Ultrahigh pile supporting box type reinforced concrete retaining wall and construction method thereof

By using an ultra-high pile support box-type reinforced concrete structure in the ultra-high fill area retaining wall, combined with a matrix pile foundation and a multi-layer unloading plate, the foundation of the ultra-high retaining wall on the high and steep fill slope is solved. Bearing capacity and stability issues have been addressed, and effective support for fill areas above 15m in height has been achieved.

CN118727804APending Publication Date: 2024-10-01SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410757053.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing technology, when the height of the retaining wall in the ultra-high fill area exceeds 15m, it is easy to suffer from insufficient foundation bearing capacity, excessive deformation of the wall top, excessive size of the retaining wall, excessive foundation burial depth, and resistance to overturning and slippage. The problem of insufficient stability makes it difficult to apply high-fill retaining walls in flat areas.

Method used

The ultra-high pile-supported box-type reinforced concrete retaining wall structure is adopted, including a matrix-distributed pile foundation, a multi-layer box wall main body, a double-layer unloading plate and a drainage pipe structure. Through the combination of the high bearing capacity of the pile foundation and the box structure , combined with a double-layer unloading plate and drainage system to enhance lateral pressure resistance and stability.

Benefits of technology

It effectively solves the problems of insufficient foundation bearing capacity, excessive wall top deformation and insufficient anti-slip stability of ultra-high retaining walls on high and steep fill slopes, making the retaining wall structure applicable to high-rise buildings with a height of more than 15m. Steep fill slopes adapt to different geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727804A_ABST
    Figure CN118727804A_ABST
Patent Text Reader

Abstract

The invention discloses an ultrahigh pile supporting box type reinforced concrete retaining wall and a construction method.The retaining wall comprises a pile foundation and a wall body, the wall body comprises a bottom plate, a wall plate, a buttress and an unloading plate, a drainage pipeline structure is laid in the wall body, the bottom plate is horizontally arranged at the top of the pile foundation, the wall plate is vertically arranged on the bottom plate, and the unloading plate is arranged on the wall body; the unloading plates are vertically arranged on the front side of the wallboard at intervals, one end of each unloading plate is fixed to the wallboard, the other end of each unloading plate horizontally extends forwards, and the buttresses are vertically arranged between the wallboard and the unloading plates at intervals. According to the retaining wall structure, the advantage of high bearing capacity of the pile foundation and the unloading effect of the double-layer unloading plate in the upper box-type structure are utilized; the problems that in the prior art, due to the fact that lateral soil pressure behind an ultrahigh retaining wall is too large, the retaining wall foundation bearing capacity is insufficient, the wall top deformation is too large, the retaining wall size is too large, the foundation burial depth is too large, and the anti-overturning and anti-sliding stability is insufficient can be effectively solved. The retaining wall structure can be suitable for high and steep fill slopes with the height being 15 m or above under different geological conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of slope support engineering, and particularly relates to an ultra-high pile-supported box-type reinforced concrete retaining wall and a construction method thereof. Background Art

[0002] In the prior art, common fill slope support forms include gravity retaining wall, cantilever retaining wall, buttress retaining wall, pile-slab retaining wall, reinforced earth retaining wall, etc., and their applicable height is generally below 12m. As the height increases, the lateral pressure it bears increases in square multiples. When the height exceeds 15m, there are often problems such as insufficient bearing capacity of the retaining wall foundation, excessive deformation of the wall top, excessive size of the retaining wall, excessive burial depth of the retaining wall foundation, insufficient anti-overturning and anti-slip stability. Patent CN204282395U of Guangzhou Urban Construction Development and Design Institute Co., Ltd. discloses a pile-supported buttress retaining wall that can adapt well to soft soil areas, but for retaining walls in ultra-high fill areas, the structural rigidity of the upper buttress retaining wall needs to be further strengthened. The invention patent CN111305257A of China Railway Eryuan Engineering Group Co., Ltd. discloses a steep slope unloading type ultra-high cantilever retaining wall structure and construction method, which can effectively control horizontal deformation by setting up unloading plates, solving the problems of difficult slope closing, stability and deformation control of high fill in steep slope areas, but it is difficult to apply to high fill retaining walls in flat areas. The patent CN215857832U of China Power Construction Group Guiyang Survey and Design Institute Co., Ltd. discloses an ultra-high buttress retaining wall support structure, which is based on the buttress retaining wall and vertically graded unloading plates are set on the back of the wall panel, but the unloading plates do not exceed the imaginary wall back, and the decompression effect needs to be discussed. Summary of the invention

[0003] In view of this, an object of the present invention is to provide a super-high pile-supported box-type reinforced concrete retaining wall and a construction method thereof, so as to solve the deficiencies in the prior art.

[0004] In order to achieve the above object, the present invention is achieved through the following technical solutions:

[0005] On the one hand, a super-high pile-supported box-type reinforced concrete retaining wall is provided, comprising a pile foundation and a wall body, wherein the wall body comprises a bottom plate, a wall panel, a buttress and a unloading plate, a drainage pipe structure is laid in the wall body, the bottom plate is horizontally arranged on the top of the pile foundation, the wall panel is erected on the bottom plate, a plurality of the unloading plates are arranged at upper and lower intervals on the front side of the wall panel, one end of the unloading plate is fixed on the wall panel, and the other end extends forward horizontally, and a plurality of the buttresses are erected between the wall panel and the unloading plate at intervals.

[0006] As for the super-high pile-supported box-type reinforced concrete retaining wall, the wall body is a three-layer box-type structure.

[0007] As in the super-high pile-supported box-type reinforced concrete retaining wall, the unloading plate includes an upper unloading plate and a lower unloading plate, the front edge of the lower unloading plate exceeds the front edge of the bottom plate by a certain distance, and the front edge of the upper unloading plate exceeds the front edge of the lower unloading plate by a certain distance.

[0008] As described in the super-high pile-supported box-type reinforced concrete retaining wall, the drainage pipe structure includes an inverted filter layer and interconnected drainage pipes, longitudinal drainage blind ditches and transverse drainage blind ditches, the inverted filter layer is laid on the inner side of the wall panel, the drainage pipe is pre-buried in the wall panel, the longitudinal drainage blind ditch is arranged in the inverted filter layer, the transverse drainage blind ditch is arranged in the buttress, and the longitudinal drainage blind ditch and the transverse drainage blind ditch are arranged at the drainage pipe.

[0009] As in the super-high pile-supported box-type reinforced concrete retaining wall, the buttress comprises an upper buttress, a middle buttress and a lower buttress, the front edge of the lower buttress is flush with the front edge of the base plate, the front edge of the middle buttress exceeds the front edge of the lower buttress by a certain distance, the upper buttress is triangular, and the lower buttress, the middle buttress and the upper buttress are aligned up and down and aligned with the pile foundation.

[0010] As in the super-high pile-supported box-type reinforced concrete retaining wall, the pile foundation includes pile rods of equal length distributed in a matrix.

[0011] For example, in the super-high pile-supported box-type reinforced concrete retaining wall, the pile type of the pile rod may be cast-in-place pile or precast pile according to the height of the retaining wall, the stress of the pile foundation, and the ground conditions.

[0012] As described in the super-high pile-supported box-type reinforced concrete retaining wall, an expansion joint is provided between two adjacent wall bodies, and the joint is filled with asphalt hemp flexible material.

[0013] On the other hand, a method for constructing a super-high pile-supported box-type reinforced concrete retaining wall is provided, which is used to construct the super-high pile-supported box-type reinforced concrete retaining wall as described above, and comprises the following steps:

[0014] S1. The site is leveled and staked out, and pile foundation is constructed. The rotary drilling machine is used to drill holes with mud wall protection. Vertical steel bars are reserved at the top of the pile and anchored into the bottom plate. The next step is carried out after the vertical and horizontal bearing capacity of the pile foundation are tested and qualified;

[0015] S2. Slope and excavate the soil to the base elevation, remove the floating slurry on the pile top, construct the bottom plate and reserve vertical anchor steel bars for the wall panels and buttresses;

[0016] S3. Construct the lower buttress and wall panels to the bottom elevation of the lower unloading plate, reserve vertical reinforcement for the upper buttress and wall panels at the top, and embed PVC drainage pipes in the wall panels, which extend beyond the outside of the retaining wall;

[0017] S4. After the strength of the lower buttress and wall panels reaches the design requirements, backfill the compacted soil in layers to the bottom elevation of the lower unloading plate. The backfill material should be gravel soil with good permeability, with a soil-to-rock ratio of 7:3. During the backfilling process, the inner filter layer, longitudinal drainage blind ditch, and transverse drainage blind ditch should be implemented simultaneously;

[0018] S5. After backfilling is completed, lay the C20 plain concrete cushion and implement the lower unloading plate;

[0019] S6. Repeat the above steps, implement the middle wall panel, middle buttress, upper unloading plate, upper buttress and upper wall panel in sequence, and complete the backfill behind the wall.

[0020] The beneficial effects of the technical solution of the present invention are:

[0021] This retaining wall structure, by leveraging the high bearing capacity advantage of the pile foundation and the unloading effect of the double-layer unloading plate in the upper box structure, can effectively solve the problems faced by the existing technology, such as insufficient bearing capacity of the retaining wall foundation caused by excessive lateral earth pressure behind the ultra-high retaining wall, excessive deformation of the wall top, excessive retaining wall size, excessive foundation burial depth, insufficient anti-overturning and anti-slip stability, etc., so that the retaining wall structure can be applied to high and steep fill slopes with a height of more than 15m under different geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] To further illustrate the above-mentioned objectives, structural features and effects of the present invention, the present invention will be described in detail below with reference to the accompanying drawings.

[0023] Figure 1 This is a schematic diagram of the overall structure of a retaining wall in a preferred embodiment of the present invention;

[0024] Figure 2 for Figure 1 AA elevation drawing;

[0025] Figure 3 for Figure 1 BB floor plan;

[0026] Figure 4 for Figure 1 CC floor plan;

[0027] Figure 5 for Figure 1 DD floor plan;

[0028] Figure 6 This is a diagram showing the lateral earth pressure distribution of the retaining wall in a preferred embodiment of the present invention;

[0029] In the figure: 1. Pile foundation; 2. Bottom plate; 3. Wall panel; 4. Upper unloading plate; 5. Lower unloading plate; 6. Filter layer; 7. Drain pipe; 8. Longitudinal drainage blind ditch; 9. Horizontal drainage blind ditch; 10. Upper buttress; 11. Middle buttress; 12. Lower buttress; 13. Expansion joint. DETAILED DESCRIPTION

[0030] The terms "invention", "present invention" and "the present invention" used in this specification are intended to refer broadly to all subject matter of this specification and any patent claims below. Statements containing these terms should not be understood to limit the subject matter described herein or to limit the meaning or scope of any patent claim below. In addition, this specification does not attempt to describe or limit the subject matter covered by any claim of any specific component, paragraph, statement or figure of this application. The subject matter should be understood with reference to the entire specification, all drawings and any claims below. The present invention may have other embodiments and be practiced or implemented in other ways. Moreover, it should be understood that the words and terms used herein are for illustrative purposes and should not be considered as limiting.

[0031] The details of the present invention will now be discussed with reference to the accompanying drawings which illustrate the present invention by way of example only. In the accompanying drawings, similar features or components may be marked with the same reference numerals.

[0032] The use of "including," "having," and "comprising" and variations thereof herein is meant to encompass the items listed thereafter and their equivalents and additional items. Although reference may be made to directions such as above, below, upward, downward, rearward, bottom, top, front, rear, etc., in describing the drawings, for convenience, reference is made relative to the drawings. These directions are not intended to literally accept or limit the present invention in any form. In addition, terms such as "first," "second," "third," etc., are used herein for illustrative purposes and are not intended to indicate or imply importance or significance.

[0033] See also Figures 1 to 6 As shown, the super-high pile-supported box-type reinforced concrete retaining wall of the present invention includes a pile foundation 1 and a wall body, the wall body includes a bottom plate 2, a wall panel 3, a buttress and a unloading plate, a drainage pipe structure is laid in the wall body, the bottom plate 2 is horizontally arranged on the top of the pile foundation 1, the wall panel 3 is erected on the bottom plate 2, a plurality of unloading plates are arranged at upper and lower intervals on the front side of the wall panel 3, one end of the unloading plate is fixed on the wall panel 3, and the other end extends forward horizontally, and a plurality of buttresses are erected between the wall panel 3 and the unloading plate at intervals.

[0034] In a preferred embodiment, continue to refer to Figure 1 , Figure 2As shown, the wall body is a three-layer box structure. Specifically, the unloading plate includes an upper unloading plate 4 and a lower unloading plate 5, the front edge of the lower unloading plate 5 exceeds the front edge of the bottom plate 2 by a certain distance, and the front edge of the upper unloading plate 4 exceeds the front edge of the lower unloading plate 5 by a certain distance.

[0035] The drainage pipe structure includes an inverted filter layer 6 and interconnected drain pipes 7, longitudinal drainage blind ditches 8 and transverse drainage blind ditches 9. The inverted filter layer 6 is laid on the inner side of the wall panel 3, the drain pipe 7 is pre-buried in the wall panel 3, the longitudinal drainage blind ditch 8 is arranged in the inverted filter layer 6, the transverse drainage blind ditch 9 is arranged in the buttress, and the longitudinal drainage blind ditch 8 and the transverse drainage blind ditch 9 are arranged at the drain pipe 7.

[0036] The buttresses include an upper buttress 10, a middle buttress 11 and a lower buttress 12. The front edge of the lower buttress 12 is flush with the front edge of the base plate 2, the front edge of the middle buttress 11 exceeds the front edge of the lower buttress 12 by a certain distance, the upper buttress 10 is triangular, the lower buttress 12, the middle buttress 11 and the upper buttress 10 are aligned up and down and aligned with the pile foundation 1, and the plane spacing of the buttresses is twice the pile spacing.

[0037] The pile foundation 1 includes pile rods of equal length distributed in a matrix. Furthermore, the pile type of the pile rod is cast-in-place pile or precast pile according to the height of the retaining wall, the force of the pile foundation, and the ground conditions. When the cast-in-place pile foundation is used, the pile diameter is 800-1400mm, and when the precast pile foundation is used, the pile diameter is 600-1000mm. The number of rows of the pile foundation is not less than 2 rows and not more than 4 rows, and the pile spacing is 3-4 times the pile diameter.

[0038] Expansion joints 13 are provided between two adjacent wall bodies. The spacing between expansion joints 13 is preferably 15m, the width of the joint is 20mm, and the joint is filled with asphalt hemp flexible material.

[0039] The construction process includes the following steps:

[0040] S1. The site is leveled and staked out, and pile foundation is constructed. The rotary drilling machine is used to drill holes with mud wall protection. Vertical steel bars are reserved at the top of the pile and anchored into the bottom plate. The next step is carried out after the vertical and horizontal bearing capacity of the pile foundation are tested and qualified;

[0041] S2. Slope and excavate the soil to the base elevation, remove the floating slurry on the pile top, construct the bottom plate and reserve vertical anchor steel bars for the wall panels and buttresses;

[0042] S3. Construct the lower buttress and wall panels to the bottom elevation of the lower unloading plate, reserve vertical reinforcement for the upper buttress and wall panels at the top, and embed a 110mm PVC drainage pipe in the wall panel, which should extend 50mm beyond the outer side of the retaining wall;

[0043] S4. After the strength of the lower buttress and wall panels reaches the design requirements, backfill the compacted soil in layers to the bottom elevation of the lower unloading plate. The backfill material should be gravel soil with good permeability, with a soil-to-rock ratio of 7:3. During the backfilling process, the inner filter layer, longitudinal drainage blind ditch, and transverse drainage blind ditch should be implemented simultaneously;

[0044] S5. After backfilling is completed, lay a 80mm thick C20 plain concrete cushion and implement the lower unloading plate;

[0045] S6. Repeat the above steps, implement the middle wall panel, middle buttress, upper unloading plate, upper buttress and upper wall panel in sequence, and complete the backfill behind the wall.

[0046] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A super-high pile-supported box-type reinforced concrete retaining wall, characterized in that: It includes a pile foundation and a wall body, the wall body includes a bottom plate, a wall panel, a buttress and a unloading plate, a drainage pipe structure is laid in the wall body, the bottom plate is horizontally arranged on the top of the pile foundation, the wall panel is erected on the bottom plate, a plurality of the unloading plates are arranged at intervals up and down on the front side of the wall panel, one end of the unloading plate is fixed on the wall panel, and the other end extends forward horizontally, and a plurality of the buttresses are erected between the wall panel and the unloading plate.

2. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 1, characterized in that: The wall body is a three-layer box-type structure.

3. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 2, characterized in that: The unloading plate comprises an upper unloading plate and a lower unloading plate, the front edge of the lower unloading plate exceeds the front edge of the bottom plate by a certain distance, and the front edge of the upper unloading plate exceeds the front edge of the lower unloading plate by a certain distance.

4. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 3, characterized in that: The drainage pipe structure includes an inverted filter layer and interconnected drainage pipes, longitudinal drainage blind ditches and transverse drainage blind ditches. The inverted filter layer is laid on the inner side of the wall panel, the drainage pipe is pre-buried in the wall panel, the longitudinal drainage blind ditch is arranged in the inverted filter layer, the transverse drainage blind ditch is arranged in the buttress, and the longitudinal drainage blind ditch and the transverse drainage blind ditch are arranged at the drainage pipe.

5. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 4, characterized in that: The buttresses include an upper buttress, a middle buttress and a lower buttress, the front edge of the lower buttress is flush with the front edge of the base plate, the front edge of the middle buttress exceeds the front edge of the lower buttress by a certain distance, the upper buttress is triangular, and the lower buttress, the middle buttress and the upper buttress are aligned up and down and aligned with the pile foundation.

6. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 1, characterized in that: The pile foundation comprises pile rods of equal length distributed in a matrix.

7. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 6, characterized in that: The pile type of the pile rod can be cast-in-place pile or precast pile according to the height of the retaining wall, the stress of the pile foundation and the ground conditions.

8. The super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 1, characterized in that: An expansion joint is arranged between two adjacent wall bodies, and the joint is filled with asphalt hemp flexible material.

9. A method for constructing a super-high pile-supported box-type reinforced concrete retaining wall, used for constructing the super-high pile-supported box-type reinforced concrete retaining wall as claimed in claim 5, characterized in that: The following steps are involved: S1. The site is leveled and staked out, and pile foundation is constructed. The rotary drilling machine is used to drill holes with mud wall protection. Vertical steel bars are reserved at the top of the pile and anchored into the bottom plate. The next step is carried out after the vertical and horizontal bearing capacity of the pile foundation are tested and qualified; S2. Slope and excavate the soil to the base elevation, remove the floating slurry on the pile top, construct the bottom plate and reserve vertical anchor steel bars for the wall panels and buttresses; S3. Construct the lower buttress and wall panels to the bottom elevation of the lower unloading plate, reserve vertical reinforcement for the upper buttress and wall panels at the top, and embed PVC drainage pipes in the wall panels, which extend beyond the outside of the retaining wall; S4. After the strength of the lower buttress and wall panels reaches the design requirements, backfill the compacted soil in layers to the bottom elevation of the lower unloading plate. The backfill material should be gravel soil with good permeability, with a soil-to-rock ratio of 7:

3. During the backfilling process, the inner filter layer, longitudinal drainage blind ditch, and transverse drainage blind ditch should be implemented simultaneously; S5. After backfilling is completed, lay the C20 plain concrete cushion and implement the lower unloading plate; S6. Repeat the above steps, implement the middle wall panel, middle buttress, upper unloading plate, upper buttress and upper wall panel in sequence, and complete the backfill behind the wall.