Power distribution network data processing method and device, computer equipment and readable storage medium

By calculating the health index and failure rate of distribution network equipment, combined with the resource conversion ratio, the net resource amount is accurately calculated, which solves the problem of inaccurate resource assessment in traditional technology and improves the accuracy of distribution network resource management and maintenance strategies. Evaluate benefits.

CN118747640APending Publication Date: 2024-10-08GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410679635.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

When traditional technology applies distribution network maintenance strategies based on condition monitoring, it is unable to accurately assess resource investment and returns, resulting in low accuracy of net resource amounts and failure to fully consider influencing factors.

Method used

By obtaining the resource input data, resource return data and operation data of the distribution network, the health index of the equipment is calculated, and then the failure rate is determined. Combined with the resource conversion ratio, the net resource amount is accurately calculated, taking into account the equipment operating temperature, partial discharge intensity and vibration. Strength, using preset impact weights and resource conversion ratios, evaluates resource changes for maintenance strategies.

Benefits of technology

It improves the accuracy of distribution network resource management, can more accurately reflect equipment failure conditions and resource impacts, provides a more reliable basis for subsequent resource assessment, and evaluates the long-term resource benefits of maintenance strategies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747640A_ABST
    Figure CN118747640A_ABST
Patent Text Reader

Abstract

The invention relates to a power distribution network data processing method and device, computer equipment, a computer readable storage medium and a computer program product. The method comprises the steps of obtaining first resource input data of a power distribution network, first resource return data of the power distribution network in a preset time period, and operation data of power distribution network equipment in the preset time period, the first resource input data, the first resource return data and the operation data are collected under the condition that the power distribution network adopts a preset maintenance strategy based on state monitoring, a health index of the power distribution network equipment is determined according to the first operation data, and a first failure rate of the power distribution network equipment is determined according to the health index; and determining a first net resource quantity of the power distribution network according to the first fault rate, the first resource input data, the first resource return data and a preset resource conversion ratio. By adopting the method, the more accurate net resource quantity of the power distribution network can be obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a distribution network data processing method, device, computer equipment, computer-readable storage medium and computer program product. Background Art

[0002] In recent years, with the popularization of sensors in power grids, distribution network maintenance strategies based on condition monitoring (hereinafter referred to as CondM strategies) have also been developed. By collecting and analyzing data input by sensors, CondM strategies can accurately predict the performance and life of equipment. Since CondM strategies require a lot of resources in the early stage, such as the construction of a large number of sensor devices, it is particularly important to conduct resource management evaluation on distribution networks that apply CondM strategies.

[0003] In traditional technology, the net resource amount of the distribution network is often simply determined based on a simplified hypothetical model by measuring the investment resources caused by installing sensors or data acquisition systems, and the investment resources can be recovered by reducing the failure and downtime of distribution network equipment.

[0004] However, the traditional scheme is based on a simplified hypothetical model and only considers when the invested resources can be recovered by reducing the distribution network equipment conditions and downtime. But when the CondM strategy is applied to the distribution network, the factors affecting the net resource amount are often not only the failure and downtime of the distribution network equipment. Therefore, the net resource amount determined by the traditional scheme is less accurate. Summary of the invention

[0005] Based on this, it is necessary to provide a distribution network data processing method, device, computer equipment, computer-readable storage medium and computer program product that can improve the accuracy of net resource quantity in response to the above technical problems.

[0006] In a first aspect, the present application provides a distribution network data processing method, comprising:

[0007] Acquire first resource input data of the distribution network, first resource return data of the distribution network within a preset time period, and operation data of distribution network equipment within the preset time period, wherein the first resource input data, the first resource return data, and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring;

[0008] Determining a health index of the distribution network equipment according to the operating data;

[0009] Determining a first failure rate of the distribution network equipment according to the health index;

[0010] A first net resource amount of the distribution network is determined according to the first failure rate, the first resource investment data, the first resource return data, and a preset resource conversion ratio.

[0011] In one embodiment, the operating data includes measured operating temperature, partial discharge intensity, and equipment vibration intensity;

[0012] Determining the health index of the distribution network equipment according to the operating data includes:

[0013] Determining a health rating of the distribution network equipment based on the operating temperature, the partial discharge intensity, and the equipment vibration intensity;

[0014] The health index of the distribution network equipment is determined according to the preset influence weight of the operating temperature, the preset influence weight of the partial discharge intensity, the preset influence weight of the equipment vibration intensity, and the health rating.

[0015] In one embodiment, determining the first failure rate of the distribution network equipment according to the health index includes:

[0016] Determining a first failure rate of the distribution network equipment according to a pre-constructed relationship model between the health index and the first failure rate, and the health index;

[0017] The pre-built relationship model is obtained by fitting the historical health index and historical failure rate of the distribution network equipment.

[0018] In one embodiment, determining the first net resource amount of the distribution network according to the first failure rate, the first resource input data, a preset resource conversion ratio and the first resource return data includes:

[0019] Determining first resource flow data of the distribution network according to the first failure rate and the first resource return data;

[0020] The first net resource amount is determined according to the first resource return data, a preset resource conversion ratio and the first resource flow data.

[0021] In one embodiment, determining the first resource flow data of the distribution network according to the first failure rate and the first resource return data includes:

[0022] When the first failure rate is greater than or equal to a preset first failure rate threshold, pushing a device maintenance message;

[0023] When the first failure rate is less than a preset first failure rate threshold, obtaining first maintenance resource data of the distribution network equipment;

[0024] The first resource flow data is determined according to the first maintenance resource data and the first resource report data.

[0025] In one embodiment, after determining the first net resource amount of the distribution network according to the first failure rate, the first resource input data and the first resource return data, the method further includes:

[0026] Acquire second resource input data of the distribution network, second resource return data of the distribution network within a preset time period, and operation time of distribution network equipment in the distribution network, wherein the second resource input data and the second resource return data are collected when the distribution network adopts a preset corrective maintenance strategy;

[0027] Determining a second failure rate of the power distribution network equipment according to the operating time and preset distribution data, wherein the preset distribution data is used to characterize a change in the second failure rate with the operating time;

[0028] Determining a second net resource amount of the distribution network according to the second failure rate, the second resource input data, a preset resource conversion ratio and the second resource return data;

[0029] Comparing the first net resource amount and the second net resource amount to obtain a comparison result;

[0030] According to the comparison result, the resource added value of the distribution network is determined when a maintenance strategy based on condition monitoring is adopted.

[0031] In one embodiment, determining the second net resource amount of the distribution network according to the second failure rate, the second resource investment data, and the second resource return data includes:

[0032] Determining second resource flow data of the distribution network according to the second failure rate and the second resource return data;

[0033] The second net resource amount is determined according to the second resource return data, a preset resource conversion ratio and the second resource flow data.

[0034] In one embodiment, determining the second resource flow data of the distribution network according to the second failure rate and the second resource return data includes:

[0035] randomly generating a second failure rate threshold, and pushing a device maintenance message when the second failure rate is greater than or equal to the second failure rate threshold;

[0036] When the second failure rate is less than the second failure rate threshold, obtaining second maintenance resource data of the distribution network equipment;

[0037] determining the second resource flow data according to the second maintenance resource data and the second resource return data;

[0038] The second resource flow data is determined according to the second maintenance resource data and the second resource report data.

[0039] In a second aspect, the present application also provides a distribution network data processing device, including:

[0040] A data acquisition module, used to obtain first resource input data of the distribution network, first resource return data of the distribution network within a preset time period, and operation data of distribution network equipment within the preset time period, wherein the first resource input data, the first resource return data, and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring;

[0041] A health index determination module, used to determine the health index of the distribution network equipment according to the operation data;

[0042] A failure rate determination module, used to determine the failure rate of the distribution network equipment according to the health index;

[0043] The net resource quantity determination module is used to determine the first net resource quantity of the distribution network according to the failure rate, the first resource input data, the first resource return data and a preset resource conversion ratio.

[0044] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps in the above-mentioned distribution network data processing method embodiments when executing the computer program.

[0045] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps in the above-mentioned distribution network data processing method embodiments are implemented.

[0046] In a fifth aspect, the present application further provides a computer program product, including a computer program, which, when executed by a processor, implements the steps in the above-mentioned distribution network data processing method embodiments.

[0047] The above-mentioned distribution network data processing method, device, computer equipment, computer-readable storage medium and computer program product obtain the first resource input data of the distribution network, the first resource return data of the distribution network within a preset time period, and the first operation data of the distribution network equipment in the distribution network within a preset time period, wherein the first resource input data, the first resource return data and the first operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring, and the health index of the distribution network equipment is determined according to the first operation data. Then, the first net resource amount of the distribution network is determined according to the failure rate, the first resource input data, the preset resource conversion ratio and the first resource return data. Different from the traditional scheme, the above-mentioned scheme converts the detected operation data into the health index of the distribution network equipment when the distribution network adopts a maintenance strategy based on condition monitoring, and further determines the failure rate of the distribution network equipment according to the health index, so as to more accurately reflect the failure condition of the distribution network equipment, and more accurately measure the impact of the failure condition of the distribution network equipment on the input resources and return resources of the distribution network, and provide a more accurate basis for the subsequent determination of the net resource amount of the distribution network. In addition, the above scheme also introduces a preset resource conversion ratio to characterize the time value of resources, so that the long-term resource changes of the distribution network based on the state detection maintenance strategy can be more accurately evaluated to obtain a more accurate net resource amount. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0049] Figure 1 An application environment diagram of a distribution network data processing method in an embodiment;

[0050] Figure 2 A schematic diagram of a flow chart of a method for processing power distribution network data in one embodiment;

[0051] Figure 3 A schematic diagram of a flow chart of a method for processing power distribution network data in another embodiment;

[0052] Figure 4 A schematic diagram of a process for determining a resource value-added amount in one embodiment;

[0053] Figure 5 A schematic diagram of a flow chart of a method for processing power distribution network data in a detailed embodiment;

[0054] Figure 6 is a structural block diagram of a distribution network data processing device in one embodiment;

[0055] Figure 7 is a structural block diagram of a distribution network data processing device in another embodiment;

[0056] Figure 8 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0057] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0058] The distribution network data processing method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown, the terminal 102 communicates with the server 104 through a network. The data storage system can store data that the server 104 needs to process. The data storage system can be integrated on the server 104, or placed on the cloud or other network servers.

[0059] Specifically, the operator may upload the first resource input data of the distribution network, the first resource return data of the distribution network within a preset time period, and the operation data of the distribution network equipment within a preset time period to the server 104 through the terminal 102, wherein the first resource input data, the first resource return data, and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring. Then, the server 104 determines the health index of the distribution network equipment based on the operation data, and determines the failure rate of the distribution network equipment based on the health index. Finally, the server 104 determines the first net resource amount of the distribution network based on the failure rate, the first resource input data, the first resource return data, and the preset resource conversion ratio.

[0060] The terminal 102 may be, but is not limited to, various personal computers, laptops, smart phones, and tablet computers. The server 104 may be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services.

[0061] In an exemplary embodiment, Figure 2 As shown, a distribution network data processing method is provided, and the method is applied to Figure 1 The server 104 in the example is used as an example to illustrate, and the following steps are included:

[0062] S200, obtaining first resource input data of the distribution network, first resource return data of the distribution network within a preset time period, and operation data of distribution network equipment within the preset time period.

[0063] Among them, the maintenance strategy based on condition monitoring refers to installing a large number of sensors or other data acquisition devices in the distribution network. By collecting and analyzing the operating data of the distribution network equipment, it can monitor the health status of the distribution network equipment and take preventive measures in time when the status of the distribution network equipment begins to deteriorate. Action should be taken before the distribution network equipment fails, thereby reducing the cost caused by premature replacement or untimely replacement of distribution network equipment.

[0064] The first resource input data, the first resource return data and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring. The first resource input data refers to the total amount of various resources invested when the distribution network system starts to operate, such as the investment cost and labor cost of installing the data acquisition system. The first resource return data refers to the amount of resource returns expected to be collected within a specific time period during the operation of the distribution network system, such as the income of the distribution network system within a specific time period. The operation data is the actual operation information collected from the distribution network equipment, including but not limited to the temperature of the equipment, the intensity of partial discharge, etc., which can be used to evaluate the status and performance of the distribution network equipment.

[0065] S400, determining a health index of the distribution network equipment according to the operation data.

[0066] Among them, the health index is a parameter used to measure the performance of distribution network equipment. It can convert different types of operating data into a comprehensive value that reflects the overall health status of the distribution network equipment.

[0067] Specifically, sensors installed in the distribution network system are used to collect the operating data of the distribution network equipment. The operating data can be multi-dimensional, including but not limited to operating temperature, partial discharge intensity, and equipment vibration intensity. Based on the operating data of each dimension, the health rating of the distribution network equipment can be rated, and the health rating of the distribution network equipment under the operating data of each dimension can be obtained. Then, the final health index of the distribution network equipment is determined by averaging the health ratings under each dimension or presetting the influence weight.

[0068] S600: Determine a first failure rate of the distribution network equipment according to the health index.

[0069] The first failure rate refers to the failure rate of distribution network equipment when the distribution network adopts a maintenance strategy based on condition monitoring. The first failure rate can be expressed in the form of a percentage, indicating the probability of failure of distribution network equipment per unit time.

[0070] Following the above steps, there is a specific functional relationship between the health index and the first failure rate. The higher the health index, the higher the first failure rate. A relationship model between the two can be constructed based on the historical health index and the historical first failure rate of the distribution network. Using this relationship model, the first failure rate can be determined based on the health index.

[0071] S800, determining a first net resource amount of the distribution network according to a first failure rate, first resource input data, first resource return data, and a preset resource conversion ratio.

[0072] Among them, the resource conversion ratio refers to the value used to convert different forms of resources, such as converting money resources and time resources. The first net resource volume refers to the difference between resource input and resource return within a preset time period, which can reflect the overall benefit of the distribution network in resource use. For example, when the first net resource volume is positive, it indicates that the resource return is greater than the resource input, and the distribution network achieves resource profit within the preset time period. If the first net resource volume is negative, it indicates that the resource return is less than the resource input, and the distribution network suffers from resource loss within the preset time period.

[0073] Specifically, through the first resource input data, the first resource return data, the preset resource conversion ratio, and the first failure rate, the different forms of resources in the distribution network are unified, and the resource consumption caused by the failure of the distribution network equipment is taken into consideration, so that the first net resource amount of the distribution network can be accurately calculated.

[0074] The above-mentioned distribution network data processing method obtains the first resource input data of the distribution network, the first resource return data of the distribution network within a preset time period, and the first operation data of the distribution network equipment in the distribution network within a preset time period, wherein the first resource input data, the first resource return data and the first operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring, and the health index of the distribution network equipment is determined according to the first operation data. Then, the first net resource amount of the distribution network is determined according to the failure rate, the first resource input data, the preset resource conversion ratio and the first resource return data. Different from the traditional scheme, the above-mentioned scheme converts the detected operation data into the health index of the distribution network equipment when the distribution network adopts a maintenance strategy based on condition monitoring, and further determines the failure rate of the distribution network equipment according to the health index, so as to more accurately reflect the failure condition of the distribution network equipment, and more accurately measure the impact of the failure condition of the distribution network equipment on the input resources and return resources of the distribution network, and provide a more accurate basis for the subsequent determination of the net resource amount of the distribution network. In addition, the above scheme also introduces a preset resource conversion ratio to characterize the time value of resources, so that the long-term resource changes of the distribution network based on the state detection maintenance strategy can be more accurately evaluated to obtain a more accurate net resource amount.

[0075] In an exemplary embodiment, Figure 3 As shown, S400 includes:

[0076] S420, determining a health rating of the distribution network equipment based on the operating temperature, the partial discharge intensity, and the equipment vibration intensity.

[0077] S440, determining the health index of the distribution network equipment according to the preset impact weight of the operating temperature, the preset impact weight of the partial discharge intensity, the preset impact weight of the equipment vibration intensity, and the health rating.

[0078] The operating data include but are not limited to the measured operating temperature, partial discharge intensity and equipment vibration intensity. The operating temperature refers to the temperature of the distribution network equipment during operation. A higher temperature indicates that the distribution network equipment is overheated and has a potential failure risk. The partial discharge intensity refers to the discharge intensity inside or around the distribution network equipment. A higher partial discharge intensity indicates that the insulation performance of the distribution network equipment is degraded and there is a risk of electrical failure. The equipment vibration intensity refers to the vibration intensity of the distribution network equipment during operation. A higher vibration indicates that the mechanical parts are worn or unbalanced and there is a risk of mechanical failure.

[0079] Specifically, based on the above operating data and formula (1), the health index of the distribution network equipment can be determined:

[0080] (1)

[0081] In the formula, It indicates the health rating of distribution network equipment under different physical characteristics, which can be determined by setting measurement thresholds. Represents the preset influence weights of different physical properties, Indicates the health index of the distribution network equipment. The preset impact weights of different physical characteristics can be pre-set based on the historical operation experience or historical operation data of the distribution network. For example, the preset impact weight of the operating temperature is larger, indicating that overheating has a more obvious impact on the health of the distribution network equipment.

[0082] For example, the health rating of the distribution network equipment at the operating temperature can be determined based on the deviation between the actual value of the operating temperature and the standard value. For example, if the standard value of the operating temperature is 0-40 degrees Celsius, when the measured operating temperature is 0-40 degrees Celsius, the health rating of the distribution network equipment at the operating temperature is 1; when the measured operating temperature is 41-60 degrees Celsius, the health rating of the distribution network equipment at the operating temperature is 0.8; when the measured operating temperature is 61 degrees Celsius or above, the health rating of the distribution network equipment at the operating temperature is 0.5. Similarly, the health rating of the distribution network equipment under other physical characteristics can be determined. Furthermore, by substituting the health rating of the distribution network equipment under each physical characteristic and the preset influence weight into formula (1), the health index of the distribution network equipment can be determined.

[0083] In this embodiment, the health index provides a quantitative indicator for measuring the operating status of the distribution network equipment, which can provide an accurate and measurable analysis basis for the subsequent determination of the failure rate, thereby more accurately predicting the failure conditions of the distribution network equipment.

[0084] In an exemplary embodiment, Figure 3 As shown, S600 includes:

[0085] S620: Determine a first failure rate of the distribution network equipment according to a pre-built relationship model between the health index and the first failure rate, and the health index.

[0086] The pre-built relationship model is obtained by fitting the historical health index and the historical first failure rate of the distribution network equipment. For example, the relationship model between the health index and the first failure rate can be shown as formula (2):

[0087] (2)

[0088] In the formula, The health index of the distribution network equipment is The first failure rate in the case of , and are all constants, representing the relationship constant between the health index of distribution network equipment and the first failure rate, which can be determined based on historical experience. For example, a large amount of historical operation data and historical health index can be collected, and the collected data can be used to determine the relationship constant in formula (2) through statistical analysis and fitting methods, such as regression analysis and least squares method.

[0089] In this embodiment, the health index of the distribution network equipment is converted into a first failure rate through a pre-built relationship model, so that the first failure rate can be used to formulate equipment maintenance plans, evaluate equipment operation risks, and optimize resource configuration.

[0090] In an exemplary embodiment, Figure 3 As shown, S800 includes:

[0091] S820: Determine first resource flow data of the distribution network according to the first failure rate and the first resource return data.

[0092] S840: Determine a first net resource amount according to the first resource input data, the first resource return data, a preset resource conversion ratio and the first resource flow data.

[0093] Exemplarily, taking the first resource input data and the first resource return data as capital type resources as an example, the resource conversion ratio can be the conversion ratio between capital and time resources accordingly. First, the capital cost incurred by the distribution network equipment due to failure or downtime can be determined based on the first failure rate, and then based on the first resource return data, the first resource flow data of the distribution network, such as capital flow data, can be determined. Taking the evaluation of the economic dimension of the distribution network as an example, the first net resource amount is the net present value, the first resource input data is the initial investment capital of the distribution network, and the resource conversion ratio is the discount rate. Further, the first net resource amount can be determined based on formula (3):

[0094] (3)

[0095] In formula (3), Characterize the net present value of the distribution network over a preset time period; Characterizes the initial investment capital of the distribution network; It represents the first resource flow data of the distribution network in the period of t years, and represents the capital flow data of the distribution network; The preset discount rate represents the discount rate used by the distribution network to convert future resources into current resources. It is set to 7%, which represents the discount rate between the capital and time value of the distribution network.

[0096] In this embodiment, by taking the preset resource conversion ratio into consideration, the time value of future resources can be effectively measured, and the future resource value can be discounted to the current resource value, thereby obtaining a more accurate first net resource amount.

[0097] In an exemplary embodiment, S820 includes: when the first failure rate is greater than or equal to a preset first failure rate threshold, pushing an equipment maintenance message; when the first failure rate is less than the preset first failure rate threshold, obtaining first maintenance resource data of the distribution network equipment; and determining first resource flow data based on the first maintenance resource data and the first resource return data.

[0098] The first maintenance resource data refers to the resource cost generated by maintaining the equipment, including but not limited to capital cost, manpower cost and time cost.

[0099] Exemplarily, when the first failure rate is equal to or greater than the preset first failure rate threshold, it indicates that the equipment needs maintenance, and the equipment maintenance message is pushed to the terminal of the relevant maintenance personnel to remind the relevant maintenance personnel to inspect and repair the equipment. When the first failure rate is less than the preset first failure rate threshold, it indicates that the failure rate of the equipment is within an acceptable range. At this time, it is necessary to obtain the first maintenance resource data of the distribution network equipment. In addition, at the end of the preset time period, the first maintenance resource data of the distribution network equipment can be obtained, including all maintenance records of the distribution network equipment within the preset time period, and the maintenance resource data generated by each maintenance.

[0100] Furthermore, based on the first maintenance resource data and the first resource return data, the first resource flow data can be determined to reflect the net resource flow in the distribution network. Taking the capital cost as an example, the first resource return data can be the capital inflow of the distribution network when the distribution network equipment operates normally, and the first maintenance resource data can be the capital consumption generated by the maintenance equipment. Based on the first maintenance resource data and the first resource return data, the capital flow data in the distribution network can be determined.

[0101] In this embodiment, by presetting the first failure rate threshold to determine whether the distribution network equipment needs maintenance, the distribution network equipment can be repaired at an appropriate time point, thereby reducing the resource cost caused by potential failures.

[0102] In an exemplary embodiment, Figure 4 As shown, after S800, the method further includes:

[0103] S910, obtaining second resource investment data of the distribution network, second resource return data of the distribution network within a preset time period, and operating time of distribution network equipment in the distribution network.

[0104] S920, determining a second failure rate of the distribution network equipment according to the operating time and preset distribution data, where the preset distribution data is used to characterize changes in the second failure rate with the operating time.

[0105] S930, determining a second net resource amount of the distribution network according to the second failure rate, the second resource input data, a preset resource conversion ratio and the second resource return data.

[0106] S940, comparing the first net resource amount and the second net resource amount to obtain a comparison result.

[0107] S950: Determine, based on the comparison result, the resource value-added amount of the distribution network when a maintenance strategy based on condition monitoring is adopted.

[0108] Among them, the second resource investment data and the second resource return data are collected when the distribution network adopts a preset corrective maintenance strategy. The corrective maintenance strategy refers to repairing or replacing the distribution network equipment when a failure occurs, without the need to deploy a large number of sensors or data acquisition systems. Compared with the maintenance strategy based on condition monitoring, the resource investment is lower, but it is easy to cause sudden failures and service interruptions in the distribution network, affecting the resource return. The second resource investment data, second resource return data, second failure rate and second net resource amount in this embodiment are similar to the first resource investment data, first resource return data, first failure rate and first net resource amount in the above embodiment, and will not be repeated here. It should be noted that the resource value-added amount refers to a value that can evaluate the degree of influence of the two strategies on the resource changes in the distribution network. For example, the resource value-added amount can characterize the investment level of the distribution network.

[0109] Among them, the distribution network in this embodiment adopts a corrective maintenance strategy. The failure rate of the distribution network equipment is related to the operating time. Therefore, the second failure rate can be determined based on formula (4):

[0110] (4)

[0111] Formula (4) represents the Weibull distribution. and is a constant and can be determined based on the historical second failure rate and historical operating time. After determining the second failure rate, based on formula (3) in the above embodiment, the second net resource amount of the distribution network under the corrective maintenance strategy can also be determined. Compare the first net resource amount and the second net resource amount to obtain the resource value-added amount. Among them, the resource value-added amount can evaluate the degree of influence of the two strategies on the resource changes of the distribution network. If the first net resource amount is greater than the second net resource amount, it indicates that the maintenance strategy based on condition monitoring can bring more resource inflows to the distribution network and is more suitable for the distribution network; otherwise, it indicates that the corrective maintenance strategy is more suitable for the distribution network.

[0112] In this embodiment, by determining the second net resource amount of the distribution network under the corrective maintenance strategy, the impact of the condition monitoring-based maintenance strategy on the resource flow of the distribution network, such as resource utilization, resource efficiency, etc., can be evaluated from the side, so as to make a more scientific maintenance and investment strategy for the distribution network and improve the overall resource utilization of the distribution network.

[0113] In an exemplary embodiment, S930 includes: determining second resource flow data of the distribution network based on the second failure rate and the second resource return data, and determining the second net resource amount based on the second resource return data, a preset resource conversion ratio and the second resource flow data.

[0114] Similar to the maintenance strategy based on condition monitoring, when the distribution network adopts a corrective maintenance strategy, the second net resource amount of the distribution network can also be determined based on a similar method as in the above embodiment, which will not be elaborated here.

[0115] In an exemplary embodiment, determining the second resource flow data of the distribution network according to the second failure rate and the second resource return data includes:

[0116] Randomly generate a second failure rate threshold, push an equipment maintenance message when the second failure rate is greater than or equal to the second failure rate threshold, obtain second maintenance resource data of the distribution network equipment when the second failure rate is less than the second failure rate threshold, determine the second resource flow data based on the second maintenance resource data and the second resource return data, and determine the second resource flow data based on the second maintenance resource data and the second resource return data.

[0117] The second failure rate threshold can be randomly generated by the Monte Carlo method, which is a method for simulating complex systems through a large number of random samples, for example, by presetting the distribution data of the failure rate, such as normal distribution, exponential distribution or uniform distribution, etc. Taking the normal distribution as an example, a random number distributor can be used to randomly generate a large number of failure rate samples from the normal distribution data of the failure rate, and the average level of the failure rate samples is determined as the second failure rate threshold.

[0118] Similar to the maintenance strategy based on condition monitoring, when the distribution network adopts a corrective maintenance strategy, the second resource flow data of the distribution network can also be determined based on a similar method as in the above embodiment, which will not be elaborated here.

[0119] In this embodiment, the Monte Carlo method is used to simulate a large number of random samples, thereby providing a scientific basis for setting the second failure rate threshold of the distribution network equipment, thereby obtaining a more accurate second failure rate threshold and more accurately evaluating the failure risk of the distribution network equipment.

[0120] In order to make a clearer description of the new energy power station cluster division method provided in this application, the following is combined with a specific embodiment and the attached Figure 5 To illustrate, this specific embodiment includes the following steps:

[0121] S501, obtaining first resource input data of a distribution network, first resource return data of the distribution network within a preset time period, and operation data of distribution network equipment within a preset time period.

[0122] S502, based on the operating temperature, partial discharge intensity, and equipment vibration intensity, determine the health rating of the distribution network equipment, and determine the health index of the distribution network equipment according to the preset impact weight of the operating temperature, the preset impact weight of the partial discharge intensity, the preset impact weight of the equipment vibration intensity, and the health rating.

[0123] S503: Determine a first failure rate of the distribution network equipment according to a pre-built relationship model between the health index and the failure rate, and the health index.

[0124] S504, when the first failure rate is greater than or equal to the preset first failure rate threshold, push the equipment maintenance message, when the first failure rate is less than the preset first failure rate threshold, obtain the first maintenance resource data of the distribution network equipment, and determine the first resource flow data based on the first maintenance resource data and the first resource return data.

[0125] S505: Determine a first net resource amount according to the first resource input data, the first resource return data, a preset resource conversion ratio and the first resource flow data.

[0126] S506, obtaining the second resource input data of the distribution network, the second resource return data of the distribution network within a preset time period, and the operating time of the distribution network equipment in the distribution network, and determining the second failure rate of the distribution network equipment according to the operating time and preset distribution data. The preset distribution data is used to characterize the change of the second failure rate with the operating time.

[0127] S507, determine the second net resource amount of the distribution network according to the second failure rate, the second resource input data, the preset resource conversion ratio and the second resource return data, compare the first net resource amount and the second net resource amount to obtain a comparison result, and determine the resource added value of the distribution network when adopting a maintenance strategy based on condition monitoring according to the comparison result.

[0128] In this embodiment, the application scenario of economic evaluation of the distribution network is taken as an example, wherein, when the distribution network adopts a maintenance strategy based on condition monitoring, the first resource investment data refers to the initial capital invested in the distribution network; the first resource return data refers to the income generated by the distribution network within a preset time period, the preset resource conversion ratio refers to the discount rate, which can be set to 7%, and the first net resource amount refers to the net present value of the distribution network. Similarly, when the distribution network adopts a corrective maintenance strategy, the second resource investment data refers to the initial capital invested in the distribution network; the second resource return data refers to the income generated by the distribution network within a preset time period, the preset resource conversion ratio refers to the discount rate, which can be set to 7%, and the second net resource amount refers to the net present value of the distribution network.

[0129] After determining the net present value under two different maintenance strategies, the two are compared. The comparison results can reflect the impact of the two different maintenance strategies on the economic value of the distribution network. For example, if the net present value of the distribution network under the maintenance strategy based on condition monitoring is higher, it means that the strategy has a greater impact on the economic value of the distribution network.

[0130] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0131] Based on the same inventive concept, the embodiment of the present application also provides a distribution network data processing device for implementing the distribution network data processing method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more distribution network data processing device embodiments provided below can refer to the limitations of the distribution network data processing method above, and will not be repeated here.

[0132] In an exemplary embodiment, Figure 6 As shown, a distribution network data processing device 600 is provided, comprising: a data acquisition module 610, a health index determination module 620, a fault rate determination module 630 and a net resource quantity determination module 640, wherein:

[0133] The data acquisition module 610 is used to obtain the first resource input data of the distribution network, the first resource return data of the distribution network within a preset time period, and the operation data of the distribution network equipment within a preset time period. The first resource input data, the first resource return data and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring.

[0134] The health index determination module 620 is used to determine the health index of the distribution network equipment according to the operation data.

[0135] The failure rate determination module 630 is used to determine a first failure rate of the distribution network equipment according to the health index.

[0136] The net resource quantity determination module 640 is used to determine the first net resource quantity of the distribution network according to the first failure rate, the first resource input data, the first resource return data and the preset resource conversion ratio.

[0137] In an exemplary embodiment, the operating data includes measured operating temperature, local discharge intensity, and equipment vibration intensity. The health index determination module 620 is also used to determine the health rating of the distribution network equipment based on the operating temperature, local discharge intensity, and equipment vibration intensity, and to determine the health index of the distribution network equipment according to the preset impact weight of the operating temperature, the preset impact weight of the local discharge intensity, the preset impact weight of the equipment vibration intensity, and the health rating.

[0138] In an exemplary embodiment, the failure rate determination module 630 is also used to determine the first failure rate of the distribution network equipment based on a pre-constructed relationship model between the health index and the failure rate, and the health index, wherein the pre-constructed relationship model is obtained by fitting the historical health index and historical failure rate of the distribution network equipment.

[0139] In an exemplary embodiment, the net resource quantity determination module 640 is also used to determine the first resource flow data of the distribution network based on the first failure rate and the first resource return data, and to determine the first net resource quantity based on the first resource return data, a preset resource conversion ratio and the first resource flow data.

[0140] In an exemplary embodiment, the net resource quantity determination module 640 is also used to push equipment maintenance messages when the first failure rate is greater than or equal to a preset first failure rate threshold, and to obtain first maintenance resource data of distribution network equipment when the first failure rate is less than a preset first failure rate threshold, and to determine first resource flow data based on the first maintenance resource data and the first resource return data.

[0141] In an exemplary embodiment, Figure 7 As shown, the distribution network data processing device 600 also includes a net resource quantity comparison module 650, which is used to obtain the second resource input data of the distribution network, the second resource return data of the distribution network within a preset time period, and the operating time of the distribution network equipment in the distribution network. The second resource input data and the second resource return data are collected when the distribution network adopts a preset corrective maintenance strategy. According to the operating time and the preset distribution data, the second failure rate of the distribution network equipment is determined. The preset distribution data is used to characterize the change of the second failure rate with the operating time. According to the second failure rate, the second resource input data, the preset resource conversion ratio and the second resource return data, the second net resource quantity of the distribution network is determined, and the first net resource quantity and the second net resource quantity are compared to obtain a comparison result. According to the comparison result, the resource value-added amount of the distribution network is determined when the maintenance strategy based on condition monitoring is adopted.

[0142] In an exemplary embodiment, the net resource quantity comparison module 650 is also used to determine the second resource flow data of the distribution network based on the second failure rate and the second resource return data, and to determine the second net resource quantity based on the second resource return data, a preset resource conversion ratio and the second resource flow data.

[0143] In an exemplary embodiment, the net resource quantity comparison module 650 is also used to randomly generate a second fault rate threshold, push an equipment maintenance message when the second fault rate is greater than or equal to the second fault rate threshold, obtain second maintenance resource data of the distribution network equipment when the second fault rate is less than the second fault rate threshold, determine the second resource flow data based on the second maintenance resource data and the second resource return data, and determine the second resource flow data based on the second maintenance resource data and the second resource return data.

[0144] Each module in the above-mentioned distribution network data processing device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0145] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Figure 8 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as the operation data of the distribution network equipment. The input / output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a distribution network data processing method is implemented.

[0146] Those skilled in the art will understand that Figure 8The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0147] In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned distribution network data processing method embodiments when executing the computer program.

[0148] In an exemplary embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned distribution network data processing method embodiments are implemented.

[0149] In an exemplary embodiment, a computer program product is provided, including a computer program, which implements the steps in the above-mentioned distribution network data processing method embodiments when executed by a processor.

[0150] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0151] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0152] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0153] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A distribution network data processing method, characterized in that: The method comprises: Acquire first resource input data of the distribution network, first resource return data of the distribution network within a preset time period, and operation data of distribution network equipment within the preset time period, wherein the first resource input data, the first resource return data, and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring; Determining a health index of the distribution network equipment according to the first operating data; Determining a first failure rate of the distribution network equipment according to the health index; A first net resource amount of the distribution network is determined according to the first failure rate, the first resource investment data, the first resource return data, and a preset resource conversion ratio.

2. The method according to claim 1, characterized in that The operating data includes measured operating temperature, partial discharge intensity and equipment vibration intensity; Determining the health index of the distribution network equipment according to the operating data includes: Determining a health rating of the distribution network equipment based on the operating temperature, the partial discharge intensity, and the equipment vibration intensity; The health index of the distribution network equipment is determined according to the preset influence weight of the operating temperature, the preset influence weight of the partial discharge intensity, the preset influence weight of the equipment vibration intensity, and the health rating.

3. The method according to claim 1, characterized in that Determining the failure rate of the distribution network equipment according to the health index includes: Determining a first failure rate of the distribution network equipment according to a pre-constructed relationship model between the health index and the failure rate, and the health index; The pre-built relationship model is obtained by fitting the historical health index and historical failure rate of the distribution network equipment.

4. The method according to claim 1, characterized in that Determining the first net resource amount of the distribution network according to the failure rate, the first resource input data, a preset resource conversion ratio and the first resource return data includes: Determining first resource flow data of the distribution network according to the first failure rate and the first resource return data; The first net resource amount is determined according to the first resource input data, the first resource return data, a preset resource conversion ratio and the first resource flow data.

5. The method according to claim 4, characterized in that The determining, according to the first failure rate and the first resource return data, first resource flow data of the distribution network includes: When the first failure rate is greater than or equal to a preset first failure rate threshold, pushing a device maintenance message; When the first failure rate is less than a preset first failure rate threshold, obtaining first maintenance resource data of the distribution network equipment; The first resource flow data is determined according to the first maintenance resource data and the first resource report data.

6. The method according to any one of claims 1 to 5, characterized in that: After determining the first net resource amount of the distribution network according to the failure rate, the first resource investment data and the first resource return data, the method further includes: Acquire second resource input data of the distribution network, second resource return data of the distribution network within a preset time period, and operation time of distribution network equipment in the distribution network, wherein the second resource input data and the second resource return data are collected when the distribution network adopts a preset corrective maintenance strategy; Determining a second failure rate of the power distribution network equipment according to the operating time and preset distribution data, wherein the preset distribution data is used to characterize a change in the second failure rate with the operating time; Determining a second net resource amount of the distribution network according to the second failure rate, the second resource input data, a preset resource conversion ratio and the second resource return data; Comparing the first net resource amount and the second net resource amount to obtain a comparison result; According to the comparison result, the resource added value of the distribution network is determined when a maintenance strategy based on condition monitoring is adopted.

7. The method according to claim 6, characterized in that The determining, according to the second failure rate, the second resource input data, and the second resource return data, a second net resource amount of the distribution network includes: Determining second resource flow data of the distribution network according to the second failure rate and the second resource return data; The second net resource amount is determined according to the second resource input data, the second resource return data, a preset resource conversion ratio and the second resource flow data.

8. The method according to claim 7, characterized in that The determining, according to the second failure rate and the second resource return data, second resource flow data of the distribution network includes: randomly generating a second failure rate threshold, and pushing a device maintenance message when the second failure rate is greater than or equal to the second failure rate threshold; When the second failure rate is less than the second failure rate threshold, obtaining second maintenance resource data of the distribution network equipment; determining the second resource flow data according to the second maintenance resource data and the second resource return data; The second resource flow data is determined according to the second maintenance resource data and the second resource report data.

9. A distribution network data processing device, characterized in that: The device comprises: A data acquisition module, used to obtain first resource input data of the distribution network, first resource return data of the distribution network within a preset time period, and operation data of distribution network equipment within the preset time period, wherein the first resource input data, the first resource return data, and the operation data are collected when the distribution network adopts a preset maintenance strategy based on condition monitoring; A health index determination module, used to determine the health index of the distribution network equipment according to the operation data; A failure rate determination module, used to determine a first failure rate of the distribution network equipment according to the health index; A net resource quantity determination module is used to determine the first net resource quantity of the distribution network according to the first failure rate, the first resource input data, the first resource return data and a preset resource conversion ratio.

10. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 8 are implemented.