A coordinated control method for photovoltaic storage system in atypical photovoltaic application scenarios

By automatically controlling the charge and discharge status of the photovoltaic microgrid system and adjusting the power strategy in real time, the problems of power fluctuation and resource waste in the photovoltaic microgrid system are solved, and stable output and efficient utilization of the photovoltaic system are achieved.

CN118659446BActive Publication Date: 2024-10-25SHENZHEN CUBENERGY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411132938.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-25
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The photovoltaic microgrid system causes grid fluctuations when connected to the grid, which cannot ensure the stability of power control. Moreover, the fluctuation of PV power during charging damages the battery life, and the fixed AC power limit during discharge cannot maximize the photovoltaic output, resulting in a waste of resources.

Method used

A photovoltaic storage system coordination control method for atypical photovoltaic application scenarios is proposed. By automatically controlling the charge and discharge power in the system, the system status is judged in real time, and different coordination control strategies are executed to maintain power balance and ensure that photovoltaic output is at maximum efficiency. Adapt to photovoltaic power changes under different light intensities.

Benefits of technology

It achieves the power balance and stable output of the photovoltaic system, avoids manual control by operation and maintenance personnel, makes full use of photovoltaic power, reduces resource waste, and improves the safety, reliability and efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118659446B_ABST
    Figure CN118659446B_ABST
Patent Text Reader

Abstract

The present invention discloses a coordinated control method for a photovoltaic storage system in an atypical photovoltaic application scenario, comprising: S1: receiving a power-on command, assigning a system master control active power setting value set by a user P set ; S2: Execute system startup and determine whether there is a system ready signal; S3: When it is determined that there is a system ready signal, determine whether the system is in a charging state or a discharging state; S4: When it is determined that the system is in a charging state, execute the first coordinated control strategy; S5: When it is determined that the system is in a discharging state, execute the second coordinated control strategy. Automatically complete power balance, photovoltaic output at maximum efficiency, and at the same time appear to be static. During the operation of this method, photovoltaic power calculation is performed at any time to maintain power balance in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy storage technology, and in particular to a coordinated control method for a photovoltaic storage system in an atypical photovoltaic application scenario. Background Art

[0002] There are many types of microgrid systems currently, and the photovoltaic microgrid energy storage system, as a combination of multiple new energy sources, has a series of advantages such as higher photovoltaic power prediction accuracy, zero carbon emissions, clean and pollution-free, etc. However, connection to the power grid will cause random fluctuations in the power grid, and cannot fully guarantee the absolute stability of the microgrid power control process. In order to ensure the safety and reliability of the system, users cannot increase the number of operation and maintenance personnel to control the power output of the system, resulting in unstable operation of the microgrid. On the other hand, when charging, the photovoltaic power fluctuates frequently with the light intensity, and there is a risk of shortening the battery life; when discharging, due to the fixed limit of the AC active power, the photovoltaic power cannot achieve the maximum power output, and there is a risk of wasting resources. Therefore, the present invention proposes a coordinated control method for a photovoltaic storage system in an atypical photovoltaic application scenario. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems in the above-mentioned technology to a certain extent. To this end, the purpose of the present invention is to propose a coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario, which automatically completes power balance, outputs photovoltaic power at maximum efficiency, and appears to be static to the outside. During the operation of this method, photovoltaic power calculation is performed at any time to maintain power balance in real time.

[0004] To achieve the above objectives, an embodiment of the present invention proposes a photovoltaic storage system coordinated control method for a non-typical photovoltaic application scenario, including:

[0005] S1: Receive the power-on command and assign the system master control active power setting set by the user P set ;

[0006] S2: Execute system startup and determine whether there is a system ready signal;

[0007] S3: when it is determined that there is a system ready signal, determining whether the system is in a charging state or a discharging state;

[0008] S4: When it is determined that the system is in a charging state, executing a first coordinated control strategy;

[0009] S5: When it is determined that the system is in a discharging state, executing a second coordinated control strategy.

[0010] According to some embodiments of the present invention, the method further includes: receiving a shutdown command, clearing the system master control active power setting set by the user, and waiting for the next startup command.

[0011] According to some embodiments of the present invention, step S2 includes:

[0012] Determine whether the system has one of the following: BMS alarm, BMS fault, PCS alarm, communication alarm, fire alarm, or battery cell full or empty. If not, it indicates that there is a system ready signal; otherwise, it indicates that there is no system ready signal.

[0013] According to some embodiments of the present invention, the system master control active power setting includes: PCS-ACDC active power setting P set-ACDC And PCS-DCDC active power setting P set-DCDC .

[0014] According to some embodiments of the present invention, step S4 includes:

[0015] S41: When it is determined that the system is in a charging state, the first control strategy of the first stage is executed to actively reduce the power output. P set Determine the difference between the real-time total power and the real-time total power: P set-ACDC Reduce P C1 The power, P set-DCDC The power remains unchanged, after t C1 After the delay, determine whether the photovoltaic is in output state. If | P dc-ACDC – 1.04* P dc-CMU | < P ΔC1 , that is, the DC power difference between the DC bus side and the battery side is less than P ΔC1 , it means that the photovoltaic power is outputting and is in the output state, and enters S42; otherwise, it is determined that the photovoltaic power is not in operation or the photovoltaic power output is too small to meet the grid power requirements, and the PCS-ACDC power delivery value P set-ACDC Restore to P set , after a delay of 5 minutes, re-enter S3;

[0016] S42: Execute the first control strategy of the second stage, actively reduce power output, P set The difference between the real-time total power and the real-time total power is judged: if the photovoltaic power output has been verified by S41, the second stage of secondary power prediction calculation will be entered; if it is determined that the system is in the charging state, Pset-ACDC Reduce again P C1 The power, P set-DCDC The power remains unchanged, after t C2 After the delay, it is used to determine whether the output state of the photovoltaic is full and output at the maximum output power; if | P set - P ac-ACDC | < P ΔC2 , it means that the system power has reached a balanced state. It can still be inferred that the photovoltaic power has not yet output at the maximum output power, and there is redundant output power. Three power prediction calculations are performed again; otherwise | P set - P ac-ACDC | ≥ P ΔC2 , it means that when charging the system, the battery DC side does not reach P set At this time, the photovoltaic power has been output at the maximum output power, resulting in low power on the DC side of the battery, and the system power has not reached a balanced state, entering S43;

[0017] S43: Execute the first control strategy of the third stage to increase power. P set Difference judgment with real-time total power: S42 has verified that the photovoltaic power has reached the maximum output power output, but the system power may not reach the system total control active power setting set by the user. P set , then enter the third stage of power prediction calculation; when it is determined that the system is in the charging state, P set-ACDC Increase P C2 The power, P set-DCDC The power remains unchanged, after t C2 After a delay of seconds, it is used to determine whether the total power of the system is balanced to prove that P set Output, if | P set – 1.04* P dc-CMU | < P ΔC2 , it means that the system power has reached a balanced state, and the photovoltaic output state is currently full, with the maximum output power output; at this time, the calculation is completed, and after a 5-minute delay, it enters S2; otherwise | Pset – 1.04* P dc-CMU | ≥ P ΔC2 , it means that the total system power is not balanced yet, and S43 is restarted; where, P dc-ACDC It is the DC power collected by PCS-ACDC, which is used to indicate the power on the DC bus side of the system; P ac-ACDC The total active power of the PCS-ACDC AC bus, which is used to indicate the total AC power of the grid-side system; P dc-CMU The DC power collected by the BMS is used to represent the DC power on the battery side. The variables under the charging state include: the charging power adjustment value of the first control strategy in the first stage P C1 , the charging power adjustment value of the first control strategy in the second stage P C2 , the first control strategy charging power judgment value of the first stage P ΔC1 , the first control strategy charging power judgment value of the second stage and the third stage P ΔC2 , the first control strategy charging power adjustment time of the first stage t C1 , the charging power adjustment time of the first control strategy in the second and third stages t C2 .

[0018] According to some embodiments of the present invention, step S5 includes:

[0019] S51: When it is determined that the system is in a discharging state, the second control strategy of the first stage is executed to actively reduce the power output. P set Determine the difference between the real-time total power and the real-time total power: P set-DCDC Reduce P D1 The power, P set-ACDC The power remains unchanged, after t D1 After the delay, it is used to determine whether the photovoltaic is in the output state; if | P set-DCDC - P dc-CMU | < P ΔDDC1 , that is, the DC power difference between the PCS-DCDC power sent value and the battery side is less than P ΔDDC1 ,| Pset – P ac-ACDC | < P ΔDAC1 , that is, the difference between the power sent and the real-time power on the grid side is less than P ΔDAC1 When both conditions are met at the same time, it means that the photovoltaic power is outputting and is in the output state, and enters S52; otherwise, it is determined that the photovoltaic power is not in operation or the photovoltaic power output is too small, and it can be ignored. The PCS-DCDC power transmission value P set-DCDC Restore to P set , after a delay of 5 minutes, re-enter S3;

[0020] S52: Execute the first control strategy of the second stage, actively reduce power output, P set Determine the difference between the real-time total power and the real-time total power: P set-DCDC Reduce again P D2 The power, P set-ACDC The power remains unchanged, after t D2 After the delay, it is used to determine whether the output state of the photovoltaic is full and output at the maximum output power; if | P set - 1.04* P dc-CMU | < P ΔD2 , it means that the system power has reached a balanced state. It can still be inferred that the photovoltaic power has not yet output at the maximum output power, and there is redundant output power. The third power prediction calculation of the first control strategy of the second stage is performed again; otherwise | P set - 1.04* P dc-CMU | ≥ P ΔD2 , it means that when the system is discharging, the AC side of the grid has not reached P set At this time, the photovoltaic power has been output at the maximum output power, and the system power has not reached a balanced state, resulting in low power on the AC side of the grid, and entering S53;

[0021] S53: Execute the second control strategy of the third stage to increase power. P set Determine the difference between the real-time total power and the real-time total power: When the system is determined to be in a discharging state, P set-DCDC Reduce PD2 The power, P set-ACDC The power remains unchanged, after t D2 After the delay, it is used to determine whether the total power of the system is balanced to prove that P set Output; if | P set – 1.04* P dc-CMU | < P ΔD2 , it means that the system power has reached a balanced state, and the photovoltaic output state is currently full, with the maximum output power output; at this time, the calculation is completed, and after a 5-minute delay, it enters S2; otherwise | P set – 1.04* P dc-CMU | ≥ P ΔD2 , it means that the total system power is not balanced yet, and S53 is restarted; among them, P dc-ACDC It is the DC power collected by PCS-ACDC, which is used to indicate the power on the DC bus side of the system; P ac-ACDC The total active power of the PCS-ACDC AC bus, which is used to indicate the total AC power of the grid-side system; P dc-CMU The DC power collected by BMS is used to represent the DC power on the battery side. The variables under the discharge state include: the first control strategy discharge power adjustment value of the first stage P D1 , the first control strategy discharge power adjustment value of the second stage P D2 , the first control strategy discharge AC power judgment value of the first stage P ΔDAC1 , the first control strategy discharge DC power judgment value of the first stage P ΔDDC1 , the first control strategy discharge power judgment value of the second stage and the third stage P ΔD2 , the first control strategy discharge power adjustment time of the first stage t D1 , the first control strategy discharge power adjustment time of the second stage and the third stage t D2 .

[0022] According to some embodiments of the present invention, before step S1, the method further includes:

[0023] Set the control word, including: automatic operation input, automatic operation start and automatic operation shutdown;

[0024] Check whether each system and each branch has any fault status.

[0025] According to some embodiments of the present invention, after determining that there is a system ready signal, the method further includes:

[0026] The site determines the test conditions with good light intensity;

[0027] Confirm the PV operating conditions and analyze them to determine whether the PV is ready.

[0028] According to some embodiments of the present invention, photovoltaic operating conditions include: a photovoltaic ready state and a photovoltaic fault state.

[0029] The present invention proposes a coordinated control method for a photovoltaic storage system in atypical photovoltaic application scenarios. The method divides the system into a grid side, a battery DC side, and a photovoltaic DC side. By automatically controlling the charging and discharging power in each group, the photovoltaic DC side can output the maximum output power, while maintaining the power stability of the energy storage system, and the system appears to be static to the outside. Using this method, the power generated by photovoltaics under different solar light intensities can be fully utilized, and the power can be coordinated with the grid side for charging, or with the battery DC side for discharging. Through the preset calculation method, the photovoltaic output power under different light intensities can be adapted to change at any time in real time, so that the total power of the system can be balanced at the fastest speed. Power balance is automatically completed, and photovoltaics are output at maximum efficiency. During the operation of this method, photovoltaic power calculations are performed at any time to maintain power balance in real time.

[0030] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.

[0031] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0033] Figure 1 It is a flow chart of a method for coordinated control of a photovoltaic storage system in a non-typical photovoltaic application scenario according to an embodiment of the present invention. DETAILED DESCRIPTION

[0034] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0035] like Figure 1 As shown, the embodiment of the present invention proposes a photovoltaic storage system coordinated control method for a non-typical photovoltaic application scenario, including steps S1-S5:

[0036] S1: Receive the power-on command and assign the system master control active power setting set by the user P set ;

[0037] S2: Execute system startup and determine whether there is a system ready signal;

[0038] S3: when it is determined that there is a system ready signal, determining whether the system is in a charging state or a discharging state;

[0039] S4: When it is determined that the system is in a charging state, executing a first coordinated control strategy;

[0040] S5: When it is determined that the system is in a discharging state, executing a second coordinated control strategy.

[0041] The method collects information such as the battery management system (hereinafter referred to as BMS), the energy storage bidirectional converter (the system is equipped with 2 types of converters, including AC-DC, hereinafter referred to as PCS-ACDC, and DC-DC, hereinafter referred to as PCS-DCDC), and provides active power within the system design power range for users to set. The method automatically controls the system coordination based on the calculated power parameters.

[0042] First, by collecting information from BMS, PCS, etc., the status of each branch system is analyzed to determine whether the system is ready. When it is determined that there is a system ready signal, it is determined whether the system is in a charging state or a discharging state; based on the different states of the system, different first coordinated control strategies are adopted.

[0043] In one embodiment, the photovoltaic state is also analyzed, and the site determines the test conditions of good light intensity, and the photovoltaic is ready; after the system is ready, the user clicks the power button, sets the required active power, and the system enters automatic operation charging and discharging, and the power will be automatically coordinated. The parameters involved in the settings are as follows:

[0044] 1) P set :System total control active power

[0045] Set to the system rated maximum input or output target power;

[0046] 2) System startup settings

[0047] When the system is turned on and ready, the energy storage bidirectional converter starts in advance to the standby state, which facilitates faster entry into the charging and discharging state;

[0048] 3) System shutdown settings

[0049] After the system is shut down, the system enters the standby state, the system power setting value will be cleared, and the energy storage bidirectional converter will be set to the shutdown state.

[0050] The conditions for system readiness are: when each group has the operating conditions, each group of systems is ready, and the collected signals include: subsystem ready, BMS alarm, BMS fault, PCS alarm, PCS fault, BMS communication alarm, PCS communication alarm, battery full, battery empty and other signals.

[0051] The conditions for PV readiness are: the external electrical components are operating well, the PV system grid-connected inverter should meet the grid-connected technical requirements, and all functions of the PV system should operate normally and meet the operating conditions.

[0052] In one embodiment, the system operation data is analyzed and the power data of BMS, PCS, etc. is collected in real time. P dc-ACDC : PCS-ACDC DC acquisition power, used to indicate the power on the DC bus side of the system; P ac-ACDC : PCS-ACDC AC bus total active power, used to indicate the total AC power of the grid side system; P dc-CMU : BMS DC collected power, used to indicate the DC power on the battery side.

[0053] In one embodiment, the system performs calculations based on current operating conditions and automatically adjusts active power.

[0054] According to some embodiments of the present invention, the method further includes: receiving a shutdown command, shutting down the system, clearing the system master control active power setting set by the user, and waiting for the next startup command.

[0055] According to some embodiments of the present invention, step S2 includes:

[0056] Determine whether the system has one of the following: BMS alarm, BMS fault, PCS alarm, communication alarm, fire alarm, or battery cell full or empty. If not, it indicates that there is a system ready signal; otherwise, it indicates that there is no system ready signal.

[0057] In one embodiment, if there is still no charging and discharging signal after a certain delay after the system is turned on, the system is turned off.

[0058] According to some embodiments of the present invention, the system master control active power setting includes: PCS-ACDC active power settingP set-ACDC And PCS-DCDC active power setting P set-DCDC .

[0059] According to some embodiments of the present invention, step S4 includes:

[0060] S41: When it is determined that the system is in a charging state, the first control strategy of the first stage is executed to actively reduce the power output. P set Determine the difference between the real-time total power and the real-time total power: P set-ACDC Reduce P C1 The power, P set-DCDC The power remains unchanged, after t C1 After the delay, determine whether the photovoltaic is in output state. If | P dc-ACDC – 1.04* P dc-CMU | < P ΔC1 , that is, the DC power difference between the DC bus side and the battery side is less than P ΔC1 , it means that the photovoltaic power is outputting and is in the output state, and enters S42; otherwise, it is determined that the photovoltaic power is not in operation or the photovoltaic power output is too small to meet the grid power requirements, and the PCS-ACDC power delivery value P set-ACDC Restore to P set , after a delay of 5 minutes, re-enter S3;

[0061] S42: Execute the first control strategy of the second stage, actively reduce power output, P set The difference between the real-time total power and the real-time total power is judged: if the photovoltaic power output has been verified by S41, the second stage of secondary power prediction calculation will be entered; if it is determined that the system is in the charging state, P set-ACDC Reduce again P C1 The power, P set-DCDC The power remains unchanged, after t C2 After the delay, it is used to determine whether the output state of the photovoltaic is full and output at the maximum output power; if | P set - P ac-ACDC | < PΔC2 , it means that the system power has reached a balanced state. It can still be inferred that the photovoltaic power has not yet output at the maximum output power, and there is redundant output power. Three power prediction calculations are performed again; otherwise | P set - P ac-ACDC | ≥ P ΔC2 , it means that when charging the system, the battery DC side does not reach P set At this time, the photovoltaic power has been output at the maximum output power, resulting in low power on the DC side of the battery, and the system power has not reached a balanced state, entering S43;

[0062] S43: Execute the first control strategy of the third stage to increase power. P set Difference judgment with real-time total power: S42 has verified that the photovoltaic power has reached the maximum output power output, but the system power may not reach the system total control active power setting set by the user. P set , then enter the third stage of power prediction calculation; when it is determined that the system is in the charging state, P set-ACDC Increase P C2 The power, P set-DCDC The power remains unchanged, after t C2 After a delay of seconds, it is used to determine whether the total power of the system is balanced to prove that P set Output, if | P set – 1.04* P dc-CMU | < P ΔC2 , it means that the system power has reached a balanced state, and the photovoltaic output state is currently full, with the maximum output power output; at this time, the calculation is completed, and after a 5-minute delay, it enters S2; otherwise | P set – 1.04* P dc-CMU | ≥ P ΔC2 , it means that the total system power is not balanced yet, and S43 is restarted; where, P dc-ACDC It is the DC power collected by PCS-ACDC, which is used to indicate the power on the DC bus side of the system; P ac-ACDCThe total active power of the PCS-ACDC AC bus, which is used to indicate the total AC power of the grid-side system; P dc-CMU The DC power collected by the BMS is used to represent the DC power on the battery side. The variables under the charging state include: the charging power adjustment value of the first control strategy in the first stage P C1 , the charging power adjustment value of the first control strategy in the second stage P C2 , the first control strategy charging power judgment value of the first stage P ΔC1 , the first control strategy charging power judgment value of the second stage and the third stage P ΔC2 , the first control strategy charging power adjustment time of the first stage t C1 , the charging power adjustment time of the first control strategy in the second and third stages t C2 .

[0063] According to some embodiments of the present invention, step S5 includes:

[0064] S51: When it is determined that the system is in a discharging state, the second control strategy of the first stage is executed to actively reduce the power output. P set Determine the difference between the real-time total power and the real-time total power: P set-DCDC Reduce P D1 The power, P set-ACDC The power remains unchanged, after t D1 After the delay, it is used to determine whether the photovoltaic is in the output state; if | P set-DCDC - P dc-CMU | < P ΔDDC1 , that is, the DC power difference between the PCS-DCDC power sent value and the battery side is less than P ΔDDC1 ,| P set – P ac-ACDC | < P ΔDAC1 , that is, the difference between the power sent and the real-time power on the grid side is less than P ΔDAC1When both conditions are met at the same time, it means that the photovoltaic power is outputting and is in the output state, and enters S52; otherwise, it is determined that the photovoltaic power is not in operation or the photovoltaic power output is too small, and it can be ignored. The PCS-DCDC power transmission value P set-DCDC Restore to P set , after a delay of 5 minutes, re-enter S3;

[0065] S52: Execute the first control strategy of the second stage, actively reduce power output, P set Determine the difference between the real-time total power and the real-time total power: P set-DCDC Reduce again P D2 The power, P set-ACDC The power remains unchanged, after t D2 After the delay, it is used to determine whether the output state of the photovoltaic is full and output at the maximum output power; if | P set - 1.04* P dc-CMU | < P ΔD2 , it means that the system power has reached a balanced state. It can still be inferred that the photovoltaic power has not yet output at the maximum output power, and there is redundant output power. The third power prediction calculation of the first control strategy of the second stage is performed again; otherwise | P set - 1.04* P dc-CMU | ≥ P ΔD2 , it means that when the system is discharging, the AC side of the grid has not reached P set At this time, the photovoltaic power has been output at the maximum output power, and the system power has not reached a balanced state, resulting in low power on the AC side of the grid, and entering S53;

[0066] S53: Execute the second control strategy of the third stage to increase power. P set Determine the difference between the real-time total power and the real-time total power: When the system is determined to be in a discharging state, P set-DCDC Reduce P D2 The power, P set-ACDC The power remains unchanged, after t D2 After the delay, it is used to determine whether the total power of the system is balanced to prove that Pset Output; if | P set – 1.04* P dc-CMU | < P ΔD2 , it means that the system power has reached a balanced state, and the photovoltaic output state is currently full, with the maximum output power output; at this time, the calculation is completed, and after a 5-minute delay, it enters S2; otherwise | P set – 1.04* P dc-CMU | ≥ P ΔD2 , it means that the total system power is not balanced yet, and S53 is restarted; among them, P dc-ACDC It is the DC power collected by PCS-ACDC, which is used to indicate the power on the DC bus side of the system; P ac-ACDC The total active power of the PCS-ACDC AC bus, which is used to indicate the total AC power of the grid-side system; P dc-CMU The DC power collected by BMS is used to represent the DC power on the battery side. The variables under the discharge state include: the first control strategy discharge power adjustment value of the first stage P D1 , the first control strategy discharge power adjustment value of the second stage P D2 , the first control strategy discharge AC power judgment value of the first stage P ΔDAC1 , the first control strategy discharge DC power judgment value of the first stage P ΔDDC1 , the first control strategy discharge power judgment value of the second stage and the third stage P ΔD2 , the first control strategy discharge power adjustment time of the first stage t D1 , the first control strategy discharge power adjustment time of the second stage and the third stage t D2 .

[0067] According to some embodiments of the present invention, before step S1, the method further includes:

[0068] Set the control word, including: automatic operation input, automatic operation start and automatic operation shutdown;

[0069] Check whether each system and each branch has any fault status.

[0070] According to some embodiments of the present invention, after determining that there is a system ready signal, the method further includes:

[0071] The site determines the test conditions with good light intensity;

[0072] Confirm the PV operating conditions and analyze them to determine whether the PV is ready.

[0073] According to some embodiments of the present invention, photovoltaic operating conditions include: a photovoltaic ready state and a photovoltaic fault state.

[0074] The present invention proposes a coordinated control method for a photovoltaic storage system in an atypical photovoltaic application scenario. The method divides the system into a grid side, a battery DC side, and a photovoltaic DC side. By automatically controlling the charging and discharging power in each group, the photovoltaic DC side can output the maximum output power, while maintaining the power stability of the energy storage system, and the system appears to be static to the outside. Using this method, the power generated by photovoltaics under different solar light intensities can be fully utilized, and the power can be coordinated with the grid side for charging, or with the battery DC side for discharging. Through the preset calculation method, the photovoltaic output power under different light intensities can be adapted to change at any time in real time, so that the total power of the system can be balanced at the fastest speed. Power balance is automatically completed, and photovoltaics are output at maximum efficiency. During the operation of this method, photovoltaic power calculations are performed at any time to maintain power balance in real time.

[0075] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario, characterized in that: include: S1: Receive the power-on command and assign the system master control active power setting set by the user P set ; S2: Execute system startup and determine whether there is a system ready signal; S3: when it is determined that there is a system ready signal, determining whether the system is in a charging state or a discharging state; S4: When it is determined that the system is in a charging state, executing a first coordinated control strategy; S5: When it is determined that the system is in a discharging state, executing a second coordinated control strategy; The system master control active power setting includes: PCS-ACDC active power setting P set-ACDC And PCS-DCDC active power setting P set-DCDC ; Step S4 comprises: S41: When it is determined that the system is in a charging state, the first control strategy of the first stage is executed to actively reduce the power output. P set Determine the difference between the real-time total power and the real-time total power: P set-ACDC Reduce P C1 The power, P set-DCDC The power remains unchanged, after t C1 After the delay, determine whether the photovoltaic is in output state. If | P dc-ACDC – 1.04* P dc-CMU | < P ΔC1 , that is, the DC power difference between the DC bus side and the battery side is less than P ΔC1 , it means that the photovoltaic power is outputting and is in the output state, and enters S42; otherwise, it is determined that the photovoltaic power is not in operation or the photovoltaic power output is too small to meet the grid power requirements, and the PCS-ACDC power delivery value P set-ACDC Restore to P set , after a delay of 5 minutes, re-enter S3; S42: Execute the first control strategy of the second stage, actively reduce power output, P set The difference between the real-time total power and the real-time total power is judged: if the photovoltaic power output has been verified by S41, the second stage of secondary power prediction calculation will be entered; if it is determined that the system is in the charging state, P set-ACDC Reduce again P C1 The power, P set-DCDC The power remains unchanged, after t C2 After the delay, it is used to determine whether the output state of the photovoltaic is full and output at the maximum output power; if | P set - P ac-ACDC | < P ΔC2 , it means that the system power has reached a balanced state. It can still be inferred that the photovoltaic power has not yet output at the maximum output power, and there is redundant output power. Three power prediction calculations are performed again; otherwise | P set - P ac-ACDC | ≥ P ΔC2 , it means that when charging the system, the battery DC side does not reach P set At this time, the photovoltaic power has been output at the maximum output power, resulting in low power on the DC side of the battery, and the system power has not reached a balanced state, entering S43; S43: Execute the first control strategy of the third stage to increase power. P set Difference judgment with real-time total power: S42 has verified that the photovoltaic power has reached the maximum output power output, but the system power may not reach the system total control active power setting set by the user. P set , then enter the third stage of power prediction calculation; when it is determined that the system is in the charging state, P set-ACDC Increase P C2 The power, P set-DCDC The power remains unchanged, after t C2 After a delay of seconds, it is used to determine whether the total power of the system is balanced to prove that P set Output, if | P set – 1.04* P dc-CMU | < P ΔC2 , it means that the system power has reached a balanced state, and the photovoltaic output state is currently full, with the maximum output power output; at this time, the calculation is completed, and after a 5-minute delay, it enters S2; otherwise | P set – 1.04* P dc-CMU | ≥ P ΔC2 , it means that the total system power is not balanced yet, and S43 is restarted; where, P dc-ACDC It is the DC power collected by PCS-ACDC, which is used to indicate the power on the DC bus side of the system; P ac-ACDC The total active power of the PCS-ACDC AC bus, which is used to indicate the total AC power of the grid-side system; P dc-CMU The DC power collected by the BMS is used to represent the DC power on the battery side. The variables under the charging state include: the charging power adjustment value of the first control strategy in the first stage P C1 , the charging power adjustment value of the first control strategy in the second stage P C2 , the first control strategy charging power judgment value of the first stage P ΔC1 , the first control strategy charging power judgment value of the second stage and the third stage P ΔC2 , the first control strategy charging power adjustment time of the first stage t C1 , the charging power adjustment time of the first control strategy in the second and third stages t C2 .

2. The coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario according to claim 1, characterized in that: Also includes: Receive the shutdown command, clear the system master control active power setting set by the user, and wait for the next startup command.

3. The coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario according to claim 1, characterized in that: Step S2 comprises: Determine whether the system has one of the following: BMS alarm, BMS fault, PCS alarm, communication alarm, fire alarm, or battery cell full or empty. If not, it indicates that there is a system ready signal; otherwise, it indicates that there is no system ready signal.

4. The coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario according to claim 1, characterized in that: Step S5 includes: S51: When it is determined that the system is in a discharging state, the second control strategy of the first stage is executed to actively reduce the power output. P set Determine the difference between the real-time total power and the real-time total power: P set-DCDC Reduce P D1 The power, P set-ACDC The power remains unchanged, after t D1 After the delay, it is used to determine whether the photovoltaic is in the output state; if | P set-DCDC - P dc-CMU | < P ΔDDC1 , that is, the DC power difference between the PCS-DCDC power sent value and the battery side is less than P ΔDDC1 ,| P set – P ac-ACDC | < P ΔDAC1 , that is, the difference between the power sent and the real-time power on the grid side is less than P ΔDAC1 When both conditions are met at the same time, it means that the photovoltaic power is outputting and is in the output state, and enters S52; otherwise, it is determined that the photovoltaic power is not in operation or the photovoltaic power output is too small, and it can be ignored. The PCS-DCDC power transmission value P set-DCDC Restore to P set , after a delay of 5 minutes, re-enter S3; S52: Execute the first control strategy of the second stage, actively reduce power output, P set Determine the difference between the real-time total power and the real-time total power: P set-DCDC Reduce again P D2 The power, P set-ACDC The power remains unchanged, after t D2 After the delay, it is used to determine whether the output state of the photovoltaic is full and output at the maximum output power; if | P set - 1.04* P dc-CMU | < P ΔD2 , it means that the system power has reached a balanced state. It can still be inferred that the photovoltaic power has not yet output at the maximum output power, and there is redundant output power. The third power prediction calculation of the first control strategy of the second stage is performed again; otherwise | P set - 1.04* P dc-CMU | ≥ P ΔD2 , it means that when the system is discharging, the AC side of the grid has not reached P set At this time, the photovoltaic power has been output at the maximum output power, and the system power has not reached a balanced state, resulting in low power on the AC side of the grid, and entering S53; S53: Execute the second control strategy of the third stage to increase power. P set Determine the difference between the real-time total power and the real-time total power: When the system is determined to be in a discharging state, P set-DCDC Reduce P D2 The power, P set-ACDC The power remains unchanged, after t D2 After the delay, it is used to determine whether the total power of the system is balanced to prove that P set Output; if | P set – 1.04* P dc-CMU | < P ΔD2 , it means that the system power has reached a balanced state, and the photovoltaic output state is currently full, with the maximum output power output; at this time, the calculation is completed, and after a 5-minute delay, it enters S2; otherwise | P set – 1.04* P dc-CMU | ≥ P ΔD2 , it means that the total system power is not balanced yet, and S53 is restarted; among them, P dc-ACDC It is the DC power collected by PCS-ACDC, which is used to indicate the power on the DC bus side of the system; P ac-ACDC The total active power of the PCS-ACDC AC bus, which is used to indicate the total AC power of the grid-side system; P dc-CMU The DC power collected by BMS is used to represent the DC power on the battery side. The variables under the discharge state include: the first control strategy discharge power adjustment value of the first stage P D1 , the first control strategy discharge power adjustment value of the second stage P D2 , the first control strategy discharge AC power judgment value of the first stage P ΔDAC1 , the first control strategy discharge DC power judgment value of the first stage P ΔDDC1 , the first control strategy discharge power judgment value of the second stage and the third stage P ΔD2 , the first control strategy discharge power adjustment time of the first stage t D1 , the first control strategy discharge power adjustment time of the second stage and the third stage t D2 。 5. The coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario according to claim 1, characterized in that: Before step S1, the method further includes: Set control words, including: automatic operation input, automatic operation start and automatic operation shutdown; Check whether each system and each branch has any fault status.

6. The coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario according to claim 1, characterized in that: After determining that the system ready signal exists, it also includes: The site determines the test conditions with good light intensity; Confirm the PV operating conditions and analyze them to determine whether the PV is ready.

7. The coordinated control method for a photovoltaic storage system in a non-typical photovoltaic application scenario according to claim 6, characterized in that: PV operating conditions include: PV ready state and PV fault state.

Citation Information

Patent Citations

  • Island microgrid photovoltaic-energy storage automatic synergic control strategy and control system

    CN110048450A

  • Alternating current and direct current hybrid micro-grid control architecture and control method

    CN114825448A

  • Light storage and charging cooperative control heavy overload treatment method and system based on energy router

    CN117424261A

  • Active dynamic coordination control method, system and equipment for photovoltaic combined power generation system

    CN118157210A

  • Apparatus, device and computer implemented method for controlling power plant system

    US20190273382A1