Virtual power plant optimization scheduling method considering pollution emission and low profit risk
By establishing the battery operation model and risk measurement model of the energy storage system, combined with the virtual power plant optimization dispatch model, the problem of energy storage system degradation cost and pollution emissions in the virtual power plant is solved, maximizing the profit of the virtual power plant and minimizing pollution, and avoiding It reduces the risk of low-profit scenarios and improves the operational efficiency and environmental friendliness of virtual power plants.
Patent Information
- Application Number
- CN202410911073.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-06-27
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology ignores the degradation cost of the energy storage system and the impact of pollution emissions on decision-making in the optimal scheduling of virtual power plants, and fails to effectively consider the risks of low-profit scenarios, resulting in poor operating efficiency and environmental impact of the virtual power plant.
Establish the battery operation model and risk measurement model of the energy storage system, combine it with the virtual power plant optimal dispatch model, and use MATLAB to solve the virtual power plant optimal dispatch plan with the goal of maximizing grid profits and minimizing pollution emissions, taking into account battery discharge depth, ambient temperature and low profits. The risk of the scenario.
It improves the optimal operation and scheduling profit of virtual power plants, reduces pollution emissions, realizes mathematical description and risk avoidance of battery degradation costs of energy storage systems, and provides more ideal virtual power plant operation planning and bidding strategies.
Smart Images

Figure CN118735264A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of virtual power plant optimization scheduling, and in particular to a virtual power plant optimization scheduling method taking into account pollution emissions and low profit risks. Background Art
[0002] The batteries in the energy storage system have a certain cycle life, which will be shortened due to the deep discharge and high temperature working environment of the battery. At present, most of the research on energy storage systems for virtual power plant optimization scheduling focuses on energy utilization, ignoring the impact of the degradation cost of the energy storage system on the optimal scheduling of virtual power plant decisions.
[0003] At the same time, the optimal scheduling and bidding of virtual power plants also need to consider the pollution emissions generated by conventional units in virtual power plants and the risks of low-profit scenarios. Existing research lacks comprehensive research on the degradation costs of energy storage systems, pollution emissions in the operation and scheduling of virtual power plants, and the risks of low-profit scenarios. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a virtual power plant optimization scheduling method that takes into account pollution emissions and low profit risks, which solves the technical problems that the degradation cost of the energy storage system, the pollution emissions in the operation and scheduling of the virtual power plant, and the risk of generating low profit scenarios affect the optimization scheduling of the virtual power plant.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a virtual power plant optimization scheduling method considering pollution emissions and low profit risks, the method comprising the following processes:
[0006] Establish an energy storage system battery operation model based on the impact of battery discharge depth and working environment on the energy storage system battery;
[0007] Aiming at the risks generated by low-profit scenarios in the optimal dispatch of virtual power plants, a risk measurement model is established using conditional value at risk as a risk measurement technique;
[0008] The battery operation model of the energy storage system is combined with the risk measurement model to establish a virtual power plant optimization scheduling model with the objective function of maximizing grid profit and minimizing pollution emissions within the virtual power plant optimization scheduling cycle;
[0009] The virtual power plant optimization scheduling model is solved in MATLAB to obtain the optimal scheduling plan of the virtual power plant.
[0010] Furthermore, the battery type of the energy storage system is a lead-acid battery, and the energy storage system battery operation model includes energy storage system battery charging and discharging power constraints, energy storage system battery charging and discharging state constraints, energy storage system battery state of charge constraints, energy storage system battery life constraints and energy storage system battery degradation costs.
[0011] Furthermore, the energy storage system battery charging and discharging power constraints are:
[0012]
[0013] In the above formula, and They represent the charging power and discharging power of the energy storage system battery at time t respectively; and Respectively represent the maximum charging power and maximum discharging power of the energy storage system battery; s chr,t and dis,t They represent the state variables of battery charging and discharging of the energy storage system at time t respectively;
[0014] The battery charging and discharging state constraints of the energy storage system are:
[0015]
[0016] The battery state of charge constraint of the energy storage system is:
[0017]
[0018] In the above formula, and They represent the upper and lower limits of the battery charge state of the energy storage system respectively; E soc,t Indicates the state of charge of the energy storage system battery at time t; E soc,0 and E soc,24 Respectively represent the state of charge of the energy storage system battery at t=0 and t=24; and Respectively represent the initial state of charge and final state of charge of the battery of the energy storage system; η chr and η dis They represent the charging efficiency and discharging efficiency of the energy storage system battery respectively;
[0019] Energy storage system battery life constraints:
[0020] The battery life of the energy storage system is affected by the battery discharge depth and ambient temperature. The combined impact of discharge depth and ambient temperature on the battery life of the energy storage system is:
[0021]
[0022] In the above formula, L Ris the rated cycle life of the battery, determined by the manufacturer; L V Represents the life of the battery in the energy storage system of the virtual power plant; N T Indicates that the battery life of the energy storage system depends on the number of battery cycles at ambient temperature; N DoD Indicates the number of battery cycles that the battery life of the energy storage system depends on the depth of discharge;
[0023] The battery degradation cost of the energy storage system is:
[0024]
[0025] In the above formula, represents the battery degradation cost of the energy storage system; f lc For labor costs; It is a reference depth of discharge, determined by the manufacturer.
[0026] Furthermore, the risk measurement model includes risk measurement constraints and risk measurement functions.
[0027] Furthermore, the risk measurement constraint is:
[0028]
[0029] In the above formula, and γ k Auxiliary variables for calculating conditional value at risk; represents the market electricity price at time t; represents the retail price of electricity at time t; represents the heating price at time t; is the market transaction electricity at time t under scenario k, When , it indicates the electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t; represents the heat load demand at time t; is the operating cost of the CHP unit at time t; is the operating cost of the heating unit only at time t; represents the battery degradation cost of the energy storage system;
[0030] The risk measurement function is:
[0031]
[0032] In the above formula, R is the risk measurement function generated by the low-profit scenario; σ is the confidence level that needs to be met for the low-profit scenario to be generated. In this embodiment, the confidence level that needs to be met for the low-profit scenario to be generated is σ=0.9; K represents the number of scenarios; ρ k represents the probability of scene k appearing.
[0033] Furthermore, the virtual power plant optimization scheduling model consists of a wind turbine operation model, a photovoltaic power generation model, a cogeneration unit operation constraint, a heat-only unit operation constraint, and an energy balance constraint.
[0034] Furthermore, the wind turbine operation model is:
[0035] For wind turbines, the main consideration is the impact of wind speed on wind turbine output. The wind turbine output is expressed as follows:
[0036]
[0037] In the above formula, represents the total output of wind turbines at time t under scenario k; Indicates the rated power of the wind turbine N w is the number of wind turbines; v k,t represents the real-time wind speed at time t in scenario k; v in Indicates the cut-in wind speed of the wind turbine; υ out Indicates the cut-out wind speed of the wind turbine; υ r Indicates the rated wind speed of the wind turbine;
[0038] The photovoltaic power generation model is:
[0039] For photovoltaic power generation, the main consideration is the impact of temperature on photovoltaic modules. The photovoltaic output is expressed as follows:
[0040]
[0041] In the above formula, represents the total output of photovoltaic modules at time t under scenario k; Npv is the number of photovoltaic modules; F pv is the filling factor of the photovoltaic module; V k,t and I k,t They represent the voltage and current flowing through the PV module at time t in scenario k respectively;
[0042] The operation constraint of the CHP unit is composed of the output constraint of the CHP unit and the operating cost of the CHP unit. The output constraint of the CHP unit is:
[0043]
[0044] In the above formula, represents the power generation of the cogeneration unit at time t; represents the heat production of the cogeneration unit at time t; A, B, C and D are the four marginal points of the feasible operation area of the cogeneration unit; is the state variable of the cogeneration unit at time t, Indicates that the cogeneration unit is in operation. Indicates that the cogeneration unit is in shutdown state; M is a positive number;
[0045] The operating costs of a cogeneration unit include startup costs, shutdown costs, and operating costs, which are specifically expressed as follows:
[0046]
[0047] In the above formula, and represent the startup cost and shutdown cost of the CHP unit, respectively; and They represent the startup mode and shutdown mode of the cogeneration unit at time t respectively; represents the operating cost of the CHP unit;
[0048] Among them, the startup mode and shutdown mode of the cogeneration unit are specifically described as follows:
[0049]
[0050] The operating cost of a combined heat and power unit is specifically expressed as follows:
[0051]
[0052] In the above formula, and All are cost coefficients for electricity generation from cogeneration units; and Cost factor for providing heat to the CHP unit;
[0053] The operation constraint of the heating unit only consists of the heating constraint of the heating unit only and the operation cost of the heating unit only. The heating constraint of the heating unit only is:
[0054]
[0055] In the above formula, Indicates the heating capacity of the heating unit at time t; H h,max Indicates the maximum heating capacity of the heating unit only;
[0056] The operating cost of the heating unit alone is:
[0057]
[0058] In the above formula, a h , b h and c h Cost coefficient for heating only units;
[0059] The energy balance constraint consists of the power balance constraint and the heat balance constraint. The power balance constraint is:
[0060]
[0061] In the above formula, represents the total output of wind turbines at time t under scenario k; represents the total output of the PV panels at time t under scenario k; represents the power generation of the cogeneration unit at time t; Represents the discharge power of the energy storage system battery at time t; is the market transaction electricity at time t under scenario k, When , it indicates the electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t in scenario k; represents the power generation of the cogeneration unit at time t;
[0062] The heat balance constraint is:
[0063]
[0064] In the above formula, represents the waste heat released to the atmosphere at time t; represents the heat production of the cogeneration unit at time t; Indicates the heating amount of the heating unit only at time t.
[0065] Furthermore, in establishing the virtual power plant optimization dispatching model, the objective function of the virtual power plant optimization dispatching model is constructed with the maximum grid profit and the minimum pollution emission within the dispatching period. The objective function is as follows:
[0066]
[0067] In the above formula, F1 is the profit function of the power grid; F2 is the pollution emission function; Φ is the risk weight coefficient, which is between 0 and 1; T represents time; K represents the number of scenarios; ρ k represents the probability of scene k appearing; represents the market electricity price at time t; represents the retail price of electricity at time t; represents the heating price at time t; is the market transaction electricity at time t under scenario k, When , it indicates the electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t; represents the heat load demand at time t t chsis the operating cost of the cogeneration unit at time t; f t h is the operating cost of the heating unit at time t; f t stc represents the degradation cost of the energy storage system battery at time t; and They represent the pollution emissions of the electricity market, heat-only units and combined heat and power units, respectively.
[0068] By means of the above technical solution, the present invention provides a virtual power plant optimization scheduling method considering pollution emissions and low profit risks, which has at least the following beneficial effects:
[0069] 1. The virtual power plant optimization scheduling method proposed in the present invention can effectively improve the profit of the optimal operation scheduling of the virtual power plant, reduce the pollution emissions of conventional units in the virtual power plant, and is more conducive to the virtual power plant operator to make the best bid.
[0070] 2. The present invention takes into account the impact of deep discharge and working environment on the batteries of the energy storage system, realizes the mathematical description of the degradation cost of the batteries of the energy storage system, and incorporates the conditional risk value into the model, avoiding the risks generated by low-profit scenarios. It takes the maximum profit of the power grid and the minimum pollution emissions as the optimization goals, and realizes the optimal scheduling planning of the virtual power plant.
[0071] 3. The present invention analyzes cases with different risk weight coefficients: Φ=0, Φ=0.5 and Φ=1, and compares the scheduling results. It can be seen that the scheduling result with the risk weight coefficient Φ=0.5 is very beneficial for the virtual power plant operator to make the best operation plan, and is also beneficial for the virtual power plant operator to make the best bid. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0073] Figure 1 It is a schematic diagram of the feasible area of electric heating of the cogeneration unit of the present invention;
[0074] Figure 2 The structure diagram of the 22-node interconnected power system improved by the present invention;
[0075] Figure 3 It is a wind speed value curve diagram under different scenarios of the present invention;
[0076] Figure 4 It is a curve diagram of solar radiation intensity value under different scenes of the present invention;
[0077] Figure 5Schematic diagram of probability values of different scenarios of the present invention;
[0078] Figure 6 This is the power optimal scheduling result diagram of Case A of the present invention;
[0079] Figure 7 This is the optimal scheduling result diagram of heat supply in Case A of the present invention;
[0080] Figure 8 This is the power optimal scheduling result diagram of Case B of the present invention;
[0081] Fig. 9 This is the optimal scheduling result diagram of heat supply in Case B of the present invention;
[0082] Fig.10 This is the power optimal scheduling result diagram of Case C of the present invention;
[0083] Fig.11 This is the optimal scheduling result diagram of heat supply in Case C of the present invention;
[0084] Fig.12 This is a schematic diagram comparing the hourly profits of Cases A, B, and C of the present invention;
[0085] Fig.13 This is a schematic diagram comparing the hourly pollution emissions of Cases A, B, and C of the present invention. DETAILED DESCRIPTION
[0086] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods, so that the implementation process of how the present application uses technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly.
[0087] Virtual power plants (VPPs) can aggregate decentralized resources, dynamically optimize energy production and consumption, and allow only energy to be consumed in a distributed environment through optimized management of demand and generation. They effectively promote various renewable energy sources (RES) and other distributed energy resources (DER) to participate in the energy trading market, and can better compensate and predict possible deviations between production and demand. They are a favorable tool for integrating RES to promote grid balance. Virtual power plants mainly rely on energy storage systems (ESS) to integrate RES. Energy storage systems achieve supply and demand balance of the power grid by providing ancillary services and load tracking, thereby improving the stability of the power system. Batteries in energy storage systems have a certain cycle life, which will be shortened due to deep discharge and high temperature working environment of batteries. At present, most of the research on energy storage systems for optimal scheduling of virtual power plants focuses on energy utilization, ignoring the impact of the degradation cost of energy storage systems on the optimal scheduling of virtual power plant decisions. At the same time, the optimal scheduling and bidding of virtual power plants also need to consider the pollution emissions generated by conventional units in virtual power plants and the risks of low-profit scenarios. Existing research lacks comprehensive research on the degradation costs of energy storage systems, pollution emissions in the operation and scheduling of virtual power plants, and the risks of low-profit scenarios.
[0088] To address the impact of the degradation cost of energy storage systems, pollution emissions in virtual power plant operation and scheduling, and the risk of low profit scenarios on the optimal scheduling of virtual power plants, please refer to Figure 1-Figure 13 This embodiment proposes a virtual power plant optimization scheduling method that takes into account pollution emissions and low profit risks, which can effectively improve the profit of the optimal operation scheduling of the virtual power plant, reduce the pollution emissions of conventional units in the virtual power plant, and is more conducive to the virtual power plant operator to make the best bid. The method includes the following processes:
[0089] The energy storage system battery operation model is established based on the impact of battery discharge depth and working environment on the energy storage system battery. Among them, the energy storage system battery type is lead-acid battery, and the energy storage system battery operation model includes energy storage system battery charge and discharge power constraints, energy storage system battery charge and discharge state constraints, energy storage system battery charge state constraints, energy storage system battery life constraints and energy storage system battery degradation cost.
[0090] Energy storage system battery charging and discharging power constraints:
[0091]
[0092] In the above formula, and They represent the charging power and discharging power of the energy storage system battery at time t respectively; and Respectively represent the maximum charging power and maximum discharging power of the energy storage system battery; s chr,t and dis,t They represent the state variables of the energy storage system battery charging and discharging at time t respectively.
[0093] Energy storage system battery charging and discharging state constraints:
[0094] The energy storage system battery cannot be in the charging state and discharging state at the same time, so the energy storage system battery charging and discharging state is constrained as follows:
[0095]
[0096] Energy storage system battery state of charge constraints:
[0097]
[0098] In the above formula, and They represent the upper and lower limits of the battery charge state of the energy storage system respectively; E soc,t Indicates the state of charge of the energy storage system battery at time t; E soc,0 and E soc,24 Respectively represent the state of charge of the energy storage system battery at t=0 and t=24; and Respectively represent the initial state of charge and final state of charge of the battery of the energy storage system; η chr and η dis They represent the charging efficiency and discharging efficiency of the energy storage system battery respectively.
[0099] Energy storage system battery life constraints:
[0100] The battery life of the energy storage system is affected by the battery discharge depth and ambient temperature, namely:
[0101] The impact of discharge depth on the battery life of energy storage systems:
[0102]
[0103] In the above formula, DoD t Indicates the discharge depth of the energy storage system battery at time t; DoD av represents the average discharge depth; T represents the total number of time periods, T = 24; N DoD Indicates that the battery life of the energy storage system depends on the number of battery cycles at the depth of discharge; d1 and d2 are the dependence coefficients of the cycle life of the lead-acid battery on the depth of discharge.
[0104] Impact of ambient temperature on battery life of energy storage system:
[0105] N T =τ1×exp(τ2T c ) (5)
[0106] In the above formula, N T Indicates that the battery life of the energy storage system depends on the number of battery cycles at the ambient temperature; τ1 and τ2 are both the dependence coefficients of the cycle life of the lead-acid battery on the ambient temperature; T c Indicates room temperature.
[0107] Then, the combined impact of discharge depth and ambient temperature on the battery life of the energy storage system is:
[0108]
[0109] In the above formula, L R is the rated cycle life of the battery, determined by the manufacturer; L V Represents the life of the battery in the energy storage system of the virtual power plant.
[0110] Energy storage system battery degradation cost:
[0111]
[0112] In the above formula, represents the battery degradation cost of the energy storage system; f lc For labor costs; It is a reference depth of discharge, determined by the manufacturer.
[0113] This embodiment constructs an energy storage system battery operation model, takes into account the impact of deep discharge and working environment on the energy storage system battery, and realizes a mathematical description of the degradation cost of the energy storage system battery.
[0114] Aiming at the risks generated by low-profit scenarios in the optimal scheduling of virtual power plants, a risk measurement model is established using conditional risk value as a risk measurement technology. The risk measurement model includes risk measurement constraints and risk measurement functions. The risk measurement model includes:
[0115] Risk measurement constraints:
[0116]
[0117] In the above formula, and γ k The auxiliary variable T for calculating conditional VaR represents time; Represents the market electricity price at time t; represents the retail price of electricity at time t; represents the heating price at time t; is the market transaction electricity at time t under scenario k, When , it indicates the electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t; represents the heat load demand at time t; is the operating cost of the CHP unit at time t; is the operating cost of the heating unit only at time t; Represents the degradation cost of the energy storage system battery at time t.
[0118] Risk measurement function:
[0119]
[0120] In the above formula, R is the risk measurement function generated by the low-profit scenario; σ is the confidence level that needs to be met for the low-profit scenario to be generated. In this embodiment, the confidence level that needs to be met for the low-profit scenario to be generated is σ=0.9; K represents the number of scenarios; ρ k represents the probability of scene k appearing.
[0121] This embodiment avoids the risks caused by low-profit scenarios by constructing a risk measurement model and incorporating conditional risk value into the risk measurement model.
[0122] The battery operation model of the energy storage system is combined with the risk measurement model to establish a virtual power plant optimization scheduling model with the objective function of maximizing grid profit and minimizing pollution emissions within the virtual power plant optimization scheduling period. The virtual power plant optimization scheduling model consists of a wind turbine operation model, a photovoltaic power generation model, cogeneration unit operation constraints, heat-only unit operation constraints, and energy balance constraints.
[0123] Wind turbine operation model:
[0124] For wind turbines, the main consideration is the impact of wind speed on wind turbine output. The wind turbine output is expressed as follows:
[0125]
[0126] In the above formula, represents the total output of wind turbines at time t under scenario k; Indicates the rated power of the wind turbine; N w is the number of wind turbines; v k,t represents the real-time wind speed at time t in scenario k; v in Indicates the cut-in wind speed of the wind turbine; u out Indicates the cut-out wind speed of the wind turbine; υ r Indicates the rated wind speed of the wind turbine.
[0127] Photovoltaic power generation model:
[0128] For photovoltaic power generation, the main consideration is the impact of temperature on photovoltaic modules. The photovoltaic output is expressed as follows:
[0129]
[0130] In the above formula, represents the total output of photovoltaic modules at time t under scenario k; Npv is the number of photovoltaic modules; F pv is the filling factor of the photovoltaic module; V k,t and I k,t They represent the voltage and current flowing through the PV panel at time t in scenario k respectively.
[0131] Among them, the filling factor of the photovoltaic module is:
[0132]
[0133] In the above formula, V max and I max Respectively represent the voltage and current when the photovoltaic module operates at the maximum power point; V oc Indicates the open circuit voltage of the photovoltaic module; I sc Indicates the short-circuit current of the PV module.
[0134] The voltage of the photovoltaic module is:
[0135]
[0136] In the above formula, F v is the voltage temperature coefficient of the PV module; Represents the temperature of the PV panel at time t in scenario k.
[0137] The current of the photovoltaic module is:
[0138]
[0139] In the above formula, F i is the current temperature coefficient of the photovoltaic module; represents the solar radiation intensity at time t in scene k; T r It is room temperature.
[0140] Temperature of PV panels:
[0141]
[0142] In the above formula, represents the ambient temperature at time t in scenario k; T noc is the nominal operating temperature of the photovoltaic module; T c For normal temperature.
[0143] Cogeneration unit operation constraints:
[0144] Among them, the operation constraints of the cogeneration unit are composed of the output constraints of the cogeneration unit and the operating costs of the cogeneration unit.
[0145] The output constraint of the cogeneration unit is:
[0146] The feasible operation area technology is used to construct the operation model of the cogeneration unit. The feasible operation area is the area in the cogeneration that can generate both heat energy and electricity, and the two are independent of each other. The feasible area of electricity and heat of the cogeneration unit is as follows: Figure 1 The specific construction method is as follows:
[0147]
[0148] In the above formula, represents the power generation of the cogeneration unit at time t; represents the heat production of the cogeneration unit at time t; A, B, C and D are the four marginal points of the feasible operation area of the cogeneration unit; is the state variable of the cogeneration unit at time t, Indicates that the cogeneration unit is in operation. Indicates that the cogeneration unit is in shutdown state; M is a large positive number.
[0149] The operating cost of a combined heat and power unit is:
[0150] The operating costs of a cogeneration unit include startup costs, shutdown costs, and operating costs, which are specifically expressed as follows:
[0151]
[0152] In the above formula, and represent the startup cost and shutdown cost of the CHP unit, respectively; and They represent the startup mode and shutdown mode of the cogeneration unit at time t respectively; Represents the operating cost of the combined heat and power unit.
[0153] Among them, the startup mode and shutdown mode of the cogeneration unit are specifically described as follows:
[0154]
[0155] The operating cost of a combined heat and power unit is specifically expressed as follows:
[0156]
[0157] In the above formula, and All are cost coefficients for electricity generation from cogeneration units; and Cost factor for providing heat to a combined heat and power unit.
[0158] Only heating unit operation constraints:
[0159] Among them, the operation constraint of the heating-only unit is composed of the heating constraint of the heating-only unit and the operation cost of the heating-only unit.
[0160] Heating constraints for heating units only:
[0161]
[0162] In the above formula, Indicates the heating capacity of the heating unit at time t; H h,max Indicates the maximum heating capacity of the heating unit only.
[0163] Operating costs of heating units only:
[0164]
[0165] In the above formula, a h , b h and c h It is the cost coefficient of heating provided by heating unit only.
[0166] Energy balance constraints:
[0167] The energy balance constraint consists of power balance constraint and heat balance constraint.
[0168] The power balance constraint is:
[0169] The total power generated by wind turbines, photovoltaic panels, cogeneration units and energy storage system battery discharge must be equal to the sum of the power sold or purchased from the market (sale is positive, purchase is negative), the power consumed by the power load and the charging power of the energy storage system battery, as expressed as follows:
[0170]
[0171] In the above formula, represents the total output of wind turbines at time t under scenario k; represents the total output of the PV panels at time t under scenario k; represents the power generation of the cogeneration unit at time t; represents the discharge power of the energy storage system battery at time t; is the market transaction electricity at time t under scenario k, When , it indicates the electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t in scenario k; Represents the power generation of the cogeneration unit at time t.
[0172] The heat balance constraint is:
[0173] The heat generated by the combined heat and power units and the heat-only units must meet the heat load requirements while also considering the heat dissipation, as described below:
[0174]
[0175] In the above formula, represents the waste heat released to the atmosphere at time t; represents the heat production of the cogeneration unit at time t; Indicates the heating amount of the heating unit only at time t.
[0176] This embodiment realizes the optimal scheduling planning of the virtual power plant by constructing a virtual power plant optimization scheduling model with maximizing grid profit and minimizing pollution emissions as the optimization goals.
[0177] In this embodiment, the objective function of the virtual power plant optimization scheduling model is constructed to maximize the grid profit and minimize the pollution emissions within the scheduling period.
[0178] The grid profit maximization model incorporates conditional risk value into the model, aiming to avoid risks and maximize profits by considering risk assessment of low-profit scenarios; pollution emissions include electricity market pollution emissions, pollution emissions from heating units only, and pollution emissions from cogeneration units.
[0179] The objective function is as follows:
[0180]
[0181] In the above formula, F1 is the profit function of the power grid; F2 is the pollution emission function; Φ is the risk weight coefficient, which is between 0 and 1; and They represent the pollution emissions of the electricity market, heat-only units and combined heat and power units, respectively.
[0182] This embodiment realizes the optimal scheduling planning of the virtual power plant by constructing a virtual power plant optimization scheduling model with maximizing grid profit and minimizing pollution emissions as the optimization goals.
[0183] The virtual power plant optimization scheduling model is solved in MATLAB to obtain the optimal scheduling plan of the virtual power plant. Specifically, this embodiment takes the improved 380KV, 22-node power system as an example, and forms a virtual power plant optimization scheduling model on the power system, wherein the virtual power plant optimization scheduling model includes 3 wind turbines, 50 photovoltaic modules, 1 cogeneration unit, 1 heating unit and 1 energy storage system, and its topology is as follows: Figure 2 shown.
[0184] Step 1: First, establish the battery operation model of the energy storage system. The parameters of the lead-acid battery are shown in Table 1:
[0185] Table 1 Aluminum acid battery parameters
[0186]
[0187]
[0188] Step 2: Establish a risk measurement model and take the low-profit scenario to generate the confidence level that needs to be met σ =0.9.
[0189] Step 3: Construct a virtual power plant optimization dispatch model, where the parameters of the wind turbine operation model are shown in Table 2:
[0190] Table 2 Wind turbine parameters
[0191]
[0192] The parameters of the photovoltaic power generation model are shown in Table 3:
[0193] Table 3 PV module parameters
[0194]
[0195] The parameters of the cogeneration unit are shown in Table 4:
[0196] Table 4 Cogeneration unit parameters
[0197]
[0198]
[0199] The parameters of the heating unit only are shown in Table 5:
[0200] Table 5 Parameters of heating unit only
[0201]
[0202] In the third step, 10 scenarios were selected in the constructed wind turbine operation model and photovoltaic power generation model based on historical wind speed and solar radiation data, such as Figure 3 , Figure 4 As shown. The sum of the probabilities of the 10 scenarios is 1, as Figure 5 shown.
[0203] In order to study the impact of risk weight coefficient on virtual power plant scheduling planning, this paper will set up three cases:
[0204] Case A, optimal operation and dispatch of the virtual power plant without considering risks, that is, Φ=0.
[0205] Case B, the optimal operation and dispatch of the virtual power plant taking both risk and profit into consideration, i.e. Φ = 0.5.
[0206] Case C, optimal scheduling of virtual power plant operation with complete risk avoidance, i.e. Φ=1.
[0207] The virtual power plant optimization scheduling model is used to consider all the objective functions and constraints mentioned above.
[0208] Case A models the optimal dispatch of the virtual power plant by taking Φ = 0, ignoring the risks of low-profit scenarios, maximizing profits and minimizing pollution emissions. In Case A, the optimal operation dispatch of the virtual power plant is as follows: Figure 6 and Figure 7 As shown, the daily profit of the virtual power plant is 15,894.378 yuan and the daily pollution emissions are 31,850.159 kg.
[0209] Case B takes Φ = 0.5 to model the optimal dispatch of the virtual power plant, weighting profit and risk equally, maximizing profit and minimizing pollution emissions. In case B, the optimal operation dispatch of the virtual power plant is as follows: Figure 8 and Fig. 9 As shown, the daily profit of the virtual power plant is 15,281.607 yuan and the daily pollution emissions are 28,689.944 kg.
[0210] Case C takes Φ = 1 to model the optimal dispatch of the virtual power plant, fully considers the risks generated by low-profit scenarios, conducts risk avoidance, maximizes profits and minimizes pollution emissions. In Case C, the optimal operation dispatch of the virtual power plant is as follows: Fig.10 and Fig.11 As shown, the daily profit of the virtual power plant is 10,096.783 yuan and the daily pollution emissions are 26,235.606 kg.
[0211] according to Fig.12It can be seen that the hourly profit of Case B is slightly lower than that of Case A, and the hourly profit of Case C is lower than that of Case A and Case B. It can be concluded that the conditional risk value method is to maximize profits under the condition of minimum profits. The virtual power plant operator of Case A does not consider the risks generated by low-profit scenarios. No matter how large the risks are, the goal is to obtain the highest possible profits; the virtual power plant operator of Case B incorporates the risks generated by low-profit scenarios into the virtual power plant optimization scheduling model, giving equal weight to risks and profits, with the goal of obtaining a more ideal profit value; the virtual power plant operator of Case C is more conservative, fully considering the risks generated by low-profit scenarios, with the goal of completely avoiding the risks generated by minimum profits.
[0212] according to Fig.13 It can be seen that the pollution emissions of Case A are higher than those of Case B and Case C, and the pollution emissions of Case B are higher than those of Case C. Fig.12 and Fig.13 ,Comparing the profit values and pollution emissions of Case A, Case B and Case C, the results show that the profit decreases with the increase of Φ value, while the risk generated by low profit scenarios also decreases, and the pollution emissions also decrease. Therefore, the optimal scheduling model of the virtual power plant in Case B is more conducive to the optimal operation scheduling of the virtual power plant operator, and is also conducive to the virtual power plant operator to make the best bid.
[0213] This embodiment analyzes the cases with different risk weight coefficients: Φ = 0, Φ = 0.5 and Φ = 1, and compares the dispatch results. It can be seen that the dispatch result with risk weight coefficient Φ = 0.5 is very beneficial for the virtual power plant operator to make the best operation plan, and also beneficial for the virtual power plant operator to make the best bid. Therefore, the virtual power plant optimization dispatching method proposed in the present invention can effectively improve the profit of the optimal operation dispatching of the virtual power plant, reduce the pollution emissions of conventional units in the virtual power plant, and is more conducive to the virtual power plant operator to make the best bid.
[0214] This embodiment also provides a computer device, which includes a processor, a memory, a network interface, an input device and a display screen connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory includes a storage medium and an internal memory. The storage medium can be a non-volatile storage medium or a volatile storage medium. The storage medium stores an operating system and can also store computer-readable instructions. When the computer-readable instructions are executed by the processor, the processor can implement the virtual power plant optimization scheduling method. The internal memory provides an environment for the operation of the operating system and computer-readable instructions in the storage medium. The internal memory can also store computer-readable instructions. When the computer-readable instructions are executed by the processor, the processor can execute the virtual power plant optimization scheduling method. The network interface of the computer device is used to communicate with an external server through a network connection. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the housing of the computer device, or an external keyboard, touchpad or mouse.
[0215] Those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, so the present application can take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application can take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0216] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the above embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.
[0217] The above implementation methods have been described in detail. Specific examples are used herein to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.
Claims
1. A virtual power plant optimization scheduling method considering pollution emissions and low profit risks, characterized in that: The Method The process includes: Establish an energy storage system battery operation model based on the impact of battery discharge depth and working environment on the energy storage system battery; Aiming at the risks generated by low-profit scenarios in the optimal dispatch of virtual power plants, a risk measurement model is established using conditional value at risk as a risk measurement technique; The battery operation model of the energy storage system is combined with the risk measurement model to establish a virtual power plant optimization scheduling model with the objective function of maximizing grid profit and minimizing pollution emissions within the virtual power plant optimization scheduling cycle; The virtual power plant optimization scheduling model is solved in MATLAB to obtain the optimal scheduling plan of the virtual power plant.
2. The virtual power plant optimization scheduling method according to claim 1, characterized in that: The battery type of the energy storage system is lead-acid battery, and the energy storage system battery operation model includes energy storage system battery charging and discharging power constraints, energy storage system battery charging and discharging state constraints, energy storage system battery charge state constraints, energy storage system battery life constraints and energy storage system battery degradation costs.
3. The virtual power plant optimization scheduling method according to claim 2 is characterized in that: The energy storage system battery charging and discharging power constraints are: In the above formula, and They represent the charging power and discharging power of the energy storage system battery at time t respectively; and Respectively represent the maximum charging power and maximum discharging power of the energy storage system battery; s chr,t and dis,t They represent the state variables of battery charging and discharging of the energy storage system at time t respectively; The battery charging and discharging state constraints of the energy storage system are: The battery state of charge constraint of the energy storage system is: In the above formula, and They represent the upper and lower limits of the battery charge state of the energy storage system respectively; E soc,t Indicates the state of charge of the energy storage system battery at time t; E soc,0 and E soc,24 Respectively represent the state of charge of the energy storage system battery at t=0 and t=24; and They represent the initial state of charge and final state of charge of the battery of the energy storage system respectively; η chr and η dis They represent the charging efficiency and discharging efficiency of the energy storage system battery respectively; Energy storage system battery life constraints: The battery life of the energy storage system is affected by the battery discharge depth and ambient temperature. The combined impact of discharge depth and ambient temperature on the battery life of the energy storage system is: In the above formula, L R is the rated cycle life of the battery, determined by the manufacturer; L V Represents the life of the battery in the energy storage system of the virtual power plant; N T Indicates that the battery life of the energy storage system depends on the number of battery cycles at ambient temperature; N DoD Indicates the number of battery cycles that the battery life of the energy storage system depends on the depth of discharge; The battery degradation cost of the energy storage system is: In the above formula, represents the battery degradation cost of the energy storage system; f lc For labor costs; It is a reference depth of discharge, determined by the manufacturer.
4. The virtual power plant optimization scheduling method according to claim 1, characterized in that: The risk measurement model includes risk measurement constraints and risk measurement functions.
5. The virtual power plant optimization scheduling method according to claim 4 is characterized in that: The risk measurement constraint is: In the above formula, and γk are auxiliary variables for calculating conditional value at risk; represents the market electricity price at time t; represents the retail price of electricity at time t; represents the heating price at time t; is the market transaction electricity at time t under scenario k, When , it indicates the amount of electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t; represents the heat load demand at time t; is the operating cost of the CHP unit at time t; is the operating cost of the heating unit only at time t; represents the battery degradation cost of the energy storage system; The risk measurement function is: In the above formula, R is the risk measurement function generated by the low-profit scenario; σ is the confidence level that needs to be met for the low-profit scenario to be generated. In this embodiment, the confidence level that needs to be met for the low-profit scenario to be generated is σ=0.9; K represents the number of scenarios; ρ k represents the probability of scene k appearing.
6. The virtual power plant optimization scheduling method according to claim 1, characterized in that: The virtual power plant optimization scheduling model consists of a wind turbine operation model, a photovoltaic power generation model, a cogeneration unit operation constraint, a heat-only unit operation constraint, and an energy balance constraint.
7. The virtual power plant optimization scheduling method according to claim 6, characterized in that: The wind turbine operation model is: For wind turbines, the main consideration is the impact of wind speed on wind turbine output. The wind turbine output is expressed as follows: In the above formula, represents the total output of wind turbines at time t under scenario k; Indicates the rated power of the wind turbine; N w is the number of wind turbines; k,t represents the real-time wind speed at time t in scene k; in Indicates the cut-in wind speed of the wind turbine; υ out Indicates the cut-out wind speed of the wind turbine; υ r Indicates the rated wind speed of the wind turbine; The photovoltaic power generation model is: For photovoltaic power generation, the main consideration is the impact of temperature on photovoltaic modules. The photovoltaic output is expressed as follows: In the above formula, represents the total output of the photovoltaic module at time t under scenario k; N pυ is the number of photovoltaic modules; F pυ is the filling factor of the photovoltaic module; V k,t and I k,t They represent the voltage and current flowing through the PV module at time t in scenario k respectively; The operation constraint of the CHP unit is composed of the output constraint of the CHP unit and the operating cost of the CHP unit. The output constraint of the CHP unit is: In the above formula, represents the power generation of the cogeneration unit at time t; represents the heat production of the cogeneration unit at time t; A, B, C and D are the four marginal points of the feasible operation area of the cogeneration unit; is the state variable of the cogeneration unit at time t, Indicates that the cogeneration unit is in operation. Indicates that the cogeneration unit is in shutdown state; M is a positive number; The operating costs of a cogeneration unit include startup costs, shutdown costs, and operating costs, which are specifically expressed as follows: In the above formula, and represent the startup cost and shutdown cost of the CHP unit, respectively; and They represent the startup mode and shutdown mode of the cogeneration unit at time t respectively; represents the operating cost of the CHP unit; Among them, the startup mode and shutdown mode of the cogeneration unit are specifically described as follows: The operating cost of a combined heat and power unit is specifically expressed as follows: In the above formula, and All are cost coefficients for electricity generation from cogeneration units; and Cost factor for providing heat to the CHP unit; The operation constraint of the heating unit only consists of the heating constraint of the heating unit only and the operation cost of the heating unit only. The heating constraint of the heating unit only is: In the above formula, Indicates the heating capacity of the heating unit at time t; H h,max Indicates the maximum heating capacity of the heating unit only; The operating cost of the heating unit alone is: In the above formula, a h 、b h and c h Cost coefficient for heating only units; The energy balance constraint consists of the power balance constraint and the heat balance constraint. The power balance constraint is: In the above formula, represents the total output of wind turbines at time t under scenario k; represents the total output of the PV panels at time t under scenario k; represents the power generation of the cogeneration unit at time t; Represents the discharge power of the energy storage system battery at time t; is the market transaction electricity at time t under scenario k, When , it indicates the electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t in scenario k; represents the power generation of the cogeneration unit at time t; The heat balance constraint is: In the above formula, represents the waste heat released to the atmosphere at time t; represents the heat production of the cogeneration unit at time t; Indicates the heating amount of the heating unit only at time t.
8. The virtual power plant optimization scheduling method according to claim 1, characterized in that: In establishing the virtual power plant optimization dispatching model, the objective function of the virtual power plant optimization dispatching model is constructed by maximizing the grid profit and minimizing the pollution emission within the dispatching period. The objective function is as follows: In the above formula, F1 is the profit function of the power grid; F2 is the pollution emission function; Φ is the risk weight coefficient, which is between 0 and 1; T represents time; K represents the number of scenarios; ρ k represents the probability of scene k appearing; represents the market electricity price at time t; represents the retail price of electricity at time t; represents the heating price at time t; is the market transaction electricity at time t under scenario k, When , it indicates the amount of electricity sold. When , it indicates the amount of electricity purchased; represents the power supply at time t; represents the heat load demand at time t t chs is the operating cost of the cogeneration unit at time t; f t h is the operating cost of the heating unit at time t; f t stc represents the degradation cost of the energy storage system battery at time t; and They represent the pollution emissions of the electricity market, heat-only units and combined heat and power units, respectively.
9. A computer-readable storage medium, characterized in that: It stores computer executable instructions, which, when executed by a processor, implement the virtual power plant optimization scheduling method described in any one of claims 1 to 8.
10. A computer device, characterized in that: It includes a processor and a memory, the memory is used to store a computer program, and when the computer program is executed by the processor, it implements the virtual power plant optimization scheduling method as described in any one of claims 1 to 8.
Citation Information
Cited By
Country light-biogas virtual power plant energy optimization operation method and system considering energy storage degradation
CN119543121A
Energy optimization operation method and system of rural light-moore virtual power plant considering energy storage degradation
CN119543121B