Scaffold anti-overturning reinforcing method for high-height ultrahigh concrete structure
By arranging lattice columns in the building and fixedly connecting them to the external scaffolding, the problem of insufficient number of connecting wall parts in ultra-high concrete structures is solved, and construction safety and stability are improved. It is suitable for structures with different storey heights and has Good economic and social benefits.
Patent Information
- Application Number
- CN202411055213.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-08
AI Technical Summary
During construction, the scaffolding of ultra-high concrete structures has insufficient column spacing due to excessive column spacing, resulting in insufficient number of connecting wall parts and inability to meet specification requirements, posing construction safety hazards, especially in high-altitude environments, which are significantly affected by wind loads.
By setting lattice columns between the main structural columns inside the building, and using BIM construction simulation software for parameter design and calculation, external scaffolding is set up and fixedly connected to the lattice columns to ensure that the number of wall-connecting parts meets the requirements, and the vertical poles can be adjusted height to accommodate different floor height requirements.
It effectively solves the problem of insufficient number of connecting wall parts, improves the stability and safety of the scaffolding, is suitable for structures with different storey heights, has good economic and social benefits, and is suitable for widespread construction promotion.
Smart Images

Figure CN118745814A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of scaffold construction, and in particular to a scaffold anti-overturning reinforcement method for a super-high concrete structure. Background Art
[0002] In the field of building construction, the scaffolding construction of super-high concrete structures faces the problems of super-high storey height and excessive column spacing, which makes it difficult for the number of scaffolding wall ties to meet the requirements of the specifications. According to relevant specifications, the wall ties of the same layer should be on the same horizontal plane, and their horizontal spacing should not be greater than 3 spans (the horizontal distance between adjacent scaffolding poles, with the spacing of three adjacent poles as one span); the cantilever height of the frame above the wall tie should not exceed 2 steps (usually refers to the vertical distance between the two adjacent horizontal bars of the scaffolding), and the vertical spacing should not be greater than 4 meters. When the building is quite high and the surrounding environment is open, the scaffolding is significantly affected by wind loads. Since the scaffolding is not only a passage for operators to go up and down during construction, but also plays a protective role, the insufficient number of wall ties will become a major safety hazard in construction. Summary of the invention
[0003] In view of the above technical problems, the present invention provides a method for reinforcing a scaffold against overturning for a super-high concrete structure.
[0004] The technical solution includes the following steps: S1. Set up the external scaffolding foundation; S2. Fabricate lattice columns on site according to the designed specifications; S3. Construction of main structure floor and installation bolts of embedded lattice columns; S4. Install the lattice columns on the main structure floor; S5. The external scaffolding is erected upward layer by layer and fixedly connected to the lattice columns.
[0005] Preferably, the specific steps of step S1 are: Arrange the external scaffolding according to the engineering construction drawings and the site layout, determine the construction parameters such as the erection height, pole spacing, step distance, etc., use BIM construction simulation software to calculate the external scaffolding and determine the layout of the external scaffolding wall parts; Finally, the external scaffolding foundation is erected.
[0006] Preferably, the lattice column in step S2 is formed by splicing an upper column and a lower column, and both the upper column and the lower column are rectangular columnar structures formed by a plurality of steel pipes, and two adjacent steel pipes are fixedly connected by a plurality of cross bars.
[0007] Preferably, the upper end of each of the steel pipes of the lower column is provided with an external thread, and each of the external threads is threadedly connected to a fine-tuning member; The fine-tuning member comprises an insert rod movably arranged on the steel pipe, the diameter of the insert rod is smaller than the inner diameter of the steel pipe, a sleeve is rotatably arranged at the lower end of the insert rod, and the sleeve is threadedly connected with the external thread; A plurality of positioning holes are arranged in an array on the rod body of the insertion rod, and the positioning holes are arranged along the axis of the insertion rod.
[0008] Preferably, a plurality of limiting holes are arranged in an array at the lower end of each of the steel pipes of the upper column, a plug is inserted into one of the limiting holes, and the plug is plugged into one of the positioning holes.
[0009] Preferably, a rectangular mounting plate is fixedly provided on the upper end of each of the steel pipes of the upper column, a plurality of mounting holes are provided on the mounting plate, the mounting holes correspond to the bolts, and the upper column is fixed to the main structure floor by bolts penetrating the mounting plate.
[0010] Preferably, a rectangular mounting plate is fixedly provided at the lower end of each of the steel pipes of the lower column, a plurality of mounting holes are provided under the mounting plate, the mounting holes correspond to the bolts, and the lower column is fixed under the main structure floor by bolts penetrating the mounting plate.
[0011] Preferably, the specific steps in step S4 are: The lattice column is fixedly connected to the floor slab by bolts and mounting plates at both ends of the lattice column.
[0012] After the lattice column is installed, several diagonal braces are set on the lattice column. The two ends of the diagonal braces are used to fix two adjacent steel pipes. Preferably, the specific steps in step S3 are: During the construction of the main structure floor slab, the bolts are installed before the main structure floor slab 6 is cast, and the positions of the bolts correspond to the arrangement of the mounting holes.
[0013] Preferably, the specific steps in step S5 are: After the lattice columns are installed, the external scaffolding can continue to be erected upwards and fixed to the main structure floor through wall connectors, and the lattice columns are connected through the cross bars extending from the external scaffolding.
[0014] The beneficial effects of the technical solution provided by the embodiment of the present invention are as follows: the problem of insufficient number of wall connecting parts is solved by arranging lattice columns in the middle of the main structural columns inside the building, and the lattice columns can be adjusted by the height of the uprights to adapt to the requirements of different floor heights, and can be processed and produced in a modular manner, and can also be modified on-site using a disc-type frame or a fastener-type steel pipe scaffolding, and can be used in rotation with the scaffolding, which is beneficial to the safety of construction workers, has good economic and social benefits, and can be widely promoted in the construction of similar structural systems. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The figure is a schematic diagram of the use process of an embodiment of the present invention.
[0016] Figure 2 Schematic diagram of a bolt and a steel pipe according to an embodiment of the present invention.
[0017] Among them, the accompanying drawings are marked as: 1. external scaffolding, 2. wall connecting parts, 3. lattice columns, 4. bolts, 5. cross bars, 6. main structure floor slabs, 7. mounting plates, 8. sleeves; 9. limit holes; 10. latches. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the present invention and are not used to limit the present invention.
[0019] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0020] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0021] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.
[0022] Example 1 See also Figure 1 to Figure 2 The present invention provides a method for strengthening scaffolding against overturning for a super-high concrete structure, comprising the following steps: S1. Set up the foundation of external scaffolding 1; S2, manufacturing lattice columns 3 on site according to the design specifications; S3, construction of main structure floor slab 6 and installation of bolts 4 of embedded lattice columns 3; S4, installing the lattice column 3 on the main structure floor 6; S5, the external scaffolding 1 is erected upward layer by layer and fixedly connected to the lattice column 3.
[0023] The specific steps of step S1 are: Arrange the external scaffolding 1 according to the engineering construction drawings and the site plan layout, determine the construction parameters such as the erection height, pole spacing, and step distance of the external scaffolding 1, and use the BIM construction simulation software to calculate the external scaffolding 1 and determine the layout method of the external scaffolding 1 wall connection parts 2; Finally, the external scaffolding 1 foundation is erected.
[0024] The lattice column 3 in step S2 is formed by splicing an upper column and a lower column. Both the upper column and the lower column are rectangular column structures formed by a plurality of steel pipes. Two adjacent steel pipes are fixedly connected by a plurality of cross bars 5.
[0025] Before the lattice column 3 is manufactured, a construction simulation analysis is performed using BIM construction simulation software to design parameters such as the main structure wall connection 2, lattice column 3, bolts 4, and the column connection between the external scaffolding 1 and the lattice column 3, and determine the selection of various construction materials and cross-sections. The lattice column 3 can use a combination of 2×2, 3×3 and other steel pipes to meet the force calculation requirements, ensuring that the wall connection 2, column, and bolts 4 are not damaged under the action of wind loads, and the lattice column 3 does not become unstable.
[0026] The upper end of each steel pipe of the lower column is provided with an external thread, and each external thread is threadedly connected to a fine-tuning piece; The fine-tuning part includes a plug rod movably arranged on the steel pipe, the diameter of the plug rod is smaller than the inner diameter of the steel pipe, and a sleeve 8 is rotatably arranged at the lower end of the plug rod, and the sleeve 8 is threadedly connected with the external thread; Furthermore, two pull rods are fixedly arranged on the outer wall of the sleeve 8, and the pull rods facilitate the user to pull the sleeve 8, thereby improving the convenience during use; A plurality of positioning holes are arranged in an array on the rod body of the insertion rod, and the positioning holes are arranged along the axis of the insertion rod.
[0027] A plurality of limiting holes 9 are arranged in an array at the lower end of each steel pipe of the upper column, a plug pin 10 is inserted into one of the limiting holes 9, and the plug pin 10 is plugged into one of the positioning holes.
[0028] A rectangular mounting plate 7 is fixedly provided at the upper end of each steel pipe of the upper column. A plurality of mounting holes are provided on the mounting plate 7. The mounting holes correspond to the bolts 4. The upper column is fixed to the main structure floor 6 by the bolts 4 penetrating the mounting plate 7.
[0029] A rectangular mounting plate 7 is fixedly provided at the lower end of each steel pipe of the lower column. A plurality of mounting holes are provided under the mounting plate 7. The mounting holes correspond to the bolts 4. The lower column is fixed under the main structure floor 6 by the bolts 4 penetrating the mounting plate 7.
[0030] The specific steps in step S4 are: The lattice column 3 is fixedly connected to the floor slab by means of bolts 4 and mounting plates 7 at both ends of the lattice column 3, and has good resistance to lateral deformation.
[0031] After the lattice column 3 is installed, a plurality of diagonal braces are arranged on the lattice column 3, and the two ends of the diagonal braces are respectively used to fix two adjacent steel pipes. The specific steps in step S3 are: During the construction of the main structure floor 6 , the bolts 4 are installed before the main structure floor 6 is cast, and the positions of the bolts 4 correspond to the arrangement of the mounting holes 7 .
[0032] The specific steps in step S5 are: After the lattice columns 3 are installed, the external scaffolding 1 can continue to be erected upwards and fixed to the main structure floor 6 through the wall connecting pieces 2, and the lattice columns 3 are connected to the columns through the cross bars 5 extending from the external scaffolding 1. According to the required number and position of the wall connecting pieces 2 of the external scaffolding 1, lattice columns 3 and holding columns are set instead of the parts where the wall connecting pieces 2 cannot be set between the external scaffolding and the main structure on site, so as to ensure the stability of the external scaffolding 1 under wind load during on-site construction.
[0033] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for strengthening scaffolding against overturning for super-high concrete structures. It is characterized in that The following steps are involved: S1. Erection of external scaffolding (1) foundation; S2, fabricating lattice columns (3) on site according to the design specifications; S3, construction of the main structure floor slab (6) and installation of bolts (4) of the embedded lattice columns (3); S4, installing the lattice column (3) on the main structure floor (6); S5. The external scaffolding (1) is erected upward layer by layer and fixedly connected to the lattice column (3).
2. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 1, It is characterized in that The specific steps of step S1 are: Arrange the external scaffolding (1) according to the engineering construction drawings and the site plan layout, determine the construction parameters such as the erection height, the spacing between the vertical poles, and the step distance of the external scaffolding (1), calculate the external scaffolding (1) using BIM construction simulation software, and determine the layout method of the external scaffolding (1) wall connecting parts (2); Finally, the foundation of the external scaffolding (1) is erected.
3. The anti-overturning reinforcement method for scaffolding of super-high concrete structure according to claim 1, It is characterized in that The lattice column (3) in step S2 is formed by splicing an upper column and a lower column, wherein the upper column and the lower column are both rectangular column structures formed by a plurality of steel pipes, and two adjacent steel pipes are fixedly connected by a plurality of cross bars (5).
4. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 3, It is characterized in that The upper end of each steel pipe of the lower column is provided with an external thread, and each of the external threads is threadedly connected to a fine-tuning piece; The fine-tuning member comprises an insert rod movably arranged on the steel pipe, the diameter of the insert rod being smaller than the inner diameter of the steel pipe, a sleeve (8) being rotatably arranged at the lower end of the insert rod, and the sleeve (8) being threadedly connected to the external thread; A plurality of positioning holes are arranged in an array on the rod body of the insertion rod, and the positioning holes are arranged along the axis of the insertion rod.
5. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 4, It is characterized in that A plurality of limiting holes (9) are arranged in an array at the lower end of each of the steel pipes of the upper column, wherein a plug pin (10) is inserted into one of the limiting holes (9), and the plug pin (10) is plugged into one of the positioning holes.
6. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 3, It is characterized in that A rectangular mounting plate (7) is fixedly provided at the upper end of each of the steel pipes of the upper column, a plurality of mounting holes are provided on the mounting plate (7), the mounting holes correspond to the bolts (4), and the upper column is fixed to the main structure floor slab (6) by means of the bolts (4) penetrating the mounting plate (7).
7. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 3, It is characterized in that A rectangular mounting plate (7) is fixedly provided at the lower end of each of the steel pipes of the lower column, a plurality of mounting holes are provided under the mounting plate (7), the mounting holes correspond to the bolts (4), and the lower column is fixed under the main structure floor slab (6) by means of the bolts (4) penetrating the mounting plate (7).
8. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 3, It is characterized in that The specific steps in step S4 are: The lattice column (3) is fixedly connected to the floor slab by means of bolts (4) and mounting plates (7) at both ends of the lattice column (3). After the lattice column (3) is installed, a plurality of diagonal braces are arranged on the lattice column (3), and the two ends of the diagonal braces are respectively used to fix two adjacent steel pipes.
9. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 6 or 7, It is characterized in that The specific steps in step S3 are: During the construction of the main structure floor slab (6), the bolts (4) are installed before the main structure floor slab 6 is cast, and the positions of the bolts (4) correspond to the arrangement of the mounting holes (7).
10. The method for strengthening the scaffolding against overturning for a super-high concrete structure according to claim 3, It is characterized in that The specific steps in step S5 are: After the lattice columns (3) are installed, the external scaffolding (1) can continue to be erected upwards and fixed to the main structure floor (6) through the wall connecting pieces (2), and the lattice columns (3) are connected to the columns through the cross bars (5) extending from the external scaffolding (1).
Citation Information
Cited By
Erecting method for wall connecting piece reinforcing structure in ultrahigh and super-span area of ring buckle external scaffold
CN120401778A