically, the weekly electricity consumption data of the electric energy meter is input into the corresponding weekly operation abnormality analysis component, and the special-shaped curve identification channel and the special-quantity curve identification channel in the component are used to detect whether there is a weekly operation abnormality. The daily electricity consumption data of the electric energy meter is input into the corresponding daily operation abnormality analysis component, and the abnormality detection logic in the component is also used to detect whether there is a daily operation abnormality. According to the output result of the analysis component, it is judged whether the operation status of the electric energy meter is abnormal. Through the above process, multiple groups of weekly operation abnormality analysis components and multiple groups of daily operation abnormality analysis components can be used to detect abnormalities in the operation status of several electric energy meters, and corresponding processing measures can be taken in time to ensure the normal operation of the electric energy meter and the stability of the power system.
[0058] In summary, the embodiments of the present application have at least the following technical effects:
[0059] First, retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated for same-meter clustering analysis, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, where several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, and several groups of historical electricity consumption information are healthy electricity consumption information. Next, perform heterogeneous meter clustering analysis on several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves to generate multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves. Traverse multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves for distribution density analysis, and generate multiple weekly center meters and multiple daily center meters. Perform intra-cluster frequency analysis on multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves to generate multiple groups of intra-weekly fuzzy fault-tolerant curves and multiple groups of intra-daily fuzzy fault-tolerant curves. Then, according to multiple weekly center meters and multiple groups of weekly intra-cluster fuzzy fault-tolerant curves, intra-cluster migration configuration is performed to generate multiple groups of weekly operation abnormality analysis components. According to multiple daily center meters, multiple groups of daily intra-cluster fuzzy fault-tolerant curves and several groups of week identifiers, intra-cluster migration configuration is performed to generate multiple groups of daily operation abnormality analysis components. Finally, according to multiple groups of weekly operation abnormality analysis components and multiple groups of daily operation abnormality analysis components, the operation status abnormality of several electric energy meters is detected. The technical problem that the abnormal maintenance of electric meters in the prior art depends on the user's active intervention analysis and lacks autonomous auxiliary detection, resulting in a low degree of intelligence is solved, and the technical effect of intelligent detection of electric meter abnormalities is achieved.
[0060] Embodiment 2
[0061] Based on the same inventive concept as the method for evaluating the operation status of an electric energy meter in combination with big data analysis in the aforementioned embodiment, Figure 2 As shown, the present application provides an electric energy meter operation status evaluation system combined with big data analysis, and the system and method embodiments in the present application embodiments are based on the same inventive concept. The system includes:
[0062] The first analysis module 11 is used to retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated, perform same-meter clustering analysis, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of week identifiers, and the several groups of historical electricity consumption information are healthy electricity consumption information; the second analysis module 12 is used to perform different-meter clustering analysis on the several weekly electricity consumption benchmark curves and the several groups of daily electricity consumption benchmark curves, and generate multiple clusters of weekly electricity consumption benchmark curves and multiple clusters of daily electricity consumption benchmark curves; the density analysis module 13 is used to traverse the multiple clusters of weekly electricity consumption benchmark curves and the multiple clusters of daily electricity consumption benchmark curves respectively to perform distribution density analysis, and generate multiple weekly center meters and multiple daily center meters. electrocardiogram meter; a frequency analysis module 14, the frequency analysis module 14 is used to perform intra-cluster frequency analysis on the multiple weekly electricity consumption benchmark curves and the multiple daily electricity consumption benchmark curves, and generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves; a configuration module 15, the configuration module 15 is used to perform intra-cluster migration configuration according to the multiple weekly center electricity meters and the multiple groups of weekly intra-cluster fuzzy fault-tolerant curves, and generate multiple groups of weekly operation abnormality analysis components, perform intra-cluster migration configuration according to the multiple daily center electricity meters, the multiple groups of daily intra-cluster fuzzy fault-tolerant curves and the multiple groups of week identifiers, and generate multiple groups of daily operation abnormality analysis components; a detection module 16, the detection module 16 is used to detect abnormal operation status of the multiple electric energy meters according to the multiple groups of weekly operation abnormality analysis components and the multiple groups of daily operation abnormality analysis components.
[0063] Furthermore, the first analysis module 11 is used to perform the following method:
[0064] Obtain a first electric energy meter of the plurality of electric energy meters in the area to be evaluated; extract a first group of weekly historical electric energy information and a first group of daily historical electric energy information from the plurality of groups of historical electric energy information according to the first electric energy meter; traverse the first group of weekly historical electric energy information and the first group of daily historical electric energy information to build curves, and construct a first group of weekly historical electric energy curves and a first group of daily historical electric energy curves; perform pairwise curve distance analysis on the first group of weekly historical electric energy curves to generate a weekly historical electric energy curve distance set, perform single centroid curve analysis on the first group of weekly historical electric energy curves according to the weekly historical electric energy curve distance set, generate a first weekly electric energy benchmark curve, and add it to the plurality of weekly electric energy benchmark curves; perform pairwise curve distance analysis on the first group of daily historical electric energy curves to generate a daily historical electric energy curve distance set, perform multi-centroid curve analysis on the first group of daily historical electric energy curves according to the daily historical electric energy curve distance set, generate a first group of daily electric energy benchmark curves, and add it to the plurality of daily electric energy benchmark curves; obtain a first group of week identifiers of the first group of daily electric energy benchmark curves, and add it to the plurality of week identifiers.
[0065] Furthermore, the first analysis module 11 is used to perform the following method:
[0066] According to the first set of weekly historical electricity consumption curves, randomly extract the first week's historical electricity consumption curve to construct a first 7-dimensional coordinate; calculate the first average daily electricity consumption of the first week's historical electricity consumption curve, and compare each coordinate of the first 7-dimensional coordinate with the first average daily electricity consumption to generate a first 7-dimensional reconstructed coordinate; according to the first set of weekly historical electricity consumption curves, randomly extract the second week's historical electricity consumption curve to construct a second 7-dimensional coordinate; calculate the second average daily electricity consumption of the second week's historical electricity consumption curve, and compare each coordinate of the second 7-dimensional coordinate with the second average daily electricity consumption to generate a second 7-dimensional reconstructed coordinate; calculate the Euclidean distance between the first 7-dimensional reconstructed coordinate and the second 7-dimensional reconstructed coordinate, set it as the distance of the first week's historical electricity consumption curve, and add it to the weekly historical electricity consumption curve distance set.
[0067] Furthermore, the first analysis module 11 is used to perform the following method:
[0068] Based on the weekly curve distance threshold, the first group of weekly historical electricity consumption curves are clustered and analyzed in combination with the weekly historical electricity consumption curve distance set to generate the first group of weekly historical electricity consumption curve clustering results; the clusters whose number of curves in the first category of the first group of weekly historical electricity consumption curve clustering results is less than or equal to the threshold of the number of curves in the first category are deleted to obtain concentrated weekly historical electricity consumption curves; the mean distance between the first concentrated weekly historical electricity consumption curve of the concentrated weekly historical electricity consumption curve and other curves of the concentrated weekly historical electricity consumption curve is calculated, and set as the first centroid coefficient; the mean distance between the Nth concentrated weekly historical electricity consumption curve of the concentrated weekly historical electricity consumption curve and other curves of the concentrated weekly historical electricity consumption curve is calculated, and set as the Nth centroid coefficient; the concentrated weekly historical electricity consumption curves with the first centroid coefficient up to the minimum value of the Nth centroid coefficient are extracted, and set as the first weekly electricity consumption reference curve.
[0069] Furthermore, the first analysis module 11 is used to perform the following method:
[0070] Based on the daily curve distance threshold, the first group of daily historical electricity consumption curves is clustered and analyzed in combination with the daily historical electricity consumption curve distance set to generate a first group of daily historical electricity consumption curve clustering results; the clusters whose number of curves in the second category of the first group of daily historical electricity consumption curve clustering results is less than or equal to the threshold of the number of curves in the second category are deleted to obtain multiple clusters of daily historical electricity consumption curves; the multiple clusters of daily historical electricity consumption curves are traversed to perform single centroid curve analysis to generate the first group of daily electricity consumption benchmark curves.
[0071] Furthermore, the density analysis module 13 is used to perform the following method:
[0072] Obtain a weekly electricity consumption benchmark curve distance set of a first cluster of weekly electricity consumption benchmark curves of the multiple clusters of weekly electricity consumption benchmark curves; perform a single centroid analysis on the weekly electricity consumption benchmark curve distance set to generate a first weekly center electricity meter, which is added to the multiple weekly center electricity meters; obtain a daily electricity consumption benchmark curve distance set of a first cluster of daily electricity consumption benchmark curves of the multiple clusters of daily electricity consumption benchmark curves; perform a single centroid analysis on the daily electricity consumption benchmark curve distance set to generate a first daily center electricity meter, which is added to the multiple daily center electricity meters.
[0073] Furthermore, the frequency analysis module 14 is used to perform the following method:
[0074] Obtain a first-day historical electricity consumption set of a first weekly electricity consumption benchmark curve of a first cluster of weekly electricity consumption benchmark curves of the multiple clusters of weekly electricity consumption benchmark curves; perform a central trend analysis on the first-day historical electricity consumption set to generate the first-day centralized electricity consumption; construct a fuzzy fault-tolerant electricity consumption of the first day according to the distribution interval of the first-day centralized electricity consumption until the fuzzy fault-tolerant electricity consumption of the seventh day is obtained; construct a fuzzy fault-tolerant curve of the first weekly electricity consumption benchmark curve of the first cluster of weekly electricity consumption benchmark curves according to the fuzzy fault-tolerant electricity consumption of the first day until the fuzzy fault-tolerant electricity consumption of the seventh day, add it into the fuzzy fault-tolerant curve in the first group of weekly clusters, and add it into the fuzzy fault-tolerant curve in the multiple groups of weekly clusters.
[0075] Furthermore, the configuration module 15 is used to execute the following method:
[0076] Extract the first weekly central meter of the first cluster of weekly electricity consumption benchmark curves and the first group of fuzzy fault-tolerant curves within the weekly cluster; based on the first weekly central meter, collect the positive sample weekly electricity consumption curve data set and the negative sample weekly electricity consumption curve data set for random mixing, and train the special-shaped curve recognition channel; according to the first group of fuzzy fault-tolerant curves within the weekly cluster, construct the abnormal quantity curve recognition channel; merge the special-shaped curve recognition channel and the abnormal quantity curve recognition channel to generate the first weekly central meter weekly operation abnormality analysis component; perform migration training on the special-shaped curve recognition channel through the non-weekly central meter of the first cluster of weekly electricity consumption benchmark curves, and construct a non-weekly central meter weekly operation abnormality analysis component set in combination with the multiple groups of fuzzy fault-tolerant curves within the weekly clusters; add the first weekly central meter weekly operation abnormality analysis component and the non-weekly central meter weekly operation abnormality analysis component set into the first group of weekly operation abnormality analysis components and into the multiple groups of weekly operation abnormality analysis components.
[0077] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0078] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0079] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. A method for evaluating the operation status of an electric energy meter combined with big data analysis, characterized in that: The method comprises: Retrieving several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated to perform cluster analysis of the same electric energy meters, and generating several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, and the several groups of historical electricity consumption information are healthy electricity consumption information; Performing heterometer clustering analysis on the plurality of weekly electricity consumption reference curves and the plurality of groups of daily electricity consumption reference curves to generate a plurality of clusters of weekly electricity consumption reference curves and a plurality of clusters of daily electricity consumption reference curves; Traversing the multiple clusters of weekly electricity consumption reference curves and the multiple clusters of daily electricity consumption reference curves respectively to perform distribution density analysis, and generate multiple weekly central electricity meters and multiple daily central electricity meters; Performing intra-cluster frequency analysis on the multiple clusters of weekly power consumption reference curves and the multiple clusters of daily power consumption reference curves to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves; Perform intra-cluster migration configuration according to the multiple weekly central electricity meters and the multiple groups of weekly intra-cluster fuzzy fault tolerance curves to generate multiple groups of weekly operation abnormality analysis components; perform intra-cluster migration configuration according to the multiple daily central electricity meters, the multiple groups of daily intra-cluster fuzzy fault tolerance curves and the multiple groups of weekday identifiers to generate multiple groups of daily operation abnormality analysis components; The abnormal operation status of the plurality of electric energy meters is detected based on the plurality of groups of weekly operation abnormality analysis components and the plurality of groups of daily operation abnormality analysis components.
2. The method according to claim 1, characterized in that Retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated for same-meter cluster analysis, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, including: Obtaining a first electric energy meter of the plurality of electric energy meters in the area to be evaluated; extracting a first group of weekly historical electricity usage information and a first group of daily historical electricity usage information from the plurality of groups of historical electricity usage information according to the first electric energy meter; Traversing the first group of weekly historical electricity consumption information and the first group of daily historical electricity consumption information to build curves, and constructing a first group of weekly historical electricity consumption curves and a first group of daily historical electricity consumption curves; Performing pairwise curve distance analysis on the first group of weekly historical electricity consumption curves to generate a weekly historical electricity consumption curve distance set, performing single centroid curve analysis on the first group of weekly historical electricity consumption curves according to the weekly historical electricity consumption curve distance set to generate a first weekly electricity consumption benchmark curve, and adding the plurality of weekly electricity consumption benchmark curves; Performing pairwise curve distance analysis on the first group of daily historical electricity consumption curves to generate a daily historical electricity consumption curve distance set, performing multi-centroid curve analysis on the first group of daily historical electricity consumption curves according to the daily historical electricity consumption curve distance set to generate a first group of daily electricity consumption benchmark curves, and adding them to the plurality of groups of daily electricity consumption benchmark curves; A first group of weekday identifiers of the first group of daily electricity consumption reference curves is obtained, and added to the plurality of groups of weekday identifiers.
3. The method according to claim 2, characterized in that Perform pairwise curve distance analysis on the first group of weekly historical electricity consumption curves to generate a weekly historical electricity consumption curve distance set, including: According to the first group of weekly historical electricity consumption curves, randomly extract the first week's historical electricity consumption curve to construct a first 7-dimensional coordinate; Calculate the first average daily electricity consumption of the first week's historical electricity consumption curve, and compare each coordinate of the first 7-dimensional coordinate with the first average daily electricity consumption to generate a first 7-dimensional reconstructed coordinate; According to the first group of weekly historical electricity consumption curves, randomly extract the second week's historical electricity consumption curves to construct a second 7-dimensional coordinate system; Calculate the second average daily electricity consumption of the second week's historical electricity consumption curve, and compare each coordinate of the second 7-dimensional coordinate with the second average daily electricity consumption to generate a second 7-dimensional reconstructed coordinate; The Euclidean distance between the first 7-dimensional reconstructed coordinates and the second 7-dimensional reconstructed coordinates is calculated, set as the first week historical electricity consumption curve distance, and added to the weekly historical electricity consumption curve distance set.
4. The method according to claim 2, characterized in that Performing a single centroid curve analysis on the first group of weekly historical electricity consumption curves according to the weekly historical electricity consumption curve distance set to generate a first weekly electricity consumption benchmark curve includes: Based on the weekly curve distance threshold, cluster analysis is performed on the first group of weekly historical electricity consumption curves in combination with the weekly historical electricity consumption curve distance set to generate a clustering result of the first group of weekly historical electricity consumption curves; Deleting the clusters whose number of first-category inner curves of the clustering results of the first group of weekly historical power consumption curves is less than or equal to the first-category inner curve number threshold, to obtain concentrated weekly historical power consumption curves; Calculate the average of the distances between the first concentrated weekly historical electricity consumption curve and other curves of the concentrated weekly historical electricity consumption curve, and set it as the first centroid coefficient; Calculate the average distance between the Nth concentrated weekly historical electricity consumption curve and other curves of the concentrated weekly historical electricity consumption curve, and set it as the Nth centroid coefficient; A concentrated weekly historical electricity consumption curve from the first centroid coefficient to the minimum value of the Nth centroid coefficient is extracted and set as the first weekly electricity consumption reference curve.
5. The method according to claim 2, characterized in that Performing a multi-centroid curve analysis on the first group of daily historical electricity consumption curves according to the daily historical electricity consumption curve distance set to generate a first group of daily electricity consumption benchmark curves, including: Based on the daily curve distance threshold, cluster analysis is performed on the first group of daily historical electricity consumption curves in combination with the daily historical electricity consumption curve distance set to generate a clustering result of the first group of daily historical electricity consumption curves; Deleting the clusters of the first group of daily historical electricity consumption curve clustering results, in which the number of second-category inner curves is less than or equal to the second-category inner curve number threshold, to obtain multiple clusters of daily historical electricity consumption curves; The plurality of clusters of daily historical electricity consumption curves are traversed to perform single centroid curve analysis to generate the first group of daily electricity consumption benchmark curves.
6. The method according to claim 1, characterized in that The plurality of weekly power consumption reference curves and the plurality of daily power consumption reference curves are respectively traversed to perform distribution density analysis, and a plurality of weekly central electricity meters and a plurality of daily central electricity meters are generated, including: Obtaining a weekly electricity consumption reference curve distance set of a first cluster of weekly electricity consumption reference curves of the plurality of clusters of weekly electricity consumption reference curves; Performing a single centroid analysis on the weekly electricity consumption reference curve distance set to generate a first weekly center electricity meter, and adding the first weekly center electricity meter to the multiple weekly center electricity meters; Obtaining a daily electricity reference curve distance set of a first cluster of daily electricity reference curves of the plurality of clusters of daily electricity reference curves; A single centroid analysis is performed on the daily electricity reference curve distance set to generate a first daily central electricity meter, which is added to the multiple daily central electricity meters.
7. The method according to claim 1, characterized in that Performing intra-cluster frequency analysis on the multiple cluster weekly power consumption reference curves and the multiple cluster daily power consumption reference curves to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves, including: Obtain a first-day historical electricity consumption set of a first week electricity consumption reference curve of a first cluster of weekly electricity consumption reference curves of the multiple clusters of weekly electricity consumption reference curves; Performing a centralized trend analysis on the historical electricity consumption set of the first day to generate the centralized electricity consumption of the first day; According to the distribution interval of the concentrated power consumption on the first day, the fuzzy fault-tolerant power consumption on the first day is constructed until the fuzzy fault-tolerant power consumption on the seventh day is obtained; According to the fuzzy fault-tolerant electricity consumption on the first day to the fuzzy fault-tolerant electricity consumption on the seventh day, the first weekly electricity consumption reference curve fuzzy fault-tolerant curve of the first cluster weekly electricity consumption reference curve is constructed, added to the first group of fuzzy fault-tolerant curves within the weekly cluster, and added to the multiple groups of fuzzy fault-tolerant curves within the weekly cluster.
8. The method according to claim 1, characterized in that According to the multiple weekly central electricity meters and the multiple groups of weekly intra-cluster fuzzy fault tolerance curves, intra-cluster migration configuration is performed to generate multiple groups of weekly operation abnormality analysis components; according to the multiple daily central electricity meters, the multiple groups of daily intra-cluster fuzzy fault tolerance curves and the multiple groups of weekday identifiers, intra-cluster migration configuration is performed to generate multiple groups of daily operation abnormality analysis components, including: Extract the first week central meter of the first cluster weekly electricity consumption benchmark curve and the first group of fuzzy fault tolerance curves within the weekly cluster; Based on the central electricity meter of the first week, a positive sample weekly electricity consumption curve data set and a negative sample weekly electricity consumption curve data set are collected and randomly mixed to train a special-shaped curve recognition channel; According to the first group of fuzzy fault-tolerant curves in the surrounding cluster, constructing an anomaly curve recognition channel; The abnormal curve identification channel and the abnormal quantity curve identification channel are combined to generate a first week central electric meter weekly operation abnormality analysis component; The non-weekly central electric meter of the first cluster of weekly electricity consumption reference curves is used to perform migration training on the special-shaped curve recognition channel, and a non-weekly central electric meter weekly operation abnormality analysis component set is constructed in combination with the multiple groups of fuzzy fault-tolerant curves within the weekly clusters; The first weekly central electricity meter weekly operation abnormality analysis component and the non-weekly central electricity meter weekly operation abnormality analysis component set are added into the first group of weekly operation abnormality analysis components, and added into the multiple groups of weekly operation abnormality analysis components.
9. The electric energy meter operation status evaluation system combined with big data analysis is characterized by: A method for evaluating the operation status of an electric energy meter combined with big data analysis according to any one of claims 1 to 8, the system comprising: A first analysis module, the first analysis module is used to retrieve several groups of historical electricity consumption information of several electric energy meters in the area to be evaluated to perform cluster analysis on the same electric meter, and generate several weekly electricity consumption benchmark curves and several groups of daily electricity consumption benchmark curves, wherein the several groups of daily electricity consumption benchmark curves have several groups of weekday identifiers, and the several groups of historical electricity consumption information are healthy electricity consumption information; a second analysis module, the second analysis module being used to perform heterometer clustering analysis on the plurality of weekly electricity consumption reference curves and the plurality of groups of daily electricity consumption reference curves to generate a plurality of clusters of weekly electricity consumption reference curves and a plurality of clusters of daily electricity consumption reference curves; A density analysis module, the density analysis module is used to traverse the multiple clusters of weekly electricity consumption reference curves and the multiple clusters of daily electricity consumption reference curves to perform distribution density analysis, and generate multiple weekly central electricity meters and multiple daily central electricity meters; A frequency analysis module, the frequency analysis module is used to perform intra-cluster frequency analysis on the multiple cluster weekly power consumption reference curves and the multiple cluster daily power consumption reference curves to generate multiple groups of weekly intra-cluster fuzzy fault-tolerant curves and multiple groups of daily intra-cluster fuzzy fault-tolerant curves; A configuration module, the configuration module is used to perform intra-cluster migration configuration according to the multiple weekly central electricity meters and the multiple groups of weekly intra-cluster fuzzy fault tolerance curves to generate multiple groups of weekly operation abnormality analysis components, and perform intra-cluster migration configuration according to the multiple daily central electricity meters, the multiple groups of daily intra-cluster fuzzy fault tolerance curves and the multiple groups of weekday identifiers to generate multiple groups of daily operation abnormality analysis components; A detection module, wherein the detection module is used to detect abnormal operation states of the plurality of electric energy meters based on the plurality of groups of weekly operation abnormality analysis components and the plurality of groups of daily operation abnormality analysis components.
Citation Information
Patent Citations
User side load data abnormal value identification method based on spatial density clustering
CN110874381A
Power consumption behavior analysis method and system based on multi-feature fusion and improved spectral clustering
CN114065819A
Internet-of-things water meter consumption anomaly detection method and system
CN116992385A
Intelligent ammeter abnormal data identification method, apparatus and device, and storage medium
CN117435937A
Anti-electricity-stealing positioning method based on big data analysis
CN117909773A