Hydropower station scheduling method considering runoff and price random correlation
The runoff and electricity price risk model of the hydropower station was established through the kernel density estimation method and Copula function, and combined with Monte-Carlo simulation and particle swarm optimization algorithm, it solved the contract performance risk problem caused by ignoring electricity price fluctuations and runoff uncertainty in the medium and long-term operation of the hydropower station. Accurate risk assessment and economic improvement of hydropower stations are achieved.
Patent Information
- Application Number
- CN202410740040.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-10-01
AI Technical Summary
During the medium and long-term operation of hydropower stations, the contract performance risks caused by electricity price fluctuations and runoff uncertainty are ignored, resulting in a decline in economics. It is difficult to effectively model and evaluate the joint risks between the two with existing technology.
The kernel density estimation method and Copula function are used to establish the marginal distribution density function of runoff and electricity price, and a conditional risk value theoretical model is constructed. Combined with Monte-Carlo simulation and particle swarm optimization algorithm, the medium and long-term dispatch model of hydropower stations is optimized to maximize the expected revenue and conditional risk. value.
Accurately assess the runoff uncertainty, electricity price fluctuations and joint risks faced by hydropower stations, optimize medium and long-term dispatch strategies, and improve the economics and risk management capabilities of market-oriented operations of hydropower stations.
Smart Images

Figure CN118735170A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydropower station dispatching and operation, and in particular to a hydropower station dispatching method considering the random correlation between runoff and price. Background Art
[0002] The power structure and power supply and demand are changing with each passing day under the background of energy structure adjustment. The high proportion of new energy grid connection and the continuous widening of the peak-to-valley difference on the load side have put forward higher requirements and greater challenges for the operation mode of flexible power sources. In the multi-scale market environment where the spot market is coupled with the medium- and long-term market, when hydropower participates in market-based transactions, it not only needs to bear the transaction risks brought by electricity price fluctuations, but also the monthly contract performance risks brought by runoff uncertainty.
[0003] At present, prospect theory, information gap decision theory, conditional value at risk theory (CVaR) and Markowitz mean-variance model have been used to analyze transaction risks, but the above studies are basically aimed at thermal power and are difficult to adapt to hydropower issues. When accurately assessing the risks faced by hydropower station operation, the joint risk brought by the correlation between runoff uncertainty and electricity price fluctuations usually reduces the economic benefits of hydropower stations in medium and long term operation, but this joint risk item is rarely considered in modeling.
[0004] To this end, we designed a hydropower station scheduling method that considers the random correlation between runoff and price to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to solve the problem of the decline in the economic efficiency of hydropower station operation due to the neglect of contract performance risks brought about by electricity price fluctuations and runoff uncertainty during the medium and long-term operation of the hydropower station, and propose a hydropower station scheduling method that considers the random correlation between runoff and price, models the runoff uncertainty risk, electricity price fluctuation risk and runoff and electricity price joint risk faced by hydropower stations in medium and long-term operation, and makes an accurate risk assessment of hydropower stations operated in a market-oriented manner. The problem of the decline in the economic efficiency of hydropower station operation due to the neglect of contract performance risks brought about by electricity price fluctuations and runoff uncertainty during the medium and long-term operation of the hydropower station is solved.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A method for dispatching hydropower stations considering random correlation between runoff and price
[0008] Step 1, obtain the daily runoff historical data of the hydropower station and the historical day-ahead market clearing electricity price data;
[0009] Step 2: Based on the acquired daily runoff historical data of the hydropower station and the historical day-ahead market clearing electricity price data, the kernel density estimation method is used to solve the marginal distribution density functions of the runoff and electricity price;
[0010] Step 3: Based on the marginal distribution density functions of runoff and electricity price, conditional risk value theory is used to establish the runoff uncertainty risk model and the electricity price fluctuation risk model;
[0011] Step 4: Based on the marginal distribution density functions of runoff and electricity price, a joint risk model of runoff and electricity price is established using Copula function, and the maximum likelihood estimation method and KS test are used to select the best Copula function;
[0012] Step 5, using the Monte-Carlo simulation method to generate a runoff and electricity price transaction combination data sample that satisfies the Copula function;
[0013] Step 6: Establish a medium- and long-term dispatch model for the hydropower station based on the runoff uncertainty risk model, the electricity price fluctuation risk model, and the runoff and electricity price joint risk model;
[0014] Step 7: Use the particle swarm optimization algorithm to optimize the medium- and long-term dispatch model of the hydropower station and analyze the medium-term dispatch output results and transaction results of the hydropower station.
[0015] As a further preferred solution of the present invention, in step 1, the daily runoff history data of the hydropower station includes daily runoff observation data l i ; Historical day-ahead market clearing price data includes day-ahead clearing price data p 2,t , Hydropower station monthly deviation assessment electricity price data p 3,i And the monthly transaction price data of hydropower stations 1,i .
[0016] As a further preferred solution of the present invention, in step 2, the process of solving the marginal distribution density functions of runoff and electricity price by using the kernel density estimation method is as follows:
[0017] Using the kernel density estimation method based on Gaussian kernel function, let X1,X2,...,X n The probability density function is If there are n independent and identically distributed one-dimensional random variables, the kernel density estimation formula is expressed as:
[0018]
[0019] In the formula, n is the sample size; h is the bandwidth parameter, x represents the mean of n one-dimensional random variables, X i represents the value of the i-th variable;
[0020] a). Runoff edge distribution density function
[0021] Through the kernel density estimation method, the discrete daily runoff observation data l iEstimate the probability density function of runoff Then integrate it to obtain the runoff edge distribution density function F L (e i ,l),
[0022]
[0023] In formula (2), represents the probability density estimate derived from discrete daily runoff observation data, n is the number of data points used in the estimation, d represents the dimension of the data, Σ l is the covariance matrix, l i is the expected matrix, ll i Indicated by l i The density contribution of the multivariate Gaussian distribution centered at point l is obtained by summing and averaging the contributions of n sample points to estimate the density function;
[0024] b).Electricity price marginal distribution density function
[0025] Based on the kernel density estimation method, the probability density function is estimated from the historical clearing price data of the power market, and the marginal distribution density function of the power price is obtained by integrating it. The expression is as follows:
[0026]
[0027] Where m is the number of data points used for estimation, Σ p 、p i are the covariance matrix and expectation matrix, respectively, obtained from the discrete day-ahead clearing price data, p represents the average value of m day-ahead clearing price data, p i represents the value of the clearing electricity price data of the i-th day before, and the difference between the two represents the difference in p i The density contribution of the multivariate Gaussian distribution centered at point p.
[0028] As a further preferred solution of the present invention, in the process of kernel density estimation, the selection of bandwidth parameters determines the smoothness and final effect of kernel density estimation. When obtaining the optimal bandwidth parameter, an interpolation method is used based on the least square error. When the integrated mean square error is the smallest, the bandwidth parameter is the best.
[0029]
[0030] k = ∫l 2 K(l)dl (8)
[0031]
[0032] In the above formula, MISE represents the integrated mean square error, E∫[·] 2represents the integrated mean square error of the variable; They refer to the deviation and variance of the data set respectively; K(l) is the Gaussian kernel function; ρ(l) represents the probability density distribution function of the daily runoff observation data;
[0033] Calculate the integrated mean square error MISE and use the insertion method to replace the estimated formula Inserting the asymptotic formula, we get the asymptotic integrated mean square error, which is shown in (10) below:
[0034]
[0035] beg The minimum value, find its first-order derivative and set it to 0, that is, when the MISE is the minimum value, it corresponds to the optimal window width, as shown in the following formula:
[0036]
[0037] By dynamically adjusting the covariance matrix Σ l The size and shape of opt , so that the kernel density estimation effect is optimal.
[0038] As a further preferred solution of the present invention, in step 3, the conditional value at risk theory is used to establish the runoff uncertainty risk model and the electricity price fluctuation risk model as shown below:
[0039] Under the confidence level ξ, the runoff uncertainty risk model and the electricity price fluctuation risk model are described by their respective marginal distribution density functions.
[0040]
[0041] In the formula, F L (e i ,l),G P (e 2,i ,p) are the marginal distribution density functions of runoff and electricity price respectively; ρ(l) and ρ(p) are the probability density distribution functions of daily runoff observation data and the probability density distribution functions of day-ahead clearing electricity price respectively; the decision variable e i With e 2,i They represent the total monthly power generation of the hydropower station and the power generation reported by the hydropower station a few days ago respectively.
[0042] As a further preferred solution of the present invention, in step 4, the content of establishing the joint risk model of runoff and electricity price using Copula function is as follows:
[0043] The joint risk model of runoff and electricity price is represented by an equivalent joint risk value, namely: It is described by the Copula function connecting the two.
[0044]
[0045] Where u and v represent the probability density distribution function of daily runoff observation data and the probability density distribution function of the day-ahead clearing electricity price, i.e. u = ρ(l), v = ρ(p);
[0046] The selection of Copula functions using the maximum likelihood estimation method and KS test includes the following:
[0047] First determine the parameters of the Copula function and introduce the parameters γ, κ, estimate the value of the parameter by maximizing the likelihood function to maximize the probability of the sample data;
[0048] In order to evaluate the goodness of fit of different Copula functions, the KS test method is used to calculate the maximum deviation between the empirical distribution of sample data and the Copula function distribution, and find the Copula function with the best fit. The maximum likelihood function formula is as follows:
[0049]
[0050] The function that maximizes the likelihood is the runoff probability density function and the probability density function of electricity price ρ(l t ; γ)), take the logarithm of the maximized likelihood function, then find the derivative and set it to 0, and finally test the estimated value;
[0051] Where T represents the number of daily runoff observation data and day-ahead clearing electricity price data, p t and l t represents the t-th day runoff observation data and the day-ahead clearing electricity price data, c represents the Copula function, R p , R q , R T Represents the parameters introduced γ and κ take values in a reasonable parameter space R.
[0052] As a further preferred solution of the present invention, in step 5, the runoff and electricity price transaction combination data sample satisfying the Copula function is generated based on the Monte-Carlo simulation method using Latin hypercube sampling, including the following contents:
[0053] Assuming that the electricity price is {P t}, t=1,2,...,T is the sampling data, and stratified sampling is performed on N random variables related to electricity prices. The constraint condition of electricity price is recorded as F n (P t),n∈{1,2,…,N}, and F is divided according to the number of samples Q. n (P t ) is divided into Q equal parts, and a value (q~U(0,1)) / Q is randomly selected in the qth equal-division interval. A random number sample P is generated by formula (18) (18) n,q , repeat the above steps to form the initial sampling matrix Again Each row is processed in shuffle to obtain the final sampling matrix
[0054]
[0055] Assume that the day-ahead runoff is sampled with {Lt}, t = 1, 2, ..., T, and the random number sample L n,q And the sampling matrix Random number pair (P n,q ,L n,q ) conforms to the Copula function distribution, repeat the above steps m times, and then according to the marginal distribution density function F of runoff and electricity price, L (e i ,l),G P (e 2,i ,p) Calculate the value of the corresponding variable and obtain the daily runoff flow and day-ahead clearing electricity price transaction combination data samples of the Copula function required for the m groups of Monte Carlo simulations.
[0056] As a further preferred solution of the present invention, in step 6, a medium- and long-term scheduling model for a hydropower station with the goal of maximizing the estimated net income and conditional risk value of the hydropower station is established as follows:
[0057] When hydropower participates in market transactions, it needs to bear the contract performance risks brought by electricity price fluctuations, runoff uncertainty and the combined risks of the two. The comprehensive risk measurement value V CVaR The CVaR values of each risk are added together to obtain the medium- and long-term dispatch model of a hydropower station with the goal of maximizing the expected return and conditional risk value, which is expressed by formula (19):
[0058]
[0059] In formula (19), μ represents the weight coefficient; π n Indicates the probability of the scenario where the price occurs; B n represents the return of the trading portfolio under the background of market coupling, which is obtained by formula (20)(20)(22), e 1,i 、e 2,i,t 、e 3,i 、e iThey represent the monthly market transaction power of hydropower station i, the power reported by the hydropower station on the tth day, the assessment deviation power of the hydropower station, and the monthly total power generation of the hydropower station, respectively. 1,i 、p 2,t 、p 3,i They represent the monthly transaction price of the hydropower station, the day-ahead clearing price on the tth day, and the monthly deviation assessment price of the hydropower station, V CVaR represents the comprehensive risk faced by a hydropower station in market operation based on the conditional risk value theory, They represent the CVaR values considering runoff uncertainty and day-ahead electricity price volatility, respectively. It represents the joint CVaR value brought about by the impact of the correlation between runoff and electricity price on the power generation plan of the hydropower station, which is a joint risk item brought about by the impact of the correlation between runoff and electricity price on the power generation plan;
[0060] The constraints of the medium- and long-term dispatch model of hydropower stations include water balance constraints, reservoir water level constraints, hydropower generator output constraints, and day-ahead transaction power constraints. After considering the medium-term operation risks, risk management constraints are introduced, as shown in the following equations (28) and (29):
[0061] V i,t =V i,t-1 +3600·(I i,t -Q i,t )·Δt (24)
[0062] Z i,min ≤Z i,t ≤Z i,max (25)
[0063] P i,min ≤η i Q i,t H i,t ≤P i,max (26)
[0064] η i Q i,t H i,t Δt≥e 2,i,t (27)
[0065]
[0066] In formula (27), V i,t is the storage capacity of hydropower station i at the end of time period t, in m 3 ;Q i,t is the average power generation flow of hydropower station i in time period t, in m 3 / s;I i,t is the inflow flow in time period t; Δt is the time period step; Z i,tis the water level in front of the reservoir at the end of time period t, in m, Z i,min is the lowest water level in front of the dam at the end of period t, Z i,max is the highest water level in front of the dam at the end of time period t; P i,min , P i,max are the minimum and maximum output of the hydropower station, in MW; η i is the output coefficient of the hydropower station, H i,t is the generating head of hydropower station i in period t, formula (28) (27) indicates that the trading volume of hydropower station i participating in day-ahead trading in period t should not exceed the power generation on that day, formula (29) (28) indicates that the conditional risk value is not greater than the sum of the expected value minus a certain proportion of the expected return, and β indicates the confidence interval; is the introduced auxiliary variable.
[0067] As a further preferred solution of the present invention, in step 7, the particle swarm optimization algorithm is used to optimize the medium- and long-term scheduling model of the hydropower station, including setting the number of particle swarms, the maximum number of iterations, the inertia weight, the self-learning factor and the group learning factor, and the decision variables are the operating water level of the hydropower station and the day-ahead clearing electricity price;
[0068] The results of the hydropower station's mid-term dispatch output and participation in transactions are analyzed as follows:
[0069] According to the operation water level process, the time of participating in the day-ahead transaction is many and scattered, and the operating water level of each reservoir fluctuates violently. The operating water level is also affected by the upstream outflow, and the fluctuation is violent, and it is impossible to maintain high head power generation; combined with the analysis of the dispatching output results, when the hydropower station does not participate in the day-ahead transaction, the operating water level is relatively stable, and high head power generation is maintained as much as possible. Due to the monthly power generation limit stipulated in the performance contract, the hydropower station must increase the power generation during the period with higher clearing electricity prices and arrange to participate in the day-ahead transaction. At this time, the actual output of the hydropower station is proportional to the clearing electricity price. Before and after the transaction, the water level fluctuates greatly, the reservoir capacity of the hydropower station is small, and the fluctuation is more obvious;
[0070] When the sum of the monthly transaction price and the monthly deviation assessment price is greater than the day-ahead clearing price, the actual power generation of the hydropower station is greater than the monthly transaction power stipulated in the contract. The hydropower station will give priority to completing the monthly transaction contract, and then arrange the power generation plan according to the day-ahead clearing price. On the premise of ensuring the fulfillment of the monthly transaction power, the hydropower station will try to increase the output during the period when the day-ahead transaction clearing price is higher, so as to maximize the power generation profit and avoid the loss caused by the negative deviation assessment.
[0071] When the day-ahead clearing electricity price of a hydropower station is greater than the sum of the monthly transaction electricity price and the monthly deviation assessment electricity price, the actual power generation of the hydropower station is lower than the monthly transaction electricity volume stipulated in the contract. The hydropower station is at risk of having to pay a fine for failure to perform the contract. The hydropower station participates in dispatching power in full and participates in transactions when the market clearing electricity price is higher, in order to obtain greater profits to offset the losses caused by the negative deviation assessment.
[0072] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention formulates medium- and long-term electricity market settlement rules with hydropower as the main body, constructs a medium- and long-term dispatch model for hydropower stations that maximizes expected returns and conditional risk value, and solves the problem of reduced economic efficiency of hydropower station operation due to ignoring risks during medium- and long-term operation; models the runoff uncertainty risk, electricity price fluctuation risk, and runoff and electricity price joint risk faced by medium- and long-term hydropower stations, and makes accurate risk assessments for market-oriented hydropower stations. It solves the problem of reduced economic efficiency of hydropower station operation due to ignoring contract performance risks brought about by electricity price fluctuations and runoff uncertainty during medium- and long-term operation of hydropower stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] Figure 1 This is a kernel density estimation diagram of runoff, day-ahead clearing electricity price and cumulative distribution in a hydropower station dispatching method that considers random correlation between runoff and price proposed by the present invention;
[0074] Figure 2 A data diagram of daily runoff and day-ahead clearing electricity price in a hydropower station dispatching method considering the random correlation between runoff and price proposed by the present invention;
[0075] Figure 3 A scenario diagram of a sample data combination of daily runoff and day-ahead clearing electricity price in a hydropower station dispatching method that considers the random correlation between runoff and price proposed by the present invention;
[0076] Figure 4 Figure a is a mid-term dispatch result diagram under different runoff volume influences in a hydropower station dispatch method considering the random correlation between runoff and price proposed by the present invention;
[0077] Figure 5 Figure b is a mid-term dispatch result diagram under different runoff volume influences in a hydropower station dispatch method considering the random correlation between runoff and price proposed by the present invention;
[0078] Figure 6 Figure a is a mid-term dispatch result diagram under different electricity price scenarios in a hydropower station dispatch method considering the random correlation between runoff and price proposed by the present invention;
[0079] Figure 7Figure b is the medium-term scheduling result under different electricity price scenarios in a hydropower station scheduling method that considers the random correlation between runoff and price proposed in the present invention. DETAILED DESCRIPTION
[0080] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0081] As the largest energy source in the current diversified clean energy supply system, hydropower generation is expected to reach 7.6kW in 2060, with huge regulation capacity and regulation potential. In order to ensure the smooth operation of the power market, it is crucial to give full play to the trading and regulation potential of hydropower stations.
[0082] This embodiment provides a method for dispatching a hydropower station that takes into account the random correlation between runoff and price. First, the kernel density estimation method is used to solve the marginal distribution density functions of runoff and electricity price respectively; then, the marginal distribution density function is used to describe the runoff uncertainty risk model and electricity price fluctuation risk model faced by hydropower stations operating in the medium and long term, and an accurate risk assessment is made for hydropower stations operating in the market. Then, the Copula function is used to establish a joint risk model of runoff and electricity price; the Monte-Carlo simulation method is used to generate a sample of runoff and electricity price transaction combinations that satisfy the Copula function; finally, a medium- and long-term dispatching model for a hydropower station is established with the goal of maximizing the expected net income and conditional risk value of the hydropower station, and the PSO algorithm (particle swarm optimization algorithm) is used to optimize the model to analyze the mid-term dispatching output results and transaction results of the hydropower station.
[0083] Among them, the conditional value at risk theory (CVaR) used in the accurate risk assessment of the hydropower station operated in the market involved in this embodiment is a risk measurement technology proposed by Rockafeuar and Uryasev in 1997. Its numerical value indicates the average loss value of the investment portfolio under the condition that the loss of the investment portfolio exceeds a given VaR value. The analytical formula of CVaR is generally not easy to obtain. For the convenience of calculation, the present invention adopts the Copula-MonteCarlo simulation method to calculate the specific value of CVaR.
[0084] Specifically, a hydropower station scheduling method considering the random correlation between runoff and price is provided, and the method mainly includes the following steps:
[0085] Step 1: Obtain the daily runoff history data of the hydropower station and the historical day-ahead market clearing electricity price data; the daily runoff history data of the hydropower station includes the daily runoff observation data l i ; Historical day-ahead market clearing price data includes day-ahead clearing price data p 2,t, Hydropower station monthly deviation assessment electricity price data p 3,i And the monthly transaction price data of hydropower stations 1,i Among them, the daily runoff observation data needs to exclude the flood season data, because the flood season will cause abnormal values in the runoff, and hydropower stations always want to sell electricity at the floor price during the flood season to increase their own transaction volume. Therefore, the electricity price data during this period has no reference value.
[0086] Step 2: Based on the acquired daily runoff historical data of the hydropower station and the historical day-ahead market clearing electricity price data, the kernel density estimation method is used to solve the marginal distribution density functions of the runoff and electricity price;
[0087] In engineering practice, the marginal distribution functions of runoff and electricity prices are usually unknown and require analysis and processing of discrete data.
[0088] In this step, this embodiment adopts the kernel density estimation method based on Gaussian kernel function. Let X1, X2, ..., X n The probability density function is If there are n independent and identically distributed one-dimensional random variables, the kernel density estimation formula is expressed as:
[0089]
[0090] Where n is the sample size; h is the bandwidth parameter, which plays the role of smoothing the curve and determines the effect of kernel density estimation; x represents the mean of n one-dimensional random variables, X i Represents the value of the i-th variable.
[0091] a). Runoff edge distribution density function
[0092] Through the kernel density estimation method, the discrete daily runoff observation data l i Estimate the probability density function of runoff Then integrate it to obtain the runoff edge distribution density function F L (e i ,l),
[0093]
[0094] In formula (2), represents the probability density estimate derived from discrete daily runoff observation data, n is the number of data points used in the estimation, d represents the dimension of the data, Σ l is the covariance matrix, l i is the expected matrix (obtaining the covariance matrix and the expected matrix from discrete data is a well-known mathematical process and will not be further introduced in this embodiment); 11 i Indicated by l iThe density contribution of the multivariate Gaussian distribution centered at point l is estimated by summing and averaging the contributions of n sample points.
[0095] b).Electricity price marginal distribution density function
[0096] Electricity prices are usually quoted per hour and can be regarded as time series. They are volatile and are affected by various factors such as market supply and demand, policies, etc. Based on the above-mentioned kernel density estimation method, the probability density function is estimated from the historical clearing price data of the power market, and the marginal distribution density function of the electricity price is obtained by integrating it. The expression is as follows:
[0097]
[0098] Where m is the number of data points used for estimation, Σ p 、p i are the covariance matrix and expectation matrix, respectively, obtained from the discrete day-ahead clearing price data, p represents the average value of m day-ahead clearing price data, p i represents the value of the clearing electricity price data of the i-th day before, and the difference between the two represents the difference in p i The density contribution of the multivariate Gaussian distribution centered at point p.
[0099] In the process of kernel density estimation, the selection of bandwidth parameters determines the smoothness and final effect of kernel density estimation. In order to better adapt to the distribution characteristics of massive historical data, this embodiment adopts the insertion method when obtaining the optimal bandwidth, and takes the equivalent bandwidth at each daily runoff observation data fitting point. Based on the least square difference idea (LSCV), when the mean integrated square error (MISE) is the smallest, the bandwidth parameter is the best;
[0100]
[0101] k = ∫l 2 K(l)dl (8)
[0102]
[0103] In the above formula, MISE represents the integrated mean square error, E∫[·] 2 represents the integrated mean square error of the variable; They refer to the deviation and variance of the data set respectively; K(l) is the Gaussian kernel function; ρ(l) represents the probability density distribution function of the daily runoff observation data;
[0104] Calculate the integrated mean square error MISE and use the insertion method to replace the estimated formula Inserting the asymptotic formula, we get the asymptotic integrated mean square error, which is shown in (10) below:
[0105]
[0106] beg The minimum value, find its first-order derivative and set it to 0, that is, when the MISE is the minimum value, it corresponds to the optimal window width, as shown in the following formula:
[0107]
[0108] By dynamically adjusting the covariance matrix Σ l The size and shape of opt , so that the kernel density estimation effect is optimal.
[0109] from Figure 1 From the frequency histogram of runoff and day-ahead clearing electricity price (clearing electricity price) and the kernel density estimation cumulative distribution diagram, the kernel density estimation method can well display the distribution of daily runoff and day-ahead clearing electricity price, and the optimal bandwidth parameter determination method based on the LSCV idea can ensure good fitting goodness of fit.
[0110] Step 3: Based on the marginal distribution density functions of runoff and electricity price obtained in step 2, the conditional value at risk theory is used to establish the runoff uncertainty risk model and the electricity price fluctuation risk model;
[0111] Under a certain confidence level ξ, the runoff uncertainty risk model and the electricity price fluctuation risk model are described by their respective marginal distribution density functions.
[0112]
[0113] In the formula, F L (e i ,l),G P (e 2,i ,p) are the marginal distribution density functions of runoff and electricity price respectively; ρ(l) and ρ(p) are the probability density distribution functions of daily runoff observation data and the probability density distribution functions of day-ahead clearing electricity price respectively; the decision variable e i With e 2,i They represent the total monthly power generation of the hydropower station and the power generation reported by the hydropower station a few days ago respectively.
[0114] Step 4: Based on the marginal distribution density functions of runoff and electricity price, a joint risk model of runoff and electricity price is established using Copula function, and the maximum likelihood estimation method and KS test are used to select the best Copula function;
[0115] The joint risk model of runoff and electricity price is represented by an equivalent joint risk value, namely: It is described by the Copula function connecting the two.
[0116]
[0117] Where u and v represent the probability density distribution function of daily runoff observation data and the probability density distribution function of the day-ahead clearing electricity price, i.e. u = ρ(l), v = ρ(p);
[0118] The selection of Copula functions using the maximum likelihood estimation method and KS test includes the following:
[0119] First determine the parameters of the Copula function and introduce the parameters γ, κ, estimate the value of the parameter by maximizing the likelihood function to maximize the probability of the sample data;
[0120] In order to evaluate the goodness of fit of different Copula functions, the KS test method is used to calculate the maximum deviation between the empirical distribution of sample data and the Copula function distribution, and find the Copula function with the best fit. The maximum likelihood function formula is as follows:
[0121]
[0122] The function that maximizes the likelihood is the runoff probability density function and the probability density function of electricity price ρ(l t ; γ)), take the logarithm of the maximized likelihood function, then find the derivative and set it to 0, and finally test the estimated value;
[0123] Where T represents the number of daily runoff observation data and day-ahead clearing electricity price data, p t and l t represents the t-th day runoff observation data and the day-ahead clearing electricity price data, c represents the Copula function, R p , R q , R T Represents the parameters introduced γ and κ take values in a reasonable parameter space R.
[0124] Depend on Figure 2 It can be seen that the daily runoff of the hydropower station and the day-ahead clearing electricity price are roughly negatively correlated. According to the results of simulation verification, after excluding the flood season data, there are 135 data samples of runoff and clearing electricity price. The person correlation coefficient of the 135 sample data is 0.753. It can be judged that there is a strong negative correlation between the two. Therefore, in the process of formulating the hydropower station scheduling plan considering the risks of runoff and price uncertainty, the associated risk items of the two cannot be ignored.
[0125] From the fitting of the three types of Copula functions and the KS test numerical results in Table 1, the KS test result corresponding to the Clayton-Copula function is the smallest, which is 0.0443. Therefore, the Clayton-Copula function is selected to fit the joint distribution of daily runoff and day-ahead clearing electricity price, which can better characterize the correlation between the two.
[0126] Table 1 Fitting of three types of Copula functions and KS test numerical results
[0127] Copula Function Types Parameter estimates KS test value Clayton-Copula 0.1512 0.0443 Frank-Copula 0.6239 0.0568 Gumbel-Copula 1.0307 0.0714
[0128] Step 5, using the Monte-Carlo simulation method to generate a runoff and electricity price transaction combination data sample that satisfies the Copula function;
[0129] In the process of traditionally generating random number pairs required by the Monte-Carlo simulation method, many methods rely on large-scale random sampling, which has good accuracy, but the computational task is heavy for huge historical data. Therefore, this embodiment uses a Monte-Carlo simulation method based on Latin hypercube sampling instead of random sampling.
[0130] Assuming that the electricity price is {P t}, t=1,2,...,T is the sampling data, and stratified sampling is performed on N random variables related to electricity prices. The constraint condition of electricity price is recorded as F n (P t ),n∈{1,2,…,N}, and F is divided according to the number of samples Q. n (P t ) is divided into Q equal parts, and a value (q~U(0,1)) / Q is randomly selected in the qth equal-division interval. A random number sample P is generated by formula (18) (18) n,q , repeat the above steps to form the initial sampling matrix Again Each row is processed in shuffle to obtain the final sampling matrix
[0131]
[0132] Assume that the day-ahead runoff is sampled with {Lt}, t = 1, 2, ..., T, and the random number sample L n,q And the sampling matrix Random number pair (P n,q ,L n,q ) conforms to the Copula function distribution, repeat the above steps m times, and then according to the marginal distribution density function F of runoff and electricity price, L(e i ,l),G P (e 2,i ,p) Calculate the value of the corresponding variable and obtain the combined data samples of daily runoff and day-ahead clearing electricity price of the Copula function required for the m groups of Monte Carlo simulations, such as Figure 3 shown.
[0133] Step 6: Establish a medium- and long-term dispatch model for the hydropower station based on the runoff uncertainty risk model, the electricity price fluctuation risk model, and the runoff and electricity price joint risk model;
[0134] When hydropower participates in market transactions, it needs to bear the contract performance risks brought by electricity price fluctuations, runoff uncertainty and the combined risks of the two. The comprehensive risk measurement value V CVaR The CVaR values of each risk are added together to obtain the medium- and long-term dispatch model of a hydropower station with the goal of maximizing the expected return and conditional risk value, which is expressed by formula (19):
[0135]
[0136] In formula (19), μ represents the weight coefficient; π n Indicates the probability of the scenario where the price occurs; B n represents the return of the trading portfolio under the background of market coupling, which is obtained by formula (20)(20)(22), e 1,i 、e 2,i,t 、e 3,i 、e i They represent the monthly market transaction power of hydropower station i, the power reported by the hydropower station on the tth day, the assessment deviation power of the hydropower station, and the monthly total power generation of the hydropower station, respectively. 1,i 、p 2,t 、p 3,i They represent the monthly transaction price of the hydropower station, the day-ahead clearing price on the tth day, and the monthly deviation assessment price of the hydropower station, V CVaR represents the comprehensive risk faced by a hydropower station in market operation based on the conditional risk value theory, They represent the CVaR values considering runoff uncertainty and day-ahead electricity price volatility, respectively. It represents the joint CVaR value brought about by the impact of the correlation between runoff and electricity prices on the power generation plan of the hydropower station. It is a joint risk item brought about by the impact of the correlation between runoff and electricity prices on the power generation plan.
[0137] st is the abbreviation of subject to, which means "subject to". h(x) represents the equality constraint in the optimization model, and g(x) represents the inequality constraint. The equality and inequality constraints are shown in equations (24)-(29).
[0138] The constraints of the medium- and long-term dispatch model of hydropower stations include water balance constraints, reservoir water level constraints, hydropower generator output constraints, and day-ahead transaction power constraints. After considering the medium-term operation risks, risk management constraints are introduced, as shown in the following equations (28) and (29):
[0139] V i,t =V i,t-1 +3600·(I i,t -Q i,t )·Δt (24)
[0140] Z i,min ≤Z i,t ≤Z i,max (25)
[0141] P i,min ≤η i Q i,t H i,t ≤P i,max (26)
[0142] η i Q i,t H i,t Δt≥e 2,i,t (27)
[0143]
[0144] In formula (27), V i,t is the storage capacity of hydropower station i at the end of time period t, in m 3 ;Q i,t is the average power generation flow of hydropower station i in time period t, in m 3 / s;I i,t is the inflow flow in time period t; Δt is the time period step; Z i,t is the water level in front of the reservoir at the end of time period t, in m, Z i,min is the lowest water level in front of the dam at the end of period t, Z i,max is the highest water level in front of the dam at the end of time period t; P i,min , P i,max are the minimum and maximum output of the hydropower station, in MW; η i is the output coefficient of the hydropower station, H i,t is the generating head of hydropower station i in period t, β represents the confidence interval; is an auxiliary variable introduced. When the net profit is higher than , the auxiliary variable is equal to zero. Otherwise, the auxiliary variable is equal to the difference between the net profit and the value. The amount of electricity traded by hydropower station i in the day-ahead transaction during period t should not exceed the power generation on that day, and the conditional risk value should not be greater than the sum of the expected value minus a certain proportion of the expected return.
[0145] Step 7: Use the particle swarm optimization algorithm to optimize the medium- and long-term dispatch model of the hydropower station and analyze the medium-term dispatch output results and transaction results of the hydropower station.
[0146] This embodiment adopts the particle swarm optimization algorithm (PSO) to optimize the medium- and long-term scheduling model of the hydropower station with the goal of maximizing the expected return and conditional risk value. The example population number N is set to 20, the maximum number of iterations is 100 generations, the inertia weight w is set to 0.8, the self-learning factor c1 is set to 0.5, the group learning factor c2 is set to 0.5, and the decision variables are the operating water level of the hydropower station and the day-ahead clearing electricity price.
[0147] For better explanation, this step takes the example of the hydropower stations involved in the calculation as two power stations of a certain cascade, A and B, which constitute a "one reservoir, two cascades" generator set. Figure 4 and Figure 5 As shown in the figure, the sum of the monthly transaction price of a given hydropower station and the monthly deviation assessment price of the hydropower station is greater than the day-ahead clearing price. The medium-term dispatching of the two cascade hydropower stations A and B under different operating water levels is analyzed. According to the operating water level process, due to the large number of days participating in day-ahead trading and the dispersion, the operating water level of each reservoir fluctuates violently. As the downstream power station of hydropower station A, the operating water level of hydropower station B is also affected by the upstream outflow flow, so the fluctuation is more violent and it is impossible to maintain high head power generation. Combined with the dispatching results, when the hydropower station does not participate in day-ahead trading, the operating water level is relatively stable and high head power generation is maintained as much as possible. Due to the monthly power generation limit stipulated in the performance contract, the hydropower station must increase the power generation during the period with higher clearing power prices and arrange to participate in day-ahead trading. At this time, the actual output of the hydropower station is proportional to the clearing power price. Before and after the transaction, the water level fluctuates greatly. Due to the small reservoir capacity of hydropower station B, the fluctuation is more obvious.
[0148] Reference Figure 6 and Figure 7 , for the operating water level of a given hydropower station B, the medium-term dispatching of the hydropower station under different scenarios is analyzed. Figure 6 The calculation results are shown when the sum of the monthly transaction price of the hydropower station and the monthly deviation assessment price of the hydropower station is greater than the day-ahead clearing price. At this time, the actual power generation of the hydropower station is greater than the monthly transaction power stipulated in the contract. In this case, the hydropower station will give priority to completing the monthly transaction contract, and then flexibly arrange the power generation plan according to the day-ahead transaction clearing price. Figure 6 It can be seen that during the entire dispatching cycle, hydropower stations, under the premise of ensuring the fulfillment of monthly trading electricity, try to increase output during the period with higher clearing electricity prices in the day-ahead, so as to maximize power generation profits and avoid losses caused by negative deviation assessments. Figure 7The calculation results are shown when the day-ahead clearing price of a hydropower station is greater than the sum of the monthly transaction price of the hydropower station and the monthly deviation assessment price of the hydropower station. This situation means that the actual power generation of the hydropower station is lower than the monthly transaction power stipulated in the contract. Due to the existence of the monthly deviation assessment mechanism, the hydropower station is at risk of having to pay a fine for non-performance. Figure 7 It can be seen that in this case, the hydropower station will participate in the dispatching of power in full and participate in transactions when the market clearing electricity price is high, in order to obtain greater profits to offset the losses caused by the negative deviation assessment.
[0149] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for dispatching a hydropower station considering the random correlation between runoff and price, characterized in that: Step 1, obtain the daily runoff historical data of the hydropower station and the historical day-ahead market clearing electricity price data; Step 2: Based on the acquired daily runoff historical data of the hydropower station and the historical day-ahead market clearing electricity price data, the kernel density estimation method is used to solve the marginal distribution density functions of the runoff and electricity price; Step 3: Based on the marginal distribution density functions of runoff and electricity price, conditional risk value theory is used to establish the runoff uncertainty risk model and the electricity price fluctuation risk model; Step 4: Based on the marginal distribution density functions of runoff and electricity price, a joint risk model of runoff and electricity price is established using Copula function, and the maximum likelihood estimation method and KS test are used to select the best Copula function; Step 5, using the Monte-Carlo simulation method to generate a runoff and electricity price transaction combination data sample that satisfies the Copula function; Step 6: Establish a medium- and long-term dispatch model for the hydropower station based on the runoff uncertainty risk model, the electricity price fluctuation risk model, and the runoff and electricity price joint risk model; Step 7: Use the particle swarm optimization algorithm to optimize the medium- and long-term dispatch model of the hydropower station and analyze the medium-term dispatch output results and transaction results of the hydropower station.
2. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 1, the daily runoff history data of the hydropower station includes the daily runoff observation data l i ; Historical day-ahead market clearing price data includes day-ahead clearing price data p 2,t , Hydropower station monthly deviation assessment electricity price data p 3,i And the monthly transaction price data of hydropower stations 1,i .
3. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 2, the process of using the kernel density estimation method to solve the marginal distribution density functions of runoff and electricity price is as follows: Using the kernel density estimation method based on Gaussian kernel function, let X1,X2,...,X n The probability density function is If there are n independent and identically distributed one-dimensional random variables, the kernel density estimation formula is expressed as: In the formula, n is the sample size; h is the bandwidth parameter, x represents the mean of n one-dimensional random variables, X i represents the value of the i-th variable; a). Runoff edge distribution density function Through the kernel density estimation method, the discrete daily runoff observation data l i Estimate the probability density function of runoff Then integrate it to obtain the runoff edge distribution density function F L (e i ,l), In formula (2), represents the probability density estimate derived from discrete daily runoff observation data, n is the number of data points used in the estimation, d represents the dimension of the data, Σ l is the covariance matrix, l i is the expected matrix, ll i Indicated by l i The density contribution of the multivariate Gaussian distribution centered at point l is obtained by summing and averaging the contributions of n sample points to estimate the density function; b).Electricity price marginal distribution density function Based on the kernel density estimation method, the probability density function is estimated from the historical clearing price data of the power market, and the marginal distribution density function of the power price is obtained by integrating it. The expression is as follows: Where m is the number of data points used for estimation, Σ p 、p i are the covariance matrix and expectation matrix, respectively, obtained from the discrete day-ahead clearing price data, p represents the average value of m day-ahead clearing price data, p i represents the value of the clearing electricity price data of the i-th day before, and the difference between the two represents the difference in p i The density contribution of the multivariate Gaussian distribution centered at point p.
4. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 3, characterized in that: In the process of kernel density estimation, the selection of bandwidth parameters determines the smoothness and final effect of kernel density estimation. The insertion method is used to obtain the optimal bandwidth parameter. Based on the minimum square error, when the integrated mean square error is the smallest, the bandwidth parameter is the best. k=∫l 2 K(l)dl (8) In the above formula, MISE represents the integrated mean square error, E∫[·] 2 represents the integrated mean square error of the variable; They refer to the deviation and variance of the data set respectively; K(l) is the Gaussian kernel function; ρ(l) represents the probability density distribution function of the daily runoff observation data; Calculate the integrated mean square error MISE and use the insertion method to replace the estimated formula Inserting the asymptotic formula, we get the asymptotic integrated mean square error, which is shown in (10) below: beg The minimum value, find its first-order derivative and set it to 0, that is, when the MISE is the minimum value, it corresponds to the optimal window width, as shown in the following formula: By dynamically adjusting the covariance matrix Σ l The size and shape of opt , so that the kernel density estimation effect is optimal.
5. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 3, the conditional value at risk theory is used to establish the runoff uncertainty risk model and the electricity price fluctuation risk model as shown below: Under the confidence level ξ, the runoff uncertainty risk model and the electricity price fluctuation risk model are described by their respective marginal distribution density functions. In the formula, F L (e i ,l),G P (e 2,i ,p) are the marginal distribution density functions of runoff and electricity price respectively; ρ(l) and ρ(p) are the probability density distribution functions of daily runoff observation data and the probability density distribution functions of day-ahead clearing electricity price respectively; the decision variable e i With e 2,i They represent the total monthly power generation of the hydropower station and the power generation reported by the hydropower station a few days ago respectively.
6. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 4, based on the marginal distribution density functions of runoff and electricity price, the content of the joint risk model of runoff and electricity price is established using the Copula function as follows: The joint risk model of runoff and electricity price is represented by an equivalent joint risk value, namely: It is described by the Copula function connecting the two. Where u and v represent the probability density distribution function of daily runoff observation data and the probability density distribution function of the day-ahead clearing electricity price, i.e. u = ρ(l), v = ρ(p); The selection of Copula functions using the maximum likelihood estimation method and KS test includes the following: First determine the parameters of the Copula function and introduce the parameters γ, κ, estimate the value of the parameter by maximizing the likelihood function to maximize the probability of the sample data; In order to evaluate the goodness of fit of different Copula functions, the KS test method is used to calculate the maximum deviation between the empirical distribution of sample data and the Copula function distribution, and find the Copula function with the best fit. The maximum likelihood function formula is as follows: The function that maximizes the likelihood is the runoff probability density function and the probability density function of electricity price ρ(l t ; γ), take the logarithm of the maximized likelihood function, then find the derivative and set it to 0, and finally test the estimated value; Where T represents the number of daily runoff observation data and day-ahead clearing electricity price data, p t and l t represents the t-th day runoff observation data and the day-ahead clearing electricity price data, c represents the Copula function, R p , R q , R T Represents the parameters introduced γ and κ take values in a reasonable parameter space R.
7. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 5, the runoff and electricity price transaction combination data samples that satisfy the Copula function are generated based on the Monte-Carlo simulation method using Latin hypercube sampling, including the following: Assuming that the electricity price is {P t }, t=1,2,...,T is the sampling data, and stratified sampling is performed on N random variables related to electricity prices. The constraint condition of electricity price is recorded as F n (P t ),n∈{1,2,…,N}, and F is divided according to the number of samples Q. n (P t ) is divided into Q equal parts, and a value (q~U(0,1)) / Q is randomly selected in the qth equal-division interval. A random number sample P is generated by formula (18) (18) n,q , repeat the above steps to form the initial sampling matrix Again Each row is processed in shuffle to obtain the final sampling matrix Assume that the day-ahead runoff is sampled with {Lt}, t = 1, 2, ..., T, and the random number sample L n,q And the sampling matrix Random number pair (P n,q ,L n,q ) conforms to the Copula function distribution, repeat the above steps m times, and then according to the marginal distribution density function F of runoff and electricity price, L (e i ,l),G P (e 2,i ,p) Calculate the value of the corresponding variable and obtain the daily runoff flow and day-ahead clearing electricity price transaction combination data samples of the Copula function required for the m groups of Monte Carlo simulations.
8. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 6, a medium- and long-term dispatch model for a hydropower station is established with the goal of maximizing the expected net income and conditional risk value of the hydropower station as follows: When hydropower participates in market transactions, it needs to bear the contract performance risks brought by electricity price fluctuations, runoff uncertainty and the combined risks of the two. The comprehensive risk measurement value V CVaR The CVaR values of each risk are added together to obtain the medium- and long-term dispatch model of a hydropower station with the goal of maximizing the expected return and conditional risk value, which is expressed by formula (19): In formula (19), μ represents the weight coefficient; π n Indicates the probability of the scenario where the price occurs; B n represents the return of the trading portfolio under the background of market coupling, which is obtained by formula (20)(20)(22), e 1,i 、e 2,i,t 、e 3,i 、e i They represent the monthly market transaction power of hydropower station i, the power reported by the hydropower station on the tth day, the assessment deviation power of the hydropower station, and the monthly total power generation of the hydropower station, respectively. 1,i 、p 2,t 、p 3,i They represent the monthly transaction price of the hydropower station, the day-ahead clearing price on the tth day, and the monthly deviation assessment price of the hydropower station, V CVaR represents the comprehensive risk faced by a hydropower station in market operation based on the conditional risk value theory, They represent the CVaR values considering runoff uncertainty and day-ahead electricity price volatility, respectively. It represents the joint CVaR value brought about by the impact of the correlation between runoff and electricity price on the power generation plan of the hydropower station, which is a joint risk item brought about by the impact of the correlation between runoff and electricity price on the power generation plan; The constraints of the medium- and long-term dispatch model of hydropower stations include water balance constraints, reservoir water level constraints, hydropower generator output constraints, and day-ahead transaction power constraints. After considering the medium-term operation risks, risk management constraints are introduced, as shown in the following equations (28) and (29): V i,t =V i,t-1 +3600·(I i,t -Q i,t )·Δt (24) WITH i,min ≤Z i,t ≤Z i,max (25) P i,min ≤η i Q i,t H i,t ≤P i,max (26) the i Q i,t H i,t Δt≥e 2,i,t (27) In formula (27), V i,t is the storage capacity of hydropower station i at the end of time period t, in m 3 ; Q i,t is the average power generation flow of hydropower station i in time period t, in m 3 / s;I i,t is the inflow flow in time period t; Δt is the time period step; Z i,t is the water level in front of the reservoir at the end of time period t, in m, Z i,min is the lowest water level in front of the dam at the end of period t, Z i,max is the highest water level in front of the dam at the end of time period t; P i,min , P i,max They are the minimum and maximum output of the hydropower station, in MW; η i is the output coefficient of the hydropower station, H i,t is the generating head of hydropower station i in period t, formula (28) (27) indicates that the trading volume of hydropower station i participating in day-ahead trading in period t should not exceed the power generation on that day, formula (29) (28) indicates that the conditional risk value is not greater than the sum of the expected value minus a certain proportion of the expected return, and β indicates the confidence interval; is the introduced auxiliary variable.
9. A method for dispatching a hydropower station considering the random correlation between runoff and price according to claim 1, characterized in that: In step 7, the particle swarm optimization algorithm is used to optimize the medium- and long-term dispatch model of the hydropower station, including setting the number of particle swarms, the maximum number of iterations, the inertia weight, the self-learning factor and the group learning factor. The decision variables are the operating water level of the hydropower station and the day-ahead clearing electricity price. The results of the hydropower station's mid-term dispatch output and participation in transactions are analyzed as follows: According to the operation water level process, the time of participating in the day-ahead transaction is many and scattered, and the operating water level of each reservoir fluctuates violently. The operating water level is also affected by the upstream outflow, and the fluctuation is violent, and it is impossible to maintain high head power generation; combined with the analysis of the dispatching output results, when the hydropower station does not participate in the day-ahead transaction, the operating water level is relatively stable, and high head power generation is maintained as much as possible. Due to the monthly power generation limit stipulated in the performance contract, the hydropower station must increase the power generation during the period with higher clearing electricity prices and arrange to participate in the day-ahead transaction. At this time, the actual output of the hydropower station is proportional to the clearing electricity price. Before and after the transaction, the water level fluctuates greatly, the reservoir capacity of the hydropower station is small, and the fluctuation is more obvious; When the sum of the monthly transaction price and the monthly deviation assessment price is greater than the day-ahead clearing price, the actual power generation of the hydropower station is greater than the monthly transaction power stipulated in the contract. The hydropower station will give priority to completing the monthly transaction contract, and then arrange the power generation plan according to the day-ahead clearing price. On the premise of ensuring the fulfillment of the monthly transaction power, the hydropower station will try to increase the output during the period when the day-ahead transaction clearing price is higher, so as to maximize the power generation profit and avoid the loss caused by the negative deviation assessment. When the day-ahead clearing electricity price of a hydropower station is greater than the sum of the monthly transaction electricity price and the monthly deviation assessment electricity price, the actual power generation of the hydropower station is lower than the monthly transaction electricity volume stipulated in the contract. The hydropower station is at risk of having to pay a fine for failure to perform the contract. The hydropower station participates in dispatching power in full and participates in transactions when the market clearing electricity price is higher, in order to obtain greater profits to offset the losses caused by the negative deviation assessment.
Citation Information
Cited By
Hydropower station income risk measurement method based on hydroenergy value
CN120387895A
Virtual power plant reliability evaluation method, system and equipment considering wind and light load time sequence volatility and medium
CN120524214A
Virtual power plant group carbon electricity transaction method, system and device considering wind and light output uncertainty, and medium
CN120528033A