Evaluation method for testing the peripheral resistance of large-section rectangular curved pipe jacking
By simulating the construction process of large-section rectangular curved pipe hoisting in the test chamber, measuring the resistance and friction coefficient of the pipe, and evaluating the resistance reduction effect of thixotropic mud, the problem of difficult to evaluate the friction resistance in the curve hoisting is solved, and the construction safety is improved and efficiency.
Patent Information
- Application Number
- CN202411230558.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-09-04
AI Technical Summary
The prior art is difficult to accurately evaluate the characteristics of the pipe friction resistance distribution characteristics and the resistance reduction effect of thixotropic mud during construction, especially during the curved ejection process, which leads to construction difficulties and disturbances of surrounding soil. Impacts construction safety and economics.
A large-section rectangular curved pipe periphery resistance test evaluation method is used to simulate the construction process in the test chamber, and use hydraulic pushing components and grouting components to measure and calculate the pipe periphery resistance, and analyze the pipe earth friction before and after grouting. Coefficient, evaluate the drag reduction effect of thixotropic mud, and optimize the mud ratio scheme.
Effectively simulate the changes in the pipe friction resistance of the rectangular curved top pipe in actual construction, provide scientific basis to optimize the construction process, reduce construction difficulties and soil disturbances, and improve construction safety and efficiency.
Smart Images

Figure CN118730520B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pipe jacking engineering, and in particular to a method for testing and evaluating the peripheral resistance of a large-section rectangular curve pipe jacking. Background Art
[0002] As a relatively mature dark excavation construction method, pipe jacking has been widely used in urban construction. However, with the development of urban construction, pipe jacking often crosses important pipelines, important urban buildings, subway lines, etc. in actual construction. Therefore, as a component of pipe jacking, the curved pipe jacking method is more flexible in the selection of pipeline line shape and is gradually used in municipal pipeline projects such as crossing rivers, lakes and busy streets in urban areas. If the pipe jacking does not take drag reduction measures during the pipe jacking construction process, the friction between the pipe and the soil is too large, resulting in excessive jacking force on the end of the pipe, which will cause construction difficulties; when encountering special formations such as overly sticky expansive clay, the high friction resistance of the formation will also increase with the increase of the jacking distance of the pipe jacking construction. On the other hand, poor drag reduction effect will cause greater disturbance to the surrounding soil. When the disturbance is too large, it will cause certain impacts on the surrounding buildings or structures, and in severe cases, it will bring economic losses and social impacts. Therefore, studying the drag reduction characteristics of pipe jacking construction has positive significance for the smoothness, safety and control of the jacking length of pipe jacking construction.
[0003] During jacking construction, as the jacking distance increases, the frictional resistance between the pipe and the soil gradually increases. At this time, it is necessary to inject thixotropic mud to form a mud layer between the pipe section and the soil to reduce the frictional resistance between the pipe and the soil, and at the same time control ground settlement.
[0004] Compared with straight pipe jacking, because it involves curved jacking, the pipe-soil extrusion contact force, friction resistance and other forces during the construction process of curved pipe jacking are more complicated. The friction resistance of curved pipe jacking during the jacking construction process is usually obtained based on theoretical calculations, and accurate data cannot be obtained. Most of the test devices related to pipe jacking are based on circular pipe jacking and are straight jacking.
[0005] Therefore, in order to determine the distribution characteristics of the friction resistance around the large-section rectangular curve pipe during the jacking process and the drag reduction effect after the injection of thixotropic mud, a test and evaluation method for the circumferential resistance of the large-section rectangular curve pipe is needed to provide a reasonable basis for the subsequent large-section rectangular curve pipe jacking construction. Summary of the invention
[0006] The purpose of the present invention is to provide a method for testing and evaluating the circumferential resistance of a large-section rectangular curve jacking pipe, which can effectively simulate the change of circumferential friction resistance of the rectangular curve jacking pipe before and after grouting during actual construction and judge the drag reduction effect of thixotropic mud.
[0007] In order to achieve the above object, the present invention provides the following technical solutions:
[0008] A method for testing and evaluating the peripheral resistance of a large-section rectangular curved jacking pipe comprises the following steps:
[0009] S1: Prefabricate rectangular pipe segments, bury earth pressure boxes around the rectangular pipe segments, and install reflective prisms on the inner surface of the rectangular pipe segments;
[0010] S2: Pre-buried rectangular pipe sections. First, lay part of the soil at the bottom of the test box, and then install several rectangular pipe sections according to the predetermined jacking curvature. γ Placed on the soil, several rectangular pipe sections are arranged in sequence from the top push inlet to the top push outlet, and then the remaining soil is laid, and the front drag reduction platform and the rear drag reduction platform are placed. A rectangular pipe section is placed on the front drag reduction platform, and the rectangular pipe section on the front drag reduction platform is close to the rectangular pipe section located in the test box body near the top push inlet. The rectangular pipe section in the test box body and the rectangular pipe section on the front drag reduction platform together form a top pipe;
[0011] S3: Install the hydraulic thrust assembly and attitude monitoring assembly, install the thruster on the reaction frame, and install the pressure sensor on the thrust surface of the thruster; install the laser transmitter on the reaction frame, and install the laser receiver on the rear drag reduction platform;
[0012] S4: Install the grouting assembly, connect the grouting assembly, and connect the grouting assembly to the rectangular pipe section;
[0013] S5: No grouting, but using hydraulic jacking assembly to jack the pipe;
[0014] S6: Grouting jacking: grouting is performed in the test box by using the grouting assembly, and the jacking pipe is pushed in by using the hydraulic jacking assembly;
[0015] S7: Calculation of the peripheral resistance of rectangular curve jacking pipe. By calculating the peripheral resistance of the jacking pipe, analyzing the distribution characteristics of the peripheral resistance of the jacking pipe, comparing the changes in the peripheral friction resistance before and after grouting, and judging the grouting effect.
[0016] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe peripheral resistance test and evaluation method, the test and evaluation method also includes step S8, changing the type of soil and the composition ratio of the thixotropic mud and conducting tests, analyzing the drag reduction effect of thixotropic mud with different ratios, and optimizing the thixotropic mud ratio scheme; in the step S1, the total number of prefabricated rectangular pipe sections is 1.5 times the number of rectangular pipe sections placed in the test box; in the step S2, the rectangular pipe sections in the direction from the jacking outlet to the jacking inlet are numbered as section 1, section 2, ... section 10, respectively. Section; in the step S3, a steel pad is placed on the side of the jacking pipe that is in direct contact with the hydraulic jacking assembly; in the steps S5 and S6, under the action of the hydraulic jacking assembly, after a rectangular pipe section is pushed out of the test box from the jacking port, the jacking device is restored to its initial state, and then a rectangular pipe section is placed between the jacking device and the jacking pipe, the rectangular pipe sections of the jacking pipe are renumbered, and then the test is continued; in the step S5, the jacking force of the hydraulic jacking assembly to push the jacking pipe forward at a uniform speed is the friction resistance around the large-section rectangular curve jacking pipe before grouting At this time, the pipe-soil friction coefficient of the large-section rectangular curved jacking pipe is It can be determined by the following formula:
[0017] Formula (1)
[0018] In formula (1), The first i The measured average value of the earth pressure box around the rectangular pipe section;
[0019] In step S6, two rectangular pipe sections are grouped as one group, and the rectangular pipe sections in the direction from the ejection outlet to the jacking inlet are group 1 to group 5 in sequence. Grouting is performed from group 1 to group 5 in sequence using a grouting assembly, and while grouting, the jacking pipe is pushed in using a hydraulic jacking assembly;
[0020] The thrust force of the hydraulic jacking assembly pushing the jacking pipe forward at a uniform speed is the friction resistance around the pipe after grouting of the large-section rectangular curve jacking pipe. At this time, the pipe-soil friction coefficient of the large-section rectangular curved jacking pipe is It can be determined by the following formula:
[0021] Formula (2)
[0022] In formula (2), During the grouting jacking stage, when a certain rectangular pipe section is pushed out, the first i The measured average value of the earth pressure box around the rectangular pipe section;
[0023] The ratio of pipe-soil friction coefficient before and after grouting isk ,but:
[0024] Formula (3)
[0025] According to the friction coefficient ratio of pipe soil before and after grouting k Evaluate the drag reduction effect of thixotropic mud on large-section rectangular curved jacking pipes; in the step S7, analyze the soil pressure distribution characteristics inside and outside the curve when the rectangular pipe section is jacked in different path curves based on the values measured by the soil pressure box buried on the rectangular jacking pipe, and analyze the distribution characteristics of the resistance around the pipe when the jacking pipe is jacked in different path curves.
[0026] Furthermore, in the above-mentioned large-section rectangular curved pipe jacking pipe peripheral resistance test evaluation method, the wedge value of the rectangular pipe section satisfy:
[0027] Formula (4)
[0028] In formula (4), L 0 is the length of the rectangular tube segment, W 0 is the width of the end of the rectangular tube segment close to the outer edge of the curve, R is the curvature radius of the jacking path;
[0029] Hydraulic rod jacking rate and jacking path curvature radius R For different curve jacking path tests, the jacking rate of the hydraulic rods at the inner edge and outer edge of the curve satisfies the following formula:
[0030] Formula (5)
[0031] In formula (5), V 1 is the pushing rate of the hydraulic rod near the outer edge of the curve, R is the radius of curvature of the jacking path, L 0 is the length of the rectangular tube segment, V 2 is the pushing rate of the hydraulic rod close to the inner edge of the curve.
[0032] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe peripheral resistance test and evaluation method, the test and evaluation method is implemented using a test system, and the test system includes a test box, a hydraulic jacking assembly, a posture monitoring assembly, a grouting assembly, a data acquisition assembly, a data acquisition instrument and a computer, wherein the test box contains soil, a jacking pipe is buried in the soil, the jacking pipe horizontally penetrates the test box and the soil, and a counterweight is applied to the upper surface of the soil; the hydraulic jacking assembly is connected to the jacking pipe, and the hydraulic jacking assembly is used to push the jacking pipe to move; the grouting assembly is used to grout into the soil around the jacking pipe; the posture monitoring assembly is used to correct and control the jacking route of the jacking pipe; the data acquisition assembly is used to collect test data, the data acquisition assembly is connected to the data acquisition instrument, and the data acquisition instrument is connected to the computer.
[0033] Furthermore, in the above-mentioned large-section rectangular curve top pipe circumferential resistance test evaluation method, the test box includes a bottom plate and four side plates, the four side plates are sequentially connected and enclosed to form a frame structure, the lower ends of the four side plates are connected to the bottom plate, the side plates are made of transparent acrylic plate, and the thickness of the test box is T 1 10mm~20mm, length L 60cm~65cm, width W 100cm, height H The test box has a length of 100 cm to 150 cm; a push inlet is provided on one of the side panels perpendicular to the length direction of the test box, and a push-out outlet is provided on another side panel perpendicular to the length direction of the test box; the axis of the push pipe is an arc-shaped curve, the axis of one end of the push pipe close to the push inlet is located on the axis of the test box, and the axis of one end of the push pipe close to the push-out outlet is located on one side of the axis of the test box; the push pipe includes a plurality of rectangular pipe sections, the rectangular pipe section is a wedge-shaped structure in the width direction, and the width of one end of the rectangular pipe section close to the outer edge of the curve is W 0 The width of the end close to the inner edge of the curve is 6 cm. W 1 , W 1 = W 0 -2 ,in, is the wedge amount of the rectangular tube section; the length of the rectangular tube section L 0 32cm, height H 0 20cm, thickness T2 The thickness of the soil above the rectangular tube section is h 1 , h 1 = H 0 , the thickness of the soil below the rectangular pipe section is h 2 , h 2 =3× H 0 ; The number of the rectangular tube sections located in the test box is 10; there are a plurality of counterweight blocks, and the counterweight blocks are evenly arranged along the length direction of the test box.
[0034] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe peripheral resistance test and evaluation method, the test system also includes a drag reduction platform, the drag reduction platform is in contact with the test box, support legs are arranged below the drag reduction platform, the support legs are fixed to the ground, a plurality of drag reduction shafts are evenly distributed on the drag reduction platform, the axis of the drag reduction shaft is perpendicular to the axis in the length direction of the test box, a plurality of pulleys are evenly sleeved on the drag reduction shaft, the distance between two adjacent drag reduction shafts is 2cm~4cm, the distance between two adjacent pulleys is 2cm~3cm, and the length of the drag reduction platform is , =1.5× L 0 The height of the upper surface of the drag reduction platform from the ground is h 3 , h 3 = h 2 There are two drag reduction platforms, namely a front drag reduction platform and a rear drag reduction platform. The front drag reduction platform is arranged at the top push entrance, and the rear drag reduction platform is arranged at the top push exit. The width of the front drag reduction platform is w 1 , w 1 =1.5× W 0 , the width of the rear drag reduction platform is w 2 , w 2 =2× W 0 .
[0035] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe peripheral resistance test and evaluation method, the hydraulic jacking assembly includes a reaction frame and a jacking device, the reaction frame is arranged on the outside of the front drag reduction platform, and the jacking device is connected to the reaction frame; a steel pad is arranged between the output end of the jacking device and the jacking pipe, the jacking device can push the jacking pipe to move, and the central axis of the jacking device coincides with the central axis of the rectangular pipe section in the thickness direction; the jacking device includes eight hydraulic rods, and two of the hydraulic rods are arranged around the central axis of the jacking device respectively; the hydraulic rods are connected to the data acquisition instrument, and the computer can control the jacking rate of each hydraulic rod.
[0036] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe peripheral resistance test and evaluation method, the posture monitoring component includes a laser transmitter, a reflection prism and a laser receiver, the laser transmitter is arranged on the reaction frame; the laser transmitter is located on the central axis of the jacking device, each rectangular pipe section is provided with a reflection prism, the reflection prism is arranged in the middle of the inner surface of one end of the rectangular pipe section close to the outer edge of the curve, the laser receiver is arranged on the outer edge of the rear drag reduction platform, the laser receiver is connected to the data acquisition instrument, and the computer uses the laser emitted by the laser transmitter to monitor the surrounding resistance of the large-section rectangular curve jacking pipe. The reflection angle is used to determine whether the jacking route of the jacking pipe deviates; a scale is provided on the laser receiver, the laser emitted by the laser transmitter is reflected onto the laser receiver through the reflecting prism, and the laser receiver transmits the data of the laser landing point to the computer, and the computer controls the jacking rate of the hydraulic rod by calculating the deviation of the laser landing point, thereby correcting the jacking route of the jacking pipe; the scale on the laser receiver is an angle, and when the angle deviation of the jacking pipe during jacking is greater than or equal to 1°, the hydraulic rod close to the laser landing point increases the jacking rate at a speed of 1mm / min to correct the jacking route.
[0037] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe circumferential resistance test and evaluation method, the data acquisition component includes an earth pressure box and a pressure sensor, the rectangular pipe section has four outer surfaces, each of which has two earth pressure boxes pre-embedded on the outer surface, the earth pressure box is connected to the data acquisition instrument, and the earth pressure box is used to measure the earth pressure around the rectangular pipe section; the pressure sensor is arranged between the hydraulic rod and the steel pad, the pressure sensor is connected to the data acquisition instrument, and the pressure sensor is used to measure the jacking force provided by the hydraulic rod.
[0038] Furthermore, in the above-mentioned large-section rectangular curve jacking pipe circumferential resistance test and evaluation method, the grouting assembly includes a mud pool, a mud pump and a grouting pipe, the grouting pipe includes a main grouting pipe and a plurality of secondary grouting pipes, the plurality of secondary grouting pipes are connected to the main grouting pipe, the secondary grouting pipes are connected to the rectangular pipe sections, and each secondary grouting pipe corresponds to one rectangular pipe section; the main grouting pipe is connected to the mud pump, the mud pump is connected to the mud pool, the secondary grouting pipe is connected to the rectangular pipe sections, and thixotropic mud is stored in the mud pool; the main grouting pipe includes a first section and a second section, the first section and the second section are connected by a snap buckle, and the main grouting pipe and the secondary grouting pipe are both equipped with control valves, and the control valves are controlled by the computer.
[0039] It can be seen from the analysis that the present invention discloses a method for testing and evaluating the circumferential resistance of a large-section rectangular curve jacking pipe. The test system is used to test and evaluate the circumferential resistance of a large-section rectangular curve jacking pipe, which can simulate the drag reduction effect of thixotropic mud in the actual rectangular curve jacking pipe construction process, and a corresponding pipe-soil friction coefficient calculation formula is established in combination with the test results, thereby judging the drag reduction effect of thixotropic mud during jacking of a large-section rectangular curve jacking pipe, and analyzing the circumferential resistance distribution characteristics of the wedge-shaped rectangular pipe section of the jacking pipe during jacking. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:
[0041] Figure 1 The figure is a flow chart of the test evaluation method of the present invention.
[0042] Figure 2 It is a schematic diagram of the main structure of an embodiment of the present invention.
[0043] Figure 3 It is a schematic diagram of a top view of the structure of an embodiment of the present invention.
[0044] Figure 4 The figure is a schematic diagram of the three-dimensional structure of a test box according to an embodiment of the present invention.
[0045] Figure 5 It is a schematic diagram of the three-dimensional structure of a front rent reduction platform according to an embodiment of the present invention.
[0046] Figure 6 It is a schematic diagram of the three-dimensional structure of a rear rent reduction station according to an embodiment of the present invention.
[0047] Figure 7 The figure is a schematic diagram of the three-dimensional structure of a rectangular tube segment according to an embodiment of the present invention.
[0048] Figure 8 It is a schematic diagram of the three-dimensional structure of the cooperation between the hydraulic jacking assembly and the rectangular pipe section according to one embodiment of the present invention.
[0049] Fig. 9 It is a schematic structural diagram of the cooperation between a hydraulic rod and a rectangular pipe section according to an embodiment of the present invention.
[0050] Fig.10 It is a schematic structural diagram of a grouting assembly according to an embodiment of the present invention.
[0051] Explanation of the reference numerals: 1 test box; 2 bottom plate; 3 side plate; 4 push inlet; 5 push outlet; 6 soil; 7 counterweight; 8 rectangular pipe section; 9 front drag reduction platform; 10 rear drag reduction platform; 11 drag reduction shaft; 12 pulley; 13 laser transmitter; 14 reflecting prism; 15 laser receiver; 16 control valve; 17 main grouting pipe; 18 mud pump; 19 mud pool; 20 secondary grouting pipe; 21 buckle; 22 reaction frame; 23 hydraulic rod; 24 steel pad; 25 soil pressure box; 26 pressure sensor; 27 data acquisition instrument; 28 computer; 29 support leg; 30 first section; 31 second section. DETAILED DESCRIPTION
[0052] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention encompasses such modifications and variations within the scope of the appended claims and their equivalents.
[0053] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected", "connected" and "set" used in the present invention should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component; it can be a wired electrical connection, a radio connection, or a wireless communication signal connection. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0054] One or more examples of the present invention are shown in the accompanying drawings. The detailed description uses numbers and letter labels to refer to features in the drawings. Like or similar labels in the drawings and description have been used to refer to like or similar parts of the present invention. As used herein, the terms "first", "second", "third", etc. are used interchangeably to distinguish one component from another and are not intended to indicate the location or importance of individual components.
[0055] like Figures 1 to 10 As shown, according to an embodiment of the present invention, a method for testing and evaluating the circumferential resistance of a large-section rectangular curved jacking pipe is provided, such as Figure 1 As shown, the following steps are included:
[0056] S1: Prefabricate rectangular pipe segments 8, the total number of prefabricated rectangular pipe segments 8 is 1.5 times the number of rectangular pipe segments 8 placed in the test box 1, bury earth pressure boxes 25 around the rectangular pipe segments 8, and install reflective prisms 14 on the inner surfaces of the rectangular pipe segments 8.
[0057] S2: Pre-embed the rectangular pipe section 8. First, lay part of the soil 6 at the bottom of the test box 1. The thickness of the laid soil 6 is h 2 , h 2 =3× H 0 , the rectangular pipe section 8 is pushed in according to the predetermined curvature γ Placed on the soil 6, two adjacent rectangular pipe sections 8 are placed in contact with each other, and several rectangular pipe sections 8 are arranged in order from the top push inlet 4 to the top push outlet 5. Then lay the remaining soil 6 (the soil 6 around the top pipe and the soil 6 above the top pipe, the thickness of the soil 6 above the top pipe is h 1 , h 1 = H 0 ), a front drag reduction platform 9 and a rear drag reduction platform 10 are placed, an additional rectangular tube segment 8 is placed on the front drag reduction platform 9, the rectangular tube segment 8 on the front drag reduction platform 9 is close to the rectangular tube segment 8 located in the test box 1 near the top push inlet 4, the rectangular tube segment 8 in the test box 1 and the rectangular tube segment 8 on the front drag reduction platform 9 together form a top pipe; the number of the rectangular tube segment 8 from the top push outlet 5 to the top push inlet 4 is 10, and the rectangular tube segments 8 in the direction from the top push outlet 5 to the top push inlet 4 are numbered as the 1st segment, the 2nd segment ... the 10th segment.
[0058] S3: Install the hydraulic jacking assembly and the attitude monitoring assembly, install the jack on the reaction frame 22, the axis of the jack is perpendicular to the outer surface of the rectangular pipe section 8 on the front drag reduction platform 9, the pressure sensor 26 is installed on the jacking surface of the jack, and a steel pad 24 is placed on the side of the jacking pipe that is in direct contact with the hydraulic jacking assembly; the laser transmitter 13 is installed on the reaction frame 22, and the laser receiver 15 is installed on the rear drag reduction platform 10.
[0059] S4: Install the grouting assembly, connect the grouting assembly, and connect the grouting assembly to the rectangular pipe section 8. Connect the secondary grouting pipe 20 to the main grouting pipe 17, connect the main grouting pipe 17 to the mud pump 18, connect the mud pump 18 to the mud pool 19, and connect the secondary grouting pipe 20 to the rectangular pipe section 8 respectively.
[0060] S5: No grouting, use hydraulic jacking assembly to jack the pipe.
[0061] S6: Grouting and jacking: Grouting the soil in the test box 1 by using the grouting assembly, and jacking the jacking pipe by using the hydraulic jacking assembly. Group two rectangular pipe sections 8 as one group, and group the rectangular pipe sections 8 from the jacking outlet 5 to the jacking inlet 4 into the first group, the second group to the fifth group in sequence, and grouting is performed from the first group to the fifth group in sequence by using the grouting assembly, and the jacking pipe is jacked by using the hydraulic jacking assembly at the same time of grouting.
[0062] S7: Calculation of the peripheral resistance of rectangular curved jacking pipes. By calculating the peripheral resistance of jacking pipes under different jacking conditions (jacking without grouting and jacking with grouting), the distribution characteristics of the peripheral resistance of large-section rectangular curved jacking pipes are analyzed, and the changes in the peripheral friction resistance before and after grouting are compared to judge the grouting effect. According to the soil pressure value measured by the soil pressure box 25 buried on the rectangular jacking pipe, the soil pressure distribution characteristics of the inner and outer sides of the rectangular pipe section 8 when jacking in different path curves are analyzed, and the distribution characteristics of the peripheral resistance of the jacking pipe when jacking in different path curves are analyzed accordingly.
[0063] S8, changing the type of soil 6 and the composition ratio of the thixotropic mud and conducting experiments, analyzing the drag reduction effect of the thixotropic mud with different composition ratios, and optimizing the thixotropic mud ratio scheme.
[0064] When testing the peripheral resistance of a large-section rectangular curved jacking pipe, firstly, jacking without grouting is performed, and all rectangular pipe sections 8 are pushed out in sequence, and the peripheral friction resistance before grouting is measured. Then, grouting jacking is performed, and two sections from the first to the tenth rectangular pipe sections 8 are grouted in groups in sequence, and the peripheral friction resistance after grouting is measured. The changes in the peripheral friction resistance before and after grouting are compared to detect the drag reduction effect of the slurry. Under the action of the hydraulic jacking assembly, when a rectangular pipe section 8 close to the jacking outlet 5 of the test box 1 is pushed out of the test box 1 through the jacking outlet 5, the jacking device is restored to the initial state, and then a rectangular pipe section 8 is placed between the jacking device and the jacking pipe, and all the rectangular pipe sections 8 of the jacking pipe are renumbered, and then the test is continued.
[0065] In step S5, before grouting (without grouting jacking), the jacking force of the hydraulic jacking assembly pushing the jacking pipe forward at a uniform speed is the friction resistance around the pipe before grouting of the large-section rectangular curve jacking pipe. At this time, the pipe-soil friction coefficient of the large-section rectangular curved jacking pipe is It can be determined by the following formula:
[0066] Formula (1)
[0067] In formula (1), During the process of pushing out a certain rectangular pipe section 8 in the non-grouting jacking stage, the first i The measured average value of the soil pressure box 25 around the rectangular pipe section 8 is used to ensure the accuracy of the test evaluation. After all the rectangular pipe sections 8 required for the test are ejected, the friction coefficient of all pipes and soil is calculated. For example, if there are 10 rectangular tube sections 8 for testing, when the first rectangular tube section 8 is ejected, the following calculations are made: , ... , calculate the process value; at this time, there are still 10 rectangular tube sections 8 in the test box 1, and the 10 rectangular tube sections 8 are re-arranged from the ejection outlet 5 to the ejection inlet 4 in order from 1 to 10, and the above-mentioned ejection process is repeated, and a total of 10 rectangular tube sections 8 are ejected.
[0068] In step S6, after the grouting starts (grouting jacking), the jacking force of the hydraulic jacking assembly pushing the jacking pipe forward at a uniform speed is the friction resistance around the pipe after grouting of the large-section rectangular curve jacking pipe. At this time, the pipe-soil friction coefficient of the large-section rectangular curved jacking pipe is It can be determined by the following formula:
[0069] Formula (2)
[0070] In formula (2), During the grouting jacking stage, when a certain rectangular pipe section 8 is pushed out, the first i The measured average value of the soil pressure box 25 around the rectangular pipe section 8; in order to ensure the accuracy of the test evaluation, after all the rectangular pipe sections 8 required for the test are ejected, the friction coefficient of all pipes and soils is For example, if there are 10 rectangular tube sections 8 for testing, when the first rectangular tube section 8 is ejected, the following calculations are made: , ... N 10 , calculate the pipe-soil friction coefficient in this process value; at this time, there are still 10 rectangular tube sections 8 in the test box 1, and the 10 rectangular tube sections 8 are re-arranged from the ejection outlet 5 to the ejection inlet 4 in order from 1 to 10, and the above-mentioned ejection process is repeated, and a total of 10 rectangular tube sections 8 are ejected.
[0071] The ratio of pipe-soil friction coefficient before and after grouting is k ,but:
[0072] Formula (3)
[0073] According to the friction coefficient ratio of pipe to soil before and after grouting k Evaluation of the drag reduction effect of thixotropic mud on large-section rectangular curved jacking pipe. k ≤1, the drag reduction effect of the mud is poor, and the composition ratio and construction process of the thixotropic mud need to be further optimized; when 0.3< k ≤0.7, the mud has good drag reduction effect; when k When ≤0.3, the mud has excellent drag reduction effect and can play a good drag reduction effect on large-section rectangular curve jacking construction.
[0074] Wedge shape of rectangular tube section 8 satisfy:
[0075] Formula (4)
[0076] In formula (4), L 0 is the length of the rectangular tube section 8, W 0 is the width of the end of the rectangular tube section 8 close to the outer edge of the curve, R is the curvature radius of the jacking path.
[0077] The pushing rate of hydraulic rod 23 and the curvature radius of the pushing path R For different curve jacking paths (different curvatures) tests, the jacking rates of the hydraulic rod 23 near the inner edge of the curve and the hydraulic rod 23 near the outer edge of the curve satisfy the following formula:
[0078] Formula (5)
[0079] In formula (5), V 1 is the pushing rate of the hydraulic rod 23 near the outer edge of the curve, R is the radius of curvature of the jacking path, L 0 is the length of the rectangular tube section 8, V 2 is the pushing rate of the hydraulic rod 23 close to the inner edge of the curve.
[0080] Furthermore, the above test evaluation method is implemented using a test system, such as Figure 2 and Figure 3 As shown, the test system includes a test box 1, a hydraulic jacking assembly, a posture monitoring assembly, a grouting assembly, a data acquisition assembly, a data acquisition instrument 27 and a computer 28, wherein the test box 1 contains a soil body 6, the thickness of the soil body 6 is 5 times the height of the rectangular pipe section 8, a jacking pipe is buried in the soil body 6, the jacking pipe horizontally passes through the test box 1 and the soil body 6, a counterweight block 7 is applied to the upper surface of the soil body 6, and the counterweight block 7 is used to simulate the soil pressure on the jacking pipe in an actual project; the hydraulic jacking assembly is connected to the jacking pipe, and the hydraulic jacking assembly is used to push the jacking pipe to move; the grouting assembly is used to grout into the soil body 6 around the jacking pipe; the posture monitoring assembly is used to correct and control the jacking route of the jacking pipe; the data acquisition assembly is used to collect test data, the data acquisition assembly is connected to the data acquisition instrument 27, and the data acquisition instrument 27 is connected to the computer 28. By using the test system to carry out jacking tests on large-section rectangular curve jacking pipes, the drag reduction effect of thixotropic mud in the actual rectangular curve jacking construction process can be simulated. The corresponding pipe-soil friction coefficient calculation formula is established in combination with the test results. The drag reduction effect of thixotropic mud during jacking of large-section rectangular curve jacking pipes is judged based on this, and the distribution characteristics of the pipe circumference resistance of the wedge-shaped rectangular pipe section 8 during jacking are analyzed based on this.
[0081] Furthermore, if Figure 4 As shown, the test box 1 includes a bottom plate 2 and four side plates 3. The four side plates 3 are connected in sequence and enclosed to form a frame structure. The lower ends of the four side plates 3 are connected to the bottom plate 2. The material of the side plates 3 is a transparent acrylic plate, which is convenient for real-time observation of the test process. The thickness of the test box 1 is T 1 10mm~20mm, length L 60cm~65cm, width W 100cm, height HThe length of the jacking pipe is 100 cm to 150 cm; a push inlet 4 is provided on a side plate 3 perpendicular to the length direction of the test box 1, and a push outlet 5 is provided on another side plate 3 perpendicular to the length direction of the test box 1; the axis of the jacking pipe is an arc-shaped curve, the axis of one end of the jacking pipe close to the push inlet 4 is located on the axis of the test box 1, and the axis of one end of the jacking pipe close to the push outlet 5 is located on one side of the axis of the test box 1; the jacking pipe includes a plurality of rectangular pipe sections 8, such as Figure 7 As shown, the rectangular tube segment 8 is a wedge-shaped structure in the width direction, and the width of the end of the rectangular tube segment 8 close to the outer edge of the curve is W 0 The width of the end close to the inner edge of the curve is W 1 , W 1 = W 0 -2 ,in, is the wedge-shaped amount of the rectangular tube section 8; the length of the rectangular tube section 8 L 0 32cm, height H 0 20cm, thickness T 2 is 3cm; Figure 2 As shown, the thickness of the soil 6 located above the rectangular pipe section 8 is h 1 , h 1 = H 0 The thickness of the soil 6 below the rectangular pipe section 8 is h 2 , h 2 =3× H 0 The number of rectangular tube sections 8 located in the test box 1 is 10; a plurality of counterweight blocks 7 are provided, and the plurality of counterweight blocks 7 are evenly arranged along the length direction of the test box 1.
[0082] Furthermore, if Figure 5 and Figure 6As shown, the test system also includes a drag reduction platform, which is placed outside the test box 1 and in contact with the test box 1. Support legs 29 are provided below the drag reduction platform, and the support legs 29 are fixed to the ground to prevent the drag reduction platform from sliding during the jacking process, thereby affecting the accuracy of the test parameters. A number of drag reduction shafts 11 are evenly distributed on the drag reduction platform, and the axis of the drag reduction shaft 11 is perpendicular to the axis of the test box 1 in the length direction. A number of pulleys 12 are evenly sleeved on the drag reduction shaft 11, and the distance between two adjacent drag reduction shafts 11 is 2cm~4cm, and the distance between two adjacent pulleys 12 is 2cm~3cm. The length of the drag reduction platform is , =1.5× L 0 The height of the upper surface of the drag reduction platform from the ground is h 3 , h 3 = h 2 Before conducting the circumferential resistance test of large-section rectangular curve jacking pipes, it is necessary to correct the friction resistance of the drag reduction platform. Use the hydraulic jacking assembly to push the jacking pipe forward at a constant speed for a distance on the drag reduction platform. The thrust force at this time is the friction resistance on the drag reduction platform. Subtract this part of the friction resistance during the subsequent formal jacking to ensure the accuracy of the test results.
[0083] There are two drag reduction platforms, namely a front drag reduction platform 9 and a rear drag reduction platform 10. The front drag reduction platform 9 is arranged at the top push inlet 4, and the rear drag reduction platform 10 is arranged at the top push outlet 5. The width of the front drag reduction platform 9 is w 1 , w 1 =1.5× W 0 , the width of the rear drag reduction platform 10 is w 2 , w 2 =2× W 0 The front drag reduction platform 9 offsets the external friction resistance when the rectangular tube section 8 is pushed into the test box 1 by the rolling of the pulley 12, and the rear drag reduction platform 10 offsets the external friction resistance when the rectangular tube section 8 is pushed out of the test box 1 by the rolling of the pulley 12.
[0084] Furthermore, if Figure 8 and Fig. 9As shown, the hydraulic jacking assembly includes a reaction frame 22 and a jacking device. The reaction frame 22 is arranged on the outside of the front drag reduction platform 9, and the jacking device is connected to the reaction frame 22. A steel pad 24 is arranged between the output end of the jacking device and the jacking pipe. The jacking device can push the jacking pipe to move. The central axis of the jacking device coincides with the central axis of the rectangular pipe section 8 on the front drag reduction platform 9 in the thickness direction. The jacking device includes eight hydraulic rods 23. Two hydraulic rods 23 are arranged around the central axis of the jacking device, and the two hydraulic rods 23 and The two hydraulic rods 23 located below the central axis of the thruster are symmetrically distributed with respect to the cross-section where the central axis of the thruster is located, and the two hydraulic rods 23 located on one side of the central axis of the thruster and the two hydraulic rods 23 located on the other side of the central axis of the thruster are symmetrically distributed with respect to the longitudinal section where the central axis of the thruster is located; the hydraulic rods 23 are connected to the data acquisition instrument 27, and the computer 28 can control the pushing rate of each hydraulic rod 23. By adjusting the pushing rate of the hydraulic rods 23, the jacking route of the jacking pipe can be corrected.
[0085] Furthermore, if Figure 2 As shown, the posture monitoring assembly includes a laser transmitter 13, a reflection prism 14 and a laser receiver 15. The laser transmitter 13 is arranged on the reaction frame 22; the laser transmitter 13 is located on the central axis of the jacking device, each rectangular pipe segment 8 is provided with a reflection prism 14, and the reflection prism 14 is arranged in the middle of the inner surface of one end of the rectangular pipe segment 8 close to the outer edge of the curve, and the laser receiver 15 is arranged on the outer edge of the rear drag reduction platform 10. The laser receiver 15 is connected to the data acquisition instrument 27, and the computer 28 determines whether the jacking route of the jacking pipe deviates through the reflection angle of the laser emitted by the laser receiver 15; the laser receiver 15 is provided with a reflection prism 14 on the inner surface of the rectangular pipe segment 8. A scale is provided. The laser emitted by the laser transmitter 13 is reflected by the reflecting prism 14 to the laser receiver 15. The laser receiver 15 transmits the data of the laser landing point to the computer 28. The computer 28 controls the pushing rate of the hydraulic rod 23 by calculating the deviation of the laser landing point, and then corrects the jacking route of the jacking pipe. The scale on the laser receiver 15 is an angle. When the angle deviation during jacking of the jacking pipe is greater than or equal to 1°, the hydraulic rod 23 close to the laser landing point increases the pushing rate at a speed of 1mm / min to correct the jacking route of the jacking pipe, so that the jacking pipe is jacked according to the predetermined jacking route, thereby ensuring the accuracy of the test results.
[0086] Furthermore, the data acquisition component includes an earth pressure box 25 and a pressure sensor 26. The rectangular pipe section 8 has four outer surfaces, wherein each outer surface is pre-buried with two earth pressure boxes 25, the earth pressure box 25 is connected to the data acquisition instrument 27, and the earth pressure box 25 is used to measure the earth pressure around the rectangular pipe section 8; the pressure sensor 26 is arranged between the hydraulic rod 23 and the steel pad 24, and a pressure sensor 26 is arranged on the jacking surface of each hydraulic rod 23, and the pressure sensor 26 is connected to the data acquisition instrument 27. The pressure sensor 26 is used to measure the jacking force provided by the hydraulic rod 23, and the pressure sensor 26 measures the jacking force of the hydraulic jacking assembly when jacking the pipe. F , which is transmitted to the computer 28 through the data acquisition device 27. The computer 28 controls the thrust of the hydraulic rod 23. F The pushing rate of the hydraulic rod 23 is then controlled to ensure uniform pushing of the jacking pipe and adjust the pushing route of the jacking pipe.
[0087] Furthermore, if Fig.10 As shown, the grouting assembly includes a mud pool 19, a mud pump 18 and a grouting pipe. The grouting pipe includes a main grouting pipe 17 and a plurality of secondary grouting pipes 20. The secondary grouting pipes 20 are connected to the rectangular pipe sections 8, and each secondary grouting pipe 20 corresponds to a rectangular pipe section 8; the main grouting pipe 17 is connected to the mud pump 18, the mud pump 18 is connected to the mud pool 19, the secondary grouting pipe 20 is connected to the rectangular pipe section 8, and thixotropic mud is stored in the mud pool 19; the main grouting pipe 17 includes a first section 30 and a second section 31, the first section 30 and the second section 31 are connected by a buckle 21, the first section 30 is connected to the secondary grouting pipe 20, and the second section 31 is connected to the mud pump 18. Such an arrangement can easily disassemble the rectangular pipe section 8, and the main grouting pipe 17 and the secondary grouting pipe 20 are both equipped with a control valve 16, and the control valve 16 is controlled by a computer 28.
[0088] From the above description, it can be seen that the above embodiments of the present invention achieve the following technical effects:
[0089] A method for testing and evaluating the circumferential resistance of a large-section rectangular curve jacking pipe is disclosed. A testing system is used to test and evaluate the circumferential resistance of a large-section rectangular curve jacking pipe, and the drag reduction effect of thixotropic mud in the actual rectangular curve jacking pipe construction process can be simulated. A corresponding pipe-soil friction coefficient calculation formula is established in combination with the test results, and the drag reduction effect of thixotropic mud during the jacking of the large-section rectangular curve jacking pipe is judged accordingly, and the circumferential resistance distribution characteristics of the wedge-shaped rectangular pipe section 8 of the jacking pipe are analyzed accordingly.
[0090] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for testing and evaluating the circumferential resistance of large-section rectangular curved pipe jacking. It is characterized in that The steps include: S1: Prefabricate rectangular pipe segments, bury earth pressure boxes around the rectangular pipe segments, and install reflective prisms on the inner surface of the rectangular pipe segments; S2: Pre-buried rectangular pipe sections. First, lay part of the soil at the bottom of the test box, and then install several rectangular pipe sections according to the predetermined jacking curvature. γ Placed on the soil, several rectangular pipe sections are arranged in sequence from the top push inlet to the top push outlet, and then the remaining soil is laid, and the front drag reduction platform and the rear drag reduction platform are placed. A rectangular pipe section is placed on the front drag reduction platform, and the rectangular pipe section on the front drag reduction platform is close to the rectangular pipe section located in the test box body near the top push inlet. The rectangular pipe section in the test box body and the rectangular pipe section on the front drag reduction platform together form a top pipe; S3: Install the hydraulic thrust assembly and attitude monitoring assembly, install the thruster on the reaction frame, and install the pressure sensor on the thrust surface of the thruster; install the laser transmitter on the reaction frame, and install the laser receiver on the rear drag reduction platform; S4: Install the grouting assembly, connect the grouting assembly, and connect the grouting assembly to the rectangular pipe section; S5: No grouting, but using hydraulic jacking assembly to jack the pipe; S6: Grouting jacking: grouting is performed in the test box by using the grouting assembly, and the jacking pipe is pushed in by using the hydraulic jacking assembly; S7: Calculation of the peripheral resistance of rectangular curve jacking pipe. By calculating the peripheral resistance of the jacking pipe, analyzing the distribution characteristics of the peripheral resistance of the jacking pipe, comparing the changes in the peripheral friction resistance before and after grouting, and judging the grouting effect.
2. According to the large-section rectangular curve jacking pipe peripheral resistance test and evaluation method of claim 1, It is characterized in that The test evaluation method further comprises step S8, changing the type of soil and the composition ratio of the thixotropic mud and conducting tests, analyzing the drag reduction effect of thixotropic muds with different proportions, and optimizing the thixotropic mud proportioning scheme; In step S1, the total number of prefabricated rectangular tube segments is 1.5 times the number of rectangular tube segments placed in the test box; In the step S2, the rectangular pipe sections in the direction from the ejection outlet to the ejection inlet are numbered as section 1, section 2, ... section 10 in sequence; In step S3, a steel backing plate is placed on the side of the jacking pipe that is in direct contact with the hydraulic jacking assembly; In the step S5 and the step S6, under the action of the hydraulic jacking assembly, after a rectangular pipe section is pushed out of the test box through the jacking port, the jacking device is restored to the initial state, and then a rectangular pipe section is placed between the jacking device and the jacking pipe, the rectangular pipe sections of the jacking pipe are renumbered, and then the test is continued; In step S5, the thrust force of the hydraulic jacking assembly pushing the jacking pipe forward at a uniform speed is the friction resistance around the large-section rectangular curve jacking pipe before grouting. At this time, the pipe-soil friction coefficient of the large-section rectangular curved jacking pipe is It can be determined by the following formula: Formula (1) In formula (1), The first i The measured average value of the earth pressure box around the rectangular pipe section; In step S6, two rectangular pipe sections are grouped as one group, and the rectangular pipe sections in the direction from the ejection outlet to the jacking inlet are group 1 to group 5 in sequence. Grouting is performed from group 1 to group 5 in sequence using a grouting assembly, and while grouting, the jacking pipe is pushed in using a hydraulic jacking assembly; The thrust force of the hydraulic jacking assembly pushing the jacking pipe forward at a uniform speed is the friction resistance around the pipe after grouting of the large-section rectangular curve jacking pipe. At this time, the pipe-soil friction coefficient of the large-section rectangular curved jacking pipe is It can be determined by the following formula: Formula (2) In formula (2), During the grouting jacking stage, when a certain rectangular pipe section is pushed out, the first i The measured average value of the earth pressure box around the rectangular pipe section; The ratio of pipe-soil friction coefficient before and after grouting is k ,but: Formula (3) According to the friction coefficient ratio of pipe to soil before and after grouting k To evaluate the drag reduction effect of thixotropic mud on large cross-section rectangular curved pipe jacking; In step S7, based on the values measured by the soil pressure box buried on the rectangular jacking pipe, the soil pressure distribution characteristics inside and outside the curve when the rectangular pipe segment is jacked in different path curves are analyzed, and the distribution characteristics of the resistance around the pipe when the jacking pipe is jacked in different path curves are analyzed accordingly.
3. According to the large-section rectangular curve jacking pipe circumferential resistance test and evaluation method of claim 2, It is characterized in that Wedge shape of rectangular pipe section satisfy: Formula (4) In formula (4), L 0 is the length of the rectangular tube segment, W 0 is the width of the end of the rectangular tube segment close to the outer edge of the curve, R is the curvature radius of the jacking path; Hydraulic rod jacking rate and jacking path curvature radius R For different curve jacking path tests, the jacking rate of the hydraulic rods at the inner edge and outer edge of the curve satisfies the following formula: Formula (5) In formula (5), V 1 is the pushing rate of the hydraulic rod near the outer edge of the curve, R is the radius of curvature of the jacking path, L 0 is the length of the rectangular tube segment, V 2 is the pushing rate of the hydraulic rod close to the inner edge of the curve.
4. According to the large-section rectangular curve jacking pipe peripheral resistance test and evaluation method of claim 3, It is characterized in that The test evaluation method is implemented using a test system. The test system includes a test box, a hydraulic jacking assembly, a posture monitoring assembly, a grouting assembly, a data acquisition assembly, a data acquisition instrument and a computer, wherein: The test box contains soil, a top pipe is buried in the soil, the top pipe horizontally penetrates the test box and the soil, and a counterweight is applied to the upper surface of the soil; The hydraulic jacking assembly is connected to the jacking pipe, and the hydraulic jacking assembly is used to push the jacking pipe to move; The grouting assembly is used for injecting grout into the soil around the jacking pipe; The posture monitoring component is used to perform correction control on the jacking route of the jacking pipe; The data acquisition component is used to collect test data. The data acquisition component is connected to the data acquisition instrument, and the data acquisition instrument is connected to the computer.
5. According to the large-section rectangular curve jacking pipe peripheral resistance test and evaluation method of claim 4, It is characterized in that The test box body includes a bottom plate and four side plates, the four side plates are connected in sequence and enclosed to form a frame structure, the lower ends of the four side plates are connected to the bottom plate, the side plates are made of transparent acrylic plates, and the thickness of the test box body is T 1 10mm~20mm, length L 60cm~65cm, width W 100cm, height H 100cm~150cm; A push inlet is provided on one of the side panels perpendicular to the length direction of the test box, and a push-out outlet is provided on another side panel perpendicular to the length direction of the test box; The axis of the jacking pipe is an arc-shaped curve, the axis of one end of the jacking pipe close to the jacking inlet is located on the axis of the test box, and the axis of one end of the jacking pipe close to the jacking outlet is located on one side of the axis of the test box; The top pipe comprises a plurality of rectangular pipe sections, each of which is a wedge-shaped structure in the width direction, and the width of one end of the rectangular pipe section close to the outer edge of the curve is W 0 The width of the end close to the inner edge of the curve is 6 cm. W 1 , W 1 = W 0 -2 ,in, is the wedge amount of the rectangular tube section; The length of the rectangular tube section L 0 32cm, height H 0 20cm, thickness T 2 3cm; The thickness of the soil above the rectangular pipe section is h 1 , h 1 = H 0 , the thickness of the soil below the rectangular pipe section is h 2 , h 2 =3× H 0 ; The number of the rectangular tube sections located in the test box is 10; A plurality of the counterweight blocks are provided, and the counterweight blocks are evenly arranged along the length direction of the test box.
6. The method for testing and evaluating the peripheral resistance of a large-section rectangular curved jacking pipe according to claim 4, It is characterized in that The test system also includes a drag reduction platform, which is in contact with the test box, and a support leg is arranged below the drag reduction platform, and the support leg is fixed to the ground. A plurality of drag reduction shafts are evenly distributed on the drag reduction platform, and the axis of the drag reduction shaft is perpendicular to the axis in the length direction of the test box. A plurality of pulleys are evenly sleeved on the drag reduction shaft, and the distance between two adjacent drag reduction shafts is 2cm~4cm, and the distance between two adjacent pulleys is 2cm~3cm. The length of the drag reduction platform is , =1.5× L 0 The height of the upper surface of the drag reduction platform from the ground is h 3 , h 3 = h 2 ; There are two drag reduction platforms, which are a front drag reduction platform and a rear drag reduction platform. The front drag reduction platform is arranged at the push-up entrance, and the rear drag reduction platform is arranged at the push-up exit. The width of the front drag reduction platform is w 1 , w 1 =1.5× W 0 , the width of the rear drag reduction platform is w 2 , w 2 =2× W 0 .
7. The method for testing and evaluating the peripheral resistance of a large-section rectangular curved jacking pipe according to claim 6, It is characterized in that The hydraulic jacking assembly comprises a reaction frame and a jacking device, wherein the reaction frame is arranged on the outside of the front drag reduction platform, and the jacking device is connected to the reaction frame; A steel pad is provided between the output end of the pusher and the push pipe, the pusher can push the push pipe to move, and the central axis of the pusher coincides with the central axis of the rectangular pipe section in the thickness direction; The thruster comprises eight hydraulic rods, and two of the hydraulic rods are respectively arranged around the central axis of the thruster; The hydraulic rods are connected to the data acquisition instrument, and the computer can control the pushing rate of each hydraulic rod.
8. The method for testing and evaluating the peripheral resistance of large-section rectangular curved jacking pipe according to claim 7, It is characterized in that The posture monitoring assembly includes a laser transmitter, a reflective prism and a laser receiver, and the laser transmitter is arranged on the reaction frame; The laser transmitter is located on the central axis of the jacking device, each rectangular pipe section is provided with a reflective prism, and the reflective prism is arranged in the middle of the inner surface of one end of the rectangular pipe section close to the outer edge of the curve, the laser receiver is arranged on the outer edge of the rear drag reduction platform, the laser receiver is connected to the data acquisition instrument, and the computer determines whether the jacking route of the jacking pipe deviates through the reflection angle of the laser emitted by the laser transmitter; The laser receiver is provided with a scale, the laser emitted by the laser transmitter is reflected to the laser receiver through the reflective prism, the laser receiver transmits the data of the laser landing point to the computer, the computer controls the jacking rate of the hydraulic rod by calculating the deviation of the laser landing point, and then corrects the jacking route of the jacking pipe; The scale on the laser receiver is an angle. When the angle deviation of the jacking pipe is greater than or equal to 1°, the hydraulic rod close to the laser landing point increases the jacking rate at a speed of 1mm / min to correct the jacking route.
9. The method for testing and evaluating the peripheral resistance of a large-section rectangular curved jacking pipe according to claim 4, It is characterized in that The data acquisition component includes an earth pressure box and a pressure sensor. The rectangular pipe segment has four outer surfaces, each of which is pre-buried with two earth pressure boxes. The earth pressure boxes are connected to the data acquisition instrument and are used to measure the earth pressure around the rectangular pipe segment. The pressure sensor is arranged between the hydraulic rod and the steel pad, the pressure sensor is connected to the data acquisition instrument, and the pressure sensor is used to measure the thrust force provided by the hydraulic rod.
10. The method for testing and evaluating the peripheral resistance of a large-section rectangular curve jacking pipe according to claim 4, It is characterized in that The grouting assembly includes a mud pool, a mud pump and a grouting pipe, the grouting pipe includes a main grouting pipe and a plurality of secondary grouting pipes, the plurality of secondary grouting pipes are connected to the main grouting pipe, the secondary grouting pipes are connected to the rectangular pipe sections, and each secondary grouting pipe corresponds to one rectangular pipe section; The main grouting pipe is connected to the mud pump, the mud pump is connected to the mud pool, the secondary grouting pipe is connected to the rectangular pipe section, and the mud pool stores thixotropic mud; The main grouting pipe comprises a first section and a second section, the first section and the second section are connected by a buckle, and the main grouting pipe and the secondary grouting pipe are both equipped with control valves, and the control valves are controlled by the computer.