Task heuristic planet vehicle flight program design method
Through the mission heuristic design method, the planetary rover mission is divided into multiple modules and energy constraints are introduced, which solves the flexibility of the planetary rover's on-orbit flight program design and the complex energy balance analysis problems, and achieves rapid development under multiple constraints. Responsive and efficient design.
Patent Information
- Application Number
- CN202410911441.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-09
AI Technical Summary
Existing technology cannot effectively solve the problems of poor flexibility, long design time, long verification time and complex energy balance analysis of planetary vehicle on-orbit flight program design, especially the problem of inability to respond quickly under multiple constraints.
The mission-inspired planetary rover flight program design method is used to divide the planetary rover mission into a mobile module, a sensing module, a detection module and a standby charging module. The design is based on the target task and target point, and energy constraints are introduced to ensure energy balance. Through the module Combined and time-dependent energy consumption analysis generates flight procedures.
It achieves rapid generation and accurate response flight program design under multiple constraints, improves the flexibility and energy balance analysis efficiency of the planetary vehicle's on-orbit mission, and ensures the rapid response capability of the mission.
Smart Images

Figure CN118759946A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of deep space exploration flight control, and more specifically to a mission-inspired rover flight program design method. Background Art
[0002] In the field of deep space exploration, the on-orbit tasks of planetary rovers are mostly carried out around the configured scientific payloads, using their rich patrol and survey capabilities to conduct multi-target, long-distance, and multi-path comprehensive detection. The main application scenarios and on-orbit tasks include movement, perception, detection, data downlink, standby charging, etc.
[0003] Currently, the design of rover flight programs completely relies on ground designers to arrange them one by one, and the design of constraint relationships between tasks completely relies on the flight control personnel's mastery of complex systems. Ground flight control personnel have a heavy workload, a long program design time, and great difficulty in flight control implementation. In addition, the flight program has poor flexibility. When dealing with the rover's unique detection time and location adjustments, a lot of design time and verification time are required, which is not conducive to rapid response to on-orbit missions.
[0004] Faced with this problem, patent CN201810890347.6 "Flight Program Design Method for On-orbit Propellant Replenishment of Spacecraft" designed a flight program execution sequence to cope with the propellant replenishment process. It can cope with changes in tank type and quantity and complete the flight program design, but it is oriented to a single task object (can only cope with propellant replenishment tasks) and cannot cope with the entire on-orbit workflow of the probe, especially it cannot analyze the energy balance of the entire device under energy constraints.
[0005] In addition, some scholars have proposed the use of the concept of modules to combine modules for different tasks, but it is limited to simple combinations under single constraints. There is no literature or patent that clearly defines the module combination method for complex on-orbit tasks, especially for planetary rover patrol and exploration missions. This work still relies on professionals with considerable flight program design experience and planetary rover technology foundation. At the same time, under the traditional state, after the flight program is completed, the energy balance analysis of the whole device will be carried out by professionals alone. The calculation time and iteration cycle are relatively long, which is not conducive to the rapid response of the task.
[0006] Therefore, the current rover flight program design has the following problems:
[0007] (1) In the field of engineering applications, there is no clear academic literature or patent research on the methods and principles for decomposing the on-orbit functional modules of the planetary rover;
[0008] (2) For multi-constraint target tasks such as time, location, and energy, there is a lack of a flight program design method that can combine rover modules and respond quickly. Summary of the invention
[0009] In view of this, the present invention provides a mission-inspired rover flight program design method to solve the technical problems of rover functional module decomposition, module combination for multi-constrained tasks and energy balance calculation of the whole device.
[0010] In order to achieve the above object, the present invention adopts the following technical solution:
[0011] A mission-inspired rover flight program design method comprises the following steps:
[0012] Based on the principle of covering the single mission of the rover on orbit and effective connection between modules, the rover mission is divided into mobile module, perception module, detection module and standby charging module;
[0013] Under the constraints of the target point position, target task and the longest allowed task time, a flight procedure design based on "target task-target point" is carried out to obtain a preliminary flight procedure design;
[0014] Based on the principle of meeting the energy balance of the planetary rover, energy constraints are introduced, the preliminary flight program design is updated, and the final flight program design is obtained.
[0015] Furthermore, the mobile module refers to the planetary rover completing the position and attitude change through the navigation control system and the mobile system, and its input conditions include the starting point d i and end point d i+1 , the moving time T is calculated by the specified moving average speed ν yd i =(d i+1 -d i ) / ν, and calculate the time-dependent energy consumption E yd i =α×T yd i ; Considering the energy status, an upper limit value S is set for a single movement of the planetary car.
[0016] Furthermore, the perception module refers to the planetary rover completing the perception measurement of the surrounding environment through the camera and other sensors it carries. The perception module is a fixed process, and the time required is a certain value T gz , the required energy consumption is determined by the value E gz .
[0017] Furthermore, the detection module refers to the planetary rover using the scientific equipment on board to complete the specified detection task. For the specified task, the planetary rover executes the specified process and the time required is the determined value T. tc i , the required energy consumption is determined by the value E tc i .
[0018] Furthermore, the standby charging module refers to the rover using its solar panels to complete the charging task in a static state, and does not perform other tasks while performing the charging task. Its input conditions include the current battery power Q i and target power Q i+1 , the charging time T is calculated from the specified average charging rate p cd i =(Q i+1 -Q i ) / p, or given charging time T cd i , calculate the power Q i+1 =Q i +p×T cd i .
[0019] Furthermore, the flight procedure design process based on "target mission-target point" includes:
[0020] Input the target point location, target task and the maximum allowed task time;
[0021] According to the final detection task M tc i , complete the terminal state task heuristic, that is, the specified final detection task is arranged in the last position for operation
[0022] According to the initial position d0 of the rover and the final target position d end , calculate the required number of moves num, and calculate the heuristic order of the mobile tasks, including M yd 1 , M yd 2 , ..., M yd num ; The moving distance of the first num-1 moving tasks is S, and the moving time of each moving task is T yd 1~(num-1) =S / ν; the movement time of the last moving task is T yd num =(d end -d0-(num-1)×S) / ν;
[0023] Based on the mobile mission inspiration design, the flight program is designed as follows:
[0024] {M yd 1 , M yd 2 ,…,M yd num , Mtc i}
[0025] After the rover moves to the target point, the routine task is to carry out an environmental perception task and then a detection task, and update the flight program to: yd 1 , M yd 2 ,…,M yd num , M gz ,M tc i}, as a preliminary flight procedure design.
[0026] Furthermore, after completing the flight procedure design based on "target task-target point", the total time of the current work task is calculated as:
[0027] Time = (num-1) × T yd 1~num-1 +T yd num +T gz+ T tc
[0028] Among them, T gz The time required to carry out the environmental perception task, T tc The time required to carry out the exploration mission;
[0029] Calculate the total energy consumption of the current task as:
[0030] Energy = α × (num-1) × T yd 1~num-1 +α×T yd num +E gz +E tc i
[0031] Among them, α is the energy consumption per unit time of the mobile task; E gz The energy consumption required to carry out environmental perception tasks; E tc i The energy consumption required to carry out the detection mission.
[0032] Furthermore, the energy constraints are added to the flight program design based on the principle of meeting the energy balance of the planetary rover, including:
[0033] Traverse the task sequence in the preliminary flight program design. If the power of the rover is lower than the set threshold Q after performing a certain task, limit , then insert the standby charging module before executing the task;
[0034] When the rover battery reaches full charge Q full After that, continue to traverse the task sequence after the current standby charging module, and insert the standby charging module as needed, update the task sequence in the preliminary flight procedure design and update the total task time Time;
[0035] Determine whether the total task time Time is less than the maximum task allowed time T max , if Time<T max , then the final flight procedure design result is output;
[0036] If Time>T max , then the power threshold Q limit Reduce Δ and repeat the energy balance analysis; if the energy balance and mission duration constraints still cannot be met, continue to reduce the power threshold by Δ until the energy balance and mission duration constraints are met, and output the final flight procedure design result;
[0037] If the power threshold is reduced to the hard limit threshold Q alert If the rover fails, it means that the current rover status cannot meet the mission requirements within the maximum allowed time, and the flight program design has no solution.
[0038] Furthermore, the charging time of the inserted standby charging module is T cd i =(Q full -Q i ) / p, where Q full The battery is fully charged, Q i is the current battery power, p is the average charging rate;
[0039] After inserting the standby charging module as needed in the preliminary flight program design, the total mission time is updated to: Time = (num-1) × T yd 1~num-1 +T yd num +T gz +T tc +Σ i T cd i .
[0040] It can be seen from the above technical solutions that, compared with the prior art, the present invention has the following beneficial effects:
[0041] The present invention decomposes the rover's functional modules based on the rover's working characteristics and mission features, laying the foundation for task-heuristic module combination; based on the task-heuristic strategy of the "target task-target point" dual calibration method, the functional modules of movement, perception, detection, and standby charging are combined under multiple constraints such as task, time, and position, to complete the rapid generation and accurate response of on-orbit mission flight programs; at the same time, through the time correlation coefficient between the module and the power consumption, energy constraints are introduced while the flight program is completed, thereby solving the problem of accurate analysis and efficient response of energy balance analysis of the flight program. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0043] Figure 1 The overall framework diagram of the mission-inspired rover flight program design method provided by the present invention;
[0044] Figure 2 A flow chart of the flight procedure design provided by the present invention;
[0045] Figure 3 This is an example diagram of the rover power simulation in the flight program design provided by the present invention. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] like Figure 1 As shown, an embodiment of the present invention discloses a mission-inspired rover flight program design method, comprising the following steps:
[0048] S1. Based on the principle of covering the single mission of the rover on orbit and effective connection between modules, the rover mission is divided into mobile module, perception module, detection module and standby charging module;
[0049] S2. Under the constraints of the target point position, target task and the longest allowed task time, a flight procedure design based on "target task-target point" is performed to obtain a preliminary flight procedure design;
[0050] S3. Based on the principle of meeting the energy balance of the planetary rover, energy constraints are introduced, and the preliminary flight program design is updated to obtain the final flight program design.
[0051] The above steps are further explained below.
[0052] S1. Planetary car functional module decomposition:
[0053] The functional module decomposition of the rover is carried out based on the principle of covering the single task of the rover on orbit and the effective connection between modules. The rover's on-orbit tasks are mostly to move to the designated target point through mobile tasks and complete the fixed-point tasks through environmental perception methods or scientific detection methods; during the movement or detection process, if the energy of the whole device is lower than the set threshold, the rover needs to stop the mission for charging.
[0054] Based on the above functional module decomposition principles and task requirement analysis, the rover functional modules (task-level actions) mainly include:
[0055] 1) Mobile module: refers to the rover that completes position and attitude changes through the navigation control system and mobile system. Its input conditions include the starting point d i and end point d i+1 , the moving time T is calculated by the specified moving average speed ν (usually a fixed value) yd i =(d i+1 -d i ) / ν, and calculate the time-dependent energy consumption E yd i =α×T yd i (a linear function related to time); considering the energy status, an upper limit value S is set for a single movement of the planetary car.
[0056] 2) Perception module: refers to the planetary rover using its own camera and other sensors to complete the perception measurement of the surrounding environment. The perception module is a fixed process and the time required is a fixed value T gz , the required energy consumption is determined by the value E gz .
[0057] 3) Detection module: refers to the planetary rover using the scientific equipment on board to complete the specified detection mission. For the specified mission, the planetary rover executes the specified process and the time required is a certain value T. tc i , the required energy consumption is determined by the value E tc i .
[0058] 4) Standby charging module: refers to the rover using its solar panels to complete the charging task in a static state, and does not perform other tasks while performing the charging task. Its input conditions include the current battery power Q i and target power Q i+1 , the charging time T is calculated from the specified average charging rate p (usually a fixed value) cd i =(Q i+1 -Q i ) / p, or given charging time T cd i , calculate the power Q i+1 =Q i +p×T cd i (a linear function of time).
[0059] All of the above functional modules have independent execution capabilities, no parallel motion relationship, and can be freely combined according to mission requirements. Each module can effectively respond to the mission requirements of the planetary rover and has the dual attributes of "running time" and "consumption function".
[0060] S2. The on-orbit mission of the planetary rover can ensure the safety of the entire device under the premise of ensuring energy security. Therefore, the planetary rover flight program takes obtaining a feasible solution for mission execution as the basic principle, with in-situ tasks (standby charging module, perception module and detection module) and path tasks (mobile module) as nodes.
[0061] The final target position on orbit is specified by ground teleoperation or other ground methods. end , detection task form and maximum task time constraint information T max , began to carry out task heuristic flight program design based on the "target task-target point" dual calibration method, such as Figure 2 As shown, specifically including:
[0062] Data input: input the target point location, target task and the maximum allowed task time;
[0063] Terminal state task heuristic design: According to the final detection task M tc i , complete the terminal state task heuristic, that is, the specified final detection task is arranged in the last position for operation
[0064] Mobile mission inspiration design: According to the initial position d0 of the rover (maintained autonomously by the navigation control system) and the final target position d end , calculate the required number of moves num:
[0065] num=(d end-d0) / S
[0066] Among them, num is rounded up.
[0067] The mobile task heuristic ranking is calculated, including M yd 1 , M yd 2 , ..., M yd num ; The moving distance of the first num-1 moving tasks is S, and the moving time of each moving task is T yd 1~(num-1) =S / ν; the movement time of the last moving task is T yd num =(d end -d0-(num-1)×S) / ν;
[0068] Based on the mobile mission inspiration design, the flight program is designed as follows:
[0069] {M yd 1 , M yd 2 ,…,M yd num , M tc i}
[0070] After the rover moves to the target point, the routine task is to carry out an environmental perception task and then a detection task, and update the flight program to: yd 1 , M yd 2 ,…,M yd num , M gz ,M tc i}, as a preliminary flight procedure design.
[0071] After completing the flight procedure design based on "target task-target point", the total time of the current task is calculated as:
[0072] Time = (num-1) × T yd 1~num-1 +T yd num +T gz+ T tc
[0073] Among them, T gz The time required to carry out the environmental perception task, T tc The time required to carry out the exploration mission;
[0074] Calculate the total energy consumption of the current task as:
[0075] Energy = α × (num-1) × T yd 1~num-1 +α×T yd num +E gz +E tc i
[0076] Among them, α is the energy consumption per unit time of the mobile task; E gz The energy consumption required to carry out environmental perception tasks; E tc i The energy consumption required to carry out the detection mission.
[0077] S3. Energy balance analysis: The flight program determined by the above heuristic workflow is generated based on the given target point location and target mission, so it meets the target point location and target mission constraints. However, during the actual on-orbit operation, the planetary rover also needs to meet the energy constraint, that is, the energy consumption of the planetary rover at any time cannot be lower than the set threshold Q limit , including:
[0078] Traverse the task sequence in the preliminary flight program design. If the power of the rover is lower than the set threshold Q after performing a certain task, limit , it is considered that the power before executing the task exceeds the soft limit. At this time, the task needs to be split and the standby charging module needs to be inserted before executing the task.
[0079] After that, determine whether the planet car battery has reached full charge Q full When the rover battery reaches full charge Q full After that, continue to traverse the task sequence after inserting the current standby charging module, and insert the standby charging module as needed. The charging time of the inserted standby charging module is T cd i =(Q full -Q i ) / p, where Q full The battery is fully charged, Q i is the current battery charge, and p is the average charging rate.
[0080] Update the task sequence in the preliminary flight procedure design and update the total task time Time to: Time = (num-1) × T yd 1~num-1 +T yd num +T gz +T tc +Σ i Tcd i .
[0081] Determine whether the total task time Time is less than the maximum task allowed time T max , if Time<T max , then the final flight procedure design result is output;
[0082] If Time>T max , then the power threshold Q limit If Δ is reduced, the task sequence in the preliminary flight program design is re-traversed and the energy balance analysis process is repeated; if the energy balance and task duration constraints are still not met, the power threshold is further reduced by Δ until the energy balance and task duration constraints are met, and the final flight program design result is output;
[0083] If the power threshold is reduced to the hard limit threshold Q alert After that, it means that the current rover state cannot meet the mission requirements within the maximum allowed time, the flight program design has no solution, and the output is that no solution can be found within the current maximum allowed time.
[0084] The rover flight program completed according to the above mission inspiration steps can meet the target point constraints, final detection mission constraints, mission duration constraints, and the energy balance of the rover. For this workflow, the completed flight program power simulation example is as follows: Figure 2 shown.
[0085] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0086] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A mission-inspired rover flight program design method, characterized in that: The following steps are involved: Based on the principle of covering the single mission of the rover on orbit and effective connection between modules, the rover mission is divided into mobile module, perception module, detection module and standby charging module; Under the constraints of the target point location, target task and the longest allowed task time, the flight procedure design based on "target task-target point" is carried out to obtain a preliminary flight procedure design; Based on the principle of meeting the energy balance of the planetary rover, energy constraints are introduced, the preliminary flight program design is updated, and the final flight program design is obtained.
2. The mission-inspired rover flight program design method according to claim 1, characterized in that: The mobile module refers to the planetary rover completing the position and attitude change through the navigation control system and the mobile system. Its input conditions include the starting point d i and end point d i+1 , the moving time T is calculated by the specified moving average speed ν yd i =(d i+1 -d i ) / ν, and calculate the time-dependent energy consumption E yd i =α×T yd i ; Considering the energy status, an upper limit value S is set for a single movement of the planetary car.
3. The mission-inspired rover flight program design method according to claim 1, characterized in that: The perception module refers to the planetary rover using its own camera and other sensors to complete the perception measurement of the surrounding environment. The perception module is a fixed process, and the time required is a fixed value T gz , the required energy consumption is determined by the value E gz .
4. The mission-inspired rover flight program design method according to claim 1, characterized in that: The detection module refers to the planetary rover using the scientific equipment on board to complete the specified detection mission. For the specified mission, the planetary rover executes the specified process and the time required is a certain value T. tc i , the required energy consumption is determined by the value E tc i .
5. The mission-inspired rover flight program design method according to claim 1, characterized in that: The standby charging module refers to the rover using its solar panels to complete the charging task in a static state, and does not perform other tasks while performing the charging task. Its input conditions include the current battery power Q i and target power Q i+1 , the charging time T is calculated from the specified average charging rate p cd i =(Q i+1 -Q i ) / p, or given charging time T cd i , calculate the power Q i+1 =Q i +p×T cd i .
6. The mission-inspired rover flight program design method according to claim 1, characterized in that: The flight procedure design process based on "target mission-target point" includes: Input the target point location, target task and the maximum allowed task time; According to the final detection task M tc i , complete the terminal state task heuristic, that is, the specified final detection task is arranged in the last position for operation According to the initial position d0 of the rover and the final target position d end , calculate the required number of moves num, and calculate the heuristic order of the mobile tasks, including M yd 1 , M yd 2 , ..., M yd num ; The moving distance of the first num-1 moving tasks is S, and the moving time of each moving task is T yd 1~(num-1) =S / ν; the movement time of the last moving task is T yd num =(d end -d0-(num-1)×S) / ν; Based on the mobile mission inspiration design, the flight program is designed as follows: {M yd 1 ,M yd 2 ,…,M yd num ,M tc i } After the rover moves to the target point, the routine task is to carry out an environmental perception task and then a detection task, and update the flight program to: yd 1 , M yd 2 ,…,M yd num , M gz ,M tc i }, as a preliminary flight procedure design.
7. The mission-inspired rover flight program design method according to claim 6, characterized in that: After completing the flight procedure design based on "target task-target point", the total time of the current task is calculated as: Time=(num-1)×T yd 1~num-1 +T yd num +T gz+ T tc Among them, T gz The time required to carry out the environmental perception task, T tc The time required to carry out the exploration mission; Calculate the total energy consumption of the current task as: Energy=α×(num-1)×T yd 1~num-1 +α×T yd num +E gz +E tc i Among them, α is the energy consumption per unit time of the mobile task; E gz The energy consumption required to carry out environmental perception tasks; E tc i The energy consumption required to carry out the detection mission.
8. The mission-inspired rover flight program design method according to claim 7, characterized in that: The energy constraints are added to the flight program design based on the principle of meeting the energy balance of the planetary rover, including: Traverse the task sequence in the preliminary flight program design. If the power of the rover is lower than the set threshold Q after performing a task, limit , then insert the standby charging module before executing the task; When the rover battery reaches full charge Q full After that, continue to traverse the task sequence after the current standby charging module, and insert the standby charging module as needed, update the task sequence in the preliminary flight procedure design and update the total task time Time; Determine whether the total task time Time is less than the maximum task allowed time T max , if Time<T max , then the final flight procedure design result is output; If Time>T max , then the power threshold Q limit Reduce Δ and repeat the energy balance analysis; if the energy balance and mission duration constraints still cannot be met, continue to reduce the power threshold by Δ until the energy balance and mission duration constraints are met, and output the final flight procedure design result; If the power threshold is reduced to the hard limit threshold Q alert If the rover fails, it means that the current rover status cannot meet the mission requirements within the maximum allowed time, and the flight program design has no solution.
9. The mission-inspired rover flight program design method according to claim 8, characterized in that: The charging time of the inserted standby charging module is T cd i =(Q full -Q i ) / p, where Q full The battery is fully charged, Q i is the current battery power, p is the average charging rate; After inserting the standby charging module as needed in the preliminary flight program design, the total mission time is updated to: Time = (num-1) × T yd 1~num-1 +T yd num +T gz +T tc +Σ i T cd i .
Citation Information
Patent Citations
Aerospace vehicle flight time sequence and energy balance coupling design system and method
CN107862145A
Imaging satellite energy constraint checking method based on a dynamic energy balance period
CN109992838A
Multi-celestial-body flyover detection orbit design method
CN113536536A
Planning method and system for lunar surface inspection and detection task
CN114111761A
Planet vehicle autonomous navigation method considering ground physical characteristics
CN116088525A
