Electric drawing device for high-altitude boiler probe

By designing an electric pulling device for high-altitude boiler probes, the magnetic field is used to generate hammering force and the transmission component is used to lock the shell. This solves the problem of short-term placement and risk of falling of the electric pulling hammer during high-altitude operations, and improves safety and convenience of use. .

CN118744327AInactive Publication Date: 2024-10-08YAKESHI THERMAL POWER PLANT HULUNBEIER ANTAI THERMAL POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410721014.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the replacement process of the high-altitude boiler probe, the existing electric pull hammer has no short-term placement space and the risk of falling, which leads to safety hazards. It is difficult to effectively avoid the difficulty of pulling out the probe due to corrosion.

Method used

An electric pulling device for high-altitude boiler probes is designed, including a hammer pulling unit and a placing unit. The hammer pulling unit generates hammering force through a magnetic field, and the placing unit realizes the locking and storage of the shell through the transmission assembly and locking assembly to ensure Avoid falling when working at heights.

Benefits of technology

This device realizes the locking and storage of the shell by placing the unit, which improves the convenience and safety of use, avoids the risk of the hammer pulling unit falling when working at high altitudes, and enhances safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744327A_ABST
    Figure CN118744327A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of boiler probe pulling, in particular to an electric pulling device for a high-altitude boiler probe, which comprises a hammering and pulling unit comprising a shell, a coil arranged on the shell, an iron core arranged on the shell, a hammering sliding block arranged on the shell and a control panel arranged on a box body; the containing unit comprises a containing base arranged on the box body, a supporting assembly arranged on the box body, a fixing plate arranged on the box body and a feeler lever arranged on the fixing plate, the shell can be selected to be in a locking state or a working state through the containing unit, and therefore the hammering and pulling unit is more convenient to use; the hammering and pulling unit is simple in structure and convenient to use, the shell is stored and protected when the hammering and pulling unit is not used, the hammering and pulling unit can be locked on the work clothes through the buckling unit when the hammering and pulling unit is used, the function that buckling is not in place is achieved, the falling risk of the hammering and pulling unit is avoided, and the safety of aloft work of the hammering and pulling unit is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler probe extraction, in particular to an electric extraction device for a high-altitude boiler probe. Background Art

[0002] When replacing the temperature probe element at high altitude in the boiler body, it is difficult to pull it out due to the rust of the probe. At this time, a pull hammer or a sledgehammer is used to knock it out. However, due to the small space for high-altitude operations, these tools cannot be used and there is a risk of falling from a high altitude. The use of an electric pull hammer can effectively avoid these shortcomings;

[0003] However, when the existing electric pulling hammer is used in high-altitude operations, there is no space for temporarily placing the electric pulling hammer, and when it is not in use at all, the pulling hammer and the control box need to be stored separately, which is quite troublesome. In addition, when working in high altitudes, the pulling device has the risk of falling, which poses certain safety hazards. Summary of the invention

[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0005] In view of the problem that the pulling device is easy to fall when working at high altitude and the pulling hammer is temporarily placed when working at high altitude, the present invention is proposed.

[0006] Therefore, the object of the present invention is to provide an electric pulling device for a high altitude boiler probe.

[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: an electric pulling device for a high-altitude boiler probe, comprising: a hammer pulling unit, including a shell, a coil arranged on the shell, an iron core arranged on the shell, a hammer slider arranged on the shell, a connecting rod arranged on the hammer slider, a power cord arranged on the shell, a box arranged on the power cord, a pulse generator arranged on the box, a battery assembly arranged on the box, and a control panel arranged on the box; a placement unit, including a placement base arranged on the box, a transmission assembly arranged on the box, a supporting assembly arranged on the box, a pressure assembly arranged on the supporting assembly, a locking assembly arranged on the supporting assembly, a fixing plate arranged on the box, and a touch rod arranged on the fixing plate.

[0008] As a preferred solution of the electric pulling device for the high-altitude boiler probe described in the present invention, the transmission assembly includes a knob arranged on the box body, a rotating rod arranged on the knob, a thread arranged on the rotating rod, a transmission plate arranged on the thread, and a first conical tooth arranged on the rotating rod.

[0009] As a preferred solution of the electric pulling device for the high-altitude boiler probe of the present invention, the supporting assembly includes an arc block arranged on the box body, a slide groove arranged on the box body, and a slide plate arranged on the arc block.

[0010] As a preferred solution of the electric pulling device for the high-altitude boiler probe of the present invention, the pressure-bearing component includes a fixed shaft arranged in the arc block, a seesaw arranged on the fixed shaft, and a fixed spring arranged on the seesaw.

[0011] As a preferred solution of the electric pulling device for the high-altitude boiler probe described in the present invention, the locking assembly includes a locking block arranged on the arc block, a follower block arranged on the locking block, a movable shaft arranged on the follower block and passing through one end of the seesaw, a magnetic block arranged on the follower block, and an iron plate arranged on the arc block.

[0012] As a preferred solution of the electric pulling device for the high-altitude boiler probe described in the present invention, it also includes: a locking unit, including a driven component arranged on the box body, a moving block arranged on the driven component, and a telescopic component arranged on the moving block, a bending component arranged on the telescopic component, a snap assembly arranged on the bending component, and a buckle plate arranged on the box body.

[0013] As a preferred solution of the electric pulling device for the high-altitude boiler probe of the present invention, the driven component includes a support plate arranged in the box body, a driven rod arranged on the support plate, and a second conical tooth arranged on the driven rod.

[0014] As a preferred solution of the electric pulling device for the high-altitude boiler probe of the present invention, the telescopic assembly includes a compression spring arranged on the moving block, a telescopic block arranged on the compression spring, and a clamping plate arranged on the telescopic block.

[0015] As a preferred solution of the electric pulling device for the high-altitude boiler probe described in the present invention, the bending assembly is provided with a touch plate on the telescopic block, a push rod on the touch plate, a fixing pin on the telescopic block, and a bending rod on the fixing pin and connected to the push plate.

[0016] As a preferred solution of the electric pulling device for the high-altitude boiler probe described in the present invention, the snap-fit ​​assembly is arranged on a slide rail on the telescopic block, a slide rod arranged on the slide rail, a fixed plate arranged on the slide rod, a connecting rod arranged on the fixed plate, a locking rod arranged on the connecting rod, and an arc groove arranged on the fixed plate.

[0017] The beneficial effects of the present invention are as follows: the present invention realizes the selection of the shell being in a locked state and a working state through the placement unit, so that the hammer-pull unit is more convenient to use, and the shell is stored and protected when not in use. When in use, the buckle unit can lock the hammer-pull unit on the work clothes, and has a detection function of the buckle not being in place, avoiding the risk of the hammer-pull unit falling and improving the safety of the hammer-pull unit in high-altitude operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0019] Figure 1 It is an overall schematic diagram of an electric pulling device for a high-altitude boiler probe.

[0020] Figure 2 This is a schematic diagram of the box of an electric pulling device for a high-altitude boiler probe.

[0021] Figure 3 The figure is a schematic diagram of the rotating assembly of an electric pulling device for a high-altitude boiler probe.

[0022] Figure 4 The diagram is a schematic diagram of an arc block of an electric pulling device for a high altitude boiler probe.

[0023] Figure 5 for Figure 4 Enlarged view of point A in .

[0024] Figure 6 The figure is a schematic diagram of the moving block of an electric pulling device for a high altitude boiler probe.

[0025] Figure 7 This is a schematic diagram of the bending components of an electric pulling device for a high-altitude boiler probe. DETAILED DESCRIPTION

[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0027] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0028] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0029] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0030] Example 1

[0031] Reference Figure 1-Figure 2 , which is the first embodiment of the present invention, provides an electric pulling device for a high-altitude boiler probe, including a hammer pulling unit 100 and a placement unit 200. The hammer pulling unit 100 is used to connect with the probe to pull out the probe of the high-altitude boiler, and the placement unit 200 is used to place the components of the hammer pulling unit 100.

[0032] Specifically, the hammer pull unit 100 includes a shell 101, a coil 102 is installed inside the shell 101, an iron core 103 is installed at the inner end of the shell 101, the coil 102 is surrounded by the iron core 103, a hammer slider 104 is installed on the inner wall of the shell 101, and the hammer slider 104 can be adsorbed by the coil 102 and the iron core 103 that are energized, a connecting rod 105 is installed on the outer wall of the hammer slider 104, and the connecting rod 105 is connected to the probe, a power cord 106 is installed on the outer wall of the shell 101, and a box 107 is installed at the other end of the power cord 106. A pulse generator 108 is installed inside the body 107, a battery pack 109 is installed on the inner wall of the box 107, and a control panel 110 is installed on the outer wall of the box 107. When current flows through the coil 102, a magnetic field is generated, and the hammer slider 104 is sucked to the coil 102 to produce hammering. The hammer slider 104 pulls the connecting rod 105, and the end of the connecting rod 105 is connected to the pulled device. At the same time, the pulse frequency of the pulse generator 108 can be adjusted to change the vibration frequency, and the voltage or current can be adjusted through the control panel 110 to change the vibration intensity to meet the needs of on-site work.

[0033] Operation process: When in use, it is connected to the probe through the connecting rod 105. When current flows through the coil 102, a magnetic field is generated, and the hammer slider 104 is sucked to the coil 102 to produce hammering. The hammer slider 104 pulls the connecting rod 105, and the end of the connecting rod 105 is connected to the pulled device. At the same time, the pulse frequency of the pulse generator 108 can be adjusted to change the vibration frequency, and the voltage or current can be adjusted through the control panel 110 to change the vibration intensity to meet the needs of on-site work.

[0034] Example 2

[0035] Reference Figure 1-Figure 4 , which is the second embodiment of the present invention, and this embodiment is different from the first embodiment in that: a placement unit 200 includes a placement base 201 arranged on a box body 107, the placement base 201 is used to place the shell 101, a transmission component 202 is installed inside the box body 107, a supporting component 203 is installed on the outer wall of the box body 107, a pressure component 204 is installed inside the supporting component 203, a locking component 205 is installed inside the supporting component 203, and a fixing plate 206 is installed on the outer wall of the box body 107, A touch rod 207 is installed at the bottom of the fixed plate 206, and its transmission component 202 can drive the supporting component 203 to move. When the supporting component 203 is at the bottom position, it is convenient to take and put the shell 101. This state can be used for temporary storage of the shell 101 during operation. When the supporting component 203 is at the top position, the locking component 205 pops out, and the locking component 205 is embedded in the corresponding groove of the shell 101, so that the shell 101 is locked. This state is convenient for locking and storing the shell 101 when not in use.

[0036] Specifically, the transmission assembly 202 includes a knob 202a set on the box body 107. Turning the knob 202a can drive the rotating rod 202b connected to the bottom end to rotate. The bottom end of the rotating rod 202b is separately provided with a thread 202c, and a transmission plate 202d is connected to the thread 202c. The outer wall of the rotating rod 202b is installed with a first conical tooth 202e. The rotation of the rotating rod 202b drives the transmission plate 202d to move up and down at the thread 202c.

[0037] Furthermore, the supporting component 203 includes an arc block 203a arranged on the box body 107, and a slide groove 203b is opened on the outer wall of the box body 107. Its transmission plate 202d extends into the interior of the arc block 203a through the slide groove 203b, thereby driving the movement of the arc block 203a. A slide plate 203c is installed on the outer wall of the arc block 203a. The slide plate 203c supports the arc block 203a in the slide groove 203b, so that the arc block 203a can slide up and down stably.

[0038] Furthermore, the pressure component 204 includes a fixed shaft 204a arranged in the arc block 203a, and a seesaw 204b is installed on the outer wall of the fixed shaft 204a. One end of the seesaw 204b is located on the bottom side of the transmission plate 202d. When the transmission plate 202d moves downward, the seesaw 204b is first pressed on the seesaw 204b, and the other end of the seesaw 204b is tilted to drive the locking component 205 to move. A fixed spring 204c is installed at one end of the seesaw 204b, and the fixed spring 204c can restore the seesaw 204b when needed.

[0039] Furthermore, the locking assembly 205 includes a locking block 205a disposed on the arc block 203a, a follower block 205b is movably mounted on the outer wall of the locking block 205a, and a movable shaft 205c is mounted on the inner wall of the follower block 205b, wherein the movable shaft 205c movably connects the follower block 205b with one end of the seesaw 204b, and when the transmission plate 202d contacts one end of the seesaw 204b, the other end of the seesaw 204b tilts up to move the locking block 205a toward the inside of the arc block 203a, so that The locking of the shell 101 is cancelled. At this time, the displaced follower block 205b is adsorbed by the magnetic block 205d installed on the top and the iron plate 205e installed on the inner wall of the arc block 203a. At this time, when the transmission plate 202d continues to move downward, the transmission plate 202d can press the arc block 203a downward, so that the arc block 203a contacts the bottom of the placement base 201. At this time, the shell 101 can be easily taken out for use, and it is also convenient for the shell 101 to be placed temporarily, making the device more suitable for high-altitude operations.

[0040] The rest of the structure is the same as that of Example 1.

[0041] Operation process: When the transmission plate 202d touches one end of the seesaw 204b, the other end of the seesaw 204b tilts up to move the locking block 205a toward the inside of the arc block 203a, so that the locking of the housing 101 is cancelled. At this time, the follower block 205b after displacement is adsorbed by the magnetic block 205d installed on the top and the iron plate 205e installed on the inner wall of the arc block 203a. At this time, when the transmission plate 202d continues to move downward, the transmission plate 202d can press the arc block 203a downward, so that the arc block 203a and the placement base 201 When the arc block 203a is in contact with the bottom, the shell 101 can be easily taken out for use, and it is also convenient to temporarily place the shell 101, making the device more suitable for high-altitude operations. When not in use, the transmission plate 202d drives the arc block 203a upward. When the locking block 205a of the arc block 203a moves to one side of the groove of the shell 101, the touch rod 207 of the fixed plate 206 presses the follower block 205b downward, so that the magnetic block 205d is separated from the iron plate 205e. At this time, the fixed spring 204c restores the seesaw 204b.

[0042] Example 3

[0043] Reference Figure 5-Figure 7 , which is the third embodiment of the present invention, and this embodiment is different from the above embodiments in that it also includes a locking unit 300, including a driven component 301 arranged on the box body 107, wherein the driven component 301 is engaged with the rotating component, a moving block 302 is installed at one end of the driven component 301, and the driven component 301 can drive the moving block 302 to move, a telescopic component 303 is installed at one end of the moving block 302, a bending component 304 is installed inside the telescopic component 303, and a buckle component 305 is installed at one end of the bending component 304, and the box body 107 A buckle plate 306 is installed on the outer wall, and the buckle plate 306 is used to buckle on the work clothes. When the knob 202a is rotated to convert the arc block 203a into a high-altitude working state, its driven component 301 rotates to drive the moving block 302 to move, and the moving block 302 drives the telescopic component 303, so that the telescopic component 303 clamps the buckle plate 306 on the work clothes. The bending component 304 and the buckle component 305 make the locking unit 300 play a locking role when it is not buckled into place at the buckle of the work clothes, so that the staff can timely detect the problem of failure to buckle into place.

[0044] Furthermore, the driven component 301 includes a support plate 301a arranged in the box body 107, and a driven rod 301b is installed on the outer wall of the support rod. A second conical tooth 301c is installed at one end of the driven rod 301b, and the second conical tooth 301c is engaged with the first conical tooth 202e. When the rotating rod 202b rotates, its first conical tooth 202e drives the second conical tooth 301c to rotate, and the rotation of the second conical tooth 301c drives the driven rod 301b to rotate. The rotation of the driven rod 301b drives the moving block 302 to move, so that the moving block 302 can drive the clamping plate 303c to move.

[0045] Furthermore, the telescopic assembly 303 includes a compression spring 303a arranged on the moving block 302, a telescopic block 303b is installed at one end of the compression spring 303a, a clamping plate 303c is installed on the outer wall of the telescopic block 303b, and the clamping plate 303c is located inside the buckle plate 306.

[0046] Furthermore, the bending component 304 is arranged on a touch plate 304a on the telescopic block 303b, a push rod 304b is movably mounted on one end of the touch plate 304a, a fixing pin 304c is mounted on the inner wall of the telescopic block 303b, and a bending rod 304d movably connected to the push plate is mounted on the outer wall of the fixing pin 304c.

[0047] Furthermore, the buckle assembly 305 is arranged on the slide rail 305a on the telescopic block 303b, and a slide rod 305b is installed inside the slide rail 305a, a fixed plate 305c is installed at one end of the slide rod 305b, a connecting rod 305d is installed on the outer wall of the fixed plate 305c, and a locking rod 305e is movably connected to one end of the connecting rod 305d, an arc groove 305f is provided on the outer wall of the fixed plate 305c, and the other end of the bending rod 304d is connected to the inside of the arc groove 305f through an axis, so that when the bending rod 304d is bent, it can drive the fixed plate 305c to move on the slide rail 305a.

[0048] The rest of the structure is the same as that of Example 2.

[0049] Operation process: when the knob 202a is rotated, its moving rod moves and drives the clamping plate 303c of the sliding plate 203c to move. At this time, the touch plate 304a of the protruding clamping plate 303c contacts the work clothes in the buckle plate 306 first, and the touch plate 304a is gradually squeezed into the telescopic block 303b. When the touch plate 304a moves and drives the push rod 304b to move, its fixing pin 304c is fixed to the middle section of the bending rod 304d, and one end of the bending rod 304d of the push rod 304b applies a thrust, and the other end of the bending rod 304d is movably connected in the arc groove 305f of the fixed plate 305c, so that the other end of the bending rod 304d moves and drives the fixed plate 305c to move along the slide rail 305a. The movement of the fixed plate 305c pulls out the locking rod 305e movably connected through the connecting rod 305d, so that the telescopic block 303b The locking of the moving block 302 is cancelled. At this time, when the moving block 302 continues to move, its compression spring 303a is compressed and stored, so that the clamping force of the telescopic block 303b and the clamping plate 303c on the work clothes gradually increases, thereby completing the clamping of the work clothes. If the work clothes are not buckled in place, so that the work clothes are not on the side of the touch plate 304a, the telescopic block 303b and the moving block 302 are always locked, and when the clamping plate 303c contacts the work clothes, the moving stroke of the moving block 302 is not fully in place. At this time, the moving stroke of the rotating rod 202b to the transmission plate 202d is not fully in place. At this time, the arc block 203a is not fully fitted with the bottom of the placement base 201, so that the staff can judge that the buckle is not in place based on this phenomenon, avoiding the accidental detachment of the hammer pull unit 100 during high-altitude operations, thereby improving safety.

[0050] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An electric pulling device for a high altitude boiler probe, characterized in that: include, A hammer pull unit (100) comprises a housing (101), a coil (102) arranged on the housing (101), an iron core (103) arranged on the housing (101), a hammer slide (104) arranged on the housing (101), a connecting rod (105) arranged on the hammer slide (104), a power cord (106) arranged on the housing (101), a box (107) arranged on the power cord (106), a pulse generator (108) arranged on the box (107), a battery pack (109) arranged on the box (107), and a control panel (110) arranged on the box (107); The placement unit (200) comprises a placement base (201) arranged on the box (107), a transmission assembly (202) arranged on the box (107), a supporting assembly (203) arranged on the box (107), a pressure-bearing assembly (204) arranged on the supporting assembly (203), a locking assembly (205) arranged on the supporting assembly (203), a fixing plate (206) arranged on the box (107), and a touch rod (207) arranged on the fixing plate (206).

2. The electric pulling device for high altitude boiler probe according to claim 1, characterized in that: The transmission assembly (202) comprises a knob (202a) arranged on a housing (107), a rotating rod (202b) arranged on the knob (202a), a thread (202c) arranged on the rotating rod (202b), a transmission plate (202d) arranged on the thread (202c), and a first conical tooth (202e) arranged on the rotating rod (202b).

3. The electric pulling device for high altitude boiler probe according to claim 2, characterized in that: The supporting assembly (203) comprises an arc-shaped block (203a) arranged on the box body (107), a slide groove (203b) arranged on the box body (107), and a slide plate (203c) arranged on the arc-shaped block (203a).

4. The electric pulling device for high altitude boiler probe as claimed in claim 3, characterized in that: The pressure-bearing component (204) comprises a fixed shaft (204a) arranged in the arc block (203a), a seesaw (204b) arranged on the fixed shaft (204a), and a fixed spring (204c) arranged on the seesaw (204b).

5. The electric pulling device for high altitude boiler probe according to claim 4, characterized in that: The locking assembly (205) comprises a locking block (205a) arranged on the arc block (203a), a follower block (205b) arranged on the locking block (205a), a movable shaft (205c) arranged on the follower block (205b) and passing through one end of the seesaw (204b), a magnetic block (205d) arranged on the follower block (205b), and an iron plate (205e) arranged on the arc block (203a).

6. The electric pulling device for high altitude boiler probe according to claim 5, characterized in that: It also includes a locking unit (300), including a driven component (301) arranged on the box body (107), a moving block (302) arranged on the driven component (301), a telescopic component (303) arranged on the moving block (302), a bending component (304) arranged on the telescopic component (303), a buckle component (305) arranged on the bending component (304), and a buckle plate (306) arranged on the box body (107).

7. The electric pulling device for high altitude boiler probe according to claim 6, characterized in that: The driven component (301) comprises a support plate (301a) arranged in a housing (107), a driven rod (301b) arranged on the support plate (301a), and a second conical tooth (301c) arranged on the driven rod (301b).

8. The electric pulling device for high altitude boiler probe according to claim 7, characterized in that: The telescopic assembly (303) comprises a compression spring (303a) arranged on the moving block (302), a telescopic block (303b) arranged on the compression spring (303a), and a clamping plate (303c) arranged on the telescopic block (303b).

9. The electric pulling device for high altitude boiler probe according to claim 8, characterized in that: The bending component (304) comprises a touch plate (304a) arranged on the telescopic block (303b), a push rod (304b) arranged on the touch plate (304a), a fixing pin (304c) arranged on the telescopic block (303b), and a bending rod (304d) arranged on the fixing pin (304c) and connected to the push plate.

10. The electric pulling device for high altitude boiler probe according to claim 9, characterized in that: The buckle assembly (305) is arranged on a slide rail (305a) on the telescopic block (303b), a slide rod (305b) arranged on the slide rail (305a), a fixed plate (305c) arranged on the slide rod (305b), a connecting rod (305d) arranged on the fixed plate (305c), a locking rod (305e) arranged on the connecting rod (305d), and an arc groove (305f) arranged on the fixed plate (305c).