Drying method of upper-stage storage tank
Through absolute ethanol replacement and hot nitrogen purging combined with heating treatment, the problem of unsatisfactory drying effect of the upper stage storage box is solved, a more efficient drying effect is achieved, equipment requirements are simplified, and it is suitable for upper stage storage boxes of various shapes. box.
Patent Information
- Application Number
- CN202410881668.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-02
AI Technical Summary
The existing upper-level storage box drying method is not ideal and easily retains moisture, and the vacuum drying equipment requires a large volume and power, making it difficult to meet the drying degree and equipment requirements.
The method of absolute ethanol replacement and hot nitrogen blowing combined with a heating belt is used to add absolute ethanol and high-purity nitrogen through multiple cycles, combined with heating treatment, to ensure that the inner wall of the upper-level tank is dry, especially at the bottom lock weld and A heating belt is installed at the propellant management device to improve the drying effect.
It significantly improves the drying effect of the upper stage storage tank, simplifies the requirements for drying equipment, reduces the volume and power requirements of the equipment, and is suitable for various shapes of upper stage storage tanks.
Smart Images

Figure CN118729694A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of aerospace technology, and in particular to a method for drying an upper stage tank. Background Art
[0002] As an important component of the upper stage power system, the upper stage tank provides the engine with non-aired propellant through the upper stage tank during the on-orbit period. Usually, the upper stage tank is filled with propellant by vacuuming. If there is liquid in the upper stage tank, vacuuming will take a lot of time, so it is critical to ensure the dryness of the upper stage tank. After the hydraulic test and the cleaning of excess materials, there is moisture on the inner wall of the upper stage tank, and usually the upper stage tank is not equipped with a manhole, so the moisture in the upper stage tank cannot be manually cleaned. In addition, due to the presence of welded bottom locks and propellant management devices for providing non-aired propellant to the engine inside the upper stage tank, ordinary drying is not ideal and it is easy to retain moisture; if vacuum drying is used, due to the large volume of the upper stage tank, the volume and power requirements of the vacuum drying box are relatively large.
[0003] In view of the above situation, it is necessary to provide a method for drying the upper stage tank to ensure that the dryness of the upper stage tank meets the use requirements and reduce the volume and power requirements of the drying equipment. Summary of the invention
[0004] The present application provides a method for drying an upper stage storage tank, which simplifies the requirements for drying equipment and improves the drying effect.
[0005] In order to solve the above technical problems, this application provides the following technical solutions:
[0006] A method for drying an upper stage tank comprises the following steps: step S110, placing the upper stage tank vertically, opening its air inlet, and adding a predetermined amount of anhydrous ethanol into the upper stage tank from its liquid outlet so that the liquid level can completely cover the propellant management device; step S120, closing the air inlet and the liquid outlet, turning the upper stage tank from a vertical state to a horizontal state, and rotating or shaking the upper stage tank so that the inner cavity wall of the upper stage tank is in full contact with the anhydrous ethanol; step S130, turning the upper stage tank from a horizontal state to a vertical state, opening the air inlet and the liquid outlet, introducing high-purity nitrogen through the air inlet, and discharging the anhydrous ethanol through the liquid outlet; step S140, repeating steps S110 to S130 for multiple times; step S150, at a predetermined position on the outer wall of the upper stage tank A heating belt is provided to ensure that the temperature of the outer wall of the upper stage tank is not lower than a predetermined value through the heating belt; step S160, the upper stage tank is placed vertically, the liquid outlet is opened, and hot nitrogen gas with a first predetermined temperature and a first predetermined pressure is introduced into the upper stage tank through the air inlet, and the gas is blown for a first predetermined time; step S170, the upper stage tank is placed vertically, the air inlet is opened, and hot nitrogen gas with a first predetermined temperature and a second predetermined pressure is introduced into the upper stage tank through the liquid outlet, and the gas is blown for a second predetermined time, wherein the second predetermined pressure is less than the first predetermined pressure, and the second predetermined time is shorter than the first predetermined time; step S180, step S160 and step S170 are repeated multiple times; step S190, the relative humidity value at the liquid outlet is detected, and when the relative humidity value reaches the predetermined value, the blowing and drying is terminated.
[0007] In the above-mentioned method for drying the upper stage tank, it is preferred that the anhydrous ethanol added to the upper stage tank is analytical grade.
[0008] In the above-mentioned method for drying the upper stage tank, it is preferred that the amount of anhydrous ethanol added to the upper stage tank is 1 / 10 to 1 / 3 of the volume of the upper stage tank.
[0009] In the above-mentioned drying method of the upper stage tank, preferably, the upper stage tank is rotated along the central axis, or shaken horizontally, vertically or in other directions along the central axis of the upper stage tank.
[0010] In the above-mentioned method for drying the upper stage tank, it is preferred that the high-purity nitrogen is 0.05MPa to 0.1MPa high-purity nitrogen with a dew point of ≤-55°C.
[0011] In the above-mentioned method for drying the upper stage tank, it is preferred that steps S110 to S130 are repeated at least three times; and steps S160 and S170 are repeated at least two times.
[0012] In the above-mentioned method for drying the upper stage tank, it is preferred that the power of the heating belt should ensure that the temperature of the outer wall of the upper stage tank is not less than 40°C.
[0013] In the drying method of the upper stage tank as described above, preferably, the predetermined position is the weld between the lower edge of the upper head and the upper edge of the cylindrical section, the weld between the lower edge of the cylindrical section and the upper edge of the lower head, and the position corresponding to the propellant management device, or the position within the predetermined range corresponding to the propellant management device.
[0014] In the drying method of the upper stage tank as described above, preferably, the first predetermined temperature is 60°C to 80°C, the first predetermined pressure is 0.1MPa to 0.2MPa, the second predetermined pressure is 0.02MPa to 0.05MPa, the first predetermined time is not less than 4 hours, and the second predetermined time is not less than 0.5 hour.
[0015] In the above-mentioned method for drying the upper stage storage tank, preferably, the predetermined value of the relative humidity value is less than 1% within 10 minutes.
[0016] Compared with the above-mentioned background technology, the drying method of the upper stage tank of the present application simplifies the requirements for drying equipment and improves the drying effect; and the present application adopts the methods of anhydrous ethanol replacement, hot nitrogen blowing, and setting heating belts at the bottom lock weld and the location where the propellant management device is arranged, which effectively improves the drying effect of the upper stage tank; in addition, the drying method of the upper stage tank of the present application has a wide range of uses and can be used for spherical, spherical and special-shaped upper stage tanks, and can also be used for partially managed and fully managed upper stage tanks. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0018] Figure 1 is a flow chart of a drying method for an upper stage tank provided in an embodiment of the present application;
[0019] Figure 2 is a schematic diagram of an upper stage tank provided in an embodiment of the present application;
[0020] Figure 3 It is a schematic diagram of the weld bottom locking structure of the upper stage tank provided in an embodiment of the present application;
[0021] Figure 4It is a schematic diagram of the heating belt of the upper stage tank provided in an embodiment of the present application. DETAILED DESCRIPTION
[0022] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be interpreted as limiting the present invention.
[0023] like Figure 1 As shown, the present application provides a method for drying an upper stage tank, comprising the following steps:
[0024] Step S110, placing the upper stage tank vertically, opening its air inlet, and adding a predetermined amount of anhydrous ethanol into the upper stage tank from its liquid outlet so that the liquid level can completely cover the propellant management device;
[0025] like Figure 2 As shown, the upper stage tank 200 includes: an upper head 210, a cylindrical section 220 and a lower head 230; wherein the lower edge of the upper head 210 is fixedly connected to the upper edge of the cylindrical section 220, and the lower edge of the cylindrical section 220 is fixedly connected to the upper edge of the lower head 230, thereby forming the upper stage tank 200. Optionally, the lower edge of the upper head 210 is fixedly connected to the upper edge of the cylindrical section 220 by welding, and the lower edge of the cylindrical section 220 is fixedly connected to the upper edge of the lower head 230 by welding. Also optionally, as Figure 3 As shown, the weld between the upper end cap 210 and the cylindrical section 220 is a bottom-locking weld, and the weld between the lower end cap 230 and the cylindrical section 220 is also a bottom-locking weld. The bottom-locking weld is a weld formed by welding on the pipe mouth at the bottom of the butt joint, so the bottom-locking weld can be considered as a part of the butt joint. Specifically, the lower edge of the upper end cap 210 is stepped, the upper edge of the cylindrical section 220 is placed on the stepped position of the lower edge of the upper end cap 210, and is welded at the stepped position to form a bottom-locking weld; the upper edge of the lower end cap 230 is stepped, the lower edge of the cylindrical section 220 is placed on the stepped position of the upper edge of the lower end cap 230, and is welded at the stepped position to form a bottom-locking weld.
[0026] In addition, an air inlet 240 is provided on the upper head 210 to introduce additional gas into the upper stage tank 200, and a liquid outlet 250 is provided on the lower head 230 to provide propellant to the engine. In addition, a propellant management device 260 is also provided on the upper stage tank 200, and the propellant management device 260 can ensure that the propellant provided to the engine through the liquid outlet 250 is a non-air-entrained propellant. Optionally, the central axis of the air inlet 240 and the central axis of the liquid outlet 250 are coaxial with the central axis of the upper stage tank 200.
[0027] Place the upper tank vertically, that is, Figure 2 The air inlet 240 on the upper head 210 is then opened, and a predetermined amount of anhydrous ethanol is added into the upper stage tank 200 from the liquid outlet 250 on the lower head 230, and the liquid level is made to completely cover the propellant management device 260. At the same time, the gas in the upper stage tank 200 is discharged to the outside through the air inlet 240.
[0028] Optionally, the anhydrous ethanol added to the upper stage tank 200 is analytically pure, which is prepared by relatively complex processes, such as molecular distillation, ion exchange, etc., to ensure its high purity, and its purity is usually above 99.5%. Also optionally, the amount of anhydrous ethanol added to the upper stage tank 200 is 1 / 10 to 1 / 3 of the volume of the upper stage tank 200.
[0029] Step S120, closing the air inlet and the liquid outlet, flipping the upper stage tank from a vertical state to a horizontal state, and rotating or shaking the upper stage tank so that the inner cavity wall of the upper stage tank is in full contact with the anhydrous ethanol;
[0030] After the anhydrous ethanol is filled into the upper stage tank 200, the air inlet 240 and the liquid outlet 250 are closed, and then the upper stage tank 200 is flipped from a vertical state to a horizontal state, and then the upper stage tank 200 is rotated or shaken for a predetermined time until the inner cavity wall of the upper stage tank 200 is in full contact with the anhydrous ethanol.
[0031] Optionally, the upper tank 200 is rotated along the central axis to make the inner wall of the upper tank 200 fully contact with the anhydrous ethanol. Optionally, the upper tank 200 is shaken horizontally, vertically or in other directions along the central axis to make the inner wall of the upper tank 200 fully contact with the anhydrous ethanol.
[0032] Step S130, flip the upper stage tank from a horizontal state to a vertical state, open the air inlet and the liquid outlet, introduce high-purity nitrogen through the air inlet, and discharge anhydrous ethanol through the liquid outlet;
[0033] After the inner wall of the upper tank 200 is fully in contact with the anhydrous ethanol, the upper tank 200 is flipped from a horizontal state to a vertical state, the air inlet 240 and the liquid outlet 250 of the upper tank 200 are opened, and then high-purity nitrogen is introduced from the air inlet 240, and the anhydrous ethanol in the upper tank 200 is discharged from the liquid outlet 250. Optionally, the high-purity nitrogen is 0.05MPa to 0.1MPa high-purity nitrogen (dew point ≤-55°C).
[0034] Step S140, repeating steps S110 to S130 multiple times;
[0035] After step S130 is executed, return to step S110, and repeat steps S110 to S130 multiple times. Optionally, steps S110 to S130 are repeated for no less than 3 times.
[0036] Step S150, setting a heating belt at a predetermined position on the outer wall of the upper stage tank, so as to ensure that the temperature of the outer wall surface of the upper stage tank is not lower than a predetermined value through the heating belt;
[0037] After step S140 is completed, Figure 4 As shown, a heat belt 270 is provided at a predetermined position on the outer wall of the upper stage tank 200, and the power of the heating belt 270 should ensure that the outer wall temperature of the upper stage tank 200 is not lower than 40°C.
[0038] Optionally, the predetermined position is the weld between the lower edge of the upper head 210 and the upper edge of the cylindrical section 220, the weld between the lower edge of the cylindrical section 220 and the upper edge of the lower head 230, and the position corresponding to the propellant management device 260, or the position near the propellant management device 260, where "near" means within a predetermined range. Optionally, the predetermined position is the bottom lock weld between the lower edge of the upper head 210 and the upper edge of the cylindrical section 220, and the bottom lock weld between the lower edge of the cylindrical section 220 and the upper edge of the lower head 230.
[0039] Step S160, placing the upper stage tank vertically, opening the liquid outlet, introducing hot nitrogen at a first predetermined temperature and a first predetermined pressure into the upper stage tank through the air inlet, and blowing for a first predetermined time;
[0040] After step S150 is completed, the upper stage tank 200 is placed vertically, and then the liquid outlet 250 is opened, and hot nitrogen at 60°C to 80°C is introduced into the upper stage tank 200 through the air inlet 240. The hot nitrogen pressure is 0.1MPa to 0.2MPa, and the blowing time is not less than 4 hours.
[0041] In addition, during the blowing process, the heating belts 270 are also turned on to continuously heat the bottom lock weld between the lower edge of the upper head 210 of the upper stage tank 200 and the upper edge of the cylindrical section 220, the bottom lock weld between the lower edge of the cylindrical section 220 and the upper edge of the lower head 230, and the corresponding position of the propellant management device 260 and the nearby position.
[0042] Step S170, placing the upper stage tank vertically, opening the air inlet, introducing hot nitrogen at a first predetermined temperature and a second predetermined pressure into the upper stage tank through the liquid outlet, and blowing for a second predetermined time, wherein the second predetermined pressure is less than the first predetermined pressure, and the second predetermined time is shorter than the first predetermined time;
[0043] After step S160 is completed, the upper stage tank 200 is placed vertically, the air inlet 240 is opened, and hot nitrogen at 60°C to 80°C is introduced into the upper stage tank 200 through the liquid outlet 250. The hot nitrogen pressure is 0.02MPa to 0.05MPa, and the blowing is carried out for no less than 0.5 hour.
[0044] Step S180, repeating steps S160 and S170 multiple times;
[0045] After step S170 is executed, return to step S160, and repeat step S160 and step S170 multiple times. Optionally, step S160 and step S170 are repeated for no less than 2 times.
[0046] Step S190, detecting the relative humidity value at the liquid outlet, and when the relative humidity value reaches a predetermined value, ending the blowing and drying;
[0047] After step S180 is completed, a hygrometer is used to detect the relative humidity value at the liquid outlet 250. When the relative humidity value is less than 1% within 10 minutes, the blowing and drying is terminated.
[0048] The above-mentioned method for drying the upper stage tank can be applied to an automated system, and the above-mentioned steps S110 to S190 can be completed by controlling a manipulator through a control component.
[0049] Effects of this application:
[0050] (1) The present application overcomes the deficiencies of the prior art and provides a method for drying an upper stage tank, thereby simplifying the requirements for drying equipment and improving the drying effect.
[0051] (2) The present application adopts the methods of anhydrous ethanol replacement, hot nitrogen blowing, and setting heating belts at the bottom lock weld and the location where the propellant management device is arranged, which effectively improves the drying effect of the upper area storage tank.
[0052] (3) The upper stage tank drying method of the present application has a wide range of uses and can be used for spherical, spherical-cylindrical and special-shaped upper stage tanks.
[0053] (4) The upper stage tank drying method of the present application has a wide range of uses and can be used for partial management and full management of upper stage tanks.
[0054] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0055] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A method for drying an upper stage tank, characterized in that: The steps include: Step S110, placing the upper stage tank vertically, opening its air inlet, and adding a predetermined amount of anhydrous ethanol into the upper stage tank from its liquid outlet so that the liquid level can completely cover the propellant management device; Step S120, closing the air inlet and the liquid outlet, flipping the upper stage tank from a vertical state to a horizontal state, and rotating or shaking the upper stage tank so that the inner cavity wall of the upper stage tank is in full contact with the anhydrous ethanol; Step S130, flip the upper stage tank from a horizontal state to a vertical state, open the air inlet and the liquid outlet, introduce high-purity nitrogen through the air inlet, and discharge anhydrous ethanol through the liquid outlet; Step S140, repeating steps S110 to S130 multiple times; Step S150, setting a heating belt at a predetermined position on the outer wall of the upper stage tank, so as to ensure that the temperature of the outer wall surface of the upper stage tank is not lower than a predetermined value through the heating belt; Step S160, placing the upper stage tank vertically, opening the liquid outlet, introducing hot nitrogen at a first predetermined temperature and a first predetermined pressure into the upper stage tank through the air inlet, and blowing for a first predetermined time; Step S170, placing the upper stage tank vertically, opening the air inlet, introducing hot nitrogen at a first predetermined temperature and a second predetermined pressure into the upper stage tank through the liquid outlet, and blowing for a second predetermined time, wherein the second predetermined pressure is less than the first predetermined pressure, and the second predetermined time is shorter than the first predetermined time; Step S180, repeating steps S160 and S170 multiple times; Step S190, detecting the relative humidity value at the liquid outlet, and when the relative humidity value reaches a predetermined value, ending the blowing and drying.
2. The method for drying the upper stage tank according to claim 1, characterized in that: The anhydrous ethanol added to the upper stage tank is analytical grade.
3. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: The amount of anhydrous ethanol added to the upper stage tank is 1 / 10 to 1 / 3 of the volume of the upper stage tank.
4. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: Rotate along the central axis of the upper stage tank, or shake horizontally, vertically or in other directions along the central axis of the upper stage tank.
5. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: High purity nitrogen is 0.05MPa~0.1MPa high purity nitrogen, and the dew point is ≤-55℃.
6. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: Repeat steps S110 to S130 for no less than 3 times; Repeat step S160 and step S170 for no less than 2 times.
7. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: The power of the heating belt must ensure that the outer wall temperature of the upper stage tank is not lower than 40℃.
8. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: The predetermined position is the weld between the lower edge of the upper head and the upper edge of the cylindrical section, the weld between the lower edge of the cylindrical section and the upper edge of the lower head, and the position corresponding to the propellant management device, or the position within the predetermined range corresponding to the propellant management device.
9. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: The first predetermined temperature is 60° C. to 80° C., the first predetermined pressure is 0.1 MPa to 0.2 MPa, the second predetermined pressure is 0.02 MPa to 0.05 MPa, the first predetermined time is not less than 4 hours, and the second predetermined time is not less than 0.5 hours.
10. The method for drying the upper stage tank according to claim 1 or 2, characterized in that: The preset value of the relative humidity value is that the relative humidity value is less than 1% within 10 minutes.
Citation Information
Patent Citations
Oxy-hydrogen rocket liquid hydrogen storage box replacement method
CN106567992A
Storage-box test article and test method applicable to cold shock test of heat insulation structure
CN107741373A
Plate type storage tank ground propellant large-flow repeated adding and discharging method and control system
CN108195608A
Spherical storage box drying method
CN109442869A
Upper-stage annular propellant storage tank
CN116006355A
Cited By
Method for removing residual water in closed inner cavity of diaphragm type storage tank on detector
CN120697977A
Under-pressure drainage and drying process for rocket storage tank
CN122543881A