Large aperture leakage stoppage simulation experiment method and device

By designing large-pore and fracture plugging simulation experimental devices and methods, the problem of large-pore and fracture sealing in the existing technology has been solved. By simulating the wellbore and recording the plugging process with high-speed cameras, we can quantitatively analyze the adaptability of the plugging slurry and achieve more accurate results. The leakage plugging effect evaluation has improved the leakage plugging cycle and cost.

CN118731276APending Publication Date: 2024-10-01CHINA PETROLEUM & CHEMICAL CORP +1

Patent Information

Application Number
CN202310325170.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively plug leakage in large pores and fractures, mainly because conventional plugging materials are difficult to reside in large pores and fractures and are contaminated or destroyed by formation fluids, resulting in long plugging cycles, high costs and poor results. It is difficult to accurately evaluate leakage plugging ability with simulation experiments.

Method used

A large pore and fracture plugging simulation experimental device and method are designed, including a simulated wellbore, a pumping component, a pressurizing component and a high-speed camera. A transparent high-pressure cylinder and a transparent inner cylinder in the simulated wellbore are used to simulate large pores and fractures and inject formation fluids. and leakage plugging slurry, observe and record the leakage plugging process, use back pressure valves and heating components to simulate actual working conditions, and evaluate the leakage plugging effect through CT scanning and compressive strength testing.

Benefits of technology

This method can more accurately simulate the leakage plugging conditions of large pores and caves, and quantitatively analyze the density, rheology and bridge plugging ability of the leakage plugging slurry through high-speed cameras and image processing technology, providing a more realistic plugging effect. Evaluation, improved the leakage plugging cycle and cost, and improved the leakage plugging effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118731276A_ABST
    Figure CN118731276A_ABST
Patent Text Reader

Abstract

The invention discloses a large aperture leakage stoppage simulation experiment method and a large aperture leakage stoppage simulation experiment device, which are characterized in that the flow of a leakage stoppage simulation experiment is improved, and the situation that formation fluid exists in large apertures and large karst caves with different gradients and the situation that the leakage stoppage slurry can be polluted and damaged by the formation fluid so as to influence the plugging effect are fully considered; and the underground practical working condition of leaking stoppage of large apertures and large karst caves is better met. According to the invention, the experimental process is recorded through high-speed camera shooting and image processing technologies, the adaptability of the density, rheological property, bridge plugging capability and water invasion resistance of the plugging slurry to a large-aperture leakage layer is evaluated, and the adaptability of the propelling speed of the plugging slurry is evaluated. Meanwhile, by means of naked eye observation, CT scanning, compressive strength measurement, breakdown pressure testing and the like, the leaking stoppage effect of the leaking stoppage slurry on the large-aperture leakage layer is quantitatively evaluated and analyzed, and research data are provided for quantitatively researching the influence and effect of factors such as the density of the leaking stoppage slurry on the leaking stoppage effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of plugging oil and gas wells, and more specifically to a large-pore plugging simulation experiment method and device. Background Art

[0002] Well leakage is one of the malignant accidents that often occur during drilling. In order to study the effects of various plugging materials and the laws and mechanisms of leakage, a variety of plugging simulation experiments, evaluation methods and devices have been developed at home and abroad. However, most of them are aimed at conventional leakage caused by small holes and seams, and plugging is achieved by bridging, filling and forming a sealing plugging zone on the seam plate, orifice plate or sand bed with plugging slurry. In the actual drilling process, the seam-hole type leakage caused by large holes and seams is the most difficult to plug. The reason is that conventional plugging materials are difficult to stay and bridge in large holes and seams. A relatively effective method for large hole and seam leakage is gel consolidation plugging, which plugs the leakage by solidifying and bonding the plugging slurry to form a high-strength solidified body, which does not necessarily contain bridging plugging materials. In this regard, conventional plugging simulation experimental methods and devices for small holes and seams are difficult to evaluate their plugging capabilities. To this end, it is necessary to develop large hole and seam plugging simulation experimental methods and devices, and on this basis, carry out targeted large hole and seam plugging mechanism and technology research.

[0003] Chinese patent 201921804993.2 discloses a high-temperature and high-pressure visual dynamic plugging simulation device, which includes: a reaction device, a rotating stirring component, a temperature component, a pressurizing component and a metering component. The bottom of the inner cavity of the filter loss cylinder of the reaction device of this device is used to place a sand bed. The gaps between sand or gravel in the sand bed can simulate formation cracks. The pressurizing component is used to simulate the downhole high-pressure environment, the temperature component is used to simulate the downhole high-temperature environment, the rotating stirring component is used to simulate the circulation process of the downhole plugging slurry, the measuring cylinder is used to collect the outflowing plugging liquid and measure the volume of the plugging liquid. The filter loss cylinder and the heating sleeve are both made of transparent materials, so that the entire dynamic plugging process can be observed intuitively.

[0004] Chinese patent 202010929813.4 discloses a microscopic visualization experimental device and simulation observation method for the formation mechanism of fracture plugging layer, which includes a power system, a pressure monitoring system, a process monitoring system, a visualization fracture chip, and a suspension recovery system. The fracture simulation system, based on the three-dimensional laser scanning natural fracture data, uses laser etching glass to simulate the real formation fracture morphology and realize microscopic visualization, with the characteristics of high precision, short cycle, good light transmittance, and easy operation.

[0005] Chinese patent 202123337648.2 discloses a high-pressure visual gravel plugging instrument, which includes a mud cup, a visual kettle installed at the lower end of the mud cup, an upper end cover installed at the upper end of the mud cup, a piston that can slide up and down inside, a lower end cover installed at the lower end of the visual kettle, and a drain valve installed on the lower end cover. A rotating shaft is welded to the outside of the mud cup, and the rotating shaft is mounted on the chassis through a bearing. This patent can simulate underground pressure conditions and the inclination angle of the wellbore to perform large-pore plugging tests, and the entire experimental process is visualized.

[0006] However, in the large-pore plugging operation, the plugging slurry is easily contaminated or damaged by the formation fluid in the large-pore fracture when entering the leaking layer, making it difficult to form an effective plugging zone, further increasing the difficulty of plugging, resulting in a long plugging cycle and high cost, and even long-term plugging is basically ineffective. The above patent does not take into account the situation that there are formation fluids in large-pore fractures and large caves, and that the formation fluids can pollute and damage the plugging slurry and thus affect the plugging effect. Its test results are somewhat different from the actual underground working conditions of large-pore fracture and large cave plugging.

[0007] To this end, the present invention hopes to make improvements on the basis of the above-mentioned patent, add the influence of formation fluids in large pores and large caves on the plugging operation into the test considerations, and provide a large pore plugging simulation experimental method and device to obtain test results that are more in line with the actual plugging conditions of large pores and large caves underground. Summary of the invention

[0008] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a large pore and fracture plugging simulation experimental method and device, which, by improving the process of the plugging simulation experiment, fully considers the existence of formation fluids in large pores and fractures of different inclinations and large caves, and the fact that formation fluids may pollute and damage the plugging slurry, thereby affecting the plugging effect, and is more in line with the actual underground working conditions of large pore and fracture and large cave plugging.

[0009] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a large-pore seam plugging simulation experimental device, comprising a simulated wellbore, a pumping assembly and a pressurizing assembly; the simulated wellbore comprises a high-pressure top cover, a transparent high-pressure cylinder, a perforated baffle seat and a transparent low-pressure cylinder, which are detachably and sealably connected in sequence from top to bottom; a liquid outlet is provided at the bottom of the transparent low-pressure cylinder; the pumping assembly comprises a working pump and a liquid inlet valve, a liquid inlet is provided on the high-pressure top cover, the liquid inlet valve is installed at the liquid inlet, and the working pump is connected to the liquid inlet valve; the pressurizing assembly comprises an inert gas cylinder and a pressurizing valve, a pressurizing port is also provided on the high-pressure top cover, the pressurizing valve is installed at the pressurizing port, and the inert gas cylinder is connected to the pressurizing valve.

[0010] The present invention is further configured as follows: the simulated wellbore also includes a transparent inner cylinder, the top of the transparent inner cylinder is open, and the bottom of the wall is provided with a mesh; the transparent inner cylinder is detachably connected to the transparent high-pressure cylinder.

[0011] The present invention is further configured as follows: the pumping assembly further comprises a liquid storage tank, and the liquid storage tank is installed between the liquid inlet valve and the working pump.

[0012] The present invention is further configured to include a heating component, which is detachably wrapped around the outside of the transparent high-pressure cylinder.

[0013] The present invention is further configured to include a support frame, and the simulated wellbore is rotatably connected to the support frame and can be fixed on the support frame.

[0014] The present invention is further configured to include a back pressure valve, which is installed at the liquid outlet.

[0015] The present invention is further configured to include a high-speed camera, which is used to record the experimental process in the simulated wellbore.

[0016] A large hole crack plugging simulation test method, which uses the large hole crack plugging simulation test device mentioned above, and the specific steps are as follows:

[0017] S1. Preparation steps: first, put granular materials of appropriate size into a transparent high-pressure cylinder to simulate a large-pore fracture leakage layer; then open the liquid inlet valve, start the working pump, and inject simulated formation fluid into the transparent high-pressure cylinder so that the simulated formation fluid just completely submerges the large-pore fracture leakage layer; finally, close the liquid inlet valve and the working pump;

[0018] S2. Simulated plugging: first open the liquid inlet valve, start the working pump, inject plugging slurry into the transparent high-pressure cylinder according to the set volume, and close the liquid inlet valve; then open the pressure valve, open the inert gas cylinder, slowly pressurize the transparent high-pressure cylinder, and squeeze the plugging slurry into the large-pore fracture leakage layer; during the squeezing and injection, it is necessary to observe and record the process of the plugging slurry displacing the simulated formation fluid in the large-pore fracture leakage layer under the action of the pressure difference and entering the large-pore fracture leakage layer, as well as the process of the front of the plugging slurry advancing in the large-pore fracture leakage layer being contaminated and damaged by the simulated formation fluid, and the situation of the plugging zone formed by the simulated formation fluid advancing with the plugging slurry in the large-pore fracture leakage layer; after the squeezing and injection is completed, it is necessary to observe and record the process of the plugging slurry being affected by the density difference on the large-pore fracture leakage layer and being replaced and damaged by the formation fluid in the simulated large cave under static conditions;

[0019] S3. Analyze the plugging situation: After the plugging slurry solidifies and forms strength, observe the plugging situation of the large hole seam leakage layer being cemented and solidified by the plugging slurry;

[0020] S4. Evaluation of plugging effect: Comprehensive evaluation based on the results of S2 and S3.

[0021] The present invention is further configured as follows: the specific steps of S3 are as follows: measuring the thickness of the effective plugging layer, or observing the internal microstructure of the plugging belt through CT scanning, and then cutting a portion of the plugging belt downward from the top surface of the large-pore leakage layer, measuring its compressive strength on a compressive strength testing machine, and testing its breakdown pressure in a high-temperature and high-pressure dehydration instrument.

[0022] The present invention is further configured as follows: a detachable transparent inner cylinder is arranged inside the transparent high-pressure cylinder in S1; the macroporous crack leakage layer is constructed inside the transparent inner cylinder, and in S3 the transparent inner cylinder needs to be taken out from the transparent high-pressure cylinder to observe and test the macroporous crack leakage layer inside the transparent inner cylinder.

[0023] The present invention is further configured as follows: in S1, the inclination angle of the simulated wellbore also needs to be adjusted.

[0024] The present invention is further configured as follows: after completing the recording of the plugging slurry being affected by the density difference on the large pore fracture leaking layer and the simulated large cave being replaced and destroyed by the formation fluid under static conditions in S2, a heating component is coated on the outside of the transparent high-pressure cylinder.

[0025] The present invention is further configured to record the process in which the plugging slurry displaces the simulated formation fluid in the large pore and fracture leakage layer under the action of pressure difference and enters the large pore and fracture leakage layer, the process in which the front of the plugging slurry advancing in the large pore and fracture leakage layer is contaminated and destroyed by the simulated formation fluid, the situation in which the plugging zone is formed by the simulated formation fluid advancing with the plugging slurry in the large pore and fracture leakage layer, and the process in which the plugging slurry is affected by the density difference in the large pore and fracture leakage layer and is replaced and destroyed by the formation fluid in the simulated large cave under static conditions, all using a high-speed camera.

[0026] In summary, the present invention has the following beneficial effects compared with the prior art:

[0027] (1) The present invention improves the process of plugging simulation experiment, adds a lower chamber for containing formation fluid and a back pressure valve, and a rotating guide head that can adjust the inclination angle of the simulated wellbore. It fully considers the existence of formation fluid in large pores and large caves with different inclinations, and the fact that formation fluid can pollute and damage the plugging slurry, thereby affecting the plugging effect. It is more in line with the actual underground working conditions of plugging large pores and large caves.

[0028] (2) The present invention uses high-speed camera photography and image processing technology to quantitatively analyze and evaluate the process in which the plugging slurry displaces the simulated formation fluid from the large pores and fractures into the large pore fracture leakage layer under the action of pressure difference during the entire plugging process, as well as the process in which the plugging slurry is contaminated and damaged by the simulated formation fluid during the plugging process. The density, rheology, bridging and water intrusion resistance of the plugging slurry are evaluated for their adaptability to the large pore fracture leakage layer, and the adaptability of the plugging slurry advancement speed is evaluated.

[0029] (3) The present invention quantitatively evaluates and analyzes the plugging effect of the plugging slurry on the large-pore leaking layer by means of visual observation, CT scanning, measurement of compressive strength, testing of breakdown pressure, etc., and provides research data for quantitatively studying the influence and role of factors such as the density of the plugging slurry on the plugging effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the overall structure of the embodiment.

[0031] In the figure: 1. working pump; 2. liquid storage tank; 3. liquid inlet; 4. pressurizing port; 5. high-pressure top cover; 6. transparent high-pressure cylinder; 7. transparent inner cylinder; 8. O-ring; 9. perforated partition seat; 10. inert gas cylinder; 11. connecting frame; 12. lifting platform; 13. transparent low-pressure cylinder; 14. back pressure valve; 15. high-speed camera; 16. support frame; 17. rotating guide head; 18. heating assembly. DETAILED DESCRIPTION

[0032] The technical solution of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention, and all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the invention.

[0033] It should be noted that the directions or positional relationships indicated by terms such as “center”, “up”, “down”, “horizontal”, “left”, “right”, “front”, “back”, “lateral” and “longitudinal” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0034] Example 1

[0035] like Figure 1As shown, it is a basic structural schematic diagram of a large-pore seam plugging simulation experimental device in the present invention, which includes a simulated wellbore, a pumping component, a pressurizing component and a back-pressure valve 14; the simulated wellbore includes a high-pressure top cover 5, a transparent high-pressure cylinder 6, a perforated partition seat 9 and a transparent low-pressure cylinder 13, which are detachably sealed and connected in sequence from top to bottom; the simulated wellbore also includes a transparent inner cylinder 7, the top of the transparent inner cylinder 7 is open, the interior is used to fill large granular materials to simulate a large-pore seam leakage layer, and a mesh is arranged at the bottom of the wall; the transparent inner cylinder 7 is detachably connected to the transparent high-pressure cylinder 6. The bottom of the transparent low-pressure cylinder 13 is provided with a liquid outlet, and a back pressure valve 14 is installed at the liquid outlet; the pumping assembly includes a working pump 1 and a liquid inlet valve, a liquid inlet 3 is provided on the high-pressure top cover 5, the liquid inlet valve is installed at the liquid inlet 3, and the working pump 1 is connected to the liquid inlet valve; the pressurizing assembly includes an inert gas cylinder 10 and a pressurizing valve, a pressurizing port 4 is also provided on the high-pressure top cover 5, the pressurizing valve is installed at the pressurizing port 4, and the inert gas cylinder 10 is connected to the pressurizing valve. The inert gas cylinder 10 in this embodiment is a nitrogen cylinder.

[0036] Specifically, the simulated wellbore further includes an O-type sealing ring 8 , which is in contact with the transparent inner tube 7 , the transparent high-pressure tube 6 and the perforated partition seat 9 .

[0037] Specifically, the pumping assembly further includes a liquid storage tank 2 , which is installed between the liquid inlet valve and the working pump 1 .

[0038] In this embodiment, the maximum head of the working pump 1 is 25m, the maximum speed is 960r / min, the flow range is 1.6L / min~2.5L / min, the volume of the liquid storage tank 2 is 5L~10L, and the outlet size of the liquid storage tank 2 is consistent with the inner diameter of the pipeline to ensure that the plugging slurry flows evenly in the pipeline.

[0039] Specifically, in this embodiment, the high-pressure top cover 5 and the transparent high-pressure cylinder 6 are double-connected by thread and flange to further ensure the sealing of the experiment.

[0040] Specifically, the transparent high-pressure cylinder 6, the transparent inner cylinder 7 and the transparent low-pressure cylinder 13 can be selected according to the experimental pressure and requirements. When the experimental pressure is 0.5-2MPa, the three can be made of organic glass; when the experimental pressure is 0-0.5MPa, the three can use ordinary glass and acrylic board as carriers. In this embodiment, the three are made of organic glass.

[0041] Specifically, the perforated partition seat 9 is divided into two types: slit plates and orifice plates according to the different cross-sections of the holes. Slit plates can be used when the flow rate is less than 2L / min, and orifice plates can be used when the flow rate is greater than 2L / min. However, regardless of whether slit plates or orifice plates are used, the crack length and hole distribution are best controlled within a circle with a diameter of 50mm.

[0042] Specifically, the back pressure valve 14 can be selected according to the test pressure and requirements. When the test pressure is 0-0.5 MPa, a PVC back pressure valve 14 can be used; when the test pressure is greater than 0.5-2 MPa, a stainless steel back pressure valve 14 can be used. In this embodiment, a stainless steel back pressure valve 14 is used.

[0043] Specifically, the present embodiment further includes a heating assembly 18, which is detachably wrapped around the outside of the transparent high-pressure cylinder 6. The heating assembly 18 can be a wrap-around heating belt, a wrap-around heating sleeve, etc. After observing the plugging process of the plugging slurry, the transparent high-pressure cylinder 6 is heated and kept warm to accelerate the curing and bonding process of the plugging slurry.

[0044] Specifically, this embodiment further includes a high-speed camera 15, which is used to record the experimental process in the simulated wellbore. High-speed cameras with different recording rates can be selected according to experimental requirements. In this embodiment, a 6000 frame / second high-speed camera is used for recording.

[0045] In this embodiment, a first visualization platform is set up and a first camera is placed opposite to the simulated large-pore fracture leakage layer to observe and record the process of the plugging slurry displacing the simulated formation flow pattern in the large pores and fractures under the action of pressure difference to enter the leakage layer, as well as the process and degree of contamination and damage of the plugging slurry by the simulated formation flow pattern during the process; a second visualization platform is set up and a second camera is placed opposite to the upper position of the lower cavity to observe and record the situation of the plugging slurry after passing through the large-pore fracture leakage layer, and the situation after entering the large-scale cave containing formation fluid simulation, such as displacement sinking under the action of density difference, and contamination and damage by formation fluid during sinking.

[0046] Specifically, the present embodiment further includes a support frame 16, which is a metal support. A connecting frame 11 is provided on the support frame 16. The connecting frame 11 is connected to the outside of the simulated wellbore and does not interfere with the observation of the inside of the simulated wellbore and the installation of the heating assembly 18. In the present embodiment, the connecting frame 11 is a metal connecting frame 11. A rotating guide head 17 is also provided on the support frame 16. The simulated wellbore is rotatably connected to the support frame 16 through the rotating guide head 17. The simulated wellbore can be fixed on the support frame 16 by the rotating guide head 17. Both the first visualization platform and the second visualization platform are lifting platforms 12, and are both provided on the support frame 16, so as to adjust the shooting height of the high-speed camera 15 according to actual needs.

[0047] Example 2

[0048] A preferred embodiment of a large-pore seam plugging simulation experimental method of the present invention uses the large-pore seam plugging simulation experimental device as described in Example 1, and the specific steps are as follows:

[0049] S1. Preparation steps:

[0050] First, put granular materials of appropriate size into the transparent inner tube 7 to simulate the large-pore fracture leakage layer. The granular materials can be gravel, glass balls or steel balls. Select a working pump 1 and pipeline of appropriate power, and connect all components except the heating component 18, remove the high-pressure top cover 5, place the transparent inner tube 7 on the perforated partition seat 9, and install the high-pressure top cover 5. According to the experimental requirements, adjust the inclination angle of the simulated wellbore according to the well type by rotating the guide head 17. Then set the back pressure valve 14 to release the pressure, and close the back pressure valve 14; then open the liquid inlet valve, start the working pump 1, and inject the simulated formation fluid into the transparent high-pressure cylinder 6 so that the simulated formation fluid just completely submerges the simulated large-pore fracture leakage layer; finally, close the liquid inlet valve and the working pump 1.

[0051] S2. Simulate leak plugging:

[0052] First, open the liquid inlet valve, start the working pump 1, inject the plugging slurry into the transparent inner cylinder 7 according to the set volume, and close the liquid inlet valve; then open the pressure valve, open the nitrogen bottle, slowly pressurize the transparent high-pressure cylinder 6, and squeeze the plugging slurry into the simulated large pore fracture leakage layer; during the squeezing and injection, observe and record the process of the plugging slurry displacing the simulated formation fluid in the simulated large pore fracture leakage layer under the action of the pressure difference and entering the simulated large pore fracture leakage layer, as well as the process of the front of the plugging slurry advancing in the simulated large pore fracture leakage layer being contaminated and damaged by the simulated formation fluid, and the situation of the plugging zone formed by the simulated formation fluid advancing with the plugging slurry in the simulated large pore fracture leakage layer; after the squeezing and injection is completed, observe and record the process of the plugging slurry being replaced and damaged by the formation fluid in the simulated large pore fracture leakage layer and the simulated large cave under static conditions under the action of the density difference.

[0053] After all the above processes are recorded, a heating assembly 18 is wrapped around the outside of the transparent high-pressure cylinder 6 to heat and insulate the inside of the transparent high-pressure cylinder 6, thereby accelerating the curing and bonding process of the plugging slurry and causing it to quickly solidify to form a high-strength plugging belt for the large-pore leak layer.

[0054] S3. Analyze the plugging situation: After the plugging slurry solidifies and forms strength, take out the transparent inner cylinder 7 from the transparent high-pressure cylinder 6 to observe the situation of the large-pore seam leakage layer being blocked by the plugging slurry; measure the thickness of the effective plugging layer, or observe the internal microstructure of the plugging tape through CT scanning, then cut a 50mm plugging tape from the top surface of the large-pore seam leakage layer, measure its compressive strength on a compressive strength testing machine, and test its breakdown pressure in a high-temperature and high-pressure dehydration instrument.

[0055] S4. Evaluation of plugging effect: The plugging effect of the plugging slurry on the large-pore leakage layer is comprehensively evaluated based on the contamination and damage of the plugging slurry during the squeezing process, the completeness of the plugging zone formed after the squeezing is completed, the strength and breakdown pressure of the plugging zone formed by the solidification of the plugging slurry, etc.

[0056] In summary, the present embodiment improves the process of the plugging simulation experiment, adds a lower chamber and a back pressure valve for containing formation fluid, and a rotating guide head that can adjust the inclination angle of the simulated wellbore, fully considering the situation that formation fluids exist in large pores and large caves with different inclinations, and the situation that formation fluids can pollute and damage the plugging slurry, thereby affecting the plugging effect, which is more in line with the actual downhole working conditions of plugging large pores and large caves. In addition, the present embodiment can also use the high-speed camera 15 camera and image processing technology to quantitatively analyze and evaluate the process of the plugging slurry displacing the large pores and simulated formation fluids into the large pore leakage layer during the entire plugging process, and the process of the plugging slurry being polluted and damaged by the simulated formation fluid during the period, evaluate the adaptability of the plugging slurry density, rheology, bridging plugging ability and water intrusion resistance to the large pore leakage layer, and evaluate the adaptability of the plugging slurry advancement speed. At the same time, this embodiment also uses visual observation, CT scanning, measurement of compressive strength, testing of breakdown pressure, etc. to quantitatively evaluate and analyze the plugging effect of the plugging slurry on the large-pore leakage layer, providing research data for quantitatively studying the influence and effect of factors such as the density of the plugging slurry on the plugging effect.

[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A large hole plugging simulation experimental device, characterized in that: The invention comprises a simulated wellbore, a pumping assembly and a pressurizing assembly; the simulated wellbore comprises a high-pressure top cover (5), a transparent high-pressure cylinder (6), a perforated baffle seat (9) and a transparent low-pressure cylinder (13) which are detachably sealed and connected in sequence from top to bottom; a liquid outlet is arranged at the bottom of the transparent low-pressure cylinder (13); the pumping assembly comprises a working pump (1) and a liquid inlet valve, a liquid inlet (3) is arranged on the high-pressure top cover (5), the liquid inlet valve is installed at the liquid inlet (3), and the working pump (1) is connected to the liquid inlet valve; the pressurizing assembly comprises an inert gas cylinder (10) and a pressurizing valve, a pressurizing port (4) is also arranged on the high-pressure top cover (5), the pressurizing valve is installed at the pressurizing port (4), and the inert gas cylinder (10) is connected to the pressurizing valve.

2. A large hole sealing simulation experimental device according to claim 1, characterized in that: The simulated wellbore further comprises a transparent inner cylinder (7), the top of the transparent inner cylinder (7) is open, and the bottom of the wall is provided with mesh; the transparent inner cylinder (7) is detachably connected to the transparent high-pressure cylinder (6).

3. A large hole sealing simulation experimental device according to claim 1, characterized in that: The pumping assembly further comprises a liquid storage tank (2), wherein the liquid storage tank (2) is installed between the liquid inlet valve and the working pump (1).

4. A large hole sealing simulation experimental device according to claim 1, characterized in that: It also comprises a heating component (18), wherein the heating component (18) is detachably wrapped around the outside of the transparent high-pressure cylinder (6).

5. The large hole sealing simulation experimental device according to claim 1 is characterized in that: It also includes a support frame (16), and the simulated wellbore is rotatably connected to the support frame (16) and can be fixed on the support frame (16).

6. The large hole sealing simulation experimental device according to claim 1 is characterized by: It also comprises a back pressure valve (14), wherein the back pressure valve (14) is installed at the liquid outlet.

7. A large hole sealing simulation experimental device according to any one of claims 1 to 6, characterized in that: It also comprises a high-speed camera (15), wherein the high-speed camera (15) is used to record the experimental process in the simulated wellbore.

8. A large hole plugging simulation experimental method, characterized in that: The large hole crack plugging simulation experimental device as claimed in claim 1 is used, and the steps are as follows: S1, preparation steps: first, put granular materials of appropriate size into the transparent high-pressure cylinder (6) to simulate the macroporous fracture leakage layer; then open the liquid inlet valve, start the working pump (1), and inject the simulated formation fluid into the transparent high-pressure cylinder (6) so that the simulated formation fluid just completely submerges the macroporous fracture leakage layer; finally, close the liquid inlet valve and the working pump (1); S2, simulated plugging: first, open the liquid inlet valve, start the working pump (1), inject the plugging slurry into the transparent high-pressure cylinder (6) according to the set volume, and close the liquid inlet valve; then open the pressure valve, open the inert gas bottle (10), slowly pressurize the transparent high-pressure cylinder (6), and squeeze the plugging slurry into the large-pore fracture leakage layer; during the squeezing and injection, it is necessary to observe and record the process of the plugging slurry displacing the simulated formation fluid in the large-pore fracture leakage layer under the action of the pressure difference and entering the large-pore fracture leakage layer, as well as the process of the front of the plugging slurry advancing in the large-pore fracture leakage layer being contaminated and damaged by the simulated formation fluid, and the situation of the plugging zone formed by the simulated formation fluid advancing with the plugging slurry in the large-pore fracture leakage layer; after the squeezing and injection is completed, it is necessary to observe and record the process of the plugging slurry being affected by the density difference on the large-pore fracture leakage layer and being replaced and damaged by the formation fluid in the simulated large cave under static conditions; S3. Analyze the plugging situation: After the plugging slurry solidifies and forms strength, observe the plugging situation of the large hole seam leakage layer being cemented and solidified by the plugging slurry; S4. Evaluation of plugging effect: Comprehensive evaluation based on the results of S2 and S3.

9. A large hole sealing simulation experimental method according to claim 8, characterized in that: The specific steps of S3 are as follows: measure the thickness of the effective plugging layer, or observe the internal microstructure of the plugging belt through CT scanning, then cut off part of the plugging belt from the top surface of the large-pore leakage layer, measure its compressive strength on a compressive strength testing machine, and test its breakdown pressure in a high-temperature and high-pressure water loss instrument.

10. A large hole sealing simulation experimental method according to claim 9, characterized in that: In S1, a detachable transparent inner cylinder (7) is arranged inside the transparent high-pressure cylinder (6); the macroporous crack leakage layer is constructed inside the transparent inner cylinder (7); and in S3, the transparent inner cylinder (7) needs to be taken out from the transparent high-pressure cylinder (6) to observe and test the macroporous crack leakage layer inside the transparent inner cylinder (7).

11. A large hole sealing simulation experimental method according to claim 8, characterized in that: In S1, the inclination angle of the simulated wellbore also needs to be adjusted.

12. A large hole sealing simulation experimental method according to claim 8, characterized in that: After completing the recording of the plugging slurry being affected by the density difference on the large pore and fracture leaking layer and the process of being replaced and destroyed by the formation fluid in the simulated large cave under static conditions in S2, a heating component (18) is wrapped on the outside of the transparent high-pressure cylinder (6).

13. A large hole sealing simulation experimental method according to claim 8, characterized in that: The process of the plugging slurry displacing the simulated formation fluid in the large pore and fracture leakage layer under the action of pressure difference and entering the large pore and fracture leakage layer, the process of the plugging slurry being contaminated and damaged by the simulated formation fluid at the front of the plugging slurry advancing in the large pore and fracture leakage layer, the situation of the plugging zone formed by the simulated formation fluid advancing with the plugging slurry in the large pore and fracture leakage layer, and the process of the plugging slurry being damaged by the formation fluid replacement in the large pore and fracture leakage layer under the action of density difference and in the simulated large cave under static conditions are all recorded using a high-speed camera (15).

Citation Information

Patent Citations

  • Crack plugging layer forming mechanism microscopic visualization experiment device and simulation observation method

    CN112067749A

  • High-temperature and high-pressure visual dynamic leaking stoppage simulation device

    CN211201865U

  • High-pressure visual gravel plugging instrument

    CN216669930U

Cited By

  • Test device for simulating cement slurry plugging in oil and gas well formations, and method

    WO2026123444A1