A method and device for automatically generating inspection plans based on artificial intelligence for smart construction sites

Through the automatic generation method of inspection plans based on artificial intelligence, combined with construction site monitoring information and supervisor locations, the inspection path and scope are optimized, which solves the problem of low efficiency of traditional inspections and realizes an inspection plan that is more suitable for the actual construction site.

CN118657358BActive Publication Date: 2024-10-22HUNAN UNITED ZHIWEI INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411141065.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-10-22
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

Traditional construction site inspection methods are inefficient and highly subjective. It is difficult for existing automated inspection systems to deeply understand the complex construction site environment, and the generated inspection plans cannot effectively adapt to the actual conditions of different construction site projects.

Method used

Adopt an artificial intelligence-based automated inspection plan generation method to obtain monitoring information from the construction site monitoring platform, determine the target node, generate the initial inspection path and scope, and perform calculations to meet the preset conditions to generate a target inspection plan, combined with supervision Optimize employee location and historical related information.

Benefits of technology

The inspection efficiency is improved, the generated inspection plan is more suitable for the actual situation of the construction site, and the problem of low inspection efficiency is solved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118657358B_ABST
    Figure CN118657358B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention provides a method and device for automatically generating an inspection plan based on artificial intelligence for a smart construction site, and relates to the technical field of smart construction site technology. The method includes: obtaining monitoring information of a construction site monitoring platform; determining the target nodes that need to be inspected based on the monitoring information; generating an initial inspection path based on the supervisor's location information and the target node, and connecting the target nodes included in the initial inspection path to determine the initial inspection range; performing inspection path calculation on the initial inspection path, and performing inspection range calculation on the initial inspection range to obtain a target path whose inspection path calculation result meets the preset path conditions and / or whose inspection range calculation result meets the preset range conditions; generating a target inspection plan based on the target path and the supervisor's location information. Through the present invention, the problem of low inspection efficiency is solved, thereby achieving the effect of improving inspection efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the field of smart construction sites, and more specifically, to a method and device for automatically generating inspection plans based on artificial intelligence for smart construction sites. Background Art

[0002] With the rapid development of the construction industry, the safety management of construction sites has become increasingly important. Traditional site inspection methods mainly rely on manual inspections, which have problems such as low efficiency, strong subjectivity, and easy omissions. In order to improve the efficiency and quality of inspections, more and more intelligent technologies have been applied to site management in recent years.

[0003] As a product of the combination of the construction industry and modern information technology, the core of smart construction sites is to achieve intelligent management of construction sites through advanced information technology. In existing technologies, some automated inspection systems have emerged, but most of these systems only stay at the level of data collection and simple analysis, lacking in-depth understanding of complex construction site environments and intelligent decision-making support, and the inspection plans they generate cannot effectively adapt to the actual conditions of different construction site projects.

[0004] There is currently no better solution to the above problems. Summary of the invention

[0005] The embodiments of the present invention provide a method and device for automatically generating an inspection plan for a smart construction site based on artificial intelligence, so as to at least solve the problem of low inspection efficiency of smart construction sites in the related art.

[0006] According to one embodiment of the present invention, a method for automatically generating an inspection plan based on artificial intelligence for a smart construction site is provided, comprising:

[0007] Acquire monitoring information of a construction site monitoring platform, wherein the monitoring information includes at least node information of all construction site projects, historical monitoring risk scores of the construction site projects, risk information of the construction site projects, equipment impact range information of the construction site projects, and location information of supervisors supervising the construction site projects;

[0008] Determine the target nodes that need to be inspected according to the node information of the construction site project, the historical monitoring risk score of the construction site project, the risk information of the construction site project, the equipment impact range information of the construction site project, and the location information of the supervisor who supervises the construction site project;

[0009] Generate an initial inspection path according to the supervisor's location information and the target node, and connect the target nodes included in the initial inspection path to determine the initial inspection range;

[0010] Performing inspection path calculation on the initial inspection path, and performing inspection range calculation on the initial inspection range, so as to obtain a target path whose inspection path calculation result meets a preset path condition and / or whose inspection range calculation result meets a preset range condition;

[0011] A target inspection plan is generated according to the target path and the supervisor's location information.

[0012] In an exemplary embodiment, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes:

[0013] Acquire first target node information of a first target node whose distance from the initial inspection range is less than a first threshold, connect the initial target node within the initial inspection range with the first target node to obtain a first inspection range, and generate a first inspection path according to the initial target node and the first target node, the target node includes the initial target node, and the first target node is a construction site project node outside the initial inspection range;

[0014] Perform a first range calculation on the first inspection range, and perform a first path calculation on the first inspection path. If the first range calculation result does not meet the preset range condition or the first path calculation result does not meet the preset path condition, exclude the first target node; otherwise, use the first inspection path as the target path.

[0015] In an exemplary embodiment, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes:

[0016] Acquire historical association information between the supervisor and a second target node, wherein the second target node is any node among the target nodes;

[0017] If the historical association information does not meet the preset association requirements, the second target node is removed, and a second inspection path and a second inspection range are regenerated based on the remaining nodes in the target node;

[0018] A patrol path calculation is performed on the second patrol path, and a second patrol range calculation is performed on the second patrol range to obtain the target path.

[0019] In an exemplary embodiment, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes:

[0020] Compare the initial inspection range with the device impact range information to determine an overlapping range between the initial inspection range and the device impact range information;

[0021] When the overlapping range is greater than a preset value, the initial inspection range is calculated, otherwise an inspection range adjustment alarm is issued.

[0022] In an exemplary embodiment, after generating a target inspection plan according to the target path and the supervisor location information, the method further includes:

[0023] Obtaining inspection information uploaded by the supervisor, wherein the inspection information includes text information, image information, and time series information;

[0024] Perform semantic recognition on the text information through a preset semantic recognition model, perform image recognition on the image information through a preset image recognition model, and calculate the inspection result score based on the semantic recognition result, the image recognition result, and the time series information;

[0025] The inspection results of the supervisors are ranked according to the inspection result scoring calculation results.

[0026] According to another embodiment of the present invention, there is provided a smart management device based on the Internet of Things application technology, comprising:

[0027] A monitoring information acquisition module is used to obtain monitoring information of a construction site monitoring platform, wherein the monitoring information at least includes node information of all construction site projects, historical monitoring risk scores of the construction site projects, risk information of the construction site projects, equipment impact range information of the construction site projects, and location information of supervisors who supervise the construction site projects;

[0028] A node determination module is used to determine the target nodes that need to be inspected according to the node information of the construction site project, the historical monitoring risk score of the construction site project, the risk information of the construction site project, the equipment impact range information of the construction site project, and the location information of the supervisor who supervises the construction site project;

[0029] A path range determination module, used to generate an initial inspection path according to the supervisor location information and the target node, and connect the target nodes included in the initial inspection path to determine the initial inspection range;

[0030] A calculation module, used to perform inspection path calculation on the initial inspection path, and perform inspection range calculation on the initial inspection range, so as to obtain a target path whose inspection path calculation result meets the preset path condition and / or whose inspection range calculation result meets the preset range condition;

[0031] The plan generation module is used to generate a target inspection plan based on the target path and the supervisor's location information.

[0032] In an exemplary embodiment, the apparatus further comprises:

[0033] A first path range determination module is used for, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, obtaining first target node information of a first target node whose distance from the initial inspection range is less than a first threshold, and connecting the initial target node in the initial inspection range with the first target node to obtain a first inspection range, and generating a first inspection path according to the initial target node and the first target node, the target node including the initial target node, and the first target node being a construction site project node outside the initial inspection range;

[0034] The first calculation module is used to perform a first range calculation on the first inspection range and a first path calculation on the first inspection path. If the first range calculation result does not meet the preset range condition or the first path calculation result does not meet the preset path condition, the first target node is excluded; otherwise, the first inspection path is used as the target path.

[0035] In an exemplary embodiment, the apparatus further comprises:

[0036] A historical association module, used for obtaining historical association information between the supervisor and a second target node after connecting the target nodes included in the initial inspection path to determine the initial inspection range, wherein the second target node is any one of the target nodes;

[0037] A second path range determination module, configured to remove the second target node if the historical association information does not meet the preset association requirements, and regenerate a second inspection path and a second inspection range based on the remaining nodes in the target node;

[0038] The second calculation module is used to perform inspection path calculation on the second inspection path and perform second inspection range calculation on the second inspection range to obtain the target path.

[0039] In an exemplary embodiment, the apparatus further comprises:

[0040] An overlap calculation module, configured to compare the initial inspection range with the device impact range information to determine an overlap range between the initial inspection range and the device impact range information after connecting the target nodes included in the initial inspection path to determine the initial inspection range;

[0041] The judgment module is used to calculate the inspection range of the initial inspection range when the overlapping range is greater than a preset value, and to issue an inspection range adjustment alarm otherwise.

[0042] According to yet another embodiment of the present invention, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to execute the steps of any one of the above method embodiments when run.

[0043] According to yet another embodiment of the present invention, there is provided an electronic device, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0044] Through the present invention, since supervisors, historical risk scores, construction site risks, etc. are analyzed in detail, an inspection plan that is more suitable for the construction site is generated. Therefore, the problem of low inspection efficiency can be solved, and the effect of improving inspection efficiency can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 It is a flow chart of a method for automatically generating an inspection plan based on artificial intelligence for a smart construction site according to an embodiment of the present invention;

[0046] Figure 2 is a schematic diagram of the principle according to a specific embodiment of the present invention;

[0047] Figure 3 It is a structural block diagram of an automatic generation device for inspection plans based on artificial intelligence for smart construction sites according to an embodiment of the present invention. DETAILED DESCRIPTION

[0048] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0049] In the following, the terms "first", "second", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0050] In addition, in the present application, directional terms such as "up", "down", "left" and "right" may be defined including but not limited to the orientation relative to the schematic placement of the components in the drawings. It should be understood that these directional terms may be relative concepts, which are used for relative description and clarification, and may change accordingly according to the change in the orientation of the components in the drawings.

[0051] In this application, unless otherwise specified or limited, the term "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. In addition, the term "coupling" can be a way of achieving electrical connection for signal transmission.

[0052] As used herein, "about," "substantially," or "approximately" includes the stated value and an average value that is within an acceptable range of variation from the particular value as determined by one of ordinary skill in the art taking into account the measurements in question and the errors associated with the measurement of the particular quantity (i.e., the limitations of the measurement system).

[0053] In this embodiment, a method for automatically generating an inspection plan based on artificial intelligence for a smart construction site is provided. Figure 1 is a flow chart of a method for automatically generating an inspection plan based on artificial intelligence for a smart construction site according to an embodiment of the present invention, such as Figure 1 As shown, the process includes the following steps:

[0054] Step S101, obtaining monitoring information of a construction site monitoring platform, wherein the monitoring information at least includes node information of all construction site projects, historical monitoring risk scores of the construction site projects, risk information of the construction site projects, equipment impact range information of the construction site projects, and location information of supervisors supervising the construction site projects;

[0055] In this embodiment, collecting relevant supervision information through a preset construction site monitoring platform can greatly improve the efficiency of collecting relevant information. There is no need to build additional information collection lines, which reduces the cost of information collection. It also facilitates the visualization of supervision information of construction site projects, so that supervision methods or inspection routes can be manually adjusted.

[0056] Among them, the construction site monitoring platform collects relevant information of the construction site projects through the Internet of Things devices installed in each construction site project. The Internet of Things devices include sensors for environmental collection, information input and transmission devices for collecting project information, and central servers for risk analysis based on the information of sensors and transmission devices; the node information of the construction site project includes (but is not limited to) the project name, location coordinates, mechanical equipment used, corresponding supervision group and supervisor name of the construction site project; the historical monitoring risk score includes the score of the project risk of the relevant project site in the past time period, the number of historical hidden dangers, the duration of historical hidden dangers and other information. Among them, the project risk score can be obtained by manually scoring according to relevant rules and then entering into the system, or it can be obtained by scoring through a preset risk assessment algorithm. For example, the number of occurrences of each risk type is first counted according to historical data, and then the probability of occurrence of the relevant risk type is calculated based on the number of occurrences. , and the impact After normalization (such as economic impact, environmental impact, public opinion impact, etc.), the risk score of each risk type is obtained by multiplying the probability of occurrence. ,Right now ; Then, according to the preset weight of each risk type Calculate the risk score for the entire project ,Right now ; Risk information includes the risk information currently detected on the relevant construction site projects (such as excessive temperature, excessive noise, abnormal line distribution of wires, etc.); the impact range of construction site equipment includes the equipment loan itinerary of different project sites, the impact of equipment loan on related project engineering (such as the impact on construction period, funds, environment, personnel adjustment, etc.), the duration of equipment impact and other information; Supervisor location information includes the supervisor's name, location coordinates at the current time point, historical movement trajectory, supervisor's maximum movement range and other information; In addition to the above information, monitoring information also includes historical supervision cases, monitoring personnel and the familiarity score of the area where the relevant project site is located, and other information.

[0057] Step S102, determining the target nodes that need to be inspected according to the node information of the construction site project, the historical monitoring risk score of the construction site project, the risk information of the construction site project, the equipment impact range information of the construction site project, and the location information of the supervisor who supervises the construction site project;

[0058] In this embodiment, in order to use inspection resources with maximum efficiency, key inspections are usually performed on some nodes with higher risks or relatively important projects, and relatively normal inspections are performed on other nodes. For example, key projects are inspected multiple times, and the inspection content is relatively detailed, while the inspection frequency of other nodes is carried out according to normal regulations, and the inspection content is also inspected according to pre-specified content.

[0059] Among them, the target node is one or more nodes of the node information of all construction site projects; when determining the target node, it can be determined through a neural network combined with GIS geographic information analysis. For example, first divide the area through GIS and determine the geographical conditions of the relevant nodes, and then use the neural network based on GIS and the aforementioned node information to determine the target nodes and other target nodes that need to be inspected and can be inspected, thereby avoiding omissions and waste of inspection resources caused by manual determination of nodes.

[0060] For example, the inspection score of each node can be calculated by a neural network based on the following formula, and nodes whose inspection scores are greater than a certain threshold and whose geographical conditions and administrative divisions meet the requirements, as well as pre-determined nodes that need to be inspected, are used as target nodes:

[0061] Bi=p i ×N i +q i ×H ki +r i ×R i +e i ×E i ;

[0062] Where N i is the node priority set in advance for the relevant nodes, H ki Score historical risk control, q i is the corresponding weight; R i For the current risk score, E i Score the device impact, p i ,q i 、r i 、e i is the corresponding weight.

[0063] It should be noted that the above formula is only an illustrative example of a principle and does not limit the actual implementation scheme.

[0064] Step S103, generating an initial inspection path according to the supervisor's location information and the target node, and connecting the target nodes included in the initial inspection path to determine the initial inspection range;

[0065] In this embodiment, the inspection path is generated to determine the path with the lowest energy consumption and the highest inspection efficiency, and the inspection range is generated by considering the inspection range of the supervisor and the range of nodes that can be adjusted subsequently.

[0066] For example, Figure 2 As shown, for the six construction site projects of AF, the target node is AD. At this time, an inspection path is generated according to the inspection order and number of AD, and the path of AD is connected to determine the inspection range surrounded by AD. The dotted line is the range that each target node needs to inspect, and nodes E and F are target nodes that may be adjusted later or in other circumstances.

[0067] Step S104, performing inspection path calculation on the initial inspection path, and performing inspection range calculation on the initial inspection range, to obtain a target path whose inspection path calculation result meets a preset path condition and / or whose inspection range calculation result meets a preset range condition.

[0068] In this embodiment, the inspection path calculation is mainly to calculate the inspection length of each generated path, the possible inspection time of each node in each path, and the total inspection time of each path, and then sort these data to comprehensively select the path that best meets the requirements (for example, the shortest path and the total time is less than a certain preset threshold, or the shortest total time and the total path length is less than a certain threshold, or the number of target nodes to be passed is the least / most, etc.); at the same time, the total range of target nodes under different paths that need to be inspected and the overlap between the range enclosed by the target nodes or the size of the total range are calculated, for example, Figure 2 As shown, for nodes A / B / C / D, node A needs to be inspected at least twice, so multiple paths such as ABDCA, ABCDA, ACBDA, ABACD,... can be obtained, and then the total inspection path length of each path and the range of the inspection path are calculated. Taking path ABDCA as an example, the calculation formula for the total inspection path length is: S=SAB+SBD+SDC+SCA, assuming that the total path lengths of path ABDCA and path ABACD are the shortest, both are S1; at the same time, the total inspection range required for path ABACD is not the same as the total inspection range required for path ABCDA, and the corresponding overlap with the enclosed range is also different. It is assumed that the total inspection range required for path ABACD is smaller than the total inspection range required for path ABACD. According to relevant requirements (assuming that the larger the total inspection range, the better), path ABACD is selected as the target path at this time, and so on.

[0069] Among them, when performing path and range calculations, a pre-trained neural network model can be used for calculation to improve calculation accuracy and efficiency. For example, a GNN or CNN neural network model or a tramsformer deep network model can be used to calculate the path between nodes. Other algorithm models can also be used for calculations.

[0070] It should be noted that in the process of path determination, it is necessary to comprehensively consider the inspection path calculation results and the inspection range calculation results. This is to ensure that the inspection efficiency is the highest, reduce the impact on the project during the inspection process, and avoid expanding the inspection impact range. Compared with the existing technology, it can better ensure the smooth progress of the project and avoid the impact of the inspection process on the project progress, thereby effectively ensuring the normal operation of the project.

[0071] Step S105, generating a target inspection plan according to the target path and the supervisor's location information.

[0072] In this embodiment, after the path is determined, the inspection plan for each time period is automatically generated according to the path and the supervisor's schedule, and reported in real time through the mobile segment. The inspection results are then analyzed on the preset supervision platform to provide data support for relevant decisions of the construction site project.

[0073] Among them, the mobile terminal can also include inspection, rectification opinions, re-inspection status and other content, and perform corresponding information processing through relevant operations.

[0074] Through the above steps, by conducting a detailed analysis of supervisors, historical risk scores, and construction site risks, an inspection plan that is more suitable for the construction site is generated, which solves the problem of low inspection efficiency and improves inspection efficiency.

[0075] The execution subject of the above steps may be a base station, a terminal, etc., but is not limited thereto.

[0076] In an optional embodiment, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes:

[0077] Step S1031, obtaining first target node information of a first target node whose distance from the initial inspection range is less than a first threshold, and connecting the initial target node within the initial inspection range with the first target node to obtain a first inspection range, and generating a first inspection path according to the initial target node and the first target node, wherein the target node includes the initial target node, and the first target node is a construction site project node outside the initial inspection range;

[0078] Step S1032, perform a first range calculation on the first inspection range, and perform a first path calculation on the first inspection path. If the first range calculation result does not meet the preset range condition or the first path calculation result does not meet the preset path condition, exclude the first target node; otherwise, use the first inspection path as the target path.

[0079] In this embodiment, in order to inspect as many construction site projects as possible, path calculation and range calculation can also be performed on the nodes near the inspection area surrounded by the target node. As long as the inspection path and inspection range of the new node still meet the requirements after adding it, the inspection efficiency of all construction site projects in the entire area can be improved.

[0080] For example, Figure 2 As shown, for node E (i.e., the aforementioned first target node), the distance between it and the connection line between node A and node D is less than the preset value, so at this time, node E is also considered to be included in the inspection, and then node AD is connected to node E to obtain the inspection area AE (i.e., the aforementioned first inspection range), and then a path including node E is generated (i.e., the aforementioned first inspection path), and path calculation and range calculation are performed on each path.

[0081] In an optional embodiment, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes:

[0082] Step S1033, obtaining historical association information between the supervisor and a second target node, wherein the second target node is any node among the target nodes;

[0083] Step S1034, when the historical association information does not meet the preset association requirement, the second target node is removed, and a second inspection path and a second inspection range are regenerated based on the remaining nodes in the target node;

[0084] Step S1035, performing inspection path calculation on the second inspection path, and performing second inspection range calculation on the second inspection range, to obtain the target path.

[0085] In this embodiment, for some special construction site projects, the higher the degree of match between the supervisor's familiarity with the people and environment around the shared area and other relevant information, the better help it can provide for the advancement of the construction site project. If the match is low, it may easily lead to the inability to carry out related work. Therefore, it is necessary to analyze the relationship between the supervisor and the construction site project based on historical information to ensure that the project can proceed normally.

[0086] The historical association information includes (but is not limited to) the supervisor's familiarity with the environment of the second target node, the degree of relationship with the area where the second target node is located, whether a conflict occurs, the conflict level, and other information.

[0087] In an optional embodiment, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes:

[0088] Step S1036, comparing the initial inspection range with the device impact range information to determine an overlapping range between the initial inspection range and the device impact range information;

[0089] Step S1037, when the overlapping range is greater than a preset value, the initial inspection range is calculated, otherwise an inspection range adjustment alarm is issued.

[0090] In this embodiment, some special large-scale equipment (such as shield machines, large tower cranes, etc.) will have some impact on the progress of other projects and environmental impact during transportation and dispatching, so it is necessary to plan its dispatching itinerary and use in advance to reduce such impact on the progress and the environment, and avoid affecting the project progress or having a large impact on the surrounding environment due to the shipment of large-scale equipment at the critical moment of the project; wherein, the determination of the impact range of the equipment can be achieved in the following ways:

[0091] Utilize the historical monitoring risk scores collected by the construction site monitoring platform, which may include equipment failure rates, past problem records, and related risk assessment data, and evaluate the scope of impact of the equipment on the construction site project, including potential impacts on construction period, funds, environment, personnel, etc. For example, determine the physical location of the equipment on the construction site, analyze its operating radius and the area that may be affected, assuming it is H; evaluate the impact of equipment operation on the project schedule, including the potential delay of the construction period due to equipment failure or maintenance, assuming it is L; consider the impact of equipment operation on construction site personnel, including safety risks K, operation training needs C, and personnel scheduling R; evaluate the impact of equipment operation on the construction site environment, such as noise pollution Z, air pollution Y, and potential impact on the surrounding ecosystem U; combine all the above factors to form a comprehensive equipment impact range assessment, namely:

[0092] ;

[0093] in, For the device impact range assessment algorithm, The area affected by the equipment.

[0094] For example, suppose the operating radius of the equipment is H, which is measured in meters; the project schedule impact L is the number of days of construction delay caused by equipment failure or maintenance; the personnel impact (K, C, R) is the number of safety accidents K, the number of days of training cycle C, and the number of personnel dispatches R; noise pollution, air pollution and the impact on the ecosystem can be quantified as the noise decibel number Z, the air pollution index Y and the degree of ecosystem damage U; the equipment impact area calculation formula is:

[0095] ;

[0096] It should be noted that the above equipment influence range formula is only for illustrative purposes. In actual use, the formula does not limit the present application.

[0097] Specifically, Figure 2 As shown in the figure, when the dotted circle represents the device influence range of the target node, the area of ​​the area enclosed by the target node AD The sector area with the dotted circle inside this area The sum of the areas of is compared, that is: ,in, is the sum of the areas of the four sectors, P is the overlapping area ratio, when If P is greater than a predetermined threshold or P is greater than a preset value, it is considered that the affected area can be effectively inspected during the inspection process. If P is greater than a preset value, it is considered that the inspection personnel may not be able to inspect the relevant area easily, and the target node or path of the inspection needs to be adjusted, and so on.

[0098] After generating a target inspection plan according to the target path and the supervisor location information, the method further includes:

[0099] Step S106, obtaining the inspection information uploaded by the supervisor, wherein the inspection information includes text information, image information, and time series information;

[0100] Step S107, performing semantic recognition on the text information through a preset semantic recognition model, performing image recognition on the image information through a preset image recognition model, and calculating the inspection result score based on the semantic recognition result, the image recognition result, and the time series information;

[0101] Step S108, sorting the inspection results of the supervisors according to the inspection result scoring calculation result.

[0102] In this embodiment, in the actual supervision process, there are supervisors who only pay attention to the surface and rely too much on situation reports and written materials, such as construction logs, supervision logs, acceptance reports, etc. They do not supervise according to the design drawings, focus on construction rather than drawings, and lack understanding and supervision of the entire construction process. They do not have an in-depth understanding of the nature and root causes of the problems, and major safety hazards cannot be fundamentally resolved, resulting in frequent quality and safety accidents. Therefore, this embodiment conducts a comprehensive assessment of the supervisor's supervision situation through the text, images, time series and location information uploaded by the supervisor, and ranks the supervisors based on this to achieve management of the supervisors.

[0103] Among them, the semantic score calculation includes judging the authenticity and rationality of the recognized semantic content. Specifically, the authenticity and rationality of the semantic content are determined based on data such as the number of words, word position, and word distance. The image score calculation is based on whether the image type is reasonable (1 for reasonable and 0 for no), whether the image quality meets the requirements (1 for reasonable and 0 for no), and the image quality (usually a value between 0 and 1).

[0104] The inspection result score calculation can be achieved through the following formula:

[0105] P = M × N + F × G + T × t;

[0106] Among them, M is the image weight, N is the image score, F is the semantic weight, G is the semantic score, T is the time weight, and t is the time series score; similarly, this formula does not limit the actual use of this embodiment, but is only used as an exemplary explanation to explain the principle of this embodiment, that is, the actual scoring calculation method used may be different from this scheme, but as long as the principle is the same, it falls within the protection scope of this application.

[0107] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for enabling a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods described in each embodiment of the present invention.

[0108] In this embodiment, a smart management device based on the Internet of Things application technology is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0109] Figure 3 is a structural block diagram of a smart management device based on Internet of Things application technology according to an embodiment of the present invention. Figure 3 As shown, the device comprises:

[0110] The monitoring information acquisition module 51 is used to obtain monitoring information of the construction site monitoring platform, wherein the monitoring information at least includes node information of all construction site projects, historical monitoring risk scores of the construction site projects, risk information of the construction site projects, equipment impact range information of the construction site projects, and location information of supervisors who supervise the construction site projects;

[0111] A node determination module 52 is used to determine the target nodes that need to be inspected according to the node information of the construction site project, the historical monitoring risk score of the construction site project, the risk information of the construction site project, the equipment impact range information of the construction site project, and the location information of the supervisor who supervises the construction site project;

[0112] A path range determination module 53, for generating an initial inspection path according to the supervisor position information and the target node, and connecting the target nodes included in the initial inspection path to determine the initial inspection range;

[0113] A calculation module 54, configured to perform inspection path calculation on the initial inspection path, and perform inspection range calculation on the initial inspection range, so as to obtain a target path whose inspection path calculation result meets a preset path condition and / or whose inspection range calculation result meets a preset range condition;

[0114] The plan generation module 55 is used to generate a target inspection plan according to the target path and the supervisor's location information.

[0115] In an optional embodiment, the device further comprises:

[0116] A first path range determination module is used for, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, obtaining first target node information of a first target node whose distance from the initial inspection range is less than a first threshold, and connecting the initial target node in the initial inspection range with the first target node to obtain a first inspection range, and generating a first inspection path according to the initial target node and the first target node, the target node including the initial target node, and the first target node being a construction site project node outside the initial inspection range;

[0117] The first calculation module is used to perform a first range calculation on the first inspection range and a first path calculation on the first inspection path. If the first range calculation result does not meet the preset range condition or the first path calculation result does not meet the preset path condition, the first target node is excluded; otherwise, the first inspection path is used as the target path.

[0118] In an optional embodiment, the device further comprises:

[0119] A historical association module, used for obtaining historical association information between the supervisor and a second target node after connecting the target nodes included in the initial inspection path to determine the initial inspection range, wherein the second target node is any one of the target nodes;

[0120] A second path range determination module, configured to remove the second target node if the historical association information does not meet the preset association requirements, and regenerate a second inspection path and a second inspection range based on the remaining nodes in the target node;

[0121] The second calculation module is used to perform inspection path calculation on the second inspection path and perform second inspection range calculation on the second inspection range to obtain the target path.

[0122] In an optional embodiment, the device further comprises:

[0123] An overlap calculation module, configured to compare the initial inspection range with the device impact range information to determine an overlap range between the initial inspection range and the device impact range information after connecting the target nodes included in the initial inspection path to determine the initial inspection range;

[0124] The judgment module is used to calculate the inspection range of the initial inspection range when the overlapping range is greater than a preset value, and to issue an inspection range adjustment alarm otherwise.

[0125] It should be noted that the above modules can be implemented by software or hardware. For the latter, it can be implemented in the following ways, but not limited to: the above modules are all located in the same processor; or the above modules are located in different processors in any combination.

[0126] An embodiment of the present invention further provides a computer-readable storage medium, in which a computer program is stored, wherein the computer program is configured to execute the steps of any of the above method embodiments when running.

[0127] In an exemplary embodiment, the computer-readable storage medium may include, but is not limited to, various media that can store computer programs, such as a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk or an optical disk.

[0128] An embodiment of the present invention further provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0129] In an exemplary embodiment, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.

[0130] Through the description of the above implementation methods, technical personnel in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device can be divided into different functional modules to complete all or part of the functions described above.

[0131] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0132] The units described as separate components may or may not be physically separated, and the components shown as units may be one physical unit or multiple physical units, that is, they may be located in one place or distributed in multiple different places. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0133] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0134] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a readable storage medium. Based on this understanding, the technical solution of the embodiment of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor (processor) to execute all or part of the steps of the various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code.

[0135] The above contents are only specific implementation methods of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application shall be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.

Claims

1. A method for automatically generating inspection plans based on artificial intelligence for smart construction sites, characterized in that: include: Acquire monitoring information of a construction site monitoring platform, wherein the monitoring information includes at least node information of all construction site projects, historical monitoring risk scores of the construction site projects, risk information of the construction site projects, equipment impact range information of the construction site projects, and location information of supervisors supervising the construction site projects; Determine the target nodes that need to be inspected according to the node information of the construction site project, the historical monitoring risk score of the construction site project, the risk information of the construction site project, the equipment impact range information of the construction site project, and the location information of the supervisor who supervises the construction site project; Generate an initial inspection path according to the supervisor's location information and the target node, and connect the target nodes included in the initial inspection path to determine the initial inspection range; Performing inspection path calculation on the initial inspection path, performing inspection range calculation on the initial inspection range, and sorting the inspection path calculation results and the inspection range calculation results, and selecting a target path whose inspection path calculation result meets the preset path condition and / or whose inspection range calculation result meets the preset range condition according to the sorting result, wherein the inspection path calculation includes calculating at least any one of the inspection length of the initial inspection path, the inspection time of each node in the path, and the total inspection time; the inspection range calculation includes calculating the overlap between the initial inspection range and the total range that the target node needs to inspect, or calculating the size of the total range that the target node needs to inspect; A target inspection plan is generated according to the target path and the supervisor's location information.

2. The method according to claim 1, characterized in that After connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes: Acquire first target node information of a first target node whose distance from the initial inspection range is less than a first threshold, connect the initial target node within the initial inspection range with the first target node to obtain a first inspection range, and generate a first inspection path according to the initial target node and the first target node, the target node includes the initial target node, and the first target node is a construction site project node outside the initial inspection range; Perform a first range calculation on the first inspection range, and perform a first path calculation on the first inspection path. If the first range calculation result does not meet the preset range condition or the first path calculation result does not meet the preset path condition, exclude the first target node; otherwise, use the first inspection path as the target path.

3. The method according to claim 1, characterized in that After connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes: Acquire historical association information between the supervisor and a second target node, wherein the second target node is any node among the target nodes; If the historical association information does not meet the preset association requirements, the second target node is removed, and a second inspection path and a second inspection range are regenerated based on the remaining nodes in the target node; A patrol path calculation is performed on the second patrol path, and a second patrol range calculation is performed on the second patrol range to obtain the target path.

4. The method according to claim 1, characterized in that: After connecting the target nodes included in the initial inspection path to determine the initial inspection range, the method further includes: Compare the initial inspection range with the device impact range information to determine an overlapping range between the initial inspection range and the device impact range information; When the overlapping range is greater than a preset value, the initial inspection range is calculated, otherwise an inspection range adjustment alarm is issued.

5. The method according to claim 1, characterized in that After generating a target inspection plan according to the target path and the supervisor location information, the method further includes: Obtaining inspection information uploaded by the supervisor, wherein the inspection information includes text information, image information, and time series information; Perform semantic recognition on the text information through a preset semantic recognition model, perform image recognition on the image information through a preset image recognition model, and calculate the inspection result score based on the semantic recognition result, the image recognition result, and the time series information; The inspection results of the supervisors are ranked according to the inspection result scoring calculation results.

6. A smart management device based on Internet of Things application technology, characterized in that: include: A monitoring information acquisition module is used to obtain monitoring information of a construction site monitoring platform, wherein the monitoring information at least includes node information of all construction site projects, historical monitoring risk scores of the construction site projects, risk information of the construction site projects, equipment impact range information of the construction site projects, and location information of supervisors who supervise the construction site projects; A node determination module is used to determine the target nodes that need to be inspected according to the node information of the construction site project, the historical monitoring risk score of the construction site project, the risk information of the construction site project, the equipment impact range information of the construction site project, and the location information of the supervisor who supervises the construction site project; A path range determination module, used to generate an initial inspection path according to the supervisor location information and the target node, and connect the target nodes included in the initial inspection path to determine the initial inspection range; A calculation module, used to perform inspection path calculation on the initial inspection path, and perform inspection range calculation on the initial inspection range, so as to obtain a target path whose inspection path calculation result meets the preset path condition and / or whose inspection range calculation result meets the preset range condition; The plan generation module is used to generate a target inspection plan based on the target path and the supervisor's location information.

7. The device according to claim 6, characterized in that The device also includes: A first path range determination module is used for, after connecting the target nodes included in the initial inspection path to determine the initial inspection range, obtaining first target node information of a first target node whose distance from the initial inspection range is less than a first threshold, and connecting the initial target node in the initial inspection range with the first target node to obtain a first inspection range, and generating a first inspection path according to the initial target node and the first target node, the target node including the initial target node, and the first target node being a construction site project node outside the initial inspection range; The first calculation module is used to perform a first range calculation on the first inspection range and a first path calculation on the first inspection path. If the first range calculation result does not meet the preset range condition or the first path calculation result does not meet the preset path condition, the first target node is excluded; otherwise, the first inspection path is used as the target path.

8. The device according to claim 6, characterized in that The device also includes: A historical association module, used for obtaining historical association information between the supervisor and a second target node after connecting the target nodes included in the initial inspection path to determine the initial inspection range, wherein the second target node is any one of the target nodes; A second path range determination module, configured to remove the second target node if the historical association information does not meet the preset association requirements, and regenerate a second inspection path and a second inspection range based on the remaining nodes in the target node; The second calculation module is used to perform inspection path calculation on the second inspection path and perform second inspection range calculation on the second inspection range to obtain the target path.

9. The device according to claim 6, characterized in that The device also includes: An overlap calculation module, configured to compare the initial inspection range with the device impact range information to determine an overlap range between the initial inspection range and the device impact range information after connecting the target nodes included in the initial inspection path to determine the initial inspection range; The judgment module is used to calculate the inspection range of the initial inspection range when the overlapping range is greater than a preset value, and to issue an inspection range adjustment alarm otherwise.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program is configured to execute the method according to any one of claims 1 to 5 when executed.