Human resource optimal configuration method and system

By extracting and analyzing employee historical and current data from the human resources information system, and using convolutional neural networks to evaluate resource allocation, the problem of uneven resource allocation in human resource management is solved, and the scientific rationality and efficiency improvement of task allocation are achieved.

CN118735476AActive Publication Date: 2024-10-01罗丹 +3

Patent Information

Application Number
CN202410926544.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-01
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

Existing human resource management methods are difficult to achieve precise balance and optimization of resource allocation. Traditional manual scheduling relies on subjective experience, and automated methods lack comprehensive analysis of employee historical data and current status, resulting in uneven resource allocation and low efficiency.

Method used

By extracting employee history records and current status information from the human resources information system, perform data preprocessing and feature extraction, use convolutional neural networks to build resource allocation analysis models, calculate comprehensive capability coefficients and task complexity coefficients, evaluate saturation evaluation index, and set balance thresholds Determine resource balance status and issue optimization instructions.

Benefits of technology

It achieves the scientific rationality of task allocation, improves work efficiency and employee satisfaction, reduces resource waste and employee overwork, provides scientific basis to reduce management blindness and randomness, and improves employee work enthusiasm and overall organizational performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735476A_ABST
    Figure CN118735476A_ABST
Patent Text Reader

Abstract

The invention discloses a human resource optimal configuration method and system, and relates to the technical field of human resources, historical record information and current situation information of each employee are extracted from a human resource information system, so that a multi-aspect employee historical data set and current situation information set are constructed, and through data preprocessing and feature extraction, the human resource optimal configuration is realized. A manager can accurately evaluate the comprehensive ability coefficient Zhxs and the task complex coefficient Rfxs of each employee, so that the tasks are scientifically and reasonably distributed. A resource allocation analysis model constructed by using a convolutional neural network is combined with a comprehensive capability coefficient Zhxs and a task complex coefficient Rfxs, and a saturation evaluation index Bpzs of an employee is obtained through precise fitting, so that the task allocation accuracy is greatly improved through an intelligent evaluation mode, and the uncertainty caused by dependence on experience and subjective judgment in a traditional method is further avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of human resources, and in particular to a method and system for optimizing human resources configuration. Background Art

[0002] In the field of human resource management, the optimization allocation method is the key to ensure the efficient operation of organizational resources. When it comes to task scheduling in human resource management, it is particularly important to reasonably allocate tasks to fully utilize the capabilities of employees and avoid overwork and waste of resources. Especially in terms of employee task scheduling, it is necessary to comprehensively analyze whether human resources are in a balanced state based on the comprehensive capabilities of each employee and the current unprocessed tasks, so as to improve work efficiency and employee satisfaction.

[0003] In the process of task scheduling, existing methods often face many challenges and shortcomings. Traditional manual scheduling methods rely on managers' subjective experience and intuition, which makes it difficult to achieve precise balance and optimization, and thus easily lead to unbalanced resource allocation and inefficiency. Although some existing rule-based automation methods can improve efficiency to a certain extent, they often lack comprehensive analysis of employees' historical data and current status, making it difficult to accurately assess employees' real load and capabilities. In addition, many existing methods lack comprehensive analysis of employees' historical data and current status information, and cannot accurately assess employees' comprehensive capabilities and task complexity. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method and system for optimizing human resource allocation, which solves the problems in the above-mentioned background technology.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for optimizing human resource allocation, comprising the following steps:

[0006] S1. Extract relevant historical record information of each employee from the human resources information system in advance, build an employee historical data set, and track and record relevant current information sets of each employee. According to the relevant current information sets of each employee, extract relevant complex information of the corresponding assigned tasks;

[0007] S2, preprocessing the employee historical data set obtained in step S1 and the relevant status information set of each employee, including data cleaning and data standardization;

[0008] S3. Feature extraction is performed on the preprocessed employee historical data set and the relevant status information set of each employee to obtain the task completion amount Rwc, the error amount Cwz, the number of collaborative workers Xzrw and the reserved time Ysc respectively. The task completion amount Rwc is associated with the error amount Cwz to obtain the comprehensive ability coefficient Zhxs of each employee, and the number of collaborative workers Xzrw is associated with the reserved time Ysc to obtain the current task complexity coefficient Rfxs of each employee. A convolutional neural network is used to construct a trained resource allocation analysis model, and then the comprehensive ability coefficient Zhxs is combined with the task complexity coefficient Rfxs of the corresponding employee to obtain the saturation evaluation index Bpzs of the corresponding employee.

[0009] S4. Pre-set the balance threshold K, and obtain the imbalance rate Shs by comparing the saturation evaluation index Bpzs of each employee. Compare and analyze the imbalance rate Shs with the balance threshold K to comprehensively judge whether the current human resources are in a balanced state in task scheduling. If not, issue a configuration optimization instruction and take corresponding optimization measures.

[0010] Preferably, S1 specifically comprises the following steps:

[0011] S1. Collect and record relevant historical record information of each employee, and track and record relevant current status information of each employee;

[0012] S11, the relevant historical record information includes the task completion amount Rwc and error amount Cwz of each employee's task in each monitoring period;

[0013] S12, the relevant status information set includes relevant pending data information of each employee and relevant complex information of the corresponding assigned tasks, wherein the relevant pending data information of each employee includes the current number of expedited tasks of each employee Jjrz, the reserved time of pending tasks Ysc and the number of collaborative workers of the pending tasks Xzrw;

[0014] The complex information related to the corresponding assigned tasks includes the current amount of tasks to be processed by each employee Drz, and combined with the task completion amount Rwc of each employee in each monitoring period, the average of the task processing amount of each employee in the monitoring period is obtained through the statistical mean algorithm

[0015] Preferably, S2 specifically includes the following steps:

[0016] S21. Detect and delete the repeatedly collected data information to avoid the bias of data duplication on analysis, and identify missing data to detect and repair outliers;

[0017] S22. Standardize the data processed in step S21 using dimensionless processing technology to eliminate unit and dimension differences in the data.

[0018] Preferably, S3 specifically includes the following steps:

[0019] S31. Use convolutional neural networks to preliminarily construct the original model, and train and test the original model with employee historical data sets and related current status information sets. Use the trained original model as a resource identification model, obtain feature information within the resource identification model, and use the obtained feature information to train and test the resource identification model. Use the trained resource identification model as a resource allocation analysis model.

[0020] Preferably, S3 also includes:

[0021] S32. Based on the employee historical data set, the task completion amount Rwc and the error amount Cwz are correlated and then subjected to linear normalization processing to calculate and obtain the comprehensive ability coefficient Zhxs of each employee. Specifically, it is obtained according to the following formula:

[0022]

[0023] Where n is the number of monitoring periods, i = 1, 2, 3, ..., n, Rwc i It is expressed as the amount of tasks completed in the i-th period, It is expressed as the mean value of the task completion in the monitoring period, Cwz i It is expressed as the amount of error in the i-th period, It is expressed as the mean value of the error amount within the monitoring period, α and β are weight coefficients, where 0<α≤1, 0<β≤1, and α+β=1.

[0024] Preferably, S3 also includes:

[0025] S33. According to the relevant status information set, the number of collaborative workers Xzrw is associated with the reserved time Ysc, and then subjected to linear normalization processing to obtain the current task complexity coefficient Rfxs of each employee, which is specifically obtained according to the following formula:

[0026]

[0027] Where Jjrz represents the number of urgent tasks, a1, a2 and a3 represent the weight coefficients of the number of collaborative workers Xzrw, the reserved time Ysc and the number of urgent tasks Jjrz, respectively, where 0<a1≤1, 0<a2≤1, 0<a3≤1, and a1+a2+a3=1, and V represents the correction constant.

[0028] Preferably, S3 also includes:

[0029] S34, by transmitting the task complexity coefficient Rfxs and the comprehensive ability coefficient Zhxs of the corresponding employee to the resource allocation analysis model, and after linear normalization processing, the saturation evaluation index Bpzs of the corresponding employee is obtained, which is specifically obtained according to the following formula:

[0030]

[0031] In the formula, Drz j Represented as the current pending tasks of the jth employee, Rfxs j Expressed as the task complexity coefficient of the jth employee Rfxs, Zhxs j Expressed as the comprehensive ability coefficient of the jth employee, It is expressed as the mean value of the task processing volume of the jth employee during the monitoring period.

[0032] Preferably, S4 specifically comprises the following steps:

[0033] S41, using the saturation evaluation index Bpzs of the corresponding employees obtained in step S34, and using a statistical mean algorithm to calculate the mean of the overall employee saturation evaluation index

[0034] S42, based on the average of the overall employee saturation assessment index The index is then compared with the saturation assessment index Bpzs of each employee to determine the degree to which each employee can bear the current task situation, including the following:

[0035] If the saturation evaluation index Bpzs exceeds the average of the overall employee saturation evaluation index When , the corresponding employee's tolerance to the current task situation will be judged to be in an abnormal state. At this time, the number of employees in the abnormal state Yss will be counted and corresponding records will be made;

[0036] If the saturation evaluation index Bpzs does not exceed the average of the overall employee saturation evaluation index When the employee's tolerance to the current task is determined to be normal,

[0037] S43, calculating the imbalance rate Shs, wherein the imbalance rate Shs is obtained by the following formula:

[0038]

[0039] Preferably, S4 also includes:

[0040] S44, presetting a balance threshold K, and comparing and analyzing the balance threshold K with the imbalance rate Shs to comprehensively determine whether the current human resources are in a balanced state in terms of task scheduling, specifically including the following contents:

[0041] If the imbalance rate Shs ≥ the balance threshold K, it will be comprehensively judged that the current human resources are not in a balanced state in terms of task scheduling, and a configuration optimization instruction will be issued to transfer the tasks to be completed from the employees in the abnormal state to the employees who are not in the abnormal state. At the same time, regular meetings will be held to understand the work status and needs of each employee and adjust the task allocation in time;

[0042] If the imbalance rate Shs is less than the balance threshold K, it will be comprehensively judged that the current human resources are in a balanced state in terms of task scheduling. At this time, no configuration optimization instructions will be issued to the outside. On the premise of ensuring task balance, the existing task allocation and work arrangements will be maintained, and the task allocation situation will be checked and evaluated regularly.

[0043] A human resource optimization configuration system, comprising a data acquisition module, a data preprocessing module, a resource analysis module and a configuration management module;

[0044] The data collection module extracts the relevant historical record information of each employee from the human resources information system in advance, constructs the employee historical data set, and simultaneously tracks and records the relevant current status information set of each employee, and extracts the relevant complex information of the corresponding assigned tasks according to the relevant current status information set of each employee;

[0045] The data preprocessing module performs data preprocessing on the acquired employee historical data set and the relevant status information set of each employee, including data cleaning and data standardization processing;

[0046] The resource analysis module extracts features from the preprocessed employee historical data set and the relevant status information set of each employee to obtain the task completion amount Rwc, the error amount Cwz, the number of collaborative workers Xzrw and the reserved time Ysc respectively, and obtains the comprehensive ability coefficient Zhxs of each employee by associating the task completion amount Rwc with the error amount Cwz, and obtains the current task complexity coefficient Rfxs of each employee by associating the number of collaborative workers Xzrw with the reserved time Ysc. A convolutional neural network is used to construct a trained resource allocation analysis model, and then the saturation evaluation index Bpzs of the corresponding employee is obtained by fitting the comprehensive ability coefficient Zhxs and the task complexity coefficient Rfxs of the corresponding employee.

[0047] The configuration management module pre-sets a balance threshold K, and obtains the imbalance rate Shs by comparing the saturation evaluation index Bpzs of each employee. The imbalance rate Shs is compared and analyzed with the balance threshold K to comprehensively determine whether the current human resources are in a balanced state in task scheduling. If not, a configuration optimization instruction is issued to the outside and corresponding optimization measures are taken.

[0048] The present invention provides a method and system for optimizing human resources allocation, which has the following beneficial effects:

[0049] (1) By extracting the historical record information and current status information of each employee from the human resources information system, a multi-faceted employee historical data set and current status information set are constructed. Through data preprocessing and feature extraction, managers can accurately evaluate the comprehensive ability coefficient Zhxs and task complexity coefficient Rfxs of each employee, thereby realizing the scientific and reasonable allocation of tasks. The resource allocation analysis model constructed by convolutional neural network combines the comprehensive ability coefficient Zhxs and the task complexity coefficient Rfxs to accurately fit the employee's saturation evaluation index Bpzs. This intelligent evaluation method greatly improves the accuracy of task allocation and further avoids the uncertainty caused by reliance on experience and subjective judgment in traditional methods. By setting the balance threshold K, the saturation evaluation index Bpzs of each employee is compared and the imbalance rate Shs is calculated. Then, by comparing and analyzing the imbalance rate Shs with the balance threshold K, it is comprehensively judged whether the current human resources are in a balanced state in terms of task scheduling. If not in a balanced state, the system will automatically issue configuration optimization instructions and take corresponding optimization measures. This mechanism further ensures the balanced use of human resources and reduces resource waste and employee overwork. Through data cleaning and standardization, the accuracy and consistency of the data are guaranteed. The application of feature extraction and convolutional neural network makes the analysis results more reliable and convincing, provides a scientific basis for management decision-making, and reduces the blindness and arbitrariness in human resource management. By reasonably allocating tasks and adjusting resource allocation in a timely manner, it not only improves the overall work efficiency, but also reduces the workload of employees and improves their job satisfaction. The work enthusiasm of employees and the overall performance of the organization have been significantly improved. In short, this method further realizes the intelligent and scientific optimization of human resource allocation through a comprehensive analysis of employee historical data and current data, combined with advanced convolutional neural network technology, and provides strong technical support for enterprises to improve their management level and competitiveness.

[0050] (2) The original model is initially constructed using a convolutional neural network, and the original model is trained and tested with a set of employee historical data and a set of relevant status information to ensure the initial accuracy and stability of the model. The trained original model is used as a resource identification model to further obtain feature information, and the resource identification model is trained and tested again. The resource identification model after training is used as a resource allocation analysis model. This process fully utilizes the advantages of convolutional neural networks in processing complex data and identifying patterns, ensuring the efficiency and accuracy of the model. This calculation method of the comprehensive ability coefficient Bpzs based on historical data can fully and accurately reflect the actual work ability of employees and ensure the scientificity and rationality of task allocation. Using the calculation formula of the comprehensive ability coefficient, the comprehensive ability of employees can be accurately evaluated, thereby achieving accurate optimization of employee task allocation. This not only improves the rationality and efficiency of task allocation, but also enables scientific task scheduling based on the actual ability of employees, further reducing the subjective judgment and experience dependence problems in traditional methods, making task allocation more rational.

[0051] (3) Use the imbalance rate formula to evaluate the balance of task scheduling, which reduces the blindness and arbitrariness in human resource management, so as to timely discover the imbalance of human resource allocation. When the imbalance rate exceeds the set balance threshold, the system can automatically issue configuration optimization instructions to adjust task allocation to ensure work efficiency and employee health. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 A schematic diagram of the steps of a method for optimizing allocation of human resources according to the present invention;

[0053] Figure 2 The figure is a flow chart of a human resource optimization configuration system of the present invention. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] Example 1

[0056] See also Figure 1 The present invention provides a method for optimizing the allocation of human resources, comprising the following steps:

[0057] S1. Extract relevant historical record information of each employee from the human resources information system in advance, build an employee historical data set, and track and record relevant current information sets of each employee. According to the relevant current information sets of each employee, extract relevant complex information of the corresponding assigned tasks;

[0058] S2, preprocessing the employee historical data set obtained in step S1 and the relevant status information set of each employee, including data cleaning and data standardization;

[0059] S3. Feature extraction is performed on the preprocessed employee historical data set and the relevant status information set of each employee to obtain the task completion amount Rwc, the error amount Cwz, the number of collaborative workers Xzrw and the reserved time Ysc respectively. The task completion amount Rwc is associated with the error amount Cwz to obtain the comprehensive ability coefficient Zhxs of each employee, and the number of collaborative workers Xzrw is associated with the reserved time Ysc to obtain the current task complexity coefficient Rfxs of each employee. A convolutional neural network is used to construct a trained resource allocation analysis model, and then the comprehensive ability coefficient Zhxs is combined with the task complexity coefficient Rfxs of the corresponding employee to obtain the saturation evaluation index Bpzs of the corresponding employee.

[0060] S4. Pre-set the balance threshold K, and obtain the imbalance rate Shs by comparing the saturation evaluation index Bpzs of each employee. Compare and analyze the imbalance rate Shs with the balance threshold K to comprehensively judge whether the current human resources are in a balanced state in task scheduling. If not, issue a configuration optimization instruction and take corresponding optimization measures.

[0061] In this embodiment, step S1 is used to extract the relevant historical record information and current status information of each employee from the human resources information system in advance, and to construct a historical data set and a current status information set of employees, so that the method can fully grasp the work history and current work status of employees. This step can effectively extract the complex information of the assigned tasks, laying a solid foundation for subsequent analysis. Secondly, in step S2, the acquired employee historical data and current status information are preprocessed, including data cleaning and data standardization, to ensure the accuracy and consistency of the data. The data preprocessing step can significantly improve the accuracy and reliability of subsequent analysis. In step S3, the comprehensive ability coefficient Zhxs of each employee is obtained through feature extraction; at the same time, through the current task complexity coefficient Rfxs of each employee, this multi-dimensional feature extraction method can comprehensively and accurately evaluate the ability and task complexity of employees. In addition, the resource allocation analysis model constructed by convolutional neural network is used to fit the saturation evaluation index Bpzs of employees, which further improves the scientificity and accuracy of the evaluation. Step S4 pre-sets the balance threshold K, and compares the saturation evaluation index Bpzs of each employee to obtain the imbalance rate Shs. By comparing and analyzing the imbalance rate Shs with the balance threshold K, it can comprehensively judge whether the current human resources are in a balanced state in terms of task scheduling. If it is not in a balanced state, a configuration optimization instruction will be issued and corresponding optimization measures will be taken. This step can not only timely discover and correct the imbalance problem of task allocation, but also improve the rationality and efficiency of task allocation through reasonable optimization means. In short, this method can realize the intelligent and precise management of employee task allocation through scientific analysis and evaluation, and further avoid the imbalance and inefficiency of resource allocation caused by subjective judgment in traditional methods. It not only improves the work efficiency and satisfaction of employees, but also effectively optimizes the human resource allocation of the enterprise, with significant beneficial effects.

[0062] Example 2

[0063] Please refer to Figure 1 Specifically: S1 specifically includes the following steps:

[0064] S1. Collect and record relevant historical record information of each employee, and track and record relevant current status information of each employee;

[0065] S11, the relevant historical record information includes the task completion amount Rwc and error amount Cwz of each employee's task in each monitoring period;

[0066] S12, the relevant status information set includes relevant pending data information of each employee and relevant complex information of the corresponding assigned tasks, wherein the relevant pending data information of each employee includes the current number of expedited tasks of each employee Jjrz, the reserved time of pending tasks Ysc and the number of collaborative workers of the pending tasks Xzrw;

[0067] The complex information related to the corresponding assigned tasks includes the current amount of tasks to be processed by each employee Drz, and combined with the task completion amount Rwc of each employee in each monitoring period, the average of the task processing amount of each employee in the monitoring period is obtained through the statistical mean algorithm

[0068] S2 specifically includes the following steps:

[0069] S21. Detect and delete the repeatedly collected data information to avoid the bias of data duplication on analysis, and identify missing data to detect and repair outliers;

[0070] S22. Standardize the data processed in step S21 using dimensionless processing technology to eliminate unit and dimension differences in the data.

[0071] In this embodiment, first, in step S1, by collecting and recording the relevant historical record information and current status information set of each employee, the work history and current work status of the employee are mastered in multiple dimensions, wherein the historical record information provides accurate basic data for subsequent analysis. In step S12, the current status information set includes the number of expedited tasks Jjrz of each employee, the reserved time Ysc of the tasks to be processed and the number of collaborative workers Xzrw, as well as the current amount of tasks to be processed Drz of each employee. By combining the task completion amount Rwc of each employee in the monitoring period and adopting the statistical mean algorithm, the mean of the task processing amount of the employee in the monitoring period is obtained. This process ensures the accurate assessment of the current task load of the employee and provides a scientific basis for task allocation. Secondly, in step S21, by detecting and deleting the repeatedly collected data information, the deviation caused by the repeatability of the data on the analysis is further avoided. At the same time, by identifying and repairing missing data, detecting and repairing outliers, the integrity and accuracy of the data are further guaranteed. This process greatly improves the data quality and provides a reliable data basis for subsequent analysis and processing. In step S22, by dimensionless processing the data, the unit and dimension differences in the data are eliminated, and the data is standardized. This step enables data of different units and scales to be effectively compared and analyzed, improving the comparability and processing efficiency of the data. In short, this method not only improves the quality and accuracy of the data by comprehensively collecting and processing the historical records and current information of employees, combined with scientific statistics and data processing techniques, but also provides strong support for the intelligent and scientific allocation of tasks. Through these steps, the comprehensive ability of employees and the complexity of tasks can be accurately evaluated, thereby achieving the optimal allocation of human resources, avoiding the problems of unbalanced resource allocation and inefficiency, and having significant beneficial effects.

[0072] Example 3

[0073] Please refer to Figure 1 Specifically: S3 specifically includes the following steps:

[0074] S31. Use convolutional neural networks to preliminarily construct the original model, and train and test the original model with employee historical data sets and related current status information sets. Use the trained original model as a resource identification model, obtain feature information within the resource identification model, and use the obtained feature information to train and test the resource identification model. Use the trained resource identification model as a resource allocation analysis model.

[0075] S3 also includes:

[0076] S32. Based on the employee historical data set, the comprehensive ability coefficient Zhxs of each employee is calculated by associating the task completion amount Rwc and the error amount Cwz and performing linear normalization processing. The coefficient is obtained specifically according to the following formula:

[0077]

[0078] Where n is the number of monitoring periods, i = 1, 2, 3, ..., n, Rwc i It is expressed as the amount of tasks completed in the i-th period, It is expressed as the mean value of the task completion in the monitoring period, Cwz i Expressed as the amount of error in the i-th period, It is expressed as the mean value of the error amount within the monitoring period, α and β are weight coefficients, where 0<α≤1, 0<β≤1, and α+β=1.

[0079] The above-mentioned task completion amount Rwc and error amount Cwz can be collected and obtained through the human resource information system;

[0080] In this embodiment, the method uses convolutional neural networks and scientific calculation methods to comprehensively analyze and process employee historical data and current information, thereby achieving accurate evaluation and optimization of employee task allocation, which has significant beneficial effects. First, in step S31, the original model is preliminarily constructed by using a convolutional neural network, and the original model is trained and tested with a set of employee historical data and a set of related current information to ensure that the model can accurately identify and extract key feature information; the trained original model is used as a resource identification model, and feature information is further acquired and extracted, and the resource identification model is retrained and tested to finally form a resource allocation analysis model. This process continuously optimizes the model to ensure that the resource allocation analysis model has high accuracy and reliability, and can accurately identify and evaluate the capabilities and task complexity of employees. By calculating and obtaining the comprehensive capability coefficient Zhxs of each employee, the task completion status and error rate of the employee in different monitoring periods can be comprehensively considered, and the comprehensive capability of the employee can be comprehensively and accurately evaluated. Linear normalization ensures the standardization of data, making the calculation of the comprehensive capability coefficient more accurate and reasonable. In short, the method can comprehensively and accurately identify and evaluate the capabilities and task complexity of employees through convolutional neural networks and scientific calculation methods. By continuously optimizing the model and accurately calculating the data, the rationality and efficiency of task allocation are ensured, thereby improving the scientificity and effectiveness of human resource management, which has significant beneficial effects.

[0081] Example 4

[0082] Please refer to Figure 1 , specifically: S3 also includes:

[0083] S33. According to the relevant status information set, the number of collaborative workers Xzrw is associated with the reserved time Ysc, and then subjected to linear normalization processing to obtain the current task complexity coefficient Rfxs of each employee, which is specifically obtained according to the following formula:

[0084]

[0085] Where Jjrz represents the number of urgent tasks, a1, a2 and a3 represent the weight coefficients of the number of collaborative workers Xzrw, the reserved time Ysc and the number of urgent tasks Jjrz, respectively, where 0<a1≤1, 0<a2≤1, 0<a3≤1, and a1+a2+a3=1, and V represents the correction constant.

[0086] The above-mentioned number of collaborative workers Xzrw, reserved time Ysc and number of expedited tasks Jjrz can all be collected and obtained through the human resources information system;

[0087] In this embodiment, first, through step S33, according to the relevant status information set, the current task complexity coefficient Rfxs of each employee is obtained. This method can comprehensively consider the complexity of the tasks currently faced by employees, further ensure the rationality and scientificity of task allocation, and through this calculation method, the current task complexity of each employee can be accurately evaluated, so as to better perform task allocation and resource allocation. Specifically, the following are the beneficial effects of this method: by considering multiple factors, the complexity of the current tasks of employees is reflected in multiple dimensions, further avoiding the one-sidedness of single-dimensional evaluation. Through linear normalization processing, the dimensional differences between different data are eliminated, so that each factor is comparable in calculation, and the accuracy of the evaluation results is improved. By setting different weight coefficients, the influence of each factor can be flexibly adjusted according to actual needs, so that the model has higher adaptability and flexibility. Using data-driven methods, the problems of subjective judgment and experience dependence in traditional methods are avoided, making task allocation and resource allocation more scientific and reasonable. By calculating the task complexity coefficient Rfxs, task allocation can be better performed, resource waste and employee overload are avoided, and overall work efficiency and employee satisfaction are further improved. In short, this method can achieve more accurate task allocation and resource allocation by comprehensively evaluating employees' task complexity coefficients through scientific data processing and optimization techniques. This not only improves the rationality and efficiency of task allocation, but also enables scientific task scheduling based on employees' actual capabilities and task complexity, which has significant beneficial effects.

[0088] Example 5

[0089] Please refer to Figure 1 , specifically: S3 also includes:

[0090] S34, by transmitting the task complexity coefficient Rfxs and the comprehensive ability coefficient Zhxs of the corresponding employee to the resource allocation analysis model, and after linear normalization processing, the saturation evaluation index Bpzs of the corresponding employee is obtained, which is specifically obtained according to the following formula:

[0091]

[0092] In the formula, Drz j Represented as the current pending tasks of the jth employee, Rfxs j Expressed as the task complexity coefficient of the jth employee Rfxs, Zhxs j Expressed as the comprehensive ability coefficient of the jth employee, It is expressed as the mean value of the task processing volume of the jth employee during the monitoring period.

[0093] In this embodiment, by inputting the task complexity coefficient and the employee comprehensive ability coefficient into the resource allocation analysis model, combined with the linear normalization process, the saturation evaluation index Bpzs of each employee can be further accurately calculated, and this index reflects the work saturation degree of the employee under the current task load. Using the mean value of the task processing volume within the monitoring period as a reference, the task processing ability of the employee can be more objectively evaluated. The saturation evaluation index Bpzs calculated by the formula provides a basis for managers to help them make reasonable resource allocation and task scheduling decisions. By analyzing the task complexity and comprehensive ability of each employee, tasks can be allocated more effectively to ensure that each employee works within their capacity, thereby improving overall work efficiency and quality. Through continuous monitoring and analysis of the employee saturation evaluation index Bpzs, managers can be helped to better perform performance management and personalized development planning to improve employee job satisfaction and performance. These data and calculation processes not only help optimize existing workflows, but also support long-term human resource planning and management decisions, helping organizations achieve higher operational efficiency and employee satisfaction.

[0094] Example 6

[0095] Please refer to Figure 1 Specifically: S4 specifically includes the following steps:

[0096] S41, using the saturation evaluation index Bpzs of the corresponding employees obtained in step S34, and using a statistical mean algorithm to calculate the mean of the overall employee saturation evaluation index

[0097] S42, based on the average of the overall employee saturation assessment index The index is then compared with the saturation assessment index Bpzs of each employee to determine the degree to which each employee can bear the current task situation, including the following:

[0098] If the saturation evaluation index Bpzs exceeds the average of the overall employee saturation evaluation index When , the corresponding employee's tolerance to the current task situation will be judged to be in an abnormal state. At this time, the number of employees in the abnormal state Yss will be counted and corresponding records will be made;

[0099] If the saturation evaluation index Bpzs does not exceed the average of the overall employee saturation evaluation index When the employee's tolerance to the current task is determined to be normal,

[0100] S43, calculating the imbalance rate Shs, wherein the imbalance rate Shs is obtained by the following formula:

[0101]

[0102] S4 also includes:

[0103] S44, presetting a balance threshold K, and comparing and analyzing the balance threshold K with the imbalance rate Shs to comprehensively determine whether the current human resources are in a balanced state in terms of task scheduling, specifically including the following contents:

[0104] If the imbalance rate Shs ≥ the balance threshold K, it will be comprehensively judged that the current human resources are not in a balanced state in terms of task scheduling, and a configuration optimization instruction will be issued to transfer the tasks to be completed from employees in abnormal states to employees who are not in abnormal states. If some tasks are urgent and the workload is large, you can consider temporarily adding manpower or outsourcing to complete some tasks, reasonably arrange overtime and rest time to ensure that employees have enough rest time to restore their energy, consider flexible working hours or remote work to reduce the burden on employees, and hold meetings regularly to understand the work status and needs of each employee and adjust task allocation in a timely manner;

[0105] If the imbalance rate Shs is less than the balance threshold K, it will be comprehensively judged that the current human resources are in a balanced state in terms of task scheduling. At this time, no configuration optimization instructions will be issued to the outside. On the premise of ensuring task balance, the existing task allocation and work arrangements will be maintained. At the same time, the task allocation situation will be regularly checked and evaluated to ensure that it continues to be balanced. Regular training will be organized to help employees improve their skills and knowledge and adapt to future work challenges.

[0106] In this embodiment, by regularly evaluating the saturation evaluation index Bpzs of employees, managers can understand the current work tolerance of employees. When employees have a moderate workload, they are more likely to maintain high efficiency and satisfaction, thereby improving work performance and productivity. By comparing the saturation evaluation index Bpzs of individual employees with the overall mean, employees in abnormal states can be found in time. For these employees, measures such as task reallocation, additional manpower or adjustment of work arrangements can be taken to reduce their work pressure and prevent long-term fatigue accumulation. Using the imbalance rate Shs to evaluate the balance of task scheduling can help decision makers quickly identify imbalances. When the imbalance rate Shs is higher than the set balance threshold, the resource allocation strategy can be adjusted in time to ensure that the task can be completed on time while ensuring the balance of employees' workload. Through regular task allocation evaluation and employee demand surveys, organizations can be helped to adapt to changing work environments and needs. Regular training and skill improvement activities can also enhance employees' adaptability and help them cope with future work challenges, thereby promoting the long-term sustainable development of the organization. In short, this method helps to improve employees' work efficiency and satisfaction, reduce employees' work pressure, and optimize the organization's task scheduling and resource allocation, laying the foundation for the sustainable development of the organization.

[0107] Example 7

[0108] Please refer to Figure 1 and Figure 2 ,Specifically: A human resource optimization configuration system includes a data collection module, a data preprocessing module, a resource analysis module and a configuration management module;

[0109] The data collection module extracts the relevant historical record information of each employee from the human resources information system in advance, constructs the employee historical data set, and simultaneously tracks and records the relevant current status information set of each employee, and extracts the relevant complex information of the corresponding assigned tasks according to the relevant current status information set of each employee;

[0110] The data preprocessing module performs data preprocessing on the acquired employee historical data set and the relevant status information set of each employee, including data cleaning and data standardization processing;

[0111] The resource analysis module extracts features from the preprocessed employee historical data set and the relevant status information set of each employee to obtain the task completion amount Rwc, the error amount Cwz, the number of collaborative workers Xzrw and the reserved time Ysc respectively, and obtains the comprehensive ability coefficient Zhxs of each employee by associating the task completion amount Rwc with the error amount Cwz, and obtains the current task complexity coefficient Rfxs of each employee by associating the number of collaborative workers Xzrw with the reserved time Ysc. A convolutional neural network is used to construct a trained resource allocation analysis model, and then the saturation evaluation index Bpzs of the corresponding employee is obtained by fitting the comprehensive ability coefficient Zhxs and the task complexity coefficient Rfxs of the corresponding employee.

[0112] The configuration management module pre-sets a balance threshold K, and obtains the imbalance rate Shs by comparing the saturation evaluation index Bpzs of each employee. The imbalance rate Shs is compared and analyzed with the balance threshold K to comprehensively determine whether the current human resources are in a balanced state in task scheduling. If not, a configuration optimization instruction is issued to the outside and corresponding optimization measures are taken.

[0113] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for optimizing human resources allocation, characterized in that: The following steps are included: S1. Extract relevant historical record information of each employee from the human resources information system in advance, build an employee historical data set, and track and record relevant current information sets of each employee. According to the relevant current information sets of each employee, extract relevant complex information of the corresponding assigned tasks; S2, preprocessing the employee historical data set obtained in step S1 and the relevant status information set of each employee, including data cleaning and data standardization; S3. Feature extraction is performed on the preprocessed employee historical data set and the relevant status information set of each employee to obtain the task completion amount Rwc, the error amount Cwz, the number of collaborative workers Xzrw and the reserved time Ysc respectively. The task completion amount Rwc is associated with the error amount Cwz to obtain the comprehensive ability coefficient Zhxs of each employee, and the number of collaborative workers Xzrw is associated with the reserved time Ysc to obtain the current task complexity coefficient Rfxs of each employee. A convolutional neural network is used to construct a trained resource allocation analysis model, and then the comprehensive ability coefficient Zhxs is combined with the task complexity coefficient Rfxs of the corresponding employee to obtain the saturation evaluation index Bpzs of the corresponding employee. S4. Pre-set the balance threshold K, and obtain the imbalance rate Shs by comparing the saturation evaluation index Bpzs of each employee. Compare and analyze the imbalance rate Shs with the balance threshold K to comprehensively judge whether the current human resources are in a balanced state in task scheduling. If not, issue a configuration optimization instruction and take corresponding optimization measures.

2. The method for optimizing human resource allocation according to claim 1, characterized in that: S1 specifically includes the following steps: S1. Collect and record relevant historical record information of each employee, and track and record relevant current status information of each employee; S11, the relevant historical record information includes the task completion amount Rwc and error amount Cwz of each employee's task in each monitoring period; S12, the relevant status information set includes relevant pending data information of each employee and relevant complex information of the corresponding assigned tasks, wherein the relevant pending data information of each employee includes the current number of expedited tasks of each employee Jjrz, the reserved time of pending tasks Ysc and the number of collaborative workers of the pending tasks Xzrw; The complex information related to the corresponding assigned tasks includes the current amount of tasks to be processed by each employee Drz, and combined with the task completion amount Rwc of each employee in each monitoring period, the average of the task processing amount of each employee in the monitoring period is obtained through the statistical mean algorithm 3. The method for optimizing human resource allocation according to claim 1, characterized in that: S2 specifically includes the following steps: S21. Detect and delete the repeatedly collected data information to avoid the bias of data duplication on analysis, and identify missing data to detect and repair outliers; S22. Standardize the data processed in step S21 using dimensionless processing technology to eliminate unit and dimension differences in the data.

4. The method for optimizing human resource allocation according to claim 2, characterized in that: S3 specifically includes the following steps: S31. Use convolutional neural networks to preliminarily construct the original model, and train and test the original model with employee historical data sets and related current status information sets. Use the trained original model as a resource identification model, obtain feature information within the resource identification model, and use the obtained feature information to train and test the resource identification model. Use the trained resource identification model as a resource allocation analysis model.

5. The method for optimizing human resource allocation according to claim 4, characterized in that: S3 also includes: S32. Based on the employee historical data set, the task completion amount Rwc and the error amount Cwz are correlated and then subjected to linear normalization processing to calculate and obtain the comprehensive ability coefficient Zhxs of each employee. Specifically, it is obtained according to the following formula: Where n is the number of monitoring periods, i = 1, 2, 3, ..., n, Rwc i It is expressed as the amount of tasks completed in the i-th period, It is expressed as the mean value of the task completion in the monitoring period, Cwz i Expressed as the amount of error in the i-th period, It is expressed as the mean value of the error amount within the monitoring period, and α and β are weight coefficients.

6. The method for optimizing human resource allocation according to claim 5, characterized in that: S3 also includes: S33. According to the relevant status information set, the number of collaborative workers Xzrw is associated with the reserved time Ysc, and then subjected to linear normalization processing to obtain the current task complexity coefficient Rfxs of each employee, which is specifically obtained according to the following formula: Where Jjrz represents the number of urgent tasks, a1, a2 and a3 represent the weight coefficients of the number of collaborative workers Xzrw, the reserved time Ysc and the number of urgent tasks Jjrz, respectively, and V represents the correction constant.

7. The method for optimizing human resource allocation according to claim 2, characterized in that: S3 also includes: S34, by transmitting the task complexity coefficient Rfxs and the comprehensive ability coefficient Zhxs of the corresponding employee to the resource allocation analysis model, and after linear normalization processing, the saturation evaluation index Bpzs of the corresponding employee is obtained, which is specifically obtained according to the following formula: In the formula, Drz j Represented as the current pending tasks of the jth employee, Rfxs j Expressed as the task complexity coefficient of the jth employee Rfxs, Zhxs j Expressed as the comprehensive ability coefficient of the jth employee, It is expressed as the mean value of the task processing volume of the jth employee during the monitoring period.

8. The method for optimizing human resource allocation according to claim 7, characterized in that: S4 specifically includes the following steps: S41, using the saturation evaluation index Bpzs of the corresponding employees obtained in step S34, and using a statistical mean algorithm to calculate the mean of the overall employee saturation evaluation index S42, based on the average of the overall employee saturation assessment index The index is then compared with the saturation assessment index Bpzs of each employee to determine the degree to which each employee can bear the current task situation, including the following: If the saturation evaluation index Bpzs exceeds the average of the overall employee saturation evaluation index When , the corresponding employee's tolerance to the current task situation will be judged to be in an abnormal state. At this time, the number of employees in the abnormal state Yss will be counted and corresponding records will be made; If the saturation evaluation index Bpzs does not exceed the average of the overall employee saturation evaluation index When the employee's tolerance to the current task is determined to be normal, S43, calculating the imbalance rate Shs, wherein the imbalance rate Shs is obtained by the following formula:

9. The method for optimizing human resource allocation according to claim 8, characterized in that: S4 also includes: S44, presetting a balance threshold K, and comparing and analyzing the balance threshold K with the imbalance rate Shs to comprehensively determine whether the current human resources are in a balanced state in terms of task scheduling, specifically including the following contents: If the imbalance rate Shs ≥ the balance threshold K, it will be comprehensively judged that the current human resources are not in a balanced state in terms of task scheduling, and a configuration optimization instruction will be issued to transfer the tasks to be completed from the employees in the abnormal state to the employees who are not in the abnormal state. At the same time, regular meetings will be held to understand the work status and needs of each employee and adjust the task allocation in time; If the imbalance rate Shs is less than the balance threshold K, it will be comprehensively judged that the current human resources are in a balanced state in terms of task scheduling. At this time, no configuration optimization instructions will be issued to the outside. On the premise of ensuring task balance, the existing task allocation and work arrangements will be maintained, and the task allocation situation will be checked and evaluated regularly.

10. A human resource optimization configuration system, using a human resource optimization configuration method according to any one of claims 1 to 9, characterized in that: It includes data acquisition module, data preprocessing module, resource analysis module and configuration management module; The data collection module extracts the relevant historical record information of each employee from the human resources information system in advance, constructs the employee historical data set, and simultaneously tracks and records the relevant current status information set of each employee, and extracts the relevant complex information of the corresponding assigned tasks according to the relevant current status information set of each employee; The data preprocessing module performs data preprocessing on the acquired employee historical data set and the relevant status information set of each employee, including data cleaning and data standardization processing; The resource analysis module extracts features from the preprocessed employee historical data set and the relevant status information set of each employee to obtain the task completion amount Rwc, the error amount Cwz, the number of collaborative workers Xzrw and the reserved time Ysc respectively, and obtains the comprehensive ability coefficient Zhxs of each employee by associating the task completion amount Rwc with the error amount Cwz, and obtains the current task complexity coefficient Rfxs of each employee by associating the number of collaborative workers Xzrw with the reserved time Ysc. A convolutional neural network is used to construct a trained resource allocation analysis model, and then the saturation evaluation index Bpzs of the corresponding employee is obtained by fitting the comprehensive ability coefficient Zhxs and the task complexity coefficient Rfxs of the corresponding employee. The configuration management module pre-sets a balance threshold K, and obtains the imbalance rate Shs by comparing the saturation evaluation index Bpzs of each employee. The imbalance rate Shs is compared and analyzed with the balance threshold K to comprehensively determine whether the current human resources are in a balanced state in task scheduling. If not, a configuration optimization instruction is issued to the outside and corresponding optimization measures are taken.

Citation Information

Patent Citations

  • Multi-task intelligent scheduling method, device and equipment and storage medium

    CN109978293A

  • Task balanced allocation method and task balanced allocation device

    CN114462849A

  • Method and device for scenic spot work planning and manpower distribution based on working conditions

    CN114897488A

  • Task allocation method, electronic equipment and computer readable storage medium

    CN117196232A

  • Intelligent enterprise management system

    CN117455181A

Cited By

  • Remote monitoring method and system for operation data of power equipment

    CN118842183A

  • Artificial intelligence task scheduling method based on deep learning

    CN119250489A

  • Manpower resource office service management method and management system

    CN120689020A