A distributed hybrid energy storage system energy scheduling method, device and equipment
By combining battery energy storage and capacitor energy storage, and optimizing the scheduling of distributed energy storage systems with controllers, the grid load fluctuations caused by instability in distributed new energy generation is solved, and the stability of the power system and energy utilization rate are improved. .
Patent Information
- Application Number
- CN202411161545.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-23
AI Technical Summary
The indirectness and instability of distributed new energy power generation lead to power deviations between power generation units and load demand, reducing the service life of the energy storage system and affecting the safe and stable operation of the power grid.
By combining battery energy storage and capacitor energy storage, real-time adjustments are made with distributed power generation units and loads, the controller obtains operation data and historical data, predicts output power and demand power, optimizes the scheduling of the energy storage system, and smoothes the load fluctuations of the grid.
It improves the utilization rate of distributed new energy, enhances the flexibility and stability of the power system, reduces energy waste, and ensures the use of energy in the optimal time and place.
Smart Images

Figure CN118676988B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of energy storage technology, and in particular to an energy scheduling method, device and equipment for a distributed hybrid energy storage system. Background Art
[0002] With the demand for global energy structure transformation, the access ratio of distributed new energy (such as solar energy, wind energy, etc.) is gradually increasing. However, distributed new energy power generation has the characteristics of indirectness and instability, which will lead to a large deviation between the actual output power of the power generation unit and the load demand; the application of energy storage system can improve the dispatchability of distributed new energy power generation units, but when tracking the scheduling plan, the energy storage system needs to be continuously charged and discharged, and multiple charge and discharge cycles will reduce the service life of the battery. Therefore, the access of distributed new energy has brought challenges to the safe and stable operation of the power grid. In order to solve this technical problem, it is necessary to combine different types of energy storage equipment, including battery energy storage, capacitor energy storage, etc., with new energy power generation equipment, and adjust them in real time according to the needs of the load, so as to achieve efficient use of new energy power generation, improve the utilization rate of renewable energy, and enhance the flexibility and stability of the power system. Summary of the invention
[0003] The present invention provides a method, device and equipment for energy scheduling of a distributed hybrid energy storage system, which solves the problem of low operating efficiency and high operating cost caused by power fluctuations of distributed power sources and loads.
[0004] In order to solve the above technical problems, the technical solution of the present invention is as follows:
[0005] An embodiment of the present invention provides an energy scheduling method for a distributed hybrid energy storage system, the scheduling method is applied to a controller, the controller is electrically connected to a distributed power generation unit and a hybrid energy storage unit; the distributed power generation unit, the hybrid energy storage unit, the load and the external power grid exchange electric energy through an intranet; the distributed power generation unit includes a photovoltaic device and a renewable energy device; the hybrid energy storage unit includes a battery and a capacitor; the scheduling method includes:
[0006] Obtaining distributed generation unit operation data, load history data and hybrid energy storage unit status data;
[0007] Obtaining the predicted output power of the distributed generation unit and the predicted load demand power within a prediction period according to the distributed generation unit operation data and the load history data;
[0008] Obtaining energy dispatching data according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, wherein the energy dispatching data is used to control the operating state of the battery and the interactive state of the power grid;
[0009] According to the energy scheduling data, hybrid energy storage unit operation data is obtained, and the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serve as hybrid energy storage unit state data for the next prediction period.
[0010] Optionally, the obtaining of the distributed generation unit operation data, load history data and hybrid energy storage unit status data includes:
[0011] According to the first metering device in the distributed power generation unit, the distributed power generation unit operation data is obtained, wherein the distributed power generation unit operation data includes photovoltaic device power generation data and renewable energy device power generation data;
[0012] Obtaining load history data according to a load demand history database, wherein the load history data includes load demand power history data and distributed generation unit output power history data;
[0013] According to the second metering device in the hybrid energy storage unit, the hybrid energy storage unit status data is obtained, wherein the hybrid energy storage unit status data includes the charging and discharging power of the battery, the grid interaction power and the charging and discharging power of the capacitor.
[0014] Optionally, obtaining the predicted output power of the distributed generation unit and the predicted load demand power within the prediction period according to the distributed generation unit operation data and the load history data includes:
[0015] The distributed power generation unit operation data is input into the load demand prediction model to obtain the predicted output power of the distributed power generation unit, the predicted grid interaction power and the predicted load demand power within the prediction period; wherein the load demand prediction model is obtained by inputting the load history data into a neural network model and training the neural network model.
[0016] Optionally, energy scheduling data is obtained according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, including:
[0017] Inputting the predicted output power of the distributed generation unit, the predicted load demand power and the state data of the hybrid energy storage unit into a first scheduling model to obtain energy scheduling data;
[0018] The expression of the first scheduling model is:
[0019] ,
[0020] Among them, P cost1 is the system operation cost; P U(t) is the electricity transaction cost between the distributed generation unit and the power grid in the tth forecast period, t=1,2,…, n; n is the number of predictions; P C (t) is the cost of using the battery in the tth prediction period; P grid (t) is the electricity price in the tth forecast period; P G (t) is the grid interaction power in the t-th prediction period; Δt is the duration of the prediction period;
[0021] P F (t) is the predicted output power of the distributed generation unit; P L (t) is the load prediction required power; l is the number of times the battery is charged and discharged; η1 and η2 are the battery charge and discharge efficiencies; C B (t) is the actual usage capacity of the battery in the tth prediction period; R B is the purchase cost of the battery; P B (t) is the charge and discharge power of the battery in the tth prediction cycle; the energy scheduling data is P cost1 The battery charging and discharging power P when the minimum value is obtained Bm Interaction power with the grid P Gm , and P Bm ∈{P B (t)},P Gm ∈{P G (t)}.
[0022] Optionally, when the energy scheduling data is obtained, the first constraint condition of the first scheduling model includes energy storage constraint and grid interaction constraint;
[0023] Wherein, the energy storage constraint is:
[0024] P Bmin ≤P B (t) ≤P Bmax ,
[0025] S Bmin ≤S B (t) ≤S Bmax ,
[0026] The grid interaction constraints are:
[0027] P Gmin ≤P G (t) ≤P Gmax ,
[0028] Among them, P Bmin , P Bmax are the minimum and maximum values of battery charging and discharging power respectively; P Gmin , P Gmaxare the minimum and maximum values of the grid interaction power respectively; S Bmin , S Bmax are the minimum and maximum values of battery energy storage respectively; S B (t) is the energy storage value of the battery in the tth prediction period.
[0029] Optionally, the hybrid energy storage unit operation data is obtained according to the energy scheduling data, including:
[0030] Inputting the energy scheduling data into a second scheduling model to obtain hybrid energy storage unit operation data;
[0031] The expression of the second scheduling model is:
[0032] ,
[0033] Among them, P cost2 is the capacitor operating cost; k1, k2, k3 are cost weight ratio coefficients; P SC (t) is the charge and discharge power of the capacitor in the tth prediction cycle; W SC (t) is the cost of using the capacitor in the tth prediction period; C SC is the purchase cost of the capacitor; L SC is the service life of the capacitor; the operating data of the hybrid energy storage unit is P cost2 The battery charging and discharging power P when the minimum value is obtained Bm1 , grid interaction power P Gm1 and capacitor charging and discharging power P SCm , and P Bm1 ∈{P B (t)}, P Gm1 ∈{P G (t)}, P SCm ∈{P SC (t)}.
[0034] Optionally, when the hybrid energy storage unit operation data is obtained, the second constraint condition of the second scheduling model includes a state of charge constraint of the capacitor and a charge and discharge power constraint of the capacitor;
[0035] Wherein, the state of charge constraint of the capacitor is:
[0036] S SCmin ≤S SC (t) ≤S SCmax ,
[0037] The charging and discharging power constraints of the capacitor are:
[0038] P SCmin ≤P SC(t) ≤P SCmax ,
[0039] Among them, S SCmin , S SCmax are the minimum and maximum values of the capacitor’s state of charge, respectively; S SC (t) is the state of charge value of the capacitor in the tth prediction period; P SCmin , P SCmax are the minimum and maximum values of the capacitor charging and discharging power, respectively.
[0040] An embodiment of the present invention further provides a distributed hybrid energy storage system, comprising:
[0041] A controller, wherein the controller is electrically connected to a distributed power generation unit and a hybrid energy storage unit; the distributed power generation unit, the hybrid energy storage unit, the load and the external power grid exchange electric energy through an intranet; the distributed power generation unit includes a photovoltaic device and a renewable energy device; the hybrid energy storage unit includes a battery and a capacitor;
[0042] The controller is used to obtain the distributed generation unit operation data, load history data and hybrid energy storage unit status data; obtain the distributed generation unit predicted output power and the load predicted demand power within the prediction period according to the distributed generation unit operation data and the load history data; obtain energy scheduling data according to the distributed generation unit predicted output power, the load predicted demand power and the hybrid energy storage unit status data, and the energy scheduling data is used to control the operation status of the battery and the interaction status of the power grid; obtain the hybrid energy storage unit operation data according to the energy scheduling data, and the hybrid energy storage unit operation data is used to control the operation status of the capacitor and serve as the hybrid energy storage unit status data for the next prediction period.
[0043] An embodiment of the present invention further provides an energy scheduling device for a distributed hybrid energy storage system, the device comprising:
[0044] An acquisition module, used to acquire distributed generation unit operation data, load history data and hybrid energy storage unit status data;
[0045] A processing module, used for obtaining the predicted output power of the distributed generation unit and the predicted demand power of the load within a prediction period according to the operation data of the distributed generation unit and the load history data;
[0046] A first generating module, configured to obtain energy dispatching data according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, wherein the energy dispatching data is used to control the operating state of the battery and the interactive state of the power grid;
[0047] The second generating module is used to obtain hybrid energy storage unit operation data according to the energy scheduling data, wherein the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serves as the hybrid energy storage unit state data of the next prediction cycle.
[0048] An embodiment of the present invention further provides a computing device, comprising: a processor and a memory storing a computer program, wherein the computer program executes the above method when executed by the processor.
[0049] The technical solution of the present invention includes at least the following effects:
[0050] The above scheme of the present invention obtains the distributed generation unit operation data, load history data and hybrid energy storage unit status data; obtains the distributed generation unit predicted output power and load predicted demand power within the prediction period according to the distributed generation unit operation data and load history data; obtains energy scheduling data according to the distributed generation unit predicted output power, load predicted demand power and hybrid energy storage unit status data, and the energy scheduling data is used to control the operation status of the battery and the interactive status of the power grid; obtains the hybrid energy storage unit operation data according to the energy scheduling data, and the hybrid energy storage unit operation data is used to control the operation status of the capacitor and serve as the hybrid energy storage unit status data for the next prediction period; and by combining the supercapacitor energy storage system with the distributed energy storage system, the charging and discharging process of electric energy is scheduled to achieve effective smoothing of power grid load fluctuations and ensure the safe and stable operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 is a flow chart of a distributed hybrid energy storage system energy scheduling method provided by an embodiment of the present invention;
[0052] Figure 2 is a structural diagram of a distributed hybrid energy storage system provided by an embodiment of the present invention;
[0053] Figure 3 It is a schematic diagram of the architecture of a load demand prediction model for a distributed hybrid energy storage system provided by an embodiment of the present invention;
[0054] Figure 4 is a schematic diagram of prediction results of a load demand prediction model provided by an embodiment of the present invention;
[0055] Figure 5 It is a distributed hybrid energy storage system energy dispatching grid interaction power waveform diagram provided by an embodiment of the present invention;
[0056] Figure 6 It is a charging and discharging power waveform diagram of an energy dispatching capacitor of a distributed hybrid energy storage system provided by an embodiment of the present invention;
[0057] Figure 7It is a charging and discharging power waveform diagram of a battery for energy scheduling in a distributed hybrid energy storage system provided by an embodiment of the present invention;
[0058] Figure 8 is a structural diagram of an energy dispatching device for a distributed hybrid energy storage system provided by an embodiment of the present invention;
[0059] Fig. 9 It is a schematic diagram of the structure of a computing device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0060] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.
[0061] like Figure 1 As shown, an embodiment of the present invention proposes an energy scheduling method for a distributed hybrid energy storage system, the scheduling method is applied to a controller, the controller is electrically connected to a distributed power generation unit and a hybrid energy storage unit; the distributed power generation unit, the hybrid energy storage unit, the load and the external power grid exchange electric energy through an intranet; the distributed power generation unit includes a photovoltaic device and a renewable energy device; the hybrid energy storage unit includes a battery and a capacitor; the scheduling method includes:
[0062] Step 11, obtaining the distributed generation unit operation data, load history data and hybrid energy storage unit status data;
[0063] Step 12, obtaining the predicted output power of the distributed generation unit and the predicted load demand power within a prediction period according to the distributed generation unit operation data and the load history data;
[0064] Step 13, obtaining energy dispatching data according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, wherein the energy dispatching data is used to control the operating state of the battery and the interactive state of the power grid;
[0065] Step 14, obtaining hybrid energy storage unit operation data according to the energy scheduling data, wherein the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serves as the hybrid energy storage unit state data for the next prediction period.
[0066] In this embodiment, the distributed hybrid energy storage system includes a distributed power generation unit, the hybrid energy storage unit, a load, an external power grid and an intranet, wherein the distributed power generation unit includes a photovoltaic device and a renewable energy device, which can convert solar energy, wind energy and tidal energy into electrical energy and output it to the load device; since the photovoltaic device and the renewable energy device are affected by climate change and the alternation of day and night, there is an instability in the output power of the electrical energy, and at the same time, the power demand of the load is also in a constant change process, in order to balance the energy demand of the power grid or the device and reduce the fluctuation of the energy supply, it is necessary to configure the distributed power generation unit with a corresponding hybrid energy storage unit, so that the distributed power generation unit is more stable and reliable when facing changes in energy demand, and the hybrid energy storage unit includes a battery and a supercapacitor, wherein the battery has a large energy density but a slow charging and discharging speed, while the supercapacitor has a fast charging and discharging speed but a low energy density; the distributed power generation unit, the hybrid energy storage unit and the load are connected through the intranet to form a distributed power supply system, wherein the intranet also has an external interface, which is connected to the external power transmission network to realize the power exchange between the intranet and the external power transmission network, such as Figure 2 As shown, when the power emitted by the power supply equipment of the intranet is greater than the power required by the load in the intranet, the excess electric energy can be output to the external power grid; when the power emitted by the power supply equipment of the intranet is less than the power required by the load in the intranet, the electric energy of the external power grid can be input to the intranet load to achieve the balance of electric energy supply and demand in the intranet; in order to achieve this technical effect, firstly, the distributed power generation unit operation data, load history data and hybrid energy storage unit status data are obtained once every preset period; according to the distributed power generation unit operation data and the load history data, the distributed power generation unit predicted output power and the load predicted demand power within the prediction period are obtained; according to the distributed power generation unit predicted output power, the load predicted demand power and the hybrid energy storage unit status data, the energy scheduling data is obtained, and the energy scheduling data is used to control the operation of the battery The interactive state of the state and the power grid, that is, controlling the charging or discharging of the battery, and the power of the battery charging and discharging; according to the energy scheduling data, the hybrid energy storage unit operation data is obtained, and the hybrid energy storage unit operation data is used to control the operation state of the capacitor, that is, controlling the charging or discharging of the supercapacitor, and the power of the supercapacitor charging and discharging. At the same time, the hybrid energy storage unit operation data is obtained and used as the hybrid energy storage unit state data of the next prediction period, so as to realize the control of the operation state of the hybrid energy storage unit in the next prediction period; it can store excess energy during the high-production period of energy and release it during the peak demand period, so as to balance the supply and demand of energy, reduce energy waste, help improve the effective utilization rate of energy, ensure that energy is used at the optimal time and place, and improve the dispatchability of renewable energy, so as to maintain the stable operation of the power system.
[0067] In an optional embodiment of the present invention, step 11 may include:
[0068] Step 111, obtaining distributed power generation unit operation data according to a first metering device in the distributed power generation unit, wherein the distributed power generation unit operation data includes photovoltaic device power generation data and renewable energy device power generation data;
[0069] Step 112, acquiring load history data according to a load demand history database, wherein the load history data includes load demand power history data and distributed generation unit output power history data;
[0070] Step 113, obtaining hybrid energy storage unit status data according to the second metering device in the hybrid energy storage unit, wherein the hybrid energy storage unit status data includes the charging and discharging power of the battery, the grid interaction power and the charging and discharging power of the capacitor.
[0071] In this embodiment, according to the first metering device (such as a voltmeter, an ammeter and a power factor meter) in the distributed power generation unit, the operating data of the distributed power generation unit is obtained, wherein the operating data of the distributed power generation unit includes the power generation data of the photovoltaic device and the power generation data of the renewable energy device; according to the load demand history database, the load history data is obtained, wherein the load history data includes the load demand power history data and the distributed power generation unit output power history data; according to the second metering device (such as a voltmeter, an ammeter and a power factor meter) in the hybrid energy storage unit, the status data of the hybrid energy storage unit is obtained, wherein the status data of the hybrid energy storage unit includes the charging and discharging power of the battery, the grid interaction power and the charging and discharging power of the capacitor; by obtaining the above-mentioned distributed power generation unit operating data, hybrid energy storage unit status data and load history data, it is used to analyze the distributed power generation unit predicted output power, grid predicted interaction power and load predicted demand power within the prediction period.
[0072] In an optional embodiment, the embodiment of the present invention provides that step 12 may include:
[0073] Step 121, input the distributed power generation unit operation data into the load demand forecasting model to obtain the distributed power generation unit predicted output power, power grid predicted interaction power and load predicted demand power within the forecasting period; wherein, the load demand forecasting model is obtained by inputting the load history data into the neural network model and training the neural network model.
[0074] In this embodiment, the load history data is input into a neural network model, and the neural network model is trained to obtain a load demand prediction model, such as Figure 3As shown, the load demand prediction model includes an input layer, a first hidden layer, a second hidden layer and an output layer. The specific process includes:
[0075] Step 1211, obtaining load history data;
[0076] Step 1212, performing feature extraction processing on the load demand prediction model to obtain multiple input vectors, wherein the input vector x={s, T, p}, s is time data, T is temperature data at time s, and p is a random impact factor;
[0077] Step 1213, inputting the input vector into an input layer of a neural network model, and the input layer outputs a first intermediate result;
[0078] Step 1214, inputting the first intermediate result output by the input layer into the first hidden layer of the neural network model for local response processing, and outputting a second intermediate result;
[0079] Step 1215, inputting the second intermediate result into the second hidden layer of the neural network model for correction processing, and outputting a third intermediate result;
[0080] Step 1216, inputting the third intermediate result into the output layer of the neural network model, and the output layer outputs the network result;
[0081] Among them, the neuron function and weight of the input layer are:
[0082] ,
[0083] Among them, w ij is the weight from the input layer to the first hidden layer, i is the number of neurons in the input layer, j is the number of neurons in the first hidden layer, and b i is the weight of the bias value of the i-th neuron in the input layer;
[0084] Among them, the neuron functions and weights of the first hidden layer and the second hidden layer are
[0085] ,
[0086] Among them, f is the output result; n i =A i ∙x+d 1i , 1≤i≤j, j is the number of neurons in the first hidden layer or the second hidden layer; A i =[a i1 , a i2 , a i3 ], a i1 、a i2 、a i3 is the weight from the input layer to the first hidden layer; d 1iis the weight of the neuron bias value in a hidden layer; a is a parameter, 0 <a<1;
[0087] Among them, the neuron function of the output layer is
[0088] ,
[0089] Step 1217, obtaining the error between the network result and each sample in the training set;
[0090] Step 1218, weighted processing is performed on the neural network function in the hidden layer according to the error and input and output calculations are performed again until the error is controlled within an allowable accuracy range, thereby obtaining the load demand prediction model.
[0091] The error function control number is
[0092] ,
[0093] Among them, y i is the actual output value; is the expected output value. Output vector y={P L , P F};
[0094] The distributed generation unit operation data is input into the load demand prediction model to obtain the distributed generation unit predicted output power, power grid predicted interaction power and load predicted demand power within the prediction period.
[0095] In an optional embodiment, the embodiment of the present invention provides that step 13 may include:
[0096] Step 131, inputting the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit into a first scheduling model to obtain energy scheduling data;
[0097] The expression of the first scheduling model is:
[0098] ,
[0099] Among them, P cost1 is the system operation cost; P U (t) is the electricity transaction cost between the distributed generation unit and the power grid in the tth forecast period, t=1,2,…, n; n is the number of predictions; P C (t) is the cost of using the battery in the tth prediction period; P grid (t) is the electricity price in the tth forecast period; Δt is the duration of the forecast period; l is the number of times the battery is charged and discharged; η1 and η2 are the battery charge and discharge efficiencies; C B(t) is the actual usage capacity of the battery in the tth prediction period; R B The purchase cost of the battery;
[0100] P F (t) is the predicted output power of the distributed generation unit; P L (t) is the load predicted required power; P B (t) is the charge and discharge power of the battery in the tth prediction cycle; P G (t) is the grid interaction power in the t-th prediction period;
[0101] The energy scheduling data is P cost1 The battery charging and discharging power P when the minimum value is obtained Bm Interaction power with the grid P Gm , P Bm ∈{P B (t)},P Gm ∈{P G (t)}.
[0102] In this embodiment, the predicted output power P of the distributed generation unit obtained in step 121 is F (t), the load prediction required power P L (t), and the hybrid energy storage unit state data obtained in step 11 is input into the first scheduling model, and when the energy storage constraint condition is met: P Bmin ≤P B (t) ≤P Bmax , S Bmin ≤S B (t) ≤S Bmax Interaction constraints with the power grid: P Gmin ≤P G (t) ≤P Gmax , where P Bmin , P Bmax are the minimum and maximum values of battery charging and discharging power respectively; P Gmin , P Gmax are the minimum and maximum values of the grid interaction power respectively; S Bmin , S Bmax are the minimum and maximum values of battery energy storage respectively; S B (t) is the energy storage value of the battery in the tth prediction period; B (t) and P G (t) Traverse the range of values that satisfy the constraints and find the value that makes the objective function Get the minimum value of P Bm and P Gm ; P Bm and P GmAs energy scheduling data (i.e., target parameters), the charging and discharging power of the battery during the forecast period and the interactive power of the internal and external power grids during the forecast period are controlled.
[0103] In an optional embodiment, the embodiment of the present invention provides that step 14 may include:
[0104] Step 141, inputting the energy scheduling data into a second scheduling model to obtain hybrid energy storage unit operation data;
[0105] The expression of the second scheduling model is:
[0106] ,
[0107] Among them, P cost2 is the capacitor operating cost; k1, k2, k3 are cost weight ratio coefficients; P SC (t) is the charge and discharge power of the capacitor in the tth prediction cycle; W SC (t) is the cost of using the capacitor in the tth prediction period; C SC is the purchase cost of the capacitor; L SC is the service life of the capacitor;
[0108] The hybrid energy storage unit operation data is P cost2 The battery charging and discharging power P when the minimum value is obtained Bm1 , grid interaction power P Gm1 and capacitor charging and discharging power P SCm , and P Bm1 ∈{P B (t)}, P Gm1 ∈{P G (t)}, P SCm ∈{P SC (t)}.
[0109] In this embodiment, the interactive power of the internal and external power grids obtained in step 131 during the prediction period and the state data of the hybrid energy storage unit obtained in step 11 are input into the second scheduling model, and the state of charge constraint of the capacitor is satisfied: S SCmin ≤S SC (t) ≤S SCmax , and the charging and discharging power constraint of the capacitor: P SCmin ≤P SC (t) ≤P SCmax , where S SCmin , S SCmax are the minimum and maximum values of the capacitor’s state of charge, respectively; S SC (t) is the state of charge value of the capacitor in the tth prediction period; P SCmin , PSCmax are the minimum and maximum values of the capacitor charging and discharging power respectively; P SC (t) is the charge and discharge power of the capacitor in the tth prediction period;
[0110] P SC Traverse the range of values that satisfy the constraints and find the value that makes the objective function
[0111] ,
[0112] Get the minimum battery charge and discharge power P Bm1 , grid interaction power P Gm2 and capacitor charging and discharging power P SCm ; and P Bm1 , P Gm2 and P SCm As the target parameter, the supercapacitor is controlled to charge and discharge within the predicted period.
[0113] A specific embodiment of the energy scheduling method of the distributed hybrid energy storage system provided by the embodiment of the present invention is:
[0114] The prediction cycle is set to 72h, the controller calls the first scheduling model every time with a time interval of 1h, calls the second scheduling model every time with a time interval of 10min, and the prediction number n is 600 times; the battery capacity is 15kWh, the maximum power is 5kWh, and the charging and discharging efficiency is 92%; the rated capacity of the supercapacitor is 1kWh, the maximum power is 10kWh, and the charging and discharging efficiency is 90%;
[0115] According to the load demand prediction model, the predicted output power of the distributed generation unit and the load predicted demand power are obtained as follows: Figure 4 shown.
[0116] The predicted output power of the distributed generation unit and the predicted load demand power are processed by the first scheduling model and the second scheduling model respectively to obtain energy scheduling data; the controller performs energy scheduling on the distributed hybrid energy storage system according to the energy scheduling data, and the output power of the power grid, battery and supercapacitor under the real-time electricity price is as follows: Figures 5 to 7 As shown, from Figures 5 to 7It can be seen that: from 1 to 10 hours, the output power of the release-type power generation unit is not enough to meet the power required by the load, and the electricity price is at a low level. The internal network purchases electricity from the external power grid to supply the load, and at the same time charges the battery so that it can output power during the peak electricity price period in the next stage, thereby realizing a scheduling strategy of buying low and selling high; from 10 to 13 hours, the output power of the release-type power generation unit still does not meet the load demand, and the real-time electricity price is on the rise. The power shortage can be made up by discharging to the external power grid and the battery; from 13 to 10 hours, the output power of the release-type power generation unit is higher than the power required by the load, and the electricity price is at a peak period. The excess power is sold to obtain higher profits, and the supercapacitor is frequently charged and discharged in a shorter time step to handle power fluctuations and reduce the number of battery charge and discharge times.
[0117] like Figure 2 As shown, an embodiment of the present invention further proposes a distributed hybrid energy storage system, comprising:
[0118] A controller, wherein the controller is electrically connected to a distributed power generation unit and a hybrid energy storage unit; the distributed power generation unit, the hybrid energy storage unit, the load and the external power grid exchange electric energy through an intranet; the distributed power generation unit includes a photovoltaic device and a renewable energy device; the hybrid energy storage unit includes a battery and a capacitor;
[0119] The controller is used to obtain the distributed generation unit operation data, load history data and hybrid energy storage unit status data; obtain the distributed generation unit predicted output power and the load predicted demand power within the prediction period according to the distributed generation unit operation data and the load history data; obtain energy scheduling data according to the distributed generation unit predicted output power, the load predicted demand power and the hybrid energy storage unit status data, and the energy scheduling data is used to control the operation status of the battery and the interaction status of the power grid; obtain the hybrid energy storage unit operation data according to the energy scheduling data, and the hybrid energy storage unit operation data is used to control the operation status of the capacitor and serve as the hybrid energy storage unit status data for the next prediction period.
[0120] In this embodiment, the distributed hybrid energy storage system includes a distributed power generation unit, the hybrid energy storage unit, a load, an external power grid and an intranet, wherein the distributed power generation unit includes a photovoltaic device and a renewable energy device, which can convert solar energy, wind energy and tidal energy into electrical energy and output it to the load device; since the photovoltaic device and the renewable energy device are affected by climate change and the alternation of day and night, there is an instability in the output power of the electrical energy, and at the same time, the power demand of the load is also in a process of constant change, in order to balance the energy demand of the power grid or the device and reduce the fluctuation of the energy supply, it is necessary to configure the distributed power generation unit with a corresponding hybrid energy storage unit so that the distributed power generation unit can meet the energy demand. The hybrid energy storage unit includes a battery and a supercapacitor, wherein the battery has a large energy density but a slow charging and discharging speed, while the supercapacitor has a fast charging and discharging speed but a low energy density; the distributed power generation unit, the hybrid energy storage unit, and the load are connected through the intranet to form a distributed power supply system, wherein the intranet also has an external interface, which is connected to the external power transmission network to realize the power exchange between the intranet and the external power transmission network, that is, when the power emitted by the power supply equipment in the intranet is greater than the power required by the load in the intranet, the excess power can be output to the external power grid, and when the power emitted by the power supply equipment in the intranet is less than the power required by the load in the intranet, the excess power can be output to the external power grid. When the power of the external power grid is reached, the electric energy of the external power grid can be input to the internal network load to achieve the balance of power supply and demand in the internal network; in order to achieve this technical effect, a controller is provided between the distributed power generation unit and the hybrid energy storage unit, and the controller is electrically connected to the distributed power generation unit and the hybrid energy storage unit. The controller obtains the operating data of the distributed power generation unit, the load history data and the status data of the hybrid energy storage unit every preset period; the controller obtains the predicted output power of the distributed power generation unit and the predicted load demand power within the prediction period according to the operating data of the distributed power generation unit and the load history data; according to the predicted output power of the distributed power generation unit, the predicted load demand power and The hybrid energy storage unit state data is used to obtain energy scheduling data, which is used by the controller to control the operating state of the battery and the interactive state of the power grid, that is, to control the charging or discharging of the battery, and the power of charging and discharging of the battery; according to the energy scheduling data, the hybrid energy storage unit operation data is obtained, and the hybrid energy storage unit operation data is used by the controller to control the operating state of the capacitor, that is, to control the charging or discharging of the supercapacitor, and the power of charging and discharging of the supercapacitor. At the same time, the hybrid energy storage unit operation data is obtained and used as the hybrid energy storage unit state data of the next prediction period, so as to realize the control of the operating state of the hybrid energy storage unit in the next prediction period;The distributed hybrid energy storage system can store excess energy during high energy production periods and release it during peak demand periods, thereby balancing energy supply and demand, reducing energy waste, helping to improve the effective utilization of energy, ensuring that energy is used at the optimal time and place, and improving the dispatchability of renewable energy, thereby maintaining the stable operation of the power system.
[0121] like Figure 8 As shown, an embodiment of the present invention further proposes an energy dispatching device 80 for a distributed hybrid energy storage system, and the device 80 includes:
[0122] An acquisition module 81 is used to acquire the operating data of the distributed generation unit, the load history data and the status data of the hybrid energy storage unit;
[0123] A processing module 82 is used to obtain the predicted output power of the distributed generation unit and the predicted demand power of the load within a prediction period according to the operation data of the distributed generation unit and the load history data;
[0124] A first generating module 83, configured to obtain energy dispatching data according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, wherein the energy dispatching data is used to control the operation state of the battery and the interaction state of the power grid;
[0125] The second generating module 84 is used to obtain hybrid energy storage unit operation data according to the energy scheduling data, and the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serve as the hybrid energy storage unit state data of the next prediction period.
[0126] Optionally, the acquisition module 81 is specifically used for:
[0127] According to the first metering device in the distributed power generation unit, the distributed power generation unit operation data is obtained, wherein the distributed power generation unit operation data includes photovoltaic device power generation data and renewable energy device power generation data;
[0128] Obtaining load history data according to a load demand history database, wherein the load history data includes load demand power history data and distributed generation unit output power history data;
[0129] According to the second metering device in the hybrid energy storage unit, the hybrid energy storage unit status data is obtained, wherein the hybrid energy storage unit status data includes the charging and discharging power of the battery, the grid interaction power and the charging and discharging power of the capacitor.
[0130] Optionally, the processing module 82 is specifically used for:
[0131] The distributed power generation unit operation data is input into the load demand prediction model to obtain the predicted output power of the distributed power generation unit, the predicted grid interaction power and the predicted load demand power within the prediction period; wherein the load demand prediction model is obtained by inputting the load history data into a neural network model and training the neural network model.
[0132] Optionally, the first generating module 83 is specifically used for:
[0133] Inputting the predicted output power of the distributed generation unit, the predicted load demand power and the state data of the hybrid energy storage unit into a first scheduling model to obtain energy scheduling data;
[0134] The expression of the first scheduling model is:
[0135] ,
[0136] Among them, P cost1 is the system operation cost; P U (t) is the electricity transaction cost between the distributed generation unit and the power grid in the tth forecast period, t=1,2,…, n; n is the number of predictions; P C (t) is the cost of using the battery in the tth prediction period; P grid (t) is the electricity price in the tth forecast period; P G (t) is the grid interaction power in the tth prediction period; Δt is the duration of the prediction period; P F (t) is the predicted output power of the distributed generation unit; P L (t) is the load prediction required power; l is the number of times the battery is charged and discharged; η1 and η2 are the battery charge and discharge efficiencies; C B (t) is the actual usage capacity of the battery in the tth prediction period; R B is the purchase cost of the battery; P B (t) is the charge and discharge power of the battery in the tth prediction cycle; the energy scheduling data is P cost1 The battery charging and discharging power P when the minimum value is obtained Bm Interaction power with the grid P Gm , P Bm ∈{P B (t)},P Gm ∈{P G (t)}.
[0137] Optionally, when the energy scheduling data is obtained, the first constraint condition of the first scheduling model includes energy storage constraint and grid interaction constraint;
[0138] Wherein, the energy storage constraint is:
[0139] P Bmin ≤P B (t) ≤P Bmax ,
[0140] S Bmin ≤S B (t) ≤S Bmax ,
[0141] The grid interaction constraints are:
[0142] P Gmin ≤P G (t) ≤P Gmax ,
[0143] Among them, P Bmin , P Bmax are the minimum and maximum values of battery charging and discharging power respectively; P Gmin , P Gmax are the minimum and maximum values of the grid interaction power respectively; S Bmin , S Bmax are the minimum and maximum values of battery energy storage respectively; S B (t) is the energy storage value of the battery in the tth prediction period.
[0144] Optionally, the second generating module 84 is specifically used for:
[0145] Inputting the energy scheduling data into a second scheduling model to obtain hybrid energy storage unit operation data;
[0146] The expression of the second scheduling model is:
[0147] ,
[0148] Among them, P cost2 is the capacitor operating cost; k1, k2, k3 are cost weight ratio coefficients; P SC (t) is the charge and discharge power of the capacitor in the tth prediction cycle; W SC (t) is the cost of using the capacitor in the tth prediction period; C SC is the purchase cost of the capacitor; L SC is the service life of the capacitor; the operating data of the hybrid energy storage unit is P cost2 The battery charging and discharging power P when the minimum value is obtained Bm1 , grid interaction power P Gm1 and capacitor charging and discharging power P SCm , and P Bm1 ∈{P B (t)}, P Gm1 ∈{PG (t)}, P SCm ∈{P SC (t)}.
[0149] Optionally, when the hybrid energy storage unit operation data is obtained, the second constraint condition of the second scheduling model includes a state of charge constraint of the capacitor and a charge and discharge power constraint of the capacitor;
[0150] Wherein, the state of charge constraint of the capacitor is:
[0151] S SCmin ≤S SC (t) ≤S SCmax ,
[0152] The charging and discharging power constraints of the capacitor are:
[0153] P SCmin ≤P SC (t) ≤P SCmax ,
[0154] Among them, S SCmin , S SCmax are the minimum and maximum values of the capacitor’s state of charge, respectively; S SC (t) is the state of charge value of the capacitor in the tth prediction period; P SCmin , P SCmax are the minimum and maximum values of the capacitor charging and discharging power, respectively.
[0155] It should be noted that the device is a device corresponding to the above method, and all implementation methods in the above method embodiment are applicable to this embodiment and can achieve the same technical effect.
[0156] like Fig. 9 As shown, the embodiment of the present invention further provides a computing device 90, including a processor 91, a memory 92, a program or instruction stored in the memory 92 and executable on the processor 91, and when the program or instruction is executed by the processor 91, each process of the above-mentioned distributed hybrid energy storage system energy scheduling method embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it is not repeated here. It should be noted that the computing device in the embodiment of the present invention includes the above-mentioned mobile electronic device and non-mobile electronic device.
[0157] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0158] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0159] In the embodiments provided by the present invention, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0160] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0161] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0162] Stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of various embodiments of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, ROM, RAM, disk or optical disk, etc., various media that can store program codes.
[0163] In addition, it should be pointed out that in the apparatus and method of the present invention, it is obvious that each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. Moreover, the steps of performing the above series of processing can naturally be performed in chronological order according to the order of description, but it is not necessary to perform them in chronological order, and some steps can be performed in parallel or independently of each other. For those of ordinary skill in the art, it is understandable that all or any steps or components of the method and apparatus of the present invention can be implemented in hardware, firmware, software or a combination thereof in any computing device (including processors, storage media, etc.) or a network of computing devices, which can be achieved by those of ordinary skill in the art using their basic programming skills after reading the description of the present invention.
[0164] Therefore, the purpose of the present invention can also be achieved by running a program or a group of programs on any computing device. The computing device can be a well-known general-purpose device. Therefore, the purpose of the present invention can also be achieved by simply providing a program product containing a program code for implementing a method or device. That is to say, such a program product also constitutes the present invention, and a storage medium storing such a program product also constitutes the present invention. Obviously, the storage medium can be any well-known storage medium or any storage medium developed in the future. It should also be pointed out that in the device and method of the present invention, it is obvious that each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. In addition, the steps of performing the above-mentioned series of processing can naturally be performed in chronological order according to the order of description, but it is not necessary to perform them in chronological order. Some steps can be performed in parallel or independently of each other.
[0165] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A distributed hybrid energy storage system energy scheduling method, characterized in that: The scheduling method is applied to a controller, the controller is electrically connected to a distributed power generation unit and a hybrid energy storage unit; the distributed power generation unit, the hybrid energy storage unit, the load and the external power grid exchange electric energy through an intranet; the distributed power generation unit includes a photovoltaic device and a renewable energy device; the hybrid energy storage unit includes a battery and a capacitor; the scheduling method includes: Obtaining distributed generation unit operation data, load history data and hybrid energy storage unit status data; Obtaining the predicted output power of the distributed generation unit and the predicted load demand power within a prediction period according to the distributed generation unit operation data and the load history data; Obtaining energy dispatching data according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, wherein the energy dispatching data is used to control the operating state of the battery and the interactive state of the power grid; According to the energy scheduling data, hybrid energy storage unit operation data is obtained, wherein the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serves as hybrid energy storage unit state data for the next prediction period; Wherein, energy scheduling data is obtained according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, including: Inputting the predicted output power of the distributed generation unit, the predicted load demand power and the state data of the hybrid energy storage unit into a first scheduling model to obtain energy scheduling data; The expression of the first scheduling model is: in, P cost1 The cost of running the system; P U ( t ) is the distributed generation unit and the grid in the t The electricity transaction cost within the forecast period is t =1,2,…, n ; n is the number of predictions; P C ( t ) is the battery in the t The usage cost within the forecast period; P grid ( t ) is the t The electricity price within the forecast period; P G ( t ) is the t The grid interaction power within the prediction period; Δ t is the duration of the prediction cycle; P F ( t ) predicts the output power for distributed generation units; P L ( t ) is the load predicted power requirement; l The number of times the battery is charged and discharged; η 1. η 2 is the battery charge and discharge efficiency; C B ( t ) is the battery in the t The actual used capacity during the forecast period; R B The purchase cost of the battery; P B ( t ) is the battery in the t The charge and discharge power within a prediction cycle; The energy scheduling data is the battery charging and discharging power P Bm Interaction power with the grid P Gm ,in, P Bm for P cost1 The battery charging and discharging power value when the minimum value is obtained, P Gm for P cost1 The grid interaction power value when the minimum value is obtained, and P Bm ∈{ P B ( t )}, P Gm ∈{ P G ( t )}; Wherein, the hybrid energy storage unit operation data is obtained according to the energy scheduling data, including: Inputting the energy scheduling data into a second scheduling model to obtain hybrid energy storage unit operation data; The expression of the second scheduling model is: in, P cost2 is the capacitor operating cost; k 1. k 2. k 3 is the cost weight ratio coefficient; P SC ( t ) is the capacitor in the t The charge and discharge power within a prediction cycle; W SC ( t ) is the capacitor in the t The usage cost within the forecast period; C SC is the purchase cost of the capacitor; L SC is the service life of the capacitor; The hybrid energy storage unit operation data is the battery charging and discharging power P Bm1 , grid interaction power P Gm1 and capacitor charging and discharging power P SCm ,in, P Bm1 for P cost2 The battery charging and discharging power value when the minimum value is obtained, P Gm1 for P cost2 The grid interaction power value when the minimum value is obtained, P SCm for P cost2 The capacitor charging and discharging power value at the minimum value is obtained, and P Bm1 ∈{ P B ( t )}, P Gm1 ∈{ P G ( t )}, P SCm ∈{ P SC ( t )}.
2. The energy dispatching method of a distributed hybrid energy storage system according to claim 1, characterized in that: The obtaining of the distributed generation unit operation data, load history data and hybrid energy storage unit status data includes: According to the first metering device in the distributed power generation unit, the distributed power generation unit operation data is obtained, wherein the distributed power generation unit operation data includes photovoltaic device power generation data and renewable energy device power generation data; Obtaining load history data according to a load demand history database, wherein the load history data includes load demand power history data and distributed generation unit output power history data; According to the second metering device in the hybrid energy storage unit, the hybrid energy storage unit status data is obtained, wherein the hybrid energy storage unit status data includes the charging and discharging power of the battery, the grid interaction power and the charging and discharging power of the capacitor.
3. The energy dispatching method of the distributed hybrid energy storage system according to claim 2, characterized in that: According to the distributed generation unit operation data and the load history data, the distributed generation unit predicted output power and the load predicted demand power within the prediction period are obtained, including: The distributed power generation unit operation data is input into the load demand prediction model to obtain the predicted output power of the distributed power generation unit, the predicted grid interaction power and the predicted load demand power within the prediction period; wherein the load demand prediction model is obtained by inputting the load history data into a neural network model and training the neural network model.
4. The energy dispatching method of the distributed hybrid energy storage system according to claim 3 is characterized in that: When the energy dispatch data is obtained, the first constraint condition of the first dispatch model includes energy storage constraint and grid interaction constraint; Wherein, the energy storage constraint is: P Bmin ≤ P B ( t ) ≤ P Bmax S Bmin ≤ S B ( t ) ≤ S Bmax The grid interaction constraints are: P Gmin ≤ P G ( t ) ≤ P Gmax in, P Bmin , P Bmax are the minimum and maximum values of the battery charging and discharging power respectively; P Gmin , P Gmax are the minimum and maximum values of grid interaction power, respectively; S Bmin , S Bmax are the minimum and maximum values of battery energy storage, respectively; S B ( t ) is the battery in the t The energy storage value within the prediction period.
5. The energy dispatching method of a distributed hybrid energy storage system according to claim 4, characterized in that: When the hybrid energy storage unit operation data is obtained, the second constraint condition of the second scheduling model includes a state of charge constraint of the capacitor and a charge and discharge power constraint of the capacitor; Wherein, the state of charge constraint of the capacitor is: S SCmin ≤ S SC ( t ) ≤ S SCmax The charging and discharging power constraints of the capacitor are: P SCmin ≤ P SC ( t ) ≤ P SCmax in, S SCmin , S SCmax are the minimum and maximum values of the capacitor’s state of charge, respectively; S SC ( t ) is the capacitor in the t State of charge value within a prediction period; P SCmin , P SCmax are the minimum and maximum values of the capacitor charging and discharging power, respectively.
6. A distributed hybrid energy storage system, characterized in that: include: A controller, wherein the controller is electrically connected to a distributed power generation unit and a hybrid energy storage unit; the distributed power generation unit, the hybrid energy storage unit, the load and the external power grid exchange electric energy through an intranet; the distributed power generation unit includes a photovoltaic device and a renewable energy device; the hybrid energy storage unit includes a battery and a capacitor; The controller is used to obtain the distributed generation unit operation data, load history data and hybrid energy storage unit status data; obtain the distributed generation unit predicted output power and load predicted demand power within the prediction period according to the distributed generation unit operation data and the load history data; obtain energy scheduling data according to the distributed generation unit predicted output power, the load predicted demand power and the hybrid energy storage unit status data, and the energy scheduling data is used to control the operation state of the battery and the interactive state of the power grid; obtain the hybrid energy storage unit operation data according to the energy scheduling data, and the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serve as the hybrid energy storage unit status data for the next prediction period; Wherein, energy scheduling data is obtained according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, including: Inputting the predicted output power of the distributed generation unit, the predicted load demand power and the state data of the hybrid energy storage unit into a first scheduling model to obtain energy scheduling data; The expression of the first scheduling model is: in, P cost1 The cost of running the system; P U ( t ) is the distributed generation unit and the grid in the t The electricity transaction cost within the forecast period is t =1,2,…, n ; n is the number of predictions; P C ( t ) is the battery in the t The usage cost within the forecast period; P grid ( t ) is the t The electricity price within the forecast period; P G ( t ) is the t The grid interaction power within the prediction period; Δ t is the duration of the prediction cycle; P F ( t ) predicts the output power for distributed generation units; P L ( t ) is the load predicted power requirement; l The number of times the battery is charged and discharged; η 1. η 2 is the battery charge and discharge efficiency; C B ( t ) is the battery in the t The actual used capacity during the forecast period; R B The purchase cost of the battery; P B ( t ) is the battery in the t The charge and discharge power within a prediction cycle; The energy scheduling data is the battery charging and discharging power P Bm Interaction power with the grid P Gm ,in, P Bm for P cost1 The battery charging and discharging power value when the minimum value is obtained, P Gm for P cost1 The grid interaction power value when the minimum value is obtained, and P Bm ∈{ P B ( t )}, P Gm ∈{ P G ( t )}; Wherein, the hybrid energy storage unit operation data is obtained according to the energy scheduling data, including: Inputting the energy scheduling data into a second scheduling model to obtain hybrid energy storage unit operation data; The expression of the second scheduling model is: in, P cost2 is the capacitor operating cost; k 1. k 2. k 3 is the cost weight ratio coefficient; P SC ( t ) is the capacitor in the t The charge and discharge power within a prediction cycle; W SC ( t ) is the capacitor in the t The usage cost within the forecast period; C SC is the purchase cost of the capacitor; L SC is the service life of the capacitor; The hybrid energy storage unit operation data is the battery charging and discharging power P Bm1 , grid interaction power P Gm1 and capacitor charging and discharging power P SCm ,in, P Bm1 for P cost2 The battery charging and discharging power value when the minimum value is obtained, P Gm1 for P cost2 The grid interaction power value when the minimum value is obtained, P SCm for P cost2 The capacitor charging and discharging power value at the minimum value is obtained, and P Bm1 ∈{ P B ( t )}, P Gm1 ∈{ P G ( t )}, P SCm ∈{ P SC ( t )}.
7. A distributed hybrid energy storage system energy dispatching device, characterized in that: The device comprises: An acquisition module, used to acquire distributed generation unit operation data, load history data and hybrid energy storage unit status data; A processing module, used for obtaining the predicted output power of the distributed generation unit and the predicted demand power of the load within a prediction period according to the operation data of the distributed generation unit and the load history data; A first generating module, configured to obtain energy dispatching data according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, wherein the energy dispatching data is used to control the operating state of the battery and the interactive state of the power grid; A second generating module is used to obtain hybrid energy storage unit operation data according to the energy scheduling data, wherein the hybrid energy storage unit operation data is used to control the operation state of the capacitor and serves as the hybrid energy storage unit state data of the next prediction period; Wherein, energy scheduling data is obtained according to the predicted output power of the distributed generation unit, the predicted required power of the load and the state data of the hybrid energy storage unit, including: Inputting the predicted output power of the distributed generation unit, the predicted load demand power and the state data of the hybrid energy storage unit into a first scheduling model to obtain energy scheduling data; The expression of the first scheduling model is: in, P cost1 The cost of running the system; P U ( t ) is the distributed generation unit and the grid in the t The electricity transaction cost within the forecast period is t =1,2,…, n ; n is the number of predictions; P C ( t ) is the battery in the t The usage cost within the forecast period; P grid ( t ) is the t The electricity price within the forecast period; P G ( t ) is the t The grid interaction power within the prediction period; Δ t is the duration of the prediction cycle; P F ( t ) predicts the output power for distributed generation units; P L ( t ) is the load predicted power requirement; l The number of times the battery is charged and discharged; η 1. η 2 is the battery charge and discharge efficiency; C B ( t ) is the battery in the t The actual used capacity during the forecast period; R B The purchase cost of the battery; P B ( t ) is the battery in the t The charge and discharge power within a prediction cycle; The energy scheduling data is the battery charging and discharging power P Bm Interaction power with the grid P Gm ,in, P Bm for P cost1 The battery charging and discharging power value when the minimum value is obtained, P Gm for P cost1 The grid interaction power value when the minimum value is obtained, and P Bm ∈{ P B ( t )}, P Gm ∈{ P G ( t )}; Wherein, the hybrid energy storage unit operation data is obtained according to the energy scheduling data, including: Inputting the energy scheduling data into a second scheduling model to obtain hybrid energy storage unit operation data; The expression of the second scheduling model is: in, P cost2 is the capacitor operating cost; k 1. k 2. k 3 is the cost weight ratio coefficient; P SC ( t ) is the capacitor in the t The charge and discharge power within a prediction cycle; W SC ( t ) is the capacitor in the t The usage cost within the forecast period; C SC is the purchase cost of the capacitor; L SC is the service life of the capacitor; The hybrid energy storage unit operation data is the battery charging and discharging power P Bm1 , grid interaction power P Gm1 and capacitor charging and discharging power P SCm ,in, P Bm1 for P cost2 The battery charging and discharging power value when the minimum value is obtained, P Gm1 for P cost2 The grid interaction power value when the minimum value is obtained, P SCm for P cost2 The capacitor charging and discharging power value at the minimum value is obtained, and P Bm1 ∈{ P B ( t )}, P Gm1 ∈{ P G ( t )}, P SCm ∈{ P SC ( t )}.
8. A computing device, characterized in that include: A processor and a memory storing a computer program, wherein when the computer program is executed by the processor, the method according to any one of claims 1 to 5 is performed.
