Device and method for testing drawing strength of adhesion of asphalt and aggregate

By designing a pull-out strength test device for asphalt and aggregate and corresponding test methods, the problem of large human subjective influence and inability to simulate the actual environment in the existing technology has been solved, and an accurate assessment of the adhesion performance of asphalt mixtures has been achieved.

CN118730716APending Publication Date: 2024-10-01CENTRAL SOUTH UNIVERSITY OF FORESTRY AND TECHNOLOGY
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202410885555.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-07-01
Filing Date
2024-07-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing adhesion evaluation methods between asphalt and aggregate are highly influenced by human subjectivity, lack quantitative evaluation indicators, cannot accurately simulate the actual road environment and stress state, and are difficult to comprehensively evaluate the adhesion performance of asphalt mixtures.

Method used

A pullout strength test device for asphalt and aggregate is designed, including a pullout head, upper stone, thickness control gasket and stone base. The upper stone is fixed with epoxy resin cement to simulate actual road conditions, and uses water , water vapor, salt corrosion and freeze-thaw cycles and other test methods under different environmental conditions.

Benefits of technology

It provides more accurate pull-out strength data, enhances the applicability and flexibility of the test, can simulate the changes in adhesion properties of asphalt and aggregate in complex environments, and improves the practicality and accuracy of the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730716A_ABST
    Figure CN118730716A_ABST
Patent Text Reader

Abstract

The invention discloses a device and method for testing the drawing strength of asphalt and aggregate adhesion, and belongs to the related technical field of building materials, the device comprises a drawing head, an upper-layer stone is movably arranged at the lower end of the drawing head, the upper-layer stone is arranged in a thickness control gasket, asphalt is arranged in the thickness control gasket, the upper-layer stone controls the area of the asphalt, and the upper-layer stone is arranged in the thickness control gasket. A stone substrate is arranged at the lower end of the thickness control gasket; and the thickness control gasket is provided with various models to meet the requirements of asphalt with different thicknesses. The upper-layer stone and asphalt are movably arranged in the thickness control gasket, and the stone substrate is arranged at the lower end of the thickness control gasket, so that the adhesion performance of the asphalt and aggregate under actual pavement conditions can be simulated, and more accurate drawing strength data can be provided. Thickness control gaskets of various models meet the requirements of asphalt of different thicknesses, and the applicability and flexibility of the device are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field related to building materials, and specifically relates to a tensile strength test device and a test method for adhesion between asphalt and aggregate. Background Art

[0002] In the field of road engineering, the performance of asphalt mixture directly affects the service life and safety of the road. With the repeated action of water and traffic loads, the interface between asphalt and aggregate will lose adhesion or the internal cohesion of asphalt will lose, which will lead to a decrease in the bonding strength of asphalt concrete and the asphalt pavement will lose its ability to resist traffic stress and be damaged. Therefore, the adhesion performance of asphalt and aggregate is one of the key factors to ensure the durability of asphalt pavement. Traditional asphalt mixture test methods mainly focus on the physical properties of asphalt and the mechanical properties of aggregates, while there are relatively few studies on the adhesion between asphalt and aggregates, which limits the comprehensive evaluation of the overall performance of asphalt mixtures.

[0003] In traditional technology, the evaluation method of asphalt-aggregate adhesion usually includes water boiling method or static water immersion method. On the one hand, the evaluation results are greatly affected by human subjective factors and there is no quantitative evaluation index; on the other hand, the test results are closely related to asphalt viscosity and film thickness, which is more suitable for evaluating base asphalt and has poor sensitivity in evaluating the adhesion of different modified asphalts. In addition, these methods cannot simulate the complex environment and stress state of the actual road surface, so it is difficult to accurately evaluate the adhesion performance of asphalt mixtures. In order to solve these problems, the present invention provides a new type of pull-out strength test device and test method. Summary of the invention

[0004] In view of the above problems, the present invention provides a pull-out strength test device and test method for the adhesion between asphalt and aggregate, which are used to solve the technical problems that the existing test method is greatly influenced by human subjectivity, has no quantitative evaluation indicators, has poor sensitivity in evaluating the adhesion of modified asphalt, and cannot simulate actual complex environments and stresses.

[0005] To achieve the above object, the technical solution adopted by the present invention is:

[0006] A pulling strength test device for asphalt-aggregate adhesion comprises a pulling head, an upper layer of stone is arranged at the lower end of the pulling head, the upper layer of stone is arranged in a thickness control gasket, asphalt is arranged in the thickness control gasket, the upper layer of stone controls the area of ​​the asphalt, and a stone base is arranged at the lower end of the thickness control gasket; the thickness control gasket is provided with various models to meet the needs of asphalt of different thicknesses.

[0007] Compared with the prior art, the invention has the following beneficial effects: the invention can simulate the adhesion performance of asphalt and aggregate under actual road conditions by movably setting the upper stone and asphalt in the thickness control gasket, and the lower end of the thickness control gasket is provided with a stone base, so as to provide more accurate pull-out strength data. Various types of thickness control gaskets meet the needs of asphalt of different thicknesses, increasing the applicability and flexibility of the device.

[0008] As a further improvement of the above solution, the thickness control gasket includes a gasket body, an overflow port is arranged on the gasket body, a bottom plate is arranged on the inner side of the gasket body; and an opening is arranged at the upper end of the gasket body.

[0009] The technical effect of the above improvements is that the overflow port and the bottom plate design on the gasket body help control the flow and distribution of asphalt and ensure the uniformity of the asphalt layer during the test. The thickness of the gasket determines the thickness of the asphalt film.

[0010] As a further improvement of the above scheme, the upper stone and the stone base are set to limestone, basalt, diabase and granite.

[0011] The technical effect of the above improvements is that the upper stone and stone base are made of different materials such as limestone, basalt, diabase and granite, which can evaluate the adhesion performance of different types of aggregates with asphalt, thereby enhancing the scope of application of the test.

[0012] As a further improvement of the above solution, a consolidating material is passed between the pulling head and the upper layer of stone, and the consolidating material is set to epoxy resin.

[0013] The technical effect of the above improvement is: using epoxy resin as a consolidating material can effectively fix the pulling head and the upper stone, ensuring stability and reliability during the test.

[0014] A test method for the pull-out strength of asphalt-aggregate adhesion is provided, which is a test method for damage modes under four different environmental effects: water, water vapor, salt corrosion and freeze-thaw cycles.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention includes test methods for damage modes of water, water vapor, salt corrosion and freeze-thaw cycle damage, which can simulate the changes in the adhesion between asphalt and aggregate under different environmental conditions and provide a comprehensive damage assessment.

[0016] A test method for the pull-out strength of asphalt-aggregate adhesion, the specific test steps for water and water vapor damage are as follows:

[0017] S1. Preparatory work: Grind the upper stone and the stone base, remove dust from the upper stone and the stone base, the control gasket and the pulling head, and put the upper stone, the stone base and the pulling head into an oven for standby use; at the same time, heat the asphalt to a flowable state;

[0018] S2. Specimen preparation: After all preparatory work is in place, take out the upper stone, stone base and pulling head from the oven; consolidate the pulling head and the upper stone with epoxy resin, and place the control gasket on the stone base;

[0019] Then take out the asphalt and stir it evenly, quickly drop a proper amount of asphalt into the range of the control gasket, quickly place the pulling head and the upper stone after being solidified with epoxy resin on the stone base as a whole and press hard until the excess asphalt binder is squeezed out from the overflow port of the control gasket as much as possible;

[0020] S3. Place the specimen in a constant temperature and humidity chamber at 25±0.5℃ and 30% for 1 hour to allow the bonding strength between the asphalt and the stone to be fully formed;

[0021] S4. Take out the test specimens and place them in a water bath at a certain temperature for 24 hours to simulate the effect of water on the adhesion between asphalt and aggregate; place another group of test specimens in a constant temperature and humidity chamber at a certain temperature and humidity for 24 hours to simulate the effect of water vapor on the adhesion between asphalt and aggregate;

[0022] S5. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a tensile strength test.

[0023] The technical effect of the above improvements is that it helps to simulate the impact of water and water vapor on asphalt adhesion in the actual environment, and improves the practicality and accuracy of the test.

[0024] A test method for the pull-out strength of asphalt-aggregate adhesion, the specific test steps for the salt corrosion damage mode are as follows:

[0025] S1. Preparatory work: Grind the upper stone and the stone base, remove dust from the upper stone and the stone base, the control gasket and the pulling head, and put the upper stone, the stone base and the pulling head into an oven for standby use; at the same time, heat the asphalt to a flowable state;

[0026] S2. Specimen preparation: After all preparatory work is in place, take out the upper stone, stone base and pulling head from the oven; consolidate the pulling head and the upper stone with epoxy resin, and place the control gasket on the stone base;

[0027] Then take out the asphalt and stir it evenly, quickly drop a proper amount of asphalt into the range of the control gasket, quickly place the pulling head and the upper stone after being solidified with epoxy resin on the stone base as a whole and press hard until the excess asphalt binder is squeezed out from the overflow port of the control gasket as much as possible;

[0028] S3. Place the specimen in a constant temperature and humidity chamber at 25±0.5℃ and 30% for 1 hour to allow the bonding strength between the asphalt and the stone to be fully formed;

[0029] S4. Take out the test pieces and place them in a water bath with a certain salt concentration for 24 hours to simulate the effect of salt corrosion on the adhesion between asphalt and aggregate;

[0030] S5. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a tensile strength test.

[0031] The technical effect of the above improvements is that it helps to simulate the impact of salt corrosion on asphalt adhesion in actual environments and improves the practicality and accuracy of the test.

[0032] A test method for the pull-out strength of asphalt-aggregate adhesion, the specific test steps for the freeze-thaw cycle damage mode are as follows:

[0033] S1. Preparatory work: Grind the upper stone and the stone base, remove dust from the upper stone and the stone base, the control gasket and the pulling head, and put the upper stone, the stone base and the pulling head into an oven for standby use; at the same time, heat the asphalt to a flowable state;

[0034] S2. Specimen preparation: After all preparatory work is in place, take out the upper stone, stone base and pulling head from the oven; consolidate the pulling head and the upper stone with epoxy resin, and place the control gasket on the stone base;

[0035] Then take out the asphalt and stir it evenly, quickly drop a proper amount of asphalt into the range of the control gasket, quickly place the pulling head and the upper stone after consolidation with epoxy resin on the stone base and press hard until the excess asphalt binder is squeezed out from the overflow port of the control gasket as much as possible; divided into experimental group and control group;

[0036] S3. Place the test specimens in a constant temperature water bath at 25℃±0.5℃ for 30 minutes, then place them flat in a plastic bag and add water until the upper layer of stones is covered. Tie the bag tightly and place the specimens flat in a constant temperature refrigerator at -18±2℃ again for 16±1h.

[0037] S4. Place the test piece of the control assembly in a curing box at 25±0.5℃ and 30% humidity for later use;

[0038] S5. Place the test pieces of the test group in S2 and the test pieces of the control assembly in S3 in a constant temperature water bath at 40±0.5℃ and keep for 24h;

[0039] S6. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a tensile strength test.

[0040] The technical effect of the above improvements is: through the specific test steps of freeze-thaw cycles, the stability of asphalt-aggregate adhesion under extreme temperature changes can be evaluated, which is of great significance for the selection of road materials in cold regions.

[0041] As a further improvement of the above scheme, the asphalt used in the experiment was 90# base asphalt, SBS modified asphalt and rubber modified asphalt.

[0042] The technical effect of the above improvements is that the adhesion performance of different types of asphalt can be evaluated, providing a basis for the selection and optimization of asphalt materials.

[0043] As a further improvement of the above scheme, the initial planned asphalt film thickness is: 0.1mm, 0.2mm, 0.3mm, 0.4mm, 0.5mm, 0.6mm and 0.8mm.

[0044] The technical effect of the above improvements is: providing asphalt films of different thicknesses can evaluate the effect of film thickness on the adhesion performance between asphalt and aggregate, which helps to optimize the design and construction process of asphalt mixtures. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 It is a schematic diagram of the tensile strength test device of the present invention.

[0046] Figure 2 It is a schematic diagram of the thickness control gasket in the pull-out strength test device of the present invention.

[0047] Figure 3 It is a schematic flow chart of the water, salt corrosion and water vapor action test method in the present invention.

[0048] Figure 4 It is a schematic diagram of the freeze-thaw cycle test method in the present invention.

[0049] Figure 5 Schematic diagram of the effect of the pull-out rate on the bonding strength of rubber-modified asphalt in the present invention.

[0050] Figure 6 Schematic diagram of the effect of asphalt film thickness on the pull-out strength of rubber-modified asphalt in the present invention.

[0051] Figure 7 It is a schematic diagram of the pull-out strength of rubber asphalt at different stone substrate heating temperatures in the present invention.

[0052] Figure 8 Schematic diagram of the effect of water action temperature on the pull-out strength of rubber asphalt in the present invention.

[0053] Fig. 9 Schematic diagram of the pull-out strength of different base asphalts and rubber-modified asphalt prepared therefrom in the present invention.

[0054] Fig.10 Schematic diagram of the pull-out strength of different asphalts at different water action temperatures in the present invention.

[0055] Fig.11 Schematic diagram of the pull-out strength of different asphalts at different water action temperatures in the present invention.

[0056] In the figure: 1, pulling head; 2, consolidation material; 3, upper stone; 4, asphalt; 5, thickness control gasket; 501, gasket body; 502, overflow port; 503, bottom plate; 504, opening; 6, stone base. DETAILED DESCRIPTION

[0057] In order to enable those skilled in the art to better understand the technical solution, the present invention is described in detail below in conjunction with embodiments. The description in this section is only exemplary and explanatory and should not have any limiting effect on the scope of protection of the present invention.

[0058] like Figure 1-2 As shown, the specific scheme of this embodiment is: a pulling strength test device for asphalt and aggregate adhesion, including a pulling head 1, the lower end of the pulling head 1 is provided with an upper stone 3, the upper stone 3 is arranged in a thickness control gasket 5, asphalt 4 is arranged in the thickness control gasket 5, the upper stone 3 controls the area of ​​the asphalt 4, and the lower end of the thickness control gasket 5 is provided with a stone base 6; the thickness control gasket 5 is provided with a variety of models to meet the different thicknesses of asphalt 4.

[0059] like Figure 2 As shown, as a preferred embodiment of the above embodiment, the thickness control gasket 5 includes a gasket body 501, an overflow port 502 is provided on the gasket body 501, a bottom plate 503 is provided on the inner side of the gasket body 501; an opening 504 is provided at the upper end of the gasket body 501.

[0060] As a preferred embodiment of the above embodiment, the upper stone 3 and the stone base 6 are set to be limestone, basalt, diabase and granite.

[0061] As a preferred embodiment of the above embodiment, a consolidating material 2 is passed between the pulling head 1 and the upper stone 3, and the consolidating material 2 is set to be epoxy resin.

[0062] The working process of a pull-out strength test device for asphalt-aggregate adhesion is as follows:

[0063] 1. Preparation stage:

[0064] Select appropriate upper stone 3 and stone base 6. During the test, the upper stone 3 and stone base 6 of the same specimen have the same stone properties, which can be representative stones of different acidity and alkalinity, namely limestone, basalt, diabase or granite, and are cut into specified sizes according to experimental requirements.

[0065] A layer of asphalt 4 is laid on a stone substrate 6, using thickness control pads 5 to ensure a uniform and desired thickness of the asphalt layer.

[0066] The upper layer of stones 3 is placed on the asphalt layer, and the area covered is controlled by the thickness control pad 5 .

[0067] 2. Consolidation stage:

[0068] Use epoxy resin as the consolidating material 2 to fix the pulling head 1 to the upper stone 3. Make sure that the consolidating material 2 is completely cured to form a strong bond.

[0069] 3. Pull-out test stage:

[0070] Before starting the experiment, check that all parts of the apparatus are properly installed and that there are no loose or damaged parts.

[0071] An upward pulling force is applied to the pulling head 1 using a pulling test machine to simulate the stress effect in actual road use.

[0072] The maximum force value when the upper stone 3 is separated from the stone base 6 is recorded, which is the pull-out strength.

[0073] 4. Data analysis stage:

[0074] The recorded data were analyzed to evaluate the adhesion strength between asphalt and aggregate.

[0075] Compare the experimental results with standard values ​​or test results of other materials to draw conclusions.

[0076] 5. Cleaning and maintenance phase:

[0077] After the experiment is completed, the device is cleaned to remove residual asphalt and consolidation material.

[0078] Check all parts of the device to ensure they work properly the next time you use it.

[0079] A test method for the pull-out strength of asphalt-aggregate adhesion is provided, which is a test method for damage modes under four different environmental effects: water, water vapor, salt corrosion and freeze-thaw cycles.

[0080] like Figure 3As shown in the figure, a test method for the pull-out strength of asphalt-aggregate adhesion, the specific test steps for the water and water vapor damage mode are as follows:

[0081] S1. Preparatory work: grinding the upper stone 3 and the stone base 6, removing dust from the upper stone 3 and the stone base 6, the thickness control gasket 5 and the drawing head 1, and placing the upper stone 3, the stone base 6 and the drawing head 1 in an oven for standby use; at the same time, heating the asphalt to a flowable state;

[0082] S2. Specimen preparation: After all preparatory work is in place, take out the upper stone 3, the stone base 6 and the pulling head 1 from the oven; consolidate the pulling head 1 and the upper stone 3 with epoxy resin, and place the thickness control gasket 5 on the stone base 6;

[0083] Then take out the asphalt and stir it evenly, quickly drop a proper amount of asphalt into the range of the thickness control gasket 5, quickly place the pulling head 1 and the upper stone 3 after being solidified with epoxy resin on the stone base 6 as a whole and press hard until the excess asphalt binder is squeezed out from the overflow port 502 of the thickness control gasket 5 as much as possible;

[0084] S3. Place the specimen in a constant temperature and humidity chamber at 25±0.5℃ and 30% for 1 hour to allow the bonding strength between the asphalt and the stone to be fully formed;

[0085] S4. Take out the test specimens and place them in a water bath at a certain temperature for 24 hours to simulate the effect of water on the adhesion between asphalt and aggregate; place another group of test specimens in a constant temperature and humidity chamber at a certain temperature and humidity for 24 hours to simulate the effect of water vapor on the adhesion between asphalt and aggregate;

[0086] S5. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a tensile strength test.

[0087] like Figure 3 As shown in the figure, a test method for the pull-out strength of asphalt-aggregate adhesion, the specific test steps for the salt corrosion damage mode are as follows:

[0088] S1. Preparatory work: grinding the upper stone 3 and the stone base 6, removing dust from the upper stone 3 and the stone base 6, the thickness control gasket 5 and the drawing head 1, and placing the upper stone 3, the stone base 6 and the drawing head 1 in an oven for standby use; at the same time, heating the asphalt to a flowable state;

[0089] S2. Specimen preparation: After all preparatory work is in place, take out the upper stone 3, the stone base 6 and the pulling head 1 from the oven; consolidate the pulling head 1 and the upper stone 3 with epoxy resin, and place the thickness control gasket 5 on the stone base 6;

[0090] Then take out the asphalt and stir it evenly, quickly drop a proper amount of asphalt into the range of the thickness control gasket 5, quickly place the pulling head 1 and the upper stone 3 after being solidified with epoxy resin on the stone base 6 as a whole and press hard until the excess asphalt binder is squeezed out from the overflow port 502 of the thickness control gasket 5 as much as possible;

[0091] S3. Place the specimen in a constant temperature and humidity chamber at 25±0.5℃ and 30% for 1 hour to allow the bonding strength between the asphalt and the stone to be fully formed;

[0092] S4. Take out the test pieces and place them in a water bath with a certain salt concentration for 24 hours to simulate the effect of salt corrosion on the adhesion between asphalt and aggregate;

[0093] S5. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a tensile strength test.

[0094] like Figure 4 As shown in the figure, a test method for the pull-out strength of asphalt-aggregate adhesion, the specific test steps for the damage mode of freeze-thaw cycle are as follows:

[0095] S1. Preparatory work: grinding the upper stone 3 and the stone base 6, removing dust from the upper stone 3 and the stone base 6, the thickness control gasket 5 and the drawing head 1, and placing the upper stone 3, the stone base 6 and the drawing head 1 in an oven for standby use; at the same time, heating the asphalt to a flowable state;

[0096] S2. Specimen preparation: After all preparatory work is in place, take out the upper stone 3, the stone base 6 and the pulling head 1 from the oven; consolidate the pulling head 1 and the upper stone 3 with epoxy resin, and place the thickness control gasket 5 on the stone base 6;

[0097] Then take out the asphalt and stir it evenly, quickly drop a proper amount of asphalt into the range of the thickness control gasket 5, quickly place the pulling head 1 and the upper stone 3 solidified with epoxy resin on the stone base 6 as a whole and press hard until the excess asphalt binder is squeezed out from the overflow port 502 of the thickness control gasket 5 as much as possible; divided into an experimental group and a control group;

[0098] S3. Place the test specimens in a constant temperature water bath at 25℃±0.5℃ for 30 minutes, then place the specimens flat in a plastic bag and add water until the upper layer of stone 3 is covered. Tie the bag tightly and place the specimens flat in a constant temperature refrigerator at -18±2℃ again for 16±1h.

[0099] S4. Place the test piece of the control assembly in a curing box at 25±0.5℃ and 30% humidity for later use;

[0100] S5. Place the test pieces of the test group in S2 and the test pieces of the control assembly in S3 in a constant temperature water bath at 40±0.5℃ and keep for 24h;

[0101] S6. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a pull-out strength test.

[0102] Figure 3 and Figure 4 The BBS in it is a pull-out strength test.

[0103] As a preferred embodiment of the above embodiment, the asphalt used in the test is 90# base asphalt, SBS modified asphalt and rubber modified asphalt.

[0104] As a preferred embodiment of the above embodiment, the thickness of the initial asphalt film is: 0.1mm, 0.2mm, 0.3mm, 0.4mm, 0.5mm, 0.6mm and 0.8mm.

[0105] As a preferred embodiment of the above embodiment, the water action temperature is: 15°C, 25°C, 30°C, 40°C and 60°C.

[0106] As a preferred embodiment of the above embodiment, the drawing rates are 0.2 MPa / s, 0.3 MPa / s, 0.7 MPa / s, 1.0 MPa / s and 1.2 MPa / s;

[0107] As a preferred embodiment of the above embodiment, the stone heating temperature is 100°C, 120°C, 150°C, 170°C and 190°C.

[0108] Determination of pull-out strength test parameters

[0109] 1.1 Loading rate determination

[0110] The present application uses rubber asphalt prepared with 40 mesh rubber powder in a rubber powder content of 20%, and the stone base 6 is diabase. The pull-out strength in dry and wet states is tested at different pull-out rates: 0.2, 0.3, 0.7, 1.0 and 1.2 MPa / s. The results are as follows: Figure 4 shown.

[0111] Depend on Figure 5 It can be seen that, in general, whether dry or soaked, there is a certain linear relationship between the pull-out rate and the pull-out strength of rubber-modified asphalt, that is, as the loading rate increases, the bonding strength tends to increase. However, at 0.7 MPa / s, the test value changes gradually decrease, and the results tend to be stable. Therefore, this application finally selects 0.7 MPa / s as the pull-out rate for subsequent implementation tests.

[0112] 1.2 Determination of asphalt film thickness

[0113] The present application improves the spindle puller head and obtains 6 different asphalt film thicknesses that can be controlled: 0.1, 0.2, 0.3, 0.4, 0.5, 0.6 and 0.8 mm. The pull-out test specimens with different film thicknesses were prepared using rubber-modified asphalt and diabase as the substrate, and the pull-out strength was tested in dry and wet states. The test results are shown in Figure 5 .

[0114] Depend on Figure 6 It can be seen that, whether in dry or wet state, as the thickness of the asphalt film increases, the pull-out strength of the rubber asphalt shows a significant downward trend. This means that the thicker the rubber asphalt film is, the worse its ability to resist external tension is. The testing principle of the adhesion tester is actually to apply a certain tensile force to the specimen. In theory, during the stretching process of an asphalt binder with a certain thickness, the transverse cross-sectional dimensions will shrink, accompanied by stress concentration. The maximum force value F that the material bears when it is broken is max The ratio of the stress obtained by the original contact area S of the binder aggregate is recorded as the strength limit σ (MPa) of the binder. When the thickness of the asphalt film is thin, the deformation is small during the stretching process, and no obvious necking has been formed, and no large-scale stress concentration has occurred. Therefore, the F max The larger the strength limit σ, the greater the value. On the contrary, the thicker the asphalt film, the greater the deformation of the asphalt material and the more obvious the stress concentration effect. Therefore, the F at break is max The smaller the thickness, the smaller the corresponding strength limit σ, and the lower the final pull-out strength. Therefore, after comprehensive consideration, this application adopts a film thickness of 0.2 mm in subsequent implementations.

[0115] 1.3 Determination of the heating temperature of the stone base

[0116] In order to analyze the effect of stone substrate heating temperature on the bonding strength of rubber asphalt, the tensile strength of rubber asphalt and diabase substrate heated at different temperatures (150, 160, 170, 180 and 190 °C) in dry state was tested.

[0117] Depend on Figure 7 It can be seen that with the increase of the heating temperature of the stone base, the pull-out strength of the rubber asphalt tends to increase. When the temperature is lower than 170°C, the pull-out strength increases significantly with the increase of the stone slab heating temperature; when the temperature exceeds 170°C, the pull-out strength increases slowly with the increase of temperature. It can be seen that within a certain temperature range, the stone slab heating temperature is the main factor affecting the bonding strength of the binder. At relatively high temperatures, the binder in contact with the stone has a lower viscosity and stronger fluidity, and can more fully penetrate the texture and pores on the stone surface, forming a stronger mechanical interlocking force and adhering more firmly to the stone surface. Taking comprehensive considerations, the heating temperature of the stone base selected for this project is 170°C.

[0118] 1.4 Determination of water action temperature

[0119] Depend on Figure 8 It can be seen that for rubber modified asphalt, when the water action temperature is less than 40°C, as the water bath temperature increases, the asphalt stone bond pull-out strength gradually decreases. When the water bath temperature increases to 40°C, the pull-out strength decreases rapidly; when the temperature continues to rise to 60°C, the pull-out strength decreases slowly. For base asphalt, as the water action temperature increases, its bond strength decreases more obviously. In fact, taking base asphalt as an example, the most obvious feature is that when the water bath temperature is 40°C, it is close to its softening point and the asphalt becomes soft. Taking comprehensive considerations, the water action temperature of this project is selected as 40°C in the subsequent implementation process.

[0120] 2. Determination of pull-out strength test parameters

[0121] Unless otherwise specified during implementation, the wet state refers to the action of water at 40°C.

[0122] 2.1 Effect of base asphalt type on adhesion

[0123] In order to study the effect of base asphalt on the adhesion of rubber asphalt, four base asphalts, SK-90 (S90), GS-90 (G90), Qinhuangdao 90# (Q90), Qinhuangdao 70# (Q70), were used to prepare four modified asphalts with 20% 40-mesh rubber powder, denoted as ARS90, ARG90, ARQ90 and ARQ70. The four base asphalts and the four prepared rubber modified asphalts were subjected to tensile strength tests in dry and wet states. The test results are shown in Fig. 9 .

[0124] Depend on Fig. 9 It can be seen that for the base asphalt, when the grade is the same as 90, the corresponding bonding strength is significantly different in different places of origin; when the origin is the same but the grade is different, the pull-out strength increases linearly with the decrease of the grade. The pull-out strength is ranked as follows: Q30>Q70>Q90>G90>S90. As the asphalt grade decreases, especially when the grade is 30, the asphalt is brittle and hard at 25°C. At a pull rate of 0.7MPa / s, the asphalt will be quickly pulled apart.

[0125] The pull-out strength of rubber-modified asphalt prepared with different base asphalts is ranked as follows: AR-S90>AR-G90>AR-Q90>AR-Q70. The higher the content of light components in the asphalt matrix, the smaller the relative molecular weight, the faster the desulfurization degradation rate of the rubber powder under high-temperature preparation conditions, the more complete the dissolution, and the better the overall performance. Among the four base asphalts, S90 has the largest aromatic content. Therefore, under the same rubber powder dosage and preparation conditions, the rubber particles in the prepared modified asphalt are finer, the stress concentration generated during the pull-out process is weaker, and the pull-out strength is greater.

[0126] 2.2 Effect of matrix asphalt type on adhesion

[0127] This application compares and analyzes the adhesion performance of rubber modified asphalt AR, base asphalt SK90, and SBS modified asphalt at different water action temperatures. The results are as follows Fig.10 shown.

[0128] Depend on Fig.10 It can be seen that the pull-out strength of the same asphalt gradually decreases with the increase of water action temperature. The decrease in the base asphalt is the most obvious, with the pull-out strength decreasing from 3.12MPa at 15℃ to 1.28MPa at 60℃, a decrease of 58.9%. Compared with 15℃, when the water bath temperature increases from 40℃ to 60℃, the pull-out strength decrease ratio contributed by it is 32.7%, indicating that the high temperature water action at 40-60℃ is very unfavorable to the adhesion of the base asphalt.

[0129] Among the three asphalts, the base asphalt has the highest pull-out strength in both dry and wet conditions, especially when the water temperature is low, its value is significantly higher than that of rubber modified asphalt and SBS modified asphalt. This shows that the addition of rubber powder and SBS modifier will reduce the bonding strength of the base asphalt. Compared with rubber asphalt, the pull-out strength of the base asphalt in dry and wet conditions at 25°C is 48.5% and 53.1% higher, respectively. When rubber powder is added to the matrix asphalt as a modifier, on the one hand, a large number of undissolved solid small particles of rubber powder are distributed in the asphalt matrix, occupying part of the volume of free asphalt, playing the role of particle filling and skeleton. The matrix asphalt wraps the rubber powder particles and fills the gaps between the particles, making the rubber asphalt system not a completely homogeneous phase. In addition, the mechanical properties (modulus) of the rubber powder particles and the asphalt matrix are quite different. When the system is subjected to external force, the asphalt deforms greatly, resulting in the deformation of the two being not synchronized, and ultimately causing stress concentration at the wrapping interface between the two. On the other hand, the rubber powder increases the viscoelasticity of the system, and in the asphalt matrix, due to the chemical bonding between the rubber powder molecular chains, a cross-linked network is formed, which has a low creep rate and small mechanical loss when subjected to tension, and thus has a small effect on the final pulling strength.

[0130] The bonding performance of SBS modified asphalt is higher than that of rubber modified asphalt. Since SBS can be evenly dissolved in the asphalt matrix to form a sub-homogeneous structure, and the properties of rubber powder and asphalt are quite different, the smaller the dosage, the smaller the stress concentration phenomenon at the interface between asphalt and rubber powder when the system is subjected to external force. Therefore, the macroscopic performance is that SBS modified asphalt has a greater tensile strength.

[0131] 2.3 Effect of aggregate properties on adhesion of rubber-modified asphalt

[0132] This application selects four aggregates: limestone (alkaline), basalt (basic), diabase (basic), and granite (acidic) to test the pull-out strength of rubber asphalt in dry and wet conditions. The results are as follows: Fig.11 shown.

[0133] Depend on Fig.11 It can be seen that in the dry state, the rubber asphalt is destroyed by cohesion, indicating that the adhesion strength of the asphalt aggregate is greater than the cohesive strength of the binder itself, so the difference in the pull-out strength measured after bonding with different rock substrates is not obvious. In the wet state, the asphalt and stone bonding interface will have different degrees of adhesion failure, which also shows that the effect of water on the adhesion of the asphalt aggregate interface is significantly greater than the cohesion of asphalt.

[0134] In wet conditions, limestone performs best, followed by basalt and diabase, and granite performs worst. Limestone, basalt and diabase all fail mainly in the form of cohesive failure, while granite will experience varying degrees of adhesive failure. In particular, in wet conditions, rubber asphalt will peel off over a large area, and as the water temperature increases, the degree of peeling increases, and even completely peel off after a 60°C water bath.

[0135] It should be noted that, in this article, the terms include, contain or any other variant thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. Specific examples are used in this article to illustrate the principle and implementation of the technical solution of the present invention. The above examples are only used to help understand the method of the present invention and its core idea. The above are only preferred implementations of the present invention. It should be pointed out that due to the limitations of textual expression and the objective existence of infinite specific structures, for ordinary technicians in this technical field, without departing from the principle of the present invention, several improvements, modifications or changes can be made, and the above technical features can also be combined in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the concept and technical solution of the invention to other occasions without improvement, should be regarded as the protection scope of the present invention.

Claims

1. A tensile strength test device for asphalt-aggregate adhesion, characterized in that: The invention comprises a pulling head (1), the lower end of the pulling head (1) is provided with an upper layer of stone (3), the upper layer of stone (3) is arranged in a thickness control gasket (5), asphalt (4) is arranged in the thickness control gasket (5), the upper layer of stone (3) controls the area of ​​the asphalt (4), and the lower end of the thickness control gasket (5) is provided with a stone base (6); the thickness control gasket (5) is provided with a plurality of models to meet the requirements of asphalt (4) of different thicknesses.

2. The asphalt-aggregate adhesion tensile strength test device according to claim 1, characterized in that: The thickness control gasket (5) comprises a gasket body (501), an overflow port (502) is arranged on the gasket body (501), a bottom plate (503) is arranged on the inner side of the gasket body (501); and an opening (504) is arranged at the upper end of the gasket body (501).

3. The asphalt-aggregate adhesion tensile strength test device according to claim 1, characterized in that: The stone base (6) is provided with limestone, diabase, basalt and granite.

4. The asphalt-aggregate adhesion tensile strength test device according to claim 1, characterized in that: A consolidating material (2) is passed between the pulling head (1) and the upper stone material (3), and the consolidating material (2) is set to be epoxy resin.

5. A test method for the pull-out strength of asphalt-aggregate adhesion, using the test device according to any one of claims 1 to 4, characterized in that: The test methods are respectively for damage modes under four different environmental effects: water, water vapor, salt corrosion and freeze-thaw cycles.

6. A test method for the pull-out strength of asphalt-aggregate adhesion according to claim 5, characterized in that: The specific test steps for water and water vapor damage are as follows: S1. Preparatory work: grinding the upper stone (3) and the stone base (6), removing dust from the upper stone (3), the stone base (6), the thickness control gasket (5) and the pulling head (1), and placing the upper stone (3), the stone base (6) and the pulling head (1) in an oven for standby use; and heating the asphalt (4) to a flowable state; S2. Specimen preparation: After all preparatory work is completed, the upper stone (3), the stone base (6) and the pulling head (1) are taken out of the oven; the pulling head (1) and the upper stone (3) are consolidated with epoxy resin, and the thickness control gasket (5) is placed on the stone base (6); Then, take out the asphalt (4) and stir it evenly, quickly drop an appropriate amount of asphalt (4) into the range of the thickness control gasket (5), quickly place the pulling head (1) and the upper stone (3) that have been solidified with epoxy resin on the stone base (6) and press hard until the excess asphalt (4) binder is squeezed out from the overflow port (502) of the thickness control gasket (5) as much as possible; S3. Place the test piece in a constant temperature and humidity chamber at 25±0.5℃ and 30% for 1 hour to allow the bonding strength between the asphalt (4) and the stone to be fully formed; S4, taking out the test pieces, and placing them in a water bath at a certain temperature for curing for 24 hours, respectively, to simulate the effect of water on the adhesion between asphalt (4) and aggregate; placing another group of test pieces in a constant temperature and humidity chamber at a certain temperature and humidity for curing for 24 hours, to simulate the effect of water vapor on the adhesion between asphalt (4) and aggregate; S5. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a pull-out strength test.

7. The test method for the pull-out strength of asphalt-aggregate adhesion according to claim 5, characterized in that: The specific test steps for the salt corrosion damage mode are as follows: S1. Preparatory work: grinding the upper stone (3) and the stone base (6), removing dust from the upper stone (3), the stone base (6), the thickness control gasket (5) and the pulling head (1), and placing the upper stone (3), the stone base (6) and the pulling head (1) in an oven for standby use; and heating the asphalt (4) to a flowable state; S2. Specimen preparation: After all preparatory work is completed, the upper stone (3), the stone base (6) and the pulling head (1) are taken out of the oven; the pulling head (1) and the upper stone (3) are consolidated with epoxy resin, and the thickness control gasket (5) is placed on the stone base (6); Then, take out the asphalt (4) and stir it evenly, quickly drop a proper amount of asphalt (4) into the range of the thickness control gasket (5), quickly place the pulling head (1) and the upper stone (3) that have been solidified with epoxy resin on the stone base (6), and press hard until the excess asphalt (4) binder is quickly squeezed out from the overflow port (502) of the thickness control gasket (5); S3. Place the test piece in a constant temperature and humidity chamber at 25±0.5℃ and 30% for 1 hour to allow the bonding strength between the asphalt (4) and the stone to be fully formed; S4, taking out the test pieces, and placing them in a water bath with a certain salt concentration for curing for 24 hours to simulate the effect of salt corrosion on the adhesion between asphalt (4) and aggregate; S5. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a pull-out strength test.

8. The test method for the pull-out strength of asphalt-aggregate adhesion according to claim 5, characterized in that: The specific test steps for the freeze-thaw cycle damage mode are as follows: S1. Preparatory work: grinding the upper stone (3) and the stone base (6), removing dust from the upper stone (3), the stone base (6), the thickness control gasket (5) and the pulling head (1), and placing the upper stone (3), the stone base (6) and the pulling head (1) in an oven for standby use; and heating the asphalt (4) to a flowable state; S2. Specimen preparation: After all preparatory work is completed, the upper stone (3), the stone base (6) and the pulling head (1) are taken out of the oven; the pulling head (1) and the upper stone (3) are consolidated with epoxy resin, and the thickness control gasket (5) is placed on the stone base (6); Then, take out the asphalt (4) and stir it evenly, quickly drop an appropriate amount of asphalt (4) into the range of the thickness control gasket (5), quickly place the pulling head (1) and the upper stone (3) that have been solidified with epoxy resin on the stone base (6) and press hard until the excess asphalt (4) binder is squeezed out from the overflow port (502) of the thickness control gasket (5) as much as possible; divided into an experimental group and a control group; S3. Place the test specimens in a constant temperature water bath at 25°C ± 0.5°C for 30 minutes, then place the specimens flat in a plastic bag and add water until the upper layer of stone is covered (3). Tighten the bag and place the specimens flat in a constant temperature refrigerator at -18±2°C again for 16±1h. S4. Place the test piece of the control assembly in a curing box at 25±0.5℃ and 30% humidity for later use; S5. Place the test pieces of the test group in S2 and the test pieces of the control assembly in S3 in a constant temperature water bath at 40±0.5℃ and keep for 24h; S6. Take out the test piece and place it in a constant temperature and humidity chamber at 25±0.5℃ and 30% humidity for 1 hour, then carry out a tensile strength test.

9. A test method for the pull-out strength of asphalt-aggregate adhesion according to claim 6, 7 or 8, characterized in that: The asphalts used in the test were 90# base asphalt, SBS modified asphalt and rubber modified asphalt.

10. A test method for the pull-out strength of asphalt-aggregate adhesion according to claim 9, characterized in that: The asphalt film thicknesses were the following: 0.1 mm, 0.2 mm, 0.3 mm, 0.4 mm, 0.5 mm, 0.6 mm and 0.8 mm.

Citation Information

Cited By

  • Drawing test method for enclosure system

    CN119413715A

  • Method and device for testing interface interaction of asphalt aggregate with sandwich structure by utilizing pull-out test

    CN119715358A

  • A method and apparatus for testing the interfacial interaction of a sandwich structure asphalt aggregate using a pull-off test

    CN119715358B

  • Device and method for testing adhesive force between rock base material and asphalt

    CN120801176A

  • Asphalt-aggregate interface bonding fatigue testing device and testing method

    CN121431258A