High-throughput satellite communication dynamic resource management method and related equipment

By adopting a dynamic resource management method in a high-throughput satellite communication system, the terminal side and the main station side collaboratively determine resource allocation, solving the problems of unfair resource allocation and insufficient immediacy in the existing technology, and achieving more efficient resource utilization. and fairness.

CN118740243APending Publication Date: 2024-10-01中国卫通集团股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410952411.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In high-throughput satellite communication systems, the existing resource management mechanism is not real-time enough in channel change scenarios, resulting in unfair resource allocation, especially when priority and resource demand estimation accuracy are lacking.

Method used

A dynamic resource management method for high-throughput satellite communications is proposed. The terminal side determines the resource request type and required resource amount. The master station side performs the first allocation based on spectrum efficiency and allocable resources, and performs secondary allocation based on satisfaction and surplus. , improve the fairness and immediacy of resource allocation.

Benefits of technology

It reduces the computing resource occupation on the main station side, improves the immediacy and fairness of resource allocation, and ensures the resource utilization efficiency of the terminal side under different application rounds.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118740243A_ABST
    Figure CN118740243A_ABST
Patent Text Reader

Abstract

The invention provides a high-throughput satellite communication dynamic resource management method and related equipment, and the method comprises the steps: a terminal side determines a resource request type of each application round, and determines a required resource amount according to the resource request type; the main station side determines the first allocation resource of each terminal side according to the spectrum efficiency of each terminal side in each application round and all current allocatable resources; the terminal side determines a first satisfaction degree of each terminal side in each application round according to the first allocated resources; if the current application round is greater than 1 and the first satisfaction degree is less than 1, the terminal side determines a secondary allocation satisfaction degree and a long-term satisfaction degree according to secondary allocation resources before the current application round, and the master station side determines a first allocation surplus; and determining secondary allocation resources of each terminal side in the current application round by using the first allocation surplus, the first satisfaction of the current application round and the long-term satisfaction proportion of all application rounds before the current application round.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of satellite communication technology, and in particular to a high-throughput satellite communication dynamic resource management method and related equipment. Background Art

[0002] With the development of satellite communication technology, the problem of satellite communication spectrum resource shortage has gradually become prominent. High-throughput satellites use multi-spot beams, frequency reuse, beam gain and other methods to maximize satellite capacity under limited spectrum resources, making high-throughput satellite communication systems the development trend of satellite communications.

[0003] In order to achieve the best transmission performance and network flexibility of high-throughput satellite communication systems, ETSI (European Telecommunications Standards Organization) introduced ACM (Adaptive Coding and Modulation) technology in the DVB-S2 / X standard. This technology uses interactive services between the master station and the terminal to estimate the link status, and adaptively selects the appropriate modulation and coding method (MODCOD) according to the link signal-to-noise ratio, so as to achieve accurate and error-free channel conditions for users as much as possible, and optimize spectrum efficiency and improve resource utilization. However, ACM only adjusts the transmission QoS (quality of service) requirements of the satellite link to the channel conditions, and has limited improvement in resource utilization. The system's resource management mechanism is more critical to the resource utilization of the network.

[0004] At present, in high-throughput satellite communication systems, resource management and allocation are carried out at the link layer, using the DAMA (demand-assigned multiple access) algorithm to allocate time slot resources to terminals based on the resource requirements reported by them. During the execution of the DAMA algorithm, the proportional fair scheduling algorithm is mainly used to allocate resources as fairly as possible among multiple terminals by estimating priorities and resource requirements. However, the proportional fair scheduling algorithm lacks immediacy in the scenario of channel changes, and lacks accuracy in estimating priorities and resource requirements, resulting in unfair resource allocation. Summary of the invention

[0005] In view of this, the purpose of the present application is to propose a high-throughput satellite communication dynamic resource management method and related equipment that overcomes the above-mentioned problems or at least partially solves the above-mentioned problems.

[0006] Based on the above purpose, the first aspect of the present application provides a high-throughput satellite communication dynamic resource management method, which is executed in a high-throughput satellite communication dynamic resource management system, and the high-throughput satellite dynamic resource management system includes: a master station side and at least one terminal side; the method includes:

[0007] The terminal side determines the resource request type of each application round, and determines the required resource amount according to the resource request type;

[0008] The master station side determines the first allocation resources of each terminal side according to the spectrum efficiency of each terminal side in each application round and all currently allocatable resources;

[0009] The terminal side determines a first satisfaction level of each terminal side in each application round according to the first allocated resources;

[0010] In response to the current application round being 1 and the first satisfaction level of the current application round being less than 1, the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the second allocation resources of each terminal side in the current application round according to the first satisfaction level of the current application round;

[0011] In response to the current application round being greater than 1 and the first satisfaction level of the current application round being less than 1, the terminal side determines the secondary allocation satisfaction level and the long-term satisfaction level based on the secondary allocation resources before the current application round, and the master station side determines the first allocation surplus of each terminal based on the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round based on the first satisfaction level of the current application round and the ratio of long-term satisfaction levels of all application rounds before the current application round.

[0012] Optionally, the resource request type of each application round includes: a rate-based resource request amount and a capacity-based resource request amount;

[0013] The required amount of resources is expressed as:

[0014] CR i n =α·r RBDC +β·r VBDC ,α∈[0,1],β∈[0,1],α+β=1,

[0015] where r RBDC is represented by the rate-based resource request, α is represented by the rate-based resource request coefficient, and r VBDC It represents the resource request amount based on capacity, β represents the resource request amount based on capacity, i represents the i-th terminal side, and n represents the application round.

[0016] Optionally, the master station side determines the first allocation resources of each terminal side according to the spectrum efficiency of each terminal in each application round and all currently allocatable resources, including:

[0017] Determine the spectrum efficiency of each terminal side;

[0018] Determine the number of terminals;

[0019] Determining a total spectrum efficiency of the terminal side according to the spectrum efficiency of each terminal side and the number of the terminal sides;

[0020] Determine all currently allocatable resources, and determine the first allocated resources for each terminal side according to the spectrum efficiency of each terminal side and the total spectrum efficiency of the terminal side;

[0021] The total spectrum efficiency of the terminal side is expressed as:

[0022]

[0023] The first allocation of resources on each terminal side is expressed as:

[0024]

[0025] Among them, se i represents the spectrum efficiency of each terminal side, M represents the number of terminals, n represents the application round, T slot Represents all currently allocatable resources.

[0026] Optionally, the terminal side determines a first satisfaction level of each application round according to the first allocated resources, including:

[0027] The terminal side determines the first satisfaction level according to the first allocation of resources in each round and the amount of resources required in each round;

[0028] The first satisfaction level is expressed as:

[0029]

[0030] in, Indicates the first allocation of resources in the nth application round on the i-th terminal side. Indicates the required resources for the nth application round on the i-th terminal side.

[0031] Optionally, in response to the current application round being 1, the master station side determines the first allocation surplus of each terminal side according to the first allocation resources of the current round, and determines the second allocation resources of each terminal side in the current application round, including:

[0032] The master station side determines that the current application round is 1 and the first satisfaction level of the current application round is less than 1, determines the first allocation resources of each terminal side and the required resources of each terminal side, and determines the first allocation surplus of each terminal side;

[0033] Determine the first total allocation surplus of all terminal sides in the current application round based on the number of terminal sides;

[0034] Determine the secondary allocation resources of each terminal side in the current application round according to the first total allocation surplus and the first satisfaction level of the current application round;

[0035] The secondary allocation resources of each terminal side in the current application round are expressed as:

[0036]

[0037] RS stands for the first total distribution surplus, SRU i It indicates the first satisfaction level of the current application round, and M indicates the number of terminals.

[0038] Optionally, in response to the current application round being greater than 1, the terminal side determines the secondary allocation satisfaction and the long-term satisfaction according to the secondary allocation resources before the current application round, the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round and the long-term satisfaction of all application rounds before the current application round, including:

[0039] The master station side determines that the current application round is greater than 1 and the first satisfaction of the current application round is less than 1, determines the first allocation resources of each terminal side and the required resources of each terminal side, and determines the first allocation surplus of each terminal side;

[0040] Determine the first total allocation surplus of all terminal sides in the current application round based on the number of terminal sides;

[0041] The terminal side determines the secondary allocation resources of the application round before the current application round;

[0042] The terminal side determines the second satisfaction level of the previous application round according to the first allocated resources of the previous application round and the second allocated resources of the previous application round;

[0043] The terminal side determines the number of all application rounds before the current application round, and determines the long-term satisfaction level according to the sum of the second satisfaction levels of all previous application rounds;

[0044] Determine the sum of the long-term satisfaction of all terminal sides, and determine the long-term satisfaction ratio according to the long-term satisfaction and the sum of the long-term satisfaction;

[0045] The terminal side determines the secondary allocation resources of each terminal side in the current application round according to the first total allocation surplus, the first satisfaction level of the current application round and the long-term satisfaction level ratio.

[0046] Optionally, the secondary allocation resources of each terminal side in the current application round are expressed as:

[0047]

[0048] Among them, RS n represents the first total distribution surplus in the current round, Indicates the first satisfaction of the current round, Indicates the long-term satisfaction ratio.

[0049] In a second aspect of the present application, a high-throughput satellite communication dynamic resource management device is provided, comprising:

[0050] A determination module, used to control the terminal side to determine the resource request type of each application round, and determine the total amount of required resources according to the resource request type;

[0051] The first allocation module is used to control the master station side to determine the first allocation resources of each terminal side according to the spectrum efficiency of each terminal side in each application round and all currently allocatable resources;

[0052] A first satisfaction module, used to control the terminal side to determine a first satisfaction level of each terminal side in each application round according to the first allocation of resources;

[0053] A secondary allocation module, used to control the master station side to determine that the current application round is 1 and the first satisfaction of the current application round is less than 1, the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round;

[0054] And it is used to control the main station side to determine that the current application round is greater than 1 and the first satisfaction of the current application round is less than 1, the terminal side determines the secondary allocation satisfaction and the long-term satisfaction according to the secondary allocation resources before the current application round, the main station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round and the long-term satisfaction of all application rounds before the current application round.

[0055] According to a third aspect of the present application, an electronic device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method described in the first aspect is implemented.

[0056] According to a fourth aspect of the present application, a non-transitory computer-readable storage medium is provided, wherein the non-transitory computer-readable storage medium stores computer instructions, wherein the computer instructions are used to enable a computer to execute the method described in the first aspect.

[0057] From the above, it can be seen that the high-throughput satellite communication dynamic resource management method and related equipment provided by the present application, in the present application, firstly, the terminal side counts different resource request types, and according to the statistical results, calculates and determines the total amount of resources corresponding to different resource request types. There is no need for the main station side to identify the resource request type, nor is there any need for the main station side to calculate the required amount of resources after identifying the resource request type in different application rounds, thereby freeing up the computing resources on the main station side, reducing computing delays, and improving the immediacy of resource allocation on the main station side.

[0058] At the same time, the master station side, based on the initial allocation of resources based on the spectrum efficiency of different terminal sides, uses the first satisfaction feedback to count the initial allocation surplus of each terminal side. When the application round is 1, the terminal side is secondary allocated with the first satisfaction and the initial allocation surplus, and the second satisfaction is determined using the secondary allocation resources. When the application round is greater than 1, the long-term satisfaction ratio of all application rounds before the current application round is determined using the second satisfaction ratio, and the first satisfaction ratio, the initial allocation surplus and the long-term satisfaction ratio are used to secondary allocate resources to the terminal side, thereby improving the fairness of resource allocation to the terminal side in different application rounds.

[0059] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] In order to more clearly illustrate the technical solutions in the present application or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0061] Figure 1 It is a flowchart of a scheduling algorithm in the related technology;

[0062] Figure 2 Flow chart of a high-throughput satellite communication dynamic resource management method 200 according to an embodiment of the present application;

[0063] Figure 3 A schematic diagram of a high-throughput satellite communication dynamic resource management system according to an embodiment of the present application;

[0064] Figure 4 A schematic diagram of dynamic resource management for high-throughput satellite communications with an application round greater than 1 according to an embodiment of the present application;

[0065] Figure 5A schematic diagram of the overall process of high-throughput satellite communication dynamic resource management according to an embodiment of the present application;

[0066] Figure 6 A schematic diagram of a high-throughput satellite communication dynamic resource management device according to an embodiment of the present application;

[0067] Figure 7 A schematic diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0068] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.

[0069] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application should be the usual meanings understood by people with ordinary skills in the field to which the present application belongs. The "first", "second" and similar words used in the embodiments of the present application do not represent any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0070] As described in the above background technology section, in the related technology, DVB-RCS2 defines the following two common types of terminal-side bandwidth resource requests: One is rate-based dynamic capacity request (RBDC): the terminal side dynamically applies to the network control center according to demand, and within the maximum rate limit, each application will overwrite the previous application. Since RBDC can be adjusted dynamically in real time when sending data according to different access rates, higher channel utilization can be achieved. The second is capacity-based dynamic capacity request (VBDC): when the request type is the same each time, the requested capacity size can be superimposed on the last time. However, the delay of using VBDC is relatively large, which is suitable for services with low requirements for delay jitter.

[0071] However, when requesting resources, the terminal selects a single resource request method according to the service characteristics to submit the request, and the master station calculates the final allocated resources based on multiple requests, which greatly occupies the computing resources of the master station. That is, the master station needs to calculate the resource request type of each terminal in each round and the total amount of resources required for the resource request type. For different resource request types, the master station needs to first determine the resource request type and then determine the corresponding calculation method, which occupies the computing resources of the master station to a large extent. In addition, in systems using ACM, the delay caused by a large number of calculations for priority and resource demand estimation leads to poor adaptation to channel time variability.

[0072] The proportional fair resource allocation algorithm on the master side is as follows: The master side uses a priority-based scheduling algorithm to allocate resources to the resource requests on the terminal side, and is divided into the first priority queue, the second priority queue, the third priority queue, etc. according to the terminal side and the resource request type. For the resource requests on the terminal side, on the basis of allocating resources according to priority, for resource requests of the same priority, the master side uses a proportional fair hopping algorithm to achieve a balance between throughput fairness and time slot fairness as much as possible. The proportional fair scheduling algorithm calculates the instantaneous rate r of user i at time t i (t) and the average rate R over the past period of time i (t), calculated by the scheduling level formula Calculate the scheduling level of the terminal side, and the terminal side to be scheduled is the terminal side with the highest level at the current moment. The scheduling algorithm is as follows: Figure 1 As shown, it can be seen that the proportional fairness algorithm will give priority to the terminal side with the highest current scheduling level, and the fairness of other terminal sides cannot be guaranteed in the current application round, and it is impossible to allocate resources fairly in the long term based on all application rounds of each terminal side.

[0073] Therefore, the purpose of this application is to reduce the occupancy of computing resources on the master side when the terminal requests resources, and further meet the improvement of long-term fairness on each terminal side.

[0074] Figure 2 A flow chart of a high-throughput satellite communication dynamic resource management method 200 according to an embodiment of the present application is shown. Figure 2 As shown, the purpose of method 200 is to implement a new means for allocating resources from the master station side to the terminal side, so as to achieve more reasonable resource allocation. Method 200 is executed in a high-throughput satellite communication dynamic resource management system, which includes: a master station side and at least one terminal side. Figure 3As shown in the figure, the master station side and the terminal side communicate using high-throughput satellites. The master station side needs to face resource requests from multiple terminal sides at the same time. At the same time, each terminal side may have different resource request types in different application rounds. The master station side needs to allocate resources to each terminal side in different application rounds. Among them, the master station side can be a server of a satellite communication operator, and the terminal side is a satellite terminal that can communicate with the master station side using Qualcomm satellite communication, such as a mobile phone, base station, etc.

[0075] Method 200 begins at step 202, where the terminal side determines the resource request type for each application round and determines the required resource amount according to the resource request type. In this step, before sending the resource request, the terminal side counts the different resource types to be applied for, and calculates and determines the resource amounts corresponding to the different resource request types according to the statistical results, and then sends the different resource request types and their corresponding required resource amounts to the master station side. In this process, the master station side does not need to identify the resource request type, and further, does not need to calculate the required resource amount on the master station side according to the resource request type, freeing up the computing resources on the master station side.

[0076] In some embodiments, the resource request types of each application round include: rate-based resource request amounts and capacity-based resource request amounts.

[0077] Accordingly, the total amount of resources required is determined as:

[0078]

[0079] where r RBDC is represented by the rate-based resource request, α is represented by the rate-based resource request coefficient, and r VBDC It represents the resource request amount based on capacity, β represents the resource request amount based on capacity, i represents the i-th terminal side, and n represents the application round.

[0080] In step 204, the master station side determines the first allocation resources for each terminal side according to the spectrum efficiency of each terminal side in each application round and all currently allocatable resources.

[0081] Specifically, the spectrum efficiency of each terminal side is determined; the number of terminal sides is determined, and the total spectrum efficiency of the terminal side is determined according to the spectrum efficiency of each terminal side and the number of terminal sides.

[0082] The total spectrum efficiency at the terminal side is expressed as:

[0083]

[0084] The master station side determines all currently allocatable resources, and determines the first allocation of resources to each terminal side based on the spectrum efficiency of each terminal side and the total spectrum efficiency of the terminal side, expressed as:

[0085]

[0086] Among them, se i represents the spectrum efficiency of each terminal side, M represents the number of terminals, n represents the application round, T slot Represents all currently allocatable resources.

[0087] It should be noted that the spectrum efficiency of each terminal side can be determined according to the current coding modulation mode selected by ACM.

[0088] In this embodiment, during the first resource allocation on the master station side, only all currently allocatable resources, the spectrum efficiency of each terminal side, and the total spectrum efficiency of the terminal side are considered to achieve preliminary allocation of resources on each master station side. The master station side has fewer calculation parameters and less calculation amount, thus preparing for the subsequent secondary resource allocation.

[0089] In step 206, the terminal side determines the first satisfaction level of each terminal side in each application round based on the first allocated resources. In this embodiment, the first satisfaction level is first introduced to evaluate the first resource allocation, to determine whether the first allocated resources in the current application round meet the required resource amount of the terminal side, and whether the first allocated resources have a surplus when meeting the required resource amount, that is, the first allocated resource amount is more than the required resource amount of the terminal side. If the first allocated resource amount is too small, it is difficult to meet the needs of the terminal side. If the first allocated resource amount is too large, the resource utilization rate is insufficient, and there is a waste of resources.

[0090] On this basis, by calculating the initial distribution surplus on the terminal side, secondary distribution is carried out, and the long-term satisfaction is calculated based on the satisfaction of the secondary distribution. The long-term satisfaction is used to provide a reference for the next application round allocation, thereby improving the long-term balance of resource allocation for the terminal side.

[0091] In some embodiments, the terminal side determines the first satisfaction level based on the initial allocation of resources in each round and the amount of resources required in each round.

[0092] The first satisfaction is expressed as:

[0093]

[0094] in, Indicates the first allocation of resources in the nth application round on the i-th terminal side. Indicates the required resources for the nth application round on the i-th terminal side.

[0095] In step S208, in response to the current application round being 1 and the first satisfaction of the current application round being less than 1, the master station side determines the first allocation surplus of each terminal based on the first allocation resources of the current round, and determines the second allocation resources of each terminal side in the current application round based on the first satisfaction of the current application round.

[0096] In this step, through the above embodiment, if the current application round is 1, it means that in the current scenario, the terminal side communicates with the master side for the first time, and the master side also allocates resources to the terminal side for the first time. And when the first satisfaction of the current application round is less than 1, only the first satisfaction of the current application round fed back by the terminal side is used to determine the amount of secondary allocation resources. By calculating the first allocation surplus of each terminal side, each terminal side is secondary allocated resources in the current application round. Through the secondary allocation of resources, it is ensured that in the current application round, the terminal side whose first allocation resources are greater than the required amount of resources is utilized, and the terminal side whose first allocation resources are less than the required amount of resources is compensated for resources.

[0097] It should be noted that, when the current application round is 1, secondary resource allocation can be performed as long as the first satisfaction of one terminal side is less than 1. If the first satisfaction of all terminal sides is greater than 1, secondary resource allocation may not be performed temporarily.

[0098] Specifically, the master station side determines that the current application round is 1, and the first satisfaction of the current application round is less than 1, determines the first allocation resources of each terminal side and the required resources of each terminal side, and determines the first allocation surplus of each terminal side;

[0099] The first distribution of surplus is expressed as:

[0100]

[0101] Among them, RA i,1 Indicates the first allocation of resources in the first application round, CR i Indicates the amount of resources required for the first application round.

[0102] Based on the number of terminal sides, determine the first total allocation surplus of all terminal sides in the current application round;

[0103] The total distributed surplus is expressed as:

[0104]

[0105] Determine the secondary allocation resources of each terminal side in the current application round according to the first total allocation surplus and the first satisfaction of the current application round;

[0106] The secondary allocation resources of each terminal side in the current application round are expressed as:

[0107]

[0108] RS stands for the first total distribution surplus, SRU i It indicates the first satisfaction level of the current application round, and M indicates the number of terminals.

[0109] In step S210, refer to Figure 4 As shown, in response to the current application round being greater than 1 and the first satisfaction of the current application round being less than 1, the terminal side determines the secondary allocation satisfaction and the long-term satisfaction based on the secondary allocation resources before the current application round, and the main station side determines the first allocation surplus of each terminal based on the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round based on the first satisfaction of the current application round and the long-term satisfaction ratio of all application rounds before the current application round.

[0110] In this step, if the current application round is greater than 1, it means that in the current scenario, the terminal side has communicated with the main station side, and the main station side is not the first time to allocate resources to the terminal side. When the first satisfaction of the current application round is less than 1, in addition to using the first satisfaction of the current application round fed back by the single test to determine the amount of secondary allocation resources, the second satisfaction of the secondary allocation resources of the previous application round before the current application round is further used to determine the overall satisfaction ratio of all previous application rounds for the secondary resource allocation. Of course, by calculating the first allocation surplus of each terminal side, secondary resource allocation is performed for each terminal side in the current application round.

[0111] The second satisfaction calculation is performed on the secondary allocation resources of the previous application round of the current application round, and the long-term satisfaction ratio of all application rounds before the current application round is used as the satisfaction of long-term resource use to ensure the long-term fairness of resource allocation on the terminal side. Similarly, by secondary allocation of resources, it is ensured that in the current application round, the terminal side with the first allocation of resources greater than the required amount of resources will use them, and the terminal side with the first allocation of resources less than the required amount of resources will receive resource compensation.

[0112] It should be noted that, when the current application round is greater than 1, secondary resource allocation can be performed as long as the first satisfaction of one terminal side is less than 1. If the first satisfaction of all terminal sides is greater than 1, secondary resource allocation may not be performed temporarily.

[0113] Specifically, the master station side determines that the current application round is greater than 1 and the first satisfaction of the current application round is less than 1, determines the first allocation resources of each terminal side and the required resources of each terminal side, and determines the first allocation surplus of each terminal side;

[0114] The first distribution of surplus is expressed as:

[0115]

[0116] in, Indicates that resources are allocated for the first time in the current application round. Indicates the amount of resources required for the current application round.

[0117] Determine the first total allocation surplus of all terminal sides in the current application round based on the number of terminal sides;

[0118]

[0119] The terminal side determines the secondary allocation resources of the application round before the current application round;

[0120] The terminal side determines the second satisfaction level of the previous application round according to the first allocated resources of the previous application round and the second allocated resources of the previous application round;

[0121] The second satisfaction level is expressed as:

[0122]

[0123] The terminal side determines the number of all application rounds before the current application round, and determines the long-term satisfaction level according to the sum of the second satisfaction levels of all previous application rounds;

[0124] Long-term satisfaction is expressed as:

[0125]

[0126] Determine the sum of the long-term satisfaction of all terminal sides, and determine the long-term satisfaction ratio according to the long-term satisfaction and the sum of the long-term satisfaction;

[0127]

[0128] The terminal side determines the secondary allocation resources of each terminal side in the current application round according to the first total allocation surplus, the first satisfaction level of the current application round and the long-term satisfaction level ratio.

[0129] For example, there are three terminal sides, and the long-term satisfaction of the three terminal sides is 0.8, 1.0, and 1.1 respectively. Accordingly, the sum of the long-term satisfaction of all terminal sides is 0.8+1.0+1.1=2.9, so the long-term satisfaction ratios of the three terminal sides are 0.8 / 2.9, 1.0 / 2.9, and 1.1 / 2.9 respectively.

[0130] In some embodiments, the master station side determines that the current application round is greater than 1 and the first satisfaction level of the current application round is less than 1, and the secondary allocation resources of each terminal side in the current application round are expressed as:

[0131]

[0132] Among them, RS n represents the first total distribution surplus in the current round, Indicates the first satisfaction of the current round, represents the long-term satisfaction ratio, and both ξ and η are proportional coefficients.

[0133] The long-term satisfaction ratio of all application rounds before the current round is used as one of the allocation criteria for long-term fairness. In each subsequent allocation process, in addition to considering the first satisfaction level, the long-term satisfaction ratio of resource allocation in all previous application rounds is also considered, which makes the resource allocation criteria for subsequent application rounds clearer.

[0134] In this application, Figure 5 A schematic diagram of the overall process of dynamic resource management of high-throughput satellite communications in an embodiment of the present application is shown. First, the terminal side counts different resource request types, and based on the statistical results, calculates and determines the total amount of resources corresponding to different resource request types. There is no need for the main station side to identify the resource request type, nor is there any need for the main station side to calculate the required resource amount after identifying the resource request type in different application rounds, thereby freeing up the computing resources on the main station side, reducing computing delays, and improving the immediacy of resource allocation on the main station side.

[0135] At the same time, the master station side, based on the initial allocation of resources based on the spectrum efficiency of different terminal sides, uses the first satisfaction feedback to count the initial allocation surplus of each terminal side. When the application round is 1, the terminal side is secondary allocated with the first satisfaction and the initial allocation surplus, and the second satisfaction is determined using the secondary allocation resources. When the application round is greater than 1, the long-term satisfaction ratio of all application rounds before the current application round is determined using the second satisfaction ratio, and the first satisfaction ratio, the initial allocation surplus and the long-term satisfaction ratio are used to secondary allocate resources to the terminal side, thereby improving the fairness of resource allocation to the terminal side in different application rounds.

[0136] It should be noted that the method of the embodiment of the present application can be performed by a single device, such as a computer or server. The method of this embodiment can also be applied to a distributed scenario and completed by multiple devices cooperating with each other. In the case of such a distributed scenario, one of the multiple devices can only perform one or more steps in the method of the embodiment of the present application, and the multiple devices will interact with each other to complete the described method.

[0137] It should be noted that the above describes some embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0138] Based on the same technical concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a high-throughput satellite communication dynamic resource management device.

[0139] refer to Figure 6 , the high-throughput satellite communication dynamic resource management device comprises:

[0140] A determination module 61, configured to control the terminal side to determine the resource request type of each application round, and determine the total amount of required resources according to the resource request type;

[0141] The first allocation module 62 is used to control the master station side to determine the first allocation resources of each terminal side according to the spectrum efficiency of each terminal side in each application round and all currently allocatable resources;

[0142] A first satisfaction module 63, used to control the terminal side to determine a first satisfaction level of each terminal side in each application round according to the first allocation of resources;

[0143] The secondary allocation module 64 is used to control the master station side to determine that the current application round is 1 and the first satisfaction of the current application round is less than 1, and the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round;

[0144] And it is used to control the main station side to determine that the current application round is greater than 1 and the first satisfaction of the current application round is less than 1, the terminal side determines the secondary allocation satisfaction and the long-term satisfaction according to the secondary allocation resources before the current application round, the main station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round and the long-term satisfaction of all application rounds before the current application round.

[0145] For the convenience of description, the above device is described in terms of functions divided into various modules. Of course, when implementing the present application, the functions of each module can be implemented in the same or multiple software and / or hardware.

[0146] The device of the above embodiment is used to implement the corresponding high-throughput satellite communication dynamic resource management method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be repeated here.

[0147] Based on the same technical concept, corresponding to any of the above-mentioned embodiments and methods, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the high-throughput satellite communication dynamic resource management method described in any of the above embodiments is implemented.

[0148] Figure 7 A more specific schematic diagram of the hardware structure of an electronic device provided in this embodiment is shown, and the device may include: a processor 1010, a memory 1020, an input / output interface 1030, a communication interface 1040, and a bus 1050. The processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040 are connected to each other through the bus 1050 in the device.

[0149] The processor 1010 can be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of this specification.

[0150] The memory 1020 may be implemented in the form of ROM (Read Only Memory), RAM (Random Access Memory), static storage device, dynamic storage device, etc. The memory 1020 may store an operating system and other application programs. When the technical solutions provided in the embodiments of this specification are implemented by software or firmware, the relevant program codes are stored in the memory 1020 and are called and executed by the processor 1010.

[0151] The input / output interface 1030 is used to connect the input / output module to realize information input and output. The input / output module can be configured in the device as a component (not shown in the figure), or it can be externally connected to the device to provide corresponding functions. The input device may include a keyboard, a mouse, a touch screen, a microphone, various sensors, etc., and the output device may include a display, a speaker, a vibrator, an indicator light, etc.

[0152] The communication interface 1040 is used to connect a communication module (not shown) to realize communication interaction between the device and other devices. The communication module can realize communication through a wired mode (such as USB, network cable, etc.) or a wireless mode (such as mobile network, WIFI, Bluetooth, etc.).

[0153] The bus 1050 includes a path that transmits information between the various components of the device (eg, the processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040).

[0154] It should be noted that, although the above device only shows the processor 1010, the memory 1020, the input / output interface 1030, the communication interface 1040 and the bus 1050, in the specific implementation process, the device may also include other components necessary for normal operation. In addition, it can be understood by those skilled in the art that the above device may also only include the components necessary for implementing the embodiments of the present specification, and does not necessarily include all the components shown in the figure.

[0155] The electronic device of the above embodiment is used to implement the corresponding high-throughput satellite communication dynamic resource management method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be repeated here.

[0156] Based on the same technical concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the high-throughput satellite communication dynamic resource management method as described in any of the above embodiments.

[0157] The computer-readable medium of this embodiment includes permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device.

[0158] The computer instructions stored in the storage medium of the above embodiment are used to enable the computer to execute the high-throughput satellite communication dynamic resource management method as described in any of the above embodiments, and have the beneficial effects of the corresponding method embodiments, which will not be repeated here.

[0159] Based on the same inventive concept, corresponding to the high-throughput satellite communication dynamic resource management method described in any of the above embodiments, the present disclosure also provides a computer program product, which includes computer program instructions. In some embodiments, the computer program instructions can be executed by one or more processors of a computer so that the computer and / or the processor executes the high-throughput satellite communication dynamic resource management method. Corresponding to the execution subject corresponding to each step in each embodiment of the high-throughput satellite communication dynamic resource management method, the processor that executes the corresponding step can belong to the corresponding execution subject.

[0160] The computer program product of the above embodiment is used to enable the computer and / or the processor to execute the high-throughput satellite communication dynamic resource management method as described in any of the above embodiments, and has the beneficial effects of the corresponding method embodiments, which will not be repeated here.

[0161] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present application (including the claims) is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.

[0162] In addition, to simplify the description and discussion, and in order not to make the embodiments of the present application difficult to understand, the known power supply / ground connection with the integrated circuit (IC) chip and other components may or may not be shown in the provided drawings. In addition, the device can be shown in the form of a block diagram to avoid making the embodiments of the present application difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform to be implemented in the embodiments of the present application (that is, these details should be fully within the scope of understanding of those skilled in the art). In the case of elaborating specific details (e.g., circuits) to describe exemplary embodiments of the present application, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details or when these specific details are changed. Therefore, these descriptions should be considered to be illustrative rather than restrictive.

[0163] Although the present application has been described in conjunction with specific embodiments of the present application, many replacements, modifications and variations of these embodiments will be apparent to those skilled in the art from the foregoing description. For example, other memory architectures (e.g., dynamic RAM (DRAM)) may use the embodiments discussed.

[0164] The embodiments of the present application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present application should be included in the scope of protection of the present application.

Claims

1. A high-throughput satellite communication dynamic resource management method, characterized in that: The method is performed in a high-throughput satellite communication dynamic resource management system, wherein the high-throughput satellite dynamic resource management system includes: a master station side and at least one terminal side; the method includes: The terminal side determines the resource request type of each application round, and determines the required resource amount according to the resource request type; The master station side determines the first allocation resources of each terminal side according to the spectrum efficiency of each terminal side in each application round and all currently allocatable resources; The terminal side determines a first satisfaction level of each terminal side in each application round according to the first allocated resources; In response to the current application round being 1 and the first satisfaction level of the current application round being less than 1, the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the second allocation resources of each terminal side in the current application round according to the first satisfaction level of the current application round; In response to the current application round being greater than 1 and the first satisfaction level of the current application round being less than 1, the terminal side determines the secondary allocation satisfaction level and the long-term satisfaction level based on the secondary allocation resources before the current application round, and the master station side determines the first allocation surplus of each terminal based on the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round based on the first satisfaction level of the current application round and the ratio of long-term satisfaction levels of all application rounds before the current application round.

2. The method according to claim 1, characterized in that The resource request types of each application round include: rate-based resource request amount and capacity-based resource request amount; The required amount of resources is expressed as: where r RBDC is represented by the rate-based resource request, α is represented by the rate-based resource request coefficient, and r VBDC It represents the resource request amount based on capacity, β represents the resource request amount based on capacity, i represents the i-th terminal side, and n represents the application round.

3. The method according to claim 1, characterized in that The master station side determines the first allocation resources of each terminal side according to the spectrum efficiency of each terminal in each application round and all currently allocatable resources, including: Determine the spectrum efficiency of each terminal side; Determine the number of terminals; Determining the total spectrum efficiency of the terminal side according to the spectrum efficiency of each terminal side and the number of the terminal sides; Determine all currently allocatable resources, and determine the first allocated resources for each terminal side according to the spectrum efficiency of each terminal side and the total spectrum efficiency of the terminal side; The total spectrum efficiency of the terminal side is expressed as: The first allocation of resources on each terminal side is expressed as: Among them, se i represents the spectrum efficiency of each terminal side, M represents the number of terminals, n represents the application round, T slot Represents all currently allocatable resources.

4. The method according to claim 1, characterized in that The terminal side determines a first satisfaction level of each application round according to the first allocated resources, including: The terminal side determines the first satisfaction level according to the first allocation of resources in each round and the amount of resources required in each round; The first satisfaction level is expressed as: in, Indicates the first allocation of resources in the nth application round on the i-th terminal side. Indicates the required resources for the nth application round on the i-th terminal side.

5. The method according to claim 1, characterized in that In response to the current application round being 1, the master station side determines the first allocation surplus of each terminal side according to the first allocation resources of the current round, and determines the second allocation resources of each terminal side in the current application round, including: The master station side determines that the current application round is 1 and the first satisfaction level of the current application round is less than 1, determines the first allocation resources of each terminal side and the required resources of each terminal side, and determines the first allocation surplus of each terminal side; Determine the first total allocation surplus of all terminal sides in the current application round based on the number of terminal sides; Determine the secondary allocation resources of each terminal side in the current application round according to the first total allocation surplus and the first satisfaction level of the current application round; The secondary allocation resources of each terminal side in the current application round are expressed as: RS stands for the first total distribution surplus, SRU i It indicates the first satisfaction level of the current application round, and M indicates the number of terminals.

6. The method according to claim 1, characterized in that In response to the current application round being greater than 1, the terminal side determines the secondary allocation satisfaction and the long-term satisfaction according to the secondary allocation resources before the current application round, the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round and the long-term satisfaction of all application rounds before the current application round, including: The master station side determines that the current application round is greater than 1 and the first satisfaction of the current application round is less than 1, determines the first allocation resources of each terminal side and the required resources of each terminal side, and determines the first allocation surplus of each terminal side; Determine the first total allocation surplus of all terminal sides in the current application round based on the number of terminal sides; The terminal side determines the secondary allocation resources of the application round before the current application round; The terminal side determines the second satisfaction level of the previous application round according to the first allocated resources of the previous application round and the second allocated resources of the previous application round; The terminal side determines the number of all application rounds before the current application round, and determines the long-term satisfaction level according to the sum of the second satisfaction levels of all previous application rounds; Determine the sum of the long-term satisfaction of all terminal sides, and determine the long-term satisfaction ratio according to the long-term satisfaction and the sum of the long-term satisfaction; The terminal side determines the secondary allocation resources of each terminal side in the current application round according to the first total allocation surplus, the first satisfaction level of the current application round and the long-term satisfaction level ratio.

7. The method according to claim 6, characterized in that The secondary allocation resources of each terminal side in the current application round are expressed as: Among them, RS n represents the first total distribution surplus in the current round, Indicates the first satisfaction of the current round, Indicates the long-term satisfaction ratio.

8. A high-throughput satellite communication dynamic resource management device, characterized in that: include: A determination module, used to control the terminal side to determine the resource request type of each application round, and determine the total amount of required resources according to the resource request type; The first allocation module is used to control the master station side to determine the first allocation resources of each terminal side according to the spectrum efficiency of each terminal side in each application round and all currently allocatable resources; A first satisfaction module, used to control the terminal side to determine a first satisfaction level of each terminal side in each application round according to the first allocation of resources; A secondary allocation module, used to control the master station side to determine that the current application round is 1 and the first satisfaction of the current application round is less than 1, the master station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round; And it is used to control the main station side to determine that the current application round is greater than 1 and the first satisfaction of the current application round is less than 1, the terminal side determines the secondary allocation satisfaction and the long-term satisfaction according to the secondary allocation resources before the current application round, the main station side determines the first allocation surplus of each terminal according to the first allocation resources of the current round, and determines the secondary allocation resources of each terminal side in the current application round according to the first satisfaction of the current application round and the long-term satisfaction of all application rounds before the current application round.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 7 is implemented.

10. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to enable a computer to execute the method according to any one of claims 1 to 7.