Construction method of unbonded prestressed fabricated road with prefabricated double-ribbed beam and slab structure

Through the prefabricated double-rib beam plate structure and non-bonded prestressed technology, the problem of low construction efficiency and quality of traditional cast-in-place structures is solved, rapid hoisting and efficient prestressed layout are achieved, and it is suitable for roads with a width of more than 18m, improving assembly construction efficiency and quality of roads.

CN118756533APending Publication Date: 2024-10-11IANGSU COLLEGE OF ENG & TECH
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410949183.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The traditional cast-in-place structure has a long construction period, long maintenance time, short structural life, and difficult maintenance, and the overall error needs to be dealt with separately, resulting in low work efficiency and quality, imperfect technical standards for prefabricated roads, and a lack of new structures and new processes. and new methods.

Method used

The unbonded prestressed assembly road construction method of prefabricated double-rib beam-slab structure is used, including surveying and laying out, excavation of subgrade beam grooves, pouring cushion, hoisting prefabricated double-rib beams, unbonded prestressed tendon perforation, high-pressure grouting and The prestressed tendons are tensioned and anchored. The structural load-bearing and hoisting efficiency are improved through modular design and mechanized hoisting. High-pressure grouting technology is used to strengthen the load-bearing combination. It is suitable for roads with more than three lanes.

Benefits of technology

It achieves fast and convenient hoisting of road structures and laying of prestressed tendons, reduces the need for tunnel grouting, improves construction speed and quality, is suitable for road projects with a width of more than 18m, and provides high-quality prefabricated road technical support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756533A_ABST
    Figure CN118756533A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of an unbonded prestressed fabricated road with a prefabricated double-rib beam-slab structure. The construction method comprises the following steps: step 1, surveying and setting out, and excavating a roadbed beam groove; 2, pouring a roadbed beam groove bottom cushion layer, and hoisting a roadbed beam; thirdly, the prefabricated double-rib beam integrated plate is hoisted; 4, perforating the unbonded prestressed tendons; 5, high-pressure grouting and hole sealing are conducted; sixthly, prestressed tendons are tensioned and anchored; seventhly, the first step to the sixth step are repeated till hoisting construction of all the structures is completed; step 8, comprehensively paving the asphalt surface layer; according to the principle of modular design, industrialized production, mechanical hoisting, a double-ribbed beam plate bearing system and combination of a prestress technology and a high-pressure grouting technology, the hoisting quality and efficiency are high, research, development and application of a new technology are enhanced, and favorable technical support is provided for high-quality development of the field of fabricated roads in China.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of prefabricated buildings, and in particular relates to a construction method for a non-bonded prestressed assembly road of a prefabricated double-rib beam-slab structure. Background Art

[0002] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories are processed and manufactured, transported to the construction site, and assembled and installed on site through reliable connection methods.

[0003] The research and development of new technologies for prefabricated buildings is of great significance to promoting the high-quality development of the industry. At present, the relevant complete set of technologies and technical standards for the application of prefabricated roads in China are still imperfect, and the compilation of subsequent new technologies for prefabricated roads and supporting standards and specifications still requires more efforts and innovations.

[0004] Traditional cast-in-place structures have problems such as long construction period, long maintenance time, short structural life, and difficult maintenance. The overall error needs to be handled separately, which leads to low working efficiency and quality of the overall structure. It is planned to gradually form a series of new structures, new processes and new methods in the key technologies of prefabricated roads to accelerate the high-quality development of the application of complete sets of prefabricated road technologies in my country. Summary of the invention

[0005] The object of the present invention is to provide a method for constructing a prefabricated double-rib beam-slab structure non-bonded prestressed assembly road to solve the problems raised in the above background technology.

[0006] To achieve the above object, the present invention adopts the following technical solutions: A method for constructing a prefabricated double-rib beam-slab structure non-bonded prestressed assembly road comprises the following steps: Step 1: Survey and lay out, excavate the roadbed beam groove; Step 2: pouring the bottom cushion of the roadbed beam trough and hoisting the roadbed beam; Step 3: Hoisting of prefabricated double-rib beam integrated plate; Step 4: Punching of unbonded prestressed tendons; Step 5: high pressure grouting and sealing; Step 6: tensioning and anchoring of prestressed tendons; Step 7: Repeat steps 1 to 6 until all structural hoisting construction is completed; Step 8: Full paving of asphalt surface layer; The specific steps are as follows: Step 1: Survey and lay out, excavate the roadbed beam groove: First, survey and lay out the roadbed range according to the engineering design drawings or the supervision unit, use lime powder to lay out the roadbed range, and compact the roadbed. In order to reduce the disturbance of the roadbed soil layer, only compact the original soil layer before excavating the roadbed beam groove. Do not excavate the excess soil layer before compacting the roadbed. When the difference between the designed roadbed top surface elevation and the original soil layer elevation exceeds 450mm, first dig out the excess soil layer and then compact the roadbed. After the roadbed soil layer is compacted, the lifting position of the roadbed beam in the subsequent process is located by surveying and laying out, that is, the roadbed beam groove excavation position line. The roadbed beam groove excavation width is 1.2 times the design width of the roadbed beam, and the excavation depth is 2 / 3 of the roadbed beam height. When encountering complex geological environments such as silty soil, expansive soil, and collapsible soil, the roadbed beam Before trench excavation, reinforced concrete prefabricated short piles with a length of 900mm~1200mm are driven in sections at the roadbed beam position. The cross-section of the reinforced concrete prefabricated short piles is 160mm larger than the design width of the roadbed beam. A reinforced concrete prefabricated short pile is set every 2500mm~4000mm, and the location of the reinforced concrete prefabricated short piles is used as the support point for the roadbed beam to be hoisted into place in the subsequent construction process. The roadbed beam trench is excavated manually, in sections and modules, and over-excavation is not allowed. The excavation is carried out to the bottom elevation of the cushion layer at the bottom of the roadbed beam trench. In order to avoid excessive disturbance of the soil layer of other parts of the roadbed, the middle roadbed beam trench is excavated first, and then the end roadbed beam trench is excavated. After the roadbed beam trench is excavated in sections and modules, temporary protection of the roadbed beam trench is carried out, and the process acceptance is organized, and people, posts and responsibilities are determined to ensure the smooth completion of the preliminary preparation work; Step 2: Cast the bottom cushion layer of the roadbed beam trough and hoist the roadbed beam: adopt continuous construction, and after the roadbed beam trough is excavated in sections and modules, the casting of the bottom cushion layer of the roadbed beam trough shall be carried out immediately. When there is a certain technical break due to construction organization problems, the cushion layer shall be cast within 6 hours after the excavation of the roadbed beam trough is completed and shall not be cast overnight. When encountering the rainy season construction stage, organize the connection between various processes in advance, cast the bottom cushion layer of the roadbed beam trough immediately and take drainage measures. The phenomenon of rainwater soaking the roadbed soil layer for a long time shall not be allowed. The bottom cushion layer of the roadbed beam trough shall be cast with fine stone concrete. The concrete strength is not less than C30, the cushion thickness is 80mm~100mm, and the "steel chisel" method is used to control the pouring elevation of the cushion when pouring the cushion. The "steel chisel" is used to improve the local load-bearing and roadbed stability. The top elevation of the cushion at the bottom of the roadbed beam groove is designed as the elevation of the lifting and positioning of the roadbed beam in the subsequent process. After the cushion at the bottom of the roadbed beam groove is poured in modules, the roadbed beam is lifted. The roadbed beam lifting adopts the technical scheme of "lifting the middle first and then the end". The prefabricated roadbed beam in the middle of the road is first lifted and fixed, and then the prefabricated double ribs in the subsequent process are lifted and fixed. The actual production size of the beam integrated plate is fully verified and the prefabricated roadbed beam at the end is hoisted after the position is accurate. In order to facilitate the segmented hoisting of the prefabricated roadbed beam, the "center line" and "outer edge control line" of the prefabricated roadbed beam are popped up on the pad at the bottom of the roadbed beam groove. The prefabricated roadbed beam hoisted in place on site adopts the "secondary verification" method, that is, the first verification of the "center line" and "outer edge control line" of the prefabricated roadbed beam after it is located on the pad at the bottom of the roadbed beam groove, the error does not exceed 2mm, the second focus is on verifying the position of the embedded bolts on the top of the prefabricated roadbed beam, and accurately measuring the top of the two transverse prefabricated roadbed beams. The spacing between the embedded bolts should have an error of no more than 3mm, ensuring that the prefabricated double-ribbed integrated slab in the subsequent process can be hoisted into place at one time. After the prefabricated roadbed beams in the construction section are accurately positioned in sections and modules, fine stone concrete is immediately used to pour the gap between the prefabricated roadbed beams and the roadbed beam grooves in place, and the gaps are compacted by tamping. During the grouting process, fine stone concrete with the same strength as the grouting is used to pour the cushion layer between the two adjacent prefabricated beams and on the top of the roadbed soil layer. The cushion layer thickness is not less than 60mm, and the cushion layer concrete strength is not less than C30. Avoid construction under complex working conditions such as rainy seasons. Step 3: Hoisting of prefabricated double-rib beam integrated plate: After the hoisting construction of the prefabricated roadbed beams in the construction section is completed, the process acceptance is carried out, and the prefabricated double-rib beam integrated plate is hoisted in sections and modules. Before the prefabricated double-rib beam integrated plate is hoisted, the distance between the embedded bolts on the top of the two adjacent roadbed beams in the hoisting section is repeatedly checked, and the distance between the bolt holes on the prefabricated double-rib beam integrated plate to be hoisted is compared to ensure that the embedded bolts on the roadbed beam are aligned with the bolt holes on the prefabricated double-rib beam integrated plate. When encountering a design road with more than three lanes, the prefabricated double-rib beam integrated plate is hoisted using the technical solution of "hoisting the integrated plate with a small error first, and then hoisting the integrated plate with a large error". Prestressed tendon perforations are provided in the middle of the rib beam of the double-rib beam integrated plate, and the prestressed tendon perforations are achieved by "pre-embedded steel sleeves". The hole diameter of the prestressed tendon is 3mm larger than the outer diameter of the unbonded prestressed tendon used in the design. During the hoisting process of the prefabricated double-rib beam integrated plate, the prestressed tendon channel is initially installed and fixed, and the end of the prestressed tendon channel is inserted into the prestressed tendon holes at both ends of the prefabricated double-rib beam integrated plate. According to the linear direction of the corrugated pipe, a horse stool reinforcement truss is set on the cushion layer above the roadbed soil layer to support the prestressed tendon channel in place. When the prefabricated double-rib beam integrated plate is hoisted to the upper part of the roadbed beam, the embedded bolts on the top of the roadbed beam are manually inserted into the bolt holes at both ends of the prefabricated double-rib beam integrated plate. The diameter of the bolt holes at both ends of the prefabricated double-rib beam integrated plate is 2mm~3mm larger than the diameter of the embedded bolts on the top of the roadbed beam. After the hoisting of the prefabricated double-rib beam integrated plate in the construction section is completed, the top embedded bolts are tightened and fixed with nuts; Step 4: Punching of unbonded prestressed tendons: The prestressed tendons are arranged 150mm below the bottom surface of the prefabricated double-rib beam integrated plate and anchored after passing through the two end rib beams of the prefabricated integrated plate. The unbonded prestressed tendons are punched by the wire guidance method or the pre-laying method. The wire guidance method is that during the process of hoisting the prefabricated double-rib beam integrated plate, the iron wire is passed through the prefabricated double-rib beam integrated plate along the linear layout position of the prestressed tendons at both ends. When the unbonded prestressed tendons are punched, the steel wire is gradually guided to accurately punch the unbonded prestressed tendons. The pre-laying method is that during the process of hoisting the prefabricated double-rib beam integrated plate, the unbonded prestressed tendons are installed in place together with the prefabricated double-rib beam integrated plate. The two ends of the unbonded prestressed tendons pass through the end of the prefabricated double-rib beam integrated plate and extend at least 350mm to facilitate the subsequent tensioning and anchoring of the prestressed tendons. Step 5: High-pressure grouting and sealing: After the prefabricated double-rib beam integrated plate in the construction section is hoisted in place and the prestressed tendons are laid, grouting work is carried out in sections and modules. The cavity between the double-rib beam integrated plate and the concrete cushion is filled with micro-expansion, low-shrinkage, high-strength fine stone concrete grouting material by high-pressure grouting method. The hole diameters of the grouting holes and the grouting holes are both 40mm. Each double-rib beam integrated plate is provided with a set of grouting holes and grouting holes. The grouting holes and the grouting holes are 200mm away from the short side of the double-rib beam integrated plate and are symmetrically arranged or diagonally arranged. After grouting, a rubber plug is used to temporarily seal the hole. 30 minutes after grouting, the rubber plug is pulled out for high-pressure grouting. Finally, threaded steel rods are installed at the grouting hole and the grouting hole simultaneously. The length of the threaded steel rod is 300mm, the top diameter is equal to the diameter of the grouting hole or the grouting hole, and the bottom diameter is 10mm. The grouting material is mainly pressurized for the second time through the installed threaded steel rod, and the hole is sealed at the same time. Since the high-pressure grouting process is a concealed project, a dedicated person is assigned to inspect and accept the process during the on-site construction, and the process acceptance records are kept well. Step 6: Tensioning and anchoring of prestressed tendons: At least two prestressed tendons are arranged in the construction module of each section. When the design is two lanes or less and the design width of the road is less than 10m, the prestressed tendons are fixed at one end and tensioned at the other end. When the design is three lanes or more and the design width of the road is greater than 10m, the prestressed tendons are tensioned symmetrically. The prestressed tensioning force is tensioned by jacks with a 1.05σcon super tensioning method, which is anchored immediately after tensioning and fully sealed. After the tensioning and anchoring of the prestressed tendons are completed, the excess protruding prestressed steel bars are cut off with cutting equipment, and the anchor is sealed with fine stone concrete of the same strength as the grouting material. A dedicated person is assigned to be responsible for the tensioning and anchoring of the prestressed tendons, and on-site inspection and acceptance are carried out for each perforation. Step 7: Repeat steps 1 to 6 until all structural hoisting construction is completed: After all the above processes are completed, repeat steps 1 to 6, adopt the flow construction method, and carry out comprehensive construction on each construction section and each module until all structural hoisting construction of the assembly road is completed. In order to facilitate subsequent maintenance, a 10mm gap is left between the prefabricated double-rib beam integrated plates of adjacent modules, mainly considering the independent load-bearing and temperature stress influence of each module during the subsequent traffic process, and also improves the efficiency of subsequent reinforcement and maintenance work; Step 8: Full paving of asphalt surface layer: After the main structure hoisting project is accepted, the asphalt surface layer is fully paved on the top of the double-rib beam integrated plate. The thickness of the asphalt surface layer is designed according to the actual project conditions, mainly based on the design elevation of the top surface of the prefabricated road. The asphalt surface layer is fully paved at one time, covering the exposed embedded bolts on the top of the double-rib beam integrated plate, and leaving a protective layer of not less than 60mm thick. Considering the subsequent road drainage problem, the main structure of the prefabricated road is completed, and prefabricated integrated drainage ditches with two-way drainage are set at both ends of the road. The lifting is completed in sections, and the project is fully accepted after the overall assembled road paving is completed.

[0007] Technical effects and advantages of the present invention: Following the principles of "modular design, factory production, mechanized lifting, double-rib beam-slab load-bearing system, prestressed technology combined with high-pressure grouting technology", the overall technical solution adopts a prefabricated double-rib beam integrated plate load-bearing structure, mechanized flow lifting in sections and modules, and the "steel chisel" method is installed at the support points to improve the structural bearing and elevation control. The "secondary verification" of prefabricated roadbed beams improves the quality and efficiency of on-site lifting. The prefabricated double-rib beam integrated plate lifting adopts the "first lifting of the integrated plate with small error, and then lifting of the integrated plate with large error" technical solution, which effectively centrally controls the lifting errors of the overall structure, and adopts the method of simultaneously installing threaded steel bars at the grouting holes and the slurry outlet holes, combining sealing holes and strengthening load-bearing into one, strengthening the research and development and application of new technologies, and providing favorable technical support for the high-quality development of my country's prefabricated road field.

[0008] The non-bonded prestressed technology is suitable for projects with more than three lanes and a designed road width of more than 18m. It ensures that the non-bonded prestressed steel bars can be laid out while the prefabricated double-rib beam integrated plate is hoisted. After the hoisting construction of all structures is completed, the non-bonded prestressed steel bars are tensioned and anchored. There is no need to lay prestressed steel bar channels or grouting channels, which makes installation easy and construction speed fast. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 This is a schematic diagram of the prestressed assembly road structure with a double-rib beam-slab integrated structure.

[0010] Figure 2 This is the process flow chart for the prestressed assembly road construction of the double-rib beam-slab integrated structure.

[0011] In the figure: 1. Roadbed beam; 11. Embedded bolts; 2. Double-rib beam integrated plate; 21. Unbonded prestressed tendons; 22. Grouting holes; 23. Grouting holes; 3. Asphalt surface layer; 4. Cushion layer; 5. Grouting material. DETAILED DESCRIPTION

[0012] The following will be combined with the attached embodiment of the present invention Figure 1-Figure 2, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Example

[0013] like Figure 1-Figure 2 As shown, the present invention provides a method for constructing a prefabricated double-rib beam-slab structure non-bonded prestressed assembly road, comprising the following steps: Step 1: Survey and lay out, excavate the roadbed beam groove; Step 2: pouring the bottom cushion layer 4 of the roadbed beam groove and hoisting the roadbed beam 1; Step 3: hoisting of prefabricated double-rib beam integrated plate 2; Step 4: Punching the unbonded prestressed tendons 21; Step 5: high pressure grouting and sealing; Step 6: tensioning and anchoring of prestressed tendons; Step 7: Repeat steps 1 to 6 until all structural hoisting construction is completed; Step 8: Asphalt surface layer 3 is fully paved; The specific steps are as follows: Step 1: Survey and lay out, excavate the roadbed beam groove: First, survey and lay out the roadbed range according to the engineering design drawings or the supervision unit, use lime powder to lay out the roadbed range, and compact the roadbed. In order to reduce the disturbance of the roadbed soil layer, only compact the original soil layer before excavating the roadbed beam groove. Do not excavate the excess soil layer before compacting the roadbed. When the difference between the designed roadbed top surface elevation and the original soil layer elevation exceeds 450mm, first dig out the excess soil layer and then compact the roadbed. After the roadbed soil layer is compacted, the lifting position of the roadbed beam 1 in the subsequent process is located by surveying and laying out, that is, the roadbed beam groove excavation position line. The roadbed beam groove excavation width is 1.2 times the design width of the roadbed beam 1, and the excavation depth is 2 / 3 of the height of the roadbed beam 1. When encountering complex geological environments such as silty soil, expansive soil, and collapsible soil, the roadbed beam groove Before excavation, reinforced concrete prefabricated short piles with a length of 900mm~1200mm are driven in sections at the position of roadbed beam 1. The cross-section of the reinforced concrete prefabricated short piles is 160mm larger than the design width of roadbed beam 1. One reinforced concrete prefabricated short pile is set every 2500mm~4000mm, and the location of the reinforced concrete prefabricated short piles is used as the support point for the lifting and installation of roadbed beam 1 in the subsequent construction process. The roadbed beam groove is excavated manually, and the excavation is carried out in sections and modules. Over-excavation is not allowed. The excavation is carried out to the bottom elevation of the cushion layer 4 at the bottom of the roadbed beam groove. In order to avoid excessive disturbance of the soil layer of other parts of the roadbed, the middle roadbed beam groove is excavated first, and then the end roadbed beam groove is excavated. After the roadbed beam groove is excavated in sections and modules, temporary protection of the roadbed beam groove is carried out, and the process acceptance is organized, and people, posts and responsibilities are determined to ensure the smooth completion of the preliminary preparation work; Step 2: pour the bottom cushion layer 4 of the roadbed beam trough, and hoist the roadbed beam 1: adopt continuous water construction, and after the excavation of the roadbed beam trough in sections and modules is completed, the pouring of the bottom cushion layer 4 of the roadbed beam trough shall be carried out immediately. When a certain technical break occurs due to construction organization problems, the pouring of the cushion layer 4 shall be completed within 6 hours after the excavation of the roadbed beam trough is completed and shall not be done overnight. When encountering the rainy season construction stage, organize the connection between the various processes in advance, immediately pour the bottom cushion layer 4 of the roadbed beam trough and take drainage measures. The phenomenon of rainwater soaking the roadbed soil layer for a long time shall not occur. The bottom cushion layer 4 of the roadbed beam trough shall be poured with fine stone concrete. The concrete strength is not less than C30, the thickness of the cushion layer 4 is 80mm~100mm, and the "steel chisel" method is used to control the pouring elevation of the cushion layer 4 when pouring the cushion layer 4. The "steel chisel" can improve the local load-bearing and roadbed stability. The top elevation of the cushion layer 4 at the bottom of the roadbed beam groove is designed as the hoisting elevation of the roadbed beam 1 in the subsequent process. After the cushion layer 4 at the bottom of the roadbed beam groove is poured in modules, the roadbed beam 1 is hoisted. The roadbed beam 1 is hoisted using the "first hoist the middle, then the end" technical solution. The prefabricated roadbed beam 1 in the middle of the road is first hoisted and fixed, and then the prefabricated double-rib beam in the subsequent process is hoisted. The actual production size of the integrated plate 2 is fully verified and the prefabricated roadbed beam 1 at the end is hoisted after the position is accurate. In order to facilitate the segmented hoisting of the prefabricated roadbed beam 1, the "center line" and "outer edge control line" of the prefabricated roadbed beam 1 are popped up on the pad 4 at the bottom of the roadbed beam groove. The prefabricated roadbed beam 1 is hoisted in place on site using the "secondary verification" method, that is, the first verification of the "center line" and "outer edge control line" of the prefabricated roadbed beam 1 after it is located on the pad 4 at the bottom of the roadbed beam groove, the error does not exceed 2mm, the second focus is on verifying the position of the embedded bolts 11 at the top of the prefabricated roadbed beam 1, and accurately measuring the top of the two transverse prefabricated roadbed beams 1 The spacing between the embedded bolts 11 has an error of no more than 3mm, ensuring that the prefabricated double-rib beam integrated plate 2 in the subsequent process is hoisted in place at one time. After the prefabricated roadbed beam 1 in the construction section is accurately positioned in sections and modules, fine stone concrete is immediately used to pour the gap between the prefabricated roadbed beam 1 and the roadbed beam groove in place, and the gap is compacted by tamping. In the process of grouting, fine stone concrete with the same strength as the grouting is used to pour the cushion layer 4 between the two adjacent prefabricated beams and on the top of the roadbed soil layer. The thickness of the cushion layer 4 is not less than 60mm, and the concrete strength of the cushion layer 4 is not less than C30. Avoid construction under complex working conditions such as rainy season. Step 3: Hoisting of prefabricated double-rib beam integrated plate 2: After the hoisting construction of the prefabricated roadbed beam 1 in the construction section is completed, the process acceptance is carried out, and the prefabricated double-rib beam integrated plate 2 is hoisted in sections and modules. Before the prefabricated double-rib beam integrated plate 2 is hoisted, the distance between the embedded bolts 11 on the tops of the two adjacent roadbed beams 1 in the hoisting section is repeatedly checked, and the distance between the bolt holes on the prefabricated double-rib beam integrated plate 2 to be hoisted is compared to ensure that the embedded bolts 11 on the roadbed beam 1 are aligned with the bolt holes on the prefabricated double-rib beam integrated plate 2. When encountering a design road with more than three lanes, the prefabricated double-rib beam integrated plate 2 is hoisted using the technical solution of "hoisting the integrated plate with a small error first, and then hoisting the integrated plate with a large error". Prestressed tendon perforations are provided in the middle of the rib beam of the double-rib beam integrated plate 2. The prestressed tendon perforations are pre-buried with steel sleeves to form holes. The diameter of the hole for the reinforcement is 3mm larger than the outer diameter of the unbonded prestressed reinforcement 21 used in the design. During the hoisting process of the prefabricated double-rib beam integrated plate 2, the prestressed reinforcement channel is initially installed and fixed, and the end of the prestressed reinforcement channel is inserted into the prestressed reinforcement holes at both ends of the prefabricated double-rib beam integrated plate 2. According to the linear direction of the corrugated pipe, a horse stool reinforcement truss is set on the cushion layer 4 on the upper part of the roadbed soil layer to support the prestressed reinforcement channel in place. When the prefabricated double-rib beam integrated plate 2 is hoisted to the upper part of the roadbed beam 1, the embedded bolts 11 on the top of the roadbed beam 1 are inserted into the bolt holes at both ends of the prefabricated double-rib beam integrated plate 2 with manual assistance. The diameter of the bolt holes at both ends of the prefabricated double-rib beam integrated plate 2 is 2mm~3mm larger than the diameter of the embedded bolts 11 at the top of the roadbed beam 1. After the hoisting of the prefabricated double-rib beam integrated plate 2 in the construction section is completed, the top embedded bolts 11 are tightened and fixed with nuts; Step 4: Punching of unbonded prestressed tendons 21: The prestressed tendons are arranged 150 mm below the bottom surface of the prefabricated double-rib beam integrated plate 2 and anchored after passing through the two end beams of the prefabricated integrated plate. During the hoisting process of the prefabricated double-rib beam integrated plate 2, the metal corrugated pipe in the construction section is assisted in installation. After the hoisting of the prefabricated double-rib beam integrated plate 2 is completed, the prestressed tendons are punched. When encountering a design road with more than three lanes, steel wires are pre-threaded inside the metal corrugated pipe when installing the prestressed tendons, and the prestressed tendons are punched later by the steel wires; Step 5: High-pressure grouting and sealing: After the prefabricated double-rib beam integrated plate 2 in the construction section is hoisted in place and the prestressed tendons are laid, the grouting work is carried out in sections and modules. The micro-expansion, low-shrinkage, high-strength fine stone concrete grouting material 5 is poured into the cavity between the double-rib beam integrated plate 2 and the concrete cushion 4 by high-pressure grouting method. The hole diameters of the grouting holes 22 and the grouting holes 23 are both 40mm. Each double-rib beam integrated plate 2 is provided with a group of grouting holes 22 and grouting holes 23. The grouting holes 22 and the grouting holes 23 are respectively 200mm away from the short side of the double-rib beam integrated plate 2 and are symmetrically arranged or along the opposite sides. Angle setting, after grouting is completed, a rubber plug is used to temporarily seal the hole. 30 minutes after the grouting is completed, the rubber plug for temporary sealing is pulled out, and a high-pressure grouting is performed. Finally, threaded steel rods are synchronously driven at the grouting hole 22 and the grouting hole 23. The length of the threaded steel rod is 300mm, the top diameter is equal to the diameter of the grouting hole 22 or the grouting hole 23, and the bottom diameter is 10mm. The grouting material 5 is mainly pressurized for the second time through the driven threaded steel rod, and the hole is sealed by the driven threaded steel rod. Since the high-pressure grouting process is a concealed project, a dedicated person is assigned to inspect and accept the site during construction, and the process acceptance records are kept well. Step 6: Tensioning and anchoring of prestressed tendons: At least two prestressed tendons are arranged in the construction module of each section. When the design is two lanes or less and the design width of the road is less than 10m, the prestressed tendons are fixed at one end and tensioned at the other end. When the design is three lanes or more and the design width of the road is greater than 10m, the prestressed tendons are tensioned symmetrically. The prestressed tensioning force is tensioned by a jack using the 1.05σcon super tensioning method, which is anchored immediately after tensioning and fully anchored. After the tensioning and anchoring of the prestressed tendons are completed, the excess protruding prestressed steel bars are cut off with cutting equipment, and the anchors are sealed with fine stone concrete of the same strength as the grouting material 5. When the grouting material 5 reaches more than 80% of its design strength, the metal corrugated pipe is grouted. A dedicated person is assigned to be responsible for the tensioning and anchoring of the prestressed tendons, and on-site inspection and acceptance are adopted for each perforation. Step 7: Repeat steps 1 to 6 until all structural hoisting construction is completed: After all the above processes are completed, repeat steps 1 to 6, adopt the flow construction method, and carry out comprehensive construction on each construction section and each module until all structural hoisting construction of the assembly road is completed. In order to facilitate subsequent maintenance, a 10mm gap is left between the prefabricated double-rib beam integrated plates 2 of adjacent modules, mainly considering the independent load-bearing and temperature stress influence of each module during the subsequent traffic process, and also improves the efficiency of subsequent reinforcement and maintenance work; Step 8: Fully paving the asphalt surface layer 3: After the main structure hoisting project is accepted, the asphalt surface layer 3 is fully paved on the top of the double-rib beam integrated plate 2. The thickness of the asphalt surface layer 3 is designed according to the actual project conditions, mainly based on the design elevation of the top surface of the prefabricated road. The asphalt surface layer 3 is fully paved at one time, covering the exposed embedded bolts 11 on the top of the double-rib beam integrated plate 2, and leaving a protective layer of not less than 60mm thick. Considering the subsequent road drainage problem, the main structure of the prefabricated road is completed, and prefabricated integrated drainage ditches with two-way drainage are set at both ends of the road. The lifting is completed in sections, and the project is fully accepted after the overall assembled road is paved.

[0014] In summary, the non-bonded prestressed technology is adopted in this embodiment, which is suitable for engineering projects with more than three lanes and a designed road width of more than 18m. It ensures that the non-bonded prestressed steel bars can be laid while the prefabricated double-rib beam integrated plate 2 is hoisted. After the hoisting construction of all structures is completed, the non-bonded prestressed tendons 21 are tensioned and anchored. There is no need to lay prestressed tendon channels or grouting the channels. The installation is convenient and the construction speed is fast.

[0015] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for constructing a prefabricated double-rib beam-slab structure without bonding prestressed assembly road. It is characterized in that The following steps are involved: Step 1: Survey and lay out, excavate the roadbed beam groove; Step 2: pouring the bottom cushion of the roadbed beam trough and hoisting the roadbed beam; Step 3: Hoisting of prefabricated double-rib beam integrated plate; Step 4: Punching of unbonded prestressed tendons; Step 5: high pressure grouting and sealing; Step 6: tensioning and anchoring of prestressed tendons; Step 7: Repeat steps 1 to 6 until all structural hoisting construction is completed; Step 8: Full paving of asphalt surface layer; The specific steps are as follows: Step 1: Survey and lay out, excavate the roadbed beam groove: First, survey and lay out the roadbed range according to the engineering design drawings or the supervision unit, use lime powder to lay out the roadbed range, and compact the roadbed. In order to reduce the disturbance of the roadbed soil layer, only compact the original soil layer before excavating the roadbed beam groove. Do not excavate the excess soil layer before compacting the roadbed. When the difference between the designed roadbed top surface elevation and the original soil layer elevation exceeds 450mm, first dig out the excess soil layer and then compact the roadbed. After the roadbed soil layer is compacted, the lifting position of the roadbed beam in the subsequent process is located by surveying and laying out, that is, the roadbed beam groove excavation position line. The roadbed beam groove excavation width is 1.2 times the design width of the roadbed beam, and the excavation depth is 2 / 3 of the roadbed beam height. When encountering complex geological environments such as silty soil, expansive soil, and collapsible soil, the roadbed beam Before trench excavation, reinforced concrete prefabricated short piles with a length of 900mm~1200mm are driven in sections at the roadbed beam position. The cross-section of the reinforced concrete prefabricated short piles is 160mm larger than the design width of the roadbed beam. A reinforced concrete prefabricated short pile is set every 2500mm~4000mm, and the location of the reinforced concrete prefabricated short piles is used as the support point for the roadbed beam to be hoisted into place in the subsequent construction process. The roadbed beam trench is excavated manually, in sections and modules, and over-excavation is not allowed. The excavation is carried out to the bottom elevation of the cushion layer at the bottom of the roadbed beam trench. In order to avoid excessive disturbance of the soil layer of other parts of the roadbed, the middle roadbed beam trench is excavated first, and then the end roadbed beam trench is excavated. After the roadbed beam trench is excavated in sections and modules, temporary protection of the roadbed beam trench is carried out, and the process acceptance is organized, and people, posts and responsibilities are determined to ensure the smooth completion of the preliminary preparation work; Step 2: Cast the bottom cushion layer of the roadbed beam trough and hoist the roadbed beam: adopt continuous construction, and after the roadbed beam trough is excavated in sections and modules, the casting of the bottom cushion layer of the roadbed beam trough shall be carried out immediately. When there is a certain technical break due to construction organization problems, the cushion layer shall be cast within 6 hours after the excavation of the roadbed beam trough is completed and shall not be cast overnight. When encountering the rainy season construction stage, organize the connection between various processes in advance, cast the bottom cushion layer of the roadbed beam trough immediately and take drainage measures. The phenomenon of rainwater soaking the roadbed soil layer for a long time shall not be allowed. The bottom cushion layer of the roadbed beam trough shall be cast with fine stone concrete. The concrete strength is not less than C30, the cushion thickness is 80mm~100mm, and the "steel chisel" method is used to control the pouring elevation of the cushion when pouring the cushion. The "steel chisel" is used to improve the local load and roadbed stability. The top elevation of the cushion at the bottom of the roadbed beam groove is designed as the elevation of the lifting and positioning of the roadbed beam in the subsequent process. After the cushion at the bottom of the roadbed beam groove is poured in modules, the roadbed beam is lifted. The roadbed beam lifting adopts the technical scheme of "lifting the middle part first and then the end part". The prefabricated roadbed beam in the middle of the road is first lifted and fixed, and then the prefabricated double ribs in the subsequent process are lifted and fixed. The actual production size of the beam integrated plate is fully verified before hoisting the prefabricated roadbed beam at the end. In order to facilitate the segmented hoisting of the prefabricated roadbed beam, the "center line" and "outer edge control line" of the prefabricated roadbed beam are popped up on the cushion layer at the bottom of the roadbed beam groove. The "secondary verification" method is adopted for the on-site hoisting of the prefabricated roadbed beam, that is, the first verification of the "center line" and "outer edge control line" of the prefabricated roadbed beam after it is located on the cushion layer at the bottom of the roadbed beam groove, and the error does not exceed 2mm. The second focus is on verifying the position of the embedded bolts on the top of the prefabricated roadbed beam, and accurately measuring the top of the two transverse prefabricated roadbed beams. The spacing between the embedded bolts should have an error of no more than 3mm, ensuring that the prefabricated double-ribbed integrated slab in the subsequent process can be hoisted into place at one time. After the prefabricated roadbed beams in the construction section are accurately positioned in sections and modules, fine stone concrete is immediately used to pour the gap between the prefabricated roadbed beams and the roadbed beam grooves in place, and the gaps are compacted by tamping. During the grouting process, fine stone concrete with the same strength as the grouting is used to pour the cushion layer between the two adjacent prefabricated beams and on the top of the roadbed soil layer. The cushion layer thickness is not less than 60mm, and the cushion layer concrete strength is not less than C30. Avoid construction under complex working conditions such as rainy seasons. Step 3: Hoisting of prefabricated double-rib beam integrated plate: After the hoisting construction of the prefabricated roadbed beams in the construction section is completed, the process acceptance is carried out, and the prefabricated double-rib beam integrated plate is hoisted in sections and modules. Before the prefabricated double-rib beam integrated plate is hoisted, the distance between the embedded bolts on the top of the two adjacent roadbed beams in the hoisting section is repeatedly checked, and the distance between the bolt holes on the prefabricated double-rib beam integrated plate to be hoisted is compared to ensure that the embedded bolts on the roadbed beam are aligned with the bolt holes on the prefabricated double-rib beam integrated plate. When encountering a design road with more than three lanes, the prefabricated double-rib beam integrated plate is hoisted using the technical solution of "hoisting the integrated plate with small error first, and then hoisting the integrated plate with large error". Prestressed tendon perforations are provided in the middle of the rib beam of the double-rib beam integrated plate, and the prestressed tendon perforations are achieved by "pre-embedded steel sleeves". The hole diameter of the prestressed tendon is 3mm larger than the outer diameter of the unbonded prestressed tendon used in the design. During the hoisting process of the prefabricated double-rib beam integrated plate, the prestressed tendon channel is initially installed and fixed, and the end of the prestressed tendon channel is inserted into the prestressed tendon holes at both ends of the prefabricated double-rib beam integrated plate. According to the linear direction of the corrugated pipe, a horse stool reinforcement truss is set on the cushion layer above the roadbed soil layer to support the prestressed tendon channel in place. When the prefabricated double-rib beam integrated plate is hoisted to the upper part of the roadbed beam, the embedded bolts on the top of the roadbed beam are manually inserted into the bolt holes at both ends of the prefabricated double-rib beam integrated plate. The diameter of the bolt holes at both ends of the prefabricated double-rib beam integrated plate is 2mm~3mm larger than the diameter of the embedded bolts on the top of the roadbed beam. After the hoisting of the prefabricated double-rib beam integrated plate in the construction section is completed, the top embedded bolts are tightened and fixed with nuts; Step 4: Punching of unbonded prestressed tendons: The prestressed tendons are arranged 150mm below the bottom surface of the prefabricated double-rib beam integrated plate and anchored after passing through the two end rib beams of the prefabricated integrated plate. The unbonded prestressed tendons are punched by the wire guidance method or the pre-laying method. The wire guidance method is that during the process of hoisting the prefabricated double-rib beam integrated plate, the iron wire is passed through the prefabricated double-rib beam integrated plate along the linear layout position of the prestressed tendons at both ends. When the unbonded prestressed tendons are punched, the steel wire is gradually guided to accurately punch the unbonded prestressed tendons. The pre-laying method is that during the process of hoisting the prefabricated double-rib beam integrated plate, the unbonded prestressed tendons are installed in place together with the prefabricated double-rib beam integrated plate. The two ends of the unbonded prestressed tendons pass through the end of the prefabricated double-rib beam integrated plate and extend at least 350mm to facilitate the subsequent tensioning and anchoring of the prestressed tendons. Step 5: High-pressure grouting and sealing: After the prefabricated double-rib beam integrated plate in the construction section is hoisted in place and the prestressed tendons are laid, grouting work is carried out in sections and modules. The cavity between the double-rib beam integrated plate and the concrete cushion is filled with micro-expansion, low-shrinkage, high-strength fine stone concrete grouting material by high-pressure grouting method. The hole diameters of the grouting holes and the grouting holes are both 40mm. Each double-rib beam integrated plate is provided with a set of grouting holes and grouting holes. The grouting holes and the grouting holes are 200mm away from the short side of the double-rib beam integrated plate and are symmetrically arranged or diagonally arranged. After grouting, a rubber plug is used to temporarily seal the hole. 30 minutes after grouting, the rubber plug is pulled out for high-pressure grouting. Finally, threaded steel rods are installed at the grouting hole and the grouting hole simultaneously. The length of the threaded steel rod is 300mm, the top diameter is equal to the diameter of the grouting hole or the grouting hole, and the bottom diameter is 10mm. The grouting material is mainly pressurized for the second time through the installed threaded steel rod, and the hole is sealed at the same time. Since the high-pressure grouting process is a concealed project, a dedicated person is assigned to inspect and accept the process during the on-site construction, and the process acceptance records are kept well. Step 6: Tensioning and anchoring of prestressed tendons: At least two prestressed tendons are arranged in the construction module of each section. When the design is two lanes or less and the design width of the road is less than 10m, the prestressed tendons are fixed at one end and tensioned at the other end. When the design is three lanes or more and the design width of the road is greater than 10m, the prestressed tendons are tensioned symmetrically. The prestressed tensioning force is tensioned by jacks with a 1.05σcon super tensioning method, which is anchored immediately after tensioning and fully sealed. After the tensioning and anchoring of the prestressed tendons are completed, the excess protruding prestressed steel bars are cut off with cutting equipment, and the anchor is sealed with fine stone concrete of the same strength as the grouting material. A dedicated person is assigned to be responsible for the tensioning and anchoring of the prestressed tendons, and on-site inspection and acceptance are carried out for each perforation. Step 7: Repeat steps 1 to 6 until all structural hoisting construction is completed: After all the above processes are completed, repeat steps 1 to 6, adopt the flow construction method, and carry out comprehensive construction on each construction section and each module until all structural hoisting construction of the assembly road is completed. In order to facilitate subsequent maintenance, a 10mm gap is left between the prefabricated double-rib beam integrated plates of adjacent modules, mainly considering the independent load-bearing and temperature stress influence of each module during the subsequent traffic process, and also improves the efficiency of subsequent reinforcement and maintenance work; Step 8: Full paving of asphalt surface layer: After the main structure hoisting project is accepted, the asphalt surface layer is fully paved on the top of the double-rib beam integrated plate. The thickness of the asphalt surface layer is designed according to the actual project conditions, mainly based on the design elevation of the top surface of the prefabricated road. The asphalt surface layer is fully paved at one time, covering the exposed embedded bolts on the top of the double-rib beam integrated plate, and leaving a protective layer of not less than 60mm thick. Considering the subsequent road drainage problem, the main structure of the prefabricated road is completed, and prefabricated integrated drainage ditches with two-way drainage are set at both ends of the road. The lifting is completed in sections, and the project is fully accepted after the overall assembled road paving is completed.

Citation Information

Patent Citations

  • Bilateral composite beam prefabrication post-tensioned prestress assembling pavement construction process

    CN109457568A

  • Criss-cross bidirectional prestress assembly road based on post-grouting technology and construction method

    CN115029983A

  • Fabricated road structure construction method adopting asphalt reverse beating process

    CN117403492A

  • Roadbed structure with pile foundation bent cap

    CN209669613U