Wind turbine generator construction control system based on intelligent hydraulic wrench
Through the intelligent hydraulic wrench system, real-time monitoring and feedback of the bolt axial force during the construction of wind turbines is solved, the problem of hidden dangers of high-strength bolt breakage in the construction of wind turbines is solved, and high-precision pre-tightening force control is achieved and construction safety is improved.
Patent Information
- Application Number
- CN202410635570.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2024-10-08
AI Technical Summary
During the construction of wind turbines, high-strength bolts are prone to fracture under alternating loads. It is difficult to effectively control the axial force of bolts with existing technology, leading to potential hazards. As the capacity of the unit increases, bolt specifications and flange sizes increase, and construction equipment size control and convenience have become important issues.
A wind turbine construction control system based on an intelligent hydraulic wrench is adopted. Through the combination of a multi-channel hydraulic wrench and a hydraulic pump station, an ultrasonic force measuring unit and an intelligent control unit, the ultrasonic principle is used to monitor and feedback axial force parameters in real time to achieve high-precision pre-tightening force. Control to avoid thread pair friction errors and achieve closed-loop control.
It achieves high-precision pre-tightening force control, reduces the dispersion coefficient, ensures the consistency and accuracy of the bolt axial force during the construction process, improves construction safety and design adaptability, and reduces the initial design cost.
Smart Images

Figure CN118745976A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind turbine generator sets, and in particular to a wind turbine generator set construction control system based on an intelligent hydraulic wrench. Background Art
[0002] As an important part of new energy, wind turbines are developing rapidly. With the application of wind resources in low wind areas and the rapid development of offshore wind turbines, the capacity of single units is increasing, the height of towers is increasing, the weight of large components of the units and the load borne by large components are also increasing. The pitch circle size of the connecting flanges between the major components of the transmission chain and the tower sections is getting larger and larger. As an important part of their connection, the role of high-strength bolt connection pairs is extremely important.
[0003] High-strength bolts connect the major transmission components to achieve energy transmission. Once a problem occurs, it will be fatal to the normal operation of the whole machine. In particular, the bolts in the flange connection structure are subjected to tension and compression cycles under alternating loads. If the construction method and axial force of the bolts cannot be well controlled during the construction process, it will become a potential hidden danger of the unit. Facts have also proved that many bolt breakage incidents occurred on site. The root cause of the analysis was mostly caused by on-site construction. In the actual design process, the dispersion coefficient range of 1.4-1.6 that may be generated by on-site construction was considered. In fact, when analyzing on-site accidents Or during the random inspection, it was found that the construction dispersion coefficient of some wind farms exceeded 2, and these factors caused the key bolts to break in the subsequent units. Especially with the increase of unit capacity, the pitch circle of the blade root flange, the flange surface connecting the main shaft and the hub, the flange connecting the main shaft and the gear box, the sleeve height and the flange size are increasing. At the same time, the bolt specifications are also increasing. Eliminating the hidden dangers caused by the supervisory factors of the personnel, a good construction method and construction tools are one of the ultimate guarantees for the safety of the unit. At the same time, in view of the increase in bolt specifications, how to control the size of construction equipment or the convenience of personnel carrying has also become one of the important research topics.
[0004] Therefore, what kind of construction tools to use for construction to ensure the safe operation and refined design of the unit, reduce the initial cost of unit design and improve the adaptability of the unit is a technical problem that needs to be solved urgently. Summary of the invention
[0005] In order to solve the deficiencies of the prior art, the present invention provides a wind turbine construction control system based on an intelligent hydraulic wrench, which can improve the refined design and achieve the adaptability of the unit.
[0006] The embodiment of the present invention provides the following solution:
[0007] An embodiment of the present invention provides a wind turbine construction control system based on an intelligent hydraulic wrench, including a multi-channel hydraulic wrench, wherein each wrench of the multi-channel hydraulic wrench is connected to a hydraulic pump station unit through a hydraulic pipeline, the hydraulic pump station unit is electrically connected to an intelligent control unit through a control cable, the intelligent control unit is electrically connected to an ultrasonic force measuring unit through a signal power cable, and the ultrasonic force measuring unit is electrically connected to a group of ultrasonic sensors through an ultrasonic force measuring cable.
[0008] In an optional embodiment, the hydraulic pump station unit includes a hydraulic pump body, on which is provided a pressure gauge, a pressure sensor, a hydraulic pipeline interface for communicating with a hydraulic pipeline, and a control cable interface for electrically connecting with a control cable.
[0009] In an optional embodiment, the hydraulic pump body is provided with a hydraulic pump station unit power interface.
[0010] In an optional embodiment, the hydraulic pump body is provided with a first connecting flange for connecting to the ultrasonic force measuring unit and a second connecting flange for connecting to the intelligent control unit.
[0011] In an optional embodiment, the intelligent control unit includes an intelligent control unit body, which is provided with a signal power interface for electrically connecting to a signal power cable and an intelligent control unit communication interface for electrically connecting to a control cable.
[0012] In an optional embodiment, the intelligent control unit is provided with a third connecting flange connected to the first connecting flange.
[0013] In an optional embodiment, the first connecting flange and the second connecting flange are respectively provided with a quick-connect slide rail and a quick-connect slide block with shapes matching each other.
[0014] In an optional embodiment, the intelligent control unit is provided with an intelligent control unit power interface.
[0015] In an optional embodiment, the ultrasonic force measuring unit includes an ultrasonic force measuring unit body, and the ultrasonic force measuring unit is provided with an ultrasonic force measuring unit signal power interface for electrically connecting to a signal power cable and a communication power interface for electrically connecting to the ultrasonic force measuring cable.
[0016] In an optional embodiment, the ultrasonic force measuring unit body is provided with a fourth connecting flange for connecting to the first connecting flange.
[0017] The beneficial effects of the present invention based on its technical solution are:
[0018] The present invention provides a wind turbine construction control system based on an intelligent hydraulic wrench. The system can feed back the applied axial force control and adjustment value to the corresponding electro-hydraulic servo system to control the wrench to tighten based on the parameter values of the axial forces of different channels collected by ultrasound, thereby avoiding error influencing factors such as friction of the threaded pair and the connection end face, and realizing high-precision preload control; an ultrasonic force measuring unit is used to realize axial force monitoring and feedback based on the ultrasonic principle; a hydraulic pump station unit is used to realize multi-way setting and multi-channel independent control, and different channel position wrenches are used to realize adjustment and control according to different needs; each unit can be modularly connected and disassembled, which is convenient for construction personnel to carry and carry for mobile construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a modular combination schematic diagram of the present invention.
[0021] Figure 2 It is a schematic diagram of the overall construction state of the present invention.
[0022] Figure 3 This is a schematic diagram of the one-way bolt construction of a multi-channel hydraulic wrench.
[0023] Figure 4 It is a schematic diagram of an ultrasonic force measuring unit.
[0024] Figure 5 It is a schematic diagram of the intelligent control unit.
[0025] Figure 6 It is a schematic diagram of the hydraulic pump station unit.
[0026] Figure 7 It is the control topology diagram of the system of the present invention.
[0027] In the figure, 1-ultrasonic force measuring unit, 1.1-ultrasonic force measuring unit signal power interface, 1.2-communication power interface, 1.3-fourth connecting flange, 2-intelligent control unit, 2.1-signal power interface, 2.2-intelligent control unit power interface, 2.3-intelligent control unit communication interface, 2.4-third connecting flange, 2.5-quick-connect slider, 3-signal power cable, 4-control cable, 5-hydraulic pump station unit, 5.1-first connecting flange, 5.2-pressure sensor, 5.3-hydraulic pipeline interface, 5.4-pressure gauge, 5.5-control cable interface, 5.6-quick-connect slide rail, 5.7-hydraulic pump station unit power interface, 5.8-second connecting flange, 6-ultrasonic force measuring cable, 7-ultrasonic sensor, 8-hydraulic pipeline, 9-multi-channel hydraulic wrench, 10-flange, 11-high-strength bolt pair. DETAILED DESCRIPTION
[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention belong to the scope of protection of the embodiments of the present invention.
[0029] The embodiment of the present invention provides the following solution:
[0030] The embodiment of the present invention provides a wind turbine construction control system based on an intelligent hydraulic wrench. Figure 1 , including a multi-channel hydraulic wrench 9, each wrench of the multi-channel hydraulic wrench is connected to the hydraulic pump station unit 5 through a hydraulic pipeline 8, the hydraulic pump station unit is electrically connected to the intelligent control unit 2 through a control cable 4, the intelligent control unit is electrically connected to the ultrasonic force measuring unit 1 through a signal power cable 3, and the ultrasonic force measuring unit is electrically connected to a group of ultrasonic sensors 7 through an ultrasonic force measuring cable 6.
[0031] Reference Figure 6 The hydraulic pump station unit includes a hydraulic pump body, on which a pressure gauge 5.4, a pressure sensor 5.2, a hydraulic pipeline interface 5.3 for communicating with a hydraulic pipeline, and a control cable interface 5.5 for electrically connecting with a control cable are provided. The hydraulic pump body is provided with a hydraulic pump station unit power interface 5.7. The hydraulic pump body is provided with a first connecting flange 5.1 for connecting with an ultrasonic force measuring unit and a second connecting flange 5.8 for connecting with an intelligent control unit.
[0032] Reference Figure 5The intelligent control unit includes an intelligent control unit body, on which a signal power interface 2.1 for electrically connecting to a signal power cable and an intelligent control unit communication interface 2.3 for electrically connecting to a control cable are provided. The intelligent control unit is provided with a third connecting flange 2.4 connected to the first connecting flange. The first connecting flange and the second connecting flange are respectively provided with a quick-connect slide rail 5.6 and a quick-connect slider 2.5 of mutually matching shapes. The intelligent control unit is provided with an intelligent control unit power interface 2.2.
[0033] Reference Figure 4 The ultrasonic force measuring unit includes an ultrasonic force measuring unit body, which is provided with an ultrasonic force measuring unit signal power interface 1.1 for electrically connecting to a signal power cable and a communication power interface 1.2 for electrically connecting to an ultrasonic force measuring cable. The ultrasonic force measuring unit body is provided with a fourth connecting flange 1.3 for connecting to the first connecting flange.
[0034] The principle of the present invention is that the hydraulic pump station unit 5 is connected to the multi-channel hydraulic wrench 9 through the hydraulic pipeline 8, and the multi-channel hydraulic wrench has a corresponding arrangement of ultrasonic sensors 7 and a corresponding pair of connecting bolts. Before construction, initial values are input into the intelligent control unit 2 for bolt specifications and tightening times, and instructions and signals are transmitted through the control cable 4 and the hydraulic pump station unit 5. The hydraulic pump station unit 5 applies torque or axial force to the multi-channel hydraulic wrench 9 through the hydraulic pipeline 8. In view of the difference in bolt pairs at various positions on the flange pitch circle, the actual applied axial force will be different. The difference value is captured by the ultrasonic sensor 7 and fed back to the ultrasonic force measuring unit 1 through the ultrasonic force measuring cable 6. After processing, the relevant data is fed back to the intelligent control unit 2 through the signal power cable 3, so as to further issue instructions to the hydraulic pump station unit 5, further control the axial force or preload of each hydraulic wrench, and form a closed-loop control, that is, the built-in ultrasonic axial force measurement component directly measures the axial preload of the bolt in real time during the tightening process, and feeds back to the electro-hydraulic servo system to control the wrench to tighten, and finally outputs accurate axial force directly and in real time during the construction process, avoiding error factors such as friction of the threaded pair and the connection end face, and realizing high-precision preload control.
[0035] Reference Figure 2 During the construction process, the multi-channel hydraulic wrench 9 is arranged on the pitch circle connected to the flange 10, and its axial force and hydraulic pressure are fed back through the signal power cable 3 and the hydraulic pipeline 8, so as to effectively control the consistency of the axial force of the bolts at different positions and reduce the dispersion coefficient. During the construction, the hydraulic wrenches of different channels are set according to the pitch circle and the bolt specifications. At the same time, the construction can be carried out in a diagonal construction or a M-shaped construction method, which can be specifically set based on the number of channels. The hydraulic wrench performs torque wrench or tension wrench construction according to the bolt connection form of the two components.
[0036] Reference Figure 3 Taking the construction of one of the bolts of the multi-channel hydraulic wrench as an example, the torque method is used based on the connection form of the two components. The two flanges 10 are connected by a high-strength bolt pair 11 on the pitch circle, and an ultrasonic sensor 7 is set on the nut side. The multi-channel hydraulic wrench 9 is constructed through the nut side, and the pressure of the multi-channel hydraulic wrench 9 is controlled by the hydraulic pipeline 8. The axial force data is tested through the ultrasonic force measuring cable 6 and transmitted to the ultrasonic force measuring unit 1.
[0037] Reference Figure 7 , is the control topology diagram of the intelligent hydraulic wrench system. Based on different bolt specifications and pre-tightening or tensioning times, the initial value is set in the intelligent control unit 2. The hydraulic pump station unit 5 outputs the pressure of each hydraulic pipeline 8 by issuing the initial value to perform the action of the multi-channel hydraulic wrench 9, and tests the axial force of each bolt through the ultrasonic sensor 7 to confirm the performance of each hydraulic wrench on the axial force of the high-strength bolt pair 11, and converts the axial force according to the parameters fed back by the ultrasonic sensor 7 through the ultrasonic force measuring unit 1, and transmits the value to the intelligent control unit 2. The intelligent control unit 2 adjusts the pressure value of each channel according to the difference on each high-strength bolt pair 11, and transmits the signal to the hydraulic pump station unit 5, and independently adjusts the pressure of each hydraulic wrench through the hydraulic pipeline 8, and finally forms a closed-loop control, thereby ensuring the consistency of the axial force of each bolt and the accuracy of the axial force during the construction process.
[0038] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0039] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A wind turbine construction control system based on an intelligent hydraulic wrench, comprising a multi-channel hydraulic wrench (9), characterized in that: Each wrench of the multi-channel hydraulic wrench is connected to a hydraulic pump station unit (5) via a hydraulic pipeline (8), the hydraulic pump station unit is electrically connected to an intelligent control unit (2) via a control cable (4), the intelligent control unit is electrically connected to an ultrasonic force measuring unit (1) via a signal power cable (3), and the ultrasonic force measuring unit is electrically connected to a group of ultrasonic sensors (7) via an ultrasonic force measuring cable (6).
2. According to claim 1, the wind turbine construction control system based on the intelligent hydraulic wrench is characterized in that: The hydraulic pump station unit comprises a hydraulic pump body, on which are provided a pressure gauge (5.4), a pressure sensor (5.2), a hydraulic pipeline interface (5.3) for communicating with a hydraulic pipeline, and a control cable interface (5.5) for electrically connecting with a control cable.
3. The wind turbine construction control system based on the intelligent hydraulic wrench according to claim 2 is characterized in that: The hydraulic pump body is provided with a hydraulic pump station unit power supply interface (5.7).
4. According to claim 2, the wind turbine construction control system based on the intelligent hydraulic wrench is characterized in that: The hydraulic pump body is provided with a first connecting flange (5.1) for connecting to the ultrasonic force measuring unit and a second connecting flange (5.8) for connecting to the intelligent control unit.
5. According to claim 1, the wind turbine construction control system based on the intelligent hydraulic wrench is characterized in that: The intelligent control unit comprises an intelligent control unit body, on which a signal power interface (2.1) for electrically connecting to a signal power cable and an intelligent control unit communication interface (2.3) for electrically connecting to a control cable are provided.
6. The wind turbine construction control system based on the intelligent hydraulic wrench according to claim 4 or 5, characterized in that: The intelligent control unit is provided with a third connecting flange (2.4) connected to the first connecting flange.
7. The wind turbine construction control system based on the intelligent hydraulic wrench according to claim 6 is characterized in that: The first connecting flange and the second connecting flange are respectively provided with a quick-connecting slide rail (5.6) and a quick-connecting slide block (2.5) whose shapes match each other.
8. The wind turbine construction control system based on the intelligent hydraulic wrench according to claim 5 is characterized in that: The intelligent control unit is provided with an intelligent control unit power supply interface (2.2).
9. The wind turbine construction control system based on the intelligent hydraulic wrench according to claim 1 is characterized in that: The ultrasonic force measuring unit comprises an ultrasonic force measuring unit body, and the ultrasonic force measuring unit is provided with an ultrasonic force measuring unit signal power interface (1.1) for electrically connecting to a signal power cable and a communication power interface (1.2) for electrically connecting to the ultrasonic force measuring cable.
10. The wind turbine construction control system based on the intelligent hydraulic wrench according to claim 4 or 9, characterized in that: The ultrasonic force measuring unit body is provided with a fourth connecting flange (1.3) for connecting to the first connecting flange.