Energy-saving optimization control system and method for fan and chilled water valve of tail end air conditioner
By using an energy-saving optimization control system for terminal air conditioning fans and chilled water valves, the system can detect and dynamically adjust the opening degree of chilled water valves and the frequency of fans in real time, thus solving the problems of slow response speed and high energy consumption in traditional terminal air conditioning systems and achieving energy-saving optimization control under temperature requirements.
Patent Information
- Application Number
- CN202410980408.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-22
AI Technical Summary
Traditional terminal air conditioning systems suffer from slow response and high energy consumption in temperature regulation, especially in large workspaces, resulting in untimely temperature regulation and high energy consumption.
An energy-saving optimization control system for terminal air conditioning fans and chilled water valves is adopted. By configuring a chilled water valve opening controller and a fan frequency converter, combined with a temperature sensor and a PID module, the system can detect and dynamically adjust the chilled water valve opening and fan frequency in real time to adapt to the temperature requirements of different operating conditions.
While ensuring temperature requirements are met, the opening degree of the chilled water valve is increased to the maximum extent, the fan frequency is reduced, the energy consumption of the terminal air conditioning system is lowered, and the system stability and energy-saving effect are improved.
Smart Images

Figure CN118757882A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of air conditioning control, and in particular to an energy-saving optimization control system and method for a terminal air conditioning fan and a chilled water valve. Background Art
[0002] In a large workspace, due to the large amount of heat dissipated by the equipment, the workers in the workspace face a long period of high temperature environment, which leads to the need for effective temperature control in the work area. A common cooling strategy is to use post air supply, which includes two key control objects: fan frequency and chilled water valve opening.
[0003] At present, there are two main traditional control methods: one is to adjust the temperature of the working area directly by adjusting the opening of the chilled water valve; the other is to control the supply air temperature by adjusting the opening of the chilled water valve and control the temperature of the working area by adjusting the fan frequency. However, when adjusting the opening of the chilled water valve, the system needs a certain amount of time to change the flow and temperature of the coolant. There is a certain inertia, resulting in a relatively slow temperature adjustment response speed, which may cause large fluctuations in the temperature of the working area or untimely adjustment. Controlling the opening of the chilled water valve and the fan at the same time may cause interference, thereby affecting the effect of temperature adjustment in the working area.
[0004] Therefore, an energy-saving optimization control strategy is needed that can simultaneously have the advantages of stable and reliable control and energy saving. On the premise of meeting the temperature requirements of the working area, it can maximize the opening of the chilled water valve, reduce the fan frequency, and reduce the energy consumption of the terminal air-conditioning system, thereby promoting the application of building energy-saving and emission reduction technologies and the realization of dual carbon goals. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide an energy-saving optimization control system and method for terminal air-conditioning fans and chilled water valves in response to the deficiencies of the above-mentioned prior art. The fan frequency and the opening of the chilled water valve can be flexibly adjusted according to different working conditions to adapt to the actual use environment, thereby maximizing the energy consumption of the system while ensuring the temperature requirements of the working area.
[0006] The technical solution of the present invention to solve the above technical problems is as follows: a terminal air-conditioning fan and a chilled water valve energy-saving optimization control system, comprising a chilled water valve equipped with a chilled water valve opening controller and a fan equipped with a fan inverter, the fan can respectively deliver fresh air and return air to each working area through a pipeline, each of the working areas is respectively provided with a temperature sensor, the chilled water valve opening controller and the temperature sensor are respectively electrically connected to the PID module;
[0007] The temperature sensors are respectively used to detect the average temperature in the corresponding working area in real time;
[0008] The PID module is used to calculate the output value of the opening of the chilled water valve according to the average temperature of the working area and the average temperature setting value;
[0009] The chilled water valve opening controller is used to detect the opening feedback signal of the chilled water valve in real time, and feedback-control the chilled water valve to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value determined by the average temperature of the working area;
[0010] The fan frequency converter is used to detect the frequency feedback signal of the fan in real time, and control the fan to dynamically adjust its operating frequency according to the frequency feedback signal, the opening feedback signal and the average temperature of the working area.
[0011] On the basis of the above technical solution, the present invention can also be improved as follows:
[0012] Further: the chilled water valve opening controller controls the chilled water valve to dynamically adjust its opening according to the opening feedback signal and the average temperature feedback of the working area, and the fan inverter controls the fan to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal feedback as follows:
[0013] At the initial moment, the PID module is based on the initial average temperature T of the working area. z0,t0 and the average temperature setting value T z0,set Calculate the initial output value U of the chilled water valve opening out,t0 The chilled water valve opening controller outputs the initial value U of the chilled water valve opening according to the out,t0 Controlling the chilled water valve to adjust its opening;
[0014] At this moment, according to the preset sampling time interval H s Sample the temperature of the working area and calculate the current time t c Average temperature of the working area T z0,tc ;
[0015] When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc >T z0,set +△T, if the duration of both is greater than the set time t1, it is determined that the opening of the chilled water valve has reached the maximum value, and the real-time output value of the fan frequency F is fixed out,tc =F out,t0 +b, and enter the next sampling cycle control;
[0016] When the opening feedback signal U is detected in real time mid k up -a, and the duration is greater than the set time t2, then maintain the current fan frequency output value F out,tc =F out,t0 No change, and enter the next sampling cycle control;
[0017] When the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, then adjust the fan frequency output value F out,tc =F out,t0 -c, and enter the next sampling cycle control;
[0018] When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc <T z0,set +△T, the duration of both is greater than the set time t4, then according to the real-time detection of the opening feedback signal U k Control the chilled water valve to reduce its opening while maintaining the fan frequency output value F out No change, and enter the next sampling cycle control;
[0019] Wherein, a is the preset opening tolerance value, b is the preset frequency step increase value, c is the preset frequency step decrease value, and △T is the temperature tolerance value.
[0020] The beneficial effect of the above further solution is: the initial output value U of the chilled water valve opening after initialization out,t0 Control the chilled water valve to adjust its opening, collect the temperature of the working area in real time during the working process, and calculate the current time t c Average temperature of the working area T z0,tc In the chilled water valve opening controller according to the real-time detection of the opening feedback signal U k On the basis of dynamically controlling the opening of the chilled water valve according to the output value of the chilled water valve opening determined by the average temperature of the working area, the frequency of the fan is adjusted according to different working conditions. In this way, the opening of the chilled water valve can be maximized while the fan frequency can be reduced, thereby reducing the energy consumption of the terminal air-conditioning system while ensuring the temperature requirement.
[0021] Further: the chilled water valve opening controller controls the chilled water valve to dynamically adjust its opening according to the opening feedback signal and the average temperature feedback of the working area, and the fan inverter controls the fan to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal feedback, and further includes:
[0022] When the freezing water valve opening output value U out,tc >=U up, it is determined that the chilled water valve opening has reached the maximum value U up , fix the freezing water valve opening output value U out,tc =U up , when the freezing water valve opening output value U out,tc <=U down , it is determined that the opening of the chilled water valve has reached the minimum value U down , fix the freezing water valve opening output value U out,tc =U down ;
[0023] When the fan frequency output signal F out,tc >=F up , it is considered that the fan frequency has reached the maximum value, and the fan frequency signal F is output. out,tc =F up , when the fan frequency output signal F out,tc <=F down , it is considered that the fan frequency has reached the minimum value, and the fan frequency signal F is output. out,tc =F down .
[0024] The beneficial effect of the above further solution is that when the freezing water valve opening output value U out,tc >=U up or <=U down , then the chilled water valve opening has reached the maximum value U up Or minimum value U down At this time, the opening adjustment of the chilled water valve reaches the limit, and the output value of the chilled water valve opening U is fixed. out =U up and F out =F down , can take into account both efficiency and safety, saving energy consumption. Similarly, when the fan frequency output value F out,tc >=F up or F out,tc <=F down , then the frequency of the fan has reached the maximum value F up or minimum value F down , by fixing the fan frequency output value F ou,tc t =F up or F out,tc =F down , which can take into account both efficiency and safety, and reduce system energy consumption while meeting the temperature requirements of the working area to the greatest extent.
[0025] The present invention also provides a method for energy-saving optimization control of a terminal air-conditioning fan and a chilled water valve, comprising the following steps:
[0026] Real-time detection of the average temperature in the corresponding working area;
[0027] Calculate the output value of the opening degree of the chilled water valve according to the average temperature of the working area and the average temperature setting value;
[0028] The chilled water valve opening controller detects the opening feedback signal of the chilled water valve in real time, and controls the chilled water valve to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value determined by the average temperature of the working area;
[0029] The fan frequency converter detects the frequency feedback signal of the fan in real time, and controls the fan to dynamically adjust its operating frequency according to the frequency feedback signal, the opening feedback signal and the average temperature of the working area.
[0030] On the basis of the above technical solution, the present invention can also be improved as follows:
[0031] Further: the chilled water valve opening controller controls the chilled water valve to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the working area, and the fan inverter controls the fan to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal, which specifically includes the following steps:
[0032] At the initial moment, the PID module is based on the initial average temperature T of the working area. z0,t0 and the average temperature setting value T z0,set Calculate the initial output value U of the chilled water valve opening out,t0 The chilled water valve opening controller outputs the initial value U of the chilled water valve opening according to the out,t0 Controlling the chilled water valve to adjust its opening;
[0033] At this moment, according to the preset sampling time interval H s Sample the temperature of the working area and calculate the current time t c Average temperature of the working area T z0,tc ;
[0034] When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc >T z0,set +△T, if the duration of both is greater than the set time t1, it is determined that the opening of the chilled water valve has reached the maximum value, and the real-time output value of the fan frequency F is fixed out,tc =F out,t0 +b, and enter the next sampling cycle control;
[0035] When the opening feedback signal U is detected in real time mid k <Uup -a, and the duration is greater than the set time t2, then maintain the current fan frequency output value F out,tc =F out,t0 No change, and enter the next sampling cycle control;
[0036] When the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, then adjust the fan frequency output value F out,tc =F out,t0 -c, and enter the next sampling cycle control;
[0037] When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc <T z0,set +△T, the duration of both is greater than the set time t4, then according to the real-time detection of the opening feedback signal U k Control the chilled water valve to reduce its opening while maintaining the fan frequency output value F out No change, and enter the next sampling cycle control;
[0038] Wherein, a is the preset opening tolerance value, b is the preset frequency step increase value, c is the preset frequency step decrease value, and △T is the temperature tolerance value.
[0039] The beneficial effect of the above further solution is: the initial output value U of the chilled water valve opening after initialization out,t0 Control the chilled water valve to adjust its opening, collect the temperature of the working area in real time during the working process, and calculate the current time t c Average temperature of the working area T z0,tc In the chilled water valve opening controller according to the real-time detection of the opening feedback signal U k On the basis of dynamically controlling the opening of the chilled water valve according to the output value of the chilled water valve opening determined by the average temperature of the working area, the frequency of the fan is adjusted according to different working conditions. In this way, the opening of the chilled water valve can be maximized while the fan frequency can be reduced, thereby reducing the energy consumption of the terminal air-conditioning system while ensuring the temperature requirement.
[0040] Further: the chilled water valve opening controller controls the chilled water valve to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the working area, and the fan inverter controls the fan to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal, and further comprises the following steps:
[0041] When the freezing water valve opening output value Uout,tc >=U up , it is determined that the chilled water valve opening has reached the maximum value U up , fix the freezing water valve opening output value U out,tc =U up , when the freezing water valve opening output value U out,tc <=U down , it is determined that the opening of the chilled water valve has reached the minimum value U down , fix the freezing water valve opening output value U out,tc =U down ;
[0042] When the fan frequency output signal F out,tc >=F up , it is considered that the fan frequency has reached the maximum value, and the fan frequency signal F is output. out,tc =F up , when the fan frequency output signal F out,tc <=F down , it is considered that the fan frequency has reached the minimum value, and the fan frequency signal F is output. out,tc =F down .
[0043] The beneficial effect of the above further solution is that when the freezing water valve opening output value U out,tc >=U up or <=U down , then the chilled water valve opening has reached the maximum value U up Or minimum value U down At this time, the opening adjustment of the chilled water valve reaches the limit, and the output value of the chilled water valve opening U is fixed. out =U up and F out =F down , can take into account both efficiency and safety, saving energy consumption. Similarly, when the fan frequency output value F out,tc >=F up or F out,tc <=F down , then the frequency of the fan has reached the maximum value F up or minimum value F down , by fixing the fan frequency output value F ou,tc t =F up or F out,tc =F down , which can take into account both efficiency and safety, and reduce system energy consumption while meeting the temperature requirements of the working area to the greatest extent.
[0044] The present invention also provides a computer-readable storage medium, characterized in that the computer-readable storage medium stores computer instructions, and the computer instructions are used to implement the energy-saving optimization control method for the terminal air-conditioning fan and the chilled water valve when the processor executes them.
[0045] The present invention also provides an energy-saving optimization control device for a terminal air-conditioning fan and a chilled water valve, the energy-saving optimization control device for a terminal air-conditioning fan and a chilled water valve comprising:
[0046] at least one processor and a storage medium, the storage medium being communicatively connected to the processor;
[0047] Among them, the storage medium stores a computer program that can be executed by at least one of the processors, and the computer program is executed by the at least one processor so that the at least one processor can execute the energy-saving optimization control method for the terminal air-conditioning fan and chilled water valve.
[0048] The terminal air-conditioning fan and chilled water valve energy-saving optimization control system and method of the present invention respectively collect the temperature of the corresponding working area through the temperature sensor, and calculate the average temperature of the working area, and the PID module calculates the chilled water valve opening output value according to the average temperature setting value of the working area, thereby adjusting the fan's supply air temperature and the average temperature of the working area. According to the energy-saving optimization control strategy of the present invention, the fan frequency and the chilled water valve opening are flexibly adjusted under different working conditions to adapt to the actual use environment; by setting a reasonable duration threshold, the interference of instantaneous fluctuations on the control strategy is avoided, and the stability of the system is enhanced. On the premise of ensuring the temperature requirement of the working area, the chilled water valve opening is maximized, the fan frequency is reduced, and the energy consumption of the terminal air-conditioning system is reduced, thereby promoting the application of building energy-saving and emission reduction technologies and the realization of dual carbon goals. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a structural schematic diagram of an energy-saving optimization control system for a terminal air-conditioning fan and a chilled water valve according to an embodiment of the present invention;
[0050] Figure 2 The present invention is a flowchart of a method for optimizing the energy saving of a terminal air-conditioning fan and a chilled water valve according to an embodiment of the present invention.
[0051] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0052] 1. Chilled water valve, 2. Chilled water valve opening controller, 3. Fan, 4. Fan inverter, 6. PID module, 7. First working area, 8. First temperature sensor, 9. Second working area, 10. Second temperature sensor. DETAILED DESCRIPTION
[0053] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0054] like Figure 1 As shown, a terminal air-conditioning fan and chilled water valve energy-saving optimization control system includes a chilled water valve 1 equipped with a chilled water valve opening controller 2 and a fan 3 equipped with a fan inverter 4. The fan 3 can respectively transport fresh air and return air to a first working area 7 and a second working area 9 through a pipeline. A first temperature sensor 8 and a second temperature sensor 10 are respectively arranged in the first working area 7 and the second working area 9. The chilled water valve opening controller 2, the first temperature sensor 8 and the second temperature sensor 10 are respectively electrically connected to the PID module 6.
[0055] The first temperature sensor 8 and the second temperature sensor 10 are used to detect the average temperature in the first working area 7 and the second working area 9 in real time respectively;
[0056] The PID module 6 is used to calculate the output value of the opening degree of the chilled water valve according to the average temperature of the first working area 7 and the second working area 9 and the average temperature setting value;
[0057] The chilled water valve opening controller 2 is used to detect the opening feedback signal of the chilled water valve 1 in real time, and feedback-control the chilled water valve 1 to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value determined by the average temperature of the first working area 7 and the second working area 9;
[0058] The fan frequency converter 4 is used to detect the frequency feedback signal of the fan 3 in real time, and control the fan 3 to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal.
[0059] According to the above embodiment, the temperatures of the first working area 7 and the second working area 9 can be respectively collected in real time by the first temperature sensor 8 and the second temperature sensor 10, so that it is convenient for the subsequent PID module 6 to calculate the fan frequency output value and the chilled water valve opening output value according to the average temperature and the average temperature setting value of the first working area 7 and the second working area 9.
[0060] According to the above embodiment, the PID module 6 is used to collect real-time operating data of the system, and the operating data includes the working area temperature collected by the temperature sensor, and the operating frequency value of the chilled water valve 1 is obtained through optimization calculation, and the calculated operating frequency value is further transmitted to the chilled water valve opening controller 2 through an electrical signal. The chilled water valve opening controller 2 completes the operating frequency adjustment of the chilled water valve 1, and then adjusts the supply air temperature and the temperature of the working area.
[0061] In the embodiment of the present invention, the minimum value U of the chilled water valve opening is set down The default value is 10%, which sets the maximum value of the chilled water valve opening. up , the default is 98%, set the lower limit of fan operating frequency F down The default setting is 35Hz, which sets the middle limit of the fan operating frequency. mid The default is 40Hz, which sets the upper limit of the fan operating frequency F up The default is 48Hz, the preset opening tolerance value a is 2%, the preset frequency step increase value b is 2Hz, the preset frequency step decrease value c is 2Hz, the temperature tolerance value △T is 0.5℃ by default, and the sampling time interval H s The default value is 15s.
[0062] In addition, the calculation of the chilled water valve opening adopts a PID module 6, which calculates the average temperature T of the working area. z0 and the average temperature setting value T z0,set The specific calculation method can be calculated by using the existing PID algorithm. In the use of PID module 6, in order to prevent the fan frequency and the chilled water valve opening from being frequently adjusted, a dead zone needs to be set; the setting of the dead zone ensures that the system does not make adjustments when the control signal changes slightly, thereby reducing the fluctuation of the system near the set value.
[0063] In one or more embodiments of the present invention, the chilled water valve opening controller 2 controls the chilled water valve 1 to dynamically adjust its opening according to the opening feedback signal and the average temperature feedback of the first working area 7 and the second working area 9, and the fan inverter 4 controls the fan 3 to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal feedback as follows:
[0064] At the initial moment, the PID module 6 determines the initial average temperature T of the first working area 7 and the second working area 9 according to the initial average temperature T z0,t0 and the average temperature setting value T z0,set Calculate the initial output value U of the chilled water valve opening out,t0 The chilled water valve opening controller 2 outputs the initial value U of the chilled water valve opening according to the out,t0 Controlling the chilled water valve 1 to adjust its opening;
[0065] After initialization is completed, the chilled water valve opening controller 2 detects the opening feedback signal U in real time. k The opening of the chilled water valve 1 is dynamically controlled by the output value of the chilled water valve opening determined by the average temperature of the working area. At the same time, the first temperature sensor 8 and the second temperature sensor 10 respectively sample the temperature of the first working area 7 and the second working area 9 to enter the subsequent control process.
[0066] At this moment, according to the preset sampling time interval H s The temperatures of the first working area 7 and the second working area 9 are sampled, and the current time t is calculated. c The average temperature T of the first working area 7 and the second working area 9 z0,tc ; This is, the chilled water valve opening PID module 6 always remains in operation;
[0067] 1. When the opening feedback signal U detected in real time k >=U up -2%, and the current average temperature T of the first working area 7 and the second working area 9 z0,tc >T z0,set +0.5, the duration of both is greater than the set time t1 (default 5min), indicating that the opening of the chilled water valve has reached the maximum value and lasts for a period of time, but the temperature of the working area cannot reach the set value, then it is determined that the opening of the chilled water valve has reached the maximum value, and the real-time output value F of the fan frequency is fixed out,tc =F out,t0 +2, and enter the next sampling cycle control;
[0068] 2. When the opening feedback signal U detected in real time mid k up -2%, and the duration is greater than the set time t2, then maintain the current fan frequency output value F out,tc =F out,t0 No change, and enter the next sampling cycle control;
[0069] 3. When the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, it means that the temperature of the working area can be met when the opening of the chilled water valve is small and lasts for a period of time, and the fan frequency output value F is adjusted. out,tc =F out,t0 -2, and enter the next sampling cycle control;
[0070] 4. When the opening feedback signal U detected in real time k >=U up -2%, and the current average temperature T of the first working area 7 and the second working area 9 z0,tc <T z0,set +0.5, the duration of both is greater than the set time t4, then according to the real-time detection of the opening feedback signal U k Control the chilled water valve 1 to reduce its opening while maintaining the fan frequency output value F out No change, and enter the next sampling cycle control;
[0071] Except for the above four situations, the chilled water valve opening controller 2 is based on the opening feedback signal U detected in real time. k The opening of the chilled water valve 1 is dynamically and independently controlled by the output value of the chilled water valve opening determined by the average temperature of the working area, and the existing PI closed-loop feedback control algorithm is adopted. In this case, the fan 3 works at the initial default frequency and is not affected by the opening feedback signal. Refer to the above-mentioned situation 2.
[0072] Wherein, a is the preset opening tolerance value, b is the preset frequency step increase value, c is the preset frequency step decrease value, and △T is the temperature tolerance value.
[0073] The initial output value U of the chilled water valve opening after initialization out,t0 Control the chilled water valve 1 to adjust its opening, and collect the temperature of the first working area 7 and the second working area 9 in real time during the working process, and calculate the current time t c The average temperature T of the first working area 7 and the second working area 9 z0,tc In the chilled water valve opening controller 2 according to the real-time detection of the opening feedback signal U k On the basis of dynamically controlling the opening of the chilled water valve 1 according to the chilled water valve opening output value determined by the average temperature of the first working area 7 and the second working area 9, the frequency of the fan 3 is adjusted according to different working conditions. In this way, the chilled water valve opening can be maximized, the fan frequency can be reduced, and the energy consumption of the terminal air-conditioning system can be reduced while ensuring the temperature requirement.
[0074] In particular, in the third case above, if the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, if the fan frequency output value F is adjusted after several cycles out,tc =F out,t0 -c, so that the fan frequency output value F out,tc <=F down , then fix the fan frequency output value F out,tc =F down , and the chilled water valve opening controller 2 has been operating independently and continuously. Therefore, at this time, the chilled water valve opening controller 2 is based on the opening feedback signal U detected in real time. k The chilled water valve 1 is dynamically and independently controlled to reduce the opening degree according to the chilled water valve opening output value determined by the average temperature of the working area.
[0075] It should be pointed out that theoretically, there will be a real-time detection of the chilled water valve opening feedback signal U k <=U mid , and the real-time average temperature of the working area is T z0,tc >Tz0,set +△T, the duration of both is greater than the set time t5, but in practice, due to the feedback signal U k <=U mid The chilled water valve opening controller 2 is used according to the opening feedback signal U detected in real time. k The opening of the chilled water valve 1 is dynamically and independently controlled by the output value of the chilled water valve opening determined by the average temperature of the working area. At this time, due to feedback control, if the real-time average temperature T z0,tc >T z0,set +△T, then the chilled water valve opening feedback signal U k It is impossible to be less than or equal to U mid , therefore, this situation is unlikely to occur in practice.
[0076] In one or more embodiments of the present invention, the chilled water valve opening controller 2 controls the chilled water valve 1 to dynamically adjust its opening according to the opening feedback signal and the average temperature feedback of the first working area 7 and the second working area 9, and the fan inverter 4 controls the fan 3 to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal feedback, and further includes:
[0077] When the freezing water valve opening output value U out,tc >=U up , it is determined that the chilled water valve opening has reached the maximum value U up , fix the freezing water valve opening output value U out,tc =U up , when the freezing water valve opening output value U out,tc <=U down , it is determined that the opening of the chilled water valve has reached the minimum value U down , fix the freezing water valve opening output value U out,tc =U down When the freezing water valve opening output value U out,tc >=U up or <=U down , then the chilled water valve opening has reached the maximum value U up Or minimum value U down At this time, the opening adjustment of the chilled water valve reaches the limit, and the output value of the chilled water valve opening U is fixed. out =U up and F out =F down , which can take into account both efficiency and safety and save energy.
[0078] When the fan frequency output signal F out,tc >=F up , it is considered that the fan frequency has reached the maximum value, and the fan frequency signal F is output. out,tc=F up , when the fan frequency output signal F out,tc <=F down , it is considered that the fan frequency has reached the minimum value, and the fan frequency signal F is output. out,tc =F down Similarly, when the fan frequency output value F out,tc >=F up or F out,tc <=F down , then the frequency of the fan has reached the maximum value F up or minimum value F down , by fixing the fan frequency output value F ou,tc t =F up or F out,tc =F down , which can take into account both efficiency and safety, and reduce system energy consumption while meeting the temperature requirements of the working area to the greatest extent.
[0079] like Figure 2 As shown, the present invention also provides an energy-saving optimization control method for a terminal air-conditioning fan and a chilled water valve, comprising the following steps:
[0080] S1: Real-time detection of the average temperature in the first working area 7 and the second working area 9;
[0081] S2: Calculating the output value of the opening of the chilled water valve according to the average temperature of the first working area 7 and the second working area 9 and the average temperature setting value;
[0082] S3: The chilled water valve opening controller 2 detects the opening feedback signal of the chilled water valve 1 in real time, and controls the chilled water valve 1 to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value determined by the average temperature of the first working area 7 and the second working area 9;
[0083] S4: The fan inverter 4 detects the frequency feedback signal of the fan 3 in real time, and controls the fan 3 to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal.
[0084] In one or more embodiments of the present invention, the chilled water valve opening controller 2 controls the chilled water valve 1 to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the first working area 7 and the second working area 9, and the fan inverter 4 controls the fan 3 to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal, specifically including the following steps:
[0085] At the initial moment, the PID module 6 determines the initial average temperature T of the first working area 7 and the second working area 9 according to the initial average temperature Tz0,t0 and the average temperature setting value T z0,set Calculate the initial output value U of the chilled water valve opening out,t0 The chilled water valve opening controller 2 outputs the initial value U of the chilled water valve opening according to the out,t0 Controlling the chilled water valve 1 to adjust its opening;
[0086] At this moment, according to the preset sampling time interval H s Sample the temperature of the first working area 7 and the second working area 9, and calculate the current time t c Average temperature of the working area T z0,tc ;
[0087] 1. When the opening feedback signal U detected in real time k >=U up -2%, and the current average temperature T of the first working area 7 and the second working area 9 z0,tc >T z0,set +0.5, if the duration of both is greater than the set time t1, it is determined that the opening of the chilled water valve has reached the maximum value, and the real-time output value F of the fan frequency is fixed out,tc =F out,t0 +2, and enter the next sampling cycle control;
[0088] 2. When the opening feedback signal U detected in real time mid k up -2%, and the duration is greater than the set time t2, then maintain the current fan frequency output value F out,tc =F out,t0 No change, and enter the next sampling cycle control;
[0089] 3. When the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, then adjust the fan frequency output value F out,tc =F out,t0 -2, and enter the next sampling cycle control;
[0090] 4. When the opening feedback signal U detected in real time k >=U up -2%, and the current average temperature T of the first working area 7 and the second working area 9 z0,tc <T z0,set +0.5, the duration of both is greater than the set time t4, then according to the real-time detection of the opening feedback signal U k Control the chilled water valve 1 to reduce its opening while maintaining the fan frequency output value F out No change, and enter the next sampling cycle control;
[0091] Wherein, a is the preset opening tolerance value, b is the preset frequency step increase value, c is the preset frequency step decrease value, and △T is the temperature tolerance value.
[0092] The initial output value U of the chilled water valve opening after initialization out,t0 Control the chilled water valve 1 to adjust its opening, and collect the temperature of the first working area 7 and the second working area 9 in real time during the working process, and calculate the current time t c The average temperature T of the first working area 7 and the second working area 9 z0,tc In the chilled water valve opening controller 2 according to the real-time detection of the opening feedback signal U k On the basis of dynamically controlling the opening of the chilled water valve 1 according to the chilled water valve opening output value determined by the average temperature of the first working area 7 and the second working area 9, the frequency of the fan 3 is adjusted according to different working conditions. In this way, the chilled water valve opening can be maximized, the fan frequency can be reduced, and the energy consumption of the terminal air-conditioning system can be reduced while ensuring the temperature requirement.
[0093] In one or more embodiments of the present invention, the chilled water valve opening controller 2 controls the chilled water valve 1 to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the first working area 7 and the second working area 9, and the fan inverter 4 controls the fan 3 to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal, and further comprises the following steps:
[0094] When the freezing water valve opening output value U out,tc >=U up , it is determined that the chilled water valve opening has reached the maximum value U up , fix the freezing water valve opening output value U out,tc =U up , when the freezing water valve opening output value U out,tc <=U down , it is determined that the opening of the chilled water valve has reached the minimum value U down , fix the freezing water valve opening output value U out,tc =U down When the freezing water valve opening output value U out,tc >=U up or <=U down , then the chilled water valve opening has reached the maximum value U up Or minimum value U down At this time, the opening adjustment of the chilled water valve reaches the limit, and the output value of the chilled water valve opening U is fixed. out =U up and F out =Fdown , which can take into account both efficiency and safety and save energy.
[0095] When the fan frequency output signal F out,tc >=F up , it is considered that the fan frequency has reached the maximum value, and the fan frequency signal F is output. out,tc =F up , when the fan frequency output signal F out,tc <=F down , it is considered that the fan frequency has reached the minimum value, and the fan frequency signal F is output. out,tc =F down Similarly, when the fan frequency output value F out,tc >=F up or F out,tc <=F down , then the frequency of the fan has reached the maximum value F up or minimum value F down , by fixing the fan frequency output value F ou,tc t =F up or F out,tc =F down , which can take into account both efficiency and safety, and reduce system energy consumption while meeting the temperature requirements of the working area to the greatest extent.
[0096] The present invention also provides a computer-readable storage medium, characterized in that the computer-readable storage medium stores computer instructions, and the computer instructions are used to implement the energy-saving optimization control method for the terminal air-conditioning fan and the chilled water valve when the processor executes them.
[0097] The present invention also provides an energy-saving optimization control device for a terminal air-conditioning fan and a chilled water valve, the energy-saving optimization control device for a terminal air-conditioning fan and a chilled water valve comprising:
[0098] at least one processor and a storage medium, the storage medium being communicatively connected to the processor;
[0099] Among them, the storage medium stores a computer program that can be executed by at least one of the processors, and the computer program is executed by the at least one processor so that the at least one processor can execute the energy-saving optimization control method for the terminal air-conditioning fan and chilled water valve.
[0100] The terminal air-conditioning fan and chilled water valve energy-saving optimization control system and method of the present invention respectively collect the temperatures corresponding to the first working area 7 and the second working area 9 through the temperature sensor, and calculate the average temperature of the first working area 7 and the second working area 9, and the PID module 6 calculates the chilled water valve opening output value according to the average temperature setting value of the first working area 7 and the second working area 9, thereby adjusting the supply air temperature of the fan 3 and the average temperature of the working area. According to the energy-saving optimization control strategy of the present invention, the fan frequency and the chilled water valve opening are flexibly adjusted under different working conditions to adapt to the actual use environment; by setting a reasonable duration threshold, the interference of instantaneous fluctuations on the control strategy is avoided, the stability of the system is enhanced, and on the premise of ensuring the temperature requirements of the working area, the chilled water valve opening is maximized, the fan frequency is reduced, and the energy consumption of the terminal air-conditioning system is reduced, thereby promoting the application of building energy-saving and emission reduction technologies and the realization of dual carbon goals.
[0101] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. An energy-saving optimization control system for terminal air-conditioning fans and chilled water valves, characterized in that: It comprises a chilled water valve (1) equipped with a chilled water valve opening controller (2) and a fan (3) equipped with a fan frequency converter (4), wherein the fan (3) can respectively deliver fresh air and return air to each working area through a pipeline, and each working area is respectively provided with a temperature sensor, and the chilled water valve opening controller (2) and the temperature sensor are respectively electrically connected to the PID module (6); The temperature sensors are respectively used to detect the average temperature in the corresponding working area in real time; The PID module (6) is used to calculate the output value of the opening degree of the chilled water valve according to the average temperature of the working area and the average temperature setting value; The chilled water valve opening controller (2) is used to detect the opening feedback signal of the chilled water valve (1) in real time, and to feedback control the chilled water valve (1) to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value determined by the average temperature of the working area; The fan frequency converter (4) is used to detect the frequency feedback signal of the fan (3) in real time, and to control the fan (3) to dynamically adjust its operating frequency according to the frequency feedback signal, the opening feedback signal and the average temperature of the working area.
2. The terminal air conditioning fan and chilled water valve energy-saving optimization control system according to claim 1 is characterized in that: The chilled water valve opening controller (2) controls the chilled water valve (1) to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the working area, and the fan inverter (4) controls the fan (3) to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal. The specific implementation is as follows: At the initial moment, the PID module (6) is set according to the initial average temperature T of the working area. z0,t0 and the average temperature setting value T z0,set Calculate the initial output value U of the chilled water valve opening out,t0 The chilled water valve opening controller (2) outputs the initial value U of the chilled water valve opening according to the out,t0 Controlling the chilled water valve (1) to adjust its opening; At this moment, according to the preset sampling time interval H s Sample the temperature of the working area and calculate the current time t c Average temperature of the working area T z0,tc ; When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc >T z0,set +△T, if the duration of both is greater than the set time t1, it is determined that the opening of the chilled water valve has reached the maximum value, and the real-time output value of the fan frequency F is fixed out,tc =F out,t0 +b, and enter the next sampling cycle control; When the opening feedback signal U is detected in real time mid k up -a, and the duration is greater than the set time t2, then maintain the current fan frequency output value F out,tc =F out,t0 No change, and enter the next sampling cycle control; When the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, then adjust the fan frequency output value F out,tc =F out,t0 -c, and enter the next sampling cycle control; When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc <T z0,set +△T, the duration of both is greater than the set time t4, then according to the real-time detection of the opening feedback signal U k Control the chilled water valve (1) to reduce its opening degree while maintaining the fan frequency output value F out No change, and enter the next sampling cycle control; Wherein, a is the preset opening tolerance value, b is the preset frequency step increase value, c is the preset frequency step decrease value, and △T is the temperature tolerance value.
3. The terminal air conditioning fan and chilled water valve energy-saving optimization control system according to claim 2 is characterized in that: The chilled water valve opening controller (2) controls the chilled water valve (1) to dynamically adjust its opening according to the opening feedback signal and the average temperature feedback of the working area, and the fan inverter (4) controls the fan (3) to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal feedback, and further comprises: When the freezing water valve opening output value U out,tc >=U up , it is determined that the chilled water valve opening has reached the maximum value U up , fix the freezing water valve opening output value U out,tc =U up , when the freezing water valve opening output value U out,tc <=U down , it is determined that the opening of the chilled water valve has reached the minimum value U down , fix the freezing water valve opening output value U out,tc =U down ; When the fan frequency output signal F out,tc >=F up , it is considered that the fan frequency has reached the maximum value, and the fan frequency signal F is output. out,tc =F up , when the fan frequency output signal F out,tc <=F down , it is considered that the fan frequency has reached the minimum value, and the fan frequency signal F is output. out,tc =F down .
4. A method for optimizing energy saving and control of terminal air conditioning fans and chilled water valves, characterized in that: The steps include: Real-time detection of the average temperature in the corresponding working area; Calculate the output value of the opening degree of the chilled water valve according to the average temperature of the working area and the average temperature setting value; The chilled water valve opening controller (2) detects the opening feedback signal of the chilled water valve (1) in real time, and controls the chilled water valve (1) to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value determined by the average temperature of the working area; The fan frequency converter (4) detects the frequency feedback signal of the fan (3) in real time, and controls the fan (3) to dynamically adjust its operating frequency according to the frequency feedback signal, the opening feedback signal and the average temperature of the working area.
5. The energy-saving optimization control method for terminal air-conditioning fans and chilled water valves according to claim 4 is characterized in that: The chilled water valve opening controller (2) controls the chilled water valve (1) to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the working area, and the fan inverter (4) controls the fan (3) to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal, specifically comprising the following steps: At the initial moment, the PID module (6) is set according to the initial average temperature T of the working area. z0,t0 and the average temperature setting value T z0,set Calculate the initial output value U of the chilled water valve opening out,t0 The chilled water valve opening controller (2) outputs the initial value U of the chilled water valve opening according to the out,t0 Controlling the chilled water valve (1) to adjust its opening; At this moment, according to the preset sampling time interval H s Sample the temperature of the working area and calculate the current time t c Average temperature of the working area T z0,tc ; When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc >T z0,set +△T, if the duration of both is greater than the set time t1, it is determined that the opening of the chilled water valve has reached the maximum value, and the real-time output value of the fan frequency F is fixed out,tc =F out,t0 +b, and enter the next sampling cycle control; When the opening feedback signal U is detected in real time mid k up -a, and the duration is greater than the set time t2, then maintain the current fan frequency output value F out,tc =F out,t0 No change, and enter the next sampling cycle control; When the real-time detected chilled water valve opening feedback signal U k <=U mid , and the duration is greater than the set time t3, then adjust the fan frequency output value F out,tc =F out,t0 -c, and enter the next sampling cycle control; When the opening feedback signal U is detected in real time k >=U up -a, and the current average temperature T of the working area z0,tc <T z0,set +△T, the duration of both is greater than the set time t4, then according to the real-time detection of the opening feedback signal U k Control the chilled water valve (1) to reduce its opening degree while maintaining the fan frequency output value F out No change, and enter the next sampling cycle control; In other cases, the opening feedback signal U detected in real time is k Dynamically controlling the opening of the chilled water valve (1) using a chilled water valve opening output value determined by an average temperature of the working area; Wherein, a is the preset opening tolerance value, b is the preset frequency step increase value, c is the preset frequency step decrease value, and △T is the temperature tolerance value.
6. The energy-saving optimization control method for the terminal air-conditioning fan and the chilled water valve according to claim 5 is characterized in that: The chilled water valve opening controller (2) controls the chilled water valve (1) to dynamically adjust its opening according to the opening feedback signal and the chilled water valve opening output value feedback determined by the average temperature of the working area, and the fan inverter (4) controls the fan (3) to dynamically adjust its operating frequency according to the frequency feedback signal and the opening feedback signal, and further comprises the following steps: When the freezing water valve opening output value U out,tc >=U up , it is determined that the chilled water valve opening has reached the maximum value U up , fix the freezing water valve opening output value U out,tc =U up , when the freezing water valve opening output value U out,tc <=U down , it is determined that the opening of the chilled water valve has reached the minimum value U down , fix the freezing water valve opening output value U out,tc =U down ; When the fan frequency output signal F out,tc >=F up , it is considered that the fan frequency has reached the maximum value, and the fan frequency signal F is output. out,tc =F up , when the fan frequency output signal F out,tc <=F down , it is considered that the fan frequency has reached the minimum value, and the fan frequency signal F is output. out,tc =F down .
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the energy-saving optimization control method for a terminal air-conditioning fan and a chilled water valve according to any one of claims 4 to 6 when executed.
8. A terminal air conditioning fan and chilled water valve energy-saving optimization control device, characterized in that: The terminal air conditioning fan and chilled water valve energy-saving optimization control equipment includes: at least one processor and a storage medium, the storage medium being communicatively connected to the processor; Wherein, the storage medium stores a computer program that can be executed by at least one of the processors, and the computer program is executed by the at least one processor so that the at least one processor can execute the energy-saving optimization control method for the terminal air-conditioning fan and chilled water valve according to any one of claims 4-6.
Citation Information
Patent Citations
Control device and control method for integral centralized air processing system
CN103335363A
Air conditioning load prediction method based on indoor average temperature
CN104729024A
Chilled water precision air conditioner and energy-conservation control method thereof
CN104748326A
Air conditioner temperature and humidity decoupling system and control method thereof
CN107588514A
Energy-saving optimization control system and method for end equipment of central air conditioning system