Permanent and temporary combined cofferdam structure and construction method
By adopting a cofferdam structure and construction method that combines permanent and permanent construction in the construction of deep water bridge caps, and using anti-collision boxes and internal supports, the structural strength and stability of the cofferdam are improved, and the steel quantity of the cofferdam in the existing technology is solved. The problem of large and difficult construction has been solved, and the cost reduction and safety requirements have been met.
Patent Information
- Application Number
- CN202411113034.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-11
AI Technical Summary
In the construction of existing deep-water bridge cap cofferdams, the amount of steel is large, construction is difficult, and safety risks are high. The temporary nature of the cofferdam structure results in high costs, and it is difficult to meet the structural strength and stability requirements for large-size cap construction.
The cofferdam structure is a permanent combination, including anti-collision boxes and internal supports arranged around the steel casing. The bottom plate uses truss keels and the internal supports use steel pipes. Through specific construction steps and equipment use, such as the lowering system, the cofferdam is realized Lifting and conversion, reducing the use of steel casing.
It improves the overall strength and stability of the cofferdam structure, reduces cost investment, meets the safety requirements for large-size cap construction, and reduces the investment in formwork for cap construction.
Smart Images

Figure CN118756728A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of deep-water bridge pedestal cofferdam construction, and in particular relates to a permanent and temporary combined cofferdam structure and a construction method. Background Art
[0002] The construction of deep-water bridge caps usually requires the use of cofferdams as auxiliary measures to create a waterless environment to facilitate steel bar binding and concrete pouring. Common cofferdam structures include steel sheet pile cofferdams, steel box cofferdams, steel hanging box cofferdams, etc. After the cap construction is completed, the cofferdam needs to be dismantled. As a large temporary structure, the cofferdam in the existing technology uses a large amount of steel, is difficult to construct, and has high safety risks. Therefore, it is necessary to improve the existing deep-water bridge cap cofferdam construction technology. Summary of the invention
[0003] In view of this, the present invention aims to overcome the defects in the prior art and proposes a permanent and temporary combined cofferdam structure and construction method.
[0004] To achieve the above object, the technical solution created by the present invention is implemented as follows:
[0005] A permanent and temporary cofferdam structure comprises an anti-collision box arranged outside a steel casing, an inner support is arranged inside the cofferdam formed by the anti-collision box, and the lower end of each anti-collision box is fixed to a bottom plate.
[0006] Furthermore, the bottom plate adopts a truss keel.
[0007] Furthermore, the inner support is made of steel pipe.
[0008] Furthermore, both ends of the inner support are fixed to the anti-collision box by bolts respectively.
[0009] A construction method of a permanent and temporary cofferdam structure comprises the following steps:
[0010] S1. Connect the high steel casing, dismantle the existing drilling platform in the cofferdam range, weld and assemble the brackets, support brackets, circumferential distribution beams and distribution beams between casings on the casing, and assemble and install the bottom plate and bottom keel on the distribution beam;
[0011] S2. Splice the anti-collision casing on site in sections, install the casing guide, weld and fix the bottom plate to the inner wall plate of the anti-collision casing, connect and fix the anti-collision casing to the bottom plate with diagonal braces, weld anti-sinking tie rods on the bottom plate, and install the inner support of the cofferdam;
[0012] S3. Weld the hanger on the bottom plate, install the cofferdam lowering system, lift the cofferdam as a whole through the lowering system, and then remove the brackets and distribution beams on the casing;
[0013] S4. Cut the casing below the inner support, lower the cofferdam to below the cross beam, and install the cross beam. Lower the cofferdam to the designed elevation through the lowering system, hang the top of the hanger on the cross beam, complete the system conversion, and then remove the cofferdam lowering system.
[0014] S5. Install anti-floating corbels at the designed low tide level, install bottom plate plugging plates, and weld shear reinforcement on the casing;
[0015] S6. Pour the first layer of bottom concrete. When the bottom concrete reaches the design strength, pump out the cofferdam at low tide. Weld the shear reinforcement to the steel casing. Weld the anti-sinking bracket and the anti-sinking bracket to the suspension rod. Then pour the second layer of bottom concrete.
[0016] S7. Remove the hanger, cross beam, casing guide, cut off the casing and diagonal brace; then construct the foundation, and remove the internal support after the foundation reaches the designed strength.
[0017] Further, in step S4, the cofferdam is lowered to 1 m below the position of the cross beam.
[0018] Further, in step S5, the casing is fixed to the shear reinforcement by spot welding.
[0019] Furthermore, in step S6, the shear steel bar is welded to the steel casing from the portion exposed above the bottom cover to the portion below the casing cutting line.
[0020] Compared with the prior art, the present invention has the following advantages:
[0021] The invention can ensure the overall structural strength and stability of the cofferdam structure and meet the protection needs and safety requirements during the construction of large-sized caps. The cofferdam side plates use permanent anti-collision sleeves, which greatly reduces the cost investment. At the same time, the anti-collision sleeves can also be used as the side molds of the cap, reducing the investment in the template for the cap construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The drawings constituting part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0023] Figure 1 This is a vertical layout diagram of the anti-collision box cofferdam in the invention;
[0024] Figure 2 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 1 Schematic diagram;
[0025] Figure 3 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 2 Schematic diagram;
[0026] Figure 4 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 3 Schematic diagram;
[0027] Figure 5 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 4 Schematic diagram;
[0028] Figure 6 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 5 Schematic diagram;
[0029] Figure 7 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 6 Schematic diagram;
[0030] Figure 8 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 7 Schematic diagram;
[0031] Fig. 9 The construction steps of the anti-collision box cofferdam in the invention are as follows Figure 8 Schematic diagram. DETAILED DESCRIPTION
[0032] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0033] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0034] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.
[0035] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0036] A permanent and temporary cofferdam structure, such as Figure 1 As shown, it includes an anti-collision box 1 arranged on the periphery of a steel casing 2, and an inner support 3 is provided on the inner side of the cofferdam formed by the anti-collision box, and the lower end of each anti-collision box is fixed to the bottom plate 6. As an example, the bottom plate adopts a truss keel. The inner support adopts a steel pipe. Usually, the two ends of the inner support are respectively fixed to the anti-collision box by bolts. In order to prevent the risk of collision, bridges in water areas need to be equipped with anti-collision facilities, which are usually in the form of steel boxes, similar to the steel box cofferdam structure. Therefore, the present invention can save a lot of cost investment by using permanent anti-collision boxes as the side plates of the cofferdam structure.
[0037] A construction method for a permanent and temporary cofferdam structure, such as Figures 2 to 8 As shown, the following steps are included:
[0038] S1. Connect the high steel casing, dismantle the existing drilling platform in the cofferdam range, weld and assemble the bracket 5 and the supporting bracket 7 on the casing, assemble the distribution beam in the annular direction and the distribution beam between the casings, and assemble and install the bottom plate and the bottom keel 4 on the distribution beam;
[0039] S2, assemble the anti-collision casing on site in sections, install the casing guide 8, weld and fix the bottom plate to the inner wall plate of the anti-collision casing, install the diagonal brace 9, connect and fix the anti-collision casing to the bottom plate with the diagonal brace, weld the anti-sinking tie rod 11 on the bottom plate, and install the inner support of the cofferdam;
[0040] S3, welding the suspension rod 12 on the bottom plate, installing the cofferdam lowering system 10, lifting the cofferdam as a whole through the lowering system, and then removing the brackets and distribution beams on the casing;
[0041] S4, cut the casing below the inner support, lower the cofferdam to below the cross beam, install the hanging cross beam 13; lower the cofferdam to the design elevation through the lowering system, hang the top of the hanger on the cross beam, complete the system conversion, and then remove the cofferdam lowering system;
[0042] S5. Install the anti-floating corbel 14 and the bottom plate plugging plate 15 at the designed low tide level, and weld the shear reinforcement on the casing;
[0043] S6, pouring the first layer of bottom concrete 16, when the bottom concrete reaches the design strength, pumping the cofferdam at low tide; welding the shear reinforcement to the steel casing (full welding); welding the anti-sinking corbel 17, and welding the anti-sinking corbel to the suspension rod, and then pouring the second layer of bottom concrete;
[0044] S7. Remove the hanger, cross beam, casing guide, cut off the casing and diagonal brace; then construct the foundation, and remove the internal support after the foundation reaches the designed strength.
[0045] In step S4, the cofferdam is lowered to 1 m below the cross beam position.
[0046] In step S5, the casing is fixed to the shear reinforcement by spot welding.
[0047] In step S6, the shear steel bar is welded to the steel casing from the portion exposed above the bottom cover to the portion below the casing cutting line.
[0048] The invention can ensure the overall structural strength and stability of the cofferdam structure and meet the protection needs and safety requirements during the construction of large-sized caps. The cofferdam side plates use permanent anti-collision sleeves, which greatly reduces the cost investment. At the same time, the anti-collision sleeves can also be used as the side molds of the cap, reducing the investment in the template for the cap construction.
[0049] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A permanent and temporary cofferdam structure, characterized in that: It comprises an anti-collision box arranged on the periphery of the steel casing, and an inner support is arranged on the inner side of the cofferdam formed by the anti-collision box, and the lower end of each anti-collision box is fixed to the bottom plate.
2. A permanent and temporary cofferdam structure according to claim 1, characterized in that: The bottom plate adopts a truss keel.
3. The permanent and temporary cofferdam structure according to claim 1 is characterized in that: The inner support is made of steel pipe.
4. The permanent and temporary cofferdam structure according to claim 1 is characterized in that: The two ends of the inner support are respectively fixed to the anti-collision sleeve box by bolts.
5. A construction method for the permanent and temporary combined cofferdam structure according to claim 1, characterized in that: The steps include: S1. Connect the high steel casing, dismantle the existing drilling platform in the cofferdam range, weld and assemble the brackets, support brackets, circumferential distribution beams and distribution beams between casings on the casing, and assemble and install the bottom plate and bottom keel on the distribution beam; S2. Splice the anti-collision casing on site in sections, install the casing guide, weld and fix the bottom plate to the inner wall plate of the anti-collision casing, connect and fix the anti-collision casing to the bottom plate with diagonal braces, weld anti-sinking tie rods on the bottom plate, and install the inner support of the cofferdam; S3. Weld the hanger on the bottom plate, install the cofferdam lowering system, lift the cofferdam as a whole through the lowering system, and then remove the brackets and distribution beams on the casing; S4. Cut the casing below the inner support, lower the cofferdam to below the cross beam, and install the hanging cross beam; The cofferdam is lowered to the designed elevation through the lowering system, and the top of the boom is hung on the cross beam to complete the system conversion, and then the cofferdam lowering system is dismantled; S5. Install anti-floating corbels at the designed low tide level, install bottom plate plugging plates, and weld shear reinforcement on the casing; S6, pouring the first layer of bottom sealing concrete, pumping water from the cofferdam at low tide; welding the shear reinforcement to the steel casing; welding the anti-sinking corbels, and welding the anti-sinking corbels to the suspension rods, and then pouring the second layer of bottom sealing concrete; S7. Remove the hanger, cross beam, casing guide, cut off the casing and diagonal brace; then construct the foundation, and remove the internal support after the foundation reaches the designed strength.
6. The construction method of a permanent and temporary cofferdam structure according to claim 5, characterized in that: In step S4, the cofferdam is lowered to 1 m below the cross beam position.
7. The construction method of a permanent and temporary cofferdam structure according to claim 5, characterized in that: In step S5, the casing is fixed to the shear reinforcement by spot welding.
8. The construction method of a permanent and temporary cofferdam structure according to claim 5, characterized in that: In step S6, the shear steel bar is welded to the steel casing from the portion exposed above the bottom cover to the portion below the casing cutting line.
Citation Information
Cited By
Steel hanging box construction method
WO2026067876A1