Compaction pile construction method and equipment capable of automatically positioning, forming holes, accurately backfilling, tamping and recording
By using a hammering guide hole rotary extrusion hole forming machine and a fully automatic tamping machine in the compacted pile method, combined with a moisture meter and satellite positioning navigation, an adaptive program was developed to solve the problem of insufficient accuracy in the filling tamping process and achieve It provides efficient and automated pile compaction, ensuring the improvement of pile quality and construction efficiency.
Patent Information
- Application Number
- CN202410902851.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-11
AI Technical Summary
The existing technology lacks precise adjustment during the filling compaction process in the squeeze pile method, which makes it difficult for the pile compaction coefficient to reach 0.97, and the degree of construction automation is insufficient to effectively respond to changes in soil moisture content and dry density.
Using a hammering hole drilling machine and a fully automatic tamping machine, combined with a moisture meter to measure the moisture content of the soil layer, a predetermined adaptive program is developed through the computer system to adjust the filler composition, amount, frequency and energy to achieve driverless automation. Fully automated walking construction.
It improves the accuracy and automation of filling compaction, ensuring that the pile compaction coefficient reaches 0.97, reducing construction costs and time, and enhancing construction efficiency and quality stability.
Smart Images

Figure CN118756701A_ABST
Abstract
Description
Technical Field
[0001] This construction method belongs to construction and pile machinery. Specifically, it is a method and equipment used for controlling the construction of an automatic tamping machine, which can move and position the pile driver automatically, extrude the pile hole by hammering, measure the moisture content of the soil layer in the pile hole, input the measured moisture content value, the pile hole depth and the dry density of the soil layer into the computer system of the fully automatic tamping machine, and formulate a predetermined adaptive program of filler composition, filler quantity, tamping frequency and tamping energy corresponding to the moisture content of the pile hole depth and the dry density of the soil layer before compaction by the computer, and control the construction operation of the automatic tamping machine. Background Art
[0002] The compaction pile method is the main construction method for treating the foundation of loess strata. The purpose is to eliminate the collapsibility of loess and improve the bearing capacity of the foundation.
[0003] The compaction pile method consists of two steps:
[0004] 1. Make pile holes, also known as drilling holes. There are two types of drilling holes: drilling holes and drilling holes. Extruding holes is the preferred method. Some of the equipment used, such as diesel hammers and vibrating pipe sinkers, are banned or restricted because of environmental pollution, noise and disturbance. Currently, two types of equipment are mainly used on construction sites: static pile drivers and rotary extrusion drilling machines. Let's compare these two types of equipment:
[0005] In recent years, static pile driver has been applied in the compaction pile method because of its fast hole-forming speed. But it has an insurmountable disadvantage that there is a large blind area of pile position in the foundation pit that cannot be constructed. Because it is too heavy, with a deadweight of at least 200 tons out of 300 tons, the pile position of 4.5m around the foundation pit cannot be reached, unless the foundation pit is expanded to increase the project cost.
[0006] The rotary extruder is often used to fill holes for static pile drivers. However, the current rotary extruder has a disadvantage, which is that it consumes too much electricity. The power of a rotary extruder is at least 250kw, which makes it impossible for power stations on many construction sites to meet the demand, limiting the promotion of this environmentally friendly pile driver.
[0007] Fortunately, we also have a method of hammering to lead the hole and then extruding it into a hole. On-site measurement: At the same construction site, we have a hammering and extruding machine that extrude pile holes of the same diameter. The total power of the whole machine is 150kw, and all construction sites can supply electricity. Moreover, after hammering the hole and then extruding it, the hole-making speed is more than twice as fast. Of course, some noise will be generated when hammering the hole, but fortunately, hammering the hole is not hammering the hole, and the noise intensity generated is very small. After the extruding drill bit enters the soil, the noise is almost inaudible.
[0008] In addition, we found that at the same construction site, the pile hole after static pressure pipe pulling had a shrinkage phenomenon, and the hole had to be repaired again by machinery; while the rotary extrusion pile hole used to supplement the pile hole around the foundation pit did not have a shrinkage phenomenon. The reason for this is that the stress of the soil layer around the hole is more thoroughly released by rotary extrusion than by static pressure pipe pulling. This is also a major advantage of the rotary extrusion method.
[0009] Based on the above discussion, we selected "a high-speed soil extrusion hole-making equipment for hammering and drilling" (ZL2019203211731) (referred to as hammering and drilling rotary extrusion hole-making machine) as the hole-making equipment for this construction method. And we optimized and upgraded it, added a satellite positioning and navigation system, so that it can be unmanned, completely controlled by computer for automatic walking and positioning, and fully automated construction.
[0010] 2. Filling compaction. The hole-making speed of the compaction pile method is several times faster than the filling compaction speed. To solve this contradiction, we have successively developed four generations of automatic tamping machines. The fourth generation of the machine "automatic spray dust removal, automatic positioning and recording of fill volume fully automatic tamping machine" (ZL2021218220463) (hereinafter referred to as fully automatic tamping machine) has been recognized for its construction efficiency and engineering quality after several years of engineering practice. The "Technical Code for Foundation Treatment by Compacting Pile Method" (DB61 / T5062-2023), which was issued on August 1, 2023 and implemented on August 30, fully affirmed this automatic tamping machine (see page 5 and page 62 of the code), and made a detailed introduction to the technical performance (see page 34 of the code). The outstanding advantage of this automatic tamping machine is that it can pre-set the program control, and record the filling volume at any time and archive it for future reference. If a satellite positioning navigation system is installed, it can be unmanned and automatically walk to locate the construction work. This construction method selects this fully automatic tamping machine.
[0011] In this newly published technical specification, the treatment depth of the compaction pile method is changed from the original 3m-15m to 4m-25m. The treatment depth has been greatly increased. As the treatment depth increases, the difference in the moisture content of the soil layer in the same pile hole will certainly increase. The moisture content is closely related to the compaction coefficient of the compaction pile body. For example, when the moisture content is lower than 12%, it is difficult to compact the soil layer. It must be soaked in water to increase humidity. The filler should also be sprayed with water for humidification. When the moisture content is high, it is easy to shrink or even collapse and silt back. At this time, the filler composition should be changed, and lime, cement, etc. should be added to ensure the strength of the pile body. Adjustments to the filler composition and filler quantity, tamping frequency and tamping energy based on the differences and changes in the moisture content of the soil layer are of decisive significance to the construction effect and engineering quality of the compaction pile method.
[0012] Unfortunately, the common practice at construction sites now is to determine the amount of fill for each layer based only on the dry density of the soil layer provided by the designer and a moisture content that is most unfavorable to the compaction effect, which is quite rough. The original intention of considering only a moisture content that is most unfavorable to compaction is to ensure the construction quality of the entire project, but the actual effect is often counterproductive. It is time-consuming, labor-intensive and costly to try to remedy a quality accident that has already occurred. If you want to make the best and most accurate adjustments to the filler composition, filler amount, tamping frequency and tamping according to the different dry densities of the soil layers and the different moisture contents of the soil layers that change with depth, you must accurately know the exact value of the moisture content of the soil layer in the pile hole that changes with depth. There are now several "moisture meter" that can help achieve this. It is reported that some use the direct current principle to measure the moisture of the soil layer through the resistance change between the probes. Some meters use the high-frequency principle, that is, there is a fixed frequency generator in the instrument. The moisture content of the object being measured is different, and the frequency transmitted to the machine through the sensor is different. The two frequency differences can be converted into frequency current to digitally display the moisture content of the object being measured. Various moisture meters are not expensive.
[0013] We fix the probe of the moisture meter on the rotary drill rod, connect the probe to the instrument with a wire, and make the probe in close contact with the soil layer on the hole wall in the pile hole that has been screwed into a hole to obtain the accurate value of the soil moisture content at different depths in the pile hole. It is not necessary to measure all the pile holes, but it is enough to test the moisture content at several key locations such as the four corners and five points in the center of the foundation pit.
[0014] In summary: we choose hammer-drilling and rotary extrusion machine to form pile holes; we choose fully automatic tamping machine to complete the filling compaction pile; we also choose moisture meter to measure the moisture content of soil layer at each depth in the pile hole. The moisture content data and the corresponding pile hole depth data together with the dry density of soil layer before compaction are input into the computer "expert software package" of the fully automatic tamping machine control system. The so-called "expert software package" is the result of years of practical experience and discussion by experienced experts in surveying, design and construction. When the filling is compacted, what kind of filler should be matched with different dry density and moisture content of soil layer, whether the filler should be sprayed with water for humidification, how much filler should be put into each layer, what frequency should be used for tamping each layer of filler, how much tamping energy should be, etc. The purpose is to achieve the best compaction effect, that is, it is necessary to ensure that the compaction coefficient of the pile body is above 0.97. Summary of the invention
[0015] The technical problems we want to solve are:
[0016] How to make the automatic tamping more precise? That is, how to adjust the filler composition, filler quantity, tamping frequency and tamping energy of the automatic tamping according to the difference in soil moisture content in the pile hole, so as to ensure that the compaction coefficient of the pile body reaches above 0.97. How to further improve the degree of automation and realize unmanned fully automated construction?
[0017] Our approach to solving the above technical problems is:
[0018] The method and equipment for compaction pile construction with automatic positioning, precise backfilling, compaction and recording is adopted. The pile hole is first formed by a hammer-driving and rotary extrusion drilling machine. The moisture content of soil layers at different depths in pile holes at several key positions is measured with a moisture meter. The dry density of the soil layer before compaction and the measured moisture content value are input into the computer system of the fully automatic compaction machine together with the depth. After computer processing, a predetermined adaptive program is formulated which links the pile hole depth and the dry density of the moisture content soil layer with the filler composition, filler amount, compaction frequency and compaction energy. The fully automatic compaction machine is controlled to perform operations according to this predetermined program.
[0019] Satellite positioning and navigation devices are installed on the hammer-drilling high-speed rotary extrusion hole-forming machine and the fully automatic rammer. They can move and locate automatically without human intervention and perform construction work fully automatically according to a predetermined procedure. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 .Schematic diagram of the process flow of this construction method.
[0021] Figure 2 The schematic diagram of the optimized and upgraded version of the hammer hole-making and extrusion hole-forming machine (ZL2019203211731).
[0022] Figure 3 A schematic diagram of the appearance of a moisture meter. (The probe is extended with a wire).
[0023] Figure 4 Simple outline diagram of the upgraded version of the fully automatic tamping machine (ZL2021218220463). DETAILED DESCRIPTION
[0024] The structures and working principles of the above-mentioned "high-speed rotary extrusion hole-forming equipment for hammering and hole-guiding" (ZL2019203211731) (referred to as hammering and hole-guiding and rotary extrusion hole-forming machine) and "fully automatic tamping machine with automatic spraying, dust removal, automatic positioning and recording of filling volume" (ZL2021218220463) (referred to as fully automatic tamping machine) have been described in detail and will not be repeated here. The following only introduces the relevant information of the upgraded model after the satellite positioning system is installed.
[0025] Beidou or GPS satellite positioning and navigation technology has been widely used in transportation vehicles and agricultural machinery. However, the requirements for positioning error and pile position error are very different. A reference point, or base station, must be set at a known coordinate point near the pile position at the construction site, so that the coordinates measured by the satellite positioning and navigation system installed on the pile driver can be compared and corrected with the coordinates of the base station to guide the pile driver to move until it reaches the precise coordinate point. In order to prevent the unmanned pile driver from stopping due to a malfunction of the pile driver hydraulic system, which is common on construction sites, we have installed sensors for oil temperature, oil volume, and impurity content in the hydraulic system tank on both types of pile drivers, and all the data measured by the sensors are input into the computer system of the fully automatic tamping machine for processing.
[0026] The core of this construction method is to combine the dry density, moisture content, depth of the soil layer before squeezing with the filler composition, filler quantity, tamping frequency, and tamping energy, and formulate a predetermined adaptive program through the computer's "expert software package" to control the construction of the fully automatic tamping machine. This method is applicable to pile holes made in any way. However, there is no blind area for the foundation pit pile position when the hammer-driving and rotary extrusion hole-making machine is working; the hole-making quality is the best and no necking phenomenon is found; the power consumption is small, and all construction sites can meet the power supply requirements, so it is selected as the preferred hole-making equipment for this construction method.
[0027] Finally, one more point: the moisture content of soil layers at different depths can be tested by yourself or asked to be provided by the designer like the dry density of the soil layer. However, "moisture content meters" are very cheap, and it is also very simple to test the pile holes at a few key locations. It is safer to verify by yourself.
Claims
1. A compaction pile construction method and equipment with automatic positioning, hole forming, accurate backfilling, compaction and recording, characterized by: The pile hole is made by hammering, rotary extrusion or other hole-making methods, and the moisture content and depth of the inner wall soil layer of the pile hole at several key positions are measured by a moisture meter. The measured values are input into the computer system of the fully automatic tamping machine together with the dry density of the soil layer before compaction. The computer system formulates a predetermined adaptive program that relates the dry density of the soil layer before compaction, the moisture content of the inner wall soil layer of the pile hole and the depth with the filler composition, filler amount, tamping frequency and tamping energy. The fully automatic tamping machine is controlled to work according to this predetermined program and all the data are recorded.
2. The method and equipment for compaction pile construction with automatic positioning, hole forming, accurate backfilling, compaction and recording as claimed in claim 1, characterized in that: The automatic positioning hammer hole-making and rotary extrusion drilling machine and the fully automatic rammer are both equipped with a satellite positioning and navigation system. The hydraulic system tank is equipped with sensors for oil temperature, oil volume, and impurity content in the oil. A reference station is installed at a known coordinate point near the pile position.
Citation Information
Cited By
Pile hole backfilling construction method
CN120486427A