A method and device for realizing signal coverage enhancement by reconfiguring RRU channel of LTE macro station
By dynamically reconstructing macro station RRU channels and using Okumura-Hata model and machine learning model, the problem of low resource utilization and high deployment cost in deep 4G network coverage is solved, and efficient and economical signal coverage enhancement is achieved to adapt to different scenarios. needs.
Patent Information
- Application Number
- CN202411140507.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-20
AI Technical Summary
Existing 4G network deep coverage solutions have problems such as low resource utilization, high deployment costs, and difficult maintenance. Traditional signal enhancement methods require new hardware equipment, resulting in high costs and difficulty in flexibly adjusting to meet the needs of different scenarios.
By cleaning and standardizing the signal quality indicators and construction condition data of the macro station, the Okumura-Hata model is used to calculate the signal path loss, combined with the machine learning model to predict the RRU channel power division effect, and the macro station RRU channel is dynamically reconstructed to improve signal coverage strength and reduce Reliance on new hardware reduces network transformation costs and quickly responds to coverage needs.
It improves resource utilization, reduces network transformation costs, enables rapid response to network coverage needs, significantly improves signal coverage quality, adapts to the needs of complex environments, and reduces dependence on new infrastructure.
Smart Images

Figure CN118660333B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of wireless technology, and in particular to a method and device for realizing signal coverage enhancement by reconstructing an RRU channel of an LTE macro station. Background Art
[0002] With the large-scale construction and promotion of 5G technology, operators' investment is concentrated on the deployment of 5G networks, which has led to a phenomenon: the investment and maintenance of 4G networks has gradually decreased, especially in terms of deep coverage. However, 4G networks are still the main means of communication for most users, especially in some areas and specific scenarios, such as indoors, elevator shafts, basements, etc., where the demand for deep coverage is still strong.
[0003] In this context, traditional 4G network deep coverage solutions are facing challenges. Existing technical solutions include adding new hardware equipment (new base stations, indoor distribution, expanded cells), increasing RRU power, and using signal amplifiers.
[0004] On the one hand, although building new base stations, indoor distribution or adding new capacity expansion cell facilities can effectively improve coverage, it will also increase network complexity, significantly increase construction and operation and maintenance costs, and require a lot of capital investment and time costs, which is impractical for operators with limited budgets.
[0005] On the other hand, existing coverage enhancement technologies, such as increasing power and deploying repeaters, often require additional hardware equipment and complex construction, which not only increases costs but may also cause interference to existing networks. For example, using higher-power RRUs, although it can increase the signal transmission distance, may cause wireless interference problems and affect the normal operation of neighboring base stations.
[0006] On the other hand, signal amplifiers are deployed in specific areas to enhance the signal, but this method may affect the stability of the signal and the overall performance of the network.
[0007] Therefore, in summary, the existing traditional technical solutions have the following technical disadvantages:
[0008] 1) Low resource utilization: Traditional signal enhancement methods often require the addition of new hardware equipment, resulting in low resource utilization and difficulty in flexible adjustment to meet the needs of different scenarios.
[0009] 2) High deployment cost: New base stations and indoor distribution systems require a large initial investment and a long construction period, which is not conducive to rapid deployment and cost control.
[0010] 3) Difficulty in maintenance: As the scale of the network increases, it becomes more difficult to maintain and optimize the network, especially in complex or hard-to-reach areas. Summary of the invention
[0011] 1. Technical issues to be resolved
[0012] In order to solve the above problems in the prior art, the present invention provides a method and device for realizing signal coverage enhancement by reconstructing the RRU channel of an LTE macro station, which can realize a more efficient, economical and flexible signal coverage enhancement technology.
[0013] (II) Technical solution
[0014] In order to achieve the above object, the technical solution adopted by the present invention is:
[0015] In a first aspect, the present invention provides a method for realizing signal coverage enhancement by reconfiguring an RRU channel of an LTE macro station, comprising:
[0016] S1. Clean and standardize the signal quality indicators, user feedback, and construction condition data of macro sites;
[0017] S2. extracting key features from the signal quality indicators;
[0018] S3, evaluating whether the basic construction conditions are met based on the construction condition data, and obtaining a construction evaluation result;
[0019] S4. Analyze the historical network load trend to predict the future network status, use the Okumura-Hata model to calculate the path loss value of the macro station signal, predict the signal coverage strength under the current RRU channel output power based on the path loss value, and calculate the current RRU channel receive power based on the path loss value;
[0020] The path loss formula for calculating the path loss value of the macro base station signal using the Okumura-Hata model in S4 is as follows:
[0021] C=C 0 -10·(f 2 / a)·log 10 (d)-10·log 10 (h b )-10·log 10 (h m )+K;
[0022] Where: C 0 =20log 10 (f)+20log 10 (d) +20;
[0023] C is the path loss in dB;
[0024] C 0 is the free space loss, whose value depends on the frequency f;
[0025] f is the frequency in MHz;
[0026] d is the distance from the base station to the terminal antenna, in km;
[0027] h b is the height of the base station antenna, in meters;
[0028] h m is the height of the terminal antenna, in meters;
[0029] a is a constant;
[0030] K is a constant adjusted according to the city type and environment, and the unit is dB;
[0031] The calculation formula for the current RRU channel receive power is as follows:
[0032] Current RRU channel received power RSRP = gNodeB output power - 10 log 10 (Number of subcarriers)-C;
[0033] Among them, gNodeB is a 5G base station, and the gNodeB output power is expressed as the power radiated to the outside world through its antenna port during the wireless signal transmission process of the 5G base station;
[0034] S5. Use historical data and extracted key features to train a machine learning model, where the machine learning model is used to predict the effect of RRU channel power division;
[0035] S6. Based on the current RRU channel receiving power, the predicted future network status, construction evaluation results, user feedback, and the RRU channel power division effect predicted by the machine learning model, the above factors are combined to generate the RRU channel power division decision.
[0036] The beneficial effects of the present invention are:
[0037] 1. Improve resource utilization: Existing technologies usually need to improve signal coverage by increasing the number of base stations or upgrading existing base stations, which is not only costly but also has a long deployment cycle. In contrast, the present invention dynamically reconstructs the RRU channels of macro stations through machine learning models, and can reallocate existing resources to areas with insufficient signal coverage without adding additional hardware. This resource reuse significantly improves the utilization of network resources and reduces dependence on new infrastructure.
[0038] 2. Reduce network transformation costs: Compared with the existing technology, the present invention avoids the need for large-scale network upgrades and new base stations, which are usually accompanied by huge capital investment. Through the implementation of this solution, operators can achieve enhanced coverage of specific areas within the existing network architecture through software configuration and slight hardware adjustments, thereby significantly reducing the cost of network transformation.
[0039] 3. Rapid response to network coverage needs: When facing network coverage problems, existing technologies often take a long time to plan and implement solutions. The channel reconstruction technology of the present invention enables operators to quickly identify areas with insufficient coverage and quickly adjust the RRU channel configuration to meet the needs. This rapid response capability shortens the time cycle from problem identification to solution implementation, improving network adaptability and user satisfaction.
[0040] Furthermore, the S6 further includes:
[0041] If the power division decision of the RRU channel is to perform power division, the number of RRU channels for power division is recommended based on the effect of the RRU channel power division predicted by the machine learning model and the current RRU channel output power, and the new output power of each RRU channel after power division is calculated.
[0042] From the above description, it can be seen that the number of RRU channels for power division can be recommended, and a specific power division solution can be provided for operators to choose. The new output power of each RRU channel after power division obtained by calculation can provide data support to ensure that the new output power of each RRU channel meets the usage requirements.
[0043] Furthermore, it also includes:
[0044] S7. Use the Okumura-Hata model and the new output power of each RRU channel to re-evaluate the signal coverage strength and signal coverage range after the RRU channel power division;
[0045] S8, calculating the adjacent channel power ratio to evaluate the interference to the adjacent channels after power division;
[0046] S9, generating a final power division decision based on signal coverage strength evaluation, adjacent channel interference evaluation and user feedback;
[0047] S10, output the generated power division decision.
[0048] From the above description, it can be seen that re-evaluating the signal coverage strength and signal coverage range after RRU channel power division is to verify the effectiveness of the power division decision; the calculation of adjacent channel power is to ensure that the power division operation does not introduce too much interference and affect the network quality; the final power division decision is generated based on signal coverage strength evaluation, adjacent channel interference evaluation and user feedback, which ensures the reliability of the final power division decision.
[0049] Furthermore, the power split decision output by S10 includes two parameters, channel_split_decision and channels_to_split. The parameter channel_split_decisio indicates whether to perform RRU channel power splitting, and the parameter channels_to_split indicates the number of RRU channels that need to be power split, which is 1 or 2.
[0050] Furthermore, the training process of the machine learning model in step S5 includes:
[0051] S501, using historical data of signal quality indicators of the macro base station after RRU power division and extracted key features as training data;
[0052] S502, selecting a learning algorithm suitable for the machine learning model, the learning algorithm comprising a random forest algorithm and a support vector machine algorithm;
[0053] S503, training the machine learning model based on the training data;
[0054] S504. Verify the performance of the trained machine learning model.
[0055] From the above description, it can be seen that the purpose of adjusting the model parameters based on the training results in step S503 is to optimize the accuracy of the prediction, and the purpose of performing performance verification on the trained machine learning model in step S504 is to ensure that it can reliably predict the effect of the RRU channel power division.
[0056] Furthermore, it also includes:
[0057] S11. Output a signal coverage enhancement plan based on the generated power division decision, wherein the content of the output signal coverage enhancement plan includes: the number of RRU channels that need to be power divided, the power division status of the RRU channels, and the antenna coverage plan that extends a preset number of antennas to the target area.
[0058] From the above description, we can see that for areas that are difficult to reach with traditional coverage methods, such as elevator shafts and basements, the invention significantly improves signal penetration and coverage quality through precise signal distribution and optimized antenna layout. This targeted solution effectively solves the limitations of existing technologies in terms of deep coverage and improves network coverage in complex environments.
[0059] Furthermore, the output signal coverage enhancement scheme in S11 includes the following specific schemes:
[0060] Solution 1: Single channel power splitter;
[0061] Use a power splitter to split the power of one of the RRU channels of the macro base station, and connect a preset number of antennas to cover the target area;
[0062] Solution 2: Dual-channel power splitter;
[0063] Use a power splitter to split the power of two symmetrical RRU channels in the macro station, and connect a preset number of antennas to cover the target area;
[0064] Option 3: Full utilization of dual channels;
[0065] The two RRU channels in the macro base station are fully utilized, and a preset number of antennas are connected externally to cover the target area.
[0066] From the above description, it can be seen that compared with the prior art, the present invention provides a variety of transformation solutions, allowing operators to choose the most suitable solution according to specific coverage requirements and site conditions. This flexibility makes network optimization more customized and can adapt to changing environments and needs, while also facilitating future network expansion and upgrades.
[0067] Furthermore, the calculation formula of the adjacent channel power ratio ACPR in S8 is:
[0068] ACPR(dB)=10·log10(P center / P adjacent );
[0069] Among them, P center is the power on the center channel;
[0070] P adjacent is the power on the adjacent channel.
[0071] In a second aspect, the present invention provides a device for realizing signal coverage enhancement by reconstructing RRU channels of LTE macro stations, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for realizing signal coverage enhancement by reconstructing RRU channels of LTE macro stations is implemented.
[0072] Among them, the technical effect corresponding to the device for realizing signal coverage enhancement by reconstructing the RRU channel of an LTE macro station provided in the second aspect refers to the relevant description of the method for realizing signal coverage enhancement by reconstructing the RRU channel of an LTE macro station provided in the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] Figure 1 A flowchart of a method for realizing signal coverage enhancement by reconstructing an LTE macro station RRU channel according to the present invention;
[0074] Figure 2 Schematic diagram of a single-channel power division solution for the signal coverage enhancement solution in Example 1;
[0075] Figure 3 It is a schematic diagram of a dual-channel power division solution of the signal coverage enhancement solution in Example 1;
[0076] Figure 4 Schematic diagram of a dual-channel full utilization solution of the signal coverage enhancement solution in Example 1;
[0077] Figure 5 This is a schematic diagram of the structure of a device for realizing signal coverage enhancement by reconfiguring an LTE macro station RRU channel in Embodiment 2;
[0078] Figure 6 This is a schematic diagram of the installation of the modified equipment in Example 4.
[0079] Description of Reference Numerals
[0080] 1: A device for realizing signal coverage enhancement by reconfiguring RRU channels of LTE macro stations;
[0081] 2: Processor;
[0082] 3: Memory. DETAILED DESCRIPTION
[0083] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0084] Embodiment 1
[0085] Please refer to Figures 1 to 4 As shown, a method for realizing signal coverage enhancement by reconfiguring an RRU channel of an LTE macro station includes:
[0086] S1. Clean and standardize the signal quality indicators, user feedback, and construction condition data of macro sites;
[0087] The signal quality indicators of the macro base station include: RSRP, SINR and other signal quality indicators of the macro base station; the user feedback includes: user satisfaction score and complaint density; the construction condition data includes: RRU availability and feeder deployment conditions;
[0088] S2. extracting key features from the signal quality indicators, wherein the key features include load level, signal attenuation rate and other key features;
[0089] S3, evaluating whether the basic construction conditions are met based on the construction condition data, and obtaining a construction evaluation result;
[0090] S4. Analyze the historical network load trend to predict the future network status, use the Okumura-Hata model to calculate the path loss value of the macro base station signal, predict the signal coverage strength under the current RRU channel output power based on the path loss value, and calculate the current RRU channel receive power based on the path loss value;
[0091] The path loss formula of the Okumura-Hata model is:
[0092] C=C 0 -10·(f 2 / a)·log 10 (d)-10·log 10 (h b )-10·log 10 (h m )+K;
[0093] Where: C 0 =20log 10 (f)+20log 10 (d) +20;
[0094] C is the path loss (dB)
[0095] C 0 is the free space loss, whose value depends on the frequency f;
[0096] f is the frequency (MHz);
[0097] d is the distance from the base station to the terminal antenna (km);
[0098] h b is the height of the base station antenna (m);
[0099] h m is the height of the terminal antenna (m);
[0100] a is a constant, usually 28;
[0101] K is a constant (dB) adjusted according to the city type and environment, usually -8dB;
[0102] Current RRU channel received power RSRP (signal strength) = gNodeB output power (dBm) - 10·log 10 (Number of subcarriers)-C;
[0103] The Okumura-Hata model is an empirical model, and the present invention has been adjusted and verified according to specific circumstances in practical applications, so that the signal coverage strength and the current RRU channel receiving power calculated thereby are accurate and reliable.
[0104] S5. Use historical data and extracted key features to train a machine learning model, where the machine learning model is used to predict the effect of RRU channel power division;
[0105] The training process of the machine learning model includes:
[0106] S501, using historical data of signal quality indicators of the macro base station after RRU power division and extracted key features as training data;
[0107] S502, selecting a learning algorithm suitable for the machine learning model, the learning algorithm comprising a random forest algorithm and a support vector machine algorithm;
[0108] S503, training the machine learning model based on the training data;
[0109] S504. Verify the performance of the trained machine learning model.
[0110] S6. Based on the current RRU channel received power, the predicted future network status, construction evaluation results, user feedback, and the RRU channel power division effect predicted by the machine learning model, the above factors are combined to generate the RRU channel power division decision to minimize the impact on the existing network and optimize the signal coverage;
[0111] If the power division decision of the RRU channel is to perform power division, the number of RRU channels for power division is recommended based on the effect of the RRU channel power division predicted by the machine learning model and the current RRU channel output power, and the new output power of each RRU channel after power division is calculated.
[0112] S7. Use the Okumura-Hata model and the new output power of each RRU channel to re-evaluate the signal coverage strength and signal coverage range after the RRU channel power division. The coverage range is calculated based on the distance from the base station to the terminal and the signal coverage strength.
[0113] S8. Calculate the adjacent channel power ratio (ACPR) to evaluate the interference to adjacent channels after power division to ensure that the interference level after power division meets the standards of network operators.
[0114] The calculation formula for adjacent channel power ratio ACPR is:
[0115] ACPR(dB)=10·log10(P center / P adjacent );
[0116] Among them, P center is the power on the center channel, which can be obtained by measuring the signal power transmitted by the base station;
[0117] Padjacent is the power on the adjacent channel, which can be obtained by measuring the signal leakage power outside the center channel.
[0118] S9, generating a final power division decision based on signal coverage strength evaluation, adjacent channel interference evaluation and user feedback;
[0119] S10, output the generated power division decision.
[0120] The power split decision output by S10 includes two parameters: channel_split_decision and channels_to_split. The parameter channel_split_decisio indicates whether to perform RRU channel power splitting, and the parameter channels_to_split indicates the number of RRU channels that need to be split, which is 1 or 2.
[0121] S11. Output a signal coverage enhancement plan based on the generated power division decision, wherein the content of the output signal coverage enhancement plan includes: the number of RRU channels that need to be power divided, the power division status of the RRU channels, and the antenna coverage plan that extends a preset number of antennas to the target area.
[0122] The output signal coverage enhancement scheme in S11 includes the following specific schemes:
[0123] Solution 1: Single channel power splitter;
[0124] refer to Figure 2 As shown, a power splitter is used to divide the power of one of the RRU channels of the macro base station, and a preset number of antennas are connected externally to cover the target area;
[0125] Expected effect: Only one signal is split, the target area has only a single-stream effect, and the antenna has no diversity gain;
[0126] Operation steps and applicable scenarios:
[0127] ① After single-channel power division, the external plate antenna covers the elevator, basement, and partial floor scenes;
[0128] ② After single-channel power division, external spotlights cover partial building scenes.
[0129] Solution 2: Dual-channel power splitter;
[0130] refer to Figure 3 As shown, a power splitter is used to divide the power of two symmetrical RRU channels of the macro station, and a preset number of antennas are connected externally to cover the target area;
[0131] Expected effect: Connect 2 feeders, have dual-stream effect, and have graded gain, which can strengthen the signal to a certain extent.
[0132] Operation steps and applicable scenarios:
[0133] ① After dual-channel power division, the external plate antenna covers the elevator, basement, and partial floor scenes;
[0134] ②After dual-channel power division, external spotlights cover partial building scenes.
[0135] Option 3: Full utilization of dual channels;
[0136] refer to Figure 4 As shown, the two RRU channels in the macro base station are fully utilized, and a preset number of antennas are connected to the target area for coverage.
[0137] Expected effect: Fully occupy the two RRU channel signals of the macro station, with maximum power and best effect for the target coverage area.
[0138] Operation steps and applicable scenarios:
[0139] ① Two RRU channels are connected to external plate antennas to cover elevators, basements, and partial floors;
[0140] ②2 channels of external spotlights cover partial building scenes.
[0141] If the prediction results of the machine learning model in the signal coverage enhancement solution output above show that the signal coverage and interference level after power splitting 1 RRU channel are in line with expectations and have little impact on the existing network, then power splitting 1 RRU channel is appropriate. If the prediction results show that power splitting 2 RRU channels can provide better signal coverage, while the interference level is still controllable and in line with expectations, then power splitting 2 channels is a better choice. The staff can select the output solution according to actual needs; currently, considering that the 4G indoor distribution system supports up to two channels, the power splitting requirements for more than two channels are not considered for the time being.
[0142] Embodiment 2
[0143] Reference Figure 5 As shown, a device for realizing signal coverage enhancement by reconstructing RRU channels of LTE macro stations includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, a method for realizing signal coverage enhancement by reconstructing RRU channels of LTE macro stations according to an embodiment of the present invention is implemented.
[0144] Embodiment 3
[0145] The method for realizing signal coverage enhancement by reconstructing the RRU channel of an LTE macro station in Example 1 is applied to the scenario of weak elevator coverage.
[0146] ①Renovation requirements
[0147] A building in a certain city has 14 floors and 3 elevators. Both 2G and 4G floors are covered by macro base stations with good coverage. The 2G indoor distributed system in the elevator has good coverage, but 4G has no coverage. With the advancement of 4G independent networking, the ESRVCC function has been turned off, so the 4G coverage problem of the elevator has become apparent, and users have complained significantly.
[0148] ②Feasibility analysis
[0149] The 2G in the building elevator is equipped with an indoor distribution system, and there happens to be a 4G macro station on the roof. So two F-band RRUs of the 4G macro station are selected, and a dual-channel power division solution is adopted. Two of the power division signals are combined with the indoor distribution system of the 2G elevator part. Specifically, one RRU channel is power-divided and connected in parallel to two of the elevators, and the other RRU channel is power-divided and used separately for the third elevator. The RRU model used is R8978 M1920A, with a full output power of 160W. The output power of a single RRU channel is 20W (corresponding to 43dB), plus the loss of each component. The antenna output power is calculated through the LTE macro station RRU channel reconstruction method as shown in Tables 1 and 2 below, all of which are above 16dB, theoretically meeting the signal coverage requirements.
[0150] Table 1: RRU power and device losses
[0151]
[0152] Table 2: Antenna port power
[0153]
[0154] Table 3: Comparison of performance indicators of three elevators before and after renovation
[0155]
[0156] Table 4: Comparison of the performance of three elevators before and after renovation
[0157]
[0158] ③Effect verification
[0159] As shown in Tables 3 and 4 above, the average RSRP of the three elevators before the transformation was around -110dBm, and the network was often disconnected in the middle floors, and the call quality was likely to be poor, and the Internet perception was poor. After the transformation, the average RSRP of the three elevators was around -95dBm, the average SINR was 19, the average download rate was 30Mbps, the average upload rate was 2Mbps, the calls were clear, and the perception was good.
[0160] Table 5: Price comparison with traditional indoor distribution
[0161] Related Fees Traditional room division (yuan) Macro station power division transformation (yuan) Material cost 8000 780 Construction cost 1800 150 Other expenses 300 0 total 10100 930
[0162] As shown in Table 5 above, there is no significant change in key performance indicators such as connection rate, call drop rate, and switching success rate before and after the transformation. Affected by power division, the diversity gain effect of the macro station has changed slightly, and the uplink and downlink 64QAM coding ratio has slightly decreased compared to the original. However, compared with solving the long-standing problem of weak elevator coverage, the fluctuation of this indicator is within an acceptable range. The overall cost has dropped by 90.79%, and the construction period has been shortened to 0.5 days compared to the estimated 6 days of traditional indoor distribution, and there is no need to wait for the cumbersome site opening process. At the same time, the reduction of indoor distribution devices and indoor branch lines can greatly reduce the probability of failure and the length of fault maintenance. The maintenance cost is expected to decrease by 60% each year, achieving cost reduction and efficiency improvement.
[0163] Embodiment 4
[0164] The method for realizing signal coverage enhancement by reconstructing the RRU channel of an LTE macro station in Example 1 is applied to a scenario with weak coverage in a residential area.
[0165] ①Renovation requirements
[0166] A resettlement house has 30 floors, 2 units are interconnected, with a corridor in the middle and rooms on both sides. The south side is well covered by the rooftop spotlights of a 6-story building A. The north side is poorly covered because the spotlight signal is difficult to penetrate due to the building structure.
[0167] ②Feasibility analysis
[0168] There is Building B to the north of the resettlement house. The antennas of Building B are mainly distributed on the west side of the building, and there are coverage requirements in all directions. It is inconvenient to adjust the antenna position to cover the resettlement house, but two of the RRU channels of its macro station can be fully utilized, and an additional antenna can be added to cover the resettlement house through the feeder line to the near end of the east side of the building. The RRU model used is R8978 M1920A, with a full output power of 160W and an output power of 20W (corresponding to 43dB) for a single channel. The conclusion is drawn through the dynamic reconstruction method of the LTE macro station RRU channel. After deducting the loss of 6.4dB of the 60-meter feeder extension, the power reaching the antenna port is 36.6dB, which can theoretically meet the coverage requirements. The installation diagram of the equipment is shown below. Figure 6 shown.
[0169] ③Effect verification
[0170] As shown in Tables 6 and 7 below, before the renovation, the north side mainly received the signal from the rooftop spotlight of Building A, with an average RSRP of about -107dBm and an average SINR of 10 on each floor. After the renovation, the north side mainly received the signal from Building B, with an average RSRP of about -82dBm and an average SINR of 18. The average download rate increased from 10Mbps to 46Mbps, and the average upload rate increased from 2.1Mbps to 6.1Mbps. The overall coverage has been significantly improved, achieving the expected effect.
[0171] Table 6: Comparison of test indicators before and after transformation
[0172]
[0173] Table 7: Comparison of performance indicators before and after transformation
[0174]
[0175] After the transformation, the number of RRC connected users increased slightly and the traffic increased due to the wider coverage. There was no significant change in other key performance indicators. The weak coverage problem of the entire building was solved by simply transforming the existing macro base station. As shown in Table 8 below, it saved 94.16% compared with the traditional expansion project, achieving cost reduction and efficiency improvement.
[0176] Table 8: Comparison with traditional expansion prices
[0177]
[0178] Therefore, the technical solution of the present invention is an effective method to enhance LTE signal coverage without affecting the normal operation of the macro base station. Through a carefully designed transformation scheme, the signal coverage can be improved in a specific micro scene while ensuring that the overall performance of the macro base station is not negatively affected. This method has the advantages of low cost and high efficiency and is suitable for a wide range of LTE network optimization needs.
[0179] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for realizing signal coverage enhancement by reconfiguring RRU channels of LTE macro stations, characterized in that: include: S1. Clean and standardize the signal quality indicators, user feedback, and construction condition data of macro sites; S2. extracting key features from the signal quality indicators; S3, evaluating whether the basic construction conditions are met based on the construction condition data, and obtaining a construction evaluation result; S4. Analyze the historical network load trend to predict the future network status, use the Okumura-Hata model to calculate the path loss value of the macro base station signal, predict the signal coverage strength under the current RRU channel output power based on the path loss value, and calculate the current RRU channel receive power based on the path loss value; The path loss formula for calculating the path loss value of the macro base station signal using the Okumura-Hata model in S4 is as follows: C=C0-10·(f 2 / a)·log 10 (d)-10·log 10 (h b )-10·log 10 (h m )+K; Where: C0=20log 10 (f)+20log 10 (d) +20; C is the path loss in dB; C0 is the free space loss, whose value depends on the frequency f; f is the frequency in MHz; d is the distance from the base station to the terminal antenna, in km; h b is the height of the base station antenna, in meters; h m is the height of the terminal antenna, in meters; a is a constant; K is a constant adjusted according to the city type and environment, and the unit is dB; The calculation formula for the current RRU channel receive power is as follows: Current RRU channel received power RSRP = gNodeB output power - 10 log 10 (Number of subcarriers)-C; Among them, gNodeB is a 5G base station, and the gNodeB output power is expressed as the power radiated to the outside world through its antenna port during the wireless signal transmission process of the 5G base station; S5. Use historical data and extracted key features to train a machine learning model, where the machine learning model is used to predict the effect of RRU channel power division; S6. Based on the current RRU channel receiving power, the predicted future network status, construction evaluation results, user feedback, and the RRU channel power division effect predicted by the machine learning model, the above factors are combined to generate the RRU channel power division decision.
2. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 1, characterized in that: The S6 further includes: If the power division decision of the RRU channel is to perform power division, the number of RRU channels for power division is recommended based on the effect of the RRU channel power division predicted by the machine learning model and the current RRU channel output power, and the new output power of each RRU channel after power division is calculated.
3. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 2, characterized in that: Also includes: S7. Use the Okumura-Hata model and the new output power of each RRU channel to re-evaluate the signal coverage strength and signal coverage range after the RRU channel power division; S8, calculating the adjacent channel power ratio to evaluate the interference to the adjacent channels after power division; S9, generating a final power division decision based on signal coverage strength evaluation, adjacent channel interference evaluation and user feedback; S10. Output the generated power division decision.
4. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 3 is characterized in that: The power division decision output by S10 includes two parameters, channel_split_decision and channels_to_split. The parameter channel_split_decisio indicates whether to perform RRU channel power division, and the parameter channels_to_split indicates the number of RRU channels that need to be power divided, which is 1 or 2.
5. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 1, characterized in that: The training process of the machine learning model in step S5 includes: S501, using historical data of signal quality indicators of the macro base station after RRU power division and extracted key features as training data; S502, selecting a learning algorithm suitable for the machine learning model, the learning algorithm comprising a random forest algorithm and a support vector machine algorithm; S503, training the machine learning model based on the training data; S504. Verify the performance of the trained machine learning model.
6. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 3, characterized in that: Also includes: S11. Output a signal coverage enhancement plan based on the generated power division decision, wherein the content of the output signal coverage enhancement plan includes: the number of RRU channels that need to be power divided, the power division status of the RRU channels, and the antenna coverage plan that extends a preset number of antennas to the target area.
7. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 6, characterized in that: The output signal coverage enhancement scheme in S11 includes the following specific schemes: Solution 1: Single channel power splitter; Use a power splitter to split the power of one of the RRU channels of the macro base station, and connect a preset number of antennas to cover the target area; Solution 2: Dual-channel power splitter; Use a power splitter to split the power of two symmetrical RRU channels in the macro station, and connect a preset number of antennas to cover the target area; Option 3: Full utilization of dual channels; The two RRU channels in the macro base station are fully utilized, and a preset number of antennas are connected externally to cover the target area.
8. The method for realizing signal coverage enhancement by LTE macro station RRU channel reconstruction according to claim 3, characterized in that: The calculation formula of the adjacent channel power ratio ACPR in S8 is: ACPR(dB)=10·log10(P center / P adjacent ); Among them, P center is the power on the center channel; P adjacent is the power on the adjacent channel.
9. A device for realizing signal coverage enhancement by reconfiguring RRU channels of LTE macro stations, characterized in that: The invention comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for realizing signal coverage enhancement by reconstructing the RRU channel of an LTE macro station as described in any one of claims 1 to 8 is implemented.