Well sealing method for relief well of foundation pit of subway station

By welding bent water-stopping steel plates and using ball valves to control water pumping and grouting equipment in deep foundation pit projects, the problem of concrete grouting caused by groundwater backwater during well sealing was solved, and the safety and anti-seepage strength of the well sealing were improved. Effective sealing of dewatering wells is ensured.

CN118745744APending Publication Date: 2024-10-08CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411098573.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

In deep foundation pit projects, due to the rapid return of groundwater during well sealing, serious grouting of the concrete makes it impossible to seal the dewatering well, and the anti-seepage strength of conventional sealing methods is insufficient, posing hidden dangers.

Method used

The bent water-stop steel plate is welded to the dewatering well, and the water pumping and grouting equipment are controlled by a ball valve to connect to the pumping and grouting integrated pipe to ensure the stability of groundwater changes during the construction process, prevent concrete from grouting, increase groundwater seepage paths, and use waterproof layers and Reinforce the hoop to ensure the safety of well sealing.

Benefits of technology

It effectively prevents concrete grouting problems caused by groundwater backwater, ensures the successful sealing of dewatering wells, increases the safety and anti-seepage strength of well sealing, and construction equipment can be reused.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745744A_ABST
    Figure CN118745744A_ABST
Patent Text Reader

Abstract

The invention relates to a well sealing method for a relief well of a foundation pit of a subway station. The well sealing method specifically comprises the following steps that S101, a pumping well is inserted into a soil body at the bottom of the foundation pit; s102, a waterproof layer is tightly connected with the dewatering well through a hoop; s103, the bent water stop steel plate is welded to the dewatering well, specifically, the bent water stop steel plate is welded to the outer side of the dewatering well; the bent water stop steel plate is welded firstly, then the influence caused by underground water change in the construction process can be effectively prevented in cooperation with control of the ball valve, the grouting equipment and the water pumping equipment are connected with the water pumping and grouting integrated pipe, and water pumping and grouting can be controlled at any time; after construction is finished, the equipment can be disassembled and reused through a threaded connector; the underground water seepage path is further increased by adopting the bent water stop steel plate different from the common rectangular water stop steel plate, and the safety of well shut-in is ensured by matching the L-shaped laying of the waterproof layer and the hoop reinforcement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sealing a foundation pit pressure relief well, in particular to a sealing method for a subway station foundation pit pressure relief well. Background Art

[0002] With the continuous acceleration of urbanization, high-rise and super-high-rise buildings and underground engineering construction are increasing, and deep foundation pit projects are gradually increasing. The pressure relief and dewatering wells in deep foundation pit projects are inserted into the pressurized water layer, the aquifer has a large permeability system, and the groundwater recharge is fast, which makes it more difficult to seal the wells.

[0003] The commonly used deep foundation pit sealing method is: after the structure meets the anti-floating requirements and anti-surge requirements, the remaining pressure-reducing wells are sealed. When sealing the wells, it is necessary to do it under static water conditions, that is, all dewatering wells stop pumping water, so that the water level in the well pipe rises to a static state, and the dewatering wells are sealed by grouting technology. After the sealing is completed, a 4-6mm thick steel plate is welded in the well. Since the blocked dewatering wells need to pass through the bottom plate, it is also necessary to weld a waterproof steel plate outside the well, lay a waterproof layer on the bottom cushion layer, and then cast the bottom plate. This method is only applicable when the groundwater level is stable or the impact of concrete grouting caused by the rise of groundwater is small.

[0004] In addition, since all the precipitation wells stop pumping water when sealing the wells, there is a risk of rapid groundwater backflow during grouting and sealing the wells, resulting in serious concrete slurrying and making it impossible to seal the precipitation wells. At the same time, conventional sealing methods have insufficient anti-seepage strength and pose certain risks. Summary of the invention

[0005] In view of the technical problem that all dewatering wells stop pumping water when sealing the wells as proposed in the background technology, there is a risk of rapid groundwater backflow during grouting and sealing the wells, resulting in serious concrete slurrying and failure to seal the dewatering wells. At the same time, the conventional sealing method has insufficient anti-seepage strength and certain hidden dangers. The present invention provides a method for sealing a subway station foundation pit decompression well.

[0006] The technical solution adopted by the present invention is: a method for sealing a pressure relief well in a subway station foundation pit, which specifically comprises the following steps: Step S101: inserting a pumping well into the soil at the bottom of a foundation pit; Step S102: tightly connect the waterproof layer to the precipitation well through a hoop; Step S103: welding the bent water-stop steel plate to the dewatering well, specifically welding the bent water-stop steel plate to the outside of the dewatering well; Step S104: laying a waterproof layer on the cushion layer, and reinforcing the two ends of the waterproof layer contacting the precipitation well with hoops; Step S105: Cast the bottom plate, weld the integrated pumping and grouting pipe to the steel plate, and then put it into the precipitation well. According to the specific welding position of the steel plate, fix the integrated pumping and grouting pipe with an external bracket; Step S106: Connect the pumping equipment and the grouting equipment to the water grouting integrated pipe through a threaded interface, and then weld them to the steel plate; If the groundwater level is stable at this time, cement slurry can be injected synchronously through the grouting equipment, and the grouting valve can control the grouting speed; If the groundwater level rises at this time, it can be lowered through pumping equipment, and the pumping valve can control the pumping speed; Step S107: After welding is completed, concrete pouring is performed. While waiting for the concrete to solidify, if the groundwater level rises, the mixed mortar will surge up through the pumping and grouting integrated pipe. Even if the ball valve is closed, the poured concrete can be filled with grout through the grouting equipment and the water grouting integrated pipe after solidification. Step S108: After the overall process is completed, the pumping equipment and grouting equipment are removed through the threaded interface and subsequently recycled. The exposed part of the water-grouting integrated pipe is subsequently leveled by pouring concrete.

[0007] In one of the embodiments, the waterproof layer is L-shaped, and the end of the waterproof layer is close to the lower end of the bent water-stop steel plate.

[0008] In one of the embodiments, the bent water-stop steel plate and the ball valve are both located below the top of the foundation pit floor.

[0009] In one of the embodiments, the bent water-stop steel plate is a circular steel plate, the diameter of which is slightly smaller than the inner diameter of the precipitation well, with a circular hole in the middle, and the size of which is slightly larger than the outer diameter of the integrated pumping and grouting pipe.

[0010] In one of the embodiments, a plurality of through holes are provided on the outside of the integrated water pumping and grouting pipe.

[0011] In one of the embodiments, the bent water-stop steel plate has a wavy structure.

[0012] The beneficial effects of the present invention are as follows: compared with the prior art, the present invention can effectively prevent the influence of groundwater changes during the construction process by first welding the bent water-stop steel plate and then cooperating with the control of the ball valve. The grouting equipment and the pumping equipment are connected to the integrated pumping and grouting pipe, and the pumping and grouting can be controlled at any time; after the construction is completed, the equipment can be disassembled and reused through the threaded interface; the use of bent water-stop steel plates different from ordinary rectangular water-retaining steel plates further increases the groundwater seepage path, and the L-shaped laying of the waterproof layer and the reinforcement of the clamps ensure the safety of the well sealing, so when grouting and sealing the well, there will be no risk of fast groundwater backflow, no serious concrete grouting, and no problem of being unable to seal the precipitation well. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the present invention.

[0014] The markings in the figure are: 1. Dewatering well; 2. Cushion layer; 3. Waterproof layer; 4. Hoop; 5. Bent water-stop steel plate; 6. Foundation pit bottom plate; 7. Pumping and grouting integrated pipe; 8. Cement slurry; 9. Ball valve; 10. Pumping equipment; 11. Grouting equipment; 12. Pumping valve; 13. Grouting valve; 14. Steel plate; 15. Threaded interface. DETAILED DESCRIPTION

[0015] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by terms such as “front”, “up”, “down”, “left”, “right”, “vertical” and “horizontal” are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0016] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0017] The following is combined with Figure 1 The present invention is further described.

[0018] In order to solve the problems existing in the background technology, the present application proposes the following technical solution: a method for sealing a decompression well in a foundation pit of a subway station, which specifically comprises the following steps: Step S101: inserting a pumping well into the soil at the bottom of a foundation pit; Step S102: The waterproof layer is tightly connected to the precipitation well 1 through the hoop 3 waterproof layer; 4; Step S103: welding the bent water-stopping steel plate 14 to the dewatering well 1, specifically, welding the bent water-stopping steel plate 14 to the outer side of the dewatering well 1; Step S104: laying a waterproof layer on the cushion layer 2, and reinforcing the waterproof layer with hoops 3 and 4 at both ends of the contact part of the waterproof layer with the precipitation well 1; Step S105: Cast the bottom plate, weld the integrated pumping and grouting pipe 7 to the steel plate 14, and then put it into the precipitation well 1. According to the specific welding position of the steel plate 14, fix the integrated pumping and grouting pipe 7 with an external bracket (not shown in the figure, which can facilitate fixed installation and facilitate the welding of the bent water-stop steel plate 14); Step S106: Connect the pumping equipment 10 and the grouting equipment 11 to the water grouting integrated pipe through the threaded interface 15, and then weld them to the steel plate 14; If the groundwater level is stable at this time, cement slurry 8 can be synchronously grouted through the grouting equipment 11, and the grouting valve 13 can control the grouting speed; If the groundwater level rises at this time, it can be lowered through the pumping equipment 10, and the pumping valve 12 can control the pumping speed; The pumping equipment 10 may be a pump, and the grouting equipment 11 may be a grouting machine, both of which are existing products in the art.

[0019] Step S107: (In conventional construction, grouting is performed first, and then the steel plate 14 is welded to seal the well. If the groundwater level changes after grouting, it is easy to cause concrete grouting, affecting the concrete solidification and subsequent welding of the steel plate 14) After welding is completed, concrete pouring is performed. While waiting for the concrete to solidify, if the groundwater level rises, the mixed mortar surges up through the pumping grouting integrated pipe 7, and the ball valve 9 can be closed. After the poured concrete solidifies, the grouting operation can be performed through the grouting equipment 11 and the water grouting integrated pipe; Step S108: After the overall process is completed, the pumping equipment 10 and the grouting equipment 11 are removed through the threaded interface 15 and subsequently recycled. The exposed portion of the water-grouting integrated pipe is subsequently leveled by pouring concrete.

[0020] The above technical solution is explained as follows: The welding bent water-stop steel plate 14 is to prevent groundwater leakage from affecting the upper building. The bent water-stop steel plate 14 increases the seepage path of groundwater and also plays a role in blocking groundwater. In conventional construction, ordinary rectangular steel plates 14 are used. The present invention uses a bent water-stop steel plate 14 to further increase the seepage path of groundwater.

[0021] In the further optimized design, the waterproof layer is L-shaped, and the end of the waterproof layer is close to the lower end of the bent water-stop steel plate 14. The bent water-stop steel plate 14 and the ball valve 9 are both located below the top of the bent water-stop steel plate 14 of the foundation pit bottom plate 5; 6. The bent water-stop steel plate 14 is a circular steel plate 14, with a diameter slightly smaller than the inner diameter of the precipitation well 1, with a circular hole in the middle, and a size slightly larger than the outer diameter of the integrated pumping and grouting pipe 7. A plurality of through holes are provided on the outside of the integrated pumping and grouting pipe 7, and the bent water-stop steel plate 14 is a wavy structure.

[0022] In summary, the present invention can effectively prevent the influence of groundwater changes during the construction process by first welding the bent water-stop steel plate 14 and then cooperating with the control of the ball valve 9. The grouting equipment 11 and the pumping equipment 10 are connected to the integrated pumping and grouting pipe 7, and the pumping and grouting can be controlled at any time; after the construction is completed, the equipment can be disassembled and reused through the threaded interface 15; the use of the bent water-stop steel plate 14 which is different from the ordinary rectangular water-retaining steel plate 14 further increases the groundwater seepage path, and cooperates with the L-shaped laying of the waterproof layer and the clamp 3 waterproof layer; 4 reinforcement to ensure the safety of the well closure.

[0023] In addition, if the groundwater level is stable during the well sealing process, grouting in the dewatering well 1 and welding of the steel plate 14 can be carried out simultaneously; at the same time, the grouting and pumping integrated pipe is welded to the steel plate 14 and fixed by a bracket, which helps to improve construction efficiency.

[0024] The standard parts used in the present invention can all be purchased from the market, and special-shaped parts can be customized according to the description in the specification and the drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. Machinery, parts and equipment all adopt conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here. The content not described in detail in this specification belongs to the prior art known to professional and technical personnel in this field.

[0025] While the embodiments of the present invention have been shown and described, it will be apparent to those skilled in the art that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for sealing a pressure relief well in a subway station foundation pit, characterized in that: Step S101: inserting a pumping well into the soil at the bottom of a foundation pit; Step S102: tightly connecting the waterproof layer to the precipitation well (1) through a clamp (3 waterproof layer; 4); Step S103: welding the bent water-stopping steel plate (14) to the drainage well (1), specifically, welding the bent water-stopping steel plate (14) to the outside of the drainage well (1); Step S104: laying a waterproof layer on the cushion layer (2), and reinforcing the two ends of the contact part of the waterproof layer with the drainage well (1) with hoops (3 waterproof layer; 4); Step S105: Casting the bottom plate, welding the integrated pumping and grouting pipe (7) to the steel plate (14), and then placing it into the precipitation well (1). According to the specific welding position of the steel plate (14), the integrated pumping and grouting pipe (7) is fixed with an external bracket; Step S106: connecting the pumping equipment (10) and the grouting equipment (11) to the water grouting integrated pipe through the threaded interface (15), and then welding them to the steel plate (14); If the groundwater level is stable at this time, cement slurry (8) can be injected synchronously through the grouting equipment (11), and the grouting valve (13) can control the grouting speed; If the groundwater level rises at this time, it can be lowered through the pumping equipment (10), and the pumping valve (12) can control the pumping speed; Step S107: After welding is completed, concrete pouring is performed. While waiting for the concrete to solidify, if the groundwater level rises, the mixed mortar will surge up through the pumping and grouting integrated pipe (7). Even if the ball valve (9) is closed, after the poured concrete solidifies, the grouting operation can be performed through the grouting equipment (11) and the water grouting integrated pipe. Step S108: After the overall process is completed, the pumping equipment (10) and the grouting equipment (11) are removed through the threaded interface (15) and subsequently recycled, and the exposed part of the water grouting integrated pipe is subsequently leveled by pouring concrete.

2. A method for sealing a subway station foundation pit pressure relief well according to claim 1, characterized in that: The waterproof layer is L-shaped, and the end of the waterproof layer is closely attached to the lower end of the bent water-stop steel plate (14).

3. A method for sealing a subway station foundation pit pressure relief well according to claim 2, characterized in that: The steel plate (14) and the ball valve (9) are both located below the top of the foundation pit bottom plate (5; bent water-stop steel plate (14); 6).

4. A method for sealing a subway station foundation pit pressure relief well according to claim 3, characterized in that: The bent water-stopping steel plate (14) is a circular steel plate (14) with a diameter slightly smaller than the inner diameter of the precipitation well (1), a circular hole in the middle, and a size slightly larger than the outer diameter of the integrated pumping and grouting pipe (7).

5. A method for sealing a subway station foundation pit pressure relief well according to claim 4, characterized in that: The outside of the integrated pumping and grouting pipe (7) is provided with a plurality of groups of through holes.

6. A method for sealing a subway station foundation pit pressure relief well according to claim 5, characterized in that: The bent water-stop steel plate (14) has a wave-shaped structure.