Water resources digital processing system and device based on data drive
By introducing multi-dimensional data collection, distributed computing and quantum algorithms into the water resources management system, a real-time feedback and dynamic adjustment mechanism is established to solve the problems of low efficiency and poor accuracy of the traditional water resources management system and achieve efficient water resource allocation. , accurate and reliable scheduling.
Patent Information
- Application Number
- CN202411196735.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-29
AI Technical Summary
The traditional water resources management system cannot dynamically adjust according to the actual situation, resulting in low efficiency and poor accuracy of water distribution, making it difficult to meet the requirements of modern water resources management for efficient, accurate and reliable dispatch.
Adopting a data-driven digital processing system for water resources, through multi-dimensional water resources data collection, distributed computing node configuration, quantum algorithm module embedding and real-time feedback mechanism, a distributed computing framework is established to determine water resource scheduling plans and dynamically adjust fluid power transmission Loop to optimize computing resource allocation.
It improves the optimization effect of water resources distribution, achieves efficient, accurate and reliable water resource dispatching, and meets the needs of modern water resources management.
Smart Images

Figure CN118691059B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of digital processing technology, and in particular to a water resource digital processing system and device based on data drive. Background Art
[0002] With the growing demand for water resource management and the challenges brought by climate change, digital water resource processing technology plays a vital role in modern water resource management. However, with the continuous expansion of management scale and the complexity of processing technology, the optimization control in the water resource scheduling process is also facing increasing challenges. Traditional water resource management systems cannot be dynamically adjusted according to actual conditions. As a result, the water resource allocation effect in different regions or conditions is not ideal, and it is difficult to meet the requirements of modern water resource management for efficient, accurate and reliable scheduling. Summary of the invention
[0003] The present application provides a data-driven digital water resource processing system and device, which is used to solve the technical problems of low efficiency and poor accuracy in water resource management in the existing technology.
[0004] In view of the above problems, the present application provides a data-driven digital water resource processing system and device.
[0005] In a first aspect of the present application, a data-driven digital water resources processing system is provided, the system comprising:
[0006] A multidimensional water resource data acquisition unit, wherein the multidimensional water resource data acquisition unit sets monitoring equipment based on the target area and collects multidimensional water resource data, wherein the multidimensional water resource data includes water level data, water flow data, water pressure data, and water quality data; a distributed computing node configuration unit, wherein the distributed computing node configuration unit introduces meteorological forecast data, and configures distributed computing nodes in combination with the multidimensional water resource data, wherein the distributed computing nodes are configured in a parallel communication manner; a distributed computing framework establishment unit, wherein the distributed computing framework establishment unit establishes a distributed computing framework based on the distributed computing nodes, and embeds a quantum algorithm module, wherein the quantum algorithm module uses quantum gate operations to find an approximate optimal solution corresponding to a water resource allocation task; a water resource scheduling plan determination unit, wherein the water resource scheduling plan determination unit is based on the distributed computing framework , calling the quantum gate sequence to determine the water resource scheduling plan, the water resource scheduling plan aims to minimize the water resource call loss and maximize the supply and demand matching degree; a water resource scheduling management unit, the water resource scheduling management unit performs water resource scheduling management in the target area through the water resource scheduling plan, and collects feedback data in real time; a processing performance evaluation unit, the processing performance evaluation unit dynamically adjusts the fluid power transmission cycle based on the feedback data and combined with the sudden water resource demand, and evaluates the emergency handling performance to determine whether to activate the failure risk instruction, the fluid power transmission cycle includes pumping rate, water transmission path, and water transmission path priority; a complementary optimization unit, after activating the failure risk instruction, the complementary optimization unit performs computing resource complementary optimization on the distributed computing framework through the feedback data and the fluid power transmission cycle.
[0007] The second aspect of the present application provides a data-driven digital water resources processing device, the device comprising:
[0008] Monitoring equipment, processing core and user interface; the monitoring equipment includes a water level meter, a flow meter, a pressure sensor, and a water quality monitor; the processing core includes the data-driven water resource digital processing system within the first aspect; the monitoring equipment, processing core and user interface are communicatively connected.
[0009] The technical solution provided in this application has at least the following technical effects or advantages:
[0010] The present application sets monitoring equipment based on the target area and collects multi-dimensional water resource data, which includes water level data, water flow data, water pressure data, and water quality data; introduces meteorological forecast data, and configures distributed computing nodes in combination with the multi-dimensional water resource data, and the distributed computing nodes are set in a parallel communication mode; establishes a distributed computing framework based on the distributed computing nodes, and embeds a quantum algorithm module, which uses quantum gate operations to find the approximate optimal solution corresponding to the water resource allocation task; based on the distributed computing framework, calls the quantum gate sequence to determine the water resource scheduling plan, which aims to minimize the water resource call loss and maximize the supply and demand matching degree; through the water resource scheduling plan, water resource scheduling management is carried out in the target area, and feedback data is collected in real time; based on the feedback data, the fluid power transmission cycle is dynamically adjusted in combination with the sudden water resource demand, and the emergency handling performance is evaluated to determine whether to activate the failure risk instruction, and the fluid power transmission cycle includes pumping rate, water transmission path, and water transmission path priority; after activating the failure risk instruction, the distributed computing framework is optimized for computing resource complementarity through feedback data and fluid power transmission cycle. The present invention solves the technical problems of low efficiency and poor accuracy in water resource management in the prior art, and achieves the technical effect of improving the optimization effect of water resource allocation by introducing distributed computing technology, embedding quantum algorithm modules and establishing real-time feedback and dynamic adjustment mechanisms. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0012] Figure 1 A schematic diagram of the structure of a data-driven water resources digital processing system provided in an embodiment of the present application;
[0013] Figure 2 A schematic flow chart of a data-driven water resources digital processing method provided in an embodiment of the present application.
[0014] Explanation of the accompanying drawings: multi-dimensional water resource data collection unit 11, distributed computing node configuration unit 12, distributed computing framework establishment unit 13, water resource scheduling plan determination unit 14, water resource scheduling management unit 15, processing performance evaluation unit 16, complementary optimization unit 17. DETAILED DESCRIPTION
[0015] This application provides a data-driven digital water resource processing system and device to solve the technical problems of low efficiency and poor accuracy in water resource management in the existing technology. By introducing distributed computing technology, embedding quantum algorithm modules and establishing real-time feedback and dynamic adjustment mechanisms, the application achieves the technical effect of improving the optimization effect of water resource allocation.
[0016] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0017] It should be noted that any variations of the terms "include" and "have" are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or inherent to these processes, methods, products or devices. Embodiment 1
[0018] like Figure 1 As shown, the present application provides a data-driven water resources digital processing system for performing the following Figure 2 The data-driven water resources digital processing method shown in the figure comprises:
[0019] The multi-dimensional water resource data acquisition unit 11 is configured with monitoring equipment based on the target area, and collects multi-dimensional water resource data, wherein the multi-dimensional water resource data includes water level data, water flow data, water pressure data, and water quality data.
[0020] In the embodiment of the present application, the multi-dimensional water resource data collection unit collects multi-dimensional water resource data by installing monitoring equipment in the target area. The monitoring equipment includes a water level meter, a flow meter, a pressure sensor and a multi-parameter water quality analyzer.
[0021] When collecting water level data, ultrasonic water level meters or radar water level meters are used to obtain water level data by measuring the distance between the water surface and the sensor. When collecting water flow data, electromagnetic flow meters or ultrasonic flow meters are used to calculate water flow by detecting water flow velocity and cross-sectional area. When collecting water pressure data, pressure sensors such as strain gauge pressure sensors or piezoelectric pressure sensors are used to measure pressure changes in the water body. When collecting water quality data, multi-parameter water quality analyzers are used to measure the chemical and physical parameters of the water body, such as pH, dissolved oxygen, conductivity, turbidity, ammonia nitrogen, and heavy metal ions.
[0022] Through the above process, multi-dimensional water resource data is obtained, and the multi-dimensional water resource data includes water level data, water flow data, water pressure data, and water quality data.
[0023] The distributed computing node configuration unit 12 introduces meteorological forecast data, combines the multi-dimensional water resources data, and configures distributed computing nodes, wherein the distributed computing nodes are set in a parallel communication manner.
[0024] In an embodiment of the present application, the distributed computing node configuration unit first uses an existing meteorological monitoring and forecasting system to obtain meteorological forecast data. Then, these meteorological forecast data are integrated with multidimensional water resources data. When configuring distributed computing nodes, an existing distributed computing framework such as Apache Hadoop is used to deploy computing tasks on multiple computing nodes. These computing nodes are physical servers or virtual machines connected through a network. Distributed computing nodes are set up in a parallel communication mode, using a message passing interface or remote procedure call technology to achieve efficient communication between nodes.
[0025] A distributed computing framework establishing unit 13 is provided. The distributed computing framework establishing unit 13 establishes a distributed computing framework based on the distributed computing nodes and embeds a quantum algorithm module. The quantum algorithm module uses quantum gate operations to find an approximate optimal solution corresponding to the water resource allocation task.
[0026] In the embodiment of the present application, the distributed computing framework establishment unit uses a distributed computing platform, such as Apache Hadoop, Apache Spark, Apache Flink, etc., to build a distributed computing environment on multiple computing nodes. These nodes are deployed in a cloud computing platform or a local server cluster of an enterprise.
[0027] Configure the resources of each computing node, including CPU, memory, storage, etc. Use resource management tools such as Apache YARN and Kubernetes for resource allocation and task scheduling. Perform large-scale data processing tasks in a distributed computing framework through parallel processing technologies such as the MapReduce programming model.
[0028] The quantum algorithm module is embedded in the distributed computing framework. Combined with quantum computing simulators such as IBM Qiskit, Google Cirq, and Microsoft Quantum Development Kit, the quantum algorithm module uses quantum gate operations to accelerate the computing process. Quantum gates are the basic operating units of quantum computing, similar to logic gates in classical computing. The quantum algorithm module operates quantum bits through quantum gate sequences to form quantum circuits. The quantum circuit parameters are adjusted through quantum gate operations, and quantum algorithms such as QAOA are used for iterative optimization. After each iteration, the quantum state changes and gradually approaches the optimal solution. This process is used to find the approximate optimal solution corresponding to the water resource allocation task.
[0029] A water resource scheduling plan determination unit 14, which calls a quantum gate sequence based on the distributed computing framework to determine a water resource scheduling plan, wherein the water resource scheduling plan aims to minimize water resource call loss and maximize supply and demand matching.
[0030] In the embodiment of the present application, the goal is first determined, that is, to minimize the loss of water resource call and maximize the matching degree of supply and demand. Next, the water resource scheduling plan determination unit uses the established distributed computing framework to decompose the water resource scheduling problem into multiple subtasks and process them in parallel on multiple computing nodes. In the distributed computing framework, a quantum gate sequence is called to execute the quantum algorithm. The quantum algorithm searches for the optimal solution or the approximate optimal solution on the quantum computer through quantum gate operations. In the water resource scheduling problem, these quantum gate operations are optimized for specific scheduling models, such as linear programming models, dynamic programming models, etc., to find a water resource scheduling plan that meets the goals and principles. The operation data of the fluid power transmission cycle collected, such as water level, water quality, pipe network pressure, etc., are combined with factors such as geography, climate and water demand to perform scheduling simulation and optimization. By continuously adjusting the operating mode of the fluid power transmission cycle, the start-stop strategy of the pump group and other parameters, a water resource scheduling plan that can minimize the loss of water resource call and maximize the matching degree of supply and demand is found.
[0031] The water resource scheduling management unit 15 performs water resource scheduling management in the target area through the water resource scheduling plan and collects feedback data in real time.
[0032] In an embodiment of the present application, the water resource scheduling management unit receives a water resource scheduling plan, which contains detailed operation instructions, such as pumping rate, water transmission path and priority. In the target area, the scheduling management unit controls the water conservancy facilities related to the fluid power transmission cycle and operates according to the plan. The scheduling process includes starting or stopping fluid transmission, adjusting water flow and pressure, etc. The scheduling management unit collects multi-dimensional data such as water level, water flow, water pressure and water quality through various sensors installed at the fluid transmission nodes, and completes the collection of feedback data.
[0033] The processing performance evaluation unit 16 dynamically adjusts the fluid power transmission cycle based on the feedback data and combined with the sudden water resource demand, and evaluates the emergency event processing performance to determine whether to activate the failure risk instruction. The fluid power transmission cycle includes a pumping rate, a water transmission path, and a water transmission path priority.
[0034] In an embodiment of the present application, the fluid power transmission cycle is dynamically adjusted based on feedback data in combination with sudden water resource demands. Specifically, the pumping rate is adjusted according to the real-time water level and flow data to ensure water supply safety under sudden demands. For example, an adaptive control algorithm is used to adjust the pumping rate in real time. In addition, the water transfer path is optimized according to the current water resource distribution and demand. Graph theory algorithms and optimization algorithms, such as the Dijkstra algorithm or the A* algorithm, are used to calculate the optimal water transfer path to ensure efficient allocation of water resources. At the same time, the priority of the water transfer path is set according to the urgency of water use in different areas, and the water supply demand in key areas is prioritized.
[0035] Next, we will establish an evaluation index system, including response time, water resource call efficiency, and emergency handling success rate. We will use big data analysis technology to evaluate the operating data of the fluid power transmission cycle, monitor and record the emergency handling performance in real time, and compare the emergency handling performance with the preset threshold to determine whether to activate the failure risk instruction.
[0036] The complementary optimization unit 17 performs complementary optimization of computing resources on the distributed computing framework through the feedback data and fluid power transmission cycle after activating the failure risk instruction.
[0037] In an embodiment of the present application, when the failure risk instruction is activated, the complementary optimization unit uses feedback data to perform a detailed analysis of the current state. These feedback data include key indicators such as water level, flow, pressure and water quality monitored in real time. By analyzing these data, abnormal conditions in operation are found and urgent tasks that need to be handled immediately are determined. Based on these feedback data, the distributed computing framework is adjusted in combination with the fluid power transmission cycle. The fluid power transmission cycle provides guidelines for how to operate fluid transmission under different conditions, including how to adjust the pumping rate, water delivery path and the priority of the water delivery path. By combining these strategies with real-time feedback data, the current optimal computing resource configuration scheme is determined. Next, through resource management and scheduling algorithms, resources are tilted and allocated in the distributed computing framework. This process includes dynamically adjusting the allocation of computing resources to ensure that high-priority tasks obtain more computing resource support so that these urgent tasks can be processed and completed in priority. Finally, by monitoring the resource usage and task completion of the system in real time, the load and task allocation of the computing nodes are dynamically adjusted to complete the complementary optimization of computing resources for the distributed computing framework.
[0038] Furthermore, in the system provided in the embodiment of the application, based on the distributed computing framework, the quantum gate sequence is called to determine the water resource scheduling plan, including:
[0039] Based on the distributed computing framework, a quantum gate sequence is called to configure an initialization quantum state; based on the initialization quantum state, the quantum gate sequence is iterated through the quantum algorithm module, and quantum circuit parameters are adjusted each iteration; based on the quantum gate sequence and quantum circuit parameters, a solution space is searched to determine a water resources scheduling plan.
[0040] In the embodiment of the present application, a distributed computing framework is first used for large-scale data processing and efficient computing. Within this framework, a quantum computing platform, such as a quantum gate sequence provided by IBM Q and Google Quantum AI, is called to configure the initialization quantum state. The initialization quantum state is the starting point for the operation of the quantum algorithm. The quantum bit is placed in a superposition state through quantum operations such as the Hadamard gate to ensure that all possible states are considered simultaneously. Next, the quantum gate sequence is iterated on the distributed computing node through the quantum algorithm module. In each iteration, the quantum circuit parameters, such as the rotation angle, are adjusted based on the feedback measurement results. Specifically, a quantum programming framework such as Qiskit or PyQuil is used to write a quantum circuit, and iterative optimization is performed through parameterized quantum gates. After each iteration, the quantum state changes and gradually approaches the optimal region of the solution space. In the iterative optimization process, based on the quantum gate sequence and quantum circuit parameters, quantum computing explores multiple possible solution paths in parallel. By measuring the quantum state, multiple candidate solutions are obtained. These candidate solutions are evaluated and sorted using the classical computing framework, and a water resource scheduling plan that minimizes the loss of water resource calls and maximizes the matching degree of supply and demand is selected. For example, the optimal scheduling plan can be determined through the measurement results of quantum bits to ensure the efficiency and accuracy of water resource call-off.
[0041] Furthermore, in the system provided in the embodiment of the application, based on the quantum gate sequence and quantum circuit parameters, searching the solution space and determining the water resource scheduling plan include:
[0042] In each iteration process, after the quantum gate sequence is executed, a set of candidate solutions is obtained and the quantum circuit parameters are adjusted; based on the solution space, solution space pruning is performed in combination with multiple iterative learning, and after the search converges, the approximate optimal solution corresponding to the water resource allocation task is used as the water resource scheduling plan.
[0043] In an embodiment of the present application, within a distributed computing framework, a quantum computing platform is called and a quantum gate sequence is executed. During each iteration, the quantum gate sequence acts on the initialized quantum state, and a set of candidate solutions is obtained through the evolution of the quantum circuit. These candidate solutions represent different water resource scheduling schemes. The quality of the candidate solution is evaluated through a classical computing framework, such as by measuring indicators such as computing resource utilization efficiency and supply and demand matching. Next, based on the quality evaluation results of the candidate solution, the parameters of the quantum circuit, such as the rotation angle of the quantum gate, are adjusted. The adjustment of the parameters is based on learning algorithms, such as gradient descent, reinforcement learning, etc., to make the quantum state more likely to converge to the optimal solution in subsequent iterations. During multiple iterations, it is gradually discovered that some areas of the solution space are unlikely to contain the optimal solution, so solution space pruning is performed. Solution space pruning is implemented by a variety of methods, such as based on heuristic rules, based on historical iteration data, etc. Through pruning, the remaining solution space is searched more efficiently, reducing unnecessary computational overhead. When the quality of the candidate solution remains stable or improves slowly in multiple consecutive iterations, the search is stopped. After stopping the search, the best candidate solution obtained in the current iteration is taken as the approximate optimal solution for the water resources scheduling plan.
[0044] Furthermore, in the system provided in the embodiment of the application, the water resource scheduling plan aims to minimize the loss of water resource call and maximize the matching degree of supply and demand, and includes:
[0045] Based on the solution space, with the goal of minimizing the water resource call loss, an approximate optimal solution is found and a first candidate solution set is established; the solution space is pruned through the first candidate solution set to eliminate inferior solutions; after eliminating inferior solutions, with the goal of maximizing the supply and demand matching, an approximate optimal solution for the water resource allocation task is found.
[0046] In the embodiment of the present application, the parallelism and superposition of quantum computing are used to efficiently explore the solution space. Through quantum computing iterative optimization and measurement, a series of candidate solutions are generated, and the solutions in the first candidate solution set are evaluated using the classical computing framework to analyze their performance in minimizing water resource call loss. Based on the evaluation results, solutions with poor performance, i.e., inferior solutions, are eliminated to narrow the scope of the solution space. This can reduce the amount of calculation for subsequent searches and improve search efficiency.
[0047] After eliminating inferior solutions, the search goal is adjusted to maximize the matching degree of supply and demand. Based on the remaining solution space, that is, the solution space remaining after pruning, the quantum computing framework and distributed computing resources are used to continue searching for the approximate optimal solution that meets the goal of maximizing the matching degree of supply and demand. Through quantum computing iterative optimization and measurement, a solution that meets the two goals of minimizing water resource call loss and maximizing the matching degree of supply and demand is generated, and the approximate optimal solution for the water resource allocation task is obtained.
[0048] Furthermore, in the system provided by the embodiment of the application, after the failure risk instruction is activated, the distributed computing framework is optimized for computing resource complementation through the feedback data and the fluid power transmission cycle, including:
[0049] Based on the feedback data corresponding to the activation of the failure risk instruction, data mining is performed to obtain abnormal key indicators, which include abnormal water level fluctuations, sudden increases in flow, and sudden changes in water quality; through the abnormal key indicators, the risk level is evaluated, and the risk level is used to mark emergency water resource allocation tasks; based on the fluid power transmission cycle, combined with the emergency water resource allocation task, resources are tilted and allocated in the distributed computing framework; after the resources are tilted and allocated, the distributed computing framework is optimized for computing resource complementarity.
[0050] In an embodiment of the present application, detailed data mining is performed based on the feedback data collected after activating the failure risk instruction to obtain abnormal key indicators. These key indicators include abnormal water level fluctuations, sudden increases in flow, and sudden changes in water quality. Data mining and analysis tools, such as big data analysis platforms, are used to quickly process and analyze sensor data collected in real time to identify potential risk points. After obtaining the abnormal key indicators, the risk level is evaluated by analyzing the severity and possible impact of these abnormal indicators through a risk assessment model to determine the current risk level. For example, abnormal water level fluctuations indicate potential flood risks, while sudden increases in flow indicate sudden high-demand events, and sudden changes in water quality mean pollution events. By evaluating these risks, priorities can be set for emergency water resource allocation tasks.
[0051] After determining the risk level, resources are allocated in a distributed computing framework based on the fluid power transmission cycle and combined with the emergency water resource allocation task. Resource management algorithms, such as load balancing algorithms and resource scheduling algorithms, dynamically adjust resource distribution between computing nodes to ensure that high-priority tasks can obtain more computing resource support. For example, in the Apache Hadoop or Apache Spark framework, resources are allocated through YARN to meet the needs of emergency tasks.
[0052] After resource allocation, by real-time monitoring of system resource usage and task completion, using existing monitoring and management tools such as Apache Ambari, dynamically adjust the load and task allocation of computing nodes to avoid overloading of certain nodes and ensure the efficient operation and stability of the overall system. Complementary optimization of computing resources in the distributed computing framework is completed.
[0053] Furthermore, in the system provided in the embodiment of the application, based on the fluid power transmission cycle and combined with the emergency water resource allocation task, resource tilt allocation in the distributed computing framework includes:
[0054] Based on the fluid power transmission cycle, in the task manager, a task queue is inserted, and the emergency water resource allocation task is added to the task queue.
[0055] In an embodiment of the present application, based on the fluid power transmission cycle, the demand and priority of the emergency water resource allocation task are identified and determined. These emergency tasks are set to ensure water supply safety and reasonable resource allocation after the emergency is identified. Next, the task is dynamically managed and scheduled in a distributed computing environment through a task manager. Based on the fluid power transmission cycle, the emergency water resource allocation task is inserted into the task queue of the task manager. The task manager sorts and schedules the tasks according to the preset task priority and resource requirements.
[0056] Furthermore, in the system provided in the embodiment of the application, the distributed computing framework is optimized for computing resource complementarity, including:
[0057] Based on the target area, a water resource scheduling network is established, and the custom constraint indicators corresponding to the water resource scheduling network include a fixed total water volume; based on the circulating water tower pool, filter, and electrochemical descaling equipment in the target area, an auxiliary core of the water resource scheduling network is added; after resource complementarity optimization, the distributed computing framework is downloaded to the main control core of the water resource scheduling network.
[0058] In an embodiment of the present application, a water resource scheduling network is first established based on the target area, and the target area includes multiple key nodes, such as circulating water tower pools, filters, and electrochemical descaling equipment. To ensure the rational use and efficient scheduling of water resources, custom constraint indicators are defined, including a fixed total water volume. The fixed total water volume refers to the total water volume limit that can be used during the entire scheduling process, ensuring that the water volume remains unchanged during the scheduling process to avoid excessive use or waste of water resources. Through geographic information systems and sensor network technology, a water resource scheduling network covering the entire area is constructed.
[0059] On this basis, the auxiliary core of the water resource scheduling network is added based on the circulating water tower pool, filter, and electrochemical descaling equipment in the target area. The auxiliary core includes various sensors and control devices, which are interconnected through the Internet of Things technology to collect and transmit water resource status data in real time. Sensor devices such as water level meters, flow meters, pressure sensors, and water quality monitors transmit data through wireless sensor networks, and control devices are used to adjust the operating status of fluid transmission. Next, after resource complementarity optimization, the distributed computing framework is downloaded to the main control core of the water resource scheduling network. The distributed computing framework is used to process large-scale data and complex computing tasks. Through cloud computing platforms such as Amazon Web Services, computing resources can be flexibly expanded to support efficient data processing and real-time analysis.
[0060] In the embodiments of the present application, in summary, the embodiments of the present application have at least the following technical effects:
[0061] The present application sets monitoring equipment based on the target area and collects multi-dimensional water resource data, which includes water level data, water flow data, water pressure data, and water quality data; introduces meteorological forecast data, and configures distributed computing nodes in combination with the multi-dimensional water resource data, and the distributed computing nodes are set in a parallel communication mode; establishes a distributed computing framework based on the distributed computing nodes, and embeds a quantum algorithm module, which uses quantum gate operations to find the approximate optimal solution corresponding to the water resource allocation task; based on the distributed computing framework, calls the quantum gate sequence to determine the water resource scheduling plan, which aims to minimize the water resource call loss and maximize the supply and demand matching degree; through the water resource scheduling plan, water resource scheduling management is carried out in the target area, and feedback data is collected in real time; based on the feedback data, the fluid power transmission cycle is dynamically adjusted in combination with the sudden water resource demand, and the emergency handling performance is evaluated to determine whether to activate the failure risk instruction, and the fluid power transmission cycle includes pumping rate, water transmission path, and water transmission path priority; after activating the failure risk instruction, the distributed computing framework is optimized for computing resource complementarity through feedback data and fluid power transmission cycle. The present invention solves the technical problems of low efficiency and poor accuracy in water resource management in the prior art, and achieves the technical effect of improving the optimization effect of water resource allocation by introducing distributed computing technology, embedding quantum algorithm modules and establishing real-time feedback and dynamic adjustment mechanisms. Embodiment 2
[0062] Based on the same inventive concept as the data-driven digital water resource processing system in the aforementioned embodiment, the present application provides a data-driven digital water resource processing device. The device and system embodiments in the present application are based on the same inventive concept. The device includes a monitoring device, a processing core and a user interface; the monitoring device includes a water level meter, a flow meter, a pressure sensor, and a water quality monitor for collecting multi-dimensional water resource data; the processing core includes the data-driven digital water resource processing system in the first aspect, which is used to support the functions of multiple units in the execution system and realize Figure 2 The method shown sends the execution process and processing results to a user interface; the user interface is used to display the execution process and processing results; the monitoring device, the processing core and the user interface are communicatively connected.
[0063] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. The processes depicted in the accompanying drawings do not necessarily require the specific order and continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0064] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0065] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. Based on data-driven digital water resource processing system, It is characterized in that The system comprises: A multi-dimensional water resource data acquisition unit, wherein the multi-dimensional water resource data acquisition unit is based on the target area, sets monitoring equipment, and collects multi-dimensional water resource data, wherein the multi-dimensional water resource data includes water level data, water flow data, water pressure data, and water quality data; A distributed computing node configuration unit, wherein the distributed computing node configuration unit introduces meteorological forecast data, combines the multi-dimensional water resources data, and configures distributed computing nodes, wherein the distributed computing nodes are set in a parallel communication mode; A distributed computing framework establishing unit, wherein the distributed computing framework establishing unit establishes a distributed computing framework based on the distributed computing nodes and embeds a quantum algorithm module, wherein the quantum algorithm module operates with quantum gates to find an approximate optimal solution corresponding to a water resource allocation task; A water resource scheduling plan determination unit, wherein the water resource scheduling plan determination unit calls a quantum gate sequence based on the distributed computing framework to determine a water resource scheduling plan, wherein the water resource scheduling plan aims to minimize water resource call loss and maximize supply and demand matching; A water resource scheduling management unit, which performs water resource scheduling management in the target area through the water resource scheduling plan and collects feedback data in real time; a processing performance evaluation unit, wherein the processing performance evaluation unit dynamically adjusts the fluid power transmission cycle based on the feedback data and in combination with the sudden water resource demand, and evaluates the emergency event processing performance to determine whether to activate the failure risk instruction, wherein the fluid power transmission cycle includes a pumping rate, a water transmission path, and a water transmission path priority; A complementary optimization unit, after activating the failure risk instruction, the complementary optimization unit performs computing resource complementary optimization on the distributed computing framework through the feedback data and the fluid power transmission cycle, wherein the system is also used to execute the following method: based on the target area, a water resource scheduling network is established, and the custom constraint indicators corresponding to the water resource scheduling network include a fixed total water volume; Adding the auxiliary core of the water resource scheduling network based on the circulating water tower pool, filter, and electrochemical descaling equipment in the target area; After resource complementarity optimization, the distributed computing framework is downloaded to the main control core of the water resource scheduling network.
2. The data-driven digital water resource processing system according to claim 1, It is characterized in that Based on the distributed computing framework, a quantum gate sequence is called to determine a water resource scheduling plan. The system includes: Based on the distributed computing framework, calling the quantum gate sequence and configuring the initialization quantum state; Iterating the quantum gate sequence through the quantum algorithm module based on the initialized quantum state, and adjusting the quantum circuit parameters in each iteration; Based on the quantum gate sequence and quantum circuit parameters, a solution space is searched to determine a water resource scheduling plan.
3. The data-driven digital water resource processing system according to claim 2, It is characterized in that Based on the quantum gate sequence and quantum circuit parameters, the solution space is searched to determine the water resource scheduling plan. The system includes: In each iteration, after the quantum gate sequence is executed, a set of candidate solutions is obtained, and quantum circuit parameters are adjusted; Based on the solution space, multiple iterations of learning are combined to perform solution space pruning. After the search converges, the approximate optimal solution corresponding to the water resource allocation task is used as a water resource scheduling plan.
4. The data-driven digital water resource processing system according to claim 3, It is characterized in that The water resource scheduling plan aims to minimize water resource call loss and maximize supply and demand matching. The system includes: Based on the solution space, with the goal of minimizing the water resource call loss, an approximate optimal solution is sought to establish a first candidate solution set; Pruning the solution space through the first candidate solution set to eliminate inferior solutions; After eliminating inferior solutions, the approximate optimal solution of the water resource allocation task is sought with the goal of maximizing the matching degree between supply and demand.
5. The data-driven digital water resource processing system according to claim 4, It is characterized in that After activating the failure risk instruction, the distributed computing framework is optimized for computing resource complementation through the feedback data and fluid power transmission cycle, and the system includes: Performing data mining based on the feedback data corresponding to the activation of the failure risk instruction to obtain abnormal key indicators, wherein the abnormal key indicators include abnormal water level fluctuation, sudden increase in flow, and sudden change in water quality; By means of the abnormal key indicators, a risk level is evaluated, and the risk level is used to mark an emergency water resource allocation task; Based on the fluid power transmission cycle, combined with the emergency water resource allocation task, resources are tilted and allocated in the distributed computing framework; After the resources are tilted and allocated, the distributed computing framework is optimized for computing resource complementarity.
6. The data-driven digital water resource processing system according to claim 5, It is characterized in that Based on the fluid power transmission cycle, combined with the emergency water resource allocation task, resources are tilted and allocated in the distributed computing framework, and the system includes: Based on the fluid power transmission cycle, in the task manager, a task queue is inserted, and the emergency water resource allocation task is added to the task queue.
7. Data-driven digital water resource processing device, It is characterized in that The device includes a monitoring device, a processing core and a user interface; the monitoring device includes a water level meter, a flow meter, a pressure sensor, and a water quality monitor; the processing core includes the data-driven water resource digital processing system described in any one of claims 1-6; the monitoring device, the processing core and the user interface are communicatively connected.
Citation Information
Patent Citations
Intelligent water resource control platform based on cloud computing and expert system
CN103489053A
Intelligent security comprehensive management platform
CN118211779A
Hydraulic engineering project management intelligent system
CN118333423A
Method and system for maintenance services planning and scheduling optimization
US20170091688A1
