Equipment for alloy powder preparation

By using pipeline separation and cleaning mechanisms in alloy powder preparation equipment, the blockage problem caused by the adhesion of powder on the inner wall of the argon gas pipe is solved, ensuring the stability of cooling effect and production efficiency, and ensuring high-efficiency alloy powder preparation and product quality.

CN118720152BActive Publication Date: 2024-11-15SHANDONG ZHONGGEN NEW MATERIALS CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411228261.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-15
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

During the alloy powder preparation process, the powder adhesion of the inner wall of the argon pipe leads to clogging, affecting the flow of argon gas, and thus affecting the continuity and stability of powder preparation.

Method used

The pipe separation mechanism and the pipe wall cleaning mechanism are used to separate the cooling tube and clean the inner wall attachments of the cooling tube using a specific chemical solvent or solution to ensure the stability and efficiency of the cooling effect and prevent the powder from contaminating the newly generated alloy powder.

Benefits of technology

Effectively remove adhesions in the inner wall of the cooling tube, avoid decreasing production efficiency, ensure consistency and purity of product quality, and achieve efficient preparation and production efficiency of alloy powder.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118720152B_ABST
    Figure CN118720152B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of alloy powder preparation, and in particular to equipment for alloy powder preparation, including a metal smelting atomization device and a cooling device, wherein the cooling device has a cooling pipe and also includes a pipeline maintenance device, wherein the pipeline maintenance device is provided with a pipeline separation mechanism for separating the cooling pipe from the cooling device and a pipe wall cleaning mechanism for cleaning the separated cooling pipe. The present invention can timely remove attachments on the inner wall of the cooling pipe through the use of the pipeline separation mechanism and the pipe wall cleaning mechanism, thereby ensuring the stability and efficiency of the cooling effect, avoiding the decrease in alloy powder production efficiency caused by internal blockage of the cooling pipe, and effectively preventing the powder attached to the inner wall of the cooling pipe from contaminating the newly generated alloy powder, thereby ensuring the consistency and purity of product quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of alloy powder preparation, in particular to equipment for alloy powder preparation. Background Art

[0002] During the alloy powder preparation process, after the alloy powder melt is introduced into the argon tube to contact with argon and exchange heat, the originally high-temperature spherical alloy powder is rapidly cooled to below its melting point due to the cooling effect of the argon gas, and then changes from liquid to solid. The powder is rapidly cooled and solidified into small solid particles. However, the problem of powder adhesion on the inner wall of the argon tube has not been solved, which can easily lead to blockage of the argon tube and affect the normal circulation of argon.

[0003] The currently disclosed Chinese patent CN116921684B discloses an alloy powder preparation device, comprising a sealed box with two box doors hinged on the outside, a partition for dividing the sealed box into two independent spaces is fixedly installed inside the sealed box, a copper crucible containing melt inside is detachably placed on the top of the partition, two fixed rods distributed horizontally are fixedly installed on the sealed box, and the same melt centrifugal assembly is rotatably installed on the side where the two fixed rods are close to each other, a transmission box with a hollow arrangement is fixedly installed on the top of the partition, a power mechanism located inside the transmission box is transmission-connected to the melt centrifugal assembly, an introduction assembly for introducing the melt into the melt centrifugal assembly is fixedly installed inside the sealed box, the introduction assembly is transmission-connected to the power mechanism through the transmission assembly, the copper crucible can be detached from the transmission connection with the transmission assembly through the linkage assembly, a fixed box with a hollow arrangement below the partition is fixedly installed inside the sealed box, an alloy powder anti-blocking assembly transmission-connected to the linkage assembly is provided in the fixed box, and a melt collection assembly for collecting the centrifuged melt is fixedly installed on the partition.

[0004] According to the above patent, the patent is aimed at the blockage problem of the lower end of the argon tube, and the powder at the lower end is scraped flat, but the argon gas flows from the upper end to the lower end of the argon tube, and the blockage problem is not easy to occur. However, the powder will adhere to the inner wall of the argon tube and gradually accumulate, which may eventually cause the argon tube to be blocked, affecting the normal flow of argon gas, and further affecting the continuity and stability of the entire powder preparation process. Therefore, it is currently necessary to design a mechanism that can clean the powder sticking to the inner wall of the tube to address this problem. Summary of the invention

[0005] In view of the problems existing in the prior art, an equipment for preparing alloy powder is provided. The present invention can timely remove the attachments on the inner wall of the cooling tube through the use of a tube separation mechanism and a tube wall cleaning mechanism, thereby ensuring the stability and efficiency of the cooling effect, avoiding the decrease in the alloy powder production efficiency caused by blockage inside the cooling tube, and effectively preventing the powder agglomerated attached to the inner wall of the cooling tube from contaminating the newly generated alloy powder, thereby ensuring the consistency and purity of the product quality.

[0006] In order to solve the problems of the prior art, the present invention provides equipment for preparing alloy powder, including a metal smelting atomization device and a cooling device, wherein the cooling device has a cooling pipe and also includes a pipeline maintenance device, wherein the pipeline maintenance device is provided with a pipeline separation mechanism for separating the cooling pipe from the cooling device and a pipe wall cleaning mechanism for cleaning the separated cooling pipe.

[0007] Preferably, the cooling device further comprises an argon gas pipe located above the cooling pipe, and the pipe separation mechanism comprises a sealing sleeve for connecting the upper end of the cooling pipe with the lower end of the argon gas pipe, and the sealing sleeve is slidably mounted on the argon gas pipe.

[0008] Preferably, the cooling pipe has an interface near the upper end thereof that can be connected to the metal smelting atomization device, and the pipe wall cleaning mechanism includes a water pipe that can be connected to the interface on the cooling pipe.

[0009] Preferably, the tube wall cleaning mechanism further comprises a plug for blocking the upper end of the cooling tube.

[0010] Preferably, a base support is provided under the cooling pipe, and the base support has a feed port and a drain port. The pipeline separation mechanism also includes a rotating connector for rotatably connecting the lower end of the cooling pipe to the base support. When the cooling pipe is docked with the argon gas pipe, the cooling pipe and the feed port are in a connected state. When the interface on the cooling pipe is docked with the water pipe, the cooling pipe and the drain port are in a connected state.

[0011] Preferably, the rotating connector is provided with a rotating block, which has a pipe joint that can be connected with the blanking port or the drain outlet during its rotation. The upper end of the pipe joint has a clamping strip extending upward, and the lower end of the cooling pipe has a clamping groove that is clamped with the clamping strip. When the cooling pipe is connected with the blanking port or the drain outlet, the interface on the cooling pipe faces the metal smelting atomization device or the water pipe.

[0012] Preferably, there are at least two cooling pipes, and when the interface on one of the cooling pipes is connected to the metal smelting atomization device, the interface on the other cooling pipe is connected to the water pipe.

[0013] Preferably, the metal smelting atomization device includes a box body on which an argon gas pipe is fixedly installed and a water supply pipe is movably installed, and the interior of the box body is also provided with parallel partitions for fixed installation of a bottom support, and the parallel partitions divide the interior of the box body into an upper space and a lower space, and the bottom support is provided with a vertical partition extending downward, and the vertical partition divides the lower space into a storage bin connected to the discharge port and a sewage discharge bin connected to the sewage discharge port.

[0014] Preferably, a driving mechanism for synchronously driving the sealing sleeve and the plug body to move closer to or away from the cooling pipe is installed on the box body.

[0015] Preferably, the driving mechanism includes a fixed magnet fixedly mounted on the top of the box body and a movable magnet fixedly mounted between the sealing sleeve and the plug body, the movable magnet is located below the fixed magnet, and at least one of the fixed magnet and the movable magnet is an electromagnet.

[0016] Compared with the prior art, the beneficial effects of the present application are as follows: the present invention can timely remove the attachments on the inner wall of the cooling tube through the use of the pipeline separation mechanism and the tube wall cleaning mechanism, thereby ensuring the stability and efficiency of the cooling effect, avoiding the decrease in alloy powder production efficiency caused by blockage inside the cooling tube, and effectively preventing the powder attached to the inner wall of the cooling tube from contaminating the newly generated alloy powder, thereby ensuring the consistency and purity of the product quality, realizing the efficient preparation of alloy powder, and improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional schematic diagram of the equipment for preparing alloy powder.

[0018] Figure 2 It is the front view of the equipment for preparing alloy powder.

[0019] Figure 3 It is a plan cross-sectional view of the equipment for preparing alloy powder.

[0020] Figure 4 It is a three-dimensional structural cross-sectional view of the equipment for preparing alloy powder.

[0021] Figure 5 It is a partial three-dimensional structural schematic diagram of the cooling tube and rotating connector of the equipment for preparing alloy powder.

[0022] Figure 6 yes Figure 5 An enlarged schematic diagram of point A.

[0023] Figure 7 It is a partial three-dimensional structural schematic diagram of the lower end of the cooling tube of the equipment for preparing alloy powder and the upper end of the tube joint in a docking state.

[0024] Figure 8It is a partial three-dimensional structural schematic diagram of a device for preparing alloy powder, in which the lower end of a cooling tube and the upper end of a tube joint are in a separated state.

[0025] Fig. 9 It is a three-dimensional structural schematic diagram of a sealing sleeve, a plug body and a driving mechanism of an alloy powder preparation device.

[0026] Fig.10 yes Figure 3 An enlarged schematic diagram of point B.

[0027] The numbers in the figure are: 1. cooling pipe; 11. interface; 12. slot; 2. pipeline separation mechanism; 21. sealing sleeve; 22. rotating connector; 221. rotating block; 2211. bearing; 222. pipe joint; 2221. clamping strip; 3. pipe wall cleaning mechanism; 31. water pipe; 311. pipe plug; 3111. fixed magnetic ring; 3112. movable magnetic ring; 312. tension spring; 32. plug body; 321. guide rod; 322. guide port; 4. argon gas pipe; 5. bottom support; 51. blanking port; 52. sewage outlet; 6. box body; 61. parallel partition; 62. vertical partition; 621. storage bin; 622. sewage bin; 63. driving mechanism; 631. fixed magnet; 632. movable magnet. DETAILED DESCRIPTION

[0028] In order to further understand the features, technical means, specific objectives and functions of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0029] See also Figure 1-Figure 4 As shown, the equipment for preparing alloy powder includes a metal smelting atomization device and a cooling device, wherein the cooling device has a cooling pipe 1, and also includes a pipeline maintenance device, wherein the pipeline maintenance device is provided with a pipeline separation mechanism 2 for separating the cooling pipe 1 from the cooling device and a pipe wall cleaning mechanism 3 for cleaning the separated cooling pipe 1.

[0030] In the process of preparing alloy powder, firstly, the metal raw material is melted and atomized into fine alloy powder particles by a metal smelting atomization device. The atomized alloy powder is rapidly cooled in the cooling device through a vertically placed cooling tube 1. The specific cooling method is to pass argon gas into the cooling tube 1, and the liquid alloy powder in the molten state contacts with the argon gas and exchanges heat. Due to the cooling effect of the argon gas, the originally high-temperature alloy powder is rapidly cooled to below its melting point, and then changes from liquid to solid to form solid powder. The advantage of the cooling tube 1 being placed vertically is that After the alloy powder is cooled, it falls directly, which is effective for the rapid discharge of the alloy powder after cooling. After a period of production, the inner wall of the cooling tube 1 will be attached with powder. At this time, the pipeline separation mechanism 2 in the pipeline maintenance device is started to separate the cooling tube 1 from the cooling device. At this time, the cooling tube 1 is disconnected from the metal smelting atomization device and moved to the tube wall cleaning mechanism 3. Then, the tube wall cleaning mechanism 3 cleans the separated cooling tube 1. Since the attachments on the inner wall of the cooling tube 1 come from the condensation of metal droplets when they are cold, it belongs to metallurgical transformation. Such condensation "scarring" It is difficult to remove by flushing with conventional pressure water flow. Therefore, without damaging the cooling tube 1, a specific chemical solvent or solution, such as an acid solution or an alkaline solution, is used to dissolve the "scars" condensed on the inner wall of the cooling tube 1. When using an acid solution or an alkaline solution, an anti-corrosion coating or a temporary protective layer is pre-applied to key parts such as the cooling tube 1 and the joints to isolate the cleaning solution from direct contact with the tube wall, thereby ensuring that the "scars" condensed on the inner wall of the cooling tube 1 are removed under conventional fluid pressure without increasing the fluid pressure. After the "scars" condensed on the inner wall of the cooling tube 1 are removed, normal water flow is introduced through the tube wall cleaning mechanism 3 to flush the specific chemical solvent or solution. After cleaning, the pipeline separation mechanism 2 reinstalls the cooling tube 1 back into the cooling device. After the cooling tube 1 has been used for a long time, the inner wall of the cooling tube 1 will be contacted by the alloy powder and accompanied by the influence of friction, causing wear of the inner wall of the cooling tube 1. At this time, it is not necessary to clean it, and a new cooling tube 1 should be replaced to ensure the normal use effect of the cooling tube 1. After the installation is completed, the entire system resumes normal operation and continues to prepare the alloy powder.

[0031] See also Figure 1-Figure 4 As shown, the cooling device also has an argon gas pipe 4 located above the cooling pipe 1, and the pipeline separation mechanism 2 includes a sealing sleeve 21 for connecting the upper end of the cooling pipe 1 with the lower end of the argon gas pipe 4, and the sealing sleeve 21 is slidably sleeved on the argon gas pipe 4.

[0032] High-temperature alloy powder is introduced into the cooling tube 1 through a metal smelting atomization device, and argon gas is introduced into the cooling tube 1 through an argon tube 4 located above the cooling tube 1. The lower end of the argon tube 4 is connected to the upper end of the cooling tube 1 through a sealing sleeve 21 in a pipeline separation mechanism 2 to form a closed conveying channel. The sealing sleeve 21 can be slidably mounted on the argon tube 4 so that when the cooling tube 1 needs to be maintained or replaced, the connection between the argon tube 4 and the cooling tube 1 can be easily separated without affecting the sealing of the argon gas introduction. Argon gas flows from the argon tube 4 into the cooling tube 1, contacts with the high-temperature alloy powder that is sliding down, quickly absorbs its heat, and realizes efficient heat transfer cooling, so that the powder is quickly cooled and solidified into a solid state.

[0033] See also Figure 1-Figure 4 As shown, the cooling pipe 1 has an interface 11 near the upper end thereof that can be connected to the metal smelting atomization device, and the pipe wall cleaning mechanism 3 includes a water pipe 31 that can be connected to the interface 11 on the cooling pipe 1.

[0034] The water pipe 31 has a pipe plug 311 that can be inserted into the interface 11. The high-temperature alloy powder is passed into the cooling pipe 1 from the interface 11 in the form of atomization through the metal smelting atomization device. At this time, the interface 11 is connected to the metal smelting atomization device. The alloy powder generated by the metal smelting atomization device only enters the cooling pipe through the interface 11, and the alloy powder will not float on the outside of the cooling pipe 1, ensuring that the alloy powder enters the cooling pipe 1 in a concentrated manner. After the cooling pipe 1 is separated from the metal smelting atomization device and the argon gas pipe 4, the interface 11 on the cooling pipe 1 is aligned with the water pipe 31 in the pipe wall cleaning mechanism 3, so that the pipe plug 311 on the water pipe 31 is inserted into the interface 11, and a specific chemical solvent or solution is injected through the water pipe 31 to flush the pipe wall to remove the attached alloy powder. The removed sewage flows out from the lower end of the cooling pipe 1. When the cooling pipe 1 is reinstalled back to the position where it is docked with the argon gas pipe 4, the pipe plug 311 is pulled out of the interface 11 on the cooling pipe 1 to facilitate the separation and installation of the cooling pipe 1.

[0035] See also Figure 1-Figure 4 As shown, the tube wall cleaning mechanism 3 also includes a plug 32 for plugging the upper end of the cooling tube 1 .

[0036] When it is necessary to clean the inner wall of the cooling tube 1, first insert the plug 32 into the opening at the upper end of the cooling tube 1 to block it, ensure that the cleaning chemical solvent or solution flows out from the bottom of the cooling tube 1, and prevent the chemical solvent or solution from splashing out from the top. After the plug 32 successfully blocks the opening at the upper end of the cooling tube 1, the pipe plug 311 of the water pipe 31 is docked with the interface 11 to flush the inner wall of the cooling tube 1. The chemical solvent or solution flows in the cooling tube 1, washes down the alloy powder attached to the tube wall, and is discharged from the bottom of the cooling tube 1 with the water flow, completing the cleaning process of the inner wall of the cooling tube 1. After the cleaning is completed, the plug 32 is taken out, the cooling tube 1 is re-docked with the argon tube 4, and the argon supply is turned on to allow the argon to flow in through the opening at the upper end of the cooling tube 1 to resume the normal cooling process.

[0037] See also Figure 1-Figure 5 As shown, a base 5 is provided under the cooling pipe 1, and the base 5 has a feed port 51 and a drain port 52. The pipeline separation mechanism 2 also includes a rotating connector 22 for rotatably connecting the lower end of the cooling pipe 1 to the base 5. When the cooling pipe 1 is docked with the argon gas pipe 4, the cooling pipe 1 and the feed port 51 are in a connected state. When the interface 11 on the cooling pipe 1 is docked with the water pipe 31, the cooling pipe 1 and the drain port 52 are in a connected state.

[0038] The argon tube 4 and the blanking port 51 are in a coaxial installation state. When the cooling tube 1 and the argon tube 4 are connected through the sealing sleeve 21 in the pipeline separation mechanism 2, the argon gas can flow from the argon tube 4 into the cooling tube 1, contact with the atomized high-temperature alloy powder, and be quickly cooled. The cooled alloy powder particles flow downward along the inner wall of the cooling tube 1 under the action of their own gravity. Since the argon tube 4 and the blanking port 51 are in a coaxial state, after the cooling tube 1 and the argon tube 4 are connected, the cooling tube 1 is connected with the blanking port 51. state, and finally discharged through the blanking port 51 on the bottom bracket 5. When cleaning the cooling tube 1, first release the connection between the cooling tube 1 and the argon gas tube 4, then drive the cooling tube 1 to rotate through the rotating connector 22 until the lower end of the cooling tube 1 is connected with the drain port 52, then dock the interface 11 on the cooling tube 1 with the pipe plug 311 of the water pipe 31, and the chemical solvent or solution enters the cooling tube 1 through the water pipe 31 to flush the inner wall of the cooling tube 1. The flushed powder is discharged through the drain port 52 on the bottom bracket 5, completing the cleaning and drainage process.

[0039] See also Figure 3-Figure 8As shown, the rotating connector 22 is provided with a rotating block 221, and the rotating block 221 has a pipe joint 222 that can be connected with the blanking port 51 or the sewage outlet 52 during its rotation. The upper end of the pipe joint 222 has an upwardly extending clamping strip 2221, and the lower end of the cooling pipe 1 has a clamping groove 12 that is clamped with the clamping strip 2221. When the cooling pipe 1 is connected with the blanking port 51 or the sewage outlet 52, the interface 11 on the cooling pipe 1 is facing the metal smelting atomization device or the water pipe 31.

[0040] The rotating block 221 is connected to the bottom bracket 5 via a bearing 2211. Since the cooling pipe 1 and the pipe joint 222 are tightly engaged with each other via the clamping strip 2221 and the clamping groove 12, the cooling pipe 1 is stably connected to the pipe joint 222. As the rotating block 221 of the rotating connector 22 rotates, the cooling pipe 1 is driven to rotate together. The rotating connector 22 also has a rotating driver for driving the rotating block 221 to rotate. The rotating driver is not shown in the figure. The lower end of the cooling pipe 1 is connected to the blanking port 51 or the drain port 52. By rotating the connecting piece 22, the lower end of the cooling pipe 1 can be easily and quickly switched between the blanking port 51 and the drain port 52 to meet the needs of two different working conditions, production and cleaning. When the inner wall of the cooling pipe 1 is severely worn, the cooling pipe 1 needs to be removed. At this time, it is only necessary to release the downward pressure on the cooling pipe 1 at the position of the plug body 32, and then pull the cooling pipe 1 out of the pipe joint 222 to complete the disassembly of the cooling pipe 1, so as to facilitate the replacement of the new cooling pipe 1.

[0041] See also Figure 2-Figure 4 As shown, there are at least two cooling pipes 1 . When the interface 11 on one cooling pipe 1 is connected to the metal smelting atomization device, the interface 11 on the other cooling pipe 1 is connected to the water pipe 31 .

[0042] When there are at least two cooling tubes 1, while one cooling tube 1 is cooling the high-temperature alloy powder, the other cooling tube 1 is in a cleaning state. After the cooling tube 1 being cooled completes a production cycle, the cooling tube 1 is connected to the water pipe 31 through the rotating connector 22 for internal cleaning, and the previously cleaned cooling tube 1 is connected to the metal smelting atomization device and the argon gas pipe 4 through the pipeline separation mechanism 2 to start a new round of cooling work. This alternating cooling and cleaning process can realize the maintenance and cleaning of each cooling tube 1 in turn without long downtime, effectively improving production efficiency.

[0043] See also Figure 1-Figure 4 and Fig.10As shown, the metal smelting atomization device includes a box body 6 on which an argon gas pipe 4 is fixedly installed and a water supply pipe 31 is movably installed, and a parallel partition 61 for a bottom support 5 to be fixedly installed is also provided inside the box body 6, and the parallel partition 61 divides the interior of the box body 6 into an upper space and a lower space, and the bottom support 5 is provided with a vertical partition 62 extending downward, and the vertical partition 62 divides the lower space into a storage bin 621 connected to the drop port 51 and a sewage discharge bin 622 connected to the sewage discharge port 52.

[0044] The end of the water pipe 31 without the pipe plug 311 extends outward through the box body 6, and a fixed magnetic ring 3111 is fixedly provided on the box body 6 and is sleeved on the water pipe 31, and a movable magnetic ring 3112 is fixedly installed on the pipe plug 311, and a tension spring 312 is fixedly connected between the pipe plug 311 and the box body 6. When the fixed magnetic ring 3111 and the movable magnetic ring 3112 are powered on at the same time, according to the principle of like repels like and opposites attract, the pipe plug 311 is pushed close to the cooling pipe 1 until the pipe plug 311 is inserted into the interface 11 on the cooling pipe 1, at this time, chemical solvents or solutions can be passed into the cooling pipe 1 for flushing, and when the fixed magnetic ring 3111 and the movable magnetic ring 3112 are powered off at the same time, the tension spring 312 returns to a state of not being subjected to external force, and the pipe plug 311 is pulled out of the interface 11 to disconnect the cooling pipe 1, and in this state, the cooling pipe 1 can be moved to a position docking with the argon gas pipe 4.

[0045] When one cooling pipe 1 is performing cooling work, the other cooling pipe 1 is connected to the water pipe 31 for cleaning and sewage discharge. The vertical partition 62 inside the bottom support 5 divides the lower space into a storage bin 621 and a sewage discharge bin 622, ensuring that the cooled alloy powder and the cleaning wastewater are stored separately. The alloy powder generated by cooling is stored in the storage bin 621, while the cleaning wastewater is collected in the sewage discharge bin 622, which is convenient for centralized treatment at a later stage.

[0046] See also Figure 2-Figure 4 As shown, the box body 6 is provided with a driving mechanism 63 for synchronously driving the sealing sleeve 21 and the plug body 32 to approach or move away from the cooling pipe 1 .

[0047] When it is necessary to dock the argon tube 4 with the cooling tube 1 for cooling operation, the driving mechanism 63 will drive the sealing sleeve 21 to move toward the cooling tube 1, so that it fits tightly at the interface 11 between the argon tube 4 and the cooling tube 1 to ensure that the argon gas does not leak. At the same time, the driving mechanism 63 will also drive the plug body 32 to be close to the upper end of the other cooling tube 1, so that the plug body 32 is pressed into the opening of the cooling tube 1 to prevent chemical solvents or solutions from splashing during the cleaning process. Conversely, when switching two cooling tubes 1, the driving mechanism 63 will drive the sealing sleeve 21 away from the cooling tube 1, disconnect the connection between the argon tube 4 and the cooling tube 1, and then drive the plug body 32 away from the upper end of the corresponding cooling tube 1, so that the plug body 32 is pulled out from the opening of the cooling tube 1. At this time, the positions of all cooling tubes 1 can be adjusted at the same time by rotating the connecting piece 22 to facilitate the introduction of argon gas and cleaning of the cooling tubes 1.

[0048] See also Figure 4 and Fig. 9 As shown, the driving mechanism 63 includes a fixed magnet 631 fixedly installed on the top of the box body 6 and a movable magnet 632 fixedly installed between the sealing sleeve 21 and the plug body 32. The movable magnet 632 is located below the fixed magnet 631. At least one of the fixed magnet 631 and the movable magnet 632 is an electromagnet.

[0049] A guide rod 321 extending downward is installed on the top of the box body 6 towards the direction of the plug body 32. A guide opening 322 slidingly engaged with the guide rod 321 is opened on the plug body 32 to stabilize the movement of the plug body 32 following the movable magnet 632. When the plug body 32 is pressed down into the upper opening of the cooling tube 1, the stability of the pressing of the plug body 32 is ensured to prevent the sealing sleeve 21 from being subjected to excessive pressure resulting in incomplete sealing.

[0050] The driving modes of the fixed magnet 631 and the movable magnet 632 are:

[0051] The fixed magnet 631 is a conducting electromagnet, and the movable magnet 632 is a conductive magnet. The conductive magnet is made of permanent magnetic material and has north and south poles. It follows the principle that like charges repel and opposite charges attract, and can generate attractive or repulsive force with another electromagnet. In this combination, the fixed magnet 631 can be energized to generate a magnetic field to attract or repel the movable magnet 632, thereby changing the position or state of the movable magnet 632 and realizing the synchronous movement of the sealing sleeve 21 and the plug body 32.

[0052] The fixed magnet 631 is a conductive magnet, and the movable magnet 632 is an electromagnet. In this combination, the movable magnet 632 can generate a magnetic field by energizing, and interact with the fixed magnet 631 by changing its own magnetic field strength to achieve synchronous movement of the sealing sleeve 21 and the plug body 32.

[0053] The fixed magnet 631 and the movable magnet 632 are both electromagnets. In this combination, both the fixed magnet 631 and the movable magnet 632 can be energized and cooperate to control the magnetic field strength and direction, and interact with each other to achieve synchronous movement of the sealing sleeve 21 and the plug body 32.

[0054] The present invention can timely remove the attachments on the inner wall of the cooling tube 1 through the use of the pipeline separation mechanism 2 and the tube wall cleaning mechanism 3, thereby ensuring the stability and efficiency of the cooling effect, avoiding the decrease in the alloy powder production efficiency caused by the blockage inside the cooling tube 1, and effectively preventing the powder agglomerated attached to the inner wall of the cooling tube 1 from contaminating the newly generated alloy powder, thereby ensuring the consistency and purity of the product quality, realizing the efficient preparation of the alloy powder, and improving the production efficiency.

[0055] The above embodiments only express one or several implementation modes of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.

Claims

1. An alloy powder preparation device, comprising a metal smelting atomization device and a cooling device, wherein the cooling device has a cooling pipe (1); It is characterized in that Also included is a pipeline maintenance device, the pipeline maintenance device being provided with a pipeline separation mechanism (2) for separating the cooling pipe (1) from the cooling device and a pipe wall cleaning mechanism (3) for cleaning the separated cooling pipe (1); The cooling device also comprises an argon gas pipe (4) located above the cooling pipe (1), and the pipe separation mechanism (2) comprises a sealing sleeve (21) for connecting the upper end of the cooling pipe (1) with the lower end of the argon gas pipe (4), wherein the sealing sleeve (21) is slidably mounted on the argon gas pipe (4); The cooling pipe (1) has an interface (11) near the upper end thereof that can be connected to the metal smelting atomization device, and the pipe wall cleaning mechanism (3) includes a water pipe (31) that can be connected to the interface (11) on the cooling pipe (1); The tube wall cleaning mechanism (3) further comprises a plug (32) for plugging the upper end of the cooling tube (1); A base (5) is provided below the cooling pipe (1), the base (5) having a material drop opening (51) and a sewage outlet (52), and the pipeline separation mechanism (2) further comprises a rotating connection member (22) for rotatably connecting the lower end of the cooling pipe (1) to the base (5); when the cooling pipe (1) is docked with the argon gas pipe (4), the cooling pipe (1) and the material drop opening (51) are in a communication state, and when the interface (11) on the cooling pipe (1) is docked with the water pipe (31), the cooling pipe (1) and the sewage outlet (52) are in a communication state; The rotating connector (22) is provided with a rotating block (221), the rotating block (221) having a pipe joint (222) which can be connected to the blanking port (51) or the sewage outlet (52) during its rotation, the upper end of the pipe joint (222) having a clamping strip (2221) extending upward, the lower end of the cooling pipe (1) having a clamping groove (12) clamped to the clamping strip (2221), when the cooling pipe (1) is connected to the blanking port (51) or the sewage outlet (52), the interface (11) on the cooling pipe (1) faces the metal smelting atomization device or the water pipe (31).

2. The equipment for preparing alloy powder according to claim 1, characterized in that: The cooling pipes (1) have at least two connections. When the interface (11) on one of the cooling pipes (1) is connected to the metal smelting atomization device, the interface (11) on the other cooling pipe (1) is connected to the water pipe (31).

3. The equipment for preparing alloy powder according to claim 1, characterized in that: The metal smelting atomization device comprises a box (6) on which an argon supply pipe (4) is fixedly installed and a water supply pipe (31) is movably installed. A parallel partition (61) is also provided inside the box (6) on which a bottom bracket (5) is fixedly installed. The parallel partition (61) divides the inside of the box (6) into an upper space and a lower space. The bottom bracket (5) is provided with a vertical partition (62) extending downward. The vertical partition (62) divides the lower space into a storage bin (621) connected to a material discharge port (51) and a sewage discharge bin (622) connected to a sewage discharge port (52).

4. The equipment for preparing alloy powder according to claim 3, characterized in that: The box body (6) is provided with a driving mechanism (63) for synchronously driving the sealing sleeve (21) and the plug body (32) to move closer to or away from the cooling pipe (1).

5. The equipment for preparing alloy powder according to claim 4, characterized in that: The driving mechanism (63) comprises a fixed magnet (631) fixedly mounted on the top of the box body (6) and a movable magnet (632) fixedly mounted between the sealing sleeve (21) and the plug body (32); the movable magnet (632) is located below the fixed magnet (631); and at least one of the fixed magnet (631) and the movable magnet (632) is an electromagnet.