Vegetation building method for flood rockfall river bank
By exploring weak erosion strips on the river bank and planting perennial vines, and using micro-environment creation wells and sand-free concrete well pipes to protect the vegetation, the problem of river bank vegetation being unable to grow has been solved, and the effects of soil and water conservation and river channel stabilization have been achieved.
Patent Information
- Application Number
- CN202411122676.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-08-15
AI Technical Summary
Vegetation cannot grow normally on river banks between unstable mountains and river channels that can cause flash flood erosion, leading to severe soil erosion and river instability.
Exploring weak erosion strips along the river bank and drilling micro-environment creation wells on them, filling them with cultivation soil and planting perennial vines. The walls of the wells are designed to protect vegetation from being washed away by flash floods, and are constructed through sand-free concrete well pipes and Huade Box transplanters ensure plant growth.
It overcomes the influence of flood sediments and fallen earth and rocks on vegetation growth, establishes vegetation that plays a role in soil and water conservation, reduces soil and water loss, and stabilizes the shape of the river bank.
Smart Images

Figure CN118749360A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cultivation of special crops or plants not mentioned above, and in particular to a method for establishing vegetation on a flood-falling rock river bank. Background Art
[0002] Soil and water conservation on the river bank is the work most directly related to the water quality and stability of the river channel. The flow rate of the upstream river is small and the river channel is narrow. Generally, there is no river bank. Its soil and water conservation mainly relies on artificial slope protection structures and vegetation on the river bank. Among them, artificial slope protection structures need to be repaired regularly, the cost is high, and they cannot be self-sustaining without maintenance. Therefore, they are mainly used in relatively flat river sections close to residential areas. The river banks in most upstream areas of the river mainly rely on vegetation for slope protection.
[0003] However, some rivers are very unfavorable to the development of vegetation on their banks. A typical example is seasonal rivers located in valleys formed by unstable mountains. On the banks of these rivers, there are multiple destructive effects on vegetation, including: 1. Physical destruction and burial of vegetation caused by falling soil and rocks from unstable mountains; 2. Burial of vegetation by alluvial deposits; 3. Physical damage to vegetation and the soil around its roots caused by mountain torrents; 4. The stress of numerous sands and rocks on the growth of vegetation roots; 5. The soil on the river bank is poor (because repeated erosion has taken away nutrients in the soil) and cannot retain water (because there is too much sand and stone in the soil), which poses a threat to vegetation growth.
[0004] Due to the above factors, the vegetation on these river banks cannot exist stably for a long time. They can only be scattered on the river banks for a period of time before the river flood season. They are generally annual spring-growing short-lived plants with shallow roots, and cannot play a role in slope protection at all.
[0005] Taking the rivers in the upper reaches of the Haihe River Basin that the present invention intends to treat as examples, these rivers originate in the valleys in the suburbs of Beijing. There are many unstable mountains on both sides of the rivers. At the same time, the river flow is greatly affected by the season, and flash floods occur from time to time after the summer rain. Flash floods sweep away the vegetation and soil on the river bank, and flow into the main stream of the Haihe River with a large amount of particulate matter, causing serious adverse effects on the water quality of the Haihe River. During the dry season, the river flow is very small, and the river bank is covered with alluvial deposits mainly composed of sand and stones, and it is difficult for vegetation to grow on it. In places far away from the river channel, which are not affected by flash floods during the flood season, due to the proximity to the mountain, the soil and rocks falling from the mountain cause damage and burying to the vegetation here. The above factors lead to the lack of vegetation protection on the river bank all year round, not only is the soil and water loss serious, but even the shape of the river bank often changes. Summary of the invention
[0006] The invention provides a method for establishing vegetation on a river bank with alluvial rock falls.
[0007] The technical problem to be solved is that vegetation cannot grow normally on the river bank between unstable mountains and the river channel that may cause mountain torrents erosion, resulting in serious soil erosion and river channel instability.
[0008] In order to solve the above technical problems, the present invention adopts the following technical solution: a method for planting vegetation on a river bank with alluvial rockfall, wherein the river bank is sandwiched between an unstable mountain and a river channel that may cause mountain torrent erosion, and the topsoil and vegetation cannot be stably present due to the accumulation of alluvial materials and the falling soil and rocks from the unstable mountain. The soil and water conservation method comprises the following steps: Step 1: Exploring weak erosion strips along the river bank, wherein the weak erosion strips are strips located between alluvial deposits and fallen soil and rocks from unstable mountains and extending along the river channel; Step 2: digging microenvironment creation wells along the weak erosion strip. The microenvironment creation wells are wells filled with cultivation soil, which are arranged at intervals along the extension direction of the weak erosion strip and meet the following conditions: Condition 2.1: The well wall can protect the cultivation soil in the well from being washed away by mountain torrents; Condition 2.2: The well wall allows water and plant roots to pass through; Condition 2.3: The wellhead is higher than the surrounding area and higher than all existing flood deposits between the microenvironment-creating well and the river channel; Condition 2.4: The coverage of the slope protection creepers planted in two adjacent micro-environment creation wells can be combined or overlapped into one; Step three: Cultivate slope protection creepers in the microenvironment creation wells. The slope protection creepers are perennial vines. The slope protection creepers in each microenvironment creation well extend toward the river and the unstable mountain respectively.
[0009] Furthermore, in step one, the weak erosion zone is explored in the following manner: query the hydrological data of the river channel over the years, select the time period before the flood season of the river channel to inspect the deposits on the river bank and the temporary vegetation, and select the location with the most luxuriant temporary vegetation at the junction of the alluvial deposits and the fallen earth and rocks from the unstable mountain as the weak erosion zone.
[0010] Furthermore, the microenvironment creation well is a well composed of sand-free concrete well pipes, and the sand-free concrete well pipes are divided into sections close to the surface as extended root well pipes, and the extended root well pipes are provided with holes for assisting the roots of slope protection climbing vines to extend out of the well.
[0011] Furthermore, the bottom of the microenvironment creation well is not higher than the liquid level of the river during the dry season. Among the soil dug out from the well, the soil without sand and stone dug out from the bottom of the well is mixed with water retaining agent and organic fertilizer and then filled into the root extending well pipe as cultivation soil, and the remaining soil is filled into the well pipe below the root extending well pipe as filter material.
[0012] Further, in step three, the slope protection creeper is cultivated into the microenvironment creation well through a Ward box planter, the upper part of the Ward box planter is a Ward box with a seedling of the slope protection creeper and soil for the seedling to grow, and the lower part is a soil-breaking tip for inserting the Ward box into the soil, the soil-breaking tip is detachably connected to the Ward box, and the soil in the Ward box planter is flush with the soil in the microenvironment creation well; In step three, after the Ward box planter is inserted into the cultivation soil of the microenvironment creation well, the growth of the slope protection climbing vine seedlings is observed regularly. After its growth is stable, the transparent top cover of the Ward box is pulled out to allow the soil in the Ward box to merge with the cultivation soil of the microenvironment creation well.
[0013] Furthermore, in the Huade box planter, the soil-breaking tip is a cone with the tip pointing downward and is cast with sand-free concrete; the Huade box is a transparent plastic bottle with the original bottom removed, the transparent plastic bottle is inserted into the soil-breaking tip and takes the soil-breaking tip as the bottom; The Huade box planter is made in the following way: Cast the soil-breaking tip with the tip pointing downward; Before the concrete at the top of the soil is solidified, place the seedlings of the slope protection vines together with the soil wrapped around their roots on top of the soil. Remove the original bottom and bottle cap of a transparent plastic bottle and put it on the tip of the soil-breaking tip with the bottle cap on top. Insert the transparent plastic bottle into the concrete at the tip of the soil-breaking tip, put the seedling of the slope protection vine inside, and then screw on the bottle cap.
[0014] Furthermore, the vine plant is kudzu, ivy, honeysuckle or parthenocissus.
[0015] Compared with the prior art, the vegetation planting method for flood-falling rock riverbank of the present invention has the following beneficial effects: In the present invention, weak erosion strips that are less affected by the soil and rocks falling from unstable mountains and the alluvial deposits left by mountain torrents are found through exploration, and perennial lianas are planted at this location to cover the river bank at the remaining location, so that the main body of the vegetation cannot be destroyed by the alluvial deposits and the fallen soil and rocks, and the influence of the alluvial deposits and the fallen soil and rocks on the growth of vegetation is overcome; a micro-environment well is created in the weak erosion strip and perennial lianas are planted inside to block the damage of mountain torrents to the vegetation and the soil around the vegetation; the soil in the well is turned upside down, and the topsoil containing a large amount of sand and stone, which is poor and cannot retain water, is turned to the bottom of the well, which no longer affects the growth of vegetation and is also convenient for groundwater infiltration, and the deep soil that does not contain sand and stone, is relatively fertile and has a stronger water retention capacity is turned to the upper layer, so that the vegetation in the well grows better. The above points are combined to overcome the various damages and coercions suffered by the growth of vegetation, and a layer of vegetation that plays a role in soil and water conservation can be successfully created on the river bank. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic structural diagram of a river bank in which a vegetation planting method for a flood-falling rock river bank of the present invention is applied, when a slope protection creeper is just planted; Figure 2 for Figure 1 A partial enlarged view of the middle A area; Figure 3 It is a schematic diagram of the structure of the slope protection creeper after it has fully grown in the river bank to which the vegetation planting method for the flood-falling rock river bank of the present invention is applied; In the figure, 1-river channel, 2-unstable mountain, 3-alluvial deposits, 4-fallen soil and rocks, 5-Ward box planter, 6-microenvironment creation well, 7-slope protection vines. DETAILED DESCRIPTION
[0017] Taking the watershed ecological restoration and biodiversity conservation technology and demonstration in Xiongan New Area as an example, Figure 1-3 As shown, a method for planting vegetation on a riverbank with alluvial rock falls is provided. The riverbank is sandwiched between an unstable mountain 2 and a river channel 1 that may cause mountain torrent erosion. Due to the accumulation of alluvial materials 3 and the fallen soil and rocks 4 from the unstable mountain 2, the topsoil and vegetation cannot be stably present. The soil and water conservation method includes the following steps: Step 1: Exploring weak erosion strips along the river bank. The weak erosion strips are strips located between alluvial deposits 3 and fallen soil and rocks 4 from unstable mountains 2 and extending along the river channel 1; The physical damage and burial of vegetation by fallen soil and rocks 4 and the burial of vegetation by alluvial deposits 3 at this location are both weak, so it is not easy to be buried. There are usually observable differences in the topsoil on both sides of this location, which can be found visually; for locations that are seriously mixed and difficult to find, the topsoil can be dug up to assist in finding, or vegetation can be used to assist in finding.
[0018] Step 2: dig microenvironment creation wells 6 along the weak erosion strip. The microenvironment creation wells 6 are wells filled with cultivation soil. They are arranged at intervals along the extension direction of the weak erosion strip and meet the following conditions: Condition 2.1: The well wall can protect the cultivation soil in the well from being washed away by mountain torrents; Here, this condition is met as long as the well wall is intact.
[0019] Condition 2.2: The well wall allows water and plant roots to pass through; The soil and water in the well are limited, and this condition allows plants to utilize a wider range of soil and water.
[0020] Condition 2.3: The well mouth is higher than the surrounding area. Generally, the well mouth needs to be 20 centimeters higher than the ground surface within half a meter of the surrounding area, so that the surrounding soil and rocks will not fall into the well. It is also higher than all the existing alluvial deposits 3 between the micro-environment creation well 6 and the river channel 1; this is to ensure that alluvial deposits 3 will not enter the well when they are produced.
[0021] Condition 2.4: The coverage of the slope protection creepers 7 planted in two adjacent micro-environment creation wells 6 can be combined or overlapped into one; That is to say, the slope protection climbing vine 7 needs to cover the entire river bank.
[0022] Step three: Cultivate slope protection creepers 7 in the microenvironment creation well 6. The slope protection creepers 7 are perennial vines. The slope protection creepers 7 in each microenvironment creation well 6 extend toward the river channel 1 and the unstable mountain 2 respectively.
[0023] When perennial vines grow close to the ground, the aerial roots at the ground level will penetrate into the soil. At the same time, the tendrils, suction cups, leaves and other structures on the vines also grasp the ground surface, fixing the ground outside the main root system.
[0024] In step 1, the weak erosion zone is explored in the following way: query the hydrological data of river channel 1 over the years, select the time period before the flood season of river channel 1 to inspect the deposits on the river bank and the temporary vegetation, and select the location with the most luxuriant temporary vegetation (highest coverage) at the junction between the alluvial deposits 3 and the fallen soil and rocks 4 from the unstable mountain 2 as the weak erosion zone.
[0025] Normally, in the one or two months before the flood season of the river channel 1, the boundary between the alluvial deposits 3 and the fallen soil and rocks 4 is relatively clear, and temporary vegetation can also be used to assist in positioning, because this position during this period is a rare location where certain plants can grow and plant seeds can be left.
[0026] The micro-environment construction well 6 is a well composed of a sand-free concrete well pipe. The sand-free concrete well pipe is divided into sections close to the surface as extended root well pipes. The extended root well pipes are provided with holes for assisting the roots of the slope protection climbing vines 7 to extend out of the well.
[0027] Sand-free concrete is concrete that does not contain fine aggregate (i.e. sand). Sand-free concrete well pipes allow water to pass through, but most plant roots cannot pass through, so additional holes are required. The roots of vines will not be particularly deep, so holes can be made in the root-extending well pipe.
[0028] The bottom of the microenvironment creation well 6 is not higher than the liquid level of the river channel 1 during the dry season to facilitate water infiltration. Among the soil dug out from the well, the soil without sand and stone dug out from the bottom of the well is mixed with water retaining agent and organic fertilizer and then filled into the root extending well pipe as cultivation soil, and the remaining soil is filled into the well pipe below the root extending well pipe as filter material.
[0029] That is to say, the soil dug out from the well is used as the cultivation soil, and it is turned upside down when backfilling to overcome the adverse effect of the upper soil on plant growth. At the same time, in order to make the plants grow better, a certain amount of water-retaining agent and organic fertilizer are mixed into the soil, because the fertility of raw soil is stronger than that of alluvial deposits3 and fallen soil and rocks4 after repeated leaching by river water, but it is sticky and lacks humus.
[0030] In step 3, the slope protection creeper 7 is cultivated into the microenvironment creation well 6 through the Ward box planter 5. The upper part of the Ward box planter 5 is a Ward box with the seedlings of the slope protection creeper 7 and soil for the seedlings to grow, and the lower part is a soil-breaking tip for the Ward box to be inserted into the soil. The soil-breaking tip is detachably connected to the Ward box, and the soil in the Ward box planter 5 is flush with the soil in the microenvironment creation well 6; The Ward Box is a container used for long-distance transportation and storage of plants. It is a transparent sealed container that holds the soil and plants. The water in the soil evaporates naturally and flows back into the soil, while the plants can still carry out photosynthesis through the sunlight through the container, thus allowing long-distance and long-term plant transplantation in various continents.
[0031] Here, a simple Ward box made of discarded mineral water bottles is used to store the slope protection creepers 7 in order to ensure a sufficient survival rate. Because the present invention has a high requirement for the survival rate of the slope protection creepers 7, it is not suitable for sowing and planting. And because the construction site is a long strip area along the river, the slope protection creepers 7 need to be transported and placed for a long time before planting. If a conventional transplanting method is adopted, the vitality of the seedlings will be seriously reduced or even die before planting. However, if a Ward box is used to store the slope protection creepers 7, it will bring additional workload, and the box needs to be opened before each planting. Therefore, the Ward box is simply made together with the soil-breaking tip, and planting can be carried out without unpacking.
[0032] In step three, after the Ward box planter 5 is inserted into the cultivation soil of the microenvironment creation well 6, the growth of the seedlings of the slope protection creeper 7 is observed regularly. After its growth is stable, the transparent top cover of the Ward box is pulled out to allow the soil in the Ward box to merge with the cultivation soil of the microenvironment creation well 6.
[0033] During transportation, the root system of the seedlings will be damaged to a certain extent, so it is necessary to allow some time for the root system to recover. After recovery, the survival rate will be higher if the lid is removed. If the lid is removed rashly, the root system has not yet recovered and cannot use the water and soil in the well, and the water inside the Ward box will slowly lose, affecting the survival rate.
[0034] like Figure 2 As shown, in the Huade box planter 5, the soil-breaking tip is a cone with the tip pointing downward and is cast by sand-free concrete; the Huade box is a transparent plastic bottle with the original bottom removed, the transparent plastic bottle is inserted into the soil-breaking tip and the soil-breaking tip is used as the bottom; The sand-free concrete here is not conducive to the sealing of the Ward box, and a small amount of water vapor will be lost along the soil-breaking tip, but the impact is not great, because the Ward box in the present invention does not need to maintain plant growth for months or even years, but only needs to maintain it for several days or even weeks. After that, the soil-breaking space is inserted into the soil, and there will be no more water vapor loss, but it can be replenished. At the same time, the permeable soil-breaking tip has less impact on the growth of plant roots.
[0035] At the same time, the structure of the entire Ward box planter 5 is also very suitable for downward insertion or embedding, and it will not be broken into two parts during the downward force; but if necessary, it can be broken into two parts by pulling it upwards later.
[0036] The bond strength of sand-free concrete is small (because the aggregate is not graded), and the bonding strength between plastic and concrete is very small, so the plastic bottle inserted into the concrete is easy to be pulled out, thus achieving a detachable connection. However, it should be noted that no burrs should be left when the bottom of the plastic bottle is cut off, otherwise it will affect the extraction from the concrete.
[0037] The Huade box planter 5 is made in the following way: Cast the soil-breaking tip with the tip pointing downward; Before the concrete at the soil-breaking tip solidifies, place the seedling of the slope protection creeper 7 together with the soil wrapped around its roots above the soil-breaking tip; The slump of sand-free concrete is very low, and the shape of the soil-breaking tip is not conducive to the concrete being squeezed upward, so the seedlings placed on it and the wrapped soil will not sink in. However, when mixing concrete, attention should also be paid to controlling the slump and avoiding adding too much mixing water and water reducing agent.
[0038] The transparent plastic bottle with the original bottom and bottle cap removed is buckled on the soil-breaking tip in a manner of the bottle cap being on top, the transparent plastic bottle is inserted into the concrete of the soil-breaking tip, the seedling of the slope protection creeper 7 is buckled inside, and then the bottle cap is screwed on.
[0039] In this embodiment, the vine plant is kudzu vine, ivy, honeysuckle or parthenocissus.
[0040] These vines will take root at each node, and will be more effective in conserving soil and water when used here.
[0041] In condition 2.4, the coverage of each slope protection creeper 7 is based on the state when it grows for two years.
[0042] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A method for planting vegetation on a riverbank with alluvial rockfall, wherein the riverbank is sandwiched between an unstable mountain (2) and a river channel (1) that may cause mountain torrent erosion, and the surface soil and vegetation cannot be stably maintained due to the accumulation of alluvial materials (3) and fallen soil and rocks (4) from the unstable mountain (2), characterized in that: The soil and water conservation method comprises the following steps: Step 1: Exploring a weak erosion strip along the river bank, wherein the weak erosion strip is a strip located between the alluvial deposits (3) and the fallen soil and rocks (4) from the unstable mountain (2) and extending along the river channel (1); Step 2: digging microenvironment creation wells (6) along the weak erosion strip. The microenvironment creation wells (6) are wells filled with cultivation soil, which are arranged at intervals along the extension direction of the weak erosion strip and meet the following conditions: Condition 2.1: The well wall can protect the cultivation soil in the well from being washed away by mountain torrents; Condition 2.2: The well wall allows water and plant roots to pass through; Condition 2.3: The wellhead is higher than the surrounding area and higher than all existing alluvial deposits (3) between the microenvironment creation well (6) and the river channel (1); Condition 2.4: The coverage of the slope protection creepers (7) planted in two adjacent microenvironment creation wells (6) can be combined or overlapped into one; Step 3: Cultivating slope protection creepers (7) in the microenvironment creation well (6), wherein the slope protection creepers (7) are perennial vines, and the slope protection creepers (7) in each microenvironment creation well (6) extend toward the river channel (1) and the unstable mountain (2) respectively.
2. A method for planting vegetation on a floodplain riverbank according to claim 1, characterized in that: In step 1, the weak erosion zone is explored in the following manner: query the hydrological data of the river channel (1) over the years, select the time period before the flood season of the river channel (1) to investigate the accumulation and temporary vegetation on the river bank, and select the location with the most luxuriant temporary vegetation at the junction between the alluvial deposits (3) and the fallen soil and rocks (4) from the unstable mountain (2) as the weak erosion zone.
3. The method for establishing vegetation on a flood-rock riverbank according to claim 1, characterized in that: The microenvironment creation well (6) is a well composed of a sand-free concrete well pipe, wherein the sand-free concrete well pipe is divided into sections close to the ground surface and is marked as a root extension well pipe, and the root extension well pipe is provided with holes for assisting the roots of the slope protection climbing vines (7) to extend out of the well.
4. The method for establishing vegetation on a flood-rock riverbank according to claim 3, characterized in that: The bottom of the microenvironment creation well (6) is not higher than the dry season liquid level of the river channel (1). Among the soil excavated from the well, the soil without sand and stone excavated from the bottom of the well is mixed with a water retaining agent and organic fertilizer and then filled into the root extension well pipe as cultivation soil, and the remaining soil is filled into the well pipe below the root extension well pipe as filter material.
5. The method for establishing vegetation on a riverbank of floodplain according to claim 1, characterized in that: In step 3, the slope protection creeper (7) is cultivated in the microenvironment creation well (6) through the Ward box planter (5). The upper part of the Ward box planter (5) is a Ward box with the seedling of the slope protection creeper (7) and soil for the seedling to grow, and the lower part is a soil-breaking tip for inserting the Ward box into the soil. The soil-breaking tip is detachably connected to the Ward box, and the soil in the Ward box planter (5) is flush with the soil in the microenvironment creation well (6); In step 3, after the Ward box planter (5) is inserted into the cultivation soil of the microenvironment creation well (6), the growth of the seedlings of the slope protection creeper (7) is observed regularly. After the seedlings grow stably, the transparent top cover of the Ward box is pulled out to allow the soil in the Ward box to merge with the cultivation soil of the microenvironment creation well (6).
6. The method for establishing vegetation on a riverbank of floodplain according to claim 5, characterized in that: In the Huade box planter (5), the soil-breaking tip is a cone with the tip pointing downward and is cast with sand-free concrete; the Huade box is a transparent plastic bottle with the original bottom removed, the transparent plastic bottle is inserted into the soil-breaking tip and the soil-breaking tip serves as the bottom; The Ward box planter (5) is manufactured in the following manner: Cast the soil-breaking tip with the tip pointing downward; Before the concrete at the soil-breaking tip solidifies, the seedlings of the slope protection creeper (7) together with the soil wrapped around their roots are placed above the soil-breaking tip; A transparent plastic bottle with the original bottom and bottle cap removed is buckled on the soil-breaking tip in a manner that the bottle cap is on top, the transparent plastic bottle is inserted into the concrete of the soil-breaking tip, and the seedling of the slope protection creeper (7) is buckled inside, and then the bottle cap is screwed on.
7. The method for establishing vegetation on a riverbank of floodplain according to claim 1, characterized in that: The vine plant is kudzu vine, ivy, honeysuckle or ground ivy.
8. The method for establishing vegetation on a riverbank of floodplain according to claim 1, characterized in that: In condition 2.4, the coverage of each slope protection creeper (7) is based on the state when it grows for two years.
Citation Information
Patent Citations
Vegetation greening method for rock wall
CN109257995A
Vegetation on stony mountain damaged face, and plantation method therefor
CN111316853A
Vegetation landscape drainage channel
CN115288087A
Ecological river levee bank protection
CN207794009U
Novel ecological landscape shore protection
CN208533454U