Permanent and temporary integrated bearing structure suitable for ultra-shallow soil covering over-span structure and construction method of permanent and temporary integrated bearing structure
By designing the Yonglin integrated load-bearing structure and construction method under extremely shallow soil covering conditions, and using micro pipe jacking machines and prestressed tendons, the problem of being unable to use the pipe jacking method or shield tunneling method for construction and the structural deformation caused by soil unloading were solved. problems and achieve safe and reliable underground space development.
Patent Information
- Application Number
- CN202411011639.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-11
AI Technical Summary
Under extremely shallow soil covering conditions, there are difficulties in constructing underground structures that cannot be constructed using the pipe jacking method or shield tunneling method, as well as the risk of deformation of existing structures caused by unloading of soil caused by conventional open-cut construction, which limits the development and utilization of underground space.
A permanent-in-one load-bearing structure suitable for extremely shallow soil cover is designed, including the bottom, side load-bearing structure and node structure. The pipe jacking construction is carried out through a micro pipe jacking machine, combined with the use of prestressed tendons and anchors, to form a Solid concrete structure, and provides support during soil excavation and back construction to avoid structural deformation.
It achieves safe and reliable underground structure construction under extremely shallow soil covering conditions, avoids the risk of structural deformation caused by soil unloading, and improves the development and utilization rate of urban underground space.
Smart Images

Figure CN118756752A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of underground engineering, and in particular to a permanent and temporary bearing structure suitable for an extremely shallow soil-covered upper span structure and a construction method. Background Art
[0002] With the rapid development of urbanization in my country, central cities such as Beijing, Shanghai, and Guangzhou have begun to build multi-layer overlapping rail transit hubs. Most of these transportation hubs are located in medium-shallow underground spaces, and their dense underground structures pose great challenges to engineering construction. When the underground structure that crosses the existing structure has extremely shallow soil cover (when the soil cover depth is less than 0.6 times the tunnel width or 1 times the diameter of the shield machine, it is impossible to use the jacking method or shield method for dark excavation construction, which can be defined as extremely shallow soil cover), the jacking method or shield method cannot be used for dark excavation construction because the soil cover depth is too shallow; at the same time, if the open excavation method is used for construction, the existing structure will be greatly deformed due to the unloading of the soil, endangering the safety of the structure. The above factors make it difficult to construct underground structures in this part of the area, so that the underground space cannot be fully developed and utilized, resulting in a waste of land resources. Summary of the invention
[0003] In order to solve the above problems and improve the development and utilization rate of urban underground space, the present invention provides a permanent and temporary bearing structure and construction method suitable for extremely shallow soil-covered upper span structures. The bearing structure can be set in extremely shallow soil-covered areas where the upper span existing structures cannot be constructed by jacking pipe method or shield method, and at the same time, it plays a supporting role during the excavation of the underground structure soil and the backbuilding of the structure, avoiding the risk of large deformation of the existing structure below due to soil unloading in conventional open-cut construction.
[0004] The present invention is implemented by the following scheme: a permanent and temporary bearing structure suitable for extremely shallow soil-covered upper span structures, comprising a bottom bearing structure for being arranged on the bottom surface of the proposed underground structure, at least two side bearing structures for being arranged on the sides of the proposed underground structure, at least two node structures for being arranged at the intersection of the bottom bearing structure and the at least two side bearing structures, and a top plate structure for being cast in situ between the tops of all the side bearing structures, wherein:
[0005] The bottom bearing structure includes a plurality of first standard tubes extending in the longitudinal direction and arranged in the transverse direction, transverse prestressed tendons penetrating all the first standard tubes in the transverse direction, and a bottom concrete structure cast in the first standard tubes, between adjacent first standard tubes, and between the first standard tubes and the node structure so as to form the bottom bearing structure into a solid structure, and through holes are reserved on the first standard tubes for the transverse prestressed tendons to pass through;
[0006] The side bearing structure includes a plurality of second standard tubes extending longitudinally and arranged vertically, vertical prestressed tendons vertically penetrating all the second standard tubes, and a side concrete structure for pouring in the second standard tubes, between adjacent second standard tubes, and between the second standard tubes and the node structure so that the side bearing structure is formed into a solid structure, and through holes for the vertical prestressed tendons to pass through are reserved on the second standard tubes and the top plate structure;
[0007] The node structure includes a working tube extending longitudinally and node concrete for post-casting in the working tube to form the node structure into a solid structure. A tensioning operation space is formed inside the working tube, and a through hole is reserved on the working tube for the transverse prestressed tendons and the vertical prestressed tendons to pass through and connect to the tensioning operation space.
[0008] The further improvement of the permanent and temporary combined bearing structure applicable to the extremely shallow soil covering upper span structure of the present invention is that two adjacent first standard pipes and two adjacent second standard pipes are connected by locking buckles.
[0009] The further improvement of the permanent and temporary combined bearing structure applicable to the extremely shallow soil covering upper span structure of the present invention is that the lock buckle is filled with sealing grease.
[0010] The further improvement of the permanent and temporary combined bearing structure of the present invention applicable to the extremely shallow soil covering upper span structure is:
[0011] The first standard pipe and the second standard pipe are both formed by welding a plurality of standard pipe sections end to end, and the working pipe is formed by welding a plurality of working pipe sections end to end, and the number of the standard pipe sections of the first standard pipe, the standard pipe sections of the second standard pipe and the working pipe sections of the working pipe are the same and their positions correspond one to one;
[0012] A plurality of transverse prestressed tendons are arranged at intervals within the bottom bearing structure corresponding to the length of each standard pipe section, and a plurality of vertical prestressed tendons are arranged at intervals within the side bearing structure corresponding to the length of each standard pipe section.
[0013] The further improvement of the permanent and temporary combined bearing structure applicable to the extremely shallow soil covering upper span structure of the present invention is that: corrugated pipes are pre-buried in all the through holes.
[0014] The present invention also provides a construction method for constructing the above-mentioned permanent and temporary combined bearing structure suitable for the extremely shallow soil covering upper span structure, the construction method comprising the steps of:
[0015] Perform pipe jacking construction, use a micro-pipe jacking machine to jack the first standard pipe and the working pipe in sequence on the bottom surface of the proposed underground structure, and connect the two adjacent first standard pipes and the adjacent first standard pipes and the working pipes to each other, and jack the second standard pipe in sequence on the side of the proposed underground structure, and connect the adjacent second standard pipes and the adjacent second standard pipes and the working pipes to each other;
[0016] Casting a top plate structure on the second standard pipe at the top, and reserving a through hole on the top plate structure;
[0017] After the concrete strength of the top plate structure meets the design requirements, transverse prestressed tendons and vertical prestressed tendons are installed;
[0018] Casting of bottom concrete structure and side concrete structure;
[0019] After the concrete strength of the bottom concrete structure meets the design requirements, the transverse prestressed tendons are tensioned and anchors are installed; after the concrete strength of the side concrete structure meets the design requirements, the vertical prestressed tendons are tensioned and anchors are installed;
[0020] The transverse prestressed tendons and the vertical prestressed tendons are fixed and anchored.
[0021] A further improvement of the construction method of the present invention is that the first standard pipe and the second standard pipe are both formed by welding a plurality of standard pipe sections end to end, and the working pipe is formed by welding a plurality of working pipe sections end to end; when performing pipe jacking construction:
[0022] The first standard pipe section of the first standard pipe, the first standard pipe section of the second standard pipe and the first working pipe section of the working pipe are sequentially pushed in along the arrangement direction of the pipe fittings;
[0023] Then, the second section of the standard pipe section of the first standard pipe, the second section of the standard pipe section of the second standard pipe, and the second section of the working pipe section of the working pipe are sequentially pushed in along the pipe arrangement direction, and before pushing in, they are welded and fixed to the first section of the standard pipe section of the first standard pipe, the first section of the standard pipe section of the second standard pipe, and the first section of the working pipe section in a one-to-one correspondence;
[0024] And so on, until all standard pipe sections and working pipe sections have been pushed in.
[0025] A further improvement of the construction method of the present invention is that: before installing the transverse prestressed tendons and the vertical prestressed tendons, corrugated pipes are pre-buried in all the through holes; when fixing the transverse prestressed tendons and the vertical prestressed tendons, cement slurry is injected between each of the corrugated pipes and the transverse prestressed tendons passed through or between the vertical prestressed tendons passed through for fixing; after the strength of the cement slurry meets the design requirements, node concrete is poured into the tensioning operation space of the working pipe, and concrete is poured on the top surface of the top plate structure to achieve anchor sealing.
[0026] A further improvement of the construction method of the present invention is that when excavating the soil of the underground structure and reconstructing the structure, the permanent and temporary combined bearing structure is used for support, and heavy objects are piled on the top plate structure to prevent the existing structure from floating up.
[0027] The present invention adopts a micro-pipe segment jacking construction method to form a permanent and temporary integrated transverse bearing structure, which solves the problem of constructing underground structures in extremely shallow soil conditions that cross existing structures and cannot be constructed by jacking or shield methods. At the same time, it avoids the risk of large deformation of the existing structure below due to soil unloading in conventional open-cut construction. It is safe, reliable, and environmentally friendly, and can significantly improve the development and utilization rate of urban underground space. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 A schematic diagram of the elevation structure of the permanent and temporary integrated bearing structure of the present invention is shown.
[0029] In the figure: 1. existing structure; 2. overburden; 3. bottom bearing structure; 31. first standard pipe; 32. transverse prestressed tendons; 33. bottom concrete structure; 4. side bearing structure; 41. second standard pipe; 42. vertical prestressed tendons; 43. side concrete structure; 5. node structure; 51. working pipe; 52. tensioning operation space; 53. first poured concrete; 6. top plate structure; 7. lock; 8. anchor; 91. soil; 92. internal structure. DETAILED DESCRIPTION
[0030] In order to solve the construction problem of underground structures in extremely shallow soil conditions that span over existing structures and cannot be constructed using the jacking method or shield method, the present invention provides a permanent and temporary bearing structure and construction method suitable for extremely shallow soil-covered span structures. The permanent and temporary bearing structure and construction method suitable for extremely shallow soil-covered span structures are further described below with specific embodiments combined with the accompanying drawings.
[0031] See also Figure 1As shown, a permanent and temporary combined bearing structure suitable for extremely shallow soil-covered overspan structures is mainly arranged in the soil cover layer 2 and over the existing structure 1. The permanent and temporary combined bearing structure includes a bottom bearing structure 3 for being arranged on the bottom surface of the proposed underground structure, at least two side bearing structures 4 for being arranged on the sides of the proposed underground structure, at least two node structures 5 for being arranged at the intersection of the bottom bearing structure 3 and the at least two side bearing structures 4, and a top plate structure 6 for being cast in situ between the tops of all the side bearing structures 4, wherein: the bottom bearing structure 3 includes The side bearing structure 4 includes a plurality of first standard tubes 31 extending in the longitudinal direction and arranged in the transverse direction, transverse prestressed tendons 32 penetrating all the first standard tubes 31 in the transverse direction, and a bottom concrete structure 33 cast in the first standard tubes 31, between adjacent first standard tubes 31, and between the first standard tubes 31 and the node structure 5 so that the bottom bearing structure 3 is formed into a solid structure. The first standard tubes 31 are provided with through holes for the transverse prestressed tendons 32 to penetrate. The side bearing structure 4 includes a plurality of second standard tubes 41 extending in the longitudinal direction and arranged in the vertical direction, and a plurality of second standard tubes 41 extending in the longitudinal direction and arranged in the vertical direction. The vertical prestressed tendons 42 vertically penetrate all the second standard tubes 41, and the side concrete structure 43 is used to be cast in the second standard tubes 41, between the adjacent second standard tubes 41, and between the second standard tubes 41 and the node structure 5 so that the side bearing structure 4 is formed into a solid structure. The second standard tubes are provided with through holes for the vertical prestressed tendons 42 to penetrate, and the top plate structure 6 is provided with through holes for the top ends of the vertical prestressed tendons 42 to pass through. The node structure 5 includes a working tube 51 extending in the longitudinal direction and a side concrete structure 43 for post-casting in the working tube 51. The node structure 5 is formed into a node concrete of a solid structure in the tube 51. Specifically, the working tube 51 is a special-shaped tube, and its outer periphery corresponds to the adjacent first standard tube 31 and the second standard tube 41. A partition is provided in the working tube 51, and the partition divides the node concrete into the first poured concrete 53 located outside the partition and the post-poured concrete located in the tensioning operation space 52. Through holes are opened on the working tube 51 and the partition to allow the bottom ends of the transverse prestressed tendons 32 and the vertical prestressed tendons 42 to be inserted into the tensioning operation space 52 respectively.
[0032] In this embodiment, the number of the node structures 5 is three, and they are respectively located at the two ends and the middle of the bottom bearing structure 3. The number of the side bearing structures 4 is three, and they are respectively connected between the top plate structure 6 and the three node structures 5. The number of the node structures 5 and the side bearing structures 4 is not limited to three. According to the actual needs, they can also be set to four or even more than four, but at least two are guaranteed to be located at the two ends of the bottom bearing structure 3. The two adjacent first standard tubes 31 and the two adjacent second standard tubes 41 are connected by lock buckles 7. Preferably, the lock buckles 7 are filled with sealing grease.
[0033] As a preferred embodiment: the first standard tube 31 and the second standard tube 41 are both formed by welding a number of standard tube sections end to end, and the working tube 51 is formed by welding a number of working tube sections end to end. The number of standard tube sections of the first standard tube 31, the standard tube sections of the second standard tube 41 and the working tube sections of the working tube 51 are the same and their positions correspond one to one. Preferably, a number of transverse prestressed tendons 32 are intermittently provided in the bottom bearing structure 3 corresponding to the length of each standard tube section, and a number of vertical prestressed tendons 42 are intermittently provided in the side bearing structure 4 corresponding to the length of each standard tube section. Of course, the number and arrangement positions of the transverse prestressed tendons 32 and the vertical prestressed tendons 42 can be flexibly adjusted according to actual needs, but it is necessary to reserve through holes for the prestressed tendons to pass through before installing the prestressed tendons.
[0034] A construction method, see Figure 1 As shown, the construction method for constructing the permanent and temporary combined bearing structure suitable for the extremely shallow soil covering upper span structure as described above includes the following steps:
[0035] Step 1: Perform jacking construction of pipe fittings (including the first standard pipe 31, the second standard pipe 41 and the working pipe 51). Use a micro-pipe jacking machine to jack the first standard pipe 31 and the working pipe 51 in sequence on the bottom surface of the proposed underground structure, and connect the two adjacent first standard pipes 31 and the adjacent first standard pipes 31 and the working pipe 51 to each other. Push the second standard pipe 41 in sequence on the side of the proposed underground structure, and connect the two adjacent second standard pipes 41 and the adjacent second standard pipe 41 and the working pipe 51 to each other. It should be noted that sequential jacking is the first principle, and the first standard pipe 31, the second standard pipe 41 and the working pipe 51 can be jacked in sequence, such as Figure 1 As shown, the three working pipes 51 are respectively located at the two ends and the middle of the bottom bearing structure 3, so when jacking, they can be jacked one by one from the leftmost working pipe to the right until the rightmost working pipe is jacked. During this period, after jacking a working pipe, the corresponding second standard pipes can be jacked one by one next to the working pipe in a bottom-up order until the top three second standard pipes are jacked.
[0036] Considering the actual situation, if the length of the pipe is long, it may be set as a segmented splicing structure. That is to say, the first standard pipe 31 and the second standard pipe 41 are both formed by welding several standard pipe sections end to end, and the working pipe 51 is formed by welding several working pipe sections end to end. Then, when performing pipe jacking construction: the pipe jacking can be performed in a manner of first jacking in sequence and then jacking in sections, that is, the first section of the standard pipe section of the first standard pipe 31, the first section of the standard pipe section of the second standard pipe 41 and the first section of the working pipe section of the working pipe 51 are jacked in sequence along the arrangement direction of the pipes; then the second section of the standard pipe section of the first standard pipe 31, the second section of the standard pipe section of the second standard pipe 41 and the second section of the working pipe section of the working pipe 51 are jacked in sequence along the arrangement direction of the pipes, and before jacking, they are welded and fixed to the first section of the standard pipe section of the first standard pipe 31, the first section of the standard pipe section of the second standard pipe 41 and the first section of the working pipe section of the working pipe 51 one by one; and so on, until all standard pipe sections and working pipe sections are jacked. It is also possible to push the pipe fittings in a way of pushing in sections first and then pushing in sequence, that is, when pushing in the first standard pipe 31, first push in the first section of the standard pipe section, then push in the second section of the standard pipe section, and weld and fix the second section of the standard pipe section with the first section of the standard pipe section before pushing in, and so on, until the first standard pipe 31 is completely pushed in. The pushing method of the second standard pipe 41 and the working pipe 51 is the same as that of the first standard pipe 31, except that the pipe fittings are pushed in the order of arrangement. It should be noted that no matter which pushing method is used, before pushing in the adjacent next pipe fitting (or pipe section), the next pipe fitting should be locked and connected with the adjacent previous pipe fitting (or pipe section), and when pushing in the next pipe fitting (or pipe section), it can be pushed in by sliding along the lock buckle. When the next pipe fitting (or pipe section) is pushed in, the connection between the front and rear pipe fittings (or pipe sections) is completed at the same time. When performing the lock buckle connection, it is necessary to fill the lock buckle gap with sealing grease.
[0037] Step 2: Cast a top plate structure 6 on the second standard tube 41 at the top, and reserve a through hole on the top plate structure 6.
[0038] Step 3: After the concrete strength of the top plate structure 6 meets the design requirements, install the transverse prestressed tendons 32 and the vertical prestressed tendons 52.
[0039] Step 4: Cast the bottom concrete structure 33 and the side concrete structure 43. Specifically, the bottom concrete structure 33 includes a portion cast inside the first standard pipe 31, a portion cast inside the joint of adjacent first standard pipes 31, and a portion cast between the first standard pipe 31 and the working pipe tensioning operation space 52. Correspondingly, the side concrete structure 43 also includes three portions: inside the second standard pipe 41, inside the joint of the second standard pipe 41, and between the second standard pipe 41 and the working pipe tensioning operation space 52.
[0040] Step 5: After the concrete strength of the bottom concrete structure 33 meets the design requirements, the transverse prestressed tendons 32 are tensioned and the anchor 8 is installed. After the concrete strength of the side concrete structure 43 meets the design requirements, the vertical prestressed tendons 42 are tensioned and the anchor 8 is installed. For the vertical prestressed tendons 42, prestressing can be performed above the top plate structure 6 and in the corresponding tensioning operation space. For the transverse prestressed tendons 32, prestressing can be performed in the corresponding tensioning operation space.
[0041] Step 6, fix the transverse prestressed tendons 32 and the vertical prestressed tendons 42 and perform anchor sealing treatment. Specifically, before installing the transverse prestressed tendons 32 and the vertical prestressed tendons 52, a corrugated tube is set in all the through holes. When fixing the transverse prestressed tendons 32 and the vertical prestressed tendons 42, cement slurry is injected between each corrugated tube and the transverse prestressed tendons or the vertical prestressed tendons 42 passing through to fix the prestressed tendons. After the strength of the cement slurry meets the design requirements, pour post-cast concrete into the tensioning operation space 52 of the working tube 51 so that the poured concrete covers the anchor 8 located in the tensioning operation space 52. At the same time, pour concrete on the top surface of the top plate structure 6 so that the poured concrete covers the anchor 8 located above the top plate structure 6, and the anchor sealing treatment is completed.
[0042] As a preferred embodiment: when excavating the soil of the underground structure (i.e., excavating the soil 91 in the area enclosed by the top plate structure 6, the bottom bearing structure 3 and the side bearing structure 4) and reconstructing the structure (i.e., reconstructing the internal structure 92), the permanent and temporary combined bearing structure is used for support, and heavy objects are piled on the top plate structure 6 to prevent the existing structure 1 from floating up.
[0043] The present invention adopts a micro-pipe segment jacking construction method to form a permanent and temporary integrated transverse bearing structure, which solves the problem of constructing underground structures in extremely shallow soil conditions that cross existing structures and cannot be constructed by jacking or shield methods. At the same time, it avoids the risk of large deformation of the existing structure below due to soil unloading in conventional open-cut construction. It is safe, reliable, and environmentally friendly, and can significantly improve the development and utilization rate of urban underground space.
[0044] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A permanent and temporary bearing structure suitable for extremely shallow soil-covered upper span structures, characterized in that: The invention comprises a bottom bearing structure for being arranged on the bottom surface of the proposed underground structure, at least two side bearing structures for being arranged on the sides of the proposed underground structure, at least two node structures for being arranged at the intersection of the bottom bearing structure and the at least two side bearing structures, and a top plate structure for being cast in situ between the tops of all the side bearing structures, wherein: The bottom bearing structure includes a plurality of first standard tubes extending in the longitudinal direction and arranged in the transverse direction, transverse prestressed tendons penetrating all the first standard tubes in the transverse direction, and a bottom concrete structure cast in the first standard tubes, between adjacent first standard tubes, and between the first standard tubes and the node structure so as to form the bottom bearing structure into a solid structure, and through holes are reserved on the first standard tubes for the transverse prestressed tendons to pass through; The side bearing structure includes a plurality of second standard tubes extending longitudinally and arranged vertically, vertical prestressed tendons vertically penetrating all the second standard tubes, and a side concrete structure for pouring in the second standard tubes, between adjacent second standard tubes, and between the second standard tubes and the node structure so that the side bearing structure is formed into a solid structure, and through holes for the vertical prestressed tendons to pass through are reserved on the second standard tubes and the top plate structure; The node structure includes a working tube extending longitudinally and node concrete for post-casting in the working tube to form the node structure into a solid structure. A tensioning operation space is formed inside the working tube, and a through hole is reserved on the working tube for the transverse prestressed tendons and the vertical prestressed tendons to pass through and connect to the tensioning operation space.
2. The permanent and temporary bearing structure suitable for extremely shallow soil covering upper span structure as claimed in claim 1, characterized in that: Two adjacent first standard tubes and two adjacent second standard tubes are connected by a lock.
3. The permanent and temporary bearing structure suitable for extremely shallow soil-covered upper span structure as claimed in claim 2, characterized in that: The lock buckle is filled with sealing grease.
4. The permanent and temporary bearing structure suitable for extremely shallow soil-covered upper span structure according to claim 1, characterized in that: The first standard pipe and the second standard pipe are both formed by welding a plurality of standard pipe sections end to end, and the working pipe is formed by welding a plurality of working pipe sections end to end, and the number of the standard pipe sections of the first standard pipe, the standard pipe sections of the second standard pipe and the working pipe sections of the working pipe are the same and their positions correspond one to one; A plurality of transverse prestressed tendons are arranged at intervals within the bottom bearing structure corresponding to the length of each standard pipe section, and a plurality of vertical prestressed tendons are arranged at intervals within the side bearing structure corresponding to the length of each standard pipe section.
5. The permanent and temporary bearing structure applicable to the extremely shallow soil-covered upper span structure as claimed in claim 1, characterized in that: Bellows are pre-buried in all the through holes.
6. A construction method, characterized in that: Used for constructing the permanent and temporary combined bearing structure applicable to the extremely shallow soil covering upper span structure as claimed in claim 1, the construction method comprises the steps of: Perform pipe jacking construction, use a micro-pipe jacking machine to jack the first standard pipe and the working pipe in sequence on the bottom surface of the proposed underground structure, and connect two adjacent first standard pipes and adjacent first standard pipes and working pipes to each other, and jack the second standard pipe in sequence on the side surface of the proposed underground structure, and connect two adjacent second standard pipes and adjacent second standard pipes and working pipes to each other; Casting a top plate structure on the second standard pipe at the top, and reserving a through hole on the top plate structure; After the concrete strength of the top plate structure meets the design requirements, transverse prestressed tendons and vertical prestressed tendons are installed; Casting of bottom concrete structure and side concrete structure; After the concrete strength of the bottom concrete structure meets the design requirements, the transverse prestressed tendons are tensioned and anchors are installed; after the concrete strength of the side concrete structure meets the design requirements, the vertical prestressed tendons are tensioned and anchors are installed; The transverse prestressed tendons and the vertical prestressed tendons are fixed and anchored.
7. The construction method according to claim 6, characterized in that: The first standard pipe and the second standard pipe are both formed by welding a number of standard pipe sections end to end, and the working pipe is formed by welding a number of working pipe sections end to end; when performing pipe jacking construction: The first standard pipe section of the first standard pipe, the first standard pipe section of the second standard pipe and the first working pipe section of the working pipe are sequentially pushed in along the arrangement direction of the pipe fittings; Then, the second section of the standard pipe section of the first standard pipe, the second section of the standard pipe section of the second standard pipe, and the second section of the working pipe section of the working pipe are sequentially pushed in along the pipe arrangement direction, and before pushing in, they are welded and fixed to the first section of the standard pipe section of the first standard pipe, the first section of the standard pipe section of the second standard pipe, and the first section of the working pipe section in a one-to-one correspondence; And so on, until all standard pipe sections and working pipe sections have been pushed in.
8. The construction method according to claim 6, characterized in that: Before installing the transverse prestressed tendons and the vertical prestressed tendons, corrugated pipes are pre-buried in all the through holes; when fixing the transverse prestressed tendons and the vertical prestressed tendons, cement slurry is injected between each corrugated pipe and the transverse prestressed tendons or between each corrugated pipe and the vertical prestressed tendons for fixing; after the strength of the cement slurry meets the design requirements, node concrete is poured into the tensioning operation space of the working pipe, and concrete is poured on the top surface of the top plate structure to achieve anchor sealing.
9. The construction method according to claim 6, characterized in that: When excavating the soil of the underground structure and reconstructing the structure, the permanent and temporary combined bearing structure is used for support, and heavy objects are piled on the top plate structure to prevent the existing structure from floating up.