All-insulation gas-insulated switchgear gas tank assembly process
Through the fully insulated inflatable cabinet air box assembly process, including multiple welding, seal fixing, performance testing and other steps, the low assembly efficiency and quality problems of the existing inflatable cabinet air box are solved, and the sealing performance and qualification rate of the product are improved. Meet the needs of the power distribution industry.
Patent Information
- Application Number
- CN202410843646.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-11
AI Technical Summary
The existing inflatable cabinet air boxes have low assembly efficiency during the production and assembly process, are prone to quality problems, are not convenient for testing, and cannot meet the needs of the power distribution industry.
The fully insulated inflatable cabinet air box assembly process is adopted, including multiple welding, fixing of seals, assembly of circuit breakers and isolation mechanisms, power frequency withstand voltage test, loop resistance test, helium mass spectrometry leak detection and moisture detection, etc. Ensure air box sealing and performance.
It improves assembly efficiency, ensures the sealing effect of the air box and product qualification rate, solves quality problems, and meets the needs of the power distribution industry.
Smart Images

Figure CN118752102A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of gas boxes, and in particular to an assembly process of a fully-insulated gas cabinet gas box. Background Art
[0002] The inflatable cabinet uses environmentally friendly gas for insulation. It is compact and expandable, and is suitable for power distribution automation. The inflatable cabinet has the characteristics of compact structure, flexible operation, and reliable interlocking. The inflatable cabinet is suitable for small secondary substations, switchgear, box-type substations, residential areas, industrial and mining enterprises, and large shopping malls in the power system. The inflatable cabinet is more and more widely used in the power distribution industry because it is not affected by the external environment and the use of compressed gas insulation is conducive to the development of miniaturization.
[0003] The existing inflatable cabinet air box is not convenient for determining the assembly process according to the performance of the components during the production and assembly process, the assembly efficiency is low, the assembled air box is prone to quality problems, and it is not convenient to test the air box; therefore, it does not meet the existing needs. We have proposed a fully insulated inflatable cabinet air box assembly process. Summary of the invention
[0004] The object of the present invention is to provide a fully insulated gas cabinet air box assembly process to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solution: a fully insulated gas cabinet gas box assembly process, comprising the following steps:
[0006] S1: Position and place multiple gas tank side panels of the inflatable cabinet and perform spot welding using a welding machine. After the overall assembly is formed, perform repair welding to achieve secondary welding and weld the four end corners of the explosion-proof valve to the gas tank;
[0007] S2: Fix the box foot support with screws at the end corners at the bottom of the gas box. The heights of the box foot support are the same. First, evenly apply a proper amount of BN7503 silicone grease to the rubber ring of the environmental protection cabinet sleeve and pass it through the gas box. At the same time, evenly apply a proper amount of BN7503 silicone grease to the rubber ring of the environmental protection cabinet side expansion and pass it through the side hole in the gas box. Press the 304 stainless steel pressure plate on the outside of the gas box, and use screws to fix the 304 stainless steel pressure plate to the gas box. Then, fix the environmental protection cabinet sleeve and side expansion through the 304 stainless steel pressure plate.
[0008] S3: Assemble the circuit breaker mechanism and the isolation mechanism respectively and put them into the gas box, so that the circuit breaker mechanism and the isolation mechanism have a circuit breaker switch and an isolation switch respectively, fix the observation window with the circuit breaker switch and the isolation switch, fix the inflation unit on one side of the gas box, insert the output pipe of the inflation unit into the gas box, add a sealing ring between the output pipe and the gas box, and then fix the inner and outer reinforcing ribs to the inner and outer sides of the gas box by screws;
[0009] S4: Connect multiple copper bars with the side expansion of the environmental protection cabinet and the isolating switch. The upper end of the copper bar is connected to the grounding terminal of the isolating switch, and the lower end of the copper bar is connected to the grounding terminal of the gas box. The grounding terminals of the isolating switch and the gas box are fixed to the ground bar. At the same time, the upper end of the copper rod is connected to the isolating switch, and the lower end of the copper rod is connected to the casing of the environmental protection cabinet;
[0010] S5: Conduct power frequency withstand voltage test and loop resistance test on the circuit breaker and isolating switch in the gas box. The test range increases by 50μΩ for each additional busbar connector. Perform mechanical performance test on the opening and closing data of the circuit breaker and isolating switch. Wipe the inside of the gas box after the experiment with alcohol paper and seal it with a welding machine.
[0011] S6: Use a helium mass spectrometer leak detector to check for leaks on the gas box. If there is a leak, use the helium detector's suction gun to find the leak. After checking for the leak, repair the leak. After repairing, re-check for helium leaks. After the helium leak detection system is inflated and leaked, park for 24 hours and then check for moisture. Use a measuring instrument to check for moisture. Connect the air inlet of the micro-water detector to the one-way valve of the gas box. After the instrument stabilizes, record the value. If the moisture content in the micro-water test is qualified, the gas box can be packaged and shipped; if the micro-water content is unqualified, the gas box must be re-inflated and deflated.
[0012] Preferably, the welder in S1 and S6 is a argon arc welder or a laser welder.
[0013] Preferably, the gas box includes a box side panel, a one-way valve, an explosion-proof valve, an environmental protection cabinet casing, an environmental protection cabinet side expansion, a box foot support and a plurality of internal and external reinforcing ribs, and the spacing between the plurality of internal and external reinforcing ribs is not less than 200 mm.
[0014] Preferably, an air pressure hole is provided in the middle of one of the air box side panels, the axis of the one-way valve coincides with the axis of the air pressure hole, and the one-way valve is through-connected with the air pressure hole.
[0015] Preferably, the circuit breaker mechanism comprises a circuit breaker switch, a circuit breaker mounting seat and an observation window, and the isolation mechanism comprises an isolation switch, an isolator mounting seat and an observation window.
[0016] Preferably, the time of the power frequency withstand voltage test in S5 is 1 min, and the qualified range of the loop resistance test is single-channel P≤120μΩ, single-channel V≤150μΩ.
[0017] Preferably, the measuring instrument in S6 is a SF6 moisture measuring instrument, and the qualified range of the moisture content is ≤1000ppm(V).
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] The present invention welds the side panels of the air box twice, and can perform secondary sealing welding based on the first spot welding positioning, thereby preventing the side panels from being deformed due to premature welding. By sequentially fixing and installing the components of the air box, the overall assembly efficiency can be effectively improved. At the same time, the air box after sealing is tested for leaks and moisture, which can maintain the sealing effect of the air box after assembly and improve the qualified rate of the product. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0021] Figure 2 It is a structural schematic diagram of the air box body of the present invention;
[0022] Figure 3 It is a schematic diagram of the process of assembling the air box of the present invention. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0024] See also Figures 1 to 3 , an embodiment provided by the present invention: a fully insulated gas cabinet gas box assembly process, comprising the following steps:
[0025] S1: Position and place multiple gas tank side panels of the inflatable cabinet and perform spot welding using a welding machine. After the overall assembly is formed, perform repair welding to achieve secondary welding and weld the four end corners of the explosion-proof valve to the gas tank;
[0026] S2: Fix the box foot support with screws at the end corners at the bottom of the gas box. The heights of the box foot support are the same. First, evenly apply a proper amount of BN7503 silicone grease to the rubber ring of the environmental protection cabinet sleeve and pass it through the gas box. At the same time, evenly apply a proper amount of BN7503 silicone grease to the rubber ring of the environmental protection cabinet side expansion and pass it through the side hole in the gas box. Press the 304 stainless steel pressure plate on the outside of the gas box, and use screws to fix the 304 stainless steel pressure plate to the gas box. Then, fix the environmental protection cabinet sleeve and side expansion through the 304 stainless steel pressure plate.
[0027] S3: Assemble the circuit breaker mechanism and the isolation mechanism respectively and put them into the gas box, so that the circuit breaker mechanism and the isolation mechanism have a circuit breaker switch and an isolation switch respectively, fix the observation window with the circuit breaker switch and the isolation switch, fix the inflation unit on one side of the gas box, insert the output pipe of the inflation unit into the gas box, add a sealing ring between the output pipe and the gas box, and then fix the inner and outer reinforcing ribs to the inner and outer sides of the gas box by screws;
[0028] S4: Connect multiple copper bars with the side expansion of the environmental protection cabinet and the isolating switch. The upper end of the copper bar is connected to the grounding terminal of the isolating switch, and the lower end of the copper bar is connected to the grounding terminal of the gas box. The grounding terminals of the isolating switch and the gas box are fixed to the ground bar. At the same time, the upper end of the copper rod is connected to the isolating switch, and the lower end of the copper rod is connected to the casing of the environmental protection cabinet;
[0029] S5: Conduct power frequency withstand voltage test and loop resistance test on the circuit breaker and isolating switch in the gas box. The test range increases by 50μΩ for each additional busbar connector. Perform mechanical performance test on the opening and closing data of the circuit breaker and isolating switch. Wipe the inside of the gas box after the experiment with alcohol paper and seal it with a welding machine.
[0030] S6: Use a helium mass spectrometer leak detector to check for leaks on the gas box. If there is a leak, use the helium detector's suction gun to find the leak. After checking for the leak, repair the leak. After repairing, re-check for helium leaks. After the helium leak detection system is inflated and leaked, park for 24 hours and then check for moisture. Use a measuring instrument to check for moisture. Connect the air inlet of the micro-water detector to the one-way valve of the gas box. After the instrument stabilizes, record the value. If the moisture content in the micro-water test is qualified, the gas box can be packaged and shipped; if the micro-water content is unqualified, the gas box must be re-inflated and deflated.
[0031] Furthermore, the welding machine in S1 and S6 is a argon arc welding machine or a laser welding machine. The secondary welding of the air box by the argon arc welding machine or the laser welding machine can avoid deformation of the air box.
[0032] Among them, the air box includes a box side panel, a one-way valve, an explosion-proof valve, an environmental protection cabinet casing, an environmental protection cabinet side expansion, a box foot support and multiple internal and external reinforcement ribs. The spacing between the multiple internal and external reinforcement ribs is not less than 200mm. An air pressure hole is provided in the middle of one of the air box side panels. The axis of the one-way valve coincides with the air pressure hole, and the one-way valve and the air pressure hole are through-connected. By accurately positioning the spacing between the internal and external reinforcement ribs, the strength of the air box can be effectively enhanced by the internal and external reinforcement ribs.
[0033] The circuit breaker mechanism includes a circuit breaker, a circuit breaker mounting seat and an observation window, and the isolation mechanism includes an isolation switch, an isolator mounting seat and an observation window. The circuit breaker and the isolation switch can be sealed and observed through the observation window.
[0034] Furthermore, the time of the power frequency withstand voltage test in S5 is 1 min, and the qualified range of the loop resistance test is single-circuit P≤120μΩ, single-circuit V≤150μΩ. Testing the opening and closing data of the circuit breaker and the isolating switch can ensure the service life of the gas tank.
[0035] Among them, the measuring instrument in S6 is an SF6 moisture measuring instrument. The qualified range of moisture content is ≤1000ppm(V). The SF6 moisture measuring instrument can be used to accurately measure the moisture content in the gas box.
[0036] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A fully insulated gas cabinet gas box assembly process, characterized in that: The steps include: S1: Position and place multiple gas tank side panels of the inflatable cabinet and perform spot welding using a welding machine. After the overall assembly is formed, perform repair welding to achieve secondary welding and weld the four end corners of the explosion-proof valve to the gas tank; S2: Fix the box foot support with screws at the end corners at the bottom of the gas box. The heights of the box foot support are the same. First, evenly apply a proper amount of BN7503 silicone grease to the rubber ring of the environmental protection cabinet sleeve and pass it through the gas box. At the same time, evenly apply a proper amount of BN7503 silicone grease to the rubber ring of the environmental protection cabinet side expansion and pass it through the side hole in the gas box. Press the 304 stainless steel pressure plate on the outside of the gas box, and use screws to fix the 304 stainless steel pressure plate to the gas box. Then, fix the environmental protection cabinet sleeve and side expansion through the 304 stainless steel pressure plate. S3: Assemble the circuit breaker mechanism and the isolation mechanism respectively and put them into the gas box, so that the circuit breaker mechanism and the isolation mechanism have a circuit breaker switch and an isolation switch respectively, fix the observation window with the circuit breaker switch and the isolation switch, fix the inflation unit on one side of the gas box, insert the output pipe of the inflation unit into the gas box, add a sealing ring between the output pipe and the gas box, and then fix the inner and outer reinforcing ribs to the inner and outer sides of the gas box by screws; S4: Connect multiple copper bars with the side expansion of the environmental protection cabinet and the isolating switch. The upper end of the copper bar is connected to the grounding terminal of the isolating switch, and the lower end of the copper bar is connected to the grounding terminal of the gas box. The grounding terminals of the isolating switch and the gas box are fixed to the ground bar. At the same time, the upper end of the copper rod is connected to the isolating switch, and the lower end of the copper rod is connected to the casing of the environmental protection cabinet; S5: Conduct power frequency withstand voltage test and loop resistance test on the circuit breaker and isolating switch in the gas box. The test range increases by 50μΩ for each additional busbar connector. Perform mechanical performance test on the opening and closing data of the circuit breaker and isolating switch. Wipe the inside of the gas box after the experiment with alcohol paper and seal it with a welding machine. S6: Use a helium mass spectrometer leak detector to check for leaks on the gas box. If there is a leak, use the helium detector's suction gun to find the leak. After checking for the leak, repair the leak. After repairing, re-check for helium leaks. After the helium leak detection system is inflated and leaked, park for 24 hours and then check for moisture. Use a measuring instrument to check for moisture. Connect the air inlet of the micro-water detector to the one-way valve of the gas box. After the instrument stabilizes, record the value. If the moisture content in the micro-water test is qualified, the gas box can be packaged and shipped; if the micro-water content is unqualified, the gas box must be re-inflated and deflated.
2. The fully insulated gas cabinet gas box assembly process according to claim 1 is characterized in that: The welding machine in S1 and S6 is a argon arc welding machine or a laser welding machine.
3. The fully insulated gas cabinet gas box assembly process according to claim 1 is characterized in that: The gas box includes a box side panel, a one-way valve, an explosion-proof valve, an environmental protection cabinet casing, an environmental protection cabinet side expansion, a box foot support and multiple internal and external reinforcing ribs, and the spacing between the multiple internal and external reinforcing ribs is not less than 200 mm.
4. The fully insulated gas cabinet gas box assembly process according to claim 3 is characterized in that: A pressure hole is provided in the middle of one of the air box side plates, the axis of the one-way valve coincides with the axis of the pressure hole, and the one-way valve is connected to the pressure hole.
5. The fully insulated gas cabinet gas box assembly process according to claim 1 is characterized in that: The circuit breaker mechanism comprises a circuit breaker switch, a circuit breaker mounting seat and an observation window, and the isolation mechanism comprises an isolation switch, an isolator mounting seat and an observation window.
6. The fully insulated gas cabinet gas box assembly process according to claim 1 is characterized in that: The time of the power frequency withstand voltage test in S5 is 1 min, and the qualified range of the loop resistance test is single-channel P≤120μΩ, single-channel V≤150μΩ.