An oil and gas pipeline optical fiber early warning system and its deployment method

Through the three-layer management architecture of the oil and gas pipeline fiber early warning system, the closed-loop management of fiber early warning business and enterprise unified system is realized, solving the problems of data silos and system complexity in the existing technology, and improving management efficiency and accuracy.

CN118757683BActive Publication Date: 2024-12-03SUPCON TECH CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411237180.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-03
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

The existing fiber optical early warning system of oil and gas pipelines cannot realize the closed-loop management of the entire fiber early warning business and the enterprise unified system, resulting in the problems of data islands, complex systems, and duplication and messy functions.

Method used

Adopt a three-layer management architecture, including the station valve chamber layer, regional monitoring layer and enterprise management layer. The station valve chamber layer collects optical fiber vibration signals and uploads them to the regional monitoring layer. The regional monitoring layer processes and optimizes alarm information and transmits them to enterprise management. Level, the enterprise management layer cooperates to respond and analyze and process in real time through the unified construction system to achieve closed-loop management.

Benefits of technology

The linkage between the optical fiber warning system of oil and gas pipelines and the unified construction system has been realized, the closed-loop management of optical fiber warning business has been completed, the data silos and system complexity problems have been solved, and management efficiency and accuracy have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757683B_ABST
    Figure CN118757683B_ABST
Patent Text Reader

Abstract

The present invention relates to an optical fiber early warning system for oil and gas pipelines and a deployment method thereof, and belongs to the field of pipeline detection technology. The optical fiber early warning system is configured as a three-layer management architecture, which includes: a station valve room layer, which is deployed along the oil and gas pipeline and is used to collect optical fiber vibration signals. A regional monitoring layer, which is connected to the station valve room layer, is used to integrate and summarize the optical fiber vibration data of each station valve room layer, and processes the data information through a set algorithm to generate graphical information and alarm information; it is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management layer. The enterprise management layer is connected to the regional monitoring layer, which is used to receive the optimized alarm information, and through a preset integrated system collaboration, it performs closed-loop management including real-time response to the alarm information, analysis and processing, and transmitting the generated processing results and feedback information back to the corresponding level. The present invention enables the optical fiber early warning system to link with the unified construction system to complete the closed-loop management of the early warning business.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pipeline monitoring, and in particular to an optical fiber early warning system for oil and gas pipelines and a deployment method thereof. Background Art

[0002] As the construction of oil and gas pipelines accelerates, the external environment of oil and gas pipeline construction is becoming increasingly complex, resulting in a huge challenge to avoid various safety hazards of oil and gas pipelines. At present, some oil and gas pipelines have problems such as long operation time and remote construction areas, as well as human factors such as manual excavation and third-party construction that damage oil and gas pipelines, making it difficult to safely manage oil and gas pipelines, which in turn creates many unsafe factors for national energy security and stable energy supply. Therefore, timely detection of oil and gas pipeline operation risks and guidance and supervision of oil and gas pipeline safe operation are important components of pipeline safety management.

[0003] At present, although the use of optical fiber vibration principle for pipeline threat event warning has existed for many years, the traditional optical fiber warning system architecture mainly realizes the optical fiber warning management of specific pipelines, and the optical fiber warning equipment is set up at a pipeline station, and then connected to the optical fiber warning management system to realize the warning management of this section of pipeline. At the same time, when different pipelines are equipped with optical fiber warning equipment from different manufacturers, it is necessary to connect to multiple sets of optical fiber warning management systems to complete the warning management of different pipelines, which leads to the entire optical fiber warning system facing problems such as data islands, complex systems, and repeated and messy functions.

[0004] Therefore, there is an urgent need for a management architecture solution for the oil and gas pipeline optical fiber early warning business based on the overall management level of the enterprise. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides an oil and gas pipeline optical fiber early warning system and a deployment method thereof, which solves the technical problem that the oil and gas pipeline optical fiber early warning system cannot achieve closed-loop management of the entire optical fiber early warning business and other integrated systems of the enterprise's integrated system under the current architecture.

[0007] (II) Technical solution

[0008] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0009] In a first aspect, an embodiment of the present invention provides an oil and gas pipeline optical fiber early warning system, wherein the oil and gas pipeline optical fiber early warning system is configured as a three-layer management architecture, and the three-layer management architecture includes:

[0010] The station valve room layer is deployed along the oil and gas pipeline to collect optical fiber vibration signals, convert them into three-dimensional arrays through data analysis, and save and upload the data information to the regional monitoring layer;

[0011] The regional monitoring layer is connected to the station valve room layer, and is used to integrate and summarize the optical fiber vibration data of each station valve room layer in the region, process the received data information through the set algorithm model, and generate graphical information and alarm information for users to obtain or manage; and it is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management level;

[0012] The enterprise management layer is connected to the regional monitoring layer to receive optimized alarm information transmitted by the regional monitoring layer, and collaborates through a preset integrated system to perform closed-loop management that includes real-time response to alarm information, analysis and processing, and transmission of generated processing results and feedback information back to the corresponding level.

[0013] Optionally, the station valve room layer is configured with: optical fiber early warning equipment and edge computing unit equipment;

[0014] The optical fiber early warning device is deployed on the oil and gas pipeline through dual channels. The optical fiber early warning device is used to collect optical fiber vibration signals of the optical fiber on the oil and gas pipeline and convert them into a three-dimensional array for analysis and processing;

[0015] The edge computing unit device pre-processes the three-dimensional array, including data analysis, intensity normalization processing, and threat event pre-identification, and uploads the obtained intensity normalization processing file and threat event pre-identification information to the regional monitoring layer.

[0016] Optionally, the regional monitoring layer is configured with: a network management server and a hyper-converged integrated machine;

[0017] The network management server is used to manage the optical fiber early warning equipment and train the preset algorithm model, as well as obtain the optical pile calibration information of the optical fiber laid on the oil and gas pipeline;

[0018] The hyper-converged all-in-one machine is connected to the network management server. The hyper-converged all-in-one machine is used to process the optical pile calibration information, the intensity normalization data file and the threat event pre-identification information through the algorithm model trained by the model, and generate graphical information and alarm information; and is also used to filter and optimize the alarm information through the set alarm suppression rules and the algorithm model trained by the model, and upload the optimized alarm information to the enterprise management level;

[0019] The alarm suppression rules include:

[0020] According to the alarm level of the alarm information, the low-level alarm information is suppressed. The alarm levels are from high to low, including urgent, important, general and low;

[0021] For repeated alarm information, multiple identical alarm information are suppressed into one alarm information;

[0022] For multiple alarm information generated by the same optical fiber vibration signal, the multiple alarm information are aggregated to generate alarm information containing all alarm features.

[0023] Optionally, the algorithm model includes: a waterfall chart core algorithm, an image processing algorithm, and a first enhancement algorithm;

[0024] The waterfall chart core algorithm processes the intensity normalized data file, threat event pre-identification information, and light pile calibration information to generate a dynamic de-slashed data file and original threat event information;

[0025] The image processing algorithm processes the intensity normalized data file and the dynamic deslanted data file to generate the original waterfall chart and the optimized waterfall chart;

[0026] The first enhancement algorithm performs data processing of alarm deduplication on the original threat event to generate a threat event result.

[0027] Optionally, the enterprise management level is configured with: optical fiber early warning management system and unified construction system;

[0028] The optical fiber early warning management system is used to integrate and summarize the optimized alarm information of each regional monitoring layer and obtain the relevant data of the oil and gas pipeline;

[0029] The unified construction system is connected to the optical fiber early warning management system, and is used to process the aggregated optimized alarm information and related data by setting a second enhancement algorithm to generate final threat event alarm information; and is also used to analyze and process other integrated systems of the unified construction system in combination with the final threat event alarm information, and transmit the generated processing results and feedback information back to the corresponding level to complete the closed-loop management of the optical fiber early warning service;

[0030] Among them, the associated data of oil and gas pipelines include: pipeline ontology data, social and cultural data, pipeline environment data and video surveillance data.

[0031] Optionally, the second enhancement algorithm performs data processing including known event deletion and fixed point deletion on the optimized alarm information, pipeline ontology data, social and cultural data, pipeline environment data and video surveillance data to generate final threat event alarm information for real-time response alarm.

[0032] Optionally, the regional monitoring layer and the enterprise management layer are also configured with: a firewall and a web client;

[0033] Firewalls include regional firewalls and cloud boundary firewalls. Regional firewalls are deployed at the regional monitoring layer, and cloud boundary firewalls are deployed at the enterprise management layer.

[0034] In a second aspect, an embodiment of the present invention provides a method for deploying an oil and gas pipeline optical fiber early warning system. The method is deployed based on the three-layer management architecture of the oil and gas pipeline optical fiber early warning system described above. The method includes:

[0035] The three-layer management architecture is used to deploy the oil and gas pipeline optical fiber early warning system in layers, so as to perform closed-loop management of the oil and gas pipeline optical fiber early warning system at the corresponding management architecture layer;

[0036] The algorithm model deployment set for the three-layer management architecture is used to process the data obtained from each management architecture layer by matching the corresponding algorithm model to generate target data.

[0037] Optionally, the oil and gas pipeline optical fiber early warning system is hierarchically deployed using a three-layer management architecture to perform closed-loop management of the oil and gas pipeline optical fiber early warning system at a corresponding management architecture layer, including:

[0038] Optical fiber early warning equipment and edge computing unit equipment are deployed at the station valve room layer. The optical fiber early warning equipment is used to collect optical fiber vibration signals, and the edge computing unit equipment converts the optical fiber vibration signals into a three-dimensional array through data analysis, and saves and uploads the data information to the regional monitoring layer.

[0039] Deploy a network management server and a hyper-converged all-in-one machine at the regional monitoring layer. The network management server is used to integrate and summarize the optical fiber vibration data of the valve room layer of each station in the region. The hyper-converged all-in-one machine processes the received data information through a set algorithm model to generate graphical information and alarm information for users to obtain or manage. In addition, the hyper-converged all-in-one machine is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management level.

[0040] The fiber optic prediction management system and the integrated construction system are deployed at the enterprise management level. The fiber optic prediction management system is used to receive the optimized alarm information transmitted by the regional monitoring layer, and collaborate with other integrated systems of the integrated construction system to perform closed-loop management including real-time response to alarm information, analysis and processing, and transmission of the generated processing results and feedback information back to the corresponding level.

[0041] Optionally, an algorithm model is deployed for setting the three-layer management architecture to process the data obtained from each management architecture layer by matching the corresponding algorithm model to generate target data including:

[0042] The waterfall chart core algorithm, image processing algorithm and first enhancement algorithm are deployed in the regional monitoring layer. The data information received from the station valve room layer is processed by matching the corresponding algorithm model to generate graphical information and alarm information.

[0043] A second enhancement algorithm is deployed at the enterprise management layer, and the optimized alarm information received from the regional monitoring layer and the associated data of the oil and gas pipeline obtained are processed by the second enhancement algorithm to generate final threat event alarm information for real-time response alarm;

[0044] Among them, the associated data of oil and gas pipelines include: pipeline ontology data, social and cultural data, pipeline environment data and video surveillance data.

[0045] (III) Beneficial effects

[0046] The beneficial effects of the present invention are as follows: the fiber optic early warning system for oil and gas pipelines proposed by the present invention adopts a three-layer management architecture including a station valve room layer, a regional monitoring layer, and an enterprise management layer, wherein the station valve room layer is used to collect fiber optic vibration signals; the regional monitoring layer is used to manage the fiber optic early warning equipment in the same area and convert the fiber optic vibration signals into graphical information and optimized alarm information; the enterprise management layer is used to perform closed-loop management including real-time response to alarm information, analysis and processing, and transmission of the generated processing results and feedback information back to the corresponding level through the collaboration of the unified system after receiving the optimized alarm information from the regional monitoring layer. Compared with the prior art, the present invention enables the entire fiber optic early warning system to work in conjunction with other integrated systems of the unified system to complete the closed-loop management of the fiber optic early warning business. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 An overall architecture diagram of an oil and gas pipeline optical fiber early warning system provided by one embodiment of the present invention;

[0048] Figure 2 A hardware architecture deployment diagram of an oil and gas pipeline optical fiber early warning system provided by an embodiment of the present invention;

[0049] Figure 3 An algorithm model deployment diagram of an oil and gas pipeline optical fiber early warning system provided by an embodiment of the present invention;

[0050] Figure 4 A schematic flow chart of a method for deploying an oil and gas pipeline optical fiber early warning system provided by one embodiment of the present invention. DETAILED DESCRIPTION

[0051] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0052] Prior to this, in order to facilitate understanding of the technical solution provided by the present invention, some concepts are first introduced below.

[0053] Fiber optic early warning: refers to the use of optical fiber vibration signals laid along the pipeline to provide early warning of possible events that threaten the safety of pipeline operation.

[0054] Fiber optic early warning system: refers to a software system that uses algorithms and software to convert fiber optic vibration signals into classified and graded alarm information, clearly identify the event, time and location of the threat, and issue an audible and visual alarm at the terminal.

[0055] Unified system: refers to the information system uniformly built by the oil and gas pipeline management company, which is used to manage related business units.

[0056] like Figure 1-3 As shown, an optical fiber early warning system for oil and gas pipelines proposed in an embodiment of the present invention is configured as a three-layer management architecture, which includes: a station valve room layer, which is deployed along the oil and gas pipeline, and is used to collect optical fiber vibration signals, convert the optical fiber vibration signals into a three-dimensional array through data analysis, and save and upload the data information to the regional monitoring layer; the regional monitoring layer, which is connected to the station valve room layer, is used to integrate and summarize the optical fiber vibration data of each station valve room layer in the region, and processes the received data information through a set algorithm model to generate graphical information and alarm information for users to obtain or manage; and is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management layer; the enterprise management layer is connected to the regional monitoring layer, and is used to receive the optimized alarm information transmitted by the regional monitoring layer, and through a preset integrated system collaboration, performs closed-loop management including real-time response to alarm information, analysis and processing, and transmitting the generated processing results and feedback information back to the corresponding level.

[0057] The fiber optic early warning system for oil and gas pipelines proposed in the present invention adopts a three-layer management architecture including a station valve room layer, a regional monitoring layer, and an enterprise management layer, wherein the station valve room layer is used to collect fiber optic vibration signals; the regional monitoring layer is used to manage the fiber optic early warning equipment in the same area and convert the fiber optic vibration signals into graphical information and optimized alarm information; the enterprise management layer is used to perform closed-loop management including real-time response to alarm information, analysis and processing, and transmission of the generated processing results and feedback information back to the corresponding level through the collaboration of the unified system after receiving the optimized alarm information from the regional monitoring layer. Compared with the prior art, the present invention enables the entire fiber optic early warning system to work in conjunction with other integrated systems of the unified system to complete the closed-loop management of the fiber optic early warning business.

[0058] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0059] First, the station valve room layer is equipped with: fiber optic early warning equipment and edge computing unit equipment. The fiber optic early warning equipment is deployed on the oil and gas pipeline through dual channels. The fiber optic early warning equipment is used to collect the fiber optic vibration signal of the optical fiber on the oil and gas pipeline and convert it into a three-dimensional array for analysis and processing; the edge computing unit equipment pre-processes the three-dimensional array, including data analysis, intensity normalization processing and threat event pre-identification, and uploads the obtained intensity normalization processing file and threat event pre-identification information to the regional monitoring layer. Among them, the threat event pre-identification information includes: the fiber optic mileage corresponding to the alarm, the alarm duration and the alarm level.

[0060] In a specific embodiment, the station valve room layer is composed of several sites, and each station is deployed with optical fiber warning equipment, edge computing unit equipment and switches. The optical fiber warning equipment uses optical fiber warning equipment that can collect optical fiber vibration signals within a range of 50km, and the edge computing unit equipment uses an edge computing host computer that integrates functions such as data analysis, intensity normalization processing and threat event pre-identification. In the station valve room layer, a site is deployed every 100km between oil and gas pipelines, and the optical fiber warning equipment of each site collects optical fiber vibration signals within 50km on both sides of the site. The edge computing host computer of the site performs data preprocessing on the optical fiber vibration signal transmitted from the optical fiber warning device, including data analysis, intensity normalization processing and threat event pre-identification, and after completing the data preprocessing, the data files such as the intensity normalization processing file and the threat event pre-identification information are transmitted to the regional monitoring layer through the switch to complete the unified monitoring and management of the optical fiber warning business of all sites in the area.

[0061] Secondly, the regional monitoring layer is configured with: network management server and hyper-converged all-in-one machine. The network management server is used to manage the optical fiber early warning equipment and train the preset algorithm model, as well as obtain the optical pile calibration information of the optical fiber laid on the oil and gas pipeline; the hyper-converged all-in-one machine is connected to the network management server, and the hyper-converged all-in-one machine is used to process the optical pile calibration information, intensity normalization data files and threat event pre-identification information through the algorithm model trained by the model, and generate graphical information and alarm information; and it is also used to filter and optimize the alarm information through the set alarm suppression rules and the algorithm model trained by the model, and upload the optimized alarm information to the enterprise management level.

[0062] Furthermore, the alarm suppression rules include: suppressing low-level alarm information according to the alarm level to which the alarm information belongs, and the alarm levels include urgent, important, general and low from high to low; for repeated alarm information, suppressing multiple identical alarm information into one alarm information; for multiple alarm information generated by the same optical fiber vibration signal, aggregating multiple alarm information to generate alarm information containing all alarm features.

[0063] Furthermore, the algorithm model includes: a waterfall chart core algorithm, an image processing algorithm and a first enhancement algorithm; the waterfall chart core algorithm processes the intensity normalized data file, threat event pre-identification information and light pile calibration information to generate a dynamic de-slanted data file and original threat event information; the image processing algorithm processes the intensity normalized data file and the dynamic de-slanted data file to generate an original waterfall chart and an optimized waterfall chart; the first enhancement algorithm performs alarm deduplication data processing on the original threat event to generate a threat event result.

[0064] In a specific embodiment, the regional monitoring layer adopts a two-layer management system. The first-layer management system is mainly responsible for downward integration and aggregation of the optical fiber vibration data of each site managed by the regional monitoring layer. At the same time, the optical fiber vibration data is processed according to the matching algorithm model to generate waterfall chart information and alarm information for users to obtain or manage. The second-layer management system will filter and optimize the alarm information and other data processing to generate more accurate optimized alarm information, and upload the optimized alarm information to the enterprise management level for enterprise-level business management. The regional monitoring layer adopts a two-layer management mode for the optical fiber vibration data obtained from each site, and performs two data processing on the obtained data. The first data processing obtains waterfall chart information and alarm information, which can realize the user's acquisition of various information and monitoring and management of optical fiber warnings in the area; the optimized alarm information obtained by the second data processing is uploaded to a higher-level management system, and is uniformly managed with the optimized alarm information of other regional monitoring layers, and finally realizes the linkage management of the entire optical fiber warning system and the integrated system.

[0065] Finally, the enterprise management level is configured with: a fiber optic early warning management system and a unified construction system. The fiber optic early warning management system is used to integrate and summarize the optimized alarm information of each regional monitoring layer and obtain the associated data of the oil and gas pipeline. The unified construction system is connected to the fiber optic early warning management system, and is used to perform data processing on the summarized optimized alarm information and associated data, including the deletion of known events and fixed points, by setting a second enhancement algorithm, to generate the final threat event alarm information for real-time response alarms; and, it is also used to analyze and process the other integrated systems of the unified construction system in combination with the final threat event alarm information, and transmit the generated processing results and feedback information back to the corresponding level to complete the closed-loop management of the fiber optic early warning business. Among them, the associated data of the oil and gas pipeline includes: pipeline body data, social and cultural data, pipeline environmental data, and video surveillance data.

[0066] In a specific embodiment, the integrated system cooperates with the optical fiber early warning system and the pipeline inspection system to perform closed-loop management of the optical fiber early warning business. Specifically, after the optical fiber early warning device monitors the vibration condition on the optical fiber, the station valve room layer in the three-layer management architecture of the optical fiber early warning system performs data processing and data preprocessing on the vibration condition, and transmits the three-dimensional array obtained after preprocessing to the regional monitoring layer in the three-layer management architecture of the optical fiber early warning system. The regional monitoring layer processes the three-dimensional array through an algorithm model to obtain graphical information and alarm information, and after further filtering and optimizing the alarm information, transmits the optimized alarm information to the enterprise management layer in the three-layer management architecture of the optical fiber early warning system. The integrated system in the enterprise management layer sends the optimized alarm information to the inspection system, and the inspection system generates inspection tasks based on the optimized alarm information, and pushes the optimized alarm information and inspection tasks to the corresponding inspection personnel. The inspection personnel perform the inspection tasks and perform task closure in the inspection system according to the inspection business process to end the alarm.

[0067] It is worth mentioning that both the regional monitoring layer and the enterprise management layer are configured with: firewalls and web clients; firewalls include regional firewalls and cloud boundary firewalls. The regional firewalls are deployed in the regional monitoring layer, and the cloud boundary firewalls are deployed in the enterprise management layer.

[0068] On the other hand, reference Figure 4 As shown, the present invention also proposes a deployment method of an oil and gas pipeline optical fiber early warning system, which is deployed based on the three-layer management architecture of the oil and gas pipeline optical fiber early warning system described above, and the deployment method includes:

[0069] S1. The oil and gas pipeline optical fiber early warning system is deployed in layers using a three-layer management architecture to perform closed-loop management of the oil and gas pipeline optical fiber early warning system at the corresponding management architecture layer.

[0070] S2. Deploy an algorithm model that sets a three-layer management architecture, so as to process the data obtained from each management architecture layer by matching the corresponding algorithm model to generate target data.

[0071] Further, step S1 includes:

[0072] S11. Deploy optical fiber early warning equipment and edge computing unit equipment at the station valve room layer. The optical fiber early warning equipment is used to collect optical fiber vibration signals, and the edge computing unit equipment converts optical fiber vibration signals into three-dimensional arrays through data analysis, and saves and uploads the data information to the regional monitoring layer.

[0073] S12. Deploy a network management server and a hyper-converged integrated machine at the regional monitoring layer. The network management server is used to integrate and summarize the optical fiber vibration data of the valve room layer of each station in the region, and the hyper-converged integrated machine processes the received data information through the set algorithm model to generate graphical information and alarm information for users to obtain or manage; and the hyper-converged integrated machine is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management level.

[0074] S13. Deploy the fiber prediction management system and the unified construction system at the enterprise management level. The fiber prediction management system is used to receive the optimized alarm information transmitted by the regional monitoring layer, and collaborate with other integrated systems of the unified construction system to perform closed-loop management including real-time response to alarm information, analysis and processing, and transmission of generated processing results and feedback information back to the corresponding level.

[0075] Further, step S2 includes:

[0076] S21. Deploy the waterfall chart core algorithm, image processing algorithm and first enhancement algorithm at the regional monitoring layer, process the data information received from the station valve room layer by matching the corresponding algorithm model, and generate graphical information and alarm information.

[0077] S22. Deploy a second enhancement algorithm at the enterprise management level, and process the optimized alarm information received from the regional monitoring level and the associated data of the oil and gas pipeline obtained through the second enhancement algorithm to generate final threat event alarm information for real-time response alarm.

[0078] Among them, the associated data of oil and gas pipelines include: pipeline ontology data, social and cultural data, pipeline environment data and video surveillance data.

[0079] To sum up, the present invention takes the enterprise management level as the starting point, comprehensively considers the management mode of the overall optical fiber early warning business of the oil and gas pipeline, and proposes an oil and gas pipeline optical fiber early warning system with a three-layer management architecture to realize the linkage management and closed-loop management of the optical fiber early warning business and other integrated systems of the unified system.

[0080] Specifically, the three-layer management architecture includes: station valve room layer, regional monitoring layer and enterprise management layer. Among them, the station valve room layer is used to collect optical fiber vibration signals; the regional monitoring layer is used to manage the optical fiber early warning equipment in the same area and convert the optical fiber vibration signals into graphical information and optimized alarm information; the enterprise management layer is used to optimize the alarm information after receiving the optimized alarm information from the regional monitoring layer, and cooperate with the unified construction system to perform closed-loop management including real-time response to alarm information, analysis and processing, and transmitting the generated processing results and feedback information back to the corresponding level.

[0081] Since the system / device described in the above embodiments of the present invention is a system / device used to implement the method of the above embodiments of the present invention, a person skilled in the art can understand the specific structure and deformation of the system / device based on the method described in the above embodiments of the present invention, and thus will not be described in detail here. All systems / devices used in the method of the above embodiments of the present invention belong to the scope of protection of the present invention.

[0082] It should be understood by those skilled in the art that embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0083] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present invention. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions.

[0084] It should be noted that the word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising a number of different components and by means of a suitably programmed computer. Among the several means listed, several of these means may be embodied by the same hardware. The use of the words first, second, third, etc., is for convenience of expression only and does not indicate any order. These words may be understood as part of the name of the component.

[0085] In addition, it should be noted that, in the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0086] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments after knowing the basic creative concept. Therefore, the technical solution should be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present invention.

[0087] Obviously, those skilled in the art can make various modifications and variations to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention belong to the scope of the technical solution of the present invention and its equivalent technology, the present invention should also include these modifications and variations.

Claims

1. An oil and gas pipeline optical fiber early warning system, characterized in that: The oil and gas pipeline optical fiber early warning system is configured as a three-layer management architecture, which includes: The station valve room layer is deployed along the oil and gas pipeline to collect optical fiber vibration signals, convert them into three-dimensional arrays through data analysis, and save and upload the data information to the regional monitoring layer; The station valve room layer is equipped with: optical fiber early warning equipment and edge computing unit equipment; the optical fiber early warning equipment is deployed on the oil and gas pipeline through dual channels, and the optical fiber early warning equipment is used to collect optical fiber vibration signals of optical fibers on the oil and gas pipeline, and convert them into three-dimensional arrays for analysis and processing; the edge computing unit equipment pre-processes the three-dimensional array, including data analysis, intensity normalization processing, and threat event pre-identification, so as to upload the obtained intensity normalization processing file and threat event pre-identification information to the regional monitoring layer; The regional monitoring layer is connected to the station valve room layer, and is used to integrate and summarize the optical fiber vibration data of each station valve room layer in the region, process the received data information through the set algorithm model, and generate graphical information and alarm information for users to obtain or manage; and it is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management level; The regional monitoring layer is configured with: a network management server and a hyper-converged all-in-one machine; the network management server is used to manage the optical fiber early warning equipment and train the preset algorithm model, as well as obtain the optical pile calibration information of the optical fiber laid on the oil and gas pipeline; the hyper-converged all-in-one machine is connected to the network management server, and the hyper-converged all-in-one machine is used to process the optical pile calibration information, the intensity normalization data file and the threat event pre-identification information through the algorithm model trained by the model, and generate graphical information and alarm information; and it is also used to filter and optimize the alarm information through the set alarm suppression rules and the algorithm model trained by the model, and upload the optimized alarm information to the enterprise management level; The algorithm model includes: a waterfall chart core algorithm, an image processing algorithm and a first enhancement algorithm; the waterfall chart core algorithm processes the intensity normalization data file, threat event pre-identification information and light pile calibration information to generate a dynamic de-slanted data file and original threat event information; the image processing algorithm processes the intensity normalization data file and the dynamic de-slanted data file to generate an original waterfall chart and an optimized waterfall chart; the first enhancement algorithm performs data processing for alarm deduplication on the original threat event to generate a threat event result; The enterprise management layer is connected to the regional monitoring layer to receive optimized alarm information transmitted by the regional monitoring layer, and collaborates through a preset integrated system to perform closed-loop management that includes real-time response to alarm information, analysis and processing, and transmission of generated processing results and feedback information back to the corresponding level.

2. The oil and gas pipeline optical fiber early warning system according to claim 1, characterized in that: Alarm suppression rules include: According to the alarm level of the alarm information, the low-level alarm information is suppressed. The alarm levels are from high to low, including urgent, important, general and low; For repeated alarm information, multiple identical alarm information are suppressed into one alarm information; For multiple alarm information generated by the same optical fiber vibration signal, the multiple alarm information are aggregated to generate alarm information containing all alarm features.

3. The oil and gas pipeline optical fiber early warning system according to claim 1, characterized in that: The enterprise management level is equipped with: optical fiber early warning management system and unified construction system; The optical fiber early warning management system is used to integrate and summarize the optimized alarm information of each regional monitoring layer and obtain the relevant data of the oil and gas pipeline; The unified construction system is connected to the optical fiber early warning management system, and is used to process the aggregated optimized alarm information and related data by setting a second enhancement algorithm to generate final threat event alarm information; Furthermore, it is used to analyze and process other integrated systems of the unified system in combination with the final threat event alarm information, and transmit the generated processing results and feedback information back to the corresponding level to complete the closed-loop management of the optical fiber early warning service; Among them, the associated data of oil and gas pipelines include: pipeline ontology data, social and cultural data, pipeline environment data and video surveillance data.

4. The oil and gas pipeline optical fiber early warning system according to claim 3, characterized in that: The second enhancement algorithm performs data processing on the optimized alarm information, pipeline ontology data, social and cultural data, pipeline environment data, and video surveillance data, including deletion of known events and fixed points, to generate final threat event alarm information for real-time response alarms.

5. The optical fiber early warning system for oil and gas pipelines according to any one of claims 1 to 4, characterized in that: The regional monitoring layer and enterprise management layer are also equipped with: firewalls and web clients; Firewalls include regional firewalls and cloud boundary firewalls. Regional firewalls are deployed at the regional monitoring layer, and cloud boundary firewalls are deployed at the enterprise management layer.

6. A method for deploying an oil and gas pipeline optical fiber early warning system, characterized in that: The deployment method is deployed based on the three-layer management architecture of the oil and gas pipeline optical fiber early warning system according to any one of claims 1 to 5, and the deployment method includes: The three-layer management architecture is used to deploy the oil and gas pipeline optical fiber early warning system in layers, so as to perform closed-loop management of the oil and gas pipeline optical fiber early warning system at the corresponding management architecture layer; The algorithm model deployment set for the three-layer management architecture is used to process the data obtained from each management architecture layer by matching the corresponding algorithm model to generate target data.

7. The method for deploying an oil and gas pipeline optical fiber early warning system according to claim 6, characterized in that: The three-layer management architecture is used to deploy the oil and gas pipeline optical fiber early warning system in layers, so as to perform closed-loop management of the oil and gas pipeline optical fiber early warning system at the corresponding management architecture layer, including: Optical fiber early warning equipment and edge computing unit equipment are deployed at the station valve room layer. The optical fiber early warning equipment is used to collect optical fiber vibration signals, and the edge computing unit equipment converts the optical fiber vibration signals into a three-dimensional array through data analysis, and saves and uploads the data information to the regional monitoring layer. Deploy a network management server and a hyper-converged all-in-one machine at the regional monitoring layer. The network management server is used to integrate and summarize the optical fiber vibration data of the valve room layer of each station in the region. The hyper-converged all-in-one machine processes the received data information through a set algorithm model to generate graphical information and alarm information for users to obtain or manage. In addition, the hyper-converged all-in-one machine is also used to filter and optimize the alarm information, and upload the optimized alarm information to the enterprise management level. The fiber optic prediction management system and the integrated construction system are deployed at the enterprise management level. The fiber optic prediction management system is used to receive the optimized alarm information transmitted by the regional monitoring layer, and collaborate with other integrated systems of the integrated construction system to perform closed-loop management including real-time response to alarm information, analysis and processing, and transmission of the generated processing results and feedback information back to the corresponding level.

8. The method for deploying an oil and gas pipeline optical fiber early warning system according to claim 7, characterized in that: The algorithm model deployment set for the three-layer management architecture is used to process the data obtained from each management architecture layer by matching the corresponding algorithm model to generate target data including: The waterfall chart core algorithm, image processing algorithm and first enhancement algorithm are deployed in the regional monitoring layer. The data information received from the station valve room layer is processed by matching the corresponding algorithm model to generate graphical information and alarm information. A second enhancement algorithm is deployed at the enterprise management layer, and the optimized alarm information received from the regional monitoring layer and the associated data of the oil and gas pipeline obtained are processed by the second enhancement algorithm to generate final threat event alarm information for real-time response alarm; Among them, the associated data of oil and gas pipelines include: pipeline ontology data, social and cultural data, pipeline environment data and video surveillance data.

Citation Information

Patent Citations

  • Intelligent gas system

    CN112241924A

  • Civil aviation air traffic control network security detection early warning platform

    CN113486351A

  • Distributed storage system alarm processing method and device, equipment and medium

    CN118069061A

  • Waterfall plot processing method and device and electronic equipment

    CN118212140A

  • Intelligence oil gas pipe -line system

    CN205579152U