A bridge construction safety monitoring method and system

By dividing module areas on the bridge and installing sensors, and setting early warning thresholds using finite element calculations, the problem of data processing delay in the bridge construction safety monitoring system is solved, and the rapid identification and response of potential risks is achieved, and the safety of the construction site is improved. Management ability.

CN118736802BActive Publication Date: 2024-11-26SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411230525.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-26
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

Bridge construction safety monitoring systems lack the ability to process and analyze quickly when processing large amounts of monitoring data, resulting in delays in alarms and the inability to quickly identify and deal with potential risks.

Method used

By establishing a three-dimensional model, the bridge is divided into multiple module areas, sensors and sub-managers are installed in each area, and the warning thresholds of No. 1 and No. 2 are set using finite element calculation and prediction methods, and the threshold values ​​are monitored and corrected in real time. In order to quickly identify and deal with abnormal situations.

Benefits of technology

It realizes rapid safety monitoring of the bridge construction site, reduces data processing delays, improves the response speed and management capabilities of the monitoring system, and ensures the safety of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118736802B_ABST
    Figure CN118736802B_ABST
Patent Text Reader

Abstract

The present invention discloses a bridge construction safety monitoring method and system, and relates to the technical field of bridge construction safety. The monitoring method comprises: establishing a three-dimensional model: establishing a three-dimensional model of a bridge, and dividing the three-dimensional model into a plurality of No. 1 module areas according to a division method. The present invention compares and analyzes the real-time data of the sensor with the No. 1 warning threshold by setting the No. 1 warning threshold. The advantage is that it allows direct comparison of the actual data with the No. 1 warning threshold, so as to quickly identify any potential risks. In addition, by reasonably controlling the size of the No. 1 module area, the accuracy of the data and the simplicity of comparison are ensured. Once the actual data exceeds the range set by the No. 1 warning threshold, the system will be able to immediately trigger an alarm, so as to quickly discover and respond to abnormal situations and ensure the safety of the construction site. This efficient and direct monitoring method can improve the management ability and response speed of bridge construction safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction safety, and in particular to a bridge construction safety monitoring method and system. Background Art

[0002] Bridge monitoring is an important means to ensure bridge safety and stability. Bridge construction safety monitoring provides data basis for bridge safety early warning, safety analysis and evaluation, timely understands structural defects and damage, and evaluates and analyzes their possible development under the current environmental conditions and the potential risks they cause to structural safety, so as to realize the monitoring and management of bridge structure construction. By installing monitoring equipment and sensors on the bridge, the safety status of the construction site can be monitored and managed in real time, so as to timely discover and deal with potential safety hazards and ensure the safety of construction personnel and equipment.

[0003] When monitoring the safety of bridge construction, faced with a large amount of monitoring data, the system lacks the ability to quickly process and analyze data. Only after processing and analyzing the data can anomalies be discovered and alarms be issued. However, data processing and analysis takes time, resulting in a large delay in issuing alarms, which makes it impossible to quickly issue alarms. For this reason, a bridge construction safety monitoring method and system were invented. Summary of the invention

[0004] The purpose of the present invention is to provide a bridge construction safety monitoring method and system to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: the monitoring method comprises:

[0006] Establishing a three-dimensional model: establishing a three-dimensional model of the bridge, and dividing the three-dimensional model into a number of No. 1 module areas according to the division method;

[0007] Layout of monitoring network: sensors for collecting data are installed in the No. 1 module area, sub-managers are set up to collect sensor data inside the module area, and a general manager is set up to transmit information with sub-managers. The sub-managers store the location information of sensors. The data collected by the sensors include bridge data and environmental data. The three-dimensional model is combined with the location information of the sensors and installed on the bridge;

[0008] Acquiring data: The sensor monitors the bridge data in the No. 1 module area in real time, obtains real-time data, processes the real-time data through prediction methods, and obtains predicted data;

[0009] Establish alarm thresholds; use finite element calculations and three-dimensional models to obtain a first warning threshold for comparison with real-time data and a second alarm threshold for comparison with predicted data;

[0010] Establish a threshold correction model: establish a No. 1 correction method for modifying the internal parameters of the No. 1 warning threshold based on real-time data, and establish a No. 2 correction method for modifying the internal parameters of the No. 2 warning threshold based on forecast data;

[0011] Threshold correction: Correction method No. 1 continuously corrects the warning threshold No. 1, and correction method No. 2 continuously corrects the warning threshold No. 2;

[0012] Establish early warning: Make judgments based on the revised No. 1 early warning threshold and No. 2 early warning threshold, real-time data and No. 1 early warning threshold. When the real-time data exceeds the early warning threshold, issue a No. 1 alarm. When the predicted data exceeds the No. 2 early warning threshold, issue a No. 2 alarm.

[0013] Furthermore, the method for establishing the No. 1 warning threshold is as follows: obtaining real-time monitoring data of sensors, combining finite element simulation calculations, analyzing the results, simulating the stress, displacement and frequency of various parts of the bridge under different working conditions, obtaining the stress, displacement and frequency limit values ​​or safety ranges, obtaining the No. 1 basic warning threshold, establishing a dynamic safety value, combining the dynamic safety value with the No. 1 basic warning threshold, and obtaining the No. 1 warning threshold;

[0014] The method for establishing the No. 2 warning threshold is the same as the method for establishing the No. 1 warning threshold, and the dynamic safety value in the No. 2 warning threshold is greater than the dynamic safety value in the No. 1 warning threshold.

[0015] Furthermore, the No. 1 correction method adjusts the dynamic safety value in the No. 1 warning threshold to achieve the correction of the No. 1 warning threshold. The establishment method of the No. 1 correction method includes establishing a first association between bridge data, establishing a second association between environmental data and bridge data, obtaining simulation data through finite element analysis calculation, the simulation data is the impact result of simulated environmental data on simulated bridge data, comparing the simulation data with the No. 1 basic warning threshold, obtaining the ratio value between the simulation data and the No. 1 basic warning threshold, and adjusting the dynamic safety value;

[0016] The No. 2 correction method adjusts the dynamic safety value in the No. 2 alarm threshold to achieve correction of the No. 2 alarm threshold. The establishment method of the No. 2 correction method is the same as the establishment method of the No. 1 correction method.

[0017] Furthermore, the bridge data includes displacement data, stress data, vibration data and deflection data of the bridge, and the environmental data includes wind data, temperature data and humidity data;

[0018] The method of establishing the first association is based on elastic mechanics and structural dynamics to establish the mathematical relationship between displacement, stress, vibration and deflection, and the finite element analysis method is used to simulate the force and deformation process of the structure to obtain the first association;

[0019] The method for establishing the second association is as follows: based on the first association, the impact of environmental data on the bridge is simulated, and based on the impact result, the second association is obtained.

[0020] Furthermore, the division method includes dividing the three-dimensional model according to the connection parts and structural characteristics of the bridge, the connection parts include welding seams and rivet points, and the structural characteristics include main beams, bridge towers, bridge deck systems, bridge spans, supporting structures and bridge decks.

[0021] Furthermore, the No. 1 warning threshold includes a displacement threshold, a stress threshold, a vibration threshold and a deflection threshold. The No. 1 basic threshold in the module area is calculated by finite element analysis. The No. 1 basic threshold includes a displacement basic threshold, a stress basic threshold and a deflection basic threshold. The fixed frequency is obtained by a fixed frequency acquisition method. The fixed frequency is the vibration threshold. The No. 1 basic warning threshold and the vibration threshold are combined to obtain the No. 1 basic warning threshold. The sub-manager obtains real-time data from the sensor, compares the real-time data with the No. 1 warning threshold, and determines whether the real-time data exceeds the No. 1 warning threshold. When the real-time data is judged to exceed the basic threshold, an alarm No. 1 is issued.

[0022] A bridge construction safety monitoring system adopts the above-mentioned bridge construction safety monitoring method.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The bridge construction safety monitoring method and system, through the setting of the No. 1 warning threshold, compares and analyzes the real-time data of the sensor with the No. 1 warning threshold. The advantage is that it allows direct comparison of actual data with the No. 1 warning threshold, so as to quickly identify any potential risks. In addition, by reasonably controlling the size of the No. 1 module area, the accuracy of the data and the ease of comparison are ensured. Once the actual data exceeds the range set by the No. 1 warning threshold, the system will be able to immediately trigger an alarm to quickly discover and respond to abnormal situations and ensure the safety of the construction site. This efficient and direct monitoring method can improve the management capabilities and response speed of bridge construction safety.

[0025] At the same time, by dividing the No. 1 module area and installing sensors in the No. 1 module area, the sub-managers are responsible for collecting the bridge data in the No. 1 module area in real time to ensure the timeliness and accuracy of the information. This modular setting not only divides the entire bridge structure reasonably, but also greatly reduces the amount of calculation required by a single sub-manager. Each sub-manager can respond and process data more quickly, thereby achieving rapid response and efficient operation of the entire monitoring system. This design optimizes the alarm process.

[0026] By establishing correction method No. 1 and correction method No. 2, the warning threshold No. 1 and the warning threshold No. 2 can be effectively corrected. Correction method No. 1 is mainly responsible for adjusting the dynamic safety value of the warning threshold No. 1, so that it can be flexibly adjusted according to different environmental data, thereby realizing timely alarm of the bridge status under various environmental conditions, while correction method No. 2 adjusts the dynamic safety value of the warning threshold No. 2 to realize the warning function of the future status of the bridge. By comparing and judging the real-time data with the warning threshold No. 1 and the predicted data with the warning threshold No. 2, the safety status of the bridge can be monitored comprehensively and accurately to ensure the stable operation of the bridge. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a schematic diagram of the monitoring method of the present invention;

[0028] Figure 2 A schematic diagram of the alarm method of the present invention;

[0029] Figure 3 A schematic diagram of generating a first warning threshold for the present invention. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] like Figure 1 - Figure 3 As shown, the present invention provides a technical solution: the monitoring method comprises:

[0032] Establishing a three-dimensional model: establishing a three-dimensional model of the bridge, and dividing the three-dimensional model into a number of No. 1 module areas according to the division method;

[0033] Layout of monitoring network: sensors for collecting data are installed in the No. 1 module area, sub-managers are set up to collect sensor data inside the module area, and a general manager is set up to transmit information with sub-managers. The sub-managers store the location information of sensors. The data collected by the sensors include bridge data and environmental data. The three-dimensional model is combined with the location information of the sensors and installed on the bridge;

[0034] Acquiring data: The sensor monitors the bridge data in the No. 1 module area in real time, obtains real-time data, processes the real-time data through prediction methods, and obtains predicted data;

[0035] Establish alarm thresholds; use finite element calculations and three-dimensional models to obtain a first warning threshold for comparison with real-time data and a second alarm threshold for comparison with predicted data;

[0036] Establish a threshold correction model: establish a No. 1 correction method for modifying the internal parameters of the No. 1 warning threshold based on real-time data, and establish a No. 2 correction method for modifying the internal parameters of the No. 2 warning threshold based on forecast data;

[0037] Threshold correction: Correction method No. 1 continuously corrects the warning threshold No. 1, and correction method No. 2 continuously corrects the warning threshold No. 2;

[0038] Establish early warning: Make judgments based on the revised No. 1 early warning threshold and No. 2 early warning threshold, real-time data and No. 1 early warning threshold. When the real-time data exceeds the early warning threshold, issue a No. 1 alarm. When the predicted data exceeds the No. 2 early warning threshold, issue a No. 2 alarm.

[0039] Method for establishing the No. 1 warning threshold: obtain real-time monitoring data from sensors, combine finite element simulation calculations, analyze the results, simulate the stress, displacement and frequency of various parts of the bridge under different working conditions, obtain the stress, displacement and frequency limit values ​​or safety ranges, obtain the No. 1 basic warning threshold, establish a dynamic safety value, combine the dynamic safety value with the No. 1 basic warning threshold, and obtain the No. 1 warning threshold;

[0040] The method for establishing the No. 2 warning threshold is the same as the method for establishing the No. 1 warning threshold, and the dynamic safety value in the No. 2 warning threshold is greater than the dynamic safety value in the No. 1 warning threshold.

[0041] The first correction method adjusts the dynamic safety value in the first warning threshold to achieve the correction of the first warning threshold. The establishment method of the first correction method includes establishing a first association between bridge data, establishing a second association between environmental data and bridge data, obtaining simulation data through finite element analysis calculation, the simulation data is the impact result of simulated environmental data on simulated bridge data, comparing the simulation data with the first basic warning threshold, obtaining the ratio value between the simulation data and the first basic warning threshold, and adjusting the dynamic safety value;

[0042] The No. 2 correction method adjusts the dynamic safety value in the No. 2 alarm threshold to achieve correction of the No. 2 alarm threshold. The establishment method of the No. 2 correction method is the same as the establishment method of the No. 1 correction method.

[0043] The bridge data includes the displacement data, stress data, vibration data and deflection data of the bridge, and the environmental data includes wind data, temperature data and humidity data;

[0044] The method of establishing the first association is based on elastic mechanics and structural dynamics to establish the mathematical relationship between displacement, stress, vibration and deflection, and the finite element analysis method is used to simulate the force and deformation process of the structure to obtain the first association;

[0045] The method for establishing the second association is as follows: based on the first association, the impact of environmental data on the bridge is simulated, and based on the impact result, the second association is obtained.

[0046] The division method includes dividing the three-dimensional model according to the connection parts and structural characteristics of the bridge. The connection parts include welding seams and rivet points, and the structural characteristics include main beams, bridge towers, bridge deck systems, bridge spans, supporting structures and bridge decks.

[0047] The No. 1 warning threshold includes displacement threshold, stress threshold, vibration threshold and deflection threshold. The No. 1 basic threshold in the module area is calculated by finite element analysis. The No. 1 basic threshold includes displacement basic threshold, stress basic threshold and deflection basic threshold. The fixed frequency is obtained by fixed frequency acquisition method. The fixed frequency is the vibration threshold. The No. 1 basic warning threshold is obtained by combining the No. 1 basic warning threshold and the vibration threshold. The sub-manager obtains the real-time data of the sensor, compares the real-time data with the No. 1 warning threshold, and judges whether the real-time data exceeds the No. 1 warning threshold. When the real-time data is judged to exceed the basic threshold, the No. 1 alarm is issued.

[0048] A bridge construction safety monitoring system adopts the above-mentioned bridge construction safety monitoring method.

[0049] And obtain the construction process of the bridge, gradually install sensors on the bridge according to the construction process of the bridge, arrange multiple sensors at the bridge construction site to monitor environmental data such as temperature, humidity, wind speed, wind direction in real time, and monitor bridge data such as stress and deformation of the bridge structure at the same time, realize real-time transmission and analysis of data, and use the characteristics of sound wave propagation to measure the stress distribution inside the bridge, or use other methods to detect the internal stress of the bridge. There are existing technologies for detecting the internal stress of the bridge, monitoring the temperature change of the bridge structure, and helping to identify the thermal stress and cold stress caused by temperature. When the temperature changes and in the absence of external force, the internal stress of the bridge will change. The disturbance data can be calculated through the displacement data. Wind force is an important factor causing bridge vibration. When the frequency of wind force is close to the natural frequency of the bridge, it may cause resonance, resulting in large-scale vibration, displacement and stress changes in the bridge. Temperature changes will affect the thermal expansion and contraction properties of the material, thereby causing displacement and deflection changes in the structure. Therefore, a correlation can be established between wind force data and frequency data, and a correlation can also be established between temperature data and stress data.

[0050] However, there are multiple sensors and there are multiple types of sensors, which can respectively realize real-time detection of displacement data, stress data, vibration data and deflection data. At the same time, they can realize real-time detection and collection of bridge data and transmit the collected data to the sub-manager.

[0051] Before the construction of the bridge, the design data of the bridge is already existing data. The design data includes the location data of the bridge connection parts, the location data of the welding seams and rivet points, the size data of the supporting structure, the bridge deck data, etc. A three-dimensional model of the bridge is established by computer. The size of the three-dimensional model is the same as the size of the designed bridge. The three-dimensional model is first divided into several No. 1 module areas on the three-dimensional model. The design data is referred to when designing the three-dimensional model. At the same time, the design data is also referred to when it is divided into several No. 1 module areas. The preferred spatial size of the No. 1 module area is initially set to 30*30*30 cubic meters-40*40*40 cubic meters. Then, the No. 1 module area is modified through the division method, so that the No. 1 module area can divide the connection parts and structural characteristics of the bridge. At the same time, the minimum width of the No. 2 module area is 5 meters.

[0052] In the first embodiment, the sub-manager will obtain the data of the sensor in real time and compare it with the No. 1 warning threshold. If the real-time data exceeds any No. 1 warning threshold (displacement, stress, vibration, deflection), the system will immediately issue a No. 1 alarm. Based on elastic mechanics and structural dynamics, a mathematical relationship between displacement, stress, vibration and deflection is established. The mathematical relationship can be expressed by a partial differential equation, where vibration is usually expressed as acceleration or velocity vibration.

[0053] Finite element analysis can process the three-dimensional model to obtain the basic warning threshold. The safety value and the basic warning threshold are combined to obtain the first warning threshold and the second warning threshold. The adjustment range of the dynamic safety value is 0.80-0.95; the dynamic safety value will reduce the limit value or safety range in the basic warning threshold. The limit value and the safety value are multiplied to obtain the reduced limit value. The safety range takes the center point as the constant base point. The safety range is multiplied by the safety value to obtain a smaller safety range, so that the first warning threshold can be obtained. Since the second warning threshold is a comparison of the predicted data, the basic warning threshold and When the second warning threshold is obtained by combining the safety value, the dynamic safety value used will be greater than the safety value in the No. 1 warning threshold. The dynamic safety value is adjusted, wherein the ratio value between the simulation data and the No. 1 basic warning threshold, a ratio range is established based on the ratio value, wherein the ratio value is a specific value, the ratio value is less than 1, and the ratio value is multiplied by the range difference of the dynamic safety value. For example, the range difference of the dynamic safety value is 0.95-0.80=0.15, 0.15 is multiplied by the ratio value, and a modified value is obtained. Then the minimum value of the dynamic safety value is added to the modified value to obtain a new modified value, and a new dynamic safety value is obtained.

[0054] In the second embodiment, the sub-manager transmits the sensor data acquired in real time to the main manager, and the main manager analyzes the data from the sensors. Since the sensor data can be expressed as changes in numerical values, the changes in numerical values ​​are predicted based on the changes in numerical values ​​to obtain predicted data. If the predicted data exceeds any No. 2 warning threshold (displacement, stress, vibration, deflection), the system will issue a No. 2 alarm. Based on the actual detected values, the main manager can obtain predicted bridge data through the detected values ​​through a prediction method, and compare the predicted bridge data with the No. 2 warning threshold. The prediction method predicts subsequent values ​​based on the specific values ​​of the detected bridge data. The prediction method exists in the prior art and will not be explained in detail here.

[0055] When the No. 2 correction model modifies the dynamic safety value in the No. 2 warning threshold, its method is the same as the method of modifying the dynamic safety value in the No. 1 warning threshold by the No. 1 correction model, but a cache value is added in the No. 2 correction model. Through the cache value, the dynamic safety value in the No. 2 correction model is greater than or equal to the dynamic safety value in the No. 1 warning threshold.

[0056] Finite element analysis uses mathematical approximation methods to simulate real physical systems (geometry and load conditions). By using simple but interacting elements (i.e. units), a finite number of unknown quantities can be used to approximate a real system with infinite unknown quantities. There are existing technologies for finite element analysis, so we will not give a specific explanation of finite element analysis here.

[0057] After dividing the three-dimensional model into several No. 1 module areas, the divided No. 1 module areas are matched with the actual bridges, and sensors are installed on the actual bridges according to the No. 1 module areas. However, when sensors in adjacent No. 1 module areas collect data, the data are similar and correlated. Therefore, No. 2 module areas are established in the overlapping areas between the No. 1 module areas, and the No. 2 module areas are repeatedly sampled to collect real-time data, thereby realizing the correlation analysis of the data between adjacent No. 1 module areas. By analyzing the data in the No. 2 module area, the correlation of the adjacent No. 1 module area brackets can be analyzed, and through the correlation, Effectively analyzing the overall stress conditions of the bridge, setting up the No. 2 module area is of key significance in the bridge monitoring and early warning system. These overlapping areas ensure the verification and accuracy of the data, because multiple sensors can collect data in these areas at the same time, thus providing a data redundancy mechanism. In addition, the No. 2 module area helps to avoid data omissions at the boundaries of adjacent No. 1 module areas, ensuring the comprehensiveness of the data monitored by the sensors. The general manager will process the No. 1 module area and the No. 2 module area at the same time, and complete the data connection and transition between the adjacent No. 1 module areas through the data of the No. 2 module area, so as to obtain the situation of the entire bridge.

[0058] The prediction method includes that since the real-time data is a specific numerical value, it is regarded as a numerical value, and the prediction of subsequent numerical values ​​is realized through the prediction method to obtain predicted data. The prediction method includes a numerical prediction model, and the prediction model includes a linear regression model and time series analysis, etc., so as to realize the simulation of the numerical value. There is existing technology for the prediction model.

[0059] There will be obvious differences in the bridge structure, and there will be differences between the module areas after division. The module area near one end of the bridge and the module area near the middle of the bridge will have different designed No. 1 warning thresholds. Some of the module areas will have piers, while others will not. Therefore, the number of sensors and the sensor location data inside the two module areas are different, ensuring the number of sensors in the No. 1 module area.

[0060] The position of the sensor is designed. When the sensor transmits information to the sub-manager, the sub-manager also has the location data of the connected sensor. Information is transmitted between the sub-manager and the main manager. The main manager obtains the real-time data in the sub-manager, predicts the subsequent data based on the real-time data, and obtains the predicted data.

[0061] Based on the three-dimensional model, the basic warning threshold is obtained through finite element analysis and calculation. The basic warning threshold is used as a reference value for the No. 1 warning threshold and the No. 2 warning threshold. The basic warning threshold is combined with the dynamic safety value to obtain the No. 1 warning threshold and the No. 2 warning threshold. An alarm is set on the bridge, and the alarm can send out the No. 1 alarm and the No. 2 alarm. When the No. 2 warning threshold collects real-time data from the sensor, the subsequent numerical value is predicted through the real-time data. The No. 1 alarm is used to detect the real-time data of the sensor, and the No. 2 alarm is used to detect the predicted data. There will be differences in the alarm modes between the No. 1 alarm and the No. 2 alarm, so that construction personnel can distinguish and respond quickly. The No. 2 warning threshold is used to compare with the predicted bridge data. When the predicted bridge data exceeds the No. 2 warning threshold, the No. 2 alarm is issued.

[0062] The number of module No. 1 areas is equal to the number of sub-managers. Module No. 1 areas correspond to sub-managers. Sub-managers collect data from sensors inside module No. 1 areas and establish real-time data within the module areas. By dividing module No. 1 areas and installing sensors within module No. 1 areas, sub-managers are responsible for collecting bridge data within these module No. 1 areas in real time to ensure the timeliness and accuracy of information. This modular setting not only reasonably divides the entire bridge structure, but also greatly reduces the amount of calculation required by a single sub-manager. Each sub-manager can respond and process data more quickly, thereby achieving rapid response and efficient operation of the entire monitoring system. This design optimizes the alarm process.

[0063] By establishing correction method No. 1 and correction method No. 2, the warning threshold No. 1 and the warning threshold No. 2 can be effectively corrected. Correction method No. 1 is mainly responsible for adjusting the dynamic safety value of the warning threshold No. 1, so that it can be flexibly adjusted according to different environmental data, thereby realizing timely alarm of the bridge status under various environmental conditions, while correction method No. 2 adjusts the dynamic safety value of the warning threshold No. 2 to realize the warning function of the future status of the bridge. By comparing and judging the real-time data with the warning threshold No. 1 and the predicted data with the warning threshold No. 2, the safety status of the bridge can be monitored comprehensively and accurately to ensure the stable operation of the bridge.

[0064] There is a correlation between displacement, stress, vibration and deflection. The displacement of the bridge can be used to preliminarily calculate its stress and deflection. At the same time, through vibration, stress will cause the structure to deform, thereby generating displacement or deflection. During the vibration process, the object will produce dynamic displacement and stress changes. Vibration will cause dynamic displacement of the structure. This displacement changes with time. The frequency of vibration is close to the natural frequency of the structure, which may induce resonance, causing large vibrations and stress changes in the structure, and may even cause structural damage.

[0065] When outliers appear, due to the third correlation between the appearance of outliers and similar data, third correlations will appear between the values ​​in the same data. Based on this correlation, outliers can be identified and eliminated. For example, two sensors that are close to each other and can be used to detect bridge frequency may detect different frequencies due to different positions, but the amplitude and frequency are similar. Three sensors that are close to each other and can be used to detect bridge displacement may detect different displacements due to different positions, but the displacements are correlated and can be gradually changed, so outliers can be identified.

[0066] The displacement and deformation of the bridge structure under stress are measured to evaluate its stress state. Displacement and deformation are the most direct reflection of the structure after stress, which can reflect the overall stiffness and local stress of the structure. Deflection can be regarded as a special form of displacement, focusing on describing the bending deformation of the structure. Deflection is an important parameter for measuring the stress and disaster resistance of the structure. By measuring the deflection of the material, the structural stress of the bridge under extreme climate, natural disasters and other conditions can be predicted, so as to prevent possible damage to the building structure in the future. The measurement of deflection is particularly important. The disturbance accumulates in the connected module area, but in the No. 1 module area, the disturbance can be calculated through the displacement of the connection, and the establishment of The disturbance threshold is used to prevent the data detected by the sensor from exceeding the disturbance threshold. By setting the No. 1 warning threshold, the real-time data of the sensor is compared and analyzed with the No. 1 warning threshold. Its advantage is that it allows direct comparison of the actual data with the No. 1 warning threshold, so as to quickly identify any potential risks. In addition, by reasonably controlling the size of the No. 1 module area, the accuracy of the data and the ease of comparison are ensured. Once the actual data exceeds the range set by the No. 1 warning threshold, the system will be able to trigger an alarm immediately to quickly discover and respond to abnormal situations and ensure the safety of the construction site. This efficient and direct monitoring method can improve the management capabilities and response speed of bridge construction safety.

[0067] Based on the knowledge of bridge engineering and statistics, features closely related to the changes in bridge status are selected. The features may include the vibration amplitude at a specific frequency, the displacement change trend, the stress change in the stress concentration area, etc. These features are extracted from the preprocessed data using signal processing techniques (such as Fourier transform and wavelet analysis).

[0068] The fixed frequency acquisition method includes the vibration table method. The vibration table method includes applying a certain excitation force on the bridge to make it vibrate, measuring the vibration response of the bridge through a suitable sensor, obtaining a vibration signal, analyzing and processing the collected vibration signal, and thus determining the natural frequency of the bridge. In addition to the above-mentioned vibration table method, there are also free vibration method and inertial measurement method. There are existing technologies for the fixed frequency acquisition method of the bridge, which will not be described in detail here. The natural frequency of the No. 1 module area is obtained according to the fixed frequency acquisition method. Since the bridge is under construction, the natural frequency of the bridge will change with the continuous construction of the bridge. Therefore, during the construction of the bridge, the natural frequency can be obtained intermittently through the fixed frequency acquisition method, and the vibration threshold is updated according to the obtained natural frequency, and compared with the actual monitoring data to verify the accuracy of the prediction model. If the model is found to have deviations or deficiencies, it needs to be adjusted and optimized in time to simulate the impact of environmental data on the bridge. Then, statistical methods such as the Pearson correlation coefficient are used to analyze the correlation between environmental data and bridge data, identify which environmental factors have a significant impact on the bridge status, and then obtain the second correlation.

[0069] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is limited by the attached embodiments and their equivalents.

Claims

1. A bridge construction safety monitoring method, It is characterized in that The monitoring method comprises: Establishing a three-dimensional model: establishing a three-dimensional model of the bridge, and dividing the three-dimensional model into a number of No. 1 module areas according to the division method; Layout of monitoring network: sensors for collecting data are installed in the No. 1 module area, sub-managers are set up to collect sensor data inside the module area, and a general manager is set up to transmit information with sub-managers. The sub-managers store the location information of sensors. The data collected by the sensors include bridge data and environmental data. The three-dimensional model is combined with the location information of the sensors and installed on the bridge; Acquiring data: The sensor monitors the bridge data in the No. 1 module area in real time, obtains real-time data, processes the real-time data through prediction methods, and obtains predicted data; Establish alarm thresholds; use finite element calculations and three-dimensional models to obtain a first warning threshold for comparison with real-time data and a second alarm threshold for comparison with predicted data; Establish a threshold correction model: establish a No. 1 correction method for modifying the internal parameters of the No. 1 warning threshold based on real-time data, and establish a No. 2 correction method for modifying the internal parameters of the No. 2 warning threshold based on forecast data; Threshold correction: Correction method No. 1 continuously corrects the warning threshold No. 1, and correction method No. 2 continuously corrects the warning threshold No. 2; Establish early warning: Make judgments based on the revised No. 1 and No. 2 early warning thresholds, real-time data and No. 1 early warning thresholds. When the real-time data exceeds the early warning threshold, the No. 1 alarm is issued. When the predicted data exceeds the No. 2 early warning threshold, the No. 2 alarm is issued. Method for establishing the No. 1 warning threshold: obtain real-time monitoring data from sensors, combine finite element simulation calculations, analyze the results, simulate the stress, displacement and frequency of various parts of the bridge under different working conditions, obtain the stress, displacement and frequency limit values ​​or safety ranges, obtain the No. 1 basic warning threshold, establish a dynamic safety value, combine the dynamic safety value with the No. 1 basic warning threshold, and obtain the No. 1 warning threshold; The method for establishing the No. 2 warning threshold is the same as that for establishing the No. 1 warning threshold, and the dynamic safety value in the No. 2 warning threshold is greater than the dynamic safety value in the No. 1 warning threshold; The first correction method adjusts the dynamic safety value in the first warning threshold to achieve the correction of the first warning threshold. The establishment method of the first correction method includes establishing a first association between bridge data, establishing a second association between environmental data and bridge data, obtaining simulation data through finite element analysis calculation, the simulation data is the impact result of simulated environmental data on simulated bridge data, comparing the simulation data with the first basic warning threshold, obtaining the ratio value between the simulation data and the first basic warning threshold, and adjusting the dynamic safety value; The second correction method adjusts the dynamic safety value in the second alarm threshold to achieve the correction of the second alarm threshold. The establishment method of the second correction method is the same as the establishment method of the first correction method. The bridge data includes displacement data, stress data, vibration data and deflection data of the bridge, and the environmental data includes wind data, temperature data and humidity data; The method of establishing the first association is based on elastic mechanics and structural dynamics to establish the mathematical relationship between displacement, stress, vibration and deflection, and the finite element analysis method is used to simulate the force and deformation process of the structure to obtain the first association; The method for establishing the second association is as follows: based on the first association, the impact of environmental data on the bridge is simulated, and based on the impact result, the second association is obtained.

2. A bridge construction safety monitoring method according to claim 1, Features: The division method includes dividing the three-dimensional model according to the connection parts and structural characteristics of the bridge, the connection parts include welding seams and rivet points, and the structural characteristics include main beams, bridge towers, bridge deck systems, bridge spans, supporting structures and bridge decks.

3. A bridge construction safety monitoring method according to claim 1, Features: The No. 1 warning threshold includes a displacement threshold, a stress threshold, a vibration threshold and a deflection threshold. The No. 1 basic threshold in the module area is calculated by finite element analysis. The No. 1 basic threshold includes a displacement basic threshold, a stress basic threshold and a deflection basic threshold. The fixed frequency is obtained by a fixed frequency acquisition method. The fixed frequency is the vibration threshold. The No. 1 basic threshold and the vibration threshold are combined to obtain the No. 1 basic warning threshold. The sub-manager obtains real-time data from the sensor, compares the real-time data with the No. 1 warning threshold, and determines whether the real-time data exceeds the No. 1 warning threshold. When the real-time data is judged to exceed the basic threshold, a No. 1 alarm is issued.

4. A bridge construction safety monitoring system, Features: A bridge construction safety monitoring method as described in any one of claims 1 to 3 is adopted.