Intelligent logistics collaborative production system based on artificial intelligence

Through artificial intelligence analysis of factory order data and market conditions, material supply and production capacity are optimized, which solves the problem of inaccurate inter-factory production capacity control and material distribution in the existing technology, and improves equipment utilization and production efficiency.

CN118747636AInactive Publication Date: 2024-10-08SHANGHAI LIUYANG NETWORK TECHNOLOGY CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410736288.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technology cannot accurately control production capacity and material supply between factories, resulting in insufficient or overcapacity in some factories, low equipment utilization, and inaccurate material distribution, affecting production efficiency.

Method used

Adopt an intelligent logistics collaborative production system based on artificial intelligence, including a data collection module, a collaborative management module and a logistics management module. By analyzing the factory's order data, equipment failure frequency, market conditions and other factors, the material supply model and production capacity are adjusted, and the inter-factory relationship is optimized. production relations and warehousing management.

Benefits of technology

It improves the accuracy of material distribution and equipment utilization, avoids insufficient or overcapacity, reduces warehouse management costs, and improves overall production efficiency and resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747636A_ABST
    Figure CN118747636A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent logistics collaborative production system based on artificial intelligence, which comprises a data collection module, a collaborative management module and a logistics management module, and is characterized in that the data collection module is used for collecting order data and factory workshop comprehensive data of a factory; historical production data of factories and historical production data of equipment are input into the system, and the collaborative management module is used for analyzing production demand influence factors of all factories, distributing material resources for the factories according to analysis results, analyzing influences of failure frequencies of the factory equipment on productivity and adjusting the yield of the factories according to the analysis results. The logistics management module is used for analyzing the warehouse stock of products and distributing materials for factories according to factory requirements, the data collection module, the collaborative management module and the logistics management module are in communication connection with one another, and the data collection module comprises a data acquisition module and a historical data entry module. The method has the characteristics of improving accuracy and equipment utilization rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of collaborative production technology, and specifically to an intelligent logistics collaborative production system based on artificial intelligence. Background Art

[0002] With the rapid development of Internet technology, manufacturing companies have generally begun to transform to intelligent production. The traditional single production model is gradually unable to meet the production needs of enterprises. In order to cope with the situation of intensified competition and intensified environmental dynamics, enterprises are paying more and more attention to the coordination of production links.

[0003] At present, the warehouses of some companies are far away from their factories, and they need to use logistics for transportation scheduling. However, since the production needs of factories are affected by many factors, the existing technology mainly relies on the experience of technicians to judge the needs of each factory, and cannot accurately allocate materials to the factories, resulting in some factories being unable to obtain sufficient material supply. Moreover, in the production process, the existing technology cannot accurately regulate the production capacity and consumption between factories, which can easily cause insufficient or excessive production capacity in some factories, resulting in low equipment utilization in downstream factories. Therefore, it is very necessary to design an intelligent logistics collaborative production system based on artificial intelligence to improve accuracy and equipment utilization. Summary of the invention

[0004] The purpose of the present invention is to provide an intelligent logistics collaborative production system based on artificial intelligence to solve the problems raised in the above background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: an intelligent logistics collaborative production system based on artificial intelligence, comprising a data collection module, a collaborative management module and a logistics management module, characterized in that: the data collection module is used to collect factory order data and factory workshop comprehensive data, and enter the factory's historical production data and equipment's historical production data into the system; the collaborative management module is used to analyze the production demand influencing factors of each factory, allocate material resources to the factory according to the analysis results, analyze the impact of the failure frequency of factory equipment on production capacity, and adjust the factory's output according to the analysis results; the logistics management module is used to analyze the storage inventory of products and distribute materials to the factory according to factory needs; the data collection module, the collaborative management module and the logistics management module are connected to each other for communication;

[0006] The demand management module includes a capacity analysis submodule, a market analysis submodule and a demand analysis submodule. The capacity analysis submodule is used to analyze the impact of historical equipment capacity data and historical equipment failure frequency on factory capacity. The market analysis submodule is used to analyze the impact of market changes on factory capacity. The demand forecasting submodule is used to analyze the changes in factory demand under the influence of market conditions and adjust the factory material supply mode according to the analysis results.

[0007] The production management module includes a production relationship analysis submodule, a production capacity adjustment submodule and an order management submodule. The production relationship analysis submodule is used to analyze the production relationship between factories, and the production adjustment submodule is used to analyze the relationship between the production capacity of upstream factories and the consumption of downstream factories, and adjust the factory's production capacity and equipment load according to the analysis results.

[0008] According to the above technical solution, the data collection module includes a data acquisition module and a historical data entry module. The data acquisition module is used to collect the factory's product order data and the comprehensive data of the factory workshop. The historical data entry module is used to enter the factory's historical production data and the equipment's historical production data into the system.

[0009] According to the above technical solution, the collaborative management module includes a demand management module, which is used to analyze the impact of equipment failure frequency on factory production capacity, the impact of product market conditions on factory material demand, analyze changes in factory demand based on the analysis results, and adjust material supply based on changes in demand.

[0010] According to the above technical solution, the collaborative management module also includes a production management module, which is used to analyze the production relationship and capacity consumption relationship between upstream and downstream factories, and adjust the factory's capacity according to the analysis results.

[0011] According to the above technical solution, the logistics management module includes a warehousing management module and a logistics distribution module. The warehousing management module is used to analyze the storage cost of materials, and store buffer material resources for the factory based on the analysis results and changes in factory demand. The logistics distribution module is used to distribute materials to the factory.

[0012] According to the above technical solution, the operation method of the intelligent logistics collaborative production system mainly includes the following steps:

[0013] Step S1: periodically collect the factory's product order data and the comprehensive data of the factory workshop through the data collection module, and enter the factory's historical production data and the equipment's historical production data into the system through the historical data entry module;

[0014] Step S2: After the data is entered into the system, the system starts the demand management module, starts to analyze the capacity of the factory's production equipment, further analyzes the impact of capacity and market conditions on the factory's material demand, and allocates material resources to the factory based on the analysis results;

[0015] Step S3: During the factory production process, the production management module starts to analyze the production relationship between factories, analyze the capacity of upstream factories and the consumption relationship of downstream factories, and adjust the capacity of factories according to the analysis results;

[0016] Step S4: During the logistics management process, the system analyzes whether the factory's surplus production capacity can cope with changes in factory demand, analyzes the management cost and transportation cost of warehousing, and distributes material resources to the factory according to the factory's actual needs.

[0017] According to the above technical solution, step S2 further includes the following steps:

[0018] Step S21: Acquire historical production data of the factory workshop, identify the historical output of the factory workshop, pre-process the historical output of the factory workshop, and remove historical output values ​​that are less than a minimum threshold or greater than a maximum threshold;

[0019] Step S22: Obtain the processed historical production value, compare it with the database, retrieve the equipment operation characteristics corresponding to the historical production value, retrieve the corresponding influence coefficient α on the workshop production in the database according to the equipment operation characteristics, and calculate the deviation coefficient of the historical production of the factory workshop under the equipment operation characteristics according to the formula In the formula, i = 1, 2, 3...n, P represents the deviation coefficient of the historical output of the factory workshop under the operating characteristics of the equipment, G i It represents the historical output of the factory workshop under the operating characteristics of the equipment. Represents the historical average output of the factory workshop, and retrieves the corresponding output impact coefficient β in the database according to the deviation coefficient of the historical output;

[0020] Step S23: Obtain the failure frequency of the equipment within the factory workshop cycle, and retrieve the weight φ of the corresponding equipment failure feature on the factory workshop demand impact coefficient in the database according to the equipment failure frequency.

[0021] According to the above technical solution, step S23 further includes the following steps:

[0022] Step S231: Obtain the fault characteristics of the factory equipment, retrieve the corresponding product quality depreciation rate η in the database according to the fault characteristics of the factory equipment, and calculate the theoretical output of the material in the factory workshop according to the formula Q1=(α·φ+β)M, where Q1 represents the theoretical output of the material in the factory workshop, and M represents the rated output of the factory workshop;

[0023] Step S232: Obtain the product code produced by the production workshop, retrieve the influence coefficient of the market situation on the factory workshop output in the database according to the product code, and retrieve the influence coefficient of the market situation on the material demand according to the product code. Calculate the actual material demand of factory equipment under the influence of market conditions through formula In the formula, Q2 represents the actual material demand of factory equipment under the influence of market conditions. The difference between Q1 and Q2 is calculated by the formula. If the difference between Q1 and Q2 is less than the minimum threshold, a material buffer is built in the warehouse. The material inventory of the warehouse material buffer is calculated by the formula Q3=κQ1-Q2|, in which Q3 represents the material inventory of the warehouse material buffer, κ represents the error coefficient of the material inventory, and materials with an inventory of Q3 are pre-stored in the warehouse material buffer. If the difference between Q1 and Q2 is greater than the maximum threshold, the material allocation quantity of the factory workshop with an inventory of Q3 is reduced. Otherwise, the system continues to detect and uses the adjusted material quantity as the material allocation quantity of the factory workshop.

[0024] According to the above technical solution, step S3 further includes the following steps:

[0025] Step S31: Obtain the position of the factory workshop in the production line, identify the code of the factory workshop and the code of the downstream workshop in the production line, retrieve the production relationship between the corresponding workshops in the database according to the code of the current workshop and the code of the downstream workshop, and when the production relationship is a direct production relationship, identify the output of the workshop, calculate the difference between the output of the current workshop and the material demand of the downstream workshop, and if the difference is less than the threshold, retrieve the surplus output of the adjacent workshop for compensation, otherwise mark the current workshop as having surplus output;

[0026] Step S32: Identify the surplus production of the current workshop and compare it with the inventory of the material buffer in the downstream workshop. If the surplus production is greater than the threshold, mark the surplus production as storable, otherwise transport the surplus production of the current workshop to the idle equipment, retrieve the corresponding storage management fee in the database according to the surplus production, if the storage management fee is greater than the system set threshold, mark the surplus production as non-storable, otherwise mark it as storable, identify the marks in the surplus production of the workshop, if the marks are all storable marks, store the surplus production of the workshop in the boring buffer, otherwise transport the surplus production of the current workshop to the idle equipment.

[0027] According to the above technical solution, in step S4, the material surplus stored in the factory workshop warehouse is identified, the corresponding material surplus index in the workshop production process in the database is compared, and the absolute value H of the difference between the material surplus of the current factory workshop and the material surplus index in the database is calculated. If the material surplus of the current factory workshop is greater than the material surplus index, the material inventory of the current factory workshop is reduced, otherwise the material inventory of the current factory workshop is increased, and the material allocation quantity of each factory workshop is obtained, and the materials are distributed to the workshop according to the material allocation quantity of the workshop.

[0028] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention, by analyzing the impact of equipment failure characteristics on workshop output, can accurately calculate the change in factory demand, and then accurately allocate materials to the factory, greatly improving the accuracy of the system; by analyzing the impact of various factors on the output of the factory workshop, can accurately calculate the theoretical output of workshop materials, and then accurately allocate material quantities to the factory workshop, further improving the accuracy of the system; by analyzing the impact of market conditions on the output of the factory workshop, further analyzing the impact on the material demand of the factory workshop, can accurately allocate materials to the factory workshop, avoid insufficient material allocation, resulting in idle equipment, avoid excessive material allocation, resulting in excessive occupation of warehouse resources, thereby greatly improving the accuracy of the system and resource utilization; by analyzing the production relationship between workshops, and then adjusting the output of the factory workshop, resulting in excessive material resources in the downstream factory workshop, and dispatching the surplus output of the workshop to idle equipment, can avoid excess workshop output, avoid waste of resources, and then greatly increase the utilization of equipment; analyzing the storage cost of the surplus output of the workshop, can reduce the storage management cost of the factory workshop, and then reduce the production cost of the factory. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0030] Figure 1 It is a schematic diagram of the system module composition of the present invention. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1, the present invention provides a technical solution: an intelligent logistics collaborative production system based on artificial intelligence, including a data collection module, a collaborative management module and a logistics management module, characterized in that: the data collection module is used to collect the factory's order data and the factory workshop comprehensive data, and enter the factory's historical production data and the equipment's historical production data into the system; the collaborative management module is used to analyze the production demand influencing factors of each factory, allocate material resources to the factory according to the analysis results, analyze the impact of the failure frequency of the factory equipment on the production capacity, and adjust the factory's output according to the analysis results; the logistics management module is used to analyze the storage inventory of the product and distribute materials to the factory according to the factory's needs; the data collection module, the collaborative management module and the logistics management module are connected to each other in communication;

[0033] The demand management module includes a capacity analysis submodule, a market analysis submodule, and a demand analysis submodule. The capacity analysis submodule is used to analyze the impact of historical equipment capacity data and equipment failure frequency on factory capacity. The market analysis submodule is used to analyze the impact of market changes on factory capacity. The demand forecasting submodule is used to analyze the changes in factory demand under the influence of market conditions and adjust the factory material supply mode according to the analysis results.

[0034] The production management module includes a production relationship analysis submodule, a capacity adjustment submodule and an order management submodule. The production relationship analysis submodule is used to analyze the production relations between factories, and the production adjustment submodule is used to analyze the relationship between the capacity of upstream factories and the consumption of downstream factories, and adjust the factory's capacity and equipment load according to the analysis results.

[0035] The data collection module includes a data acquisition module and a historical data entry module. The data acquisition module is used to collect the factory's product order data and the comprehensive data of the factory workshop. The historical data entry module is used to enter the factory's historical production data and the equipment's historical production data into the system.

[0036] The collaborative management module includes a demand management module, which is used to analyze the impact of equipment failure frequency on factory production capacity and the impact of product market conditions on factory material demand. Based on the analysis results, the changes in factory demand are analyzed and the material supply is adjusted according to the changes in demand.

[0037] The collaborative management module also includes a production management module, which is used to analyze the production relationship and capacity consumption relationship between upstream and downstream factories, and adjust the factory's capacity based on the analysis results.

[0038] The logistics management module includes the warehouse management module and the logistics distribution module. The warehouse management module is used to analyze the storage cost of materials, and store buffer material resources for the factory based on the analysis results and changes in factory demand. The logistics distribution module is used to distribute materials to the factory.

[0039] The operation method of the intelligent logistics collaborative production system mainly includes the following steps:

[0040] Step S1: periodically collect the factory's product order data and the comprehensive data of the factory workshop through the data collection module, and enter the factory's historical production data and the equipment's historical production data into the system through the historical data entry module;

[0041] Step S2: After the data is entered into the system, the system starts the demand management module, starts to analyze the capacity of the factory's production equipment, further analyzes the impact of capacity and market conditions on the factory's material demand, and allocates material resources to the factory based on the analysis results;

[0042] Step S3: During the factory production process, the production management module starts to analyze the production relationship between factories, analyze the capacity of upstream factories and the consumption relationship of downstream factories, and adjust the capacity of factories according to the analysis results;

[0043] Step S4: During the logistics management process, the system analyzes whether the factory's surplus production capacity can cope with changes in factory demand, analyzes the warehousing management cost and transportation cost, and distributes material resources to the factory according to the factory's actual needs.

[0044] Step S2 further comprises the following steps:

[0045] Step S21: Acquire historical production data of the factory workshop, identify the historical output of the factory workshop, pre-process the historical output of the factory workshop, and remove historical output values ​​that are less than a minimum threshold or greater than a maximum threshold;

[0046] Step S22: Obtain the processed historical production value, compare it with the database, retrieve the equipment operation characteristics corresponding to the historical production value, retrieve the corresponding influence coefficient α on the workshop production in the database according to the equipment operation characteristics, and calculate the deviation coefficient of the historical production of the factory workshop under the equipment operation characteristics according to the formula In the formula, i = 1, 2, 3...n, P represents the deviation coefficient of the historical output of the factory workshop under the operating characteristics of the equipment, G i It represents the historical output of the factory workshop under the operating characteristics of the equipment. Indicates the historical average output of the factory workshop. According to the deviation coefficient of the historical output, the corresponding output impact coefficient β in the database is retrieved. By analyzing the impact of equipment failure characteristics on workshop output, the change in factory demand can be accurately calculated, and materials can be accurately allocated to the factory, greatly improving the accuracy of the system.

[0047] Step S23: Obtain the failure frequency of the equipment within the factory workshop cycle, and retrieve the weight φ of the corresponding equipment failure feature on the factory workshop demand impact coefficient in the database according to the equipment failure frequency.

[0048] Step S23 further includes the following steps:

[0049] Step S231: Obtain the fault characteristics of the factory equipment, retrieve the corresponding product quality depreciation rate η in the database according to the fault characteristics of the factory equipment, and calculate the theoretical output of the material in the factory workshop according to the formula Q1=(α·φ+β)M, where Q1 represents the theoretical output of the material in the factory workshop, and M represents the rated output of the factory workshop. By analyzing the influence of various factors on the output of the factory workshop, the theoretical output of the workshop material can be accurately calculated, and then the material quantity can be accurately allocated to the factory workshop, further improving the accuracy of the system;

[0050] Step S232: Obtain the product code produced by the production workshop, retrieve the influence coefficient of the market situation on the factory workshop output in the database according to the product code, and retrieve the influence coefficient of the market situation on the material demand according to the product code. Calculate the actual material demand of factory equipment under the influence of market conditions through formula In the formula, Q2 represents the actual material demand of factory equipment under the influence of market conditions. The difference between Q1 and Q2 is calculated by the formula. If the difference between Q1 and Q2 is less than the minimum threshold, it means that the factory has insufficient material allocation. A material buffer is built in the warehouse. The material inventory of the warehouse material buffer is calculated by the formula Q3=κQ1-Q2|, in which Q3 represents the material inventory of the warehouse material buffer, and κ represents the error coefficient of the material inventory. Materials with an inventory of Q3 are pre-stored in the warehouse material buffer. If the difference between Q1 and Q2 is greater than the maximum threshold, it means that too much material is allocated. The material allocation amount of the factory workshop with an inventory of Q3 is reduced. Otherwise, the system continues to detect and uses the adjusted material amount as the material allocation amount of the factory workshop. By analyzing the impact of market conditions on the output of the factory workshop and further analyzing the impact on the material demand of the factory workshop, materials can be accurately allocated to the factory workshop to avoid insufficient material allocation, resulting in idle equipment, and excessive material allocation, resulting in excessive occupation of warehouse resources, thereby greatly improving the accuracy of the system and the utilization of resources.

[0051] Step S3 further comprises the following steps:

[0052] Step S31: Obtain the position of the factory workshop in the production line, identify the code of the factory workshop and the code of the downstream workshop in the production line, retrieve the production relationship between the corresponding workshops in the database according to the code of the current workshop and the code of the downstream workshop, and when the production relationship is a direct production relationship, identify the output of the workshop, calculate the difference between the output of the current workshop and the material demand of the downstream workshop, and if the difference is less than the threshold, retrieve the surplus output of the adjacent workshop for compensation, otherwise mark the current workshop as having surplus output;

[0053] Step S32: Identify the surplus production of the current workshop and compare it with the inventory of the material buffer of the downstream workshop. If the surplus production is greater than the threshold, mark the surplus production as storable, otherwise transport the surplus production of the current workshop to idle equipment, retrieve the corresponding storage management fee in the database according to the surplus production, if the storage management fee is greater than the system set threshold, mark the surplus production as non-storable, otherwise mark it as storable, identify the marks in the surplus production of the workshop, if the marks are all storable marks, store the surplus production of the workshop in the boring buffer, otherwise transport the surplus production of the current workshop to idle equipment, analyze the production relationship between workshops, and then adjust the production of the factory workshop, resulting in excessive material resources in the downstream factory workshop, and dispatch the surplus production of the workshop to idle equipment, which can avoid excess production in the workshop, avoid waste of resources, and greatly increase the utilization rate of equipment, analyze the storage cost of the workshop surplus production, can reduce the storage management cost of the factory workshop, and thus reduce the production cost of the factory.

[0054] In step S4, the material surplus stored in the factory workshop warehouse is identified, and the corresponding material surplus index in the workshop production process in the database is compared, and the absolute value H of the difference between the material surplus of the current factory workshop and the material surplus index in the database is calculated. If the material surplus of the current factory workshop is greater than the material surplus index, the material inventory of the current factory workshop is reduced, otherwise the material inventory of the current factory workshop is increased, and the material allocation quantity of each factory workshop is obtained, and materials are distributed to the workshop according to the material allocation quantity of the workshop.

[0055] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0056] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. The intelligent logistics collaborative production system based on artificial intelligence includes a data collection module, a collaborative management module and a logistics management module, and is characterized by: The data collection module is used to collect the factory's order data and comprehensive factory workshop data, and enter the factory's historical production data and equipment's historical production data into the system. The collaborative management module is used to analyze the production demand influencing factors of each factory, allocate material resources to the factory according to the analysis results, analyze the impact of the failure frequency of factory equipment on production capacity, and adjust the factory's output according to the analysis results. The logistics management module is used to analyze the storage inventory of products and distribute materials to the factory according to factory needs. The data collection module, collaborative management module and logistics management module are connected to each other in communication; The demand management module includes a capacity analysis submodule, a market analysis submodule and a demand analysis submodule. The capacity analysis submodule is used to analyze the impact of historical equipment capacity data and historical equipment failure frequency on factory capacity. The market analysis submodule is used to analyze the impact of market changes on factory capacity. The demand forecasting submodule is used to analyze the changes in factory demand under the influence of market conditions and adjust the factory material supply mode according to the analysis results. The production management module includes a production relationship analysis submodule, a production capacity adjustment submodule and an order management submodule. The production relationship analysis submodule is used to analyze the production relationship between factories, and the production adjustment submodule is used to analyze the relationship between the production capacity of upstream factories and the consumption of downstream factories, and adjust the factory's production capacity and equipment load according to the analysis results.

2. The intelligent logistics collaborative production system based on artificial intelligence according to claim 1 is characterized by: The data collection module includes a data acquisition module and a historical data entry module. The data acquisition module is used to collect the factory's product order data and the comprehensive data of the factory workshop. The historical data entry module is used to enter the factory's historical production data and the equipment's historical production data into the system.

3. The intelligent logistics collaborative production system based on artificial intelligence according to claim 2 is characterized by: The collaborative management module includes a demand management module, which is used to analyze the impact of equipment failure frequency on factory production capacity, the impact of product market conditions on factory material demand, analyze changes in factory demand based on the analysis results, and adjust material supply based on changes in demand.

4. The intelligent logistics collaborative production system based on artificial intelligence according to claim 3 is characterized by: The collaborative management module also includes a production management module, which is used to analyze the production relationship and capacity consumption relationship between upstream and downstream factories, and adjust the factory's capacity according to the analysis results.

5. The intelligent logistics collaborative production system based on artificial intelligence according to claim 4 is characterized by: The logistics management module includes a warehouse management module and a logistics distribution module. The warehouse management module is used to analyze the storage cost of materials and store buffer material resources for the factory based on the analysis results and changes in factory demand. The logistics distribution module is used to distribute materials to the factory.

6. The intelligent logistics collaborative production system based on artificial intelligence according to claim 5 is characterized by: The operation method of the intelligent logistics collaborative production system mainly includes the following steps: Step S1: periodically collect the factory's product order data and the comprehensive data of the factory workshop through the data collection module, and enter the factory's historical production data and the equipment's historical production data into the system through the historical data entry module; Step S2: After the data is entered into the system, the system starts the demand management module, starts to analyze the capacity of the factory's production equipment, further analyzes the impact of capacity and market conditions on the factory's material demand, and allocates material resources to the factory based on the analysis results; Step S3: During the factory production process, the production management module starts to analyze the production relationship between factories, analyze the capacity of upstream factories and the consumption relationship of downstream factories, and adjust the capacity of factories according to the analysis results; Step S4: During the logistics management process, the system analyzes whether the factory's surplus production capacity can cope with changes in factory demand, analyzes the management cost and transportation cost of warehousing, and distributes material resources to the factory according to the factory's actual needs.

7. The intelligent logistics collaborative production system based on artificial intelligence according to claim 6 is characterized by: The step S2 further comprises the following steps: Step S21: Acquire historical production data of the factory workshop, identify the historical output of the factory workshop, pre-process the historical output of the factory workshop, and remove historical output values ​​that are less than a minimum threshold or greater than a maximum threshold; Step S22: Obtain the processed historical production value, compare it with the database, retrieve the equipment operation characteristics corresponding to the historical production value, retrieve the corresponding influence coefficient α on the workshop production in the database according to the equipment operation characteristics, and calculate the deviation coefficient of the historical production of the factory workshop under the equipment operation characteristics according to the formula In the formula, i = 1, 2, 3...n, P represents the deviation coefficient of the historical output of the factory workshop under the operating characteristics of the equipment, G i represents the historical output of the factory workshop under the operation characteristics of the equipment, G represents the historical average output of the factory workshop, and the corresponding output impact coefficient β in the database is retrieved according to the deviation coefficient of the historical output; Step S23: Obtain the failure frequency of the equipment within the factory workshop cycle, and retrieve the weight φ of the corresponding equipment failure feature on the factory workshop demand impact coefficient in the database according to the equipment failure frequency.

8. The intelligent logistics collaborative production system based on artificial intelligence according to claim 7 is characterized by: The step S23 further comprises the following steps: Step S231: Obtain the fault characteristics of the factory equipment, retrieve the corresponding product quality depreciation rate η in the database according to the fault characteristics of the factory equipment, and calculate the theoretical output of the material in the factory workshop according to the formula Q1=(α·φ+β)M, where Q1 represents the theoretical output of the material in the factory workshop, and M represents the rated output of the factory workshop; Step S232: Obtain the product code produced by the production workshop, retrieve the influence coefficient of the market situation on the factory workshop output in the database according to the product code, and retrieve the influence coefficient of the market situation on the material demand according to the product code. Calculate the actual material demand of factory equipment under the influence of market conditions through formula In the formula, Q2 represents the actual material demand of factory equipment under the influence of market conditions. The difference between Q1 and Q2 is calculated by the formula. If the difference between Q1 and Q2 is less than the minimum threshold, a material buffer is built in the warehouse. The material inventory of the warehouse material buffer is calculated by the formula Q3=κQ1-Q2|, in which Q3 represents the material inventory of the warehouse material buffer, κ represents the error coefficient of the material inventory, and materials with an inventory of Q3 are pre-stored in the warehouse material buffer. If the difference between Q1 and Q2 is greater than the maximum threshold, the material allocation quantity of the factory workshop with an inventory of Q3 is reduced. Otherwise, the system continues to detect and uses the adjusted material quantity as the material allocation quantity of the factory workshop.

9. The intelligent logistics collaborative production system based on artificial intelligence according to claim 8 is characterized by: The step S3 further comprises the following steps: Step S31: Obtain the position of the factory workshop in the production line, identify the code of the factory workshop and the code of the downstream workshop in the production line, retrieve the production relationship between the corresponding workshops in the database according to the code of the current workshop and the code of the downstream workshop, and when the production relationship is a direct production relationship, identify the output of the workshop, calculate the difference between the output of the current workshop and the material demand of the downstream workshop, and if the difference is less than the threshold, retrieve the surplus output of the adjacent workshop for compensation, otherwise mark the current workshop as having surplus output; Step S32: Identify the surplus production of the current workshop and compare it with the inventory of the material buffer in the downstream workshop. If the surplus production is greater than the threshold, mark the surplus production as storable, otherwise transport the surplus production of the current workshop to the idle equipment, retrieve the corresponding storage management fee in the database according to the surplus production, if the storage management fee is greater than the system set threshold, mark the surplus production as non-storable, otherwise mark it as storable, identify the marks in the surplus production of the workshop, if the marks are all storable marks, store the surplus production of the workshop in the boring buffer, otherwise transport the surplus production of the current workshop to the idle equipment.

10. The intelligent logistics collaborative production system based on artificial intelligence according to claim 9 is characterized in that: In the step S4, the material surplus stored in the factory workshop warehouse is identified, and the corresponding material surplus index in the workshop production process in the database is compared, and the absolute value H of the difference between the material surplus of the current factory workshop and the material surplus index in the database is calculated. If the material surplus of the current factory workshop is greater than the material surplus index, the material inventory of the current factory workshop is reduced, otherwise the material inventory of the current factory workshop is increased, and the material allocation quantity of each factory workshop is obtained, and the materials are distributed to the workshop according to the material allocation quantity of the workshop.

Citation Information

Cited By

  • Industrial internet platform and production collaborative management method

    CN119904072A

  • Cross-factory multi-production flow game optimization method and system

    CN121563174A